41
Dr Jon Gosling Strategies for Engineertoorder Supply Chains: Lessons from Manufacturing and Construction Prof Mo Naim

Upload: others

Post on 17-Sep-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: New for Engineer to order Supply Chains: Lessons from … · 2014. 11. 17. · ETO References Used • Gosling, Jonathan, and Mohamed M. Naim. "Engineer‐to‐order supply chain

Dr Jon Gosling

Strategies for Engineer‐to‐order Supply Chains: Lessons from 

Manufacturing and Construction

Prof Mo Naim

Page 2: New for Engineer to order Supply Chains: Lessons from … · 2014. 11. 17. · ETO References Used • Gosling, Jonathan, and Mohamed M. Naim. "Engineer‐to‐order supply chain
Page 3: New for Engineer to order Supply Chains: Lessons from … · 2014. 11. 17. · ETO References Used • Gosling, Jonathan, and Mohamed M. Naim. "Engineer‐to‐order supply chain

• Ranked 4th in the UK in the last Research Assessment

• 2600 students each year, 130 faculty staff, total 300

Page 4: New for Engineer to order Supply Chains: Lessons from … · 2014. 11. 17. · ETO References Used • Gosling, Jonathan, and Mohamed M. Naim. "Engineer‐to‐order supply chain

Logistics Systems Dynamics Group

Page 5: New for Engineer to order Supply Chains: Lessons from … · 2014. 11. 17. · ETO References Used • Gosling, Jonathan, and Mohamed M. Naim. "Engineer‐to‐order supply chain

Construction as a manufacturing process (?)

Page 6: New for Engineer to order Supply Chains: Lessons from … · 2014. 11. 17. · ETO References Used • Gosling, Jonathan, and Mohamed M. Naim. "Engineer‐to‐order supply chain

AuthorisedDealers

DistributionCentres

FinalAssembly

10,00010

100's

HardfileVendors

(Far East)

JapanSub-Assembly

Plant

EuropeSub-Assembly

Plant

EuropeComponents

Plant

EuropeComponents

Plant

EuropeComponents

Plant

EuropeComponents

Plant

Europe Sub-Assembly

Plant

5

PCBVendors(Europe)

ComponentsVendors(Global)

1000's

Vendor Base (Global)

4

COMPONENTS ECHELON SUB-ASSEMBLYECHELON

FINISHED GOODSASSEMBLYECHELON

DISTRIBUTIONECHELON

RETAILERECHELON

END-USERS

1 WEEK1 WEEK2 WEEKS

16 WEEKS12 WEEKS

= Company Unit

= Non-Company Unit

= Material FlowNo. of Units

Personal Computer global supply chain

(Berry & Naim, 1996)

Page 7: New for Engineer to order Supply Chains: Lessons from … · 2014. 11. 17. · ETO References Used • Gosling, Jonathan, and Mohamed M. Naim. "Engineer‐to‐order supply chain

Quality x Service

Cost x Lead Time

Meeting Customer RequirementsFitness for UseProcess IntegrityMinimum VariancesElimination of WasteContinuous Improvement

Customer SupportProduct ServiceProduct SupportFlexibility to Meet Customer DemandsFlexibility to Meet Market Changes

Time to Market -Concept to Delivery -Order Entry to DeliveryResponse to Market ForcesLead Time -Design, Conversion, Eng., Delivery

MaterialsInventory

Design and EngineeringConversionQuality AssuranceDistributionAdministrationInventoryMaterials

=

Supply Chain Focus on Total Customer Value

(Johansson et al., 1990)

Page 8: New for Engineer to order Supply Chains: Lessons from … · 2014. 11. 17. · ETO References Used • Gosling, Jonathan, and Mohamed M. Naim. "Engineer‐to‐order supply chain

Some definitions

• Agility means using market knowledge and a virtual corporation to exploit profitable opportunities in a volatile market place.

• Leanness means developing a value stream to eliminate waste, including time, and to ensure a level schedule

• A supply chain is a system whose constituent parts include material suppliers, production facilities, distribution services and customers linked together via a feedforward flow of materials, a feedback flow of information and flows of cash and resources

• The decoupling point separates the part of the supply chain oriented towards customer orders from the part of the supply chain based on planning

(Naylor, Naim and Berry, 1999)

Page 9: New for Engineer to order Supply Chains: Lessons from … · 2014. 11. 17. · ETO References Used • Gosling, Jonathan, and Mohamed M. Naim. "Engineer‐to‐order supply chain

Pull Buy to order

Pull Make to Stock

Pull Assemble to order

Pull Make to order

Pull Ship to stock

Raw MaterialSupplier

Manufacturers/Assemblers Retailer End-Users

MATERIAL MATERIAL MATERIAL

A Stockholding Decoupling Point

Supply Chain Strategies

(Hoekstra & Romme, 1992)

Page 10: New for Engineer to order Supply Chains: Lessons from … · 2014. 11. 17. · ETO References Used • Gosling, Jonathan, and Mohamed M. Naim. "Engineer‐to‐order supply chain

Flow Of Material

Push PlanPull Execution Pull

Num

ber

of

Mat

eria

l Flo

ws

Demand Downstream fromthe Decoupling Point

Demand Upstream fromthe Decoupling Point

Stock Levels atthe Decoupling Point

The Decoupling Point

Impact of the Supply Chain Decoupling Point

Agile responseLean supply

(Naylor, Naim and Berry, 1999)

Page 11: New for Engineer to order Supply Chains: Lessons from … · 2014. 11. 17. · ETO References Used • Gosling, Jonathan, and Mohamed M. Naim. "Engineer‐to‐order supply chain

The Role of Flexibility

(Purvis, Gosling and Naim, 2014)

Page 12: New for Engineer to order Supply Chains: Lessons from … · 2014. 11. 17. · ETO References Used • Gosling, Jonathan, and Mohamed M. Naim. "Engineer‐to‐order supply chain

Linking operations to marketing

Metric Agile Lean

Lead Time MQ MQ

Service OW MQ

Costs MQ OW

Quality MQ MQ

(Naylor, Naim and Berry, 1999)

Page 13: New for Engineer to order Supply Chains: Lessons from … · 2014. 11. 17. · ETO References Used • Gosling, Jonathan, and Mohamed M. Naim. "Engineer‐to‐order supply chain

Uncertainty reduction in a PC supply chain

0

1

2

3

4

5

Unc

erta

inty

at c

hip

com

pone

nts b

usin

ess

Pre-

1980

1980

- L

ean

1985

-IM

LS

&V

BI

1990

- T

BM

1995

-"L

eagi

lity"

Re-engineering phases

Traditional supply chainLean supply chainCo-ordinated production (CPFR)Front end integrationMass customisation -

lean & agile

(Berry & Naim, 1996)

Page 14: New for Engineer to order Supply Chains: Lessons from … · 2014. 11. 17. · ETO References Used • Gosling, Jonathan, and Mohamed M. Naim. "Engineer‐to‐order supply chain

HQ

Manufacturers A

Manufacturers B

Merchant

Manufacturers C

Do the job!

Regionalpurchaser

Sitemanager

Contractors

JITKitting

Consolidate kits

Buy longterm capacity

JITcall-offs

JIT delivery ofkits & contractors

A

B

C

Agile (pull execute)Lean (push plan / pull execute) DP

Salesassistant Customer

Optionslist

Customisedneeds

TOTAL VALUEDELIVERED

(Naim & Barlow, 2003)

Page 15: New for Engineer to order Supply Chains: Lessons from … · 2014. 11. 17. · ETO References Used • Gosling, Jonathan, and Mohamed M. Naim. "Engineer‐to‐order supply chain

Customisation vs. standardisation

(Lampel & Mintzberg, 1996)

Page 16: New for Engineer to order Supply Chains: Lessons from … · 2014. 11. 17. · ETO References Used • Gosling, Jonathan, and Mohamed M. Naim. "Engineer‐to‐order supply chain

House building supply chain strategies

(Barlow et al., 2003)

Page 17: New for Engineer to order Supply Chains: Lessons from … · 2014. 11. 17. · ETO References Used • Gosling, Jonathan, and Mohamed M. Naim. "Engineer‐to‐order supply chain

Strategy identification matrix

(Barlow et al., 2003)

Page 18: New for Engineer to order Supply Chains: Lessons from … · 2014. 11. 17. · ETO References Used • Gosling, Jonathan, and Mohamed M. Naim. "Engineer‐to‐order supply chain

Construction as a manufacturing process?

orManufacturing as a 

construction process?

Page 19: New for Engineer to order Supply Chains: Lessons from … · 2014. 11. 17. · ETO References Used • Gosling, Jonathan, and Mohamed M. Naim. "Engineer‐to‐order supply chain

Why we think ‘engineering‐to‐order’ is a useful term? 

Page 20: New for Engineer to order Supply Chains: Lessons from … · 2014. 11. 17. · ETO References Used • Gosling, Jonathan, and Mohamed M. Naim. "Engineer‐to‐order supply chain

CODP Basic Concept

Decoupling Point

• Logic of Aggregation

Typically Means

• Standard Work Processes / Products

• Resources Easy to Forecast

• Logic of the Specific

Typically Means

Adapted from Hoekstra and Romme (1990) and Christophe and Towill (2003) Naylor et al (1999) Lampel and Mintzberg 1(996)

• Variety in Work Processes / Products

• Flexible Resources May Be Required

Page 21: New for Engineer to order Supply Chains: Lessons from … · 2014. 11. 17. · ETO References Used • Gosling, Jonathan, and Mohamed M. Naim. "Engineer‐to‐order supply chain
Page 22: New for Engineer to order Supply Chains: Lessons from … · 2014. 11. 17. · ETO References Used • Gosling, Jonathan, and Mohamed M. Naim. "Engineer‐to‐order supply chain
Page 23: New for Engineer to order Supply Chains: Lessons from … · 2014. 11. 17. · ETO References Used • Gosling, Jonathan, and Mohamed M. Naim. "Engineer‐to‐order supply chain
Page 24: New for Engineer to order Supply Chains: Lessons from … · 2014. 11. 17. · ETO References Used • Gosling, Jonathan, and Mohamed M. Naim. "Engineer‐to‐order supply chain

A system with levels

Adapted from Gosling, Towill Naim and Dainty (2014) ‘Principles for the design and operation of engineer-to-order supply chains in the construction sector

Page 25: New for Engineer to order Supply Chains: Lessons from … · 2014. 11. 17. · ETO References Used • Gosling, Jonathan, and Mohamed M. Naim. "Engineer‐to‐order supply chain

ETO Project

Windows

(MTO)

Concrete

(MTO)

Lifts

(ATO)

Doors

(BTO)

Bricks

(MTS) Timber Frame

(MTO)

Roof System

(MTO) Metalwork

(BTO)

Bathrooms

(ATO)

Page 26: New for Engineer to order Supply Chains: Lessons from … · 2014. 11. 17. · ETO References Used • Gosling, Jonathan, and Mohamed M. Naim. "Engineer‐to‐order supply chain

Characterising Uncertainty and Risk from Project Team Perspective?

Gosling, Naim and Towill (2013) Identifying and Categorizing the Sources of Uncertainty in Construction Supply Chains

Page 27: New for Engineer to order Supply Chains: Lessons from … · 2014. 11. 17. · ETO References Used • Gosling, Jonathan, and Mohamed M. Naim. "Engineer‐to‐order supply chain

Typical Problems from a Manufacturer’s Perspective?

Adapted from Gosling, Towill Naim and Dainty (2014) ‘Principles for the design and operation of engineer-to-order supply chains in the construction sector

Page 28: New for Engineer to order Supply Chains: Lessons from … · 2014. 11. 17. · ETO References Used • Gosling, Jonathan, and Mohamed M. Naim. "Engineer‐to‐order supply chain

Are there sufficient similarities across ETO sectors? 

Do you recognize these challenges and problems?

Page 29: New for Engineer to order Supply Chains: Lessons from … · 2014. 11. 17. · ETO References Used • Gosling, Jonathan, and Mohamed M. Naim. "Engineer‐to‐order supply chain

Transfer of Best Practice

Adapted from Gosling, Towill Naim and Dainty (2014) ‘Principles for the design and operation of engineer-to-order supply chains in the construction sector

Page 30: New for Engineer to order Supply Chains: Lessons from … · 2014. 11. 17. · ETO References Used • Gosling, Jonathan, and Mohamed M. Naim. "Engineer‐to‐order supply chain

Adopting, adapting, and implementing improvement 

initiatives from MTS

Page 31: New for Engineer to order Supply Chains: Lessons from … · 2014. 11. 17. · ETO References Used • Gosling, Jonathan, and Mohamed M. Naim. "Engineer‐to‐order supply chain

How do these Principles apply to ETO?

Jay Forrester Jack Burbidge Denis Towill

Page 32: New for Engineer to order Supply Chains: Lessons from … · 2014. 11. 17. · ETO References Used • Gosling, Jonathan, and Mohamed M. Naim. "Engineer‐to‐order supply chain

RM Assembly NDC RDC RT

Individual Cycle Times

Time Compression Principle 

Information Transparency 

Adapted from Gosling et al 2014

Information Flow

Adapted from Gosling, Towill Naim and Dainty (2014) ‘Principles for the design and operation of engineer-to-order supply chains in the construction sector

Page 33: New for Engineer to order Supply Chains: Lessons from … · 2014. 11. 17. · ETO References Used • Gosling, Jonathan, and Mohamed M. Naim. "Engineer‐to‐order supply chain

RM Assembly NDC RDC RT

Echelon Elimination Principle

Control System Principle 

XXReduces Potential for Information

Distortion

Removes Cycle Times

Control System

Adapted from Gosling, Towill Naim and Dainty (2014) ‘Principles for the design and operation of engineer-to-order supply chains in the construction sector

Page 34: New for Engineer to order Supply Chains: Lessons from … · 2014. 11. 17. · ETO References Used • Gosling, Jonathan, and Mohamed M. Naim. "Engineer‐to‐order supply chain

RM Assembly NDC RDC RT

Synchronization PrincipleDecisions, information and orders are co‐ordinated and related to 

discrete points in time 

Adapted from Gosling et al 2014

Adapted from Gosling, Towill Naim and Dainty (2014) ‘Principles for the design and operation of engineer-to-order supply chains in the construction sector

Page 35: New for Engineer to order Supply Chains: Lessons from … · 2014. 11. 17. · ETO References Used • Gosling, Jonathan, and Mohamed M. Naim. "Engineer‐to‐order supply chain

Gosling, Naim and Towill (2012) ‘Learning how to eat and elephant’: implementing supply chain management principles’

Page 36: New for Engineer to order Supply Chains: Lessons from … · 2014. 11. 17. · ETO References Used • Gosling, Jonathan, and Mohamed M. Naim. "Engineer‐to‐order supply chain

Gosling, Naim and Towill (2012) ‘Learning how to eat and elephant’: implementing supply chain management principles’

Page 37: New for Engineer to order Supply Chains: Lessons from … · 2014. 11. 17. · ETO References Used • Gosling, Jonathan, and Mohamed M. Naim. "Engineer‐to‐order supply chain

Adapted from Gosling, Towill Naim and Dainty (2014) ‘Principles for the design and operation of engineer-to-order supply chains in the construction sector

Page 38: New for Engineer to order Supply Chains: Lessons from … · 2014. 11. 17. · ETO References Used • Gosling, Jonathan, and Mohamed M. Naim. "Engineer‐to‐order supply chain

We concluded that initiatives need appropriate ‘interpretation’ &

additional extras.

Page 39: New for Engineer to order Supply Chains: Lessons from … · 2014. 11. 17. · ETO References Used • Gosling, Jonathan, and Mohamed M. Naim. "Engineer‐to‐order supply chain

Closing thoughts

• ETO is an important model – maintain ETO identify while translating best practice initiatives

• Manufacturing as a construction process (?)– Shipbuilding, aerospace

• Sustainability and Resilience

• Complex adaptive systems

• Risk and Reward

Page 40: New for Engineer to order Supply Chains: Lessons from … · 2014. 11. 17. · ETO References Used • Gosling, Jonathan, and Mohamed M. Naim. "Engineer‐to‐order supply chain

ETO References Used• Gosling, Jonathan, and Mohamed M. Naim. "Engineer‐to‐order supply chain 

management: A literature review and research agenda." International Journal of Production Economics 122.2 (2009): 741‐754.

• Gosling, J., L. Purvis, and M. M. Naim. "Supply chain flexibility as a determinant of supplier selection." International Journal of Production Economics 128.1 (2010): 11‐21.

• Gosling, J., Naim, M. M., Fowler, N., & Fearne, A. (2007, July). MANUFACTURERS'PREPAREDNESS FOR AGILE CONSTRUCTION. In Agile Manufacturing, 2007. ICAM 2007. IET International Conference on (pp. 103‐110). IET.

• Gosling, J., Naim, M., & Towill, D. (2013). A supply chain flexibility framework for engineer‐to‐order systems. Production Planning & Control, 24(7), 552‐566.

• Gosling, Jonathan, et al. "Principles for the design and operation of engineer‐to‐order supply chains in the construction sector." Production Planning & Control ahead‐of‐print (2014): 1‐16.

• Gosling, J., Towill, D., & Naim, M. (2012). Learning how to eat an elephant: Implementing supply chain management principles. In Proceedings of 28th Annual ARCOM Conference (p. 28th).

Page 41: New for Engineer to order Supply Chains: Lessons from … · 2014. 11. 17. · ETO References Used • Gosling, Jonathan, and Mohamed M. Naim. "Engineer‐to‐order supply chain

Many thanks for listening