gec gec gec gec- - -co co co co Global Engineering & Global Engineering & Global Engineering & Global Engineering & Consulting Consulting Consulting Consulting New Drilling Technology New Drilling Technology New Drilling Technology New Drilling Technology Tallinn University of Technology 17.04.2009 Dipl.Ing., MBA Thorsten Weimann

Upload: gerd-tarand

Post on 05-Jul-2015

1.773 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: New Drilling Technology by Dipl.Ing., MBA Thorsten Weimann

gecgecgecgec----cocococoGlobal Engineering & Global Engineering & Global Engineering & Global Engineering & ConsultingConsultingConsultingConsulting

New Drilling TechnologyNew Drilling TechnologyNew Drilling TechnologyNew Drilling Technology

Tallinn University of Technology

17.04.2009

Dipl.Ing., MBA Thorsten Weimann

Page 2: New Drilling Technology by Dipl.Ing., MBA Thorsten Weimann

17/04/2009 2

gecgecgecgec----cocococoGlobal Engineering & Global Engineering & Global Engineering & Global Engineering & ConsultingConsultingConsultingConsulting

TopicsTopicsTopicsTopics

• Background

• Basics

• Modern Drilling Rig

• Top Drive Technology

• Directional Drilling

• Data Transmission

Page 3: New Drilling Technology by Dipl.Ing., MBA Thorsten Weimann

17/04/2009 3

gecgecgecgec----cocococoGlobal Engineering & Global Engineering & Global Engineering & Global Engineering & ConsultingConsultingConsultingConsulting

TopicsTopicsTopicsTopics

• Background

• Basics

• Modern Drilling Rig

• Top Drive Technology

• Directional Drilling

• Data Transmission

Page 4: New Drilling Technology by Dipl.Ing., MBA Thorsten Weimann

17/04/2009 4

gecgecgecgec----cocococoGlobal Engineering & Global Engineering & Global Engineering & Global Engineering & ConsultingConsultingConsultingConsulting

Professional Background Professional Background Professional Background Professional Background

Th.WeimannTh.WeimannTh.WeimannTh.Weimann

• 1994 – 2001 Bauer Spezialtiefbau GmbH– Different drilling technologies

– International project management

• 2001 – 2005 Herrenknecht AG– Horizontal directional drilling technology

– Foundation of Herrenknecht Vertical GmbH

• 2005 – 2007 Herrenknecht Vertical GmbH– Executive Director

– Manufacturer of drilling rigs

• Since 2007 gec-co GmbH– Owner and Executive Director

– Engineering, geothermal projects, R&D drilling technology

– Consulting, Due Diligence, business process optimizing

– Project Management, Geothermal Projects, Drilling projects

– Seven employees, all engineers and scientists

Mechanical Engineer, TU Munich 1993

MBA Master of Business Administration, Augsburg / Pittsburgh 2003

Page 5: New Drilling Technology by Dipl.Ing., MBA Thorsten Weimann

17/04/2009 5

gecgecgecgec----cocococoGlobal Engineering & Global Engineering & Global Engineering & Global Engineering & ConsultingConsultingConsultingConsulting

TopicsTopicsTopicsTopics

• Background

• Basics

• Modern Drilling Rig

• Top Drive Technology

• Directional Drilling

• Data Transmission

Page 6: New Drilling Technology by Dipl.Ing., MBA Thorsten Weimann

17/04/2009 6

gecgecgecgec----cocococoGlobal Engineering & Global Engineering & Global Engineering & Global Engineering & ConsultingConsultingConsultingConsulting

Drilling Rig Drilling Rig Drilling Rig Drilling Rig –––– Basic DesignBasic DesignBasic DesignBasic Design

Page 7: New Drilling Technology by Dipl.Ing., MBA Thorsten Weimann

17/04/2009 7

gecgecgecgec----cocococoGlobal Engineering & Global Engineering & Global Engineering & Global Engineering & ConsultingConsultingConsultingConsulting

Well design Well design Well design Well design ---- BasicBasicBasicBasic

Page 8: New Drilling Technology by Dipl.Ing., MBA Thorsten Weimann

17/04/2009 8

gecgecgecgec----cocococoGlobal Engineering & Global Engineering & Global Engineering & Global Engineering & ConsultingConsultingConsultingConsulting

Drill BitsDrill BitsDrill BitsDrill Bits

Page 9: New Drilling Technology by Dipl.Ing., MBA Thorsten Weimann

17/04/2009 9

gecgecgecgec----cocococoGlobal Engineering & Global Engineering & Global Engineering & Global Engineering & ConsultingConsultingConsultingConsulting

Innovation of drilling Innovation of drilling Innovation of drilling Innovation of drilling

TechnologyTechnologyTechnologyTechnology

© KCADeutag

Page 10: New Drilling Technology by Dipl.Ing., MBA Thorsten Weimann

17/04/2009 10

gecgecgecgec----cocococoGlobal Engineering & Global Engineering & Global Engineering & Global Engineering & ConsultingConsultingConsultingConsulting

TopicsTopicsTopicsTopics

• Background

• Basics

• Modern Drilling Rig

• Top Drive Technology

• Directional Drilling

• Data Transmission

Page 11: New Drilling Technology by Dipl.Ing., MBA Thorsten Weimann

17/04/2009 11

gecgecgecgec----cocococoGlobal Engineering & Global Engineering & Global Engineering & Global Engineering & ConsultingConsultingConsultingConsulting

Conventional RigConventional RigConventional RigConventional Rig

Page 12: New Drilling Technology by Dipl.Ing., MBA Thorsten Weimann

17/04/2009 12

gecgecgecgec----cocococoGlobal Engineering & Global Engineering & Global Engineering & Global Engineering & ConsultingConsultingConsultingConsulting

Drilling Rigs Drilling Rigs Drilling Rigs Drilling Rigs ---- ITAGITAGITAGITAG

© ITAG Tiefbohr GmbH

Page 13: New Drilling Technology by Dipl.Ing., MBA Thorsten Weimann

17/04/2009 13

gecgecgecgec----cocococoGlobal Engineering & Global Engineering & Global Engineering & Global Engineering & ConsultingConsultingConsultingConsulting

Drilling Drilling Drilling Drilling RigsRigsRigsRigs ––––

Herrenknecht Herrenknecht Herrenknecht Herrenknecht VerticalVerticalVerticalVertical

© Herrenknecht Vertical GmbH

Page 14: New Drilling Technology by Dipl.Ing., MBA Thorsten Weimann

17/04/2009 14

gecgecgecgec----cocococoGlobal Engineering & Global Engineering & Global Engineering & Global Engineering & ConsultingConsultingConsultingConsulting

Drilling Drilling Drilling Drilling RigRigRigRig ---- BentecBentecBentecBentec

© Bentec GmbH

Page 15: New Drilling Technology by Dipl.Ing., MBA Thorsten Weimann

17/04/2009 15

gecgecgecgec----cocococoGlobal Engineering & Global Engineering & Global Engineering & Global Engineering & ConsultingConsultingConsultingConsulting

Drilling Drilling Drilling Drilling RigsRigsRigsRigs ---- DrilltecDrilltecDrilltecDrilltec

© GFZ Potsdam

Page 16: New Drilling Technology by Dipl.Ing., MBA Thorsten Weimann

17/04/2009 16

gecgecgecgec----cocococoGlobal Engineering & Global Engineering & Global Engineering & Global Engineering & ConsultingConsultingConsultingConsulting

New Rig TechnologyNew Rig TechnologyNew Rig TechnologyNew Rig Technology

• Box on Box – Type– Integration of different aggregates in the substructure

• Electrical drives– Connection to the electric grid

– VFD controlled, AC-Technology

– PLC controlled

• Hydraulic driven Hoisting system– Hydraulic cylinder

– Drawworks

• Sound isolated– Wind walls

• Pipehandling– Horizontal pipehandling

• Interlock Systems

Page 17: New Drilling Technology by Dipl.Ing., MBA Thorsten Weimann

17/04/2009 17

gecgecgecgec----cocococoGlobal Engineering & Global Engineering & Global Engineering & Global Engineering & ConsultingConsultingConsultingConsulting

Drillers cabinDrillers cabinDrillers cabinDrillers cabin

© Herrenknecht Vertical GmbH

Page 18: New Drilling Technology by Dipl.Ing., MBA Thorsten Weimann

17/04/2009 18

gecgecgecgec----cocococoGlobal Engineering & Global Engineering & Global Engineering & Global Engineering & ConsultingConsultingConsultingConsulting

Drillers cabinDrillers cabinDrillers cabinDrillers cabin

© Herrenknecht Vertical GmbH

Page 19: New Drilling Technology by Dipl.Ing., MBA Thorsten Weimann

17/04/2009 19

gecgecgecgec----cocococoGlobal Engineering & Global Engineering & Global Engineering & Global Engineering & ConsultingConsultingConsultingConsulting

Drillers StandDrillers StandDrillers StandDrillers Stand

Page 20: New Drilling Technology by Dipl.Ing., MBA Thorsten Weimann

17/04/2009 20

gecgecgecgec----cocococoGlobal Engineering & Global Engineering & Global Engineering & Global Engineering & ConsultingConsultingConsultingConsulting

TopicsTopicsTopicsTopics

• Background

• Basics

• Modern Drilling Rig

• Top Drive Technology

• Directional Drilling

• Data Transmission

Page 21: New Drilling Technology by Dipl.Ing., MBA Thorsten Weimann

17/04/2009 21

gecgecgecgec----cocococoGlobal Engineering & Global Engineering & Global Engineering & Global Engineering & ConsultingConsultingConsultingConsulting

Top Drive TechnologyTop Drive TechnologyTop Drive TechnologyTop Drive Technology

Page 22: New Drilling Technology by Dipl.Ing., MBA Thorsten Weimann

17/04/2009 22

gecgecgecgec----cocococoGlobal Engineering & Global Engineering & Global Engineering & Global Engineering & ConsultingConsultingConsultingConsulting

Top Drive TechnologyTop Drive TechnologyTop Drive TechnologyTop Drive Technology

Elevator

IBOP

Remote controlled Kelly Valve

Bails

Gearbox

Hydraulic or electric motor

Hydraulic power pack

Make-up / break-out unit

© Tesco Corp.

Page 23: New Drilling Technology by Dipl.Ing., MBA Thorsten Weimann

17/04/2009 23

gecgecgecgec----cocococoGlobal Engineering & Global Engineering & Global Engineering & Global Engineering & ConsultingConsultingConsultingConsulting

Top DrivesTop DrivesTop DrivesTop Drives

+ Use of longer stands in the derrick (3 instead of 1 joint)

+ Quickly engage the pumps or the rotary while tripping pipe

+ Back reaming

+ Washing and reaming

+ Decease possibility of “stuck pipe”

+ Less joint connection has to made

+ Well control improvement

- Most frequently reason for

NPT

- Higher Dayrate

- Derrick capacity reduced

- Lack of experience of rig

crew

- More wear on drilling line

(?)

Page 24: New Drilling Technology by Dipl.Ing., MBA Thorsten Weimann

17/04/2009 24

gecgecgecgec----cocococoGlobal Engineering & Global Engineering & Global Engineering & Global Engineering & ConsultingConsultingConsultingConsulting

Influence of Influence of Influence of Influence of DrillpipeDrillpipeDrillpipeDrillpipe Stand Stand Stand Stand

length on Trip Timelength on Trip Timelength on Trip Timelength on Trip Time

0

1000

2000

3000

4000

5000

6000

7000

0 2 4 6 8 10 12

Depth

[m

]

Trip Time [h]

DP-Stand 9,25

DP-Stand 13,00

DP-Stand 18,50

DP-Stand 27,75

Influence of Drillpipe Stand Length on Trip Time(one way, w/o BHA - for complete round trip x 2)

© IDEAS

Page 25: New Drilling Technology by Dipl.Ing., MBA Thorsten Weimann

17/04/2009 25

gecgecgecgec----cocococoGlobal Engineering & Global Engineering & Global Engineering & Global Engineering & ConsultingConsultingConsultingConsulting

Top DrivesTop DrivesTop DrivesTop Drives

© IDEAS

Page 26: New Drilling Technology by Dipl.Ing., MBA Thorsten Weimann

17/04/2009 26

gecgecgecgec----cocococoGlobal Engineering & Global Engineering & Global Engineering & Global Engineering & ConsultingConsultingConsultingConsulting

Time is MoneyTime is MoneyTime is MoneyTime is Money

„Time is money“ => Boat „Chikyu“ (Japan)

• Height 120 m

• Working height 92 m (Due to Heave-Compensation)

Page 27: New Drilling Technology by Dipl.Ing., MBA Thorsten Weimann

17/04/2009 27

gecgecgecgec----cocococoGlobal Engineering & Global Engineering & Global Engineering & Global Engineering & ConsultingConsultingConsultingConsulting

TopicsTopicsTopicsTopics

• Background

• Basics

• Modern Drilling Rig

• Top Drive Technology

• Directional Drilling

• Data Transmission

Page 28: New Drilling Technology by Dipl.Ing., MBA Thorsten Weimann

17/04/2009 28

gecgecgecgec----cocococoGlobal Engineering & Global Engineering & Global Engineering & Global Engineering & ConsultingConsultingConsultingConsulting

Directional DrillingDirectional DrillingDirectional DrillingDirectional Drilling

Target may not beaccessible to verticaldrilling

Solution: „turn round thecorner“

Page 29: New Drilling Technology by Dipl.Ing., MBA Thorsten Weimann

17/04/2009 29

gecgecgecgec----cocococoGlobal Engineering & Global Engineering & Global Engineering & Global Engineering & ConsultingConsultingConsultingConsulting

Directional Drilling Directional Drilling Directional Drilling Directional Drilling

© WEG

Page 30: New Drilling Technology by Dipl.Ing., MBA Thorsten Weimann

17/04/2009 30

gecgecgecgec----cocococoGlobal Engineering & Global Engineering & Global Engineering & Global Engineering & ConsultingConsultingConsultingConsulting

Top 20 Top 20 Top 20 Top 20 ExtendedExtendedExtendedExtended ReachedReachedReachedReached

wellswellswellswells worldwideworldwideworldwideworldwide

Page 31: New Drilling Technology by Dipl.Ing., MBA Thorsten Weimann

17/04/2009 31

gecgecgecgec----cocococoGlobal Engineering & Global Engineering & Global Engineering & Global Engineering & ConsultingConsultingConsultingConsulting

Directional DrillingDirectional DrillingDirectional DrillingDirectional Drilling

Page 32: New Drilling Technology by Dipl.Ing., MBA Thorsten Weimann

17/04/2009 32

gecgecgecgec----cocococoGlobal Engineering & Global Engineering & Global Engineering & Global Engineering & ConsultingConsultingConsultingConsulting

Directional DrillingDirectional DrillingDirectional DrillingDirectional Drilling

Page 33: New Drilling Technology by Dipl.Ing., MBA Thorsten Weimann

17/04/2009 33

gecgecgecgec----cocococoGlobal Engineering & Global Engineering & Global Engineering & Global Engineering & ConsultingConsultingConsultingConsulting

Hard Rock DrillingHard Rock DrillingHard Rock DrillingHard Rock Drilling

• High performance

down hole motor

• High speed rotation

• Special type of drill

bit

• Is this the right

technology for hard

rock drilling?

© Baker Hughes

Page 34: New Drilling Technology by Dipl.Ing., MBA Thorsten Weimann

17/04/2009 34

gecgecgecgec----cocococoGlobal Engineering & Global Engineering & Global Engineering & Global Engineering & ConsultingConsultingConsultingConsulting

Directional DrillingDirectional DrillingDirectional DrillingDirectional Drilling

Page 35: New Drilling Technology by Dipl.Ing., MBA Thorsten Weimann

17/04/2009 35

gecgecgecgec----cocococoGlobal Engineering & Global Engineering & Global Engineering & Global Engineering & ConsultingConsultingConsultingConsulting

GeoGeoGeoGeo---- Steering SystemsSteering SystemsSteering SystemsSteering Systems

Page 36: New Drilling Technology by Dipl.Ing., MBA Thorsten Weimann

ERROR: stackunderflow

OFFENDING COMMAND: ~

STACK: