NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE. NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE. all-in-one offshore turbine installations les installations éoliennes offshore tout compris Dolf Elsevier van Griethuysen Ballast Nedam Offshore Energy Nieuwegein, The Netherlands - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

Page 2: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

all-in-one offshore turbine installations

les installations éoliennes offshore tout compris

Dolf Elsevier van Griethuysen

Ballast Nedam Offshore Energy

Nieuwegein, The Netherlands

Marseille, Jeudi 19 Mars 2009

Page 3: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

Co authors

Edwin van de Brug

Marcel van Bergen

Jurjan Blokland

Ballast Nedam Offshore

Nieuwegein, The Netherlands

NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

Page 4: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

Tradition in developping installation concepts:HLV Svanen installing Confederation Bridge, Canada

Page 5: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

Tradition in developping installation concepts:HLV Svanen installing Wind turbine Foundations at Egmond, NL

Page 6: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

Tradition in developping installation concepts:HLV Svanen installing Wind turbine Foundations at Egmond, NL

Page 7: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

Tradition in developing installation concepts:HLV Svanen installing Wind turbine Foundations in UK

Page 8: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

And also a tradition in installing gravity based foundations

Page 9: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

HLV Svanen installing offshore wind farm foundations:

• 2006: 36 x at Egmond, The Netherlands

• 2008: 25 x at Rhyl Flats, UK

• 2008/2009: 32 x at Gunfleet Sands, UK

• 2010: 22 x at Baltic I, Germany

New concepts for installing Windturbines Offshore

Page 10: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

Present Concepts

for

installing Windturbines

New concepts for installing Windturbines Offshore

Page 11: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

Present Windturbine installation method

Page 12: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

Other concepts in development

Page 13: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

The Challenges

New concepts for installing Windturbines Offshore

Page 14: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

Challenges in the emerging market of offshore wind:

• political, financial and logistic constraints,

• grid access,

• weather conditions,

• increasing water depths.

New concepts for installing Windturbines Offshore

Page 15: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

Challenges in the emerging market of offshore wind:

• political, financial and logistic constraints,

• grid access,

• weather conditions,

• increasing water depths.

And:

• more powerful and lager turbines

• with the subsequent need for larger installation equipment

New concepts for installing Windturbines Offshore

Page 16: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

Technical challenge I

The concept of present-day installation equipment, mainly jack-ups, is limited by its own inherent contradiction:

New concepts for installing Windturbines Offshore

Page 17: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

Technical challenge I

The concept of present-day installation equipment, mainly jack-ups, is limited by its own inherent contradiction:

• on the one hand lifting capacity should be as extensive as possible

New concepts for installing Windturbines Offshore

Page 18: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

Technical challenge I

The concept of present-day installation equipment, mainly jack-ups, is limited by its own inherent contradiction:

• on the one hand lifting capacity should be as extensive as possible

• on the other hand the soil pressure of the legs should be kept as low as possible.

New concepts for installing Windturbines Offshore

Page 19: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

The Jack Up internal constraint: lifting capacity vs leg pressure

Page 20: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

The Jack Up internal Constraint: lifting capacity vs leg pressure

Page 21: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

Technical Challenge II

For the installation of some of today’s largest offshore turbines, a one-lift concept has been successfully used, involving the deployment of a floating crane

New concepts for installing Windturbines Offshore

Page 22: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

Technical Challenge II

For the installation of some of today’s largest offshore turbines, a one-lift concept has been successfully used, involving the deployment of a floating crane

Still, operations remain time-consuming and weather, wave and wind-sensitive.

New concepts for installing Windturbines Offshore

Page 23: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

The first all-in-one offshore turbine lift, Beatrice, UK

Page 24: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

Using a Sheer Leg or an A-frame has the disadvantage of ‘multiplying effects’ on the movement of the vessel, or barge in larger displacements of the load carried by the hook of the crane.

New concepts for installing Windturbines Offshore

Page 25: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

Using a Sheer Leg or an A-frame has the disadvantage of ‘multiplying effects’ on the movement of the vessel, or barge in larger displacements of the load carried by the hook of the crane.

Lifting the load in the centre of gravity of the crane vessel will substatially reduce this effect

New concepts for installing Windturbines Offshore

Page 26: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

Displacements standard Sheerleg or Crane Vessel

Page 27: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

Displacements when load is in centre of gravity

Page 28: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

In order to meet the need for suitable and efficient equipment in installing increasingly larger and powerful turbines, new concepts have to be developed if the offshore wind energy sector wishes to contribute to the European targets set with respect to renewable energy.

New concepts for installing Windturbines Offshore

Page 29: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

In the floating crane concept optimum use can be made of water forces.

• A solution should be sought to maintain maximum stability combined with maximum lifting capacity, as required.

• And the problem to be solved is how to control acceleration forces at ‘touch-down’,

New concepts for installing Windturbines Offshore

Page 30: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

Ballast Nedam has developed a concept to control touch-down operations in a one-lift concpt with a floating crane.

The result is a combination of a soft-landing and holding device.

The principle behind the controlled operation is that before touch-down the tower will be indirectly connected to the foundation with a device that introduces a pre-stressed connection which compensates the accelerations during touch-down.

New concepts for installing Windturbines Offshore

Page 31: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

Thus, it is possible to install the heaviest and largest wind turbines in one single controlled and wave-independent operation.

New concepts for installing Windturbines Offshore

Page 32: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

The greatest advantage demonstrated by our concept is not primarily formed by the mere installation costs themselves,

New concepts for installing Windturbines Offshore

Page 33: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

The greatest advantage demonstrated by our concept is not primarily formed by the mere installation costs themselves,

but much rather the fundamental fact that the one-lift concept is actually possible and feasible;

New concepts for installing Windturbines Offshore

Page 34: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

The greatest advantage demonstrated by our concept is not primarily formed by the mere installation costs themselves,

but much rather the fundamental fact that the one-lift concept is actually possible and feasible;

that the entire commissioning and testing process can be completed onshore,

New concepts for installing Windturbines Offshore

Page 35: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

The greatest advantage demonstrated by our concept is not primarily formed by the mere installation costs themselves,

but much rather the fundamental fact that the one-lift concept is actually possible and feasible;

that the entire commissioning and testing process can be completed onshore,

and finally that we have decreased the number of weather, wave and wind-sensitive operations to be held offshore.

New concepts for installing Windturbines Offshore

Page 36: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

This presents a truly revolutionary step in risk mitigation

and thus in cutting back overall costs

New concepts for installing Windturbines Offshore

Page 37: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

Ballast Nedam

Innovation:

The One Lift Concept

New concepts for installing Windturbines Offshore

Page 38: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

PRESS RELEASE Ballast Nedam, 13 March 2009

“BN has developed a frame that enables the heavy lift vessel Svanen to pick up complete heavy windmills in the harbour, transport them to the offshore location, and then install them on site.

This development renders unnecessary the assembly of wind turbines from multiple modules in expensive and risky offshore time.”

New concepts for installing Windturbines Offshore

Page 39: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

New concepts for installing Windturbines Offshore

Page 40: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

Technical details

Page 41: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

Technical details

Page 42: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

Technical details

Page 43: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

AnimationOne Lift Concept

Page 44: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

Another and recent Innovation:

The Drilled Concrete Monopile

New concepts for installing Windturbines Offshore

Page 45: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

PRESS RELEASE Ballast Nedam, 13 March 2009:

“The technical feasibility of a drilled prefabricated concrete pile as an offshore wind turbine foundation has been demonstrated.

The advantages of this foundation are:

• Reduced noise levels (no percussion),

• lower manufacturing costs,

• greater price stability of concrete compared with steel.”

New concepts for installing Windturbines Offshore

Page 46: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

Drilled (concrete) monopiles, based on existing technologies

Page 47: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

(Drilled) concrete monopiles, based on existing technologies

The pile will be built up from vertically poured ring elements which are stored vertical to avoid ovalization and are assembled horizontally.

Page 48: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

Drilling and installing of a concrete monopile

Step 10: Continue drilling until target level is reached.

Page 49: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

Drilling and installing of a concrete monopile with HLV Svanen

49

Page 50: NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE

www.ballast-nedam.com

NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE