EAST SIDE COASTAL RESILIENCY
CB3/CB6 Task Force Meeting
May 23, 2016
![Page 2: New CB3/CB6 Task Force Meeting May 23, 2016 - New York · 2016. 5. 23. · CB3/CB6 Task Force Meeting May 23, 2016 • Review Project Goals ... Interior Drainage Management 7 . 8](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049c9c7d88604046c7c21d7/html5/thumbnails/2.jpg)
• Review Project Goals
• Review Preliminary Preferred Alternative
• What Have We Been Up To?
• What’s Next?
o Refine and Advance Design
o Continued Community Engagement
o EIS and ULURP Process
• Lower Manhattan Coastal Resiliency Project Updates
• Questions/Comments
MEETING GOALS
2
![Page 3: New CB3/CB6 Task Force Meeting May 23, 2016 - New York · 2016. 5. 23. · CB3/CB6 Task Force Meeting May 23, 2016 • Review Project Goals ... Interior Drainage Management 7 . 8](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049c9c7d88604046c7c21d7/html5/thumbnails/3.jpg)
• Provide a reliable, integrated flood
protection system; minimize use of
closure structures and deployables
• Improve waterfront open spaces
and access
• Respond quickly to the urgent need
for increased flood protection and
resiliency
• Achieve implementation milestones
and project funding allocations as
established by HUD
EAST SIDE COASTAL RESILIENCY
PROJECT GOALS
3
![Page 4: New CB3/CB6 Task Force Meeting May 23, 2016 - New York · 2016. 5. 23. · CB3/CB6 Task Force Meeting May 23, 2016 • Review Project Goals ... Interior Drainage Management 7 . 8](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049c9c7d88604046c7c21d7/html5/thumbnails/4.jpg)
EAST SIDE COASTAL RESILIENCY
PRELIMINARY PREFERRED ALTERNATIVE
4
![Page 5: New CB3/CB6 Task Force Meeting May 23, 2016 - New York · 2016. 5. 23. · CB3/CB6 Task Force Meeting May 23, 2016 • Review Project Goals ... Interior Drainage Management 7 . 8](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049c9c7d88604046c7c21d7/html5/thumbnails/5.jpg)
Since Fall/Winter:
• Stakeholder meetings
• Procuring final design team
• Addressing comments on Draft Scope of Work
• Evaluating alternatives
• Developing draft EIS and permit applications
• Continuing to identify additional funding
EAST SIDE COASTAL RESILIENCY
WHAT HAVE WE BEEN UP TO?
5
![Page 6: New CB3/CB6 Task Force Meeting May 23, 2016 - New York · 2016. 5. 23. · CB3/CB6 Task Force Meeting May 23, 2016 • Review Project Goals ... Interior Drainage Management 7 . 8](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049c9c7d88604046c7c21d7/html5/thumbnails/6.jpg)
INPUTS:
COMMUNITY PRIORITIES
CITY PRIORITIES
SITE CONDITIONS
TECHNICAL FEASIBILITY
URBAN DESIGN
CONTINUED INPUTS:
REGULATORY CONSTRAINTS
AGENCY COORDINATION
MAINTENANCE
TECHNICAL CONSIDERATIONS
COMMUNITY FEEDBACK
TRADE-OFFS AND BUDGET
OPERATIONS AND EMERGENCY MANAGEMENT
WHAT’S NEXT? - DESIGN
6
![Page 7: New CB3/CB6 Task Force Meeting May 23, 2016 - New York · 2016. 5. 23. · CB3/CB6 Task Force Meeting May 23, 2016 • Review Project Goals ... Interior Drainage Management 7 . 8](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049c9c7d88604046c7c21d7/html5/thumbnails/7.jpg)
WHAT’S NEXT? - DESIGN
Refine the Conceptual Design
Flood Protection Design
Parks Improvements & Resiliency Measures
Pedestrian Bridge & Access Improvements
Interior Drainage Management
7
![Page 8: New CB3/CB6 Task Force Meeting May 23, 2016 - New York · 2016. 5. 23. · CB3/CB6 Task Force Meeting May 23, 2016 • Review Project Goals ... Interior Drainage Management 7 . 8](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049c9c7d88604046c7c21d7/html5/thumbnails/8.jpg)
8
COASTAL PROTECTION AND INTERIOR DRAINAGE
MANAGEMENT
CURRENT CONDITIONS:
DURING A HEAVY PRECIPITATION EVENT
![Page 9: New CB3/CB6 Task Force Meeting May 23, 2016 - New York · 2016. 5. 23. · CB3/CB6 Task Force Meeting May 23, 2016 • Review Project Goals ... Interior Drainage Management 7 . 8](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049c9c7d88604046c7c21d7/html5/thumbnails/9.jpg)
COASTAL PROTECTION AND INTERIOR DRAINAGE
MANAGEMENT
STORM EVENT WITHOUT COASTAL PROTECTION:
POTENTIAL FOR FLOODING FROM BOTH
STORM SURGE AND PRECIPITATION
9
![Page 10: New CB3/CB6 Task Force Meeting May 23, 2016 - New York · 2016. 5. 23. · CB3/CB6 Task Force Meeting May 23, 2016 • Review Project Goals ... Interior Drainage Management 7 . 8](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049c9c7d88604046c7c21d7/html5/thumbnails/10.jpg)
STORM EVENT WITH COASTAL PROTECTION:
INLAND FLOODING THAT NEEDS TO BE MANAGED:
EVALUATING BOTH PUMPING AND STORAGE ALTERNATIVES
COASTAL PROTECTION AND INTERIOR DRAINAGE
MANAGEMENT
10
![Page 11: New CB3/CB6 Task Force Meeting May 23, 2016 - New York · 2016. 5. 23. · CB3/CB6 Task Force Meeting May 23, 2016 • Review Project Goals ... Interior Drainage Management 7 . 8](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049c9c7d88604046c7c21d7/html5/thumbnails/11.jpg)
How Do You Use the Waterfront?
What Are the Options?
How Do We Combine Options?
Final Concept Design: Input and Feedback
Re-Engagement Meetings (March)
Workshops (May) Workshops (July) Community Meetings/ Workshops (October)
Background Research & Studies
Design Concept Studies & Workshops
Design Concept Reports
Stakeholder Meetings
CONCEPT DESIGN
COMPLETION
CONCEPT DESIGN START
Task Force
Meetings
DECEMBER 2014
DECEMBER 2015
E A S T S I D E C O A S T A L R E S I L I E N C Y
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV
Community Engagement Meet ings
2015 COMMUNITY ENGAGEMENT RECAP
11
![Page 12: New CB3/CB6 Task Force Meeting May 23, 2016 - New York · 2016. 5. 23. · CB3/CB6 Task Force Meeting May 23, 2016 • Review Project Goals ... Interior Drainage Management 7 . 8](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049c9c7d88604046c7c21d7/html5/thumbnails/12.jpg)
Focused Stakeholder Meetings (starting in mid-June 2016)
• Montgomery Street Tie-Back
o Safety/visibility concerns
o Aesthetic design concerns
• East 25th Street Tie-Back
o Safety/visibility/circulation concerns
o Aesthetic design concerns
• Delancey Street/Grand Street Access
o Proposed newly aligned bridge and landings
o Effects on views
o Grand Street ramp/stair
• Park Programming Scope Meetings
o Murphy’s Brother’s Playground
o Asser Levy Recreation Center
WHAT’S NEXT? - COMMUNITY ENGAGEMENT
12
![Page 13: New CB3/CB6 Task Force Meeting May 23, 2016 - New York · 2016. 5. 23. · CB3/CB6 Task Force Meeting May 23, 2016 • Review Project Goals ... Interior Drainage Management 7 . 8](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049c9c7d88604046c7c21d7/html5/thumbnails/13.jpg)
• Community Engagement Meetings (One set of meetings - Project Area One South, Project Area One North, Project
Area Two - approximately every 6 months)
o Project overview
o Review designs
o Gain community feedback on designs
o First set of engagement meetings – Fall 2016
• Task Force Meetings (quarterly and open to the public)
o Tentatively July or September 2016, November 2016, February 2017,
May 2017, July 2017
WHAT’S NEXT? - COMMUNITY ENGAGEMENT
13
![Page 14: New CB3/CB6 Task Force Meeting May 23, 2016 - New York · 2016. 5. 23. · CB3/CB6 Task Force Meeting May 23, 2016 • Review Project Goals ... Interior Drainage Management 7 . 8](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049c9c7d88604046c7c21d7/html5/thumbnails/14.jpg)
• ULURP Application Preparation Underway
• EIS Draft Scope of Work (DSOW) Issued on 10/30/15
• EIS/ULURP Application Preparation Underway
• 3 Alternatives in DSOW
o Alternative 1 – No Action
o Alternative 2 – Baseline Flood Protection System
o Alternative 3 – Flood Protection System with Park and Neighborhood
Connection Improvements
• 2 Additional Alternatives since DSOW
o Alternative 4 – Flood Protection System with Integrated Park Facility
Resiliency Measures
o Alternative 5 – Flood Protection Alignment East of FDR Drive with Flyover
Bridge Alternative
WHAT’S NEXT? - ULURP AND EIS PROCESS
14
![Page 15: New CB3/CB6 Task Force Meeting May 23, 2016 - New York · 2016. 5. 23. · CB3/CB6 Task Force Meeting May 23, 2016 • Review Project Goals ... Interior Drainage Management 7 . 8](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049c9c7d88604046c7c21d7/html5/thumbnails/15.jpg)
ALTERNATIVE 5 - RAISED FDR DRIVE / PEDESTRIAN
FLYOVER BRIDGE CROSS-SECTION
15
![Page 16: New CB3/CB6 Task Force Meeting May 23, 2016 - New York · 2016. 5. 23. · CB3/CB6 Task Force Meeting May 23, 2016 • Review Project Goals ... Interior Drainage Management 7 . 8](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049c9c7d88604046c7c21d7/html5/thumbnails/16.jpg)
UPDATED PROJECT SCHEDULE
16
![Page 17: New CB3/CB6 Task Force Meeting May 23, 2016 - New York · 2016. 5. 23. · CB3/CB6 Task Force Meeting May 23, 2016 • Review Project Goals ... Interior Drainage Management 7 . 8](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049c9c7d88604046c7c21d7/html5/thumbnails/17.jpg)
LOWER MANHATTAN COASTAL RESILIENCY UPDATES
17
![Page 18: New CB3/CB6 Task Force Meeting May 23, 2016 - New York · 2016. 5. 23. · CB3/CB6 Task Force Meeting May 23, 2016 • Review Project Goals ... Interior Drainage Management 7 . 8](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049c9c7d88604046c7c21d7/html5/thumbnails/18.jpg)
QUESTIONS AND ANSWERS/
DISCUSSION