9/15/2005 New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area Tide Time High 5:57 Falling Tide Time 9:30 ID 091505_00_01 Coordinates 814454.27 Up/Down Current Up Depth (ft.) 5 Ave. Turbidity (NTUs) 0.6 Permissible Turbidity Increase (NTUs) Weather Conditions Cloudy looks like rain Vessel Traffic None 2692734.15 10 0.5 Wind ~ 5-10 Kts NE 15 0.8 No Dredging Occuring 20 0.5 25 0.4 Low 11:40 AVERAGE 0.5 20.5 Rising Tide 14:31 091505_01_1 814454.78 Up 5 0.7 (Background) Cloudy looks like rain None 2694352.7 (Background) 10 0.6 Wind ~ 5-10 Kts NE 15 2.6 20 2.3 25 2.4 AVERAGE 1.7 21.7 14:36 091505_01_9 814467.27 Down 5 3.5 ( Background) Rainy ~70 deg. F None 26903754.63 10 3.3 Wind ~ 5-10 Kts NE 15 2.9 20 3.4 25 3.6 30 3.4 AVERAGE 3.3 (18.4 Below Permissible 15:35 091505_02_1 814438.72 Up 5 2.0 Turbidity Increase Limit) Rainy ~70 deg. F None 2693793.54 (Background) 10 1.9 Wind ~ 5-10 Kts NE 15 1.2 20 1.1 25 0.8 30 0.9 AVERAGE 1.3 21.3 15:36 091505_02_9 814443.69 Down 5 7.0 ( Background) Rainy ~70 deg. F None 2694262.57 10 10.0 Wind ~ 5-10 Kts NE 15 16.0 20 16.2 25 4.0 30 2.0 AVERAGE 9.2 (11.2 Below Permissible 16:30 091505_03_1 814426.44 Up 5 6.0 Turbidity Increase Limit) Rainy ~70 deg. F None 2693767.63 (Background) 10 2.5 Wind ~ 5-10 Kts NE 15 2.6 20 2.7 25 2.9 30 2.0 AVERAGE 3.1 23.1 16:35 091505_03_9 814433.47 Down 5 7.0 ( Background) Rainy ~70 deg. F None 2694407.47 10 12.5 Wind ~ 5-10 Kts NE 15 11.0 20 12.0 25 5.0 30 3.7 AVERAGE 8.5 (14.6 Below Permissible 17:23 091505_04_1 814393.95 Up 5 1.1 Turbidity Increase Limit) Rainy ~70 deg. F None 2693794.44 (Background) 10 2.8 Wind ~ 5-10 Kts NE 15 2.6 20 2.1 25 2.1 30 2.1 AVERAGE 2.1 22.1 17:28 091505_04_9 814442.46 Down 5 1.8 ( Background) Rainy ~70 deg. F None 2694364.29 10 2.9 Wind ~ 5-10 Kts NE 15 1.6 20 3.3 25 6.5 30 2.6 AVERAGE 3.1 (19.0 Below Permissible High 18:30 Turbidity Increase Limit) Notes: An X in the vessel traffic column indicates that either a vessel had passed or there was a movement of spuds that may have had an effect on turbidity.

Upload: others

Post on 29-Sep-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

9/15/2005 New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area

Tide Time High 5:57

Falling Tide

Time

9:30

ID

091505_00_01

Coordinates

814454.27

Up/Down Current

Up

Depth (ft.)

5

Ave. Turbidity (NTUs)

0.6

Permissible Turbidity Increase (NTUs)

Weather Conditions

Cloudy looks like rain

Vessel Traffic None

2692734.15 10 0.5 Wind ~ 5-10 Kts NE 15 0.8 No Dredging Occuring 20 0.5 25 0.4

Low 11:40 AVERAGE 0.5 20.5 Rising Tide 14:31 091505_01_1 814454.78 Up 5 0.7 (Background) Cloudy looks like rain None

2694352.7 (Background) 10 0.6 Wind ~ 5-10 Kts NE 15 2.6 20 2.3 25 2.4

AVERAGE 1.7 21.7 14:36 091505_01_9 814467.27 Down 5 3.5 (Background) Rainy ~70 deg. F None

26903754.63 10 3.3 Wind ~ 5-10 Kts NE 15 2.9 20 3.4 25 3.6 30 3.4

AVERAGE 3.3 (18.4 Below Permissible 15:35 091505_02_1 814438.72 Up 5 2.0 Turbidity Increase Limit) Rainy ~70 deg. F None

2693793.54 (Background) 10 1.9 Wind ~ 5-10 Kts NE 15 1.2 20 1.1 25 0.8 30 0.9

AVERAGE 1.3 21.3 15:36 091505_02_9 814443.69 Down 5 7.0 (Background) Rainy ~70 deg. F None

2694262.57 10 10.0 Wind ~ 5-10 Kts NE 15 16.0 20 16.2 25 4.0 30 2.0

AVERAGE 9.2 (11.2 Below Permissible 16:30 091505_03_1 814426.44 Up 5 6.0 Turbidity Increase Limit) Rainy ~70 deg. F None

2693767.63 (Background) 10 2.5 Wind ~ 5-10 Kts NE 15 2.6 20 2.7 25 2.9 30 2.0

AVERAGE 3.1 23.1 16:35 091505_03_9 814433.47 Down 5 7.0 (Background) Rainy ~70 deg. F None

2694407.47 10 12.5 Wind ~ 5-10 Kts NE 15 11.0 20 12.0 25 5.0 30 3.7

AVERAGE 8.5 (14.6 Below Permissible 17:23 091505_04_1 814393.95 Up 5 1.1 Turbidity Increase Limit) Rainy ~70 deg. F None

2693794.44 (Background) 10 2.8 Wind ~ 5-10 Kts NE 15 2.6 20 2.1 25 2.1 30 2.1

AVERAGE 2.1 22.1 17:28 091505_04_9 814442.46 Down 5 1.8 (Background) Rainy ~70 deg. F None

2694364.29 10 2.9 Wind ~ 5-10 Kts NE 15 1.6 20 3.3 25 6.5 30 2.6

AVERAGE 3.1 (19.0 Below Permissible High 18:30 Turbidity Increase Limit)

Notes: An X in the vessel traffic column indicates that either a vessel had passed or there was a movement of spuds that may have had an effect on turbidity.

Page 2: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

3.9

as

814100 814200 814300 814400 814500 814600 814700 814800

091505_01_1

091505_01_9

091505_02_9

091505_02_1

091505_03_01

091505_03_09

091505_04_01

091505_04_9

Maritime Terminal Dredge Area

091505_00_1

2693

600

2693

700

2693

800

2693

900

2694

000

2694

100

2694

200

2694

300

2694

400

2694

500

26936002693700

26938002693900

26940002694100

26942002694300

26944002694500

11.9

12.3

1

is.g

Approximate Location of Dredge Barge Wood 1

814100 814200 814300 814400 814500 814600 814700 814800

Figure MARITIME TERMINAL DREDGE AREA

WATER QUALITY MONITORING LOCATIONS

JOB # 6542.011 9/15/2005

DATE: Sept. 15, 2005

New Bedford, MA New Bedford Harbor

FIGURE 1

LEGEND

- Water Quality Monitoring Location

091505_02_9

DATE BY REVISIONS

6542.011-W Q_091505

Scale 1:1200 1" = 100'

50 0 50 100 150

US survey foot 1

Page 3: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

9/16/2005 New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area

Tide Time Time ID Coordinates Up/Down Depth (ft.) Ave. Turbidity Permissible Turbidity Weather Conditions Vessel High 6.53 Current (NTUs) Increase (NTUs) Traffic

Falling Tide 7:47 091605_00_1 814417.75 Up 5 4.8 Rainy ~ 75 deg. F None 2694424.98 10 2.4 Wind ~ 5-10 Kts. SW

15 2.8 20 2.7 25 2.3 30 3.1

AVERAGE 3.0 23.0 8:08 091605_01_1 814425.05 Up 5 11.5 (Background) Rainy ~ 75 deg. F None

2694442.09 (Background) 10 4.0 Wind ~ 5-10 Kts. SW 15 3.1 20 2.5 25 2.8 30 3.8

AVERAGE 4.6 24.6 7:58 091605_01_9 814398.38 Down 5 4.1 (Background) Rainy ~ 75 deg. F None

2693834.91 10 2.0 Wind ~ 5-10 Kts. SW 15 2.6 20 2.6 25 2.5 30 3.0

AVERAGE 2.8 (21.8 Below Permissible 9:53 091605_03_1 814420.88 Up 5 4.6 Turbidity Increase Limit) Rainy ~ 75 deg. F None

2694407.78 (Background) 10 5.7 Wind ~ 5-10 Kts. SW 15 4.1 20 2.6 25 2.3 30 2.8

AVERAGE 3.7 23.7 10:08 091605_03_9 814427.12 Down 5 12.5 (Background) Rainy ~ 75 deg. F None

2693734.4 10 9.5 Wind ~ 5-10 Kts. SW 15 12.5 20 12.0 25 2.9 30 2.0

AVERAGE 8.6 (15.1 Below Permissible 12:07 091605_05_1 814422.48 Up 5 9.8 Turbidity Increase Limit) Rainy ~ 75 deg. F None

2694443.41 (Background) 10 2.4 Wind ~ 5-10 Kts. SW 15 4.4 20 6.0 25 22.0 30 14.5

AVERAGE 9.8 29.8 12:15 091605_05_9 814397.5 Down 5 6.8 (Background) Rainy ~ 75 deg. F None

2693723.13 10 13.0 Wind ~ 5-10 Kts. SW 15 6.0 20 4.1 25 3.3

Low 12.40 AVERAGE 6.6 (23.2 Below Permissible Rising Tide 14:23 091605_07_1 81485.22 Up 5 7.9 Turbidity Increase Limit) Rainy ~ 75 deg. F None

2693525.8 (Background) 10 4.5 Wind ~ 5-10 Kts. SW 15 2.3 20 2.4 25 3.2

AVERAGE 4.0 24.0 14:06 091605_07_9 814385.22 Down 5 8.8 (Background) Rainy ~ 75 deg. F None

2694216.07 10 17.5 Wind ~ 5-10 Kts. SW 15 7.5 20 5.5 25 4.3 30 1.8

AVERAGE 7.5 (16.5 Below Permissible 16:14 091605_09_1 814426.94 Up 5 5.2 Turbidity Increase Limit) Rainy ~ 75 deg. F None

2693756.21 (Background) 10 3.0 Wind ~ 5-10 Kts. SW 15 2.7 20 2.3 25 3.0 30 4.4

AVERAGE 3.4 23.4 16:10 091605_09_9 814391.97 Down 5 0.4 Rainy ~ 75 deg. F None

2694575.06 10 7.9 Wind ~ 5-10 Kts. SW 15 7.9 20 9.5 25 7.8 30 6.4

AVERAGE 6.6 (16.8 Below Permissible High 19:22 Turbidity Increase Limit)

Notes: An X in the vessel traffic column indicates that either a vessel had passed or there was a movement of spuds that may have had an effect on turbidity.

Page 4: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

4.6

9

1605 03 9

91605 07 1

09 1

814000 814100 814200 814300 814400 814500 814600 814700 814800

091605_00_01

091605_01_0

091605_01_1

091605_03_1

09 _ _

091605_05_1

091605_05_9

091605_07_9

0 _ _

091605_09_9

091605_ _

Maritime Terminal Dredge Area

2693

500

2693

600

2

6937

00

2693

800

269

3900

26

940

00

2694

100

269

4200

26

943

00

2694

400

2694

500

26

9460

0

2693500

2693600

2693700

2693800

2693900

2694000

2694100

2694200

2694300

2694400

2694500

2694600

1

Approximate Location of Dredge Barge Wood 1

814000 814100 814200 814300 814400 814500 814600 814700 814800

Figure MARITIME TERMINAL DREDGE AREA

WATER QUALITY MONITORING LOCATIONS

JOB # 6542.011 9/16/2005 DATE: Sept. 16, 2005

New Bedford, MA New Bedford Harbor

FIGURE 2

Scale 1:1200 1" = 100'

DATE BY REVISIONS

LEGEND

- Water Quality Monitoring Location

091605_05_9

6542.011-WQ

_091605

50 0 50 100 150

US survey foot 2

Page 5: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

9/17/2005 New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area

Tide Time Time ID Coordinates Up/Down Depth (ft.) Ave. Turbidity Permissible Turbidity Weather Conditions Vessel High 7:44 Current (NTUs) Increase (NTUs) Traffic

Falling Tide 8:52 091705_01_1 814598.22 Up 5 3.5 Cloudy light rain None 2694685.81 (Background) 10 2.2 Wind 10 Kts NE

15 2.3 20 2.3 25 2.3 30 2.7

AVERAGE 2.5 22.5 9:01 091705_01_9 814398.59 Down 5 16.5 (Background) Cloudy ~75 deg. F None

2693709.36 10 2.7 Wind ~ 5-10 Kts NE 15 2.7 20 2.5 25 2.6 30 3.6

AVERAGE 5.1 (17.4 Below Permissible 10:36 091705_03_1 814514.18 Up 5 3.3 Turbidity Increase Limit) Cloudy ~75 deg. F None

2694435.84 (Background) 10 2.8 Wind ~ 5-10 Kts NE 15 3.3 20 1.8 25 2.1 30 2.6

AVERAGE 2.6 22.6 10:52 091705_03_9 814488.93 Down 5 7.5 (Background) Cloudy ~75 deg. F None

2693554.73 10 8.9 Wind ~ 5-10 Kts NE 15 11.0 20 11.0 25 8.3

AVERAGE 9.3 (13.3 Below Limit) 12:38 091705_05_1 814535.37 Up 5 3.8 Turbidity Increase Limit) Cloudy ~75 deg. F None

2694592.09 (Background) 10 3.2 Wind ~ 5-10 Kts NE 15 4.4 20 2.8 25 1.7 30 2.1

AVERAGE 3.0 23.0 12:56 091705_05_9 814357.12 Down 5 6.0 (Background) Cloudy ~75 deg. F None

2694044.21 10 14.0 Wind ~ 5-10 Kts NE 15 15.0 20 6.5

Low 13:36 AVERAGE 10.4 (12.6 Below Limit) Rising Tide 14:33 091705_07_1 10' North of Up 5 3.2 Turbidity Increase Limit) Cloudy ~75 deg. F None

Rt. 6 Brdige (Background) 10 2.5 Wind ~ 5-10 Kts NE 15 2.4 20 2.9 25 3.0 30 3.5

AVERAGE 2.9 22.9 14:55 091705_07_9 10' North of Down 5 5.0 (Background) Cloudy ~75 deg. F None

Rt. 6 Brdige 10 18.5 Wind ~ 5-10 Kts NE 15 32.5 20 19.5 25 12.5 30 7.5

AVERAGE 15.9 (7.0 Below Permissible High 20:12 Turbidity Increase Limit)

Notes: An X in the vessel traffic column indicates that either a vessel had passed or there was a movement of spuds that may have had an effect on turbidity.

Page 6: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

813900 814000 814100 814200 814300 814400 814500 814600 814700 814800

091705_01_9

901705_03_1

091705_03_9

091705_05_1

091705_07_9

091705_01_1

091705_07_1

091705_05_9

Maritime Terminal Dredge Area

2693

600

2693

700

2693

800

2693

900

2694

000

2694

100

2694

200

2694

300

2694

400

2694

500

2694

600

2694

700

26936002693700

26938002693900

26940002694100

26942002694300

26944002694500

26946002694700

Approximate Location of Dredge Barge Wood 1

813900 814000 814100 814200 814300 814400 814500 814600 814700 814800

Figure MARITIME TERMINAL DREDGE AREA

WATER QUALITY MONITORING LOCATIONS

JOB # 6542.011 9/17/2005 DATE: Sept. 17, 2005

New Bedford, MA New Bedford Harbor

FIGURE 3

LEGEND

- Water Quality Monitoring Location

091705_07_9

REVISIONS DATE BY

6542.011-W Q

_091705

Scale 1:1200 1" = 100'

50 0 50 100 150

US survey foot 3

Page 7: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

9/19/2005 New Bedford Harbor Dredge Project - Phase II - Part 2

Water Quality Monitoring - White's Terminal Excavation Area

Tide Time Time ID Coordinates Up/Down Depth (ft.) Ave. Turbidity Permissible Turbidity Weather Conditions Vessel High 9:21 Current (NTUs) Increase (NTUs) Traffic

Falling Tide 10:00 091905_00_1 815055 Up 5 2.0 Sunny ~75 deg. F None 2695409 (Background) 15 1.8 Wind 5-10 kts NE

25 3.0 AVERAGE 2.3 22.3

10:18 091905_00_9 815144 Down 5 2.3 (Background) Sunny ~75 deg. F None 2694602 15 2.5 Wind 5-10 kts NE

25 3.0 AVERAGE 2.6 (19.7 Below Permissible

14:12 091905_06_1 814995 Up 5 3.5 Turbidity Increase Limit) Sunny ~75 deg. F None 2695373 (Background) 15 2.8 Wind 5-10 kts NE

25 2.5 AVERAGE 2.9 22.9

14:17 091905_06_9 815122 Down 5 3.3 (Background) Sunny ~75 deg. F None 2694597 15 3.8 Wind 5-10 kts NE

25 2.5 AVERAGE 3.2 (19.7 Below Permissible

15:21 091905_07_1 8151818 Up 5 3.0 Turbidity Increase Limit) Sunny ~75 deg. F None 2695037 (Background) 15 2.5 Wind 5-10 kts NE

25 10.0 AVERAGE 5.2 25.2

15:15 091905_07_9 815164 Down 5 18.0 (Background) Sunny ~75 deg. F None 2694528 15 5.5 Wind 5-10 kts NE

25 3.5 AVERAGE 9.0 (16.2 Below Permissible

Low 15:17 Turbidity Increase Limit)

Notes: An X in the vessel traffic column indicates that either a vessel had passed or there was a movement of spuds that may have had an effect on turbidity.

Page 8: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

814600 814800 815000 815200 815400

091905_00_1

091905_00_9

091905_06_1

091505_06_9

091905_07_9

091905_07_1

White's Terminal Dredge Area

269

4400

26

9460

0 2

6948

00

2695

000

269

520

0 26

954

00

269

560

0

269

4400

26

9460

026

948

002

695

000

2695

200

269

540

026

9560

0

815400

Approximate Location of Dredge Barge Wood 1

814600 814800 815000 815200 LEGEND

- Water Quality Monitoring Location

091905_07_1

REVISIONS DATE BY

WHITE'S TERMINAL DREDGE AREA

WATER QUALITY MONITORING LOCATIONS

JOB # 6542.011 9/19/2005 DATE: Sept. 19, 2005

New Bedford, MA New Bedford Harbor

FIGURE 4

Figure

6542.011-WQ

_091905

Scale 1:1200 1" = 100'

50 0 50 100 150 200

US survey foot 4

Page 9: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

9/21/2005 New Bedford Harbor Dredge Project - Phase II - Part 2

Water Quality Monitoring - White's Terminal Excavation Area

Tide Time Time ID Coordinates Up/Down Depth (ft.) Ave. Turbidity Permissible Turbidity Weather Conditions Vessel Low 3:56 Current (NTUs) Increase (NTUs) Traffic

Rising Tide 7:46 092105_00_1 814599.29 Up 5 2.9 Sunny ~ 75 deg. F None 2694441.52 (Background) 15 2.3 Wind 5-10 kts W

25 2.6 AVERAGE 2.6 22.6

7:59 092105_00_9 815126.88 Down 5 3.8 (Background) Sunny ~ 75 deg. F None 2694995.01 15 4.6 Wind 5-10 kts W

25 4.5 AVERAGE 3.0 (19.6 Below Permissible

9:43 092105_02_1 815248.46 Up 5 2.3 Turbidity Increase Limit) Sunny ~ 75 deg. F None 2694376.43 (Background) 15 1.5 Wind 5-10 kts W

25 2.0 AVERAGE 1.9 21.9

9:47 092105_02_9 815106.71 Down 5 3.0 (Background) Sunny ~ 75 deg. F None 2694939.99 15 3.6 Wind 5-10 kts W

25 5.0 High 10:57 AVERAGE 3.9 (18.0 Below Permissible

Falling Tide 11:25 092105_04_1 815162.14 Up 5 3.4 Turbidity Increase Limit) Sunny ~ 75 deg. F None 2695397.31 (Background) 15 3.8 Wind 5-10 kts W

25 5.0 AVERAGE 4.1 24.1

12:29 092105_04_9 815141.71 Down 5 7.3 (Background) Sunny ~ 75 deg. F None 2694557.36 15 2.5 Wind 5-10 kts W

25 3.8 AVERAGE 4.5 (19.6 Below Permissible

14:20 092105_07_1 815046.65 Up 5 3.5 Turbidity Increase Limit) Sunny ~ 75 deg. F None 2695455.02 (Background) 15 3.3 Wind 5-10 kts W

25 5.3 AVERAGE 4.0 24.0

14:25 092105_07_9 815176.7 Down 5 10.5 (Background) Sunny ~ 75 deg. F None 2694611.2 15 6.8 Wind 5-10 kts W

25 9.5 AVERAGE 8.9 (15.1 Below Permissible

17:35 092105_10_1 815207.72 Up 5 3.5 Turbidity Increase Limit) Sunny ~ 75 deg. F None 2694451.02 (Background) 15 4.0 Wind 5-10 kts W

25 3.3 AVERAGE 3.6 23.6

17:38 092105_10_9 815210.06 Down 5 2.7 (Background) Sunny ~ 75 deg. F None 2695057.56 15 10.0 Wind 5-10 kts W

25 13.0 AVERAGE 8.6 (15.0 Below Permissible

Low 16:47 Turbidity Increase Limit)

Notes: An X in the vessel traffic column indicates that either a vessel had passed or there was a movement of spuds that may have had an effect on turbidity.

Page 10: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

814600 814800 815000 815200 815400

White's Terminal Dredge Area

269

440

0 26

9460

0 2

6948

00

2695

000

269

5200

26

9540

0 2

6956

00

2694

400

269

460

026

948

002

695

000

269

5200

269

540

02

6956

00

815400

092105_00_1

092105_00_9

092105_02_1

092105_02_9

092105_04_1

092105_04_9

092105_07_1

092105_07_9

092105_10_1

092105_10_9

Approximate Location of Dredge Barge Wood 1

814600 814800 815000 815200 LEGEND

- Water Quality Monitoring Location

092105_02_1

REVISIONS DATE BY

WHITE'S TERMINAL DREDGE AREA

WATER QUALITY MONITORING LOCATIONS

JOB # 6542.011 9/21/2005 DATE: Sept. 21, 2005

New Bedford, MA New Bedford Harbor

FIGURE 5

Figure

6542.011-WQ

_092105

Scale 1:1200 1" = 100'

50 0 50 100 150 200

US survey foot 5

Page 11: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

9/26/2005 New Bedford Harbor Dredge Project - Phase II - Part 2

Water Quality Monitoring - Pease Park Excavation Area

Tide Time Time ID Coordinates Up/Down Depth (ft.) Ave. Turbidity Permissible Turbidity Weather Conditions Vessel Low 8:03 Current (NTUs) Increase (NTUs) Traffic

Rising Tide 12:55 092605_01_1 817791.2 Up 5 3.5 Cloudy ~70 deg. F None 2693259.8 (Background) 15 3.1 Wind 20-30 Kts SW

25 3.4 AVERAGE 3.3 23.3

13:03 092605_01_9 817929.5 Down 5 3.8 (Background) Cloudy ~70 deg. F None 2694003.2 15 4.6 Wind 20-30 Kts SW

25 4.5 AVERAGE 3.0 (20.3 Below Permissible

14:11 092605_02_1 817862.1 Up 5 5.0 Turbidity Increase Limit) Cloudy ~70 deg. F None 2693436.9 (Background) 15 4.3 Wind 20-30 Kts SW

25 3.5 AVERAGE 4.3 24.3

14:04 092605_02_9 818044.3 Down 5 22.5 (Background) Cloudy ~70 deg. F None 2693977.4 15 22.5 Wind 20-30 Kts SW

25 21.3 AVERAGE 22.1 (2.2 Below Permissible

High 15:30 Turbidity Increase Limit)

Notes: An X in the vessel traffic column indicates that either a vessel had passed or there was a movement of spuds that may have had an effect on turbidity.

Page 12: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57
Page 13: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

9/30/2005 New Bedford Harbor Dredge Project - Phase II - Part 2

Water Quality Monitoring - Pease Park Excavation Area

Tide Time Time ID Coordinates Up/Down Depth (ft.) Ave. Turbidity Permissible Turbidity Weather Conditions Vessel High 6:43 Current (NTUs) Increase (NTUs) Traffic

Rising Tide 8:48 093005_01_1 817925.66 Up 5 5.0 Sunny ~70 deg. F None 2694001.67 (Background) 10 5.5 Wind 5-10 Kts. NW

15 3.5 AVERAGE 4.7 24.7

8:52 093005_01_9 817945.39 Down 5 5.0 (Background) Sunny ~70 deg. F None 2693414.46 10 10.0 Wind 5-10 Kts. NW

15 17.5 AVERAGE 10.8 (13.9 Below Permissible

10:38 093005_03_1 817974.46 Up 5 2.2 Turbidity Limit) Sunny ~75 deg. F None 2693770.27 (Background) 10 3.4 Wind 5-10 Kts. NW

15 5.0 AVERAGE 3.5 23.5

10:42 093005_03_9 817968.49 Down 5 5.0 (Background) Sunny ~75 deg. F None 2693508.16 10 4.8 Wind 5-10 Kts. NW

15 2.5 Low 12:17 AVERAGE 4.1 (19.4 Below Permissible

Falling Tide 12:38 093005_05_1 817860.19 Up 5 5.5 Turbidity Limit) Sunny ~80 deg. F None 2693426.89 (Background) 10 4.3 Wind 5-10 Kts. NW

15 2.2 AVERAGE 4.0 24.0

12:43 093005_05_9 817893.86 Down 5 2.5 (Background) Sunny ~80 deg. F None 2694023.07 10 5.5 Wind 5-10 Kts. NW

15 13.0 AVERAGE 7.0 (17.0 Below Permissible

High 19:02 Turbidity Limit)

Notes: An X in the vessel traffic column indicates that either a vessel had passed or there was a movement of spuds that may have had an effect on turbidity.

Page 14: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

0

0

0

5

5

5

5

5

10

la unc hin g ramp

817400 817600 817800 818000 818200 818400

269

4200

269

4000

269

3800

269

3600

269

3400

269

3200

269

3200

26

934

00

2693

600

2

6938

00

269

4000

26

942

00

093005_05_9 5.1

3.9 5.5 6.1 4.5 5.4 BOAT RAMP 5.0

4.4 5.4

093005_01_1 4.7 5.5 4.1 BOAT RAMP 5.3

RIP-RAP 4.9 5.4 -0.8

6.2 5.8

-1.6 1.1 5.8

1.2 -1.7

6.2 -0.8 0.2 -1.7

RIP-RAP

Pease Park -0.8

3.9

-1.7 -1.5 Dredge Areas -1.3 RIP-RAP

-0.5

-1.7

-1.3 6.3 6.1 6.1 5.4

4.3 concrete 093005_03_1 -1.5

3.4 4.3 5.4 possibly 5.2 unpaved area storage area 5.3 5.2

2.4 5.3 6.1 5.2

paved loading area 6.1 5.1

4.7 storage area

5.3 4.7 5.5 7.2 5.5

RIP-RAP 5.2 5.5

5.3 5.1 4.7 RIP-RAP 4.7

5.1

Approximate Location of Dredge Barge Wood 1

-1.4

5.1

5.1 5.2

5.3

5.1

RIP-RAP

093005_03_9 object

unidentifible

6.6 6.6

6.5

6.4

6.3

6.3

6.4

-1.4 -1.5

093005_05_1

Linberg Marine Dredge Areas

6.2

9.1

9.1

10.2

9.3 9.6

-1.7 -1.6

093005_01_9 8.5

6.1 6.1

5.9 6.2 6.4

7.2 7.4 7.9

8.3

5.9 6.3 8.3

8.1 8.3

6.5 7.4 7.7

7.6 8.1

7.7

7.7

0.3 6.2

-0.6 8.1

7.5 7.6

8.2

9.4 -1.7 8.1

8.4 8.4

8.1 7.4

7.4 6.4 10.6 6.3 8.4

6.4 7.5

6.4 5.4

7.4 guiderail

-1.6 9.6 8.3

mobile dry dock 5.1 -0.3 -1.6

visibility limit 9.1

-1.6 -0.4

817400 817600 817800 818000 818200 818400 LEGEND

092905_03_1 - Water Quality Monitoring Location

65 42 .01 1-W Q

_ 09 29 05

LINBERG MARINE DREDGE AREA Figure Scale 1:1200

WATER QUALITY MONITORING LOCATIONS 1" = 100'

50 0 50 100 150 200 JOB # 6542.012 9/30/2005

US survey foot DATE: Sept. 30, 2005 New Bedford Harbor FIGURE 18 Fairhaven, MA REVISIONS DATE BY

18

Page 15: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

10/3/2005 New Bedford Harbor Dredge Project - Phase II - Part 2

Water Quality Monitoring - D.N. Kelley (K1) and SR1 Excavation Areas

Tide Time Time ID Coordinates Up/Down Depth (ft.) Ave. Turbidity Permissible Turbidity Weather Conditions Vessel Low 2:52 Current (NTUs) Increase (NTUs) Traffic

Rising Tide 8:54 100305_03_1 817942.97 Up 2 2.6 Cloudy ~70 deg F None 2693886.54 (Background) 5 5.3 Wind ~ 2 Kts. N

10 14.9 AVERAGE 7.6 27.6

9:01 100305_03_9 817824.33 Down 5 5.3 (Background) Cloudy ~70 deg F None 2693300.85 10 6.3 Wind ~ 2 Kts. N

15 5.5 High 9:38 AVERAGE 5.7 (21.9 Below Permissible

Falling Tide 11:42 100305_05_1 815199.84 Up 5 2.3 Turbidity Increase Limit) Cloudy ~70 deg F None 2693545.07 (Background) 10 2.6 Wind ~ 2 Kts. N

15 3.3 AVERAGE 2.7 22.7

11:49 100305_05_9 815780.63 Down 5 2.8 (Background) Cloudy ~70 deg F None 2692762.94 10 2.0 Wind ~ 2 Kts. N

15 2.2 AVERAGE 2.3 (20.6 Below Permissible

13:40 100305_08_1 815271.74 Up 5 2.8 Turbidity Increase Limit) Cloudy ~70 deg F None 2693858.85 (Background) 10 2.5 Wind ~ 2 Kts. N

15 10.1 AVERAGE 5.1 25.1

13:50 100305_08_9 815561.13 Down 5 7.8 (Background) Cloudy ~70 deg F None 2693013.89 10 2.8 Wind ~ 2 Kts. N

15 6.8 AVERAGE 5.8 (19.3 Below Permissible

15:55 100305_10_1 815750.15 Up 5 5.0 Turbidity Increase Limit) Cloudy ~70 deg F None 2693021.46 (Background) 10 6.9 Wind ~ 2 Kts. N

15 4.7 AVERAGE 5.5 25.5

16:02 100305_10_9 815398.53 Down 5 2.6 (Background) Cloudy ~70 deg F None 2693705.35 10 5.8 Wind ~ 2 Kts. N

15 12.8 AVERAGE 7.1 (18.4 Below Permissible

17:15 100305_11_1 817528.94 Up 5 3.3 Turbidity Increase Limit) Cloudy ~70 deg F None 2692861.62 (Background) 10 2.9 Wind ~ 2 Kts. N

15 4.0 AVERAGE 3.4 23.4

17:30 100305_11_9 817944.4 Down 5 7.3 (Background) Cloudy ~70 deg F None 693276.07 10 11.2 Wind ~ 2 Kts. N

15 11.2 AVERAGE 9.9 (13.5 Below Permissible

Low 17:57 Turbidity Increase Limit)

Notes: An X in the vessel traffic column indicates that either a vessel had passed or there was a movement of spuds that may have had an effect on turbidity.

Page 16: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

Figure

6542.011-WQ

_100305_1

19 Fairhaven, MA

New Bedford Harbor FIGURE 19 DATE BYREVISIONS

DATE: Oct. 3, 2005

JOB # 6542.012

SO. RT. 6 BRIDGE DREDGE AREA

WATER QUALITY MONITORING LOCATIONS

10/3/2005

LEGEND

- Water Quality Monitoring Location

100305_05_9

50 0 50 100 150 200 250 300

US survey foot WGS 84 / Massachusetts CS83 Mainland zone

Scale 1:1200

2692

400

2692

600

2692

800

2693

000

2693

200

2693

400

2693

600

2693

800

2694

000

26924002692600

26928002693000

26932002693400

26936002693800

2694000

814800 815000 815200 815400 815600 815800 816000 816200 816400

814800 815000 815200 815400 815600 815800 816000 816200 816400

100305_05_1

100305_05_9

100305_08_1

100305_08_9 100305_10_1

100305_10_9

South of Route 6 Bridge Dredge Area

Page 17: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

1

-1.7

-1 7

-1 6

0

-0 8

0 4

0 3-0 8

-1 31.3

1 2

mp

5

mob e overheadcrane

crane wheel travel limit

crane wheeltr avel limit

crane wheel travel limit 4.9

4 1

4.14.8

4.84 8

5 1

5.1

5 1

5 15 1

5.4

5.2

5 2

5 2

5 25.2

4 6 4 6

4.64.6

4.44 4

5 1

5.1

5.1

5 1

4 9

4.9

4.6

4 7

4.9

5 1

5

4 4

4 8

4 3

3.84 2

cr ane wheel travellimit

Figure

6542.011-WQ

_100305_2

20 New Bedford, MA

New Bedford Harbor FIGURE 20 DATE BYREVISIONS

DATE: Oct. 3, 2005

JOB # 6542.012

D.N. KELLEY DREDGE AREA WATER QUALITY

MONITORING LOCATIONS 10/3/2005

LEGEND

- Water Quality Monitoring Location

100305_11_1

Approximate Location of Dredge Barge Wood 1

50 0 50 100 150

US survey foot

Scale 1:1200

-1.7

-1.5 -1.4

.

.

-1.7

-1.6

-1.6

-1.6

-1.7

-0.7

.

.

. .

.

-0.3

0.2 -0.4

-0.6

0.3

mobile dry dock

mobile dry dock

.

ra

obselete rail

5

5

il

4.2 3.7 3.7

.

4.5

4.5

4.5

.

.

.

. .

.

.

.

. .

.

.

.

.

.

4.2

4.2

4.1 4.3

4.7

.

.

4.3

4.3

5.2

5.2

3.7

.

.

.

4.3 4.1

.

4.1

4.4

4.6

4.6 3.6

4.6

4.1 4.1 4.1 4.3

4.5 4.2

4.4 4.4

4.5

5.2

guiderail

guiderail

4.8

visibility limit

visibility limit

6.4 6.3 7.4

7.4

7.2

6.2

6.5

6.4 6.2

6.1 6.1

5.9

5.9 6.3

launching ramp

launching ramp

launching ramp

boat/storage area

boat/storage area

tanks

2692

500

2692

600

2692

700

2692

800

2692

900

2693

000

26

9310

0 2

6932

00

2693

300

2693

400

26925002692600

26927002692800

2692900

2693000

2693100

26932002693300

2693400

817500 817600 817700 817800 817900 818000 818100 818200 818300

817500 817600 817700 817800 817900 818000 818100 818200 818300

100305_03_9

100305_11_1

100305_11_9

100305_03_1

Page 18: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

10/6/2005 New Bedford Harbor Dredge Project - Phase II - Part 2

Water Quality Monitoring - D.N. Kelley (K1) Excavation Area

Tide Time Time ID Coordinates Up/Down Depth (ft.) Ave. Turbidity Permissible Turbidity Weather Conditions Vessel Low 3:24 Current (NTUs) Increase (NTUs) Traffic

Rising Tide 7:54 100605_02_1 817847.58 Up 2 1.8 Cloudy ~68 deg. F None 2693813.81 (Background) 5 5.4 Wind 1-5 Kts. NNW

10 8.0 AVERAGE 5.1 25.1

7:58 100605_02_9 817862.67 Down 2 2.0 (Background) Cloudy ~68 deg. F None 2693307.13 4 3.5 Wind 1-5 Kts. NNW

14 1.9 AVERAGE 2.5 (22.6 Below Permissible

9:47 100605_04_1 817865.43 Up 2 1.8 Turbidity Increase Limit) Cloudy ~70 deg. F None 2693879.29 (Background) 10 4.0 Wind 1-5 Kts. NNW

15 10.5 AVERAGE 5.4 25.4

9:49 100605_04_9 817953.21 Down 2 5.0 (Background) Cloudy ~70 deg. F None 2693443.85 8 8.5 Wind 1-5 Kts. NNW

16 3.4 High 10:19 AVERAGE 5.6 (19.8 Below Permissible

Falling Tide 13:15 100605_07_1 817803.18 Up 2 5.0 Turbidity Increase Limit) Sunny ~72 deg. F None 2693010.69 (Background) 5 5.5 Wind 5-10 Kts S

8 5.3 AVERAGE 5.3 25.3

13:10 100605_07_9 817575.01 Down 5 6.5 (Background) Sunny ~72 deg. F None 2692729.49 10 5.3 Wind 5-10 Kts S

15 1.8 AVERAGE 4.5 (20.8 Below Permissible

Low 16:08 Turbidity Increase Limit)

Notes: An X in the vessel traffic column indicates that either a vessel had passed or there was a movement of spuds that may have had an effect on turbidity.

Page 19: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

1

1.7

1.7

1.6

0

0.8

0.4

0 30.8

1 31.3

1.2

mp

5

mob e overheadcrane

crane wheel travel limit

crane wheel travel lim it

crane wheel travel lim it 4.9

4.1

4 14.8

4.84.8

5.1

5.1

5.1

5.1

5 1

5.4

5.2

5.2

5.2

5.25 2

4 6 4.6

4.64.6

4.4

4 4

5 1

5.1

5.1

5.1

4.9

4.9

4.6

4 7

4.9

5.1

5

4.4

4.8

4 3

3.84.2

crane wheel travel limit

Figure

6542.011 -WQ

_100605

21 New Bedford, MA

New Bedford Harbor FIGURE 21 DATE BY REVISIONS

DATE: Oct. 6, 2005

JOB # 6542.012

D.N. KELLEY DREDGE AREA WATER QUALITY

MONITORING LOCATIONS 10/6/2005

LEGEND

- Water Quality Monitoring Location

100605_02_1

Approximate Location of Dredge Barge Wood 1

50 0 50 100 150

US survey foot

Scale 1:1200

-1.7

-1.5 -1.4

-

-

-

-1.7

-1.6

-1.6

-1.6

-1.7

-0.7

-

. -

- .

-0.3

0.2 -0.4

-0.6

0.3

mobile dry dock

mobile dry dock

ra

obselete rail

5

5

il

4.2 3.7 3.7

4.5

4.5

4.5

.

.

.

.

.

.

.

4.2

4.2

4.1 4.3

4.7

.

4.3

4.3

5.2

5.2

3.7

.

4.3 4.1 4.1

4.4

4.6

4.6 3.6

4.6

4.1 4.1 4.1 4.3

4.5 4.2

4.4 4.4

4.5 5.2

guiderail

guiderail

4.8

visibility limit

visibility limit

6.4 6.3 7.4

7.4

7.2

6.2

6.5

6.4 6.2

6.1 6.1

5.9

5.9 6.3

launching ra mp

launching r amp

launching ramp

boat/storage area

boat/storage area

tanks

269

2500

2

6926

00

2692

700

269

280

0 26

929

00

269

3000

26

9310

0 26

9320

0 26

9330

0 2

6934

00

2692500

2692600

269270

026

92800

269290

02

693000

26931

002693

2002693

3002693

400

817500 817600 817700 817800 817900 818000 818100 818200 818300

817500 817600 817700 817800 817900 818000 818100 818200 818300

100605_02_1

100605_02_9

100605_07_1

100605_04_9

100605_04_1

100605_07_9

Page 20: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

10/10/2005 New Bedford Harbor Dredge Project - Phase II

Water Quality Monitoring - Linberg Excavation Area

Tide Time Time ID Coordinates Up/Down Depth (ft.) Ave. Turbidity Permissible Turbidity Weather Conditions Vessel Low 6:21 Current (NTUs) Increase (NTUs) Traffic

Flood Tide 11:09 101005_00_1 817847.58 Up 5 2.6 Raining~50 deg. F None 2693813.81 (Background) 10 2.5 Wind 10 kts SW

15 5.0 AVERAGE 3.3 23.3

11:13 101005_00_9 817862.67 Down 5 2.6 (Background) Raining~50 deg. F None 2693307.13 10 2.5 Wind 10 kts SW

High 1:55 15 3.9 Falling Tide AVERAGE 3.0 (20.3 Below Permissible

13:02 101005_02_1 817865.43 Up 5 4.5 Turbidity Increase Limit) Raining~50 deg. F None 2693879.29 (Background) 10 2.9 Wind 10 kts SW

15 3.5 AVERAGE 3.6 23.6

13:06 101005_02_9 817953.21 Down 2 7.5 (Background) Raining~50 deg. F None 2693443.85 5 15.0 Wind 10 kts SW

10 11.0 AVERAGE 11.2 (12.4 Below Permissible

14:55 101005_04_1 817803.18 Up 5 2.8 Turbidity Increase Limit) Raining~50 deg. F None 2693010.69 (Background) 10 8.0 Wind 10 kts SW

15 9.4 AVERAGE 6.7 26.7

15:15 101005_04_9 817575.01 Down 2 6.1 (Background) Raining~50 deg. F None 2692729.49 5 4.7 Wind 10 kts SW

10 5.0 AVERAGE 5.3 (21.4 Below Permissible

Low 17:48 Turbidity Increase Limit)

Notes: An X in the vessel traffic column indicates that either a vessel had passed or there was a movement of spuds that may have had an effect on turbidity.

Page 21: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

0

0

0

5

5

5

5

5

launching ramp

10

6542.011 -WQ

_101005

817400 817600 817800 818000 818200 818400

5.1

3.9 5.5 6.1

BOAT RAMP 4.5 5.4

5.0 4.4 5.4

4.7 4.1 5.5

BOAT RAMP 5.3 RIP-RAP 4.9 5.4

-0.8 101005_02_9 6.2 5.8

-1.6 1.1 5.8

1.2 -1.7

-0.8 0.2 6.2

-1.7

RIP-RAP

Pease Park -0.8

3.9

Dredge Areas 101005_00_9 -1.7

-1.7

-1.5

-1.3 RIP-RAP

-1.3 -0.5

6.3

5.4 6.1 6.1

-1.5 4.3 concrete

101005_04_1 2.4

3.4

unpaved area possibly

4.3 5.4

6.1 5.3 5.2

5.2

storage area 5.2

5.3

269

4200

2694

0002

69380

026

93600

269

3400

26932

00

269

320

0 26

934

00

269

360

0 26

938

00

269

400

0 26

942

00

paved loading area 6.1 5.1

4.7 storage area

5.3 4.7 5.5 7.2 5.5

RIP-RAP 5.2 5.5

5.3 5.1 4.7

RIP-RAP 4.7 Approximate Location 5.1

-1.4 of Dredge Barge Wood 1 5.1 5.1 5.2

5.1 5.3

RIP-RAP

unidentifible 6.3 object

6.4 6.6

6.6 6.5 6.3

6.4

Linberg Marine 6.2

Dredge Areas 10.2 -1.4 -1.5

9.1 9.6

9.3 9.1

-1.7 101005_04_9 -1.6 8.5

6.1

101005_02_1 6.1

5.9

5.9 6.2

6.3

6.4 7.2 7.4

7.9

8.3

8.3

8.1 8.3

6.5 7.6 8.1 7.7 7.4 7.7

7.7

6.2 0.3

-0.6 8.1

7.5 7.6

-1.7 101005_00_1 8.1

8.2

9.4

8.4 8.4

8.1 7.4

7.4 6.4 6.3 10.6 8.4

6.4 7.5

6.4 5.4

7.4 guiderail

-1.6 9.6

8.3

mobile dry dock 5.1

-1.6 -0.3 visibility limit 9.1

-1.6 -0.4

817400 817600 817800 818000 818200 818400 LEGEND

101005_03_1 - Water Quality Monitoring Location

LINBERG MARINE DREDGE AREA Figure Scale 1:1200

WATER QUALITY MONITORING LOCATIONS 1" = 100'

50 0 50 100 150 200 JOB # 6542.012 10/10/2005

US survey foot DATE: Oct. 10, 2005 New Bedford Harbor Fairhaven, MA FIGURE 22 REVISIONS DATE BY

22

Page 22: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

10/17/2005 New Bedford Harbor Dredge Project - Phase II

Water Quality Monitoring - Linberg Excavation Area

Tide Time Time ID Coordinates Up/Down Depth (ft.) Ave. Turbidity Permissible Turbidity Weather Conditions Vessel Current (NTUs) Increase (NTUs) Traffic

7:40 101705_02_1 817878.96 Up 5 8.5 Sunny~50 deg. F None 2693561.4 (Background) 10 3.5 Wind 10 kts NW

15 4.0 AVERAGE 5.3 25.3

7:45 101705_02_9 817948.07 Down 2 10.5 (Background) Sunny~50 deg. F None 2694131.6 5 3.1 Wind 10 kts NW

High 8:11 10 0.9 Falling Tide AVERAGE 4.8 (23.3 Below Permissible

9:35 101705_04_1 818036.19 Up 2 7.8 Turbidity Increase Limit) Sunny~50 deg. F None 2694183.4 (Background) 5 8.0 Wind 10 kts NW

8 7.3 AVERAGE 7.7 27.7

9:40 101705_4_9_1 818134.68 Down 5 10.5 (Background) Sunny~50 deg. F * 2693870.7 10 24.0 Wind 10 kts NW

15 50.0 AVERAGE 28.2 (19.4 Below Permissible

9:52 101705_4_9_2 817941.16 Down 5 42.0 Turbidity Increase Limit) Sunny~50 deg. F * 2693805.6 10 80.0 Wind 10 kts NW

15 45.0 AVERAGE 55.7 (19.0 Below Permissible

10:00 101705_4_cso 817633.61 Down 5 125.0 Turbidity Increase Limit) Sunny~50 deg. F * (cso up current) 2694021 7 37.5 Wind 10 kts NW

AVERAGE 81.3 81.3 10:12 101705_4_cso_2 817816.76 Down 2 50.0 Sunny~50 deg. F *

(cso up current) 2693756.6 5 40.0 Wind 10 kts NW 10 125.0

AVERAGE 71.7 91.7 10:18 101705_4_9_3 818143.32 Down 5 13.0 Sunny~50 deg. F *

(cso Down current) 2693908.7 10 18.0 Wind 10 kts NW AVERAGE 15.5 15.5

10:25 101705_4_9_4 817982.63 Down 5 11.5 Sunny~50 deg. F * (cso down current) 2694036.6 10 22.0 Wind 10 kts NW

15 14.5 AVERAGE 16.0 16.0

10:35 101705_5_1 817832.31 Up 5 22.5 Sunny~50 deg. F None 2694119.5 (Background) 10 10.0 Wind 10 kts NW

15 9.0 AVERAGE 13.8 28.8

10:27 101705_5_9 817802.93 Down 5 10.0 (Background) Sunny~50 deg. F None 2693701.4 10 42.5 Wind 10 kts NW

15 14.5 AVERAGE 22.3 (6.5 Below Permissible

11:15 101705_6_1 817683.71 Up 5 9.0 Turbidity Increase Limit) Sunny~50 deg. F None 2694084.9 (Background) 10 12.0 Wind 10 kts NW

15 10.5 AVERAGE 10.5 25.5

11:23 101705_6_9 817873.78 Down 2 11.0 (Background) Sunny~50 deg. F None 2693468.1 5 11.2 Wind 10 kts NW

10 8.0 AVERAGE 10.2 (15.3 Below Permissible

11:55 101705_7_1 817557.58 Up 2 9.9 Turbidity Increase Limit) Sunny~50 deg. F None 2694126.4 (Background) 5 2.5 Wind 10 kts NW

10 12.0 AVERAGE 8.1 28.1

12:05 101705_7_9 817759.74 Down 5 9.1 (Background) Sunny~50 deg. F None 2693742.8 10 9.2 Wind 10 kts NW

Low 13:24 15 7.6 Flood Tide AVERAGE 8.6 (19.0 Below Permissible

13:35 101705_8_1 817889.33 Up 2 55.0 Turbidity Increase Limit) Sunny~50 deg. F None 2693333.3 (Background) 3 60.0 Wind 10 kts NW

5 100.3 AVERAGE 71.8 93.3

13:42 101705_8_9 817749.37 Down 5 25.0 (Background) Sunny~50 deg. F None 2693976.1 10 10.0 Wind 10 kts NW

12 7.5 High 19:04 AVERAGE 14.2 (79.1 Below Permissible

Turbidity Increase Limit)

* - Observed CSO flowing into harbor up current from dredge

Notes: An X in the vessel traffic column indicates that either a vessel had passed or there was a movement of spuds that may have had an effect on turbidity.

Page 23: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

0

0

0

5

5

5

5

5

launching ramp

10

817400 817600 817800 818000 818200 818400

101705_02_9

101705_07_1 101705_04_1

101705_05_1 101705_04_cso

101705_06_1 101705_04_9_4

5.1

101705_08_9 3.9

BOAT RAMP 4.5

4.4 5.0

5.4 5.5 6.1

5.4 4.7

4.1 5.5 BOAT RAMP 5.3

RIP-RAP 5.4 4.9 -0.8

6.2 5.8

269

3200

26

9340

0 2

6936

00

269

3800

26

9400

0 2

6942

00 26

94200

2694

000

269

3800

26936

0026

9340

02

6932

00

-1.6 Pease Park 101705_04_9_3 1.1 5.8

1.2 -1.7 Dredge Areas

-0.8 0.2 6.2

-1.7

RIP-RAP

-0.8

Approximate Location of Dredge Barge Wood 1 101705_04_9_2

-1.7

5.4 6.1 6.1

101705_04_9_1

-1.5

-1.5

-1.7

-0.5

-1.3

-1.3

RIP-RAP

3.9

6.3

4.3 concrete

101705_04_cso_2 2.4

3.4

unpaved area possibly

4.3 5.4

6.1 5.3 5.2

5.2

storage area 5.2

5.3

paved loading area 6.1 5.1

4.7 storage area

5.3 101705_07_9 4.7 5.5 7.2 5.5

RIP-RAP 5.2 5.5

4.7 RIP-RAP 4.7 101705_05_9

5.3 5.1

5.1

-1.4 5.2

5.1 5.1

5.1 5.3

RIP-RAP

101705_02_1 object

unidentifible

6.6

6.6

6.3

6.4

6.5 6.3 6.4

101705_06_9 Linberg Marine 6.2

-1.4 -1.5 Dredge Areas 10.2

9.1 9.6 9.1 9.3

-1.7 -1.6

8.5

101705_08_1 6.1 6.1

5.9

5.9 6.2

6.3

6.5

6.4

7.4

7.4 7.2

7.6 7.7

7.9

8.3

8.1

8.3

8.1

7.7

7.7

8.3

0.3 6.2

-0.6

7.5

8.1

8.2

7.6

-1.7 8.1 9.4

8.4 8.4

8.1 7.4

7.4 6.4 10.6 6.3 8.4

6.4 7.5

6.4 5.4

7.4 guiderail

-1.6 9.6

8.3

mobile dry dock 5.1 -0.3 -1.6

visibility limit 9.1 -0.4 -1.6

817400 817600 817800 818000 818200 818400 LEGEND

101705_08_1 - Water Quality

Monitoring Location

Figure LINBERG MARINE DREDGE AREA Scale 1:1200

WATER QUALITY 1" = 100' MONITORING LOCATIONS

50 0 50 100 150 200 JOB # 6542.012 10/17/2005

US survey foot DATE: Oct. 17, 2005 New Bedford Harbor Fairhaven, MA FIGURE 23 REVISIONS DATE BY

6542.012-W Q_101 705

23

Page 24: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

10/21/2005 New Bedford Harbor Dredge Project - Phase II

Water Quality Monitoring - D.N. Kelley (K-3 and K-4) Excavation Area

Tide Time Time ID Coordinates Up/Down Depth (ft.) Ave. Turbidity Permissible Turbidity Weather Conditions Vessel Low 4:00 Current (NTUs) Increase (NTUs) Traffic

Flood Tide 9:53 102105_00_1 817663.71 Up 5 1.6 Sunny~60 deg. F None 2692681.4 (Background) 10 1.4 Wind 5 kts E

15 1.5 AVERAGE 1.5 21.5

10:00 102105_01_1 817693.74 Up 5 4.8 (Background) Sunny~60 deg. F None 2692561.5 (Background) 10 1.6 Wind 5 kts E

15 2.3 AVERAGE 2.9 22.9

10:03 102105_01_9 817921.39 Down 5 5.5 (Background) Sunny~60 deg. F None 2692800.1 10 1.8 Wind 5 kts E

15 1.5 AVERAGE 2.9 (20.0 Below Permissible

11:15 102105_02_1 817895.49 Up 5 1.6 Turbidity Increase Limit) Sunny~60 deg. F None 2692547.8 (Background) 10 1.5 Wind 5 kts E

High 11:18 15 3.5 Falling Tide AVERAGE 2.2 22.2

11:20 102105_02_9 817834.14 Down 5 8.5 (Background) Sunny~60 deg. F None 2692832.8 10 9.8 Wind 5 kts E

15 6.1 AVERAGE 8.1 (14.1 Below Permissible

12:10 102105_03_1 818008.65 Up 5 7.0 Turbidity Increase Limit) Sunny~60 deg. F None 2692820.5 (Background) 10 7.5 Wind 5 kts E

15 8.5 AVERAGE 7.7 27.7

12:06 102105_03_9 817780.9 Down 5 5.5 (Background) Sunny~60 deg. F None 2692511.7 10 5.8 Wind 5 kts E

15 5.5 AVERAGE 5.6 (22.1 Below Permissible

Low 17:09 Turbidity Increase Limit)

Notes: An X in the vessel traffic column indicates that either a vessel had passed or there was a movement of spuds that may have had an effect on turbidity.

Page 25: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

1

1.7

1.7

1.6

0

0.8

0.4

0 30.8

1 31.3

1.2

mp

5

mob e overheadcrane

crane wheel travel limit

crane wheel travel lim it

crane wheel travel lim it 4.9

4.1

4 14.8 4.8

4.8

5.1

5.1

5.1

5.1

5 1

5.4

5.2

5.2

5.2

5.25 2

4 6 4.6

4.64.6

4.44 4

5 1

5.1

5.1

5.1

4.9

4.9

4.6

4 7

4.9

5.1

5

4.4

4.8

4 3

3.84.2

crane wheel travel limit

Figure

6542.012-W Q

_102105

24 New Bedford, MA

New Bedford Harbor FIGURE 24 DATE BY REVISIONS

DATE: Oct. 21, 2005

JOB # 6542.012

D.N. KELLEY DREDGE AREA WATER QUALITY

MONITORING LOCATIONS 10/21/2005

LEGEND

- Water Quality Monitoring Location

102105_02_1

Approximate Location of Dredge Barge Wood 1

50 0 50 100 150

US survey foot

Scale 1:1200

-1.7

-1.5 -1.4

-

-

-

-1.7

-1.6

-1.6

-1.6

-1.7

-0.7

-

. -

- .

-0.3

0.2 -0.4

-0.6

0.3

mobile dry dock

mobile dry dock

ra

obselete rail

5

5

il

4.2 3.7 3.7

4.5

4.5

4.5

.

.

.

.

.

.

.

4.2

4.2

4.1 4.3

4.7

.

4.3

4.3

5.2

5.2

3.7

.

4.3 4.1 4.1

4.4

4.6

4.6 3.6

4.6

4.1 4.1 4.1 4.3

4.5 4.2

4.4 4.4

4.5

5.2

guiderail

guiderail

4.8

visibility limit

visibility limit

6.4 6.3 7.4

7.4

7.2

6.2

6.5

6.4 6.2

6.1 6.1

5.9

5.9 6.3

launching ra mp

launching r amp

launching ramp

boat/storage area

boat/storage area

tanks

269

250

0 26

9260

0 26

9270

0 2

692

800

269

2900

26

930

00

2693

100

26

932

00

269

330

0 26

934

00

26925

002

692600

2692

7002

692800

2692900

269300

0269

3100

269320

026

93300

26934

00

817500 817600 817700 817800 817900 818000 818100 818200 818300

817500 817600 817700 817800 817900 818000 818100 818200 818300

100605_02_1

102105_00_1

102105_01_1

102105_03_1 102105_01_9

102105_02_9

102105_03_9

Page 26: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

9/21/2005 New Bedford Harbor Dredge Project - Phase II - Part 2

Water Quality Monitoring - CAD Cell Disposal Area - Disposal # 1 Scow - Eddie Carroll - (Mostly Mud)

Tide Time Time ID Coordinates Up/Down Depth (ft.) Ave. Turbidity Permissible Turbidity Weather Conditions Vessel Low 3:56 Current (NTUs) Increase (NTUs) Traffic

Rising Tide

High 10:57

10:54 092105_d1_00 815094.22 Up 5 3.4 Sunny ~ 75 deg. F None 2695756.76 (Background) 15 2.5 Wind 5-10 kts W

10:56 DISPOSAL #1 STARTED 25 5.0

AVERAGE 3.6 43.6 Falling Tide 10:57 092105_d1_01 815093.01 Down 5 2.7 (Background) Sunny ~ 75 deg. F None

2695659.56 15 3.5 Wind 5-10 kts W 25 5.5

AVERAGE 3.0 (40.7 Below Permissible 10:59 092105_d1_03 814859.63 Down 5 2.3 Turbidity Increase Limit) Sunny ~ 75 deg. F None

2695828.06 15 2.5 Wind 5-10 kts W 25 5.5

AVERAGE 3.4 (40.2 Below Permissible 11:01 092105_d1_06 814789.68 Down 5 1.4 Turbidity Increase Limit) Sunny ~ 75 deg. F None

2696057.59 15 2.7 Wind 5-10 kts W 25 4.8

AVERAGE 2.9 (40.7 Below Permissible 11:12 092105_d1_15 814956.39 Down 5 5.0 Turbidity Increase Limit) Sunny ~ 75 deg. F None

2695834.56 15 3.8 Wind 5-10 kts W 25 5.0

AVERAGE 4.6 (39.7 Below Permissible Low 16:47 Turbidity Increase Limit)

Notes: An X in the vessel traffic column indicates that either a vessel had passed or there was a movement of spuds that may have had an effect on turbidity.

Page 27: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

Eddie Carroll

2695

000

2695

200

2695

400

2695

600

2695

800

2696

000

2696

200

2696

400

2696

600

814000 814200 814400 814600 814800 815000 815200 815400 815600 815800 816000

092105_d1_06

2696600 2696400

26962002696000

26958002695600

26954002695200

2695000

092105_d1_15092105_d1_03

092105_d1_00

092105_d1_01

814000 814200 814400 814600 814800 815000 815200 815400 815600 815800 816000

LEGEND 092205_d1_00

- Water Quality Monitoring Location

Figure CAD CELL DISPOSAL Scale 1:2400 WATER QUALITY

MONITORING LOCATIONS 1" = 200' 100 0 100 200 300

JOB # 6542.011 DISPOSAL #1 - 9/21/2005 DATE: Sept. 21, 2005 US survey footNew Bedford Harbor

New Bedford, MAFIGURE 7 REVISIONS DATE BY

65 42.011-DIS

P. #1 7

Page 28: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

9/22/2005 New Bedford Harbor Dredge Project - Phase II - Part 2

Water Quality Monitoring - CAD Cell Disposal Area - Disposal # 2 Scow - SEI 2000 (Mostly Mud)

Tide Time Time ID Coordinates Up/Down Depth (ft.) Ave. Turbidity Permissible Turbidity Weather Conditions Vessel Low 3:56 Current (NTUs) Increase (NTUs) Traffic

Rising Tide

High 11:48

11:14 092205_d2_00 814615.34 Up 5 2.5 Sunny ~ 80 deg. F None 2695266.84 (Background) 15 2.6 Wind 1-5 kts SW

11:42 DISPOSAL #2 STARTED 25 3.0

AVERAGE 2.7 42.7 Falling Tide 11:43 092205_d2_01 814996.05 Down 5 3.0 Background Sunny ~ 80 deg. F None

2695913.17 15 5.0 Wind 1-5 kts SW 25 5.0

AVERAGE 4.3 (38.4 Below Permissible 11:44 092205_d2_02 814910.81 Down 5 5.5 Turbidity Increase Limit) Sunny ~ 80 deg. F None

2696010.02 15 4.3 Wind 1-5 kts SW 25 3.8

AVERAGE 4.5 (38.2 Below Permissible 11:46 092205_d2_04 814721.45 Down 5 3.0 Turbidity Increase Limit) Sunny ~ 80 deg. F None

2695890.99 15 3.5 Wind 1-5 kts SW 25 3.5

AVERAGE 3.3 (39.4 Below Permissible 11:51 092205_d2_07 814763.43 Down 5 2.8 Turbidity Increase Limit) Sunny ~ 80 deg. F None

2695742.21 15 4.3 Wind 1-5 kts SW 25 4.6

AVERAGE 3.9 (38.8 Below Permissible Low 17:31 Turbidity Increase Limit)

Notes: An X in the vessel traffic column indicates that either a vessel had passed or there was a movement of spuds that may have had an effect on turbidity.

Page 29: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

SEI 2000

2695

000

2695

200

2695

400

2695

600

2695

800

2696

000

2696

200

2696

400

2696

600

814000 814200 814400 814600 814800 815000 815200 815400 815600 815800 816000

092205_d2_02

092205_d2_01 092205_d2_04

2696600 2696400

26962002696000

26958002695600

26954002695200

2695000

092205_d2_07

092205_d2_00

814000 814200 814400 814600 814800 815000 815200 815400 815600 815800 816000

LEGEND 092205_d2_02

- Water Quality Monitoring Location

Figure CAD CELL DISPOSAL Scale 1:2400

WATER QUALITY MONITORING LOCATIONS 1" = 200'

100 0 100 200 300 JOB # 6542.011 DISPOSAL #2 - 9/22/2005 DATE: Sept. 22, 2005 US survey foot New Bedford Harbor FIGURE 8 New Bedford, MA REVISIONS DATE BY

6542.011-DISP . #2 8

Page 30: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

9/22/2005 New Bedford Harbor Dredge Project - Phase II - Part 2

Water Quality Monitoring - CAD Cell Disposal Area - Disposal # 3 Scow - Mighty Quinn (Mostly Mud)

Tide Time Time ID Coordinates Up/Down Depth (ft.) Ave. Turbidity Permissible Turbidity Weather Conditions Vessel High 11:48 Current (NTUs) Increase (NTUs) Traffic

Falling Tide 11:14 092205_d3_00 814615.34 Up 5 2.5 Sunny ~ 80 deg. F None 2695266.84 (Background) 15 2.6 Wind 1-5 kts SW

12:06 DISPOSAL #3 STARTED 25 3.0

AVERAGE 2.7 42.7 12:13 092205_d3_07 815012.56 Down 5 3.5 Background Sunny ~ 80 deg. F None

2695876.22 15 4.6 Wind 1-5 kts SW 25 5.5

AVERAGE 4.5 (38.2 Below Permissible 12:16 092205_d3_10 814904.62 Down 5 3.2 Turbidity Increase Limit) Sunny ~ 80 deg. F None

2695948.32 15 3.4 Wind 1-5 kts SW 25 5.5 35 10.0

AVERAGE 5.5 (37.2 Below Permissible 12:21 092205_d3_15 814629.79 Down 5 2.6 Turbidity Increase Limit) Sunny ~ 80 deg. F None

2695809.59 15 3.5 Wind 1-5 kts SW 25 4.1

AVERAGE 3.4 (39.3 Below Permissible 12:24 092205_d3_18 815027.07 Down 5 2.6 Turbidity Increase Limit) Sunny ~ 80 deg. F None

2695961.87 15 7.5 Wind 1-5 kts SW 25 5.0

AVERAGE 5.0 (37.0 Below Permissible Low 17:53 Turbidity Increase Limit)

Notes: An X in the vessel traffic column indicates that either a vessel had passed or there was a movement of spuds that may have had an effect on turbidity.

Page 31: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

Migh ty Qu inn

2695

000

2695

200

2695

400

2695

600

2695

800

2696

000

2696

200

2696

400

2696

600

814000 814200 814400 814600 814800 815000 815200 815400 815600 815800 816000

092205_d3_10

092205_d3_18

2696600 2696400

26962002696000

26958002695600

26954002695200

2695000

092205_d3_15 092205_d3_07

092205_d3_00

814000 814200 814400 814600 814800 815000 815200 815400 815600 815800 816000

LEGEND 092205_d3_07

- Water Quality Monitoring Location

Figure CAD CELL DISPOSAL Scale 1:2400 WATER QUALITY

MONITORING LOCATIONS 1" = 200' 100 0 100 200 300

JOB # 6542.011 DISPOSAL #3 - 9/22/2005 DATE: Sept. 22, 2005 US survey foot New Bedford Harbor

New Bedford, MA FIGURE 9 REVISIONS DATE BY

6542.011-DISP. #3 9

Page 32: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

9/22/2005 New Bedford Harbor Dredge Project - Phase II - Part 2

Water Quality Monitoring - CAD Cell Disposal Area - Disposal # 4 Scow - Peqoud (Mostly Sand)

Tide Time Time ID Coordinates Up/Down Depth (ft.) Ave. Turbidity Permissible Turbidity Weather Conditions Vessel High 11:48 Current (NTUs) Increase (NTUs) Traffic

Falling Tide 11:14 092205_d4_00 814615.34 Up 5 2.5 Sunny ~ 80 deg. F None 2695266.84 (Background) 15 2.6 Wind ~ 1-5 kts SW

12:32 DISPOSAL #4 STARTED 25 3.0

AVERAGE 2.7 42.7 12:36 092205_d4_04 814843.98 Down 5 3.4 Background Sunny ~ 80 deg. F None

2695975.57 15 7.0 Wind ~ 1-5 kts SW 25 4.5

AVERAGE 5.0 (37.7 Below Permissible 12:40 092205_d4_08 814861.34 Down 5 3.1 Turbidity Increase Limit) Sunny ~ 80 deg. F None

2695946.36 15 4.0 Wind ~ 1-5 kts SW 25 11.0

AVERAGE 6.0 (36.7 Below Permissible 12:44 092205_d4_12 814867.16 Down 5 5.0 Turbidity Increase Limit) Sunny ~ 80 deg. F None

2696014.75 15 6.5 Wind ~ 1-5 kts SW 25 10.5

AVERAGE 7.3 (35.4 Below Permissible 12:48 092205_d4_16 814758.63 Down 5 6.0 Turbidity Increase Limit) Sunny ~ 80 deg. F None

2695809.41 15 5.0 Wind ~ 1-5 kts SW 25 2.9

AVERAGE 4.6 (38.1 Below Permissible Low 17:53 Turbidity Increase Limit)

Notes: An X in the vessel traffic column indicates that either a vessel had passed or there was a movement of spuds that may have had an effect on turbidity.

Page 33: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

Peqoud

6542.011-DISP. #4

2695

000

2695

200

2695

400

2695

600

2695

800

2696

000

2696

200

2696

400

2696

600

814000 814200 814400 814600 814800 815000 815200 815400 815600 815800 816000

092205_d4_12 092205_d4_04

092205_d4_08

092205_d4_16

092205_d4_00

814000 814200 814400 814600 814800 815000 815200 815400 815600 815800 816000

LEGEND 092205_d4_08

2696600 2696400

26962002696000

26958002695600

26954002695200

2695000

- Water Quality Monitoring Location

Figure CAD CELL DISPOSAL Scale 1:2400

10 JOB # 6542.011

WATER QUALITY MONITORING LOCATIONS

DISPOSAL #4 - 9/22/2005 100 0 100

1" = 200' 200 300

DATE: Sept. 22, 2005 New Bedford Harbor US survey foot FIGURE 10 New Bedford, MA

REVISIONS DATE BY

Page 34: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

9/22/2005 New Bedford Harbor Dredge Project - Phase II - Part 2

Water Quality Monitoring - CAD Cell Disposal Area - Disposal # 5 Scow - Eddie Carroll (Mostly Sand)

Tide Time Time ID Coordinates Up/Down Depth (ft.) Ave. Turbidity Permissible Turbidity Weather Conditions Vessel High 11:48 Current (NTUs) Increase (NTUs) Traffic

Falling Tide 13:13 092205_d5_00 815094.21 Up 5 4.0 Sunny ~ 80 deg. F None 2695756.76 (Background) 15 4.8 Wind ~ 1-5 kts SW

13:20 DISPOSAL #5 STARTED 25 8.0

AVERAGE 5.6 45.6 13:22 092205_d5_02 814950.44 Down 5 3.5 (Background) Sunny ~ 80 deg. F None

2696020.86 15 9.0 Wind ~ 1-5 kts SW 25 12.3

AVERAGE 8.3 (37.3 Below Permissible 13:24 092205_d5_04 814848.1 Down 5 4.0 Turbidity Increase Limit) Sunny ~ 80 deg. F None

2695945.08 15 10.5 Wind ~ 1-5 kts SW 25 17.5 35 25.0

AVERAGE 14.3 (31.3 Below Permissible 13:26 092205_d5_06 814817.67 Down 5 3.4 Turbidity Increase Limit) Sunny ~ 80 deg. F None

2696017.28 15 6.5 Wind ~ 1-5 kts SW 25 15.2

AVERAGE 8.4 (37.2 Below Permissible Low 17:53 Turbidity Increase Limit)

Notes: An X in the vessel traffic column indicates that either a vessel had passed or there was a movement of spuds that may have had an effect on turbidity.

Page 35: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

EddieCarro

ll

2695

000

2695

200

2695

400

2695

600

2695

800

2696

000

2696

200

2696

400

2696

600

814000 814200 814400 814600 814800 815000 815200 815400 815600 815800 816000

092205_d5_06 092205_d5_02

092205_d5_04

2696600 2696400

26962002696000

26958002695600

26954002695200

2695000

092205_d5_00

814000 814200 814400 814600 814800 815000 815200 815400 815600 815800 816000

LEGEND 092205_d5_04

- Water Quality Monitoring Location

Figure CAD CELL DISPOSAL Scale 1:2400 WATER QUALITY

MONITORING LOCATIONS 1" = 200' 100 0 100 200 300

JOB # 6542.011 DISPOSAL #5 - 9/22/2005 DATE: Sept. 22, 2005 US survey foot FIGURE 11

New Bedford Harbor New Bedford, MA

REVISIONS DATE BY

6542.011-DISP. #5 11

Page 36: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

9/25/2005 New Bedford Harbor Dredge Project - Phase II - Part 2

Water Quality Monitoring - CAD Cell Disposal Area - Disposal # 6 Scow - Eddie Carroll (Mostly Sand)

Tide Time Time ID Coordinates Up/Down Depth (ft.) Ave. Turbidity Permissible Turbidity Weather Conditions Vessel Low 6:51 Current (NTUs) Increase (NTUs) Traffic

Falling Tide 7:11 092505_d6_00 814693.78 Up 5 1.7 Sunny ~ 75 deg. F None 2695373.13 (Background) 15 2.6 Wind ~ 1-5 kts SW

7:45 DISPOSAL #6 STARTED 25 3.8

AVERAGE 2.7 42.7 7:46 092505_d6_01 814941.43 Down 5 2.5 (Background) Sunny ~ 75 deg. F None

2696086.79 15 9.0 Wind ~ 1-5 kts SW 25 6.5

AVERAGE 6.0 (36.7 Below Permissible 7:49 092505_d6_04 814727.54 Down 5 2.0 Turbidity Increase Limit) Sunny ~ 75 deg. F None

2695937.28 15 4.5 Wind ~ 1-5 kts SW 25 4.0

AVERAGE 3.5 (39.2 Below Permissible 7:52 092505_d6_07 814694.1 Down 5 4.0 Turbidity Increase Limit) Sunny ~ 75 deg. F None

2696061.19 15 5.5 Wind ~ 1-5 kts SW 25 5.0

AVERAGE 4.8 (37.9 Below Permissible High 14:35 Turbidity Increase Limit)

Notes: An X in the vessel traffic column indicates that either a vessel had passed or there was a movement of spuds that may have had an effect on turbidity.

Page 37: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

Edd ie Carroll

2695

000

2695

200

2695

400

2695

600

2695

800

2696

000

2696

200

2696

400

2696

600

814000 814200 814400 814600 814800 815000 815200 815400 815600 815800 816000

092505_d6_01092505_d6_07

2696600 2696400

26962002696000

26958002695600

26954002695200

2695000

092505_d6_04

092505_d6_00

814000 814200 814400 814600 814800 815000 815200 815400 815600 815800 816000

LEGEND 092505_d6_00

- Water Quality Monitoring Location

Figure CAD CELL DISPOSAL Scale 1:2400

12 JOB # 6542.011

WATER QUALITY MONITORING LOCATIONS

DISPOSAL #6 - 9/25/2005 100 0 100

1" = 200' 200 300

DATE: Sept. 25, 2005 New Bedford Harbor US survey foot FIGURE 12 New Bedford, MA REVISIONS DATE BY

6542.011-D ISP

.# 6

Page 38: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

9/26/2005 New Bedford Harbor Dredge Project - Phase II - Part 2

Water Quality Monitoring - CAD Cell Disposal Area - Disposal # 7 Scow - Mighty Quinn (Mostly Sand)

Tide Time Time ID Coordinates Up/Down Depth (ft.) Ave. Turbidity Permissible Turbidity Weather Conditions Vessel High 15:40 Current (NTUs) Increase (NTUs) Traffic

Falling Tide 16:26 092605_d7_00 815104.9 Up 5 2.3 Sunny ~ 75 deg. F None 2695866.6 (Background) 15 2.4

16:52 DISPOSAL #7 STARTED 25 2.3

AVERAGE 2.3 42.3 16:53 092605_d7_01 814810.4 Down 5 2.3 (Background) None

2695776.4 15 3.3 25 5.0

AVERAGE 3.5 (38.8 Below Permissible 16:55 092605_d7_03 814806.4 Down 5 2.5 Turbidity Increase Limit) None

2695591.8 15 2.4 25 3.1

AVERAGE 2.7 (39.6 Below Permissible 16:58 092605_d7_06 814814.8 Down 5 2.6 Turbidity Increase Limit) None

2695762.5 15 2.4 25 3.3

AVERAGE 2.8 (39.5 Below Permissible 17:02 092605_d7_10 815033.7 Down 5 3.3 Turbidity Increase Limit) None

2695994.9 15 3.0 25 4.0

AVERAGE 3.4 (38.9 Below Permissible 17:07 092605_d7_15 814995.1 Down 5 2.7 Turbidity Increase Limit) None

2695818.1 15 2.4 25 2.5

AVERAGE 2.5 (39.8 Below Permissible Low 22:47 Turbidity Increase Limit)

Notes: An X in the vessel traffic column indicates that either a vessel had passed or there was a movement of spuds that may have had an effect on turbidity.

Page 39: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

Mighty Quinn

2695

000

2695

200

2695

400

2695

600

2695

800

2696

000

2696

200

2696

400

2696

600

814000 814200 814400 814600 814800 815000 815200 815400 815600 815800 816000

092605_d7_10

2696600 2696400

26962002696000

26958002695600

26954002695200

2695000

092605_d7_00

092605_d7_15 092605_d7_01

092605_d7_06

092605_d7_03

814000 814200 814400 814600 814800 815000 815200 815400 815600 815800 816000

LEGEND 092505_d7_01

- Water Quality Monitoring Location

Figure CAD CELL DISPOSAL Scale 1:2400 WATER QUALITY

MONITORING LOCATIONS 1" = 200' 100 0 100 200 300 JOB # 6542.011 DISPOSAL #7 - 9/26/2005

DATE: Sept. 26, 2005 US survey foot New Bedford Harbor FIGURE 13 New Bedford, MA REVISIONS DATE BY

6542.011-D ISP

. #7 13

Page 40: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

9/27/2005 New Bedford Harbor Dredge Project - Phase II - Part 2

Water Quality Monitoring - CAD Cell Disposal Area - Disposal # 9 Scow - Peqoud (Mostly Mud)

Tide Time Time ID Coordinates Up/Down Depth (ft.) Ave. Turbidity Permissible Turbidity Weather Conditions Vessel High 14:46 Current (NTUs) Increase (NTUs) Traffic

Falling Tide 16:42 092705_d9_00 814755.4 Up 5 2.9 Sunny ~ 75 deg. F None 2695300.9 (Background) 15 5.5 Wind 5-10 Kts SW

17:32 DISPOSAL #9 STARTED 25 5.0

AVERAGE 4.5 44.5 17:34 092705_d9_02 814894.6 Down 5 1.5 (Background) Sunny ~ 75 deg. F None

2695728.1 15 2.5 Wind 5-10 Kts SW 25 2.8

AVERAGE 2.3 (42.2 Below Permissible 17:36 092705_d9_04 814846.1 Down 5 1.8 Turbidity Increase Limit) Sunny ~ 75 deg. F None

2695696.9 15 2.6 Wind 5-10 Kts SW 25 3.0

AVERAGE 2.5 (42.0 Below Permissible 17:38 092705_d9_06 814805.7 Down 5 2.2 Turbidity Increase Limit) Sunny ~ 75 deg. F None

2695724.5 15 2.9 Wind 5-10 Kts SW 25 3.8

AVERAGE 3.0 (41.5 Below Permissible 17:40 092705_d9_08 814961.8 Down 5 2.3 Turbidity Increase Limit) Sunny ~ 75 deg. F None

2695829.8 15 2.4 Wind 5-10 Kts SW 25 3.0

AVERAGE 2.6 (41.9 Below Permissible 17:42 092705_d9_10 814950.7 Down 5 1.8 Turbidity Increase Limit) Sunny ~ 75 deg. F None

2695766.2 15 2.5 Wind 5-10 Kts SW 25 2.4

AVERAGE 2.2 (42.3 Below Permissible Low 23:54 Turbidity Increase Limit)

Notes: An X in the vessel traffic column indicates that either a vessel had passed or there was a movement of spuds that may have had an effect on turbidity.

Page 41: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

Peqoud

2695

000

2695

200

2695

400

2695

600

2695

800

2696

000

2696

200

2696

400

2696

600

814000 814200 814400 814600 814800 815000 815200 815400 815600 815800 816000

2696600 2696400

26962002696000

26958002695600

26954002695200

2695000

092705_d9_08

092705_d9_06 092705_d9_10 092705_d9_02

092705_d9_04

092705_d9_00

814000 814200 814400 814600 814800 815000 815200 815400 815600 815800 816000

LEGEND 092505_d9_02

- Water Quality Monitoring Location

Figure CAD CELL DISPOSAL Scale 1:2400

14 JOB # 6542.011

WATER QUALITY MONITORING LOCATIONS

DISPOSAL #9 - 9/27/2005 100 0 100

1" = 200' 200 300

DATE: Sept. 27, 2005 New Bedford Harbor US survey foot FIGURE 14 New Bedford, MA REVISIONS DATE BY

6542.011-D ISP

.# 9

Page 42: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

9/29/2005 New Bedford Harbor Dredge Project - Phase II - Part 2

Water Quality Monitoring - CAD Cell Disposal Area - Disposal # 10 Scow - Eddie Carroll

Tide Time Time ID Coordinates Up/Down Depth (ft.) Ave. Turbidity Permissible Turbidity Weather Conditions Vessel High 6:00 Current (NTUs) Increase (NTUs) Traffic

Falling Tide 10:53 092905_d10_00 814512.2 Up 5 2.9 Sunny ~ 75 deg. F None 2695672.6 (Background) 15 3.5 Wind 15-20 Kts S

11:02 DISPOSAL #10 STARTED 25 4.6

AVERAGE 1.0 41.0 11:05 092905_d10_03 814973.1 Down 5 2.7 (Background) Sunny ~ 75 deg. F None

2695819.8 15 3.0 Wind 15-20 Kts S 25 3.6

AVERAGE 3.1 (40.6 Below Permissible 11:07 092905_d10_05 814927.2 Down 5 2.5 Turbidity Increase Limit) Sunny ~ 75 deg. F None

2695752.9 15 2.6 Wind 15-20 Kts S 25 3.2

AVERAGE 2.8 (40.9 Below Permissible 11:09 092905_d10_07 814883.6 Down 5 3.0 Turbidity Increase Limit) Sunny ~ 75 deg. F None

2695688.2 15 3.6 Wind 15-20 Kts S 25 5.5

AVERAGE 4.0 (39.7 Below Permissible 11:12 092905_d10_10 814773.6 Down 5 2.8 Turbidity Increase Limit) Sunny ~ 75 deg. F None

2695723.8 15 3.4 Wind 15-20 Kts S 25 4.3

AVERAGE 3.5 (40.2 Below Permissible 11:14 092905_d10_12 814872.2 Down 5 2.7 Turbidity Increase Limit) Sunny ~ 75 deg. F None

2695693.2 15 3.8 Wind 15-20 Kts S 25 3.4

AVERAGE 3.3 (40.3 Below Permissible Low 11:33 Turbidity Increase Limit)

Notes: An X in the vessel traffic column indicates that either a vessel had passed or there was a movement of spuds that may have had an effect on turbidity.

Page 43: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

Eddie

Carro

ll

2695

000

2695

200

2695

400

2695

600

2695

800

2696

000

2696

200

2696

400

2696

600

814000 814200 814400 814600 814800 815000 815200 815400 815600 815800 816000

2696600 2696400

26962002696000

26958002695600

26954002695200

2695000

092905_d10_03

092905_d10_05092905_d10_10 092905_d10_00 092905_d10_10

092905_d10_07

814000 814200 814400 814600 814800 815000 815200 815400 815600 815800 816000

LEGEND 092905_d10_07

- Water Quality Monitoring Location

Figure CAD CELL DISPOSAL Scale 1:2400 WATER QUALITY

MONITORING LOCATIONS 1" = 200' 100 0 100 200 300

JOB # 6542.011 DISPOSAL #10 - 9/29/2005 DATE: Sept. 29, 2005 US survey footNew Bedford Harbor

New Bedford, MAFIGURE 15 REVISIONS DATE BY

6 542.011-DIS

P. #10 15

Page 44: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

10/6/2005 New Bedford Harbor Dredge Project - Phase II - Part 2

Water Quality Monitoring - CAD Cell Disposal Area - Disposal # 16 Scow - SEI 2000

Tide Time Time ID Coordinates Up/Down Depth (ft.) Ave. Turbidity Permissible Turbidity Weather Conditions Vessel Low 4:08 Current (NTUs) Increase (NTUs) Traffic

Rising Tide 5:15 100605_d16_00 814904.16 Up 5 2.8 Sunny ~ 70 deg. F None 2695206.26 (Background) 15 2.4 Wind 5-10 kts W

5:20 DISPOSAL #16 STARTED 25 2.7

AVERAGE 2.6 42.6 5:22 100605_d16_02 814793.31 Down 5 2.8 (Background) Sunny ~ 70 deg. F None

2696254.07 15 3.0 Wind 5-10 kts W AVERAGE 2.9 (39.7 Below Permissible

5:28 100605_d16_08 814747.82 Down 5 3.1 Turbidity Increase Limit) Sunny ~ 70 deg. F None 2696453.09 15 2.8 Wind 5-10 kts W

25 5.0 AVERAGE 3.6 (38.9 Below Permissible

5:32 100605_d16_12 814783.11 Down 5 3.0 Turbidity Increase Limit) Sunny ~ 70 deg. F None 2696410.27 15 2.5 Wind 5-10 kts W

25 2.5 AVERAGE 2.6 (39.9 Below Permissible

5:36 106050_d16_16 814871.49 Down 5 3.4 Turbidity Increase Limit) Sunny ~ 70 deg. F None 2696118.78 15 2.5 Wind 5-10 kts W

25 2.8 AVERAGE 2.9 (39.7 Below Permissible

5:41 100605_d16_21 814603.72 Down 5 3.1 Turbidity Increase Limit) Sunny ~ 70 deg. F None 2695998.02 15 2.3 Wind 5-10 kts W

25 3.5 AVERAGE 3.0 (39.64 Below Permissible

High 10:01 Turbidity Increase Limit)

Notes: An X in the vessel traffic column indicates that either a vessel had passed or there was a movement of spuds that may have had an effect on turbidity.

Page 45: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

SEI 20

00

2695

000

2695

200

2695

400

2695

600

2695

800

2696

000

2696

200

2696

400

2696

600

814000 814200 814400 814600 814800 815000 815200 815400 815600 815800 816000

100605_d16_06 100605_d16_08

100605_d16_12

2696600 2696400

26962002696000

26958002695600

26954002695200

2695000

100605_d16_16

100605_d16_21

100605_d16_00

814000 814200 814400 814600 814800 815000 815200 815400 815600 815800 816000

LEGEND 100605_d16_08

- Water Quality Monitoring Location

Figure CAD CELL DISPOSAL Scale 1:2400

16 JOB # 6542.011

WATER QUALITY MONITORING LOCATIONS

DISPOSAL #16 - 10/6/2005 100 0 100

1" = 200' 200 300

DATE: Oct. 6, 2005 New Bedford Harbor US survey foot FIGURE 16 New Bedford, MA

REVISIONS DATE BY

6542.011-DISP . #16

Page 46: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

10/10/2005 New Bedford Harbor Dredge Project - Phase II

Water Quality Monitoring - CAD Cell Disposal Area - Disposal # 21 Scow - SEI 2000

Tide Time Time ID Coordinates Up/Down Depth (ft.) Ave. Turbidity Permissible Turbidity Weather Conditions Vessel Low 6:21 Current (NTUs) Increase (NTUs) Traffic

Rising Tide 9:24 101005_d21_00 814736.1 Up 5 4.4 Raining~50 deg. F None 2696246.8 (Background) 15 15.0 Wind 10 kts SW

9:20 DISPOSAL #21 STARTED 25 9.0

AVERAGE 9.5 49.5 9:42 101005_d21_22 814711.2 Down 5 10.5 (Background) Raining~50 deg. F None

2696180.4 15 12.5 Wind 10 kts SW 25 10.0

AVERAGE 11.0 (38.5 Below Permissible 9:44 101005_d21_24 814724.3 Down 5 5.3 Turbidity Increase Limit) Raining~50 deg. F None

2696158.2 15 10.8 Wind 10 kts SW 25 11.0

AVERAGE 9.0 (40.5 Below Permissible 9:45 101005_d21_25 814719.1 Down 5 12.0 Turbidity Increase Limit) Raining~50 deg. F None

2696108.9 15 6.5 Wind 10 kts SW 25 3.8

AVERAGE 7.4 (42.1 Below Permissible 9:47 101050_d21_27 815600.2 Down 5 4.0 Turbidity Increase Limit) Raining~50 deg. F None

2696150 15 9.0 Wind 10 kts SW 25 6.8

AVERAGE 6.6 (42.9 Below Permissible 9:50 101005_d21_30 814776.6 Down 5 7.0 Turbidity Increase Limit) Raining~50 deg. F None

2696167.7 15 10.0 Wind 10 kts SW 25 5.6

AVERAGE 7.5 (42.0 Below Permissible High 1:55 Turbidity Increase Limit)

Notes: An X in the vessel traffic column indicates that either a vessel had passed or there was a movement of spuds that may have had an effect on turbidity.

Page 47: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

SEI 2000

2695

000

2695

200

2695

400

2695

600

2695

800

2696

000

2696

200

2696

400

2696

600

814000 814200 814400 814600 814800 815000 815200 815400 815600 815800 816000

101005_d21_00

101050_d21_22 101005_d21_30

101005_d21_24101005_d21_27

101005_d21_25

2696600 2696400

26962002696000

26958002695600

26954002695200

2695000

814000 814200 814400 814600 814800 815000 815200 815400 815600 815800 816000

LEGEND 101005_d21_00

- Water Quality Monitoring Location

Figure CAD CELL DISPOSAL Scale 1:2400

17 JOB # 6542.011

WATER QUALITY MONITORING LOCATIONS DISPOSAL #21 - 10/10/2005 100 0 100

1" = 200' 200 300

DATE: Oct. 10, 2005 New Bedford Harbor US survey foot FIGURE 17 New Bedford, MA

REVISIONS DATE BY

6542.011-D IS

P. #21

Page 48: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

10/21/2005 New Bedford Harbor Dredge Project - Phase II

Water Quality Monitoring - CAD Cell Disposal Area - Disposal # 37 Scow - SEI 2000

Tide Time Time ID Coordinates Up/Down Depth (ft.) Ave. Turbidity Permissible Turbidity Weather Conditions Vessel High 11:18 Current (NTUs) Increase (NTUs) Traffic

Falling Tide 15:00 102105_d37_00_0 815149.67 Up 5 3.3 Sunny~60 deg. F None 2696481.2 (Background) 15 3.0 Wind 5 kts E

15:05 DISPOSAL #37 STARTED 30 2.5

AVERAGE 2.9 42.9 15:06 102105_d37_00 815031.91 Down 5 3.3 (Background) Sunny~60 deg. F None

2695678.6 15 3.0 Wind 5 kts E 30 2.5

AVERAGE 2.9 (40.0 Below Permissible 15:07 102105_d37_01 815162.07 Down 5 2.5 Turbidity Increase Limit) Sunny~60 deg. F None

2695892.4 15 3.5 Wind 5 kts E 30 2.8

AVERAGE 2.9 (40.0Below Permissible 15:08 102105_d37_02 815013.32 Down 5 3.0 Turbidity Increase Limit) Sunny~60 deg. F None

2696140.3 15 3.0 Wind 5 kts E 25 3.5

AVERAGE 3.2 (39.7 Below Permissible 15:09 102105_d37_03 814560.86 Down 5 4.0 Turbidity Increase Limit) Sunny~60 deg. F None

2696138.4 15 3.0 Wind 5 kts E 25 4.0

AVERAGE 3.7 (39.2 Below Permissible 15:10 102105_d37_04 814489.58 Down 5 3.6 Turbidity Increase Limit) Sunny~60 deg. F None

2695991.6 15 2.1 Wind 5 kts E 25 4.5

AVERAGE 3.4 (39.5 Below Permissible 15:11 102105_d37_05 814529.87 Down 5 3.3 Turbidity Increase Limit) Sunny~60 deg. F None

2695805.6 15 2.0 Wind 5 kts E 30 8.5

AVERAGE 4.6 (387.3 Below Permissible 15:12 102105_d37_06 814824.28 Down 5 2.5 Turbidity Increase Limit) Sunny~60 deg. F None

2695876.9 15 2.0 Wind 5 kts E 30 3.5

AVERAGE 2.7 (40.2 Below Permissible 15:13 102105_d37_07 814774.69 Down 5 3.3 Turbidity Increase Limit) Sunny~60 deg. F None

2695749.8 15 3.5 Wind 5 kts E 25 2.5

AVERAGE 3.1 (39.8 Below Permissible Low 4:59 Turbidity Increase Limit)

Notes: An X in the vessel traffic column indicates that either a vessel had passed or there was a movement of spuds that may have had an effect on turbidity.

Page 49: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

SEI 2000

2695

000

2695

200

2695

400

2695

600

2695

800

2696

000

2696

200

2696

400

2696

600

814000 814200 814400 814600 814800 815000 815200 815400 815600 815800 816000

102105_d37_00_0

102105_d37_03 102105_d37_02

2696600 2696400

26962002696000

26958002695600

26954002695200

2695000

102105_d37_04

102105_d37_01102105_d37_06

102105_d37_05

102105_d37_07

102105_d37_00

814000 814200 814400 814600 814800 815000 815200 815400 815600 815800 816000

LEGEND 102105_d37_07

- Water Quality Monitoring Location

Figure CAD CELL DISPOSAL Scale 1:2400

WATER QUALITY MONITORING LOCATIONS 1" = 200'

100 0 100 200 300JOB # 6542.012 DISPOSAL #37 - 10/21/2005 DATE: Oct. 21, 2005 US survey footNew Bedford Harbor FIGURE 25 New Bedford, MA REVISIONS DATE BY

6542.012-DISP

. #37 25

Page 50: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

12/29/2005 New Bedford Harbor Dredge Project - Phase II - Part 2

Water Quality Monitoring - D.N. Kelley (K-6) Excavation Area

Tide Time Time ID Coordinates Up/Down Depth (ft.) Ave. Turbidity Permissible Turbidity Weather Conditions Vessel High 6:00 Current (NTUs) Increase (NTUs) Traffic

Flood Tide 9:01 122905_01_9 817803 Down 5 2.5 Light rain, ~55 deg. F None 2692538 10 2.5 Wind 5 kts N

15 2.5 AVERAGE 2.5 (20.8 Below Permissible

9:04 122905_02_9 817886 Down 5 2.8 Turbidity Increase Limit) Light rain, ~55 deg. F None 2692745 10 2.8 Wind 5 kts N

AVERAGE 2.8 (20.5 Below Permissible 9:07 122905_03_9 818016 Down 5 3.0 Turbidity Increase Limit) Light rain, ~55 deg. F None

2692761 10 3.0 Wind 5 kts N 15 3.0

AVERAGE 3.0 (20.2 Below Permissible 9:10 122905_04_1 817538 Up 5 3.3 Turbidity Increase Limit) Light rain, ~55 deg. F None

2692571 (Background) 10 3.3 Wind 5 kts N 15 3.3 20 3.3

AVERAGE 3.3 23.3 10:27 122905_06_9 817712 Down 5 7.0 (Background) Overcast, ~55 deg. F None

2692520 10 6.0 Wind 5 kts N 15 6.0 18 6.0

AVERAGE 6.3 (20.0 Below Permissible 10:31 122905_07_9 817882 Down 5 10.5 Turbidity Increase Limit) Overcast, ~55 deg. F None

2692743 10 4.0 Wind 5 kts N AVERAGE 7.3 (19.0 Below Permissible

10:35 122905_08_1 817440 Up 5 6.5 Turbidity Increase Limit) Overcast, ~55 deg. F None 2692564 (Background) 10 6.0 Wind 5 kts N

AVERAGE 6.3 26.3 Low 12:11 (Background)

Notes: An X in the vessel traffic column indicates that either a vessel had passed or there was a movement of spuds that may have had an effect on turbidity.

Page 51: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

817650 817700 817750 817800 817850 817900 817950 818000 818050 818100 818150

K6 Dredge Area

K4

K3

K4

K4 K4

K5

K5

Approximate Location

Of Dredge Barge SEI 34

269

2550

2

6926

00

269

2650

2

6927

00

269

2750

2

6928

00

269

2850

2

6929

00

26925

50269

2600

26926

50269

2700

26927

50269

2800

26928

50269

2900

817650 817700 817750 817800 817850 817900 817950 818000 818050 818100 818150

122905_01_9

122905_02_9 122905_03_9

122905_06_9

122905_07_9 122905_08_1

122905_04_1

LEGEND

- Water Quality Monitoring Location

122905_03_9 New Bedford Harbor Dredge - Phase II - Part 2

Scale 1:600 Water Quality Monitoring Locations 25 0 25 50 75 D.N. Kelley (K6) Excavation Area

US survey foot December 29, 2005

Apex Environmental, Inc.

Page 52: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

1/4/2006 New Bedford Harbor Dredge Project - Phase II - Part 2

Water Quality Monitoring - D.N. Kelley (K-6) Excavation Area

Tide Time Time ID Coordinates Up/Down Depth (ft.) Ave. Turbidity Permissible Turbidity Weather Conditions Vessel Low 4:11 Current (NTUs) Increase (NTUs) Traffic

Rising Tide 9:01 010406_00_0 817716.4 Up 5 2.4 Cloudy ~25 Deg. F None 2692697.3 (Background) 10 2.5 Wind 5-10 Kts. NE

15 3.3 AVERAGE 2.7 22.7

9:46 010406_00_9a 817902.7 Down 5 4.0 Cloudy ~25 Deg. F None 2692571.6 10 3.5 Wind 5-10 Kts. NE

15 2.8 AVERAGE 3.4 (19.3 Below Permissible

9:51 010406_00_9b 818033.4 Down 2 3.0 Turbidity Increase Limit) Cloudy ~25 Deg. F None 2692748.4 8 3.0 Wind 5-10 Kts. NE

12 3.0 AVERAGE 3.0 (19.7 Below Permissible

10:48 010406_01_9a 817906 Down 2 10.5 Turbidity Increase Limit) Cloudy ~25 Deg. F None 2692570.8 6 8.0 Wind 5-10 Kts. NE

12 2.7 AVERAGE 7.1 (15.6 Below Permissible

10:51 010406_01_9b 818033.8 Down 5 9.0 Turbidity Increase Limit) Cloudy ~25 Deg. F None 2692749.9 10 3.4 Wind 5-10 Kts. NE

15 2.9 High 11:08 AVERAGE 5.1 (17.6 Below Permissible

Falling Tide 11:52 010406_02_9a 818063.2 Down 2 22.5 Turbidity Increase Limit) Cloudy ~25 Deg. F None 2692733.1 5 26.0 Wind 5-10 Kts. NE

10 3.5 AVERAGE 17.3 (5.4 Below Permissible

11:45 010406_02_9b 817882.9 Down 2 6.5 Turbidity Increase Limit) Cloudy ~25 Deg. F None 2692504.3 6 3.6 Wind 5-10 Kts. NE

12 3.1 AVERAGE 4.4 (18.3 Below Permissible

Low 16:53 Turbidity Increase Limit)

Notes: An X in the vessel traffic column indicates that either a vessel had passed or there was a movement of spuds that may have had an effect on turbidity.

Page 53: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

817650 817700 817750 817800 817850 817900 817950 818000 818050 818100 818150

Approximate Location

Of Dredge Barge SEI 34

K6 Dredge Area

K3

K4 K4

K4

K4

K5

K5

269

2550

2

6926

00

269

2650

2

6927

00

269

2750

2

6928

00

269

2850

2

6929

00

26925

50269

2600

26926

50269

2700

26927

50269

2800

26928

50269

2900

817650 817700 817750 817800 817850 817900 817950 818000 818050 818100 818150

010406_02_9b

010406_00_9a

010406_00_9b

010406_01_9a

010406_01_9b

010406_02_9a 010406_00_0

LEGEND

- Water Quality Monitoring Location

010406_00_0

New Bedford Harbor Dredge - Phase II - Part 2 Scale 1:600 Water Quality Monitoring Locations

25 0 25 50 75 D.N. Kelley (K6) Excavation Area US survey foot January 4, 2006

Apex Environmental, Inc.

Page 54: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

1/4/2006 New Bedford Harbor Dredge Project - Phase II - Part 2

Water Quality Monitoring - Scow Transfer Area

Tide Time Time ID Coordinates Up/Down Depth (ft.) Ave. Turbidity Permissible Turbidity Weather Conditions Vessel High 11:08 Current (NTUs) Increase (NTUs) Traffic

Falling Tide 12:48 010406_03_1 817202.4 Up 2 2.7 Cloudy ~28 Deg. F None 2692359.8 (Background) 5 2.8 Wind 5-10 Kts. NE

10 3.6 AVERAGE 3.0 23.0

12:51 010406_03_9 817293.3 Down 5 2.7 Cloudy ~28 Deg. F None 2691848.1 15 2.9 Wind 5-10 Kts. NE

20 2.4 AVERAGE 2.7 (20.3 Below Permissible

13:48 010406_04_1 817175.6 Up 2 2.8 Turbidity Increase Limit) Cloudy ~28 Deg. F None 2692366.2 (Background) 5 2.6 Wind 5-10 Kts. NE

10 3.2 AVERAGE 2.8 22.8

13:51 010406_04_9 817118.6 Down 5 2.6 Cloudy ~28 Deg. F None 2691845.5 10 2.9 Wind 5-10 Kts. NE

15 2.3 AVERAGE 2.6 (20.2 Below Permissible

14:46 010406_05_1 817211 Up 2 2.8 Turbidity Increase Limit) Cloudy ~28 Deg. F None 2692290.4 (Background) 5 3.3 Wind 5-10 Kts. NE

10 2.6 AVERAGE 2.9 22.9

14:50 010406_05_9 817159 Down 5 3.0 Cloudy ~28 Deg. F None 2691934.3 10 2.6 Wind 5-10 Kts. NE

20 2.5 AVERAGE 2.7 (20.2 Below Permissible

15:45 010406_06_1 817206.4 Up 2 2.6 Turbidity Increase Limit) Cloudy ~28 Deg. F None 2692363 (Background) 5 3.0 Wind 5-10 Kts. NE

8 2.9 AVERAGE 2.8 22.8

15:50 010406_06_9 817340.1 Down 5 2.4 Cloudy ~28 Deg. F None 2691883.2 10 2.0 Wind 5-10 Kts. NE

20 2.3 AVERAGE 2.2 (27.9 Below Permissible

Low 16:53 Turbidity Increase Limit)

Notes: An X in the vessel traffic column indicates that either a vessel had passed or there was a movement of spuds that may have had an effect on turbidity.

Page 55: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

816800 817000 817200 817400 817600 817800 818000

Approximate Location of S. Comoletti

Approximate Location of Mighty Quinn

Approximate Location of SEI 34

D.N. Kelley Shipyard

269

160

0 2

6918

00

269

200

0 26

922

00

2692

400

26

926

00

26916

0026

91800

26920

00269

2200

269240

02

69260

0

816800 817000 817200 817400 817600 817800 818000

010406_03_1

010406_03_9

010406_04_1

010406_04_9

010406_05_1

010406_05_9

010406_06_1

010406_06_9

LEGEND

- Water Quality Monitoring Location

010406_04_9

New Bedford Harbor Dredge - Phase II - Part 2 Scale 1:1200 Water Quality Monitoring Locations

50 0 50 100 150 200 250 Scow Transfer Area US survey foot January 4, 2006

Apex Environmental, Inc.

Page 56: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

1/6/2006 New Bedford Harbor Dredge Project - Phase II - Part 2

Water Quality Monitoring - D.N. Kelley (K-6) Excavation Area

Tide Time Time ID Coordinates Up/Down Depth (ft.) Ave. Turbidity Permissible Turbidity Weather Conditions Vessel Low 6:30 Current (NTUs) Increase (NTUs) Traffic

Rising Tide 8:45 010606_00_0 817793.5 Up 2 2.0 Cloudy ~35 Deg. F None 2692636.9 (Background) 6 2.6 Wind 0-5 Kts. NE

12 3.8 AVERAGE 2.8 22.8

9:20 010606_00_9a 817966.3 Down 2 4.5 Cloudy ~35 Deg. F None 2692702.8 6 4.6 Wind 0-5 Kts. NE

12 5.0 AVERAGE 4.7 (18.1 Below Permissible

9:27 010606_00_9b 817899.6 Down 2 3.1 Turbidity Increase Limit) Cloudy ~35 Deg. F None 2692580.5 5 4.0 Wind 0-5 Kts. NE

10 4.8 AVERAGE 3.9 (18.9 Below Permissible

10:27 010606_01_1 817768.2 Up 2 2.5 Turbidity Increase Limit) Cloudy ~35 Deg. F None 2692633.8 (Background) 5 2.4 Wind 0-5 Kts. NE

15 2.4 AVERAGE 2.4 22.4

10:30 010606_01_9 817832.5 Down 5 2.5 Cloudy ~35 Deg. F None 2692642.9 10 4.7 Wind 0-5 Kts. NE

15 4.3 AVERAGE 3.8 (18.6 Below Permissible

11:23 010606_02_1 817530.6 Up 2 2.9 Turbidity Increase Limit) Cloudy ~35 Deg. F None 2692676.9 (Background) 5 2.3 Wind 0-5 Kts. NE

15 2.7 AVERAGE 2.6 22.6

11:27 010606_02_9 817833.1 Down 2 3.0 Cloudy ~35 Deg. F None 2692571.3 5 9.5 Wind 0-5 Kts. NE

10 10.5 High 12:59 AVERAGE 7.7 (14.9 Below Permissible

Falling Tide 13:35 010606_04_1 817402.1 Up 2 2.2 Turbidity Increase Limit) Cloudy ~35 Deg. F None 2692604.6 (Background) 6 2.6 Wind 0-5 Kts. NE

12 2.7 AVERAGE 2.5 22.5

13:38 010606_04_9 817881.6 Down 2 18.5 Cloudy ~35 Deg. F None 2692692 10 4.1 Wind 0-5 Kts. NE

15 3.2 AVERAGE 8.6 (13.9 Below Permissible

Low 18:38 Turbidity Increase Limit)

Notes: An X in the vessel traffic column indicates that either a vessel had passed or there was a movement of spuds that may have had an effect on turbidity.

Page 57: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

817650 817700 817750 817800 817850 817900 817950 818000 818050 818100 818150

Approximate Location

Of Dredge Barge SEI 34

K6 Dredge Area

K3

K4 K4

K4 K4

K5

K5

269

2550

2

6926

00

269

2650

2

6927

00

269

2750

2

6928

00

269

2850

2

6929

00

26925

50269

2600

26926

50269

2700

26927

50269

2800

26928

50269

2900

817650 817700 817750 817800 817850 817900 817950 818000 818050 818100 818150

010606_04_1

010606_04_9

010606_00_0

010606_00_9a

010606_00_9b

010606_02_9

010606_01_9

010606_02_1

010606_01_1

LEGEND

- Water Quality Monitoring Location

010606_01_9 New Bedford Harbor Dredge - Phase II - Part 2

Scale 1:600 Water Quality Monitoring Locations 25 0 25 50 75 D.N. Kelley (K6) Excavation Area

US survey foot January 6, 2006

Apex Environmental, Inc.

Page 58: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

1/6/2006 New Bedford Harbor Dredge Project - Phase II - Part 2

Water Quality Monitoring - Scow Transfer Area

Tide Time Time ID Coordinates Up/Down Depth (ft.) Ave. Turbidity Permissible Turbidity Weather Conditions Vessel Low 6:30 Current (NTUs) Increase (NTUs) Traffic

Rising Tide 12:35 010606_03_1 817330.1 Up 5 2.4 Cloudy ~35 Deg. F None 2691783.4 (Background) 10 2.4 Wind 0-5 Kts. NE

20 3.1 AVERAGE 2.6 22.6

12:39 010606_03_9 817270.7 Down 2 3.4 Cloudy ~35 Deg. F None 2692200.2 5 2.5 Wind 0-5 Kts. NE

10 2.9 AVERAGE 2.9 (19.7 Below Permissible

High 12:59 Turbidity Increase Limit)

Notes: An X in the vessel traffic column indicates that either a vessel had passed or there was a movement of spuds that may have had an effect on turbidity.

Page 59: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

816800 817000 817200 817400 817600 817800 818000

Approximate Location of S. Comoletti

Approximate Location of Mighty Quinn

Approximate Location of SEI 34

D.N. Kelley Shipyard

269

160

0 2

6918

00

269

200

0 26

922

00

2692

400

26

926

00

26916

0026

91800

26920

00269

2200

269240

02

69260

0

816800 817000 817200 817400 817600 817800 818000

010606_03_1

010606_03_9

LEGEND

- Water Quality Monitoring Location

010606_03_1

New Bedford Harbor Dredge - Phase II - Part 2 Scale 1:1200 Water Quality Monitoring Locations

50 0 50 100 150 200 250 Scow Transfer Area US survey foot January 6, 2006

Apex Environmental, Inc.

Page 60: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

1/9/2006 New Bedford Harbor Dredge Project - Phase II - Part 2

Water Quality Monitoring - D.N. Kelley (K4) Excavation Area

Tide Time Time ID Coordinates Up/Down Depth (ft.) Ave. Turbidity Permissible Turbidity Weather Conditions Vessel Low 10:32 Current (NTUs) Increase (NTUs) Traffic

Rising Tide 14:42 010906_02_1 817509.7 Up 5 0.5 Clear ~50 Deg. F None 2692506.5 (Background) 10 0.6 Wind 10-15 Kts. SW

15 0.6 AVERAGE 0.5 20.5

14:50 010906_02_9 817998.5 Down 2 2.8 Clear ~50 Deg. F None 2692622.6 4 0.3 Wind 10-15 Kts. SW

6 0.4 High 16:00 AVERAGE 1.2 (19.3 Below Permissible

Falling Tide 16:43 010906_06_1 817634.1 Up 5 3.4 Turbidity Increase Limit) Clear ~40 Deg. F None 2692716.8 (Background) 10 4.6 Wind 10-15 Kts. SW

15 3.6 AVERAGE 3.8 23.8

16:46 010906_06_9 818038.6 Down 2 11.1 Clear ~40 Deg. F None 2692639.1 6 8.4 Wind 10-15 Kts. SW

12 9.2 AVERAGE 9.6 (14.4 Below Permissible

Low 21:31 Turbidity Increase Limit)

Notes: An X in the vessel traffic column indicates that either a vessel had passed or there was a movement of spuds that may have had an effect on turbidity.

Page 61: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

817650 817700 817750 817800 817850 817900 817950 818000 818050 818100 818150

Approxim

ateLoc

ation

Of Dred

ge Barge

SEI 34

269

2550

2

6926

00

269

2650

2

6927

00

269

2750

2

6928

00

269

2850

2

6929

00

26925

50269

2600

26926

50269

2700

26927

50269

2800

26928

50269

2900

817650 817700 817750 817800 817850 817900 817950 818000 818050 818100 818150

010906_06_1

010906_06_9

010906_02_9

010906_02_1

LEGEND

- Water Quality Monitoring Location

010906_06_1 New Bedford Harbor Dredge - Phase II - Part 2

Scale 1:600 Water Quality Monitoring Locations 25 0 25 50 75 D.N. Kelley (K5) Excavation Area

US survey foot January 9, 2006

Apex Environmental, Inc.

Page 62: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

1/9/2006 New Bedford Harbor Dredge Project - Phase II - Part 2

Water Quality Monitoring - Scow Transfer Area

Tide Time Time ID Coordinates Up/Down Depth (ft.) Ave. Turbidity Permissible Turbidity Weather Conditions Vessel Low 10:32 Current (NTUs) Increase (NTUs) Traffic

Rising Tide 15:04 010906_03_1 817073.9 Up 2 2.4 Sunny ~45 Deg. F None 2691873.8 (Background) 10 2.9 Wind 10-15 Kts. SW

20 3.1 AVERAGE 2.8 22.8

15:08 010906_03_9 817310 Down 2 3.4 Sunny ~45 Deg. F None 2692295.3 5 4.6 Wind 10-15 Kts. SW

10 4.4 AVERAGE 4.1 (18.7 Below Permissible

15:50 010906_04_1 817432.7 Up 5 2.6 Turbidity Increase Limit) Sunny ~45 Deg. F None 2691809.3 (Background) 10 3.1 Wind 10-15 Kts. SW

15 3.5 AVERAGE 3.0 23.0

15:56 010906_04_9 817326.4 Down 5 4.2 Sunny ~45 Deg. F None 2692234.9 10 4.5 Wind 10-15 Kts. SW

15 3.1 AVERAGE 3.9 (19.1 Below Permissible

High 16:00 Turbidity Increase Limit)

Notes: An X in the vessel traffic column indicates that either a vessel had passed or there was a movement of spuds that may have had an effect on turbidity.

Page 63: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

816800 817000 817200 817400 817600 817800 818000

Approximate Location of S. Comoletti

Approximate Location of Mighty Quinn

Approximate Location of SEI 34

D.N. Kelley Shipyard

269

160

0 2

6918

00

269

200

0 26

922

00

2692

400

26

926

00

26916

0026

91800

26920

00269

2200

269240

02

69260

0

816800 817000 817200 817400 817600 817800 818000

010906_03_1

010906_03_9

010906_04_1

010906_04_9

LEGEND

- Water Quality Monitoring Location

010906_03_1

New Bedford Harbor Dredge - Phase II - Part 2 Scale 1:1200 Water Quality Monitoring Locations

50 0 50 100 150 200 250 Scow Transfer Area US survey foot January 9, 2006

Apex Environmental, Inc.

Page 64: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

1/11/2006 New Bedford Harbor Dredge Project - Phase II - Part 2

Water Quality Monitoring - Warren Alexander Property (A1 + A2)

Tide Time Time ID Coordinates Up/Down Depth (ft.) Ave. Turbidity Permissible Turbidity Weather Conditions Vessel Low 12:08 Current (NTUs) Increase (NTUs) Traffic

Rising Tide 14:22 011106_06_1 817835 Up 2 5.0 Cloudy ~50 Deg. F None 2693326.3 (Background) 6 7.2 Wind 10-15 Kts. SW

12 6.4 AVERAGE 6.2 26.2

14:27 011106_06_9A 818035.8 Down 5 8.1 Cloudy ~50 Deg. F None 2693052.6 10 13.3 Wind 10-15 Kts. SW

15 9.0 AVERAGE 10.1 (16.1 Below Permissible

14:33 011106_06_9B 817952.8 Down 2 5.0 Turbidity Increase Limit) Cloudy ~50 Deg. F None 2693141.8 6 8.2 Wind 10-15 Kts. SW

12 11.0 AVERAGE 8.1 (18.1 Below Permissible

14:45 011106_06_9C 817971.8 Down 2 19.1 Turbidity Increase Limit) Cloudy ~50 Deg. F None 2693163.9 5 20.0 Wind 10-15 Kts. SW

10 18.3 AVERAGE 19.1 (7.1 Below Permissible

15:20 011106_07_1 817753.3 Up 1.5 7.4 Turbidity Increase Limit) Cloudy ~50 Deg. F None 2693084.1 (Background) 6.5 6.5 Wind 10-15 Kts. SW

10 6.3 AVERAGE 6.7 26.7

15:26 011106_07_9 817943.4 Down 2 6.2 Cloudy ~50 Deg. F None 2693138.1 6 8.2 Wind 10-15 Kts. SW

12 9.5 AVERAGE 8.0 (18.7 Below Permissible

High 17:52 Turbidity Increase Limit)

Notes: An X in the vessel traffic column indicates that either a vessel had passed or there was a movement of spuds that may have had an effect on turbidity.

Page 65: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

817850 817900 817950 818000 818050 818100 818150 818200 818250

2693

050

269

3100

26

931

50

269

3200

26

9325

0 26

9330

0 26

9335

0

2693050

2693100

2693150

2693200

2693250

2693300

2693350

817850 817900 817950 818000 818050 818100 818150 818200 818250

011106_06_1

011106_06_9A

011606_06_9B

011606_06_9C

011606_07_1

011606_07_9

APPROXIMATE LOCATION

OF DREDGE BARGE

SEI - 34

011606_07_1

LEGEND

- Water Quality Monitoring Location

New Bedford Harbor Dredge - Phase II - Part 2 Scale 1:600 Water Quality Monitoring Locations

25 0 25 50 75 Warren Alexander Property US survey foot January 11, 2006

Apex Environmental, Inc.

Page 66: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

1/11/2006 New Bedford Harbor Dredge Project - Phase II - Part 2

Water Quality Monitoring - Scow Transfer Area

Tide Time Time ID Coordinates Up/Down Depth (ft.) Ave. Turbidity Permissible Turbidity Weather Conditions Vessel High 5:31 Current (NTUs) Increase (NTUs) Traffic

Falling Tide 9:35 011106_01_1 817792.1 Up 5 13.5 Cloudy ~45 Deg. F None 2692659.2 (Background) 10 20.0 Wind 10-15 Kts. SW

15 2.1 AVERAGE 11.9 31.9

9:41 011106_01_9 817321.4 Down 5 9.0 Cloudy ~45 Deg. F None 2691811.1 10 15.5 Wind 10-15 Kts. SW

15 6.0 AVERAGE 10.2 (21.7 Below Permissible

Low 12:08 Turbidity Increase Limit)

Notes: An X in the vessel traffic column indicates that either a vessel had passed or there was a movement of spuds that may have had an effect on turbidity.

Page 67: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

816800 817000 817200 817400 817600 817800 818000

Approximate Location of S. Comoletti

Approximate Location of Mighty Quinn

Approximate Location of SEI 34

D.N. Kelley Shipyard

269

160

0 2

6918

00

269

200

0 26

922

00

2692

400

26

926

00

26916

0026

91800

26920

00269

2200

269240

02

69260

0

816800 817000 817200 817400 817600 817800 818000

011106_01_1

011106_01_9

LEGEND

- Water Quality Monitoring Location

011106_01_1 New Bedford Harbor Dredge - Phase II - Part 2

Scale 1:1200 Water Quality Monitoring Locations 50 0 50 100 150 200 250 Scow Transfer Area

US survey foot January 11, 2006

Apex Environmental, Inc.

Page 68: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

1/17/2006 New Bedford Harbor Dredge Project - Phase II - Part 2

Water Quality Monitoring - CAD Cell Disposal Area - Disposal # 2 Scow - Mighty Quinn

Tide Time Time ID Coordinates Up/Down Depth (ft.) Ave. Turbidity Permissible Turbidity Weather Conditions Vessel High 9:38 Current (NTUs) Increase (NTUs) Traffic

Falling Tide 9:48 011706_d2_00_a 814645.5 Up 5 1.1 Sunny~30 deg. F None 2696078.2 (Background) 10 1.4 Wind 5-15 kts E

20 1.2 AVERAGE 1.2 41.2

11:55 011706_d2_00_C1 814642.24 Down 5 3.2 (Background) Sunny~30 deg. F None Cleaning Scow 2696030.6 10 2.8 Wind 5-15 kts E

20 1.5 AVERAGE 2.5 (38.7 Below Permissible

12:11 011706_d2_00_C2 814654.2 Down 5 4.1 Turbidity Increase Limit) Sunny~30 deg. F None Cleaning Scow 2695944.2 10 3.2 Wind 5-15 kts E

20 2.4 AVERAGE 3.2 (38.0 Below Permissible

12:19 011706_d2-00_C3 814739.9 Down 5 5.6 Turbidity Increase Limit) Sunny~30 deg. F None Cleaning Scow 2695908.2 10 7.5 Wind 5-15 kts E

20 2.3 AVERAGE 5.1 (36.1 Below Permissible

12:32 011706_d2_00_b 814891.5 Up 5 6.3 Turbidity Increase Limit) Sunny~30 deg. F None 2696223.1 (Background) 10 6.6 Wind 5-15 kts E

20 3.8 AVERAGE 5.6 45.6

14:43 DISPOSAL STARTED (Background) 14:45 011706_d2_02 814752 Down 5 1.4 Sunny~30 deg. F None

2696186.4 10 1.3 Wind 5-15 kts E 15 2.4

AVERAGE 1.7 (43.9 Below Permissible 14:46 011706_d2_03 814658.9 Down 5 1.3 Turbidity Increase Limit) Sunny~30 deg. F None

2696211.2 15 2.0 Wind 5-15 kts E 20 1.4

AVERAGE 1.6 (44.0 Below Permissible 14:47 011706_d2_04 814563 Down 5 5.0 Turbidity Increase Limit) Sunny~30 deg. F None

2696102.5 10 3.8 Wind 5-15 kts E 20 3.4

AVERAGE 4.1 (41.5 Below Permissible 14:50 011706_d2_07 814740.8 Down 5 4.3 Turbidity Increase Limit) Sunny~30 deg. F None

2695897.7 15 5.1 Wind 5-15 kts E 25 5.0

AVERAGE 4.8 (40.8 Below Permissible 14:55 011706_d2_12 814593.2 Down 5 3.3 Turbidity Increase Limit) Sunny~30 deg. F None

2696030 10 13.5 Wind 5-15 kts E 20 4.3

AVERAGE 7.0 (38.6 Below Permissible 15:04 011706_d2_21 814598.7 Down 5 4.2 Turbidity Increase Limit) Sunny~30 deg. F None

2696252.5 10 7.5 Wind 5-15 kts E 20 24.0 30 25.0

AVERAGE 15.2 (30.4 Below Permissible Low 15:20 Turbidity Increase Limit)

Notes: An X in the vessel traffic column indicates that either a vessel had passed or there was a movement of spuds that may have had an effect on turbidity.

Page 69: NEW BEDFORD, NEW BEDFORD HARBOR DREDGE PROJECT … · New Bedford Harbor Dredge Project - Phase II - Part 2 Water Quality Monitoring - Maritime Excavation Area. Tide Time . High 5:57

814500 814600 814700 814800 814900 815000 815100 815200 26

9520

0 26

9530

0 26

9540

0 26

9550

0 26

9560

0 26

9570

0 26

9580

0 26

9590

0 26

9600

0 26

9610

0 26

9620

0 26

9630

0 26

9640

0

26952002695300

26954002695500

26956002695700

26958002695900

26960002696100

26962002696300

2696400

814500 814600 814700 814800 814900 815000 815100 815200

011706_d2_21 - Water Quality Monitoring

Location

LEGEND Scale 1:1200 New Bedford Harbor Dredge - Phase II - Part 2

50 0 50 100 Water Quality Monitoring Locations CAD Cell - Disposal Operations

US survey foot NAD83(CSRS98) / Massachusetts CS83 Mainland zone January 17, 2006

Apex Environmental, Inc.