nepal electricity authoritynea.org.np/admin/assets/uploads/supportive_docs... · nepal electricity...

43
NEPAL ELECTRICITY AUTHORITY (An Undertaking of Government of Nepal) TRANSMISSION DIRECTORATE (A component of Power Transmission and Distribution Efficiency Enhancement Project BIDDING DOCUMENT FOR Procurement of Plant for Gas Insulated 220 kV Barhabise Substation (Design, Supply, Install and Commission) Single-Stage, Two-Envelope Bidding Procedure Issued on: …………………. Invitation for Bids No.: ICB-TD-TKTLP073/74 - 02 ICB No.: ICB-TD-TKTLP073/74 - 02 Employer: Nepal Electricity Authority Country: Nepal VOLUME III OF III May 2017 Tamakoshi-Kathmandu 220/400 kV Transmission Line Project Transmission Directorate, NEA Training Center Complex Kharipati, Bhaktapur, Nepal Telephone: +977-1-6620016 Fax: +977-1-6620016

Upload: truongdan

Post on 18-Mar-2018

225 views

Category:

Documents


5 download

TRANSCRIPT

NEPAL ELECTRICITY AUTHORITY (An Undertaking of Government of Nepal)

TRANSMISSION DIRECTORATE

(A component of Power Transmission and Distribution Efficiency

Enhancement Project

BIDDING DOCUMENT

FOR

Procurement of Plant for Gas Insulated 220 kV Barhabise Substation (Design, Supply,

Install and Commission)

Single-Stage, Two-Envelope

Bidding Procedure

Issued on: ………………….

Invitation for Bids No.: ICB-TD-TKTLP–073/74 - 02

ICB No.: ICB-TD-TKTLP–073/74 - 02

Employer: Nepal Electricity Authority

Country: Nepal

VOLUME – III OF III

May 2017

Contract.

Tamakoshi-Kathmandu 220/400 kV Transmission Line Project

Transmission Directorate, NEA Training Center Complex

Kharipati, Bhaktapur, Nepal

Telephone: +977-1-6620016 Fax: +977-1-6620016

SCHEDULE - 1 PAGE 1 OF 12

Schedule No.1: Plant and Equipment including Mandatory Spares to be supplied from abroad

FC: Foreign Currency LC: Local Currency

Total Amount

(Excluding Taxes

and Duties)

Custom, VAT and

other taxes

FC LC

Currency# Unit Rate Amount

1 2 3 4 5 6 7 8 = (7) x (4) 9=8 10

I 220/132/11 kV GIS Barhabise Substation

PART - A: OWNER ASSESSED QUANTITIES

A POWER TRANSFORMER

a)53.33MVA, 220/√3 / 132//√3 kV Single Phase Power Transformer

(without transformer Oil)4 Nos.

b) Insulating oil for the above Power Transformer 4 Lot

c) 33kV Current transformer (NCT) for autotrasnformer 1 No

d) Oil Storage tank of 20KL 2 Nos.

B POWER TRANSFORMER

a)5 MVA, 132 /11 kV Three Phase Power Transformer (without

transformer Oil)1 Nos.

b) Insulating oil for the above Power Transformer 1 Lot

C) LT Transformer

a) 630KVA 11/0.400 Kv 2 Nos.

D 245 KV EQUIPMENTS

D1 245KV GIS Equipment

1.1 245kV, SF6 GIS Bus Bars Module as per section project 2 Sets

1.2 245kV, SF6 GIS Bus Coupler feeder bay Module as per section project1 Sets

1.3 245kV, SF6 GIS Line feeder bay Module as per section project 4 Sets

1.4 245kV, SF6 GIS spare Line feeder bay Module as per section project2 Sets

1.5 245kV, SF6 GIS ICT feeder bay Module as per section project 1 Sets

1.6 SF6 Gas Insulated Bus Duct (GIB) outside GIS Hall alongwith

associated support structure and accessories

a) OPTION-I

Item

No.Item description

Estimated

NEPAL ELECTRICITY AUTHORITY

FC

Tamakoshi-Kathmandu 220/400 kV Transmission Line Project

TRANSMISSION DIRECTORATE

IFB No. : ICB-TD-TKTLP-073/74-02: Design, Supply, Installation and Commissioning of Gas Insulated 220 kV Barhabise Substation

CIP (site) including insurance, clearing,

forwarding and transportation to site

(Excluding Taxes and Duties applicable

in Nepal)

Country of

origin

Quantity Unit

SCHEDULE - 1 PAGE 2 OF 12

Total Amount

(Excluding Taxes

and Duties)

Custom, VAT and

other taxes

FC LC

Currency# Unit Rate Amount

Item

No.Item description

Estimated

FC

CIP (site) including insurance, clearing,

forwarding and transportation to site

(Excluding Taxes and Duties applicable

in Nepal)

Country of

origin

Quantity Unit

1600A, 40kA for 1 sec. Single Phase 240 Mtr.

OPTION-II

1600A, 40kA, 1sec three phase 80 Mtr.

Note : Bidder is required to quote for either option-I or Option-II

b) 1600A, 40kA for 1 sec. Single Phase ( for 4X53.33 MVA 1 ph

Transformer)60 mtr

1.7 220kV, SF6 to Air Bushing alongwith associated support structure

a) 1600A, 40kA for 1 sec. Single Phase 16 Nos.

1.8 245kV, SF6 GIS Auxiliary Bus Module as per section project to

connect spare unit of Transformer 1 set

D.2 245KV Outdoor Equipment

1.1 216 KV Surge Arrester (1-phase) 16 Nos.

1.2 4400pF, 245 kV Capacitive Voltage Transformer (1-Phase) 12 Nos.

1.3 245kV Bus Post Insulator (1-Phase) (Except for wave trap) 12 Nos.

E 145kV Equipment

E.1 145KV GIS Equipment

1.1 145kV, SF6 GIS Bus Bars Module as per section project 2 Sets

1.2 145kV, SF6 GIS Bus Coupler feeder bay Module as per section project1 Set

1.3 145kV, SF6 GIS Line feeder bay Module as per section project 2 Sets

1.4 145kV, SF6 GIS Spare Line feeder bay Module as per section project1 Sets

1.5 145kV, SF6 GIS ICT feeder bay Module as per section project for

220/132 kV Transformer1 Sets

1.6 145kV, SF6 GIS ICT feeder bay Module as per section project for

132/11 kV Transformer1 Sets

1.7 SF6 Gas Insulated Bus Duct (GIB) outside GIS hall including Bus Duct

support structure and associated accessories

a) 1250A, 31.5kA, 1sec three phase 50 Mtr

b 1250A, 31.5 kA 1sec single phase (for 4x53.33MVA 1-Phase

Transformer bays)30 Mtr

1.8 145kV, SF6 to Air Bushing alongwith associated support structure

a) 1250A, 31.5kA, 1sec single phase 13 Set

1.9 145kV, SF6 GIS Auxiliary Bus Module as per section project to

connect spare unit of Transformer 1 set

SCHEDULE - 1 PAGE 3 OF 12

Total Amount

(Excluding Taxes

and Duties)

Custom, VAT and

other taxes

FC LC

Currency# Unit Rate Amount

Item

No.Item description

Estimated

FC

CIP (site) including insurance, clearing,

forwarding and transportation to site

(Excluding Taxes and Duties applicable

in Nepal)

Country of

origin

Quantity Unit

E.2 145kV EQUIPMENT(AIS)

1.0 120 kV Surge Arrestors (1-Phase) 13 Nos.

2.0 8800pF, 145 kV Capacitive Voltage Transformer (1-Phase) 6 Nos.

3.0 145KV Bus Post Insulator 6 Nos.

F 11 KV EQUIPMENT

1.0 11 kV Isolator (3-phase)-HDB

i 400A, 25kA for 3 sec, Isolator without E/s (Beam Mounted) 2 Set

2.0 9 kV Surge Arrester (1 ph.) 6 Nos

3.0 11 kV Horn Gap fuse (1 ph.) 6 Nos

4.0 11kV BPI 6 Nos

G 11kV, 25 kA (3 Phase) Indoor switch gear panel

i) 11kV Transformer Module 1 Nos

ii) 11kV LT Transformer Module 1 Nos

iii) Bus PT Module 1 Nos

H Testing & Maintenance Equipment for GIS

1.1 SF6 Gas processing Unit 1 Set

1.2 Partial Discharge Monitoring System 1 Set

1.3 Dew Point Meter 1 Set

1.4 SF6 Gas Leak Detector 1 Set

1.5 Portable Ladder with adustable height as per TS 1 Nos.

1.6 EOT crane for 220kV GIS Hall 1 Set

1.7 EOT crane for 132kV GIS Hall 1 Set

I RELAY PANELS (WITH AUTOMATION)

1 245kV

1.1 Circuit Breaker Relay Panel

a) CB Relay Panel With Auto Reclose 6 Nos.

b) CB Relay Panel Without Auto Reclose 2 Nos.

1.2 Line Protection Panel 6 Nos.

1.3 Transformer Protection Panel (For both HV & MV side) 1 Nos.

1.4 Bus Bar Protection Panel 1 set

2 145kV

1.1 Circuit Breaker Relay Panel

a) CB Relay Panel With Auto Reclose 3 Nos.

b) CB Relay Panel Without Auto Reclose 3 Nos.

1.2 Line Protection Panel 3 Nos.

SCHEDULE - 1 PAGE 4 OF 12

Total Amount

(Excluding Taxes

and Duties)

Custom, VAT and

other taxes

FC LC

Currency# Unit Rate Amount

Item

No.Item description

Estimated

FC

CIP (site) including insurance, clearing,

forwarding and transportation to site

(Excluding Taxes and Duties applicable

in Nepal)

Country of

origin

Quantity Unit

1.3 Transformer Protection Panel (For both HV & MV side) 1 Nos.

1.4 Bus Bar Protection Panel 1 set

3 Other/Common equipments Pertaining to C & R System

a) Time Synchronisation Equipment 1 No.

a) Relay Test kit 1 No.

J SUBSTATION AUTOMATION

1 Substation Automation System as per Technical Specification:

a) 220kV System 8 Nos.

b) 132 kV System 6 Nos.

c) BCU for auxilary system 1 set

d) 11 kV HT Indoor Switchgear 1 set

K Digital Protection Coupler , PBAX & Wave Trap

a Digital Protection Coupler 16 Nos

b PBAX with following configuration as per TS 1 Set

i 2 wire subscriber interface card with capacity 32 local subscribers

(along with 32 nos. Instruments)

ii 4 wire E & M interface card with capacity 8 nos. trunks (For PLCC)

iii) E-1 interface with 2 trunks G-703

iv) 2 wire interface with 1 trunk (For PSTN)

c) Line Trap

i) 1250A,0.5mH,31.5kA(132 kV) 2 nos

ii) Bus Post Insulator for above 132 kv Wave Trap 6 no.

L LT Switchgear (As per Technical specification)

a 400V Main switchboard 1 Set

b 400V ACDB 1 Set

c 400V MLDB 1 Set

d 400V Emergency LDB 1 Set

e 220V DCDB 2 Sets

g 48V DCDB 2 Set

M Batteries

a 220V

i 600 AH 2 Nos

b 48V

SCHEDULE - 1 PAGE 5 OF 12

Total Amount

(Excluding Taxes

and Duties)

Custom, VAT and

other taxes

FC LC

Currency# Unit Rate Amount

Item

No.Item description

Estimated

FC

CIP (site) including insurance, clearing,

forwarding and transportation to site

(Excluding Taxes and Duties applicable

in Nepal)

Country of

origin

Quantity Unit

i 600AH 2 Nos

N Float Cum Boost Battery Charger

a 220V Float Cum Boost Battery Charger

i 90A/90A 2 Nos

b 48V Float Cum Boost Battery Charger

i 90A/90A 2 Nos

O Diesel Generator with control Panel

a 250 kVA 1 Set

P Fire Protection System

a Portable /Trolley/Wheel mounted extinguishers

i 9 litre water type 2 Nos

ii 50 litre foam type 2 Nos

iii 4.5 kg CO2 type 6 Nos

iv 4.5 kg Dry Chemical Power (DCP) type 2 Nos

b Smoke detection system 1 Set

c Fire detection and Alarm System 1 Set

Q Cables along with clamps, glands, lugs and straight joints etc.

a 11kV HT Cable alongwith accessories and termination equipments2.5 KM

b Power Cables - (1.1kV grade)

i 3.5Cx300 sqmm (XLPE) cable for filter Machine along with 2 nos

outdoor receptacles -250A1 KM

R Air conditioning

1High wall type split AC unit of 2 TR capacities for control room, relay

room and battery room25 Nos.

S STEEL STRUCTURES (Tower,Gantry structures& Equipment

support structures)

a Lattice/pipe Structure for towers,beams and equipments including peak

plates/pack washers and guest paltes including foundation

bolts(nuts,washers,MS plate welded at the bottom)

i) Lattice stucture & foundation bolts 100 MT

SCHEDULE - 1 PAGE 6 OF 12

Total Amount

(Excluding Taxes

and Duties)

Custom, VAT and

other taxes

FC LC

Currency# Unit Rate Amount

Item

No.Item description

Estimated

FC

CIP (site) including insurance, clearing,

forwarding and transportation to site

(Excluding Taxes and Duties applicable

in Nepal)

Country of

origin

Quantity Unit

ii Pipe structure & foundation bolts 22 MT

b Fastners for towers,beams and equipment support strcutures 5 MT

T Communication Equipment

1 Transmission Equipment

ASDH Equipment ( STM- 4 MADM, upto 3 MSP protected

directions)

(I)

Base Equipment (Common cards, Cross-connect/control cards, Optical

base cards, Power supply cards, power cabling, other hardware &

accessories including sub-racks, patch cords, DDF etc. fully equipped

excluding (II) and (III) below)

2 No.

(II) Optical Interface/SFP# for

a) S4.1 4 Nos.

(a) L4.2 6 Nos.

(III) Tributary Cards

(a) E1 Interface card (Minimum 16 interfaces per card ) 2 Nos.

(b)Ethernet interfaces 10/100 Mbps with Layer-2 switching (Minimum

4 interfaces per card.)4 No.

2 Termination Equipment

Drop/Insert Multiplexer

Base Equipment (Common cards, Power supply cards, power cabling,

other hardware & accessories including sub-racks, etc. fully equipped

excluding subscriber line interface cards)

2 Nos.

A2 Subscriber Line Interface Cards

a) 2 wire (sub/sub) voice channel cards (min 8 channels per card) 2 Nos.

b) 4 wire (E&M) voice channel cards (min 8 channels per card) 2 Nos.

c) Asynchronous Sub Channels data cards (minimum 4 channels per card) 2 No.

d) Synchronous data card (NX64kbps) 2 Nos.

3 Equipment Cabinets

a) For Drop/Insert Multiplexer 2 No.

b) For SDH Equipment 2 No.

4 TMN – Craft Terminal for SDH & PDH Equipments

(a) Hardware 1 set

(b) Software 1 set

5 Synchronization Equipment

GPS clock including all hardware & accessories 1 set

Main Distribution Frame

A1

6

SCHEDULE - 1 PAGE 7 OF 12

Total Amount

(Excluding Taxes

and Duties)

Custom, VAT and

other taxes

FC LC

Currency# Unit Rate Amount

Item

No.Item description

Estimated

FC

CIP (site) including insurance, clearing,

forwarding and transportation to site

(Excluding Taxes and Duties applicable

in Nepal)

Country of

origin

Quantity Unit

(100 pairs) 2 no

7.0 Test Equipment as per TS 1 set

SUB TOTAL PART-A

PART-B: VENDOR ASSESSED QUANTITIES

A

Erection Hardware :-Insulator strings, Disc Insulators, Hardware,

conductor, bus-bar materials, cable trays, clamps, spacers, connectors

including conectors for Auto Transformer , Junction box, earthwire,

earthing material risers, buried cable trenches/pipe of equipment &

lighting, all accessories etc. for the following:

1 220 kV DM-type layout for GIS termination arrangement

1.1 Line Bay 4 Set

1.2 Transformer Bay 1 Sets

2 132 kV DM-type layout for GIS termination arrangement

1.1 Line Bay 2 Sets

1.2 Transformer Bay 2 Sets

3 11 KV 2 SET

B

Bus post insulators, Spacers, equipment support structures,

conductor(s), Al tube, clamp, connectors required for arrangement of

Neutral formation for one transformer bank for making connection

arrangement to connect spare unit in place of any other unit without

physical shifting complete in all respect

1 Sets

C Ventilation & heating System

2 Ventilation & heating system (as per technical specification)

(i) 220kV GIS Hall 1 LS

(ii) 132 kV GIS Hall 1 LS

D Illumination System

1.1 Substation Lighting

(i) Control Room cum administrative building illumination 1 LS

(ii) 220kV GIS Building 1 LS

(iii) 132kV GIS Building 1 LS

IV. Indoor Switchyrad Panel Room 1 LS

v Fire Fighting Room 1 LS

vi Outdoor Switchyard Lighting 1 LS

6

SCHEDULE - 1 PAGE 8 OF 12

Total Amount

(Excluding Taxes

and Duties)

Custom, VAT and

other taxes

FC LC

Currency# Unit Rate Amount

Item

No.Item description

Estimated

FC

CIP (site) including insurance, clearing,

forwarding and transportation to site

(Excluding Taxes and Duties applicable

in Nepal)

Country of

origin

Quantity Unit

vii Street Lighting 1 LS

viii Occupancy sensor 1 LS

1.2 Township Area Lighting 1 LS

E Fire Protection System per technical Specification)

1 Pumping arrangement inside pump house 1 set

2 Hydrant system outside the Pump House. 1 set

3 HVW spray system & Hydrant system for Transformer :

a 53.33 MVA, 220/132 kV Single Phase Auto Transformer 4 nos

b 5 MVA,132/11 kV Three phase transformer 1 nos

F POWER & CONTROL CABLES

1 1.1 kV LV Cables

1.1 Power Cable(PVC insulated) 1 LS

1.2 Power Cable(XLPE insulated) 1 LS

1.3 Control Cable (PVC insulated) 1 LS

1.4Cable glands, lugs & straight through joints for Power & Control cables

1 LS

GVisual Monitoring System for watch & ward as per technical

specification1 LS

H Earthing and lightning protection including necesaary

connectors/connections, risers etc. complete in all respect

i Earth Conductor (copper) 1 LS

ii Earth Rod (copper clad steel) 1 LS

iii Equipment for lightning protection 1 LS

I SUBSTATION AUTOMATION

a Integration of all 220/132kV Bays under present scope with the

SCADA of SIEMENS (SINAUT Spectrum) at Load Dispatch Centre,

Kathmandu including supply of Hardware, Software, accessories etc. as

per TS Section Project.

1 LS

SUB TOTAL PART-B

PART-C: MANDATORY SPARES (Break up of Lumpsum

quantity shall be as per Annexure-I, Section Project of Technical

Specification).

SCHEDULE - 1 PAGE 9 OF 12

Total Amount

(Excluding Taxes

and Duties)

Custom, VAT and

other taxes

FC LC

Currency# Unit Rate Amount

Item

No.Item description

Estimated

FC

CIP (site) including insurance, clearing,

forwarding and transportation to site

(Excluding Taxes and Duties applicable

in Nepal)

Country of

origin

Quantity Unit

I. Transformer(220/132 kV) 1 LS

II Transformer(132//11 kV) 1 LS

III. GIS(22O KV & 132 KV) 1 LS

IV 220kV CVT 1 no

V 132kV CVT 1 no

VI 216kV LA 1 no

VII 120kV LA 1 no

VIII DG Set 1 LS

IX Battery Charger 1 LS

X Relay & Protection 1 LS

XI Digital Protection Copler 1 LS

XII Sub-Station Automation System 1 LS

XIII LT Transformer 1 LS

XIV Illumination System 1 LS

XV Erection Hardware 1 LS

XVI Telecommunication Equipments 1 LS

XVII LT Indoor Switchgear 1 LS

XVIII Fire Fighting 1 LS

SUB-TOTAL PART-C

Total for 220/132/11kV BARHABISE Substation (I) (Part-A+ Part-

B+ Part C)

II EXTENSION OF 220 KV KHIMTI S/S

PART -A: OWNER ASSESSED QUANTITIES

A 245 KV EQUIPMENTS

A1 245KV GIS Equipment

1.1 245kV, SF6 GIS Bus Bars Module as per section

project(EXTENSION)2 Sets

1.2 245kV, SF6 GIS Line feeder bay Module as per section project 2 Sets

1.3 220kV, SF6 to Cable Bushing alongwith associated support structure

a) 2000A, 40kA for 1 sec. Single Phase 6 Nos.

A2 245KV Outdoor Equipment

1.1 216 KV Surge Arrester (1-phase) 6 Nos.

1.2 4400pF, 245 kV Capacitive Voltage Transformer (1-Phase) 6 Nos.

1.3 245kV Bus Post Insulator (1-Phase) (Except for wave trap) 12 Nos.

B Testing & Maintenance Equipment for GIS

SCHEDULE - 1 PAGE 10 OF 12

Total Amount

(Excluding Taxes

and Duties)

Custom, VAT and

other taxes

FC LC

Currency# Unit Rate Amount

Item

No.Item description

Estimated

FC

CIP (site) including insurance, clearing,

forwarding and transportation to site

(Excluding Taxes and Duties applicable

in Nepal)

Country of

origin

Quantity Unit

1.1 SF6 Gas processing Unit 1 Set

1.2 Partial Discharge Monitoring System 1 Set

1.3 Dew Point Meter 1 Set

1.4 SF6 Gas Leak Detector 1 Set

C RELAY PANELS (WITH AUTOMATION)

1 245kV

1.1 Circuit Breaker Relay Panel

a) CB Relay Panel With Auto Reclose 2 Nos.

1.2 Line Protection Panel 2 Nos.

1.3 Integration of existing Bus Bar Protection 1 set

3 Other/Common equipments Pertaining to C & R System

a) Relay Test kit 1 No.

D SUBSTATION AUTOMATION

1Augmentation of Substation Automation System as per Technical

Specification:

a) 220kV System 2 Nos.

E Cables along with clamps, glands, lugs and straight joints etc.

a 220 kV grade 1 core, 1200sq.mm.XLPE insulated copper cable as per

technical specification 1.5 KM

b Cable end termination(s) on Gantry as per technical specification 6 nos

F STEEL STRUCTURES (Tower,Gantry structures& Equipment

support structures)

a Lattice Structure for towers,beams and equipments including peak

plates/pack washers and guest paltes including foundation

bolts(nuts,washers,MS plate welded at the bottom)

32 MT

b Fastners for towers,beams and equipment support strcutures 1 MT

SUB TOTAL -PART-A

PART-B: VENDOR ASSESSED QUANTITIES

SCHEDULE - 1 PAGE 11 OF 12

Total Amount

(Excluding Taxes

and Duties)

Custom, VAT and

other taxes

FC LC

Currency# Unit Rate Amount

Item

No.Item description

Estimated

FC

CIP (site) including insurance, clearing,

forwarding and transportation to site

(Excluding Taxes and Duties applicable

in Nepal)

Country of

origin

Quantity Unit

A

Erection Hardware :-Insulator strings, Disc Insulators, Hardware,

conductor, bus-bar materials, cable trays, clamps, spacers, connectors

including conectors for Auto Transformer , Junction box, earthwire,

earthing material risers, buried cable trenches/pipe of equipment &

lighting, all accessories etc. for the following:

1 220 kV DM-type layout for GIS termination arrangement

1.1 Line Bay 2 Set

B POWER & CONTROL CABLES

1 1.1 kV LV Cables

1.1 Power Cable(PVC insulated) 1 LS

1.2 Control Cable (PVC insulated) 1 LS

1.3Cable glands, lugs & straight through joints for Power & Control cables

1 LS

C Earthing and lightning protection including necesaary

connectors/connections, risers etc. complete in all respect1 LS

SUB TOTAL PART-B

PART-C: MANDATORY SPARES (Break up of Lumpsum

quantity shall be as per Annexure-I, Section Project of Technical

Specification).

I GIS 1 LS

II 220kV CVT 1 no

III 216kV LA 1 no

IV Digital protecion Coupler 1 LS

V Sub-Station Automation System 1 LS

VI Illumination System 1 LS

VII Erection Hardware 1 LS

VIII Relay & Protection 1 LS

TOTAL PART-C

Total for 220kV KHIMTI Substation (II) (Part-A+ Part-B+ Part

C)

TOTAL (Total of (I) & (II) to be carried forward to Schedule No.

5: Grand Summary)

Note : 1) Bidder is required to quote prices in this Schedule for all the individual items/sub-items.

2.) The Prices of equipments are inclusive of type test charges except for those mentioned in Schedule 4( e)

SCHEDULE - 1 PAGE 12 OF 12

Total Amount

(Excluding Taxes

and Duties)

Custom, VAT and

other taxes

FC LC

Currency# Unit Rate Amount

Item

No.Item description

Estimated

FC

CIP (site) including insurance, clearing,

forwarding and transportation to site

(Excluding Taxes and Duties applicable

in Nepal)

Country of

origin

Quantity Unit

Name of Bidder: Date:

Signature of Bidder:

(Printed Name)

(Designation)

(Common Seal)

3.) BOQ given above is indicative only based on the scope of work as given in Project Specific Requirements. The quantities mentioned above may undergo change during detailed engineering

to meet the functional requirement and scope of work defined in Employer's Requirements.

SCHEDULE - 2 PAGE 1 OF 11

All prices in local currency, NRs

Total Amount

(Excluding Taxes)

VAT and other

taxesTotal Amount

Unit Rate Amount Unit Rate Amount

1 2 3 4 5 6 7 8 9 10 11

I 220/132/11 kV GIS Barhabise Substation

PART - A: OWNER ASSESSED QUANTITIES

A POWER TRANSFORMER

a)53.33MVA, 220/√3 / 132//√3 kV Single Phase Power

Transformer (without transformer Oil)4 Nos.

b) Insulating oil for the above Power Transformer 4 Lot

c) 33kV Current transformer (NCT) for autotrasnformer 1 No

d) Oil Storage tank of 20KL 2 Nos.

B POWER TRANSFORMER

a)5 MVA, 132 /11 kV Three Phase Power Transformer (without

transformer Oil)1 Nos.

b) Insulating oil for the above Power Transformer 1 Lot

C) LT Transformer

a) 630KVA 11/0.400 Kv 2 Nos.

D 245 KV EQUIPMENTS

D1 245KV GIS Equipment

1.1 245kV, SF6 GIS Bus Bars Module as per section project 2 Sets

1.2 245kV, SF6 GIS Bus Coupler feeder bay Module as per section

project1 Sets

1.3 245kV, SF6 GIS Line feeder bay Module as per section project4 Sets

1.4 245kV, SF6 GIS spare Line feeder bay Module as per section

project2 Sets

1.5 245kV, SF6 GIS ICT feeder bay Module as per section project1 Sets

1.6 SF6 Gas Insulated Bus Duct (GIB) outside GIS Hall alongwith

associated support structure and accessories

a) OPTION-I

1600A, 40kA for 1 sec. Single Phase 240 Mtr.

IFB No. : ICB-TD-TKTLP-073/74-02: Design, Supply, Installation and Commissioning of Gas Insulated 220 kV Barhabise Substation

Inland Transportation up to SiteQuantity

NEPAL ELECTRICITY AUTHORITYTRANSMISSION DIRECTORATE

Tamakoshi-Kathmandu 220/400 kV Transmission Line Project

Schedule No. 2: Plant and Equipment including Mandatory Spares Parts to be supplied from within Nepal including Type Test Charges

Item No. Item Description Unit

Ex Faxtory Price (Excluding

VAT)

SCHEDULE - 2 PAGE 2 OF 11

Total Amount

(Excluding Taxes)

VAT and other

taxesTotal Amount

Unit Rate Amount Unit Rate Amount

Inland Transportation up to SiteQuantityItem No. Item Description Unit

Ex Faxtory Price (Excluding

VAT)

OPTION-II

1600A, 40kA, 1sec three phase 80 Mtr.

Note : Bidder is required to quote for either option-I or Option-II

b) 1600A, 40kA for 1 sec. Single Phase ( for 4X53.33 MVA 1 ph

Transformer)60 mtr

1.7 220kV, SF6 to Air Bushing alongwith associated support

structure

a) 1600A, 40kA for 1 sec. Single Phase 16 Nos.

1.8 245kV, SF6 GIS Auxiliary Bus Module as per section project to

connect spare unit of Transformer 1 set

D.2 245KV Outdoor Equipment

1.1 216 KV Surge Arrester (1-phase) 16 Nos.

1.2 4400pF, 245 kV Capacitive Voltage Transformer (1-Phase)12 Nos.

1.3 245kV Bus Post Insulator (1-Phase) (Except for wave trap)12 Nos.

E 145kV Equipment

E.1 145KV GIS Equipment

1.1 145kV, SF6 GIS Bus Bars Module as per section project 2 Sets

1.2 145kV, SF6 GIS Bus Coupler feeder bay Module as per section

project1 Set

1.3 145kV, SF6 GIS Line feeder bay Module as per section project2 Sets

1.4 145kV, SF6 GIS Spare Line feeder bay Module as per section

project1 Sets

1.5 145kV, SF6 GIS ICT feeder bay Module as per section project

for 220/132 kV Transformer1 Sets

1.6 145kV, SF6 GIS ICT feeder bay Module as per section project

for 132/11 kV Transformer1 Sets

1.7 SF6 Gas Insulated Bus Duct (GIB) outside GIS hall including

Bus Duct support structure and associated accessories

a) 1250A, 31.5kA, 1sec three phase 50 Mtr

b 1250A, 31.5 kA 1sec single phase (for 4x53.33MVA 1-Phase

Transformer bays)30 Mtr

1.8 145kV, SF6 to Air Bushing alongwith associated support

structure

a) 1250A, 31.5kA, 1sec single phase 13 Set

1.9 145kV, SF6 GIS Auxiliary Bus Module as per section project to

connect spare unit of Transformer 1 set

SCHEDULE - 2 PAGE 3 OF 11

Total Amount

(Excluding Taxes)

VAT and other

taxesTotal Amount

Unit Rate Amount Unit Rate Amount

Inland Transportation up to SiteQuantityItem No. Item Description Unit

Ex Faxtory Price (Excluding

VAT)

E.2 145kV EQUIPMENT(AIS)

1.0 120 kV Surge Arrestors (1-Phase) 13 Nos.

2.0 8800pF, 145 kV Capacitive Voltage Transformer (1-Phase)6 Nos.

3.0 145KV Bus Post Insulator 6 Nos.

F 11 KV EQUIPMENT

1.0 11 kV Isolator (3-phase)-HDB

i 400A, 25kA for 3 sec, Isolator without E/s (Beam Mounted)2 Set

2.0 9 kV Surge Arrester (1 ph.) 6 Nos

3.0 11 kV Horn Gap fuse (1 ph.) 6 Nos

4.0 11kV BPI 6 Nos

G 11kV, 25 kA (3 Phase) Indoor switch gear panel

i) 11kV Transformer Module 1 Nos

ii) 11kV LT Transformer Module 1 Nos

iii) Bus PT Module 1 Nos

H Testing & Maintenance Equipment for GIS

1.1 SF6 Gas processing Unit 1 Set

1.2 Partial Discharge Monitoring System 1 Set

1.3 Dew Point Meter 1 Set

1.4 SF6 Gas Leak Detector 1 Set

1.5 Portable Ladder with adustable height as per TS 1 Nos.

1.6 EOT crane for 220kV GIS Hall 1 Set

1.7 EOT crane for 132kV GIS Hall 1 Set

I RELAY PANELS (WITH AUTOMATION)

1 245kV

1.1 Circuit Breaker Relay Panel

a) CB Relay Panel With Auto Reclose 6 Nos.

b) CB Relay Panel Without Auto Reclose 2 Nos.

1.2 Line Protection Panel 6 Nos.

1.3 Transformer Protection Panel (For both HV & MV side) 1 Nos.

1.4 Bus Bar Protection Panel 1 set

2 145kV

1.1 Circuit Breaker Relay Panel

a) CB Relay Panel With Auto Reclose 3 Nos.

b) CB Relay Panel Without Auto Reclose 3 Nos.

1.2 Line Protection Panel 3 Nos.

1.3 Transformer Protection Panel (For both HV & MV side) 1 Nos.

1.4 Bus Bar Protection Panel 1 set

SCHEDULE - 2 PAGE 4 OF 11

Total Amount

(Excluding Taxes)

VAT and other

taxesTotal Amount

Unit Rate Amount Unit Rate Amount

Inland Transportation up to SiteQuantityItem No. Item Description Unit

Ex Faxtory Price (Excluding

VAT)

3 Other/Common equipments Pertaining to C & R System

a) Time Synchronisation Equipment 1 No.

a) Relay Test kit 1 No.

J SUBSTATION AUTOMATION

1 Substation Automation System as per Technical Specification:

a) 220kV System 8 Nos.

b) 132 kV System 6 Nos.

c) BCU for auxilary system 1 set

d) 11 kV HT Indoor Switchgear 1 set

K Digital Protection Coupler , PBAX & Wave Trap

a Digital Protection Coupler 16 Nos

b PBAX with following configuration as per TS 1 Set

i 2 wire subscriber interface card with capacity 32 local

subscribers (along with 32 nos. Instruments)

ii 4 wire E & M interface card with capacity 8 nos. trunks (For

PLCC)

iii) E-1 interface with 2 trunks G-703

iv) 2 wire interface with 1 trunk (For PSTN)

c) Line Trap

i) 1250A,0.5mH,31.5kA(132 kV) 2 nos

ii) Bus Post Insulator for above 132 kv Wave Trap 6 no.

L LT Switchgear (As per Technical specification)

a 400V Main switchboard 1 Set

b 400V ACDB 1 Set

c 400V MLDB 1 Set

d 400V Emergency LDB 1 Set

e 220V DCDB 2 Sets

g 48V DCDB 2 Set

M Batteries

a 220V

i 600 AH 2 Nos

b 48V

i 600AH 2 Nos

N Float Cum Boost Battery Charger

a 220V Float Cum Boost Battery Charger

i 90A/90A 2 Nos

SCHEDULE - 2 PAGE 5 OF 11

Total Amount

(Excluding Taxes)

VAT and other

taxesTotal Amount

Unit Rate Amount Unit Rate Amount

Inland Transportation up to SiteQuantityItem No. Item Description Unit

Ex Faxtory Price (Excluding

VAT)

b 48V Float Cum Boost Battery Charger

i 90A/90A 2 Nos

O Diesel Generator with control Panel

a 250 kVA 1 Set

P Fire Protection System

a Portable /Trolley/Wheel mounted extinguishers

i 9 litre water type 2 Nos

ii 50 litre foam type 2 Nos

iii 4.5 kg CO2 type 6 Nos

iv 4.5 kg Dry Chemical Power (DCP) type 2 Nos

b Smoke detection system 1 Set

c Fire detection and Alarm System 1 Set

Q Cables along with clamps, glands, lugs and straight joints

etc.

a 11kV HT Cable alongwith accessories and termination

equipments2.5 KM

b Power Cables - (1.1kV grade)

i 3.5Cx300 sqmm (XLPE) cable for filter Machine along with 2

nos outdoor receptacles -250A1 KM

R Air conditioning

1High wall type split AC unit of 2 TR capacities for control room,

relay room and battery room25 Nos.

S STEEL STRUCTURES (Tower,Gantry structures&

Equipment support structures)

a Lattice/pipe Structure for towers,beams and equipments

including peak plates/pack washers and guest paltes including

foundation bolts(nuts,washers,MS plate welded at the bottom)

i) Lattice stucture & foundation bolts 100 MT

ii Pipe structure & foundation bolts 22 MT

b Fastners for towers,beams and equipment support strcutures5 MT

T Communication Equipment

1 Transmission Equipment

ASDH Equipment ( STM- 4 MADM, upto 3 MSP protected

directions)

SCHEDULE - 2 PAGE 6 OF 11

Total Amount

(Excluding Taxes)

VAT and other

taxesTotal Amount

Unit Rate Amount Unit Rate Amount

Inland Transportation up to SiteQuantityItem No. Item Description Unit

Ex Faxtory Price (Excluding

VAT)

(I)

Base Equipment (Common cards, Cross-connect/control cards,

Optical base cards, Power supply cards, power cabling, other

hardware & accessories including sub-racks, patch cords, DDF

etc. fully equipped excluding (II) and (III) below)

2 No.

(II) Optical Interface/SFP# for

a) S4.1 4 Nos.

(a) L4.2 6 Nos.

(III) Tributary Cards

(a) E1 Interface card (Minimum 16 interfaces per card ) 2 Nos.

(b)Ethernet interfaces 10/100 Mbps with Layer-2 switching

(Minimum 4 interfaces per card.)4 No.

2 Termination Equipment

Drop/Insert Multiplexer

Base Equipment (Common cards, Power supply cards, power

cabling, other hardware & accessories including sub-racks, etc.

fully equipped excluding subscriber line interface cards)

2 Nos.

A2 Subscriber Line Interface Cards

a) 2 wire (sub/sub) voice channel cards (min 8 channels per card) 2 Nos.

b) 4 wire (E&M) voice channel cards (min 8 channels per card) 2 Nos.

c)Asynchronous Sub Channels data cards (minimum 4 channels

per card)2 No.

d) Synchronous data card (NX64kbps) 2 Nos.

3 Equipment Cabinets

a) For Drop/Insert Multiplexer 2 No.

b) For SDH Equipment 2 No.

4 TMN – Craft Terminal for SDH & PDH Equipments

(a) Hardware 1 set

(b) Software 1 set

5 Synchronization Equipment

GPS clock including all hardware & accessories 1 set

Main Distribution Frame

(100 pairs) 2 no

7.0 Test Equipment as per TS 1 set

SUB TOTAL PART-A

PART-B: VENDOR ASSESSED QUANTITIES

A1

6

SCHEDULE - 2 PAGE 7 OF 11

Total Amount

(Excluding Taxes)

VAT and other

taxesTotal Amount

Unit Rate Amount Unit Rate Amount

Inland Transportation up to SiteQuantityItem No. Item Description Unit

Ex Faxtory Price (Excluding

VAT)

A

Erection Hardware :-Insulator strings, Disc Insulators,

Hardware, conductor, bus-bar materials, cable trays, clamps,

spacers, connectors including conectors for Auto Transformer ,

Junction box, earthwire, earthing material risers, buried cable

trenches/pipe of equipment & lighting, all accessories etc. for

the following:

1 220 kV DM-type layout for GIS termination arrangement

1.1 Line Bay 4 Set

1.2 Transformer Bay 1 Sets

2 132 kV DM-type layout for GIS termination arrangement

1.1 Line Bay 2 Sets

1.2 Transformer Bay 2 Sets

3 11 KV 2 SET

B

Bus post insulators, Spacers, equipment support structures,

conductor(s), Al tube, clamp, connectors required for

arrangement of Neutral formation for one transformer bank for

making connection arrangement to connect spare unit in place of

any other unit without physical shifting complete in all respect

1 Sets

C Ventilation & heating System

2 Ventilation & heating system (as per technical specification)

(i) 220kV GIS Hall 1 LS

(ii) 132 kV GIS Hall 1 LS

D Illumination System

1.1 Substation Lighting

(i) Control Room cum administrative building illumination 1 LS

(ii) 220kV GIS Building 1 LS

(iii) 132kV GIS Building 1 LS

IV. Indoor Switchyrad Panel Room 1 LS

v Fire Fighting Room 1 LS

vi Outdoor Switchyard Lighting 1 LS

vii Street Lighting 1 LS

viii Occupancy sensor 1 LS

1.2 Township Area Lighting 1 LS

SCHEDULE - 2 PAGE 8 OF 11

Total Amount

(Excluding Taxes)

VAT and other

taxesTotal Amount

Unit Rate Amount Unit Rate Amount

Inland Transportation up to SiteQuantityItem No. Item Description Unit

Ex Faxtory Price (Excluding

VAT)

E Fire Protection System per technical Specification)

1 Pumping arrangement inside pump house 1 set

2 Hydrant system outside the Pump House. 1 set

3 HVW spray system & Hydrant system for Transformer :

a 53.33 MVA, 220/132 kV Single Phase Auto Transformer 4 nos

b 5 MVA,132/11 kV Three phase transformer 1 nos

F POWER & CONTROL CABLES

1 1.1 kV LV Cables

1.1 Power Cable(PVC insulated) 1 LS

1.2 Power Cable(XLPE insulated) 1 LS

1.3 Control Cable (PVC insulated) 1 LS

1.4Cable glands, lugs & straight through joints for Power &

Control cables1 LS

GVisual Monitoring System for watch & ward as per technical

specification1 LS

H Earthing and lightning protection including necesaary

connectors/connections, risers etc. complete in all respect

i Earth Conductor (copper) 1 LS

ii Earth Rod (copper clad steel) 1 LS

iii Equipment for lightning protection 1 LS

I SUBSTATION AUTOMATION

a Integration of all 220/132kV Bays under present scope with the

SCADA of SIEMENS (SINAUT Spectrum) at Load Dispatch

Centre, Kathmandu including supply of Hardware, Software,

accessories etc. as per TS Section Project.

1 LS

SUB TOTAL PART-B

PART-C: MANDATORY SPARES (Break up of Lumpsum

quantity shall be as per Annexure-I, Section Project of

Technical Specification).

I. Transformer(220/132 kV) 1 LS

II Transformer(132//11 kV) 1 LS

III. GIS(22O KV & 132 KV) 1 LS

IV 220kV CVT 1 no

V 132kV CVT 1 no

VI 216kV LA 1 no

VII 120kV LA 1 no

SCHEDULE - 2 PAGE 9 OF 11

Total Amount

(Excluding Taxes)

VAT and other

taxesTotal Amount

Unit Rate Amount Unit Rate Amount

Inland Transportation up to SiteQuantityItem No. Item Description Unit

Ex Faxtory Price (Excluding

VAT)

VIII DG Set 1 LS

IX Battery Charger 1 LS

X Relay & Protection 1 LS

XI Digital Protection Copler 1 LS

XII Sub-Station Automation System 1 LS

XIII LT Transformer 1 LS

XIV Illumination System 1 LS

XV Erection Hardware 1 LS

XVI Telecommunication Equipments 1 LS

XVII LT Indoor Switchgear 1 LS

XVIII Fire Fighting 1 LS

SUB-TOTAL-C

Total for 220/132/11kV BARHABISE Substation (I) (Part-

A+ Part-B+ Part C)

II EXTENSION OF 220 KV KHIMTI S/S

PART -A: OWNER ASSESSED QUANTITIES

A 245 KV EQUIPMENTS

A1 245KV GIS Equipment

1.1 245kV, SF6 GIS Bus Bars Module as per section

project(EXTENSION)2 Sets

1.2 245kV, SF6 GIS Line feeder bay Module as per section project2 Sets

1.3 220kV, SF6 to Cable Bushing alongwith associated support

structure

a) 2000A, 40kA for 1 sec. Single Phase 6 Nos.

A2 245KV Outdoor Equipment

1.1 216 KV Surge Arrester (1-phase) 6 Nos.

1.2 4400pF, 245 kV Capacitive Voltage Transformer (1-Phase)6 Nos.

1.3 245kV Bus Post Insulator (1-Phase) (Except for wave trap)12 Nos.

B Testing & Maintenance Equipment for GIS

1.1 SF6 Gas processing Unit 1 Set

1.2 Partial Discharge Monitoring System 1 Set

1.3 Dew Point Meter 1 Set

1.4 SF6 Gas Leak Detector 1 Set

C RELAY PANELS (WITH AUTOMATION)

1 245kV

1.1 Circuit Breaker Relay Panel

SCHEDULE - 2 PAGE 10 OF 11

Total Amount

(Excluding Taxes)

VAT and other

taxesTotal Amount

Unit Rate Amount Unit Rate Amount

Inland Transportation up to SiteQuantityItem No. Item Description Unit

Ex Faxtory Price (Excluding

VAT)

a) CB Relay Panel With Auto Reclose 2 Nos.

1.2 Line Protection Panel 2 Nos.

1.3 Integration of existing Bus Bar Protection 1 set

3 Other/Common equipments Pertaining to C & R System

a) Relay Test kit 1 No.

D SUBSTATION AUTOMATION

1Augmentation of Substation Automation System as per

Technical Specification:

a) 220kV System 2 Nos.

E Cables along with clamps, glands, lugs and straight joints

etc.

a 220 kV grade 1 core, 1200sq.mm.XLPE insulated copper cable

as per technical specification 1.5 KM

b Cable end termination(s) on Gantry as per technical

specification6 nos

F STEEL STRUCTURES (Tower,Gantry structures&

Equipment support structures)

a Lattice Structure for towers,beams and equipments including

peak plates/pack washers and guest paltes including foundation

bolts(nuts,washers,MS plate welded at the bottom)32 MT

b Fastners for towers,beams and equipment support strcutures1 MT

SUB TOTAL -PART-A

PART-B: VENDOR ASSESSED QUANTITIES

A

Erection Hardware :-Insulator strings, Disc Insulators,

Hardware, conductor, bus-bar materials, cable trays, clamps,

spacers, connectors including conectors for Auto Transformer ,

Junction box, earthwire, earthing material risers, buried cable

trenches/pipe of equipment & lighting, all accessories etc. for

the following:

1 220 kV DM-type layout for GIS termination arrangement

1.1 Line Bay 2 Set

B POWER & CONTROL CABLES

1 1.1 kV LV Cables

1.1 Power Cable(PVC insulated) 1 LS

SCHEDULE - 2 PAGE 11 OF 11

Total Amount

(Excluding Taxes)

VAT and other

taxesTotal Amount

Unit Rate Amount Unit Rate Amount

Inland Transportation up to SiteQuantityItem No. Item Description Unit

Ex Faxtory Price (Excluding

VAT)

1.2 Control Cable (PVC insulated) 1 LS

1.3Cable glands, lugs & straight through joints for Power &

Control cables1 LS

C Earthing and lightning protection including necesaary

connectors/connections, risers etc. complete in all respect1 LS

SUB TOTAL PART-B

PART-C: MANDATORY SPARES (Break up of Lumpsum

quantity shall be as per Annexure-I, Section Project of

Technical Specification).

I GIS 1 LS

II 220kV CVT 1 no

III 216kV LA 1 no

IV Digital protecion Coupler 1 LS

V Sub-Station Automation System 1 LS

VI Illumination System 1 LS

VII Erection Hardware 1 LS

VIII Relay & Protection 1 LS

TOTAL PART-C

Total for 220kV KHIMTI Substation (II) (Part-A+ Part-B+

Part C)

Note : 1) Bidder is required to quote prices in this Schedule for all the individual items/sub-items.

Name of Bidder: Date:

Signature of Bidder:

(Printed Name)

(Designation)

(Common Seal)

2.) The Prices of equipments are inclusive of type test charges except for those mentioned in Schedule 4( e)

Total Ex-works Price ( Total of (I) and (II) to be carried

forward to Schedule No. 5A: Grand Summary)

3.) BOQ given above is indicative only based on the scope of work as given in Project Specific Requirements. The quantities mentioned above may undergo change during detailed

engineering to meet the functional requirement and scope of work defined in Employer's Requirements.

SCHEDULE - 3 PAGE 1 OF 1

Local Currency portion Foreign Currency Portion

Quantity Unit NRs Currency LC FC

1 2 3 4 5 6 7=3x5 8=3x6

Name of Bidder: Date:

Signature of Bidder:

(Printed Name)

(Designation)

(Common Seal)

1 NOT APPLICABLE

NEPAL ELECTRICITY AUTHORITYTRANSMISSION DIRECTORATE

Tamakoshi-Kathmandu 220/400 kV Transmission Line Project

IFB No. : ICB-TD-TKTLP-073/74-02: Design, Supply, Installation and Commissioning of Gas Insulated 220 kV Barhabise Substation

Schedule A-3: Design Services : NOT APPLICABLE

Estimated

Unit Prices Total Prices

Item

No.Item Description

SCHEDULE - 4 (a) PAGE 1 OF 12

Schedule No. 4: Installation Services

(a): Installation and Construction Charges

Currency* Unit Rate Total Charges Unit Rate Total Charges

(1) (2) (3) (4) (5) (6) (7)=(4)X6) (8) (9)=(4)X(8)

I 220/132/11kV GIS BARHABISE Substation

PART - A: OWNER ASSESSED QUANTITIES

A POWER TRANSFORMER

a)53.33MVA, 220/√3 / 132//√3 kV Single Phase Power Transformer (without

transformer Oil)Nos. 4

b) Insulating oil for the above Power Transformer Lot 4

c) 33kV Current transformer (NCT) for autotrasnformer No 1

d) Oil Storage tank of 20KL Nos. 2

B POWER TRANSFORMER

a) 5 MVA, 132 /11 kV Three Phase Power Transformer (without transformer Oil) Nos. 1

b) Insulating oil for the above Power Transformer Lot 1

C) LT Transformer

a) 630KVA 11/0.400 Kv Nos. 2

D 245 KV EQUIPMENTS

D1 245KV GIS Equipment

1.1 245kV, SF6 GIS Bus Bars Module as per section project Sets 2

1.2 245kV, SF6 GIS Bus Coupler feeder bay Module as per section project Sets 1

1.3 245kV, SF6 GIS Line feeder bay Module as per section project Sets 4

1.4 245kV, SF6 GIS spare Line feeder bay Module as per section project Sets 2

1.5 245kV, SF6 GIS ICT feeder bay Module as per section project Sets 1

1.6 SF6 Gas Insulated Bus Duct (GIB) outside GIS Hall alongwith associated support

structure and accessories

a) SF6 Gas Insulated Bus Duct (GIB) outside GIS Hall alongwith associated support

structure and accessories

OPTION-I Mtr. 240

1600A, 40kA for 1 sec. Single Phase

OPTION-II Mtr. 80

1600A, 40kA, 1sec three phase

Note : Bidder is required to quote for either option-I or Option-II

b 1600A, 40kA for 1 sec. Single Phase ( for 4X53.33 MVA 1 ph Transformer) mtr 60

NEPAL ELECTRICITY AUTHORITYTRANSMISSION DIRECTORATE

Tamakoshi-Kathmandu 220/400 kV Transmission Line Project

Portion in Nepaln Currency

(in NRs)Portion in Foreign Currency

Installation Charges

Sl. No. Qty.Item Description Unit

IFB No. : ICB-TD-TKTLP-073/74-02: Design, Supply, Installation and Commissioning of Gas Insulated 220 kV Barhabise Substation

SCHEDULE - 4 (a) PAGE 2 OF 12

Currency* Unit Rate Total Charges Unit Rate Total Charges

Portion in Nepaln Currency

(in NRs)Portion in Foreign Currency

Installation Charges

Sl. No. Qty.Item Description Unit

1.7 220kV, SF6 to Air Bushing alongwith associated support structure Nos. 16

1.8 245kV, SF6 GIS Auxiliary Bus Module as per section project to connect spare unit of

Transformer set 1

D.2 1600A, 40kA for 1 sec. Single Phase

1.1 216 KV Surge Arrester (1-phase) Nos. 16

1.2 4400pF, 245 kV Capacitive Voltage Transformer (1-Phase) Nos. 12

1.3 245kV Bus Post Insulator (1-Phase) (Except for wave trap) Nos. 12

E 145kV Equipment

E.1 145KV GIS Equipment

1.1 145kV, SF6 GIS Bus Bars Module as per section project Sets 2

1.2 145kV, SF6 GIS Bus Coupler feeder bay Module as per section project Set 1

1.3 145kV, SF6 GIS Line feeder bay Module as per section project Sets 2

1.4 145kV, SF6 GIS Spare Line feeder bay Module as per section project Sets 1

1.5 145kV, SF6 GIS ICT feeder bay Module as per section project for 220/132 kV

TransformerSets 1

1.6 145kV, SF6 GIS ICT feeder bay Module as per section project for 132/11 kV

TransformerSets 1

1.7 SF6 Gas Insulated Bus Duct (GIB) outside GIS hall including Bus Duct support

structure and associated accessories

a) 1250A, 31.5kA, 1sec three phase Mtr 50

b 1250A, 31.5 kA 1sec single phase (for 4x53.33MVA 1-Phase Transformer bays)mtr 30

1.8 145kV, SF6 to Air Bushing alongwith associated support structure

a) 1250A, 31.5kA, 1sec single phase Set 13

1.9 145kV, SF6 GIS Auxiliary Bus Module as per section project to connect spare unit of

Transformer set 1

E.2 145kV EQUIPMENT(AIS)

1.0 120 kV Surge Arrestors (1-Phase) Nos. 13

2.0 8800pF, 145 kV Capacitive Voltage Transformer (1-Phase) Nos. 6

3.0 145KV Bus Post Insulator Nos. 6

F 11 KV EQUIPMENT

1.0 11 kV Isolator (3-phase)-HDB

i 400A, 25kA for 3 sec, Isolator without E/s (Beam Mounted) Set 2

2.0 9 kV Surge Arrester (1 ph.) Nos 6

3.0 11 kV Horn Gap fuse (1 ph.) Nos 6

4.0 11kV BPI Nos 6

G 11kV, 25 kA (3 Phase) Indoor switch gear panel

i) 11kV Transformer Module Nos 1

ii) 11kV LT Transformer Module Nos 1

iii) Bus PT Module No 1

H Testing & Maintenance Equipment for GIS

SCHEDULE - 4 (a) PAGE 3 OF 12

Currency* Unit Rate Total Charges Unit Rate Total Charges

Portion in Nepaln Currency

(in NRs)Portion in Foreign Currency

Installation Charges

Sl. No. Qty.Item Description Unit

1.6 EOT crane for 220kV GIS Hall Set 1

1.7 EOT crane for 132kV GIS Hall Set 1

I RELAY PANELS (WITH AUTOMATION)

1 245kV

1.1 Circuit Breaker Relay Panel

a) CB Relay Panel With Auto Reclose Nos. 6

1.2 Line Protection Panel Nos. 6

1.3 Transformer Protection Panel (For both HV & MV side) Nos. 1

1.4 Bus Bar Protection Panel set 1

2 145kV

1.1 Circuit Breaker Relay Panel

a) CB Relay Panel With Auto Reclose Nos. 3

b) CB Relay Panel Without Auto Reclose Nos. 3

1.2 Line Protection Panel Nos. 3

1.3 Transformer Protection Panel (For both HV & MV side) Nos. 1

1.4 Bus Bar Protection Panel set 1

3 Other/Common equipments Pertaining to C & R System

a) Time Synchronisation Equipment No. 1

J SUBSTATION AUTOMATION

1 Substation Automation System as per Technical Specification:

a) 220kV System Nos. 8

b) 132 kV System Nos. 6

c) BCU for auxilary system set 1

d) 11 kV HT Indoor Switchgear set 1

K Digital Protection Coupler , PBAX & Wave Trap

a) Digital Protection Coupler Nos 16

b) PBAX with following configuration as per TS Set 1

i 2 wire subscriber interface card with capacity 32 local subscribers (along with 32 nos.

Instruments)

ii 4 wire E & M interface card with capacity 8 nos. trunks (For PLCC)

iii) E-1 interface with 2 trunks G-703

iv) 2 wire interface with 1 trunk (For PSTN)

c) Line Trap

i) 1250A,0.5mH,31.5kA(132 kV) nos 2

ii) Bus Post Insulator for above 132 kv Wave Trap no. 6

L LT Switchgear (As per Technical specification)

a 400V Main switchboard Set 1

b 400V ACDB Set 1

c 400V MLDB Set 1

d 400V Emergency LDB Set 1

SCHEDULE - 4 (a) PAGE 4 OF 12

Currency* Unit Rate Total Charges Unit Rate Total Charges

Portion in Nepaln Currency

(in NRs)Portion in Foreign Currency

Installation Charges

Sl. No. Qty.Item Description Unit

e 220V DCDB Sets 2

g 48V DCDB Set 2

M Batteries

a 220V

i 600 AH Nos 2

b 48V

i 600AH Nos 2

N Float Cum Boost Battery Charger

a 220V Float Cum Boost Battery Charger

i 90A/90A Nos 2

b 48V Float Cum Boost Battery Charger

i 90A/90A Nos 2

O Diesel Generator with control Panel

a 250 kVA Set 1

P Fire Protection System

a Portable /Trolley/Wheel mounted extinguishers

i 9 litre water type Nos 2

ii 50 litre foam type Nos 2

iv 4.5 kg Dry Chemical Power (DCP) type Nos 2

b Smoke detection system Set 1

c Fire detection and Alarm System Set 1

Q Cables along with clamps, glands, lugs and straight joints etc.

i 3.5Cx300 sqmm (XLPE) cable for filter Machine along with 2 nos outdoor

receptacles -250AKM 1

R Air conditioning

1High wall type split AC unit of 2 TR capacities for control room, relay room and

battery roomNos. 25

S STEEL STRUCTURES (Tower,Gantry structures& Equipment support

structures)

a Lattice/pipe Structure for towers,beams and equipments including peak plates/pack

washers and guest paltes including foundation bolts(nuts,washers,MS plate welded at

the bottom)

i) Lattice stucture & foundation bolts MT 100

ii Pipe structure & foundation bolts MT 22

b Fastners for towers,beams and equipment support strcutures MT 5

T Communication Equipment

SCHEDULE - 4 (a) PAGE 5 OF 12

Currency* Unit Rate Total Charges Unit Rate Total Charges

Portion in Nepaln Currency

(in NRs)Portion in Foreign Currency

Installation Charges

Sl. No. Qty.Item Description Unit

1 Transmission Equipment

A SDH Equipment ( STM- 4 MADM, upto 3 MSP protected directions)

(I)

Base Equipment (Common cards, Cross-connect/control cards, Optical base cards,

Power supply cards, power cabling, other hardware & accessories including sub-

racks, patch cords, DDF etc. fully equipped excluding (II) and (III) below)

No. 2

(II) Optical Interface/SFP# for

a) S4.1 Nos. 4

(a) L4.2 Nos. 6

(III) Tributary Cards

(a) E1 Interface card (Minimum 16 interfaces per card ) Nos. 2

(b)Ethernet interfaces 10/100 Mbps with Layer-2 switching (Minimum 4 interfaces

per card.)No. 4

2 Termination Equipment

Drop/Insert Multiplexer Base Equipment (Common cards, Power supply cards, power cabling, other hardware

& accessories including sub-racks, etc. fully equipped excluding subscriber line Nos. 2

A2 Subscriber Line Interface Cards

b) 4 wire (E&M) voice channel cards (min 8 channels per card) Nos. 2

c) Asynchronous Sub Channels data cards (minimum 4 channels per card) No. 2

d) Synchronous data card (NX64kbps) Nos. 2

3 Equipment Cabinets

a) For Drop/Insert Multiplexer No. 2

b) For SDH Equipment No. 2

(a) Hardware set 1

(b) Software set 1

5 Synchronization Equipment

GPS clock including all hardware & accessories set 1

Main Distribution Frame

(100 pairs) no 2

7.0 Test Equipment as per TS set 1

SUB TOTAL PART-A

PART-B: VENDOR ASSESSED QUANTITIES

A

Erection Hardware :-Insulator strings, Disc Insulators, Hardware, conductor, bus-bar

materials, cable trays, clamps, spacers, connectors including conectors for Auto

Transformer , Junction box, earthwire, earthing material risers, buried cable

trenches/pipe of equipment & lighting, all accessories etc. for the following:

1 220 kV DM-type layout for GIS termination arrangement

1.1 Line Bay Set 4

1.2 Transformer Bay Sets 1

2 132 kV DM-type layout for GIS termination arrangement

1.1 Line Bay Sets 2

A1

6

SCHEDULE - 4 (a) PAGE 6 OF 12

Currency* Unit Rate Total Charges Unit Rate Total Charges

Portion in Nepaln Currency

(in NRs)Portion in Foreign Currency

Installation Charges

Sl. No. Qty.Item Description Unit

3 11 KV SET 2

B

Bus post insulators, Spacers, equipment support structures, conductor(s), Al tube,

clamp, connectors required for arrangement of Neutral formation for one transformer

bank for making connection arrangement to connect spare unit in place of any other

unit without physical shifting complete in all respect

Sets 1

C Ventilation & heating System

(ii) 132 kV GIS Hall LS 1

D Illumination System

1.1 Substation Lighting

(iii) 132kV GIS Building LS 1

IV. Indoor Switchyrad Panel Room LS 1

v Fire Fighting Room LS 1

vi Outdoor Switchyard Lighting LS 1

vii Street Lighting LS 1

E Fire Protection System per technical Specification) set 1

1 Pumping arrangement inside pump house set 1

2 Hydrant system outside the Pump House. set 1

3 HVW spray system & Hydrant system for Transformer :

b 5 MVA,132/11 kV Three phase transformer nos 1

F POWER & CONTROL CABLES

1 1.1 kV LV Cables

1.1 Power Cable(PVC insulated) LS 1

1.2 Power Cable(XLPE insulated) LS 1

1.3 Control Cable (PVC insulated) LS 1

1.4 Cable glands, lugs & straight through joints for Power & Control cables LS 1

G Visual Monitoring System for watch & ward as per technical specification LS 1

H Earthing and lightning protection including necesaary connectors/connections, risers

etc. complete in all respect

i Earth Conductor (copper) LS 1

ii Earth Rod (copper clad steel) LS 1

iii Equipment for lightning protection LS 1

I SUBSTATION AUTOMATION

a Integration of all 220/132kV Bays under present scope with the SCADA of

SIEMENS (SINAUT Spectrum) at Load Dispatch Centre, Kathmandu including

supply of Hardware, Software, accessories etc. as per TS Section Project.

LS 1

SUB TOTAL PART-B

SCHEDULE - 4 (a) PAGE 7 OF 12

Currency* Unit Rate Total Charges Unit Rate Total Charges

Portion in Nepaln Currency

(in NRs)Portion in Foreign Currency

Installation Charges

Sl. No. Qty.Item Description Unit

PART-C: Civil Works

1.0Excavation in all types of soil and rock including backfilling disposal etc. for all leads

and lifts Cu.M 16,550

2.0 Providing and laying of Plain Cement Concrete (PCC) (1:4:8) Cu.M 1950

3.0 Providing and laying of Plain Cement Concrete (PCC) (1:2:4) Cu.M 910

4.0

Providing and laying of Reinforced Cement Concrete Design Mix M25 including pre

cast, shuttering, Grouting of pockets & underpinning but excluding steel

reinforcement

Cu.M 4710

5.0Providing and laying Plain Cement Concrete 1:5:10 (1 cement : 5 sand : 10 Stone

aggregate)Cu.M 600

6.0 Steel Reinforcement ( Fe 500) MT 380

7.0 Stone filling (40 mm size) over grating of transformer/ reactor foundation Cu.M 20

8.0 Misc. Structural steel including rails, embedments, edge protection angles, gratings MT 37

9.0 Stone spreading including antiweed treatment in switchyard excluding PCC Sq. M. 8000

10.0 All civil works for following buildings as per technical specification and approved

i) Auxilliary building (11kV indoor panel) Sq. M. 125

ii) Fire fighting pump house building (excluding external finish)Sq. M. 98

iii) Water Tank (excluding external finish) LS 1

v) Township (Quarters)

(a) B Type Sq. M. 500

(b) C Type Sq. M. 600

(c) D Type Sq. M. 210

vi) Transit Camp Sq. M. 420

vii) Parking Shed (for 10 Cars) LS 3

11.0 External finish as per specification for following buildings:

i) Auxilliary building (11kV indoor panel) Sq. M. 125

ii) Fire fighting pump house building (excluding external finish) Sq. M. 98

iii) Water Tank (excluding external finish) LS 1

v) Township (Quarters)

(a) B Type Sq. M. 500

(b) C Type Sq. M. 600

(c) D Type Sq. M. 210

vi) Transit Camp Sq. M. 420

vii) Parking Shed (for 10 Cars) LS 3

12.0 PRE ENGINEERED BUILDINGS

i) CONTROL ROOM BULIDING

All Civil works including finishing, internal cable trench, etc. complete as per

technical specification and approved drawings, excluding excavation, PCC, RCC and

Sq. M. 750

ii) 220 KV GIS HALL

All Civil works including finishing, internal cable trench, etc. complete as per

technical specification and approved drawings, excluding excavation, PCC, RCC and

Sq. M. 600

iii) 132 KV GIS HALL

All Civil works including finishing, internal cable trench, etc. complete as per

technical specification and approved drawings, excluding excavation, PCC, RCC and

Sq. M. 500

13.0 Concrete road as per drawing except reinforcement & concrete

SCHEDULE - 4 (a) PAGE 8 OF 12

Currency* Unit Rate Total Charges Unit Rate Total Charges

Portion in Nepaln Currency

(in NRs)Portion in Foreign Currency

Installation Charges

Sl. No. Qty.Item Description Unit

(a)    Road 3.75m wide Sq.M. 2850

14.0

Construction of rail cum road as per drawing including all items such as excavation,

compaction, rolling, watering, WBM etc but excluding concrete, reinforcement and

structural steel.

a) Section having four rails Sq.M. 230

15.0Chain link fencing as per technical sepcification and approved drawing excluding

concrete RM 300

16.0 Switchyard Gate excluding Concrete Nos. 2

17.0

Septic tank and soak pit (for 50 users) complete as per technical specification and

approved drawing excluding concrete & reinforcment which shall be measured and

paid seperately under respective items of BPS .

LS 3

18.0 Supplying & laying hume pipe of grade (NP-3) excluding concrete and reinforcement

a)      250mm dia RM 150

b)      300mm dia RM 120

c)      450mm dia RM 80

d)      600mm dia RM 40

e) 900mm dia RM 10

19.0 Supplying and erecting dewatering pumps

a)      5 HP Nos. 2

b)      0.5 HP Nos. 2

20.0 Drains Excluding Concrete

a)      Section A-A (300 mm wide X depth up to 600mm) RM 200

b)      Section B-B ( 450 mm wideX depth from 600 mm to 900 mm) RM 100

c)      Section C-C (600 mm wide X depth from 900 mm to 1200 mm) RM 80

d)      Section D-D (750 mm wide X depth from 1200 mm to 1500mm ) RM 20

21.0 External water supply from borewell/main water supply point to Fire water Tank,

control room building, township buildings ( i ) 80 mm Dia GI pipe RM 100

( ii ) 50 mm Dia GI pipe RM 80

(iii) 40mm Dia GI pipe RM 60

(iii) 25mm Dia GI pipe RM 40

22.0 External sewerage system including all item such as excavation, piping, pipe fittings,

manholes, gali trap, gali chamber etc.(i) 250 mm Dia. RM 50

(i) 150 mm Dia. RM 50

23.0

All civil works for Boundary wall including excavation, concrete, reinforcement steel

,structural steel, plaster, painting, barbed wire and concertina coil etc all complete as

per technical specification (2.5 m high brick masonary wall and 0.5 m high angle

support on top).

RM 1200

24.0Main boundary wall Gate (Steel ) including all works complete as per technical

specificationLS 1

25.0 Site levelling

SCHEDULE - 4 (a) PAGE 9 OF 12

Currency* Unit Rate Total Charges Unit Rate Total Charges

Portion in Nepaln Currency

(in NRs)Portion in Foreign Currency

Installation Charges

Sl. No. Qty.Item Description Unit

iEarth work in excavation and filling in all types of soils including soft/disintegrated

rock with all leads and lifts within sub station boundary Cu. M 50000

iiEarth work in filling with borrowed earth with all leads and lifts including

royalty,taxes etc Cu. M 10000

26.0

All civil works for security room as per TS including septic tank and soak pit. Internal

and external finish, sanitary and plumbing works, plinth protection etc. to complete

the building are included in the item.

Sq. m. 9

27.0

Construction of retaining wall with random rubble masonary in cement sand mortar

(1:6) including levelling up with cement concrete (1:6:12), providing weep holes of

PVC pipes (150 mm dia) with necessary filter material at the mouth of weep holes, 50

mm thick cement concrete (1:2:4) copping on the top of wall, 100 mm thick PCC

(1:4:8) below RR masonary work, excavation of foundation for all lifts up to 3m

above lower level. Item of excavation, PCC (1:2:4 & 1:4:8) shall be measured and

paid seperately under respective items of BPS

Cu. M 9900

28 Soil Investigation as per TS LS 1

29 Aproach Road-Strenghthening of existing approach road as per TS (2.5 cm thick pre- Sq. m. 24000

SUB-TOTAL-C

Total for 220/132/11kV BARHABISE Substation (I) (Part-A+ Part-B+ Part C)

II EXTENSION OF 220 KV KHIMTI S/S

PART -A: OWNER ASSESSED QUANTITIES

A 245 KV EQUIPMENTS

A1 245KV GIS Equipment

1.1 245kV, SF6 GIS Bus Bars Module as per section project(EXTENSION) Sets 2

1.2 245kV, SF6 GIS Line feeder bay Module as per section project Sets 2

1.3 220kV, SF6 to Cable Bushing alongwith associated support structure

a) 2000A, 40kA for 1 sec. Single Phase Nos. 6

A2 245KV Outdoor Equipment

1.1 216 KV Surge Arrester (1-phase) Nos. 6

1.2 4400pF, 245 kV Capacitive Voltage Transformer (1-Phase) Nos. 6

1.3 245kV Bus Post Insulator (1-Phase) (Except for wave trap) Nos. 12

B Testing & Maintenance Equipment for GIS

1.1 SF6 Gas processing Unit Set 1

1.2 Partial Discharge Monitoring System Set 1

1.3 Dew Point Meter Set 1

1.4 SF6 Gas Leak Detector Set 1

C RELAY PANELS (WITH AUTOMATION)

1 245kV

1.1 Circuit Breaker Relay Panel

a) CB Relay Panel With Auto Reclose Nos. 2

SCHEDULE - 4 (a) PAGE 10 OF 12

Currency* Unit Rate Total Charges Unit Rate Total Charges

Portion in Nepaln Currency

(in NRs)Portion in Foreign Currency

Installation Charges

Sl. No. Qty.Item Description Unit

1.2 Line Protection Panel Nos. 2

1.3 Integration of existing Bus Bar Protection set 1

3 Other/Common equipments Pertaining to C & R System

a) Relay Test kit No. 1

D SUBSTATION AUTOMATION

1 Augmentation of Substation Automation System as per Technical Specification:

a) 220kV System Nos. 2

E Cables along with clamps, glands, lugs and straight joints etc.

a 220 kV grade 1 core, 1200sq.mm.XLPE insulated copper cable as per technical

specification KM 1.5

b Cable end termination(s) on Gantry as per technical specification nos 6

F STEEL STRUCTURES (Tower,Gantry structures& Equipment support

structures)

a Lattice Structure for towers,beams and equipments including peak plates/pack

washers and guest paltes including foundation bolts(nuts,washers,MS plate welded at

the bottom)

MT 32

b Fastners for towers,beams and equipment support strcutures MT 1

SUB TOTAL -PART-A

PART-B: VENDOR ASSESSED QUANTITIES

A

Erection Hardware :-Insulator strings, Disc Insulators, Hardware, conductor, bus-bar

materials, cable trays, clamps, spacers, connectors including conectors for Auto

Transformer , Junction box, earthwire, earthing material risers, buried cable

trenches/pipe of equipment & lighting, all accessories etc. for the following:

1 220 kV DM-type layout for GIS termination arrangement

1.1 Line Bay Set 2

B POWER & CONTROL CABLES

1 1.1 kV LV Cables

1.1 Power Cable(PVC insulated) LS 1

1.2 Control Cable (PVC insulated) LS 1

1.3 Cable glands, lugs & straight through joints for Power & Control cables LS 1

C Earthing and lightning protection including necesaary connectors/connections, risers

etc. complete in all respectLS 1

SUB TOTAL PART-B

PART-C-Civil Works

SCHEDULE - 4 (a) PAGE 11 OF 12

Currency* Unit Rate Total Charges Unit Rate Total Charges

Portion in Nepaln Currency

(in NRs)Portion in Foreign Currency

Installation Charges

Sl. No. Qty.Item Description Unit

1.0Excavation in all types of soil and rock including backfilling disposal etc. for all leads

and lifts Cu.M 950

2.0 Providing and laying of Plain Cement Concrete (PCC) (1:4:8) Cu.M 125

3.0 Providing and laying of Plain Cement Concrete (PCC) (1:2:4) Cu.M 60

4.0

Providing and laying of Reinforced Cement Concrete Design Mix M25 including pre

cast, shuttering, Grouting of pockets & underpinning but excluding steel

reinforcement

Cu.M 230

5.0Providing and laying Plain Cement Concrete 1:5:10 (1 cement : 5 sand : 10 Stone

aggregate)Cu.M 75

6.0 Steel Reinforcement ( Fe 500) MT 11

7.0Misc. Structural steel including rails, embedments, edge protection angles, gratings

etc. but excluding the reinforcement steel and steel for lattice and pipe structures. MT 5

8.0 Stone spreading including antiweed treatment in switchyard excluding PCC Sq. M. 1000

9.0 Concrete road as per drawing except reinforcement & concrete

(a)    Road 3.75m wide Sq.M. 375

10.0Chain link fencing as per technical sepcification and approved drawing excluding

concrete RM 50

11.0 Dismantling & reerection of chain link fencing excluding concrete RM 50

12.0 Supplying & laying hume pipe of grade (NP-3) excluding concrete and reinforcement

a)      250mm dia RM 50

b)      300mm dia RM 30

c)      450mm dia RM 25

d)      600mm dia RM 25

13.0 Drains Excluding Concrete

a)      Section A-A (300 mm wide X depth up to 600mm) RM 60

b)      Section B-B ( 450 mm wideX depth from 600 mm to 900 mm) RM 20

c)      Section C-C (600 mm wide X depth from 900 mm to 1200 mm) RM 20

d)      Section D-D (750 mm wide X depth from 1200 mm to 1500mm ) RM 20

14.0 Site levelling

iEarth work in excavation and filling in all types of soils including soft/disintegrated

rock with all leads and lifts within sub station boundary Cu. M 10000

iiEarth work in filling with borrowed earth with all leads and lifts including

royalty,taxes etc Cu. M 2000

15.0

Construction of retaining wall with random rubble masonary in cement sand mortar

(1:6) including levelling up with cement concrete (1:6:12), providing weep holes of

PVC pipes (150 mm dia) with necessary filter material at the mouth of weep holes, 50

mm thick cement concrete (1:2:4) copping on the top of wall, 100 mm thick PCC

(1:4:8) below RR masonary work, excavation of foundation for all lifts up to 3m

above lower level. Item of excavation, PCC (1:2:4 & 1:4:8) shall be measured and

paid seperately under respective items of BPS

Cu. M 1000

SCHEDULE - 4 (a) PAGE 12 OF 12

Currency* Unit Rate Total Charges Unit Rate Total Charges

Portion in Nepaln Currency

(in NRs)Portion in Foreign Currency

Installation Charges

Sl. No. Qty.Item Description Unit

Total PART-C

Total for 220kV KHIMTI Substation (II) (Part-A+ Part-B+ Part C)

Note : 1) Bidder is required to quote prices in this Schedule for all the individual items/sub-items.

*

Φ Strike out if not applicable

Name of Bidder: Date:

Signature of Bidder:

(Printed Name)

(Designation)

(Common Seal)

Specify currency in accordance with BDS ITB Clause 19.1, Part-I of the Bidding Documents.

TOTAL INSTALLATION SERVICES (Total of (I) and (II) to be carried

forward to Schedule No. 5: Grand Summary)

2.) BOQ given above is indicative only based on the scope of work as given in Employer's Requirements. The quantities mentioned above may undergo change during detailed engineering to meet the functional requirement and scope

of work defined in Employer's Requirements.

Schedule-4 (b) Page 1 of 1

Schedule No. 4 : Installation and Other Services

(b):Training Charges for training to be imparted abroad

Currency Total

Training Charges

1 2 3 4 5 6 7 = 4x5 x 6

i) Control & Protection and Substation

Automation System

3 5 days

ii) GIS 3 5 days

iii) Telecommunication Equipment (SDH ,MUX

& NMS (Craft Terminal))

3 5 days

iv)Transformer 3 5 days

Total for Training Charges (Total of column 7 to be

carried forward to Schedule No. 5: Grand Summary)

Name of Bidder: Date:

Signature of Bidder:

(Printed Name)

(Designation)

(Common Seal)

Sl.

No.

Total Training Charges

Training to Owners personnel on Design , testing and

Maintenance aspect as per Section Project, Technical

Specification at manufacturer's works

Description

Country

where training

is to be

imparted

Nos. of

TraineeItem for which training is to be imparted.

NEPAL ELECTRICITY AUTHORITYTRANSMISSION DIRECTORATE

Tamakoshi-Kathmandu 220/400 kV Transmission Line Project

A

Training

duration in

days

IFB No. : ICB-TD-TKTLP-073/74-02: Design, Supply, Installation and Commissioning of Gas Insulated 220 kV Barhabise Substation

Schedule 4 (c) Page 1 of 1

Schedule No. 4 : Installation and Other Services

(c):Training Charges for training to be imparted to Employer's Personnel by Bidder's Instructor in Nepal

Item for which training is to be imparted. CurrencyTotal

Training Charges

1 2 3 4 5 6 = 4x 5

i) Control & Protection 5

ii) Substation Automation System including

integration aspect of existing SCADA (of Siemens

suppliedSINAUT Spectrum Software) at Load

Dispatch Center

5

GIS 5

iv) Telecommunication Equipment (SDH ,MUX &

NMS (Craft Terminal)) 5

TRANSFORMERS 5

Total for Training Charges ( total of column 6 To

be carried forward to Schedule 5: Grand

Summary)

Date: Signature:

Printed Name:

Designation:

Common Seal:

Sl. No. Description of the Test

Training

duration in

days

Training Charges for Contractors

IFB No. : ICB-TD-TKTLP-073/74-02: Design, Supply, Installation and Commissioning of Gas Insulated 220 kV Barhabise Substation

NEPAL ELECTRICITY AUTHORITYTRANSMISSION DIRECTORATE

Tamakoshi-Kathmandu 220/400 kV Transmission Line Project

On Job training on operation, maintenance and

testing & commissioning aspectat at one Location in

Nepal as per section Project, Technical Specification

a)

Schedule 4 (d) Page 1 of 1

Schedule No. 4 : Installation and Other Services

(d): Maintenance Charges

Currency Total Maintenance Charges

1

Maintenance Charges for Communication

Equipments including SDH & MUX. for One

(1) year during Warranty period

Year 1

2

Maintenance Charges for Communication

Equipments including SDH & MUX. for Six

(6) years after Warranty period

Year 6

Total Maintenance Charges (To be

carried forward to Schedule 5: Grand

Summary)

Date: Signature:

Printed Name:

Designation:

Common Seal:

IFB No. : ICB-TD-TKTLP-073/74-02: Design, Supply, Installation and Commissioning of Gas Insulated 220 kV Barhabise Substation

NEPAL ELECTRICITY AUTHORITYTRANSMISSION DIRECTORATE

Tamakoshi-Kathmandu 220/400 kV Transmission Line Project

Sl No Description Unit Qty.

Total Maintenance Charges

SCHEDULE - 4 (e) PAGE 1 OF 1

Schedule No. 4 : Installation and Other Services

(e): Type Test charges for Type Tests to be conducted abroad

(1) (2) (3) (4) (5) (6) (7)=(5) x ( 6)

I 220/132kV, 53.33MVA Single Phase Power Transformer

a) Temperate rise test 1

b) Measurement of zero sequence reactance 1

c) Measurement of Accoustic Noise Level 1

d) Measurement of Harmonic Level at No-load current 1

e) Measurement of power taken by fans and pumps 1

II 132/11, 5 MVA Three Phase Power Transformer

a) Temperate rise test 1

b) Measurement of zero sequence reactance 1

c) Measurement of Accoustic Noise Level 1

d) Measurement of Harmonic Level at No-load current 1

e) Measurement of power taken by fans and pumps 1

TOTAL (Total of column 7 to be carried forward to Schedule No. 5:

Grand Summary)

#

Name of Bidder: Date:

Signature of Bidder:

(Printed Name)

(Designation)

(Common Seal)

Specify currency in accordance with BDS ITB Clause 19.1, Part-I of the Bidding Documents.

IFB No. : ICB-TD-TKTLP-073/74-02: Design, Supply, Installation and Commissioning of Gas Insulated 220 kV Barhabise Substation

TRANSMISSION DIRECTORATE

Currency # AmountSl. No. Description of Tests Country of Testing Unit Qty.

Tamakoshi-Kathmandu 220/400 kV Transmission Line Project

Schedule 5 Page 1 of 1

Schedule No. 5: Grand Summary

1 TOTAL SCHEDULE NO. 1

Plant and Equipment including Mandatory Spares to be

supplied from abroad.

2 TOTAL SCHEDULE NO. 2

Plant and Equipment including Mandatory Spares Parts to

be supplied from within Nepal

3 TOTAL SCHEDULE NO. 3

Design Services

4 TOTAL SCHEDULE NO. 4

(a) Installation and construction charges

(b) Training charges for training to be imparted abroad

( c) Training charges for training to be imparted in Nepal

(d) Maintenance charges

(e) Type Tests charges for type Tests to be conducted

abroad

GRAND TOTAL FOR PART A [1+2+3+4]

Date: Signature:

Printed Name:

Designation:

Common Seal:

NEPAL ELECTRICITY AUTHORITYTRANSMISSION DIRECTORATE

Tamakoshi-Kathmandu 220/400 kV Transmission Line Project

Sl. No. DescriptionTotal Price Foreign

( )

Total Price Local

( )

IFB No. : ICB-TD-TKTLP-073/74-02: Design, Supply, Installation and Commissioning

of Gas Insulated 220 kV Barhabise Substation

SCHEDULE - 6 PAGE 1 OF 1

Item No. Name & Description of

Parts

Name of Original

Manufacturer

Part No. Number of Units in

each set

Total No. of Sets to

be provided

Unit Price Total Price Remarks

Name of Bidder: Date:

Signature of Bidder:

(Printed Name)

(Designation)

(Common Seal)

Schedule No. 6: Recommended Availability/Optional Spares parts and Recommended Test Equipment (in line with Technical Specifications)

NEPAL ELECTRICITY AUTHORITYTRANSMISSION DIRECTORATE

Tamakoshi-Kathmandu 220/400 kV Transmission Line Project

IFB No. : ICB-TD-TKTLP-073/74-02: Design, Supply, Installation and Commissioning of Gas Insulated 220 kV Barhabise

Substation