neil chapman session 4 - bureau of meteorologyneil_chapman_session_4 author kirstena created date...

14
IP Telemetry

Upload: others

Post on 07-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Neil Chapman Session 4 - Bureau of MeteorologyNeil_Chapman_Session_4 Author kirstena Created Date 9/28/2010 12:00:00 AM

IP Telemetry

Page 2: Neil Chapman Session 4 - Bureau of MeteorologyNeil_Chapman_Session_4 Author kirstena Created Date 9/28/2010 12:00:00 AM

Rationalise network

IP network– NextG– Globalstar

Existing dial-up network 170 systems comprising;

– Mini Sat M – Iridium– NextG

– GSM– Landline

– Point to Point

Page 3: Neil Chapman Session 4 - Bureau of MeteorologyNeil_Chapman_Session_4 Author kirstena Created Date 9/28/2010 12:00:00 AM

The Trial

• Commenced early 2008• Initially 5 NextG and 5 Satellite• Expanded to another 5 Satellite (BoM)• Antenna issues• Service issues

Page 4: Neil Chapman Session 4 - Bureau of MeteorologyNeil_Chapman_Session_4 Author kirstena Created Date 9/28/2010 12:00:00 AM

Acceptance Testing

Page 5: Neil Chapman Session 4 - Bureau of MeteorologyNeil_Chapman_Session_4 Author kirstena Created Date 9/28/2010 12:00:00 AM

Site Locations

Page 6: Neil Chapman Session 4 - Bureau of MeteorologyNeil_Chapman_Session_4 Author kirstena Created Date 9/28/2010 12:00:00 AM

Site Photos - NextGBrockman River Brockman River ““ TanamerahTanamerah ””

Page 7: Neil Chapman Session 4 - Bureau of MeteorologyNeil_Chapman_Session_4 Author kirstena Created Date 9/28/2010 12:00:00 AM

Site Photos - NextG

Page 8: Neil Chapman Session 4 - Bureau of MeteorologyNeil_Chapman_Session_4 Author kirstena Created Date 9/28/2010 12:00:00 AM

Site Photos - Satellite

Page 9: Neil Chapman Session 4 - Bureau of MeteorologyNeil_Chapman_Session_4 Author kirstena Created Date 9/28/2010 12:00:00 AM

Compatibility with Existing Loggers

• Current loggers half way through replacement cycle

• IP system incorporates logger• Two master’s on same SDI-12 bus• Timing… SDI-12 clashes

Page 10: Neil Chapman Session 4 - Bureau of MeteorologyNeil_Chapman_Session_4 Author kirstena Created Date 9/28/2010 12:00:00 AM

Sdi-12 Listener

• Allows 2 masters on bus• Interchangeable - Active/Listener• Failsafe - if one side fails reverts to logger• 12v low power

Page 11: Neil Chapman Session 4 - Bureau of MeteorologyNeil_Chapman_Session_4 Author kirstena Created Date 9/28/2010 12:00:00 AM

Costs

• Capital cost high (includes logger)

• NextG - $7/month plan– includes 5mb , ok at 10 min

• Globalstar - $30 /month plan – Hourly ~ $20 per month call costs– Average total cost $50/month

Page 12: Neil Chapman Session 4 - Bureau of MeteorologyNeil_Chapman_Session_4 Author kirstena Created Date 9/28/2010 12:00:00 AM

TCP / IP- UDP Communications

Page 13: Neil Chapman Session 4 - Bureau of MeteorologyNeil_Chapman_Session_4 Author kirstena Created Date 9/28/2010 12:00:00 AM

Security

• data packets in binary (not ASCII).• UDP (User Datagram Protocol, designed for speed with

application error checking).• use a SIM card• Private APN

Page 14: Neil Chapman Session 4 - Bureau of MeteorologyNeil_Chapman_Session_4 Author kirstena Created Date 9/28/2010 12:00:00 AM

Compressed Data

� Send raw compressed data

� “thin / cheaper” communications pipe from logger

� More secure over the internet