nedm collaboration meeting asu 2/2008 preliminary engineering report nedm central detector john c....

12
Preliminary Engineering Report nEDM Central Detector John C. Ramsey Los Alamos National Laboratory

Upload: adele-mclaughlin

Post on 18-Jan-2018

224 views

Category:

Documents


0 download

DESCRIPTION

nEDM Collaboration Meeting ASU 2/2008 Major assembly assumptions What is here is in no way set in stone! Assembly cantilevered off of central volume composite end plate Material of choice wherever possible is acrylic (PMMA) to minimize thermal contraction mismatches We are able to coat the acrylic for the electrodes and return No metal components closer than 1 meter upstream of the end plate Light guides not currently included in the model

TRANSCRIPT

Page 1: NEDM Collaboration Meeting ASU 2/2008 Preliminary Engineering Report nEDM Central Detector John C. Ramsey Los Alamos National Laboratory

Preliminary Engineering ReportnEDM Central Detector

John C. RamseyLos Alamos National Laboratory

Page 2: NEDM Collaboration Meeting ASU 2/2008 Preliminary Engineering Report nEDM Central Detector John C. Ramsey Los Alamos National Laboratory

Objectives• Sound out assumptions–Materials choices– Design rationale– Component placement– Interfaces with other subsystems

• Voice concerns– See list above!

• Obtain feedback and initiate communications

Page 3: NEDM Collaboration Meeting ASU 2/2008 Preliminary Engineering Report nEDM Central Detector John C. Ramsey Los Alamos National Laboratory

Major assembly assumptions• What is here is in no way set in stone!• Assembly cantilevered off of central volume

composite end plate• Material of choice wherever possible is acrylic

(PMMA) to minimize thermal contraction mismatches

• We are able to coat the acrylic for the electrodes and return

• No metal components closer than 1 meter upstream of the end plate

• Light guides not currently included in the model

Page 4: NEDM Collaboration Meeting ASU 2/2008 Preliminary Engineering Report nEDM Central Detector John C. Ramsey Los Alamos National Laboratory

Central volume cap• Mounting plate for entire cantilevered

assembly• Feedthroughs for light-guides, services,

etc.• Assumptions

– G-10 is superfluid tight provided low enough stress levels

– 1.5” thick G-10 with carbon fiber reinforcing plate

– Windows are large enough to compensate for thermal contraction

– We can seal G-10 cap to G-10 vessel– We can seal the feed-throughs

Page 5: NEDM Collaboration Meeting ASU 2/2008 Preliminary Engineering Report nEDM Central Detector John C. Ramsey Los Alamos National Laboratory

Acrylic interface plate

• Large contraction mismatch between acrylic and G-10

• Radial slots keep back plate concentric as acrylic contracts

• Supports entire cantilevered assembly

• Studs and Belleville washers may replaced with PTFE glides

Page 6: NEDM Collaboration Meeting ASU 2/2008 Preliminary Engineering Report nEDM Central Detector John C. Ramsey Los Alamos National Laboratory

HV return and support

• Provide structural support to all components

• Additional support tube handles axial loads from the capacitor

• HV return is coated (striped?) for conductivity

Page 7: NEDM Collaboration Meeting ASU 2/2008 Preliminary Engineering Report nEDM Central Detector John C. Ramsey Los Alamos National Laboratory

Electrode assemblies

• Hollowed acrylic• Coated for conductivity• Acrylic supports to HV return– Hidden from E-field– One or more coated to provide

HV return path?

Page 8: NEDM Collaboration Meeting ASU 2/2008 Preliminary Engineering Report nEDM Central Detector John C. Ramsey Los Alamos National Laboratory

Light guide and cell assemblies• Level of detail currently low• Assuming glued box for the cells• Can we make a well performing, separable

mechanical joint for the light-guide/cell interface?

• Light-guides need support at multiple locations

Page 9: NEDM Collaboration Meeting ASU 2/2008 Preliminary Engineering Report nEDM Central Detector John C. Ramsey Los Alamos National Laboratory

3He service to the measurement cells

• 2” OD, 1.5” ID acrylic piping (per George’s current assumptions)

• Bellows to allow for system contraction

• Bell crank actuated V1 valve

Page 10: NEDM Collaboration Meeting ASU 2/2008 Preliminary Engineering Report nEDM Central Detector John C. Ramsey Los Alamos National Laboratory

SQUIDs• Silicon substrate resting on acrylic pads• Located with a pair of pins on the V1 valve housing (not

shown)• Placement along cell centerline makes V1 valve

packaging very difficult and compromises the cell opening– Splitting up the SQUID array?

Page 11: NEDM Collaboration Meeting ASU 2/2008 Preliminary Engineering Report nEDM Central Detector John C. Ramsey Los Alamos National Laboratory

V1 Valve• Torlon return spring – to be tested• Rod or rope actuation of bell crank• Larger area housing body• 0.75” cell penetration• Very tight requirements for cell wall

surface quality with valve closed• Acrylic is very brittle…vespel? d-

vespel?• Flushing pipes with V1 valve

closed?

Page 12: NEDM Collaboration Meeting ASU 2/2008 Preliminary Engineering Report nEDM Central Detector John C. Ramsey Los Alamos National Laboratory

Current and future efforts• FEM models– Simple 2” disc transient thermal model

• to examine stresses induced by cool down rate

– Full assembly• Gravity, other structural loads • Thermal contraction• Cooldown simulation

• G-10 seal test vessel• Continue iterations and

development in coordination with the various relevant subsystems