necc –delaware progress

10
3/16/2012 1 NECC – Delaware Progress Karl V. Steiner 2012 Annual NECC Meeting, Newark, Delaware – March 16, 2012 Delaware INBRE/EPSCoR Partners

Upload: others

Post on 27-Jun-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NECC –Delaware Progress

3/16/2012

1

NECC – Delaware Progress

Karl V. Steiner 2012 Annual NECC Meeting, 

Newark, Delaware – March 16, 2012

Delaware INBRE/EPSCoR Partners

Page 2: NECC –Delaware Progress

3/16/2012

2

Delaware’s Cyberinfrastructure Expansion

Five related Grants

• NSF EPSCoR RII‐2 Track‐1 (2008‐2013)

• NSF EPSCoR RII‐2 Track‐2 (2009‐2012)

• NSF EPSCoR RII‐2 Track‐2 C2 (2010‐2012)

• NIH INBRE–2 (2009‐2014) 

• NIH INBRE IDeA CyberIT Supplement (2009‐2012)

Delaware EPSCoR Cyberinfrastructure Strategy

Cyberinfrastructure Goals

• Strengthen capacity and capability of cyber‐

knowledgeable faculty and staff

• Develop a high‐throughput genomics 

research capability 

• Key Focus Theme: “Environmental 

Observation and Sensing“

• Establish Delaware Environmental 

Monitoring and Analysis Center (DEMAC)

Page 3: NECC –Delaware Progress

3/16/2012

3

Delaware INBRE Bioinformatics Goals

• Creation of a new Center for Bioinformatics and Computational Biology

• Increase in Cyber‐savvy Faculty and Students

• New Graduate Courses in Bioinformatics and Computational Biology

• Integration with Biostatistics Resources at Christiana Care  Center for Outcomes Research 

• Integrated Cyberinfrastructure with Delaware IDeA Partner Institutions; i.e. NECC

NECC Cyberinfrastructure Upgrades in Delaware

Prior to NECC:

– UD is linked to Internet‐2 via MAGPI in Philadelphia

– INBRE‐funded Extension of Internet‐2 to DSU – 2006

NECC Enhancements:

– UD: Bandwidth Expansion to Lewes Campus (100 Mbps to 1,000 Mbps)Regional Datacenter at DBI & Environmental Monitoring in Lewes

– UD: Campus Backbone Upgrade & Distributed Data Center in Newark

– DSU: Redundancy loop across Dover Campus

– Wesley: Wireless access across Dover Campus

– DelTech: Campus‐wide cyber‐infrastructure upgrades                                            at Georgetown Campus

Page 4: NECC –Delaware Progress

3/16/2012

4

Increased Use of Bandwidth

• Upgraded Connection from UD Campus in Newark to Lewes Campus from 100 Mbps to 1,000 Mbps in October 2010

• Significant increase in bandwidth usage over the past year

UD Network Infrastructure Upgrades

Major Improvements in Capabilities – Leveraged Programs

• Wide‐area Network (connecting UD with Internet/Internet2)

• Fiber ring (50 Gbps upgrade from 10 Gbps)

• I2/ION: on‐demand 10Gbps optical waves

• Campus Backbone 

• Upgrade from 1 Gbps to 10 Gbps

• Reliability and Resilience

• Adding a second connectivity point 

• Wireless Connectivity

• 802.11n capability added to 100 buildings

• IP Address Range increased

Page 5: NECC –Delaware Progress

3/16/2012

5

UD Cyberinfrastructure Upgrades

Research Support Initiatives

• Community Cluster Program (Mills Cluster)

• 5,136‐core HPC cluster, Infiniband network fabric, Lustre filesystem

• 14 Terabyte of RAM, 200 Terabytes of Disk Space

• Partners include DEMAC, Environmental Sciences faculty, DBI scientists

• Physical and Virtual Server Hosting 

• Including major replacements of power generator, HVAC, UPS

• InCommon federated Authentication

• For multi‐institutional shared resources

• Provide a redundant 10 Gbps data network to academic buildings for NSF and NIH faculty and students

– Install new 10 Gbps fiber 

– Create new Data Closets in several locations

• Install new Cisco Data Network Equipment to support 10 GbpsNetwork & UPS’s to protect the equipment

• Upgrade Internal Copper Wiring to support higher bandwidth

• Packet shape data traffic going into and out of DSU to speed up and control the type of data traffic

Delaware State University Cyberinfrastructure Upgrades

Page 6: NECC –Delaware Progress

3/16/2012

6

Page 7: NECC –Delaware Progress

3/16/2012

7

DTCC Cyberinfrastructure Plan

• Installation of 15 new network infrastructure              switches to provide connectivity among all                   buildings on campus

• Installation of single mode 72‐pair fiber optic cable

that existing multi‐mode cable would not support 

• Increased speed from 100 Mbps to 10 Gbpsto allow significantly enhanced  connectivity on       Campus as well as with UD and DSU.

100 Mbps

10 Gbps

Page 8: NECC –Delaware Progress

3/16/2012

8

Delaware Tech Owens Campus

Wesley CollegeCyberinfrastructure Upgrades

• Original Bandwidth Utilization to Campus was at 85% to 95% of capacity.

• Upgrade Campus Connection from 40 Mbps to 100 Mbps

– Completed in May 2011

• This bandwidth enhancement has had a significant impact on the graduate and undergraduate research capability at Wesley College.

Page 9: NECC –Delaware Progress

3/16/2012

9

Wesley – Cyber Upgrades

Before:  June 2010 ‐ June 2011 Network Bandwidth Utilization 

Wesley – Cyber Upgrades

After: October 2011 ‐ November 2011 Network Bandwidth Utilization 

Page 10: NECC –Delaware Progress

3/16/2012

10

Wesley – Cyber Upgrades

June 2011 Download/Upload Speeds November 2011 Download/Upload Speeds

NECC – Delaware Progress

Thank you