nec3 to nec4 · tssc option a nec4 - tssub z z z z z z z clauses. thames tideway tunnel project
TRANSCRIPT
NEC3 to NEC4Key changes for flexibility and tier 2
Matthew Garratt
Costain / NEC team
NEC4 Contract suite
New
Contracts (16)
ECC & ECC Short
ECS & ECS Short
TSC & TSC Short
TSS (subcontract)
PSC & PSC Short
PSS (subcontract)
Supply & Supply Short
Dispute Resolution Service
Framework
DBOC
Alliance
NEC4 Contract suite
New
Contracts (16)
ECC & ECC Short
ECS & ECS Short
TSC & TSC Short
TSS (subcontract)
PSC & PSC Short
PSS (subcontract)
Supply & Supply Short
Dispute Resolution Service
Framework
DBOC
Alliance
New
New
TIDEWAY – USE OF NEC CONTRACTS
5
Thames Tideway Tunnel
6
Tunnel statistics
• Length: 25 kilometres
• Gradient: Falls one metre every
790 metres to be self-cleansing
• Diameter: 7.2 metres
• Volume: 1.6 million cubic
metres (include Lee Tunnel)
Tideway – use of NEC contract suite
Employer
Contractor
ECC Option C
Project Manager
PSC
Supervisor
PSC
DesignPermanent works
PSC Option CTemporary works
PSC Option E
NEC4 - PSSub
Sub-Contractorse.g. marine works,
civils works,
groundwork, ground
investigation, surveys,
monitoring
ECS Option A
ECS Option B
ECS Option C
ECSS – Option A
Materials Supplye.g. tunnel segments
SC Option A
Service providerse.g. consents
management, report
preparation, labour
supply
PSC Option A
PSC Option E
Equipment Supplye.g. TBM machines
SC Option A
Term Service
Contractorse.g. security,
occupational health
TSC Option Alabour supply
TSSC Option A
NEC4 - TSSub
Tideway– use of NEC contract suite
Employer
Contractor
ECC Option C
Project Manager
PSC
Supervisor
PSC
DesignPermanent works
PSC Option CTemporary works
PSC Option E
NEC4 - PSSub
Sub-Contractorse.g. marine works,
civils works,
groundwork, ground
investigation, surveys,
monitoring
ECS Option A
ECS Option B
ECS Option C
ECSS – Option A
Materials Supplye.g. tunnel segments
SC Option A
Service providerse.g. consents
management, report
preparation, labour
supply
PSC Option A
PSC Option E
Equipment Supplye.g. TBM machines
SC Option A
Term Service
Contractorse.g. security,
occupational health
TSC Option Alabour supply
TSSC Option A
NEC4 - TSSub
Z clauses
Tideway – use of NEC contract suite
Employer
Contractor
ECC Option C
Project Manager
PSC
Supervisor
PSC
DesignPermanent works
PSC Option CTemporary works
PSC Option E
NEC4 - PSSub
Sub-Contractorse.g. marine works,
civils works,
groundwork, ground
investigation, surveys,
monitoring
ECS Option A
ECS Option B
ECS Option C
ECSS – Option A
Materials Supplye.g. tunnel segments
SC Option A
Service providerse.g. consents
management, report
preparation, labour
supply
PSC Option A
PSC Option E
Equipment Supplye.g. TBM machines
SC Option A
Term Service
Contractorse.g. security,
occupational health
TSC Option Alabour supply
TSSC Option A
NEC4 - TSSub
Z
Z
Z
Z
Z
Z
Z
clauses
Tideway – use of NEC contract suite
Employer
Contractor
ECC Option C
Project Manager
PSC
Supervisor
PSC
DesignPermanent works
PSC Option CTemporary works
PSC Option E
NEC4 - PSSub
Sub-Contractorse.g. marine works,
civils works,
groundwork, ground
investigation, surveys,
monitoring
ECS Option A
ECS Option B
ECS Option C
ECSS – Option A
Materials Supplye.g. tunnel segments
SC Option A
Service providerse.g. consents
management, report
preparation, labour
supply
PSC Option A
PSC Option E
Equipment Supplye.g. TBM machines
SC Option A
Term Service
Contractorse.g. security,
occupational health
TSC Option Alabour supply
TSSC Option A
NEC4 - TSSub
Z
Z
Z
Z
Z
Z
Z
clauses
Thames Tideway Tunnel project – use of NEC contract suite
Employer
Contractor
ECC Option C
Project Manager
PSC
Supervisor
PSC
DesignPermanent works
PSC Option CTemporary works
PSC Option E
NEC4 - PSSub
Sub-Contractorse.g. marine works,
civils works,
groundwork, ground
investigation, surveys,
monitoring
ECS Option A
ECS Option B
ECS Option C
ECSS – Option A
Materials Supplye.g. tunnel segments
SC Option A
Service providerse.g. consents
management, report
preparation, labour
supply
PSC Option A
PSC Option E
Equipment Supplye.g. TBM machines
SC Option A
Term Service
Contractorse.g. security,
occupational health
TSC Option Alabour supply
TSSC Option A
NEC4 - TSSub
CVB JV
Tideway – use of NEC contract suite
The need for innovation and new solutions
How can such improvements be delivered?
33%Lower costs
50%Faster delivery
50%Lower Emissions
The Construction Leadership Council has set out
aspirations for 33% lower costs, 50% faster delivery
and 50% lower emissions. Effective procurement can
assist in delivering better outcomes for the whole
project. Projects procured under NEC contracts, such
as Crossrail, demonstrate how good procurement
strategies can deliver successful projects and assist in
delivering economic growth.
Clients are facing major operational and financial challenges
Construction Leadership Council goals
NEC4 – new features
Contractor’s proposals for new solutions
• The Contractor can propose changes to Scope which reduce costs
• The parties can share the benefits
• The Contractor can propose changes to Scope to reduce whole life cost[New secondary option]
• The parties can share the benefits
• The Contractor can propose acceleration to shorten the programme
• The parties can share the benefits
NEC4 – new features
Early Contractor Involvement (ECI)
• A secondary option for ECI
• Appoint a Contractor at an early stage, to participate in the development of designs and proposals
• Contractor inputs to the design at a stage when significant improvements and innovation can be introduced
1 2 3 4 5 6 7 8
Feasibility
Study
Concept
Design
Detailed
Design
Major Plant
Procurement
Co-ordinated
Drawings
Pre-fabrication
& Construction
Project
Commission
Operation
Project Life Cycle (time)
ABILITY TO
INFLUENCE COST
COST OF
CHANGEPro
ject C
osts
Early Contractor Involvement – principle
1 2 3 4 5 6 7 8
Feasibility
Study
Concept
Design
Detailed
Design
Major Plant
Procurement
Co-ordinated
Drawings
Pre-fabrication
& Construction
Project
Commission
Operation
Project Life Cycle (time)
LOSS OF
ABILITY TO
INFLUENCE
COST &
PROGRAMME
COST OF
CHANGEPro
ject C
osts
Early Contractor Involvement – principle
CONTRACTOR &
SUPPLY CHAIN
INVOLVEMENT
NEC4 – new features
Contractor design and build option
• A new secondary option for the ECC and ECS
• Professional indemnity insurance to be provided by the Contractor
• The Contractor’s design duty has been aligned with industry standard preferred by insurers
• Intellectual property ownership and license to use material
• Retention of documents / design information
NEC4 – new features
Building Information Modelling (BIM)
• A secondary option for BIM
• Provides additional clauses to support the
management of BIM specific
requirements
• Deals with Issues of BIM Model and BIM
Information ownership, and liability of the
parties
NEC4 – new features
Dispute Avoidance Board Option
• Dispute resolution option W3 introduced
• Not used where UK HGCRA applies
• Dispute Avoidance Board is nominated by the parties at the time the contract is formed
• DAB members become familiar with the project prior to any dispute arising
• The DAB help parties find a solution to disputes
• They provide a recommendation to resolve the dispute if it is not resolved by discussion
• Parties can accept the recommendation, it is not binding
Other New Features
NEC4 – new features
Undertakings to
Others (collateral
warranties) –new
secondary option
Bribery
and corruption
clauses
Confidentiality
and publicity
clauses
Transfer
of benefits
(assignment)
clauses
Quality
management
Additional
compensation
events
(user defined)
New
termination
secondary
option
NEC4 – summary
Increased range of potential contract and procurement solutions for projects and works programmes of all types and sizes.
• No problems moving from NEC3 to
NEC4 – style, structure and key
features remain
• Plain English drafting style remains
Supports the on-going drive for:
• further collaboration and integration of
teams and supply chain
• innovation and new solutions
• modern work methods
• capex and opex consideration
• management of risk and opportunity
• avoid disputes
NEC3 to NEC4Key changes for flexibility & tier 2
Matthew Garratt
Costain / NEC team