nearest wp3 meeting berlin 8tth october 2008, technische fachhochschule berlin seismic data from...
TRANSCRIPT
NEAREST WP3 meetingBerlin 8tth October 2008, Technische Fachhochschule Berlin
Seismic data from GEOSTAR
Stephen Monna and Francesco FrugoniI.N.G.V. - Rome
Presentation overview
Data statistics
Signal qualityDisturbancesPossibility to “cure” disturbances
Data examples
Conclusions
GURALP CMG-40T 3 component broadband seismometer (30 s-50 Hz)
GURALP CMG-5T 3 component broadband accelerometer, strong motion (DC-100 Hz)
OAS E-2PD- Hydrophone 0- 5KHz
100 Hz sampling, 7 channels 24 bit + 3 mass channels 16 bit
GURALP DM-24 Digitizer, 7 channels at 24 bit + 3 auxiliary OBS mass channels at 16 bit
synchronization from SERCEL rubidium clock- input in GPS DM-24 channel
MCU restarted day 53 (17 October 2007)
Number of bytes recorded/day for OBS, ACC, HYD
For OBS: 2.22*10^4 over 2.34*10^4 Mbytes = 95 % of expected bytes recorded
21 August 2007- Port of Faro, Portugal
OBS-E
OBS-Z
OBS-N
ACC-Z
ACC-N
ACC-E
HYD
Time 200 s
Recording 7 channels before deployment
First recording period after deployment 7 channels25 August 2007
OBS-E
OBS-Z
OBS-N
ACC-Z
ACC-N
ACC-E
HYD
Time 200 sHydrophone breakdown
145 s period disturbance
Detail- hydrophone breakdown, note the corresponding step on ACC
OBS-E
OBS-Z
OBS-N
ACC-Z
ACC-N
ACC-E
HYD
Time 10 s
25 August 2007
Hydrophone- comb-style waveform starts25 August 2007
OBS-E
OBS-Z
OBS-N
ACC-Z
ACC-N
ACC-E
HYD
OBS-E
OBS-Z
OBS-N
ACC-Z
ACC-N
ACC-E
HYD
Time 100 s
Example 1 hour recording for all 7 channels
OBS-E
OBS-Z
OBS-N
ACC-Z
ACC-N
ACC-E
HYD
Time 500 s
06 March 2008
06 March 2008
OBS-E
OBS-Z
OBS-N
ACC-Z
ACC-N
ACC-E
HYD
Zoom on 145 s period disturbance
Time 20 s
This signal form strongly suggests leveling of the sensors is going on
Effect of simple cleaning procedure, teleseismic event Mw6.9 N-mid atlantic ridge
Onset first P-arrival 1 Hz, at 9:45:40 (no drift correction)
Arrival at Portuguese land station PFVI (100 km from GEOSTAR ), 9:45:477 s difference is in agreement with P traveltime tables for shallow eventsClock drift for the whole mission is 184 ms in 359 days ---> ~ 0.51 ms/day
time10 s
before
after
time 5 s
Signal cleaning example for a very local event (not present on local seismic bulletins)
before
after
Onset P arrival
Bandpassed 4-20 Hz 4 poles, butterworth