navigation systems assignments for 2014 2014 “top” priority “verify” 1/3 of the patons in...

20
Navigation Systems Assignments for 2014

Upload: ilene-richard

Post on 16-Jan-2016

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Navigation Systems Assignments for 2014 2014 “TOP” Priority “Verify” 1/3 of the PATONs in each patrol area. These aids will be scheduled and will list

Navigation SystemsAssignments for

2014

Page 2: Navigation Systems Assignments for 2014 2014 “TOP” Priority “Verify” 1/3 of the PATONs in each patrol area. These aids will be scheduled and will list

2014 “TOP” Priority“Verify” 1/3 of the PATONs

in each patrol area.These aids will be scheduled and will list when

an AV logs into the PATON System.

PATONs list by Patrol Area by PATON name.This list also acts as your annual Status Report.

2

Scheduled PATON ListAppears when you log-on

as an Auxiliarist.Scheduled PATONs will listby Patrol Area by PATON Name.

Page 3: Navigation Systems Assignments for 2014 2014 “TOP” Priority “Verify” 1/3 of the PATONs in each patrol area. These aids will be scheduled and will list

1/3 PATON SCHEDULE by SECTORSECTOR NNE 162 17.9%DIV 1 Northern Maine 45 27.8% ADSO-NS SawyerDIV 2 Southern Maine 89 54.9% ADSO-NS ThomsonDIV 15 Burlington VT 38 23.5%

SECTOR BOS 167 18.4% ADSO-NS Larkin

DIV 3 Merrimac River 31 18.6%DIV 4 North Shore MA 38 22.8%DIV 5 Boston 23 13.8%DIV 9 Connecticut River 20 12.0%DIV 12 South Shore MA 55 32.9%

SECTOR SENE 560 61.7%DIV 6 Buzzards Bay 66 11.8% ADSO-NS CuttsDIV 11 Cape Cod 338 60.4% ADSO-NS CuttsDIV 7-10 Narragansett Bay 156 27.9% ADSO-NS Quinn

TOTAL FOR 2014 907 100% DSO-NS Larkin

3

Page 4: Navigation Systems Assignments for 2014 2014 “TOP” Priority “Verify” 1/3 of the PATONs in each patrol area. These aids will be scheduled and will list

1/3 PATON VERIFICATION 2014 PLAN by DIVDIV 1 Northern Maine 45 5.1% SO-NS Plunkett

DIV 2 Southern Maine 89 10.0% SO-NS Homer

DIV 3 Merrimac River 31 3.4% SO-NS DIV 4 North Shore MA 38 4.2% SO-NS Pierce

DIV 5 Boston 23 2.6% SO-NS Silvestri

DIV 6 Buzzards Bay 66 7.4% SO-NS Dlouhy

DIV 7-10 Narragansett Bay 156 17.2% SO-NS Quinn

DIV 9 Connecticut River 20 2.2% SO-NS Lydon

DIV 11 Cape Cod 338 37.5% SO-NS Cave

DIV 12 South Shore MA 55 6.2% SO-NS Bloomquist

DIV 15 Burlington VT 28 3.2% SO-NS Enny

TOTAL FOR 2014 907 100%

4

Page 5: Navigation Systems Assignments for 2014 2014 “TOP” Priority “Verify” 1/3 of the PATONs in each patrol area. These aids will be scheduled and will list

2014 “2nd” PriorityPhotograph all PATONs

without photos on record.If the PATON is scheduled or is unscheduled with a discrepancy, submit photo on report.

Otherwise, identify photo and e-mail to [email protected].

5

Page 6: Navigation Systems Assignments for 2014 2014 “TOP” Priority “Verify” 1/3 of the PATONs in each patrol area. These aids will be scheduled and will list

PATON PHOTO SCHEDULE by DIVISIONDIV 1 Northern Maine 113 06.7%DIV 2 Southern Maine 217 13.0%DIV 3 Merrimac River 57 3.4%DIV 4 North Shore MA 76 4.5%DIV 5 Boston 18 1.1%DIV 6 Buzzards Bay 96 5.7%DIV 7-10 Narragansett Bay 201 12.0%DIV 9 Connecticut River 57 3.4%DIV 11 Cape Cod 672 40.1%DIV 12 South Shore MA 67 4.0%DIV 15 Burlington VT 54 3.2%

TOTAL FOR 2014 1,675 100%6

Page 7: Navigation Systems Assignments for 2014 2014 “TOP” Priority “Verify” 1/3 of the PATONs in each patrol area. These aids will be scheduled and will list

Use low pixel cameras or phone cameras.

If the PATON is scheduled or is unscheduled with a discrepancy, you should submit the photo

on-line on a USCG AV PATON Report-7054.

Otherwise, identify the photo and e-mail it to [email protected].

HD Photos often reject on the PATON System.

7

Page 8: Navigation Systems Assignments for 2014 2014 “TOP” Priority “Verify” 1/3 of the PATONs in each patrol area. These aids will be scheduled and will list

Never submit a USCG AV PATON Report-7054 for an “unscheduled”

Private aid unless you have observed a documentation error or

a discrepancy.

NEVER9

EVER

Page 9: Navigation Systems Assignments for 2014 2014 “TOP” Priority “Verify” 1/3 of the PATONs in each patrol area. These aids will be scheduled and will list

The PATON List is the official 2014 PATON schedule and

status report.When there are no more PATONs left on this list, you have completed your 2014

PATON assignment.

10

Page 10: Navigation Systems Assignments for 2014 2014 “TOP” Priority “Verify” 1/3 of the PATONs in each patrol area. These aids will be scheduled and will list

Also check every ATON in every patrol area in First

Northern Pass close to Federal aids using a chart plotter

to check the position. Perform a visual check of the aid’s features. Compare to the Light List and check their charted position.

Notify the CG ANT or STA when you observe a discrepancy on an ATON – Federal Aid.

12

Page 11: Navigation Systems Assignments for 2014 2014 “TOP” Priority “Verify” 1/3 of the PATONs in each patrol area. These aids will be scheduled and will list

Remember

“You are not alone!”Keep the Auxiliary management aware of all

problems that may deter your team from attaining their assigned goals.

There are many resources available to assist you in planning, communicating, and executing.

14

Page 12: Navigation Systems Assignments for 2014 2014 “TOP” Priority “Verify” 1/3 of the PATONs in each patrol area. These aids will be scheduled and will list

BRIDGESSurvey all Class 1, 2 and

3 bridges.

•If a bridge is not navigable from the sea, submit a Bridge Update Report to change the Class Code to Class 4.– We will not need to survey this bridge again.

•Do not survey Class 4 Bridges unless specifically requested by the Coast Guard.

15

Page 13: Navigation Systems Assignments for 2014 2014 “TOP” Priority “Verify” 1/3 of the PATONs in each patrol area. These aids will be scheduled and will list

CHART UPDATING PROGRAM

•Encourage members to participate in Chart Updating WebEX Training and live workshop programs.

•Prepare and publish a list of Chart Updating opportunities for your AOR.

•Plan and facilitate some Chart Updating events and submit CU reports to NOAA.

17

Page 14: Navigation Systems Assignments for 2014 2014 “TOP” Priority “Verify” 1/3 of the PATONs in each patrol area. These aids will be scheduled and will list

SMALL CRAFT FACILITY (SCF) UPDATING

•Identify and publish a list of Small Craft Facilities within your AOR that meet the criteria for inclusion on a Small Craft Chart.

•Review existing charted and listed SCFs for accuracy.

•Encourage members to participate in the Small Craft Facility WebEX Training programs.

•Plan and facilitate some Small Craft Facility events and submit SCF reports to NOAA.

•If your area is not plotted on a NOAA Small Craft Chart, you are off the hook.

18

Page 15: Navigation Systems Assignments for 2014 2014 “TOP” Priority “Verify” 1/3 of the PATONs in each patrol area. These aids will be scheduled and will list

The ATON (Federal Aid) PROGRAMEncourage and teach OPFAC owners and coxswains to check every Federal Aid to Navigation that they pass while underway on a CG AUX patrol.

Encourage OPFAC owners to make discrepancy reports to the Coast Guard. Never report Federal Aids that are watching properly. The Coast Guard only wants to be alerted to discrepancies.

19

Page 16: Navigation Systems Assignments for 2014 2014 “TOP” Priority “Verify” 1/3 of the PATONs in each patrol area. These aids will be scheduled and will list

OVERALL NAVIGATION SYSTEMS ANNUAL RESPONSIBILITIES

It is the DSO, ADSO, SO and FSOs responsibility in each AOR to formulate a plan of execution to accomplish their assigned goals. This planning should include such items as:

Forming Navigation Systems (NS) Teams with the NS Staff Officers within your AOR.

Preparing and publishing a list of AVs and members who are committed to execute the work required to meet each Goal and Objective.

20

Page 17: Navigation Systems Assignments for 2014 2014 “TOP” Priority “Verify” 1/3 of the PATONs in each patrol area. These aids will be scheduled and will list

Preparing and publishing a list of OPFACs that are committed to support your assigned work plan.

[OPFAC owners do not have to be AV trained.]

Tracking and reporting your AVs performance throughout the year.

Following up and re-planning for success when schedules are not met.

Providing constant communication and feedback back to your volunteers and chain of command.

21

Page 18: Navigation Systems Assignments for 2014 2014 “TOP” Priority “Verify” 1/3 of the PATONs in each patrol area. These aids will be scheduled and will list

PATON and Bridge Scorecard

22

Page 19: Navigation Systems Assignments for 2014 2014 “TOP” Priority “Verify” 1/3 of the PATONs in each patrol area. These aids will be scheduled and will list

Unfortunately, when an Navigation Systems Staff Officer fails to make a detailed plan for achieving their

assigned goals and objectives, it is a sure bet that nothing is going to be accomplished in their AOR in

2014.23

Page 20: Navigation Systems Assignments for 2014 2014 “TOP” Priority “Verify” 1/3 of the PATONs in each patrol area. These aids will be scheduled and will list

Any questions about what the Coast Guard assigned to

be accomplished by the

First Northern Aid Verifiers during 2014?

24