Page 1: NAVAL GE · 2018-02-23 · each sector of the company. We can only evolve constantly and securely with technical training, imagination, courage, experience, hard work and the participa-tion

‡ DINAKChimney Systems

NAVAL GE Gas Exhaust Systems

ECAEUROPEAN CHIMNEYS ASSOCIA

TIO

N

EN 1856-1

Type te

sted

Production monitored

Baumuster geprüft

Produktion überwachtTUV....SUD

dinak.com

Page 2: NAVAL GE · 2018-02-23 · each sector of the company. We can only evolve constantly and securely with technical training, imagination, courage, experience, hard work and the participa-tion

Florida

The DINAK GroupWe are a European group with headquarters in Vigo, with solid experience and future prospect based on R&D&I, focused on the client and with the �exibility that our presence in more than 30 markets demands.

Our objective is the most demanding customer satisfaction in addition to the development of clean and respectful environmental technology.

What we do

We focus on design, manufacturing, distribution and installation of modular domestic and industrial chimneys for the exhaust of gases as well as general ventilation systems.

Our objective

We strive to be leaders with constant multina-tional growth, providing our clients with quality service at a competitive price.

1211654

Applications of the naval GE range

Naval GE

Features of the Dinak GE+ systemMaterials and applications

Alternative GE Ranges

GE50GE100

Dinak GE+ elements

Items and dimensions

Assembly instructions

Fitting between elementsAdjustable lengthsTemperature of the external wall

Page 3: NAVAL GE · 2018-02-23 · each sector of the company. We can only evolve constantly and securely with technical training, imagination, courage, experience, hard work and the participa-tion

Norwich

MADRID

BILBAO

VIGO

BARCELONA

Palma de Mallorca

MILANLYON

WALDBRÖL

León

Valladolid

AlicanteSevilla

Málaga

Granada Córdoba

Mérida

Lisbon

Porto

Zaragoza

Paris

Cvikov

MartinStrasbourg

Toulouse

Bordeaux

Nantes

Poitiers

Rouen

Osnabrück

Krakow

Leeds

York

Belfast

Glasgow

Edimburg

Manchester

BIRMINGHAMOxford

London

Brighton

Bristol

Duisburg Dortmund

Stuttgart

Mannheim Würzburg

Leipzig

Freiburg

Clermont Ferrand

MontpellierMarseille

Torino

Bologna

Firenze

NapoliBari

Palermo

Cagliari

VeneziaTrieste

L’Aquila

Trento

Brescia

Dijon

Lille

Roma

Athens

Sofia

Valletta

BRUSSELS

Our strategy

Client focus

We know our clients well and provide them with global and innovative solutions, excellent service and an immediate and e�cient response.

R&D&I

Innovation is an inherent reality at Dinak. We stand by the professionalism and technical background of our personnel in each sector of the company. We can only evolve constantly and securely with technical training, imagination, courage, experience, hard work and the participa-tion of external partners in the day-to-day operations of our company. Quality

Our product specialisation and commit-ment to quality are linked to our institu-tional presence.We actively promote the creation and implementation of European Standards for our industry, by belonging to di�erent organisations such as the European Sub-Committee for Standardisation of Metallic Chimneys (whose president is our CEO), the Association of Spanish Manufac-turers of Metallic Chimneys and the European Chimney Association (ECA).

Internationalisation

We adapt to di�erent markets where we are currently present. We develop speciali-sed products demanded by each market. In addition to the mandatory CE mark of the European Union, we have speci�c certi�cations for each country we operate in and the structure of our company is focused on our sales network, speci�c to each country.

151413 1716 18

Design Criteria

Materials and range selection guideVelocity

Installation Criteria

Supports

Installation Criteria

Straight elements : 020 or 202Connection elements between horizontal and verticalTerminal elements

Installation Criteria

Fixed points and length compensators systems

Accessories

Length compensators and anti-vibration devicesAcoustic attenuation systemsTerminals and custom elements

Certi�cations

Page 4: NAVAL GE · 2018-02-23 · each sector of the company. We can only evolve constantly and securely with technical training, imagination, courage, experience, hard work and the participa-tion

3

Weight reduction. Around 50% approximately.

Simple installation. It is not necessary to cut, weld the pieces together or to use lifting equipment. Fast installation.

Prefabricated system, manufactured with strict quality controls according to an integrated structure in the manufacturing control system.

“Finished” system, it is not necessary to lag the ducts or coat them with exterior enclosures.

No transmission of expansion to the structure of the vessel (without the need for compensators or expan-sion joints interwoven into the ducts).

Ducts are made out of stainless steel, have long durability and the system is guaranteed.

Excellent aesthetic �nish.

Calculation and design of the facilities is available from DINAKs technical department .

Flexible system, allows for design modi�cations during installation in addition to repairs in the event of accidents.

NAVAL GE

ADVANTAGES OVER TRADITIONAL EXHAUST SYSTEMS

The DINAK GE NAVAL range is made up of modular ducts with double rockwool insulation and has a complete anchoring system and accessories specially designed for shipping facilities.

Given the high performance reached by the DINAK GE NAVAL range, its excellent aesthetic �nish and the ease of installation, this is the best option in all types of medium or high temperature gas conduction (up to 600ºC) that are subject, or not, to high process pressures (up to 5000 Pa).

Page 5: NAVAL GE · 2018-02-23 · each sector of the company. We can only evolve constantly and securely with technical training, imagination, courage, experience, hard work and the participa-tion

4APPLICATIONS OF THE NAVAL GE RANGE

The versatility of the Naval GE range makes it possible to integrate exhaust ducts in several elements of the ship as shown below.

IncineratorsOn board combustible waste management:

Fuel: Diesel, LPG, NGProcess temperature:300- 600ºCMaximum outlet pressure Maximum: 3000 Pa

GeneratorsSet of Motor + AlternatorElectric energy production

Fuel: Diesel, LPG, NGProcess temperature: approx. 450- 550ºCMaximum outlet pressureMaximum: 5000Pa

Motor pumps/Auxiliary motors

Fuel: Diesel, LPG, NGProcess temperature: up to 600ºCMaximum outlet pressureMaximum: 5000Pa

Main motors assigned to the main propulsion of the ship

Fuel: Diesel, LPG, NGProcess temperature:approx. 450- 550ºCMaximum outlet pressure Maximum: 5000Pa

Boilers/steam generatorsProduction of hot water for sanitary usePressurised water vapour

Fuel: Diesel, LPG, NGProcess temperature: approx. 150- 300ºCMaximum outlet pressureMaximum: < 200 Pa

Page 6: NAVAL GE · 2018-02-23 · each sector of the company. We can only evolve constantly and securely with technical training, imagination, courage, experience, hard work and the participa-tion

5 FEATURES OF THE DINAK GE+ SYSTEM

FEATURES

MATERIALS & APPLICATIONS

Individual expansion absorption at joints

Gas tightnessGas tightness class H1 (up to 5000 Pa) at the connection point between elements by means of a silicone joint on the outer wall. The locking band press the joint securing the tightness and at the same time covering it and protecting it from external agents.Outer Wall: Butt welded in every piece of the chimney.

Temperature class T600 (up to 600ºC)The GE30+ range is heat-insulated using rockwool with a thickness of 30mm and a density of 130kg/m³ whereas the GE50+ insulation has a thickness of 50mm and a density of 100kg/m³.Both ranges are CE-certi�ed for the evacuation of exhaust gases produced by power generators and �re pumps. Their walls are not guided by any thermal bridge elements.The most suitable range for a speci�c installation will be determined depending on the maximum temperature required on the outer wall, the type of installation and the prevailing regulations.

Stable and resistantThe overlap between elements is 40mm, which confers stability and robustness to the system, especially to horizontal sections and during its installation.The locking bands �t directly to the outer wall, giving rigidness to the ensemble and making the silicone joint redundant to ensure the mechanical stability of the chimney.

Reliable and easy to installIt is not required to apply lubricant nor apply high pressure to the elements to carry out the installation.The installation of the outer seal is simple and, thanks to its position in the chimney, it is possible to verify visually that it has been correctly installed. Therefore, it is a completely reliable system.It can be totally dismantled.

The inner and outer walls work together on the male end of straight sections, while on the female end the inner Wall expansions freely with the e�ects of temperature.

The outer wall of the straight elements (202) includes a bellow on the male end, which ensures correct absorption of the expansions in the outer wall. This way, it is not required to install before each o�set extra elements to absorb the expansions.

Inner wallStainless Steel AISI 316L (1.4404)Engines, generators, boilers (condensing and dry conditions), incineratorsStainless Steel AISI 304 (1.4301)Engines, generators, boilers (condensing and dry conditions)Outer wallStainless Steel AISI 304 (1.4301) Non-saline environment. Interior lakes and riversStainless Steel AISI 316L (1.4404)Saline and maritime environmentInsulation130 kg/m³ density Rockwool for GE 30+ and 100 kg/m³ for GE 50+Joint insulationRockwoolOuter Joint insulationSilicone T200External �nishMirror �nish (BA). Optional power couted according RAL range

Page 7: NAVAL GE · 2018-02-23 · each sector of the company. We can only evolve constantly and securely with technical training, imagination, courage, experience, hard work and the participa-tion

6DINAK GE+ ELEMENTS

020 Straight length L=940 mm

202 Straight length with expansion systemL=930 mm

024 Straight length L=440 mm

031 90º Tee with no de�ector

L (mm) 270 440 440 440 440 610 610 610 690 690 940 940 940 940 C (mm) 180 218 218 218 218 303 303 303 343 343 468 468 468 468 D (mm) 130 140 153 165 178 190 215 240 265 290 315 340 365 390

Ø 80 100 125 150 175 200 250 300 350 400 450 500 550 600

GE30+

L (mm) 270 440 440 440 440 610 610 610 690 690 940 940 940 940 C (mm) 180 218 218 218 218 303 303 303 343 343 468 468 468 468 D (mm) 130 140 153 165 178 190 215 240 265 290 315 340 365 390

Ø 80 100 125 150 175 200 250 300 350 400 450 500 550 600

GE50+

025 Straight length L=270 mm

022 Adjustable length L=550-900 mm

Minimum length : 530 mm / Max. length : 800 mm

Minimum length : 350 mm / Max. length : 530 mm

Minimum length : 280 mm / Max. length : 375 mm

023 Adjustable length L=370-550

235 Adjustable length extra short

318 90º Tee with de�ector

L (mm) 270 440 440 440 440 610 610 610 690 690 940 940 940 940 C (mm) 180 218 218 218 218 303 303 303 343 343 468 468 468 468 D (mm) 130 140 153 165 178 190 215 240 265 290 315 340 365 390

Ø 80 100 125 150 175 200 250 300 350 400 450 500 550 600

GE30+

L (mm) 440 440 440 440 440 610 610 610 690 690 940 940 940 940 C (mm) 219 219 230 230 230 304 304 304 344 344 469 469 469 469 D (mm) 150 160 173 185 198 210 235 260 285 310 335 360 385 410

Ø 80 100 125 150 175 200 250 300 350 400 450 500 550 600

GE50+

Engine Incinerator Boiler Other systems for overpressure and/or high temperatures

440

940

930

270

L

L

L

L

D

C

90º

L

D

C

90º

Page 8: NAVAL GE · 2018-02-23 · each sector of the company. We can only evolve constantly and securely with technical training, imagination, courage, experience, hard work and the participa-tion

303 135º Tee

L (mm) 440 440 440 610 610 610 690 690 940 940 940 1090 1090 1140 C (mm) 169 153 158 163 169 174 184 195 205 215 226 236 246 257 D (mm) 176 193 214 257 257 278 321 364 407 449 492 535 577 620

Ø 80 100 125 150 175 200 250 300 350 400 450 500 550 600

GE30+

L (mm) 440 440 610 610 610 610 690 940 940 940 940 1030 1130 C (mm) 137 141 182 152 161 162 171 183 193 203 214 225 235 D (mm) 210 228 249 270 291 313 355 398 440 483 526 569 611

Ø 80 100 125 150 175 200 250 300 350 400 450 500 550

GE50+

060 Soot collector 061 Soot collector with drain

026 Reducer

1AR Adaptor 1BR Adaptor with frange

040 45º Elbow

A (mm) 79 83 88 93 99 104 114 125 135 145 156 166 176 187 A1 (mm) 129 133 138 143 149 154 164 175 185 195 206 216 226 237

Ø 80 100 125 150 175 200 250 300 350 400 450 500 550 600

GE30+

A (mm) 95 99 105 110 115 120 130 141 151 162 172 182 193 203 A1 (mm) 135 139 145 150 155 160 170 181 191 202 212 222 233 243

Ø 80 100 125 150 175 200 250 300 350 400 450 500 550 600

GE50+

MOTOR INCINERADOR CALDERA Otros sistemas en sobrepresión y/o alta temperatura

7 DINAK GE+ SYSTEM PIECES

L

D

C

135º

125

125 L

210

≤ LT

≤ 4

10

210

≤ LT

≤ 4

10

ØBØCØD

NxØE

A

A1

Page 9: NAVAL GE · 2018-02-23 · each sector of the company. We can only evolve constantly and securely with technical training, imagination, courage, experience, hard work and the participa-tion

042 30º Elbow

A (mm) 69 71 75 78 81 85 92 98 105 112 118 125 132 138 A1 (mm) 119 121 125 128 131 135 142 148 155 162 168 175 182 188

Ø 80 100 125 150 175 200 250 300 350 400 450 500 550 600

GE30+

A (mm) 982 85 88 91 95 98 105 112 118 125 132 138 145 152 A1 (mm) 122 125 128 131 135 138 145 152 158 165 172 178 185 192

Ø 80 100 125 150 175 200 250 300 350 400 450 500 550 600

GE50+

044 15º Elbow

A (mm) 59 61 62 64 65 67 70 74 77 80 84 87 90 93 A1 (mm) 109 111 112 114 115 117 120 124 127 130 134 137 140 143

Ø 80 100 125 150 175 200 250 300 350 400 450 500 550 600

GE30+

A (mm) 70 71 73 74 76 78 81 84 88 91 94 97 101 104 A1 (mm) 110 111 113 114 116 118 121 124 128 131 134 137 141 144

Ø 80 100 125 150 175 200 250 300 350 400 450 500 550 600

GE50+

433 90º Elbow

A (mm) 158 168 181 193 206 218 243 268 293 318 343 368 393 418 A1 (mm) 198 208 221 233 246 258 283 308 333 358 383 408 433 458

Ø 80 100 125 150 175 200 250 300 350 400 450 500 550 600

GE30+

A (mm) 178 188 201 213 226 238 263 288 313 338 363 388 413 A1 (mm) 218 228 241 253 266 278 303 328 353 378 403 428 453

Ø 80 100 125 150 175 200 250 300 350 400 450 500 550 600

GE50+

43N 90º Elbow with drainage

A (mm) 158 168 181 193 206 218 243 268 293 318 343 368 393 418 A1 (mm) 198 208 221 233 246 258 283 308 333 358 383 408 433 458

Ø 80 100 125 150 175 200 250 300 350 400 450 500 550 600

GE30+

A (mm) 178 188 201 213 226 238 263 288 313 338 363 388 413 A1 (mm) 218 228 241 253 266 278 303 328 353 378 403 428 453

Ø 80 100 125 150 175 200 250 300 350 400 450 500 550 600

GE50+

8DINAK GE+ SYSTEM PIECES

A1A

A1A

A

A1

A

A1

90°

Page 10: NAVAL GE · 2018-02-23 · each sector of the company. We can only evolve constantly and securely with technical training, imagination, courage, experience, hard work and the participa-tion

40N Elbow with drainage

A (mm) 79 83 88 93 99 104 114 125 135 145 156 166 176 187 A1 (mm) 129 133 138 143 149 154 164 175 185 195 206 216 226 237

Ø 80 100 125 150 175 200 250 300 350 400 450 500 550 600

GE30+

A (mm) 95 99 105 110 115 120 130 141 151 162 172 182 193 203 A1 (mm) 135 139 145 150 155 160 170 181 191 202 212 222 233 243

Ø 80 100 125 150 175 200 250 300 350 400 450 500 550 600

GE50+

529 Circular Inspection lenght

13N Raincap d:52mm

13G Raincap d:80mm

15N Directional terminal

15M 45º Directional terminal

L (mm) 258 266 277 287 297 308 328 349 L1 (mm) 189 208 233 258 283 308 357 407

Ø 80 100 125 150 175 200 250 300

GE30+

L (mm) 275 283 293 304 314 324 345 366 L1 (mm) 228 248 273 298 322 347 397 446

Ø 80 100 125 150 175 200 250 300

GE50+

MOTOR INCINERADOR CALDERA Otros sistemas en sobrepresión y/o alta temperatura

9 DINAK GE+ SYSTEM PIECES

L (mm) 281 292 307 321 336 350 379 408 437 466 494 523 552 581 Ø 80 100 125 150 175 200 250 300 350 400 450 500 550 600

GE30+

L (mm) 304 315 330 344 359 373 402 431 460 489 518 546 575 604 Ø 80 100 125 150 175 200 250 300 350 400 450 500 550 600

GE50+

A45º

A1

440

90°

243

95

ØDext

c

c

ØDext + 105

115

ØDext

c

c

ØDext + 160

115

L

60º

L

L1

60°

45º

Page 11: NAVAL GE · 2018-02-23 · each sector of the company. We can only evolve constantly and securely with technical training, imagination, courage, experience, hard work and the participa-tion

15R 90º Directional terminal

A (mm) 285 305 330 355 380 405 455 505 A1 (mm) 236 258 285 312 339 365 419 473

Ø 80 100 125 150 175 200 250 300

GE30+

A (mm) 325 345 370 395 420 445 495 545 A1 (mm) 279 301 328 354 381 408 462 516

Ø 80 100 125 150 175 200 250 300

GE50+

055 Straight length L=270 mm with drainage

55N Straight length L=940 mmwith drainage

070 Locking band

003 Joint

80

ØDext

60

ØDext

80N/86N Wall support

T (mm) 76 84 94 148 163 177 206 235 264 293 321 350 379 408 S (mm) 167 187 212 237 262 287 337 387 437 487 537 587 637 687

Ø 80 100 125 150 175 200 250 300 350 400 450 500 550 600

GE30+

T (mm) 92 142 157 171 186 200 229 258 287 316 345 373 402 431 S (mm) 207 227 252 277 302 327 377 427 477 527 577 627 677 727

Ø 80 100 125 150 175 200 250 300 350 400 450 500 550 600

GE50+

0KV Anti-vibration Kit PF1 Fixed wall support

Note 1: The dimensions correspond to the diameter of the 80N/86N plates.Note 2: Made of carbon steel protected by a layer of epoxy primer.

Note: for installation instructions, see the design criteria section.

10DINAK GE+ SYSTEM PIECES

90°

A

A1

60°

137

270

137

940

25S

T

Page 12: NAVAL GE · 2018-02-23 · each sector of the company. We can only evolve constantly and securely with technical training, imagination, courage, experience, hard work and the participa-tion

11 ASSEMBLY INSTRUCTIONS

FITTING BETWEEN ELEMENTS

ADJUSTABLE LENGTHS

Step 1: Install the joint to the female’s side and in the position indicated. Then put the locking band on the male.

Step 2: Fit in the lengths and take down the joint like this photo. After that, you have to check the �tting.

Step 3: Install the locking band.Important: it is necessary a minimum of pressure 7 N.m

Step 1: Remove the locking band from the adjustable length and adjust the element to the desired length.

Step 2: Apply a strip of DINAK heat resistant neutral silicon in the joint of the parts of the adjustable length.

Step 3: Install the locking band and leave the silicon to cure for at least 48 hours before starting up the equipment.

One of the main criteria for selection of the GE+ range is the temperature for the outer wall of the chimney.

The following table shows the values calculated in the same depending on the features of the facility.

TEMPERATURE OF THE OUTER WALL

One of the main criteria for selection of the GE+ range is the temperature for the outer wall of the chimney.The following table shows the values calculated in thesame depending on the features of the facility.

Calculation assumptions ·Inside installation: ambiant temperature 25 ºC, vertical installation, interior diameter 450 mm.·Outside installation: ambiant temperature 15 ºC, vertical installation, interior diameter 450 mm, wind speed 2 m/s.·To obtain a calculation adapted to a specific installation, contact DINAK.

Gas temperature

(ºC) Outer wall Temperature (ºC)

GE30+ GE50+ GE100

Gas temperature

(ºC)Indoor

installationOutdoor

installationIndoor

installationOutdoor

installationIndoor

installationOutdoor

installation

T. Outerwall (ºC)

T. Outerwall (ºC)

T. Outerwall (ºC)

T. Outerwall (ºC)

T. Outerwall (ºC)

T. Outerwall (ºC)

450 96 48 85 39 62 27 500 106 55 92 45 67 29 550 115 63 101 51 72 32 600 126 72 109 57 78 35

Page 13: NAVAL GE · 2018-02-23 · each sector of the company. We can only evolve constantly and securely with technical training, imagination, courage, experience, hard work and the participa-tion

12ALTERNATIVE GE RANGES

MATERIALS & APPLICATIONS

Inner wallStainless Steel AISI 316L (1.4404)Engines, generators, boilers (condensing and dry conditions), incineratorsStainless Steel AISI 304 (1.4301)Engines, generators, boilers (condensing and dry conditions)Outer wallStainless Steel AISI 304 (1.4301) Non-saline environment. Interior lakes and riversStainless Steel AISI 316L (1.4404)Saline and maritime environmentInsulation100 kg/m³ density RockwoolJoint insulationBiosoluble ceramic �bre with density Sealing ringStainless steel AISI 304 (1.4301)External �nishMirror �nish (BA). Optional power couted according RAL range

Diameters and weight table

GE50The GE50 range has been tested and installed for years in all types of industrial and marine installations. The GE30+ and GE 50+

ranges are supplemented to service applications that need diameters larger than 600 mm.

The selection criteria in this line and range of service, regarding

pressure and maximum temperature, are shared with the GE+

range, meaning up to 5000 Pa of excess pressure and 600ºC in

continuous operation.

Available diameters and weight table

GE100For those cases where the exterior temperature limitation of the ducts is extreme, DINAK o�ers clients the GE100 range with the

same essential characteristics as the rest of the GE range but with a greater thickness of insulation.

Individual expansion absorption at joints

The inner and outer walls work together on the male end of straight sections, while on the female end the inner wall expansions freely with the e�ects of temperature.

Dext 750 800 850 900 Kg/m 35 37 40 40

Ø 650 700 750 800

Dext 280 300 325 350 375 400 450 500 550 600 650 700 750 800 850 900 950 1000 kg/m 16 17 19 20 22 24 27 30 32 35 38 43 46 49 55 58 62 65

Ø 80 100 125 150 175 200 250 300 350 400 450 500 550 600 650 700 750 800

Page 14: NAVAL GE · 2018-02-23 · each sector of the company. We can only evolve constantly and securely with technical training, imagination, courage, experience, hard work and the participa-tion

13 DESIGN CRITERIA

Material and range selection guide

The DINAK GE Naval range is available in di�erent diameters and insulation con�gurations and adapts to the requirements demanded for each application. For example, a duct may be limited so that the process it services does not exceed a certain speed (limitation of maximum pressure or noise generated, for example) or a certain temperature of the exterior wall.

In addition, the range provides di�erent combina-tions of materials for the gas ducts and the exterior wall in order to reach an optimal solution in each project and application.

Saline and maritime environment

Non saline environment. Interior lakes and rivers

EnvironmentOuter wall

Every part

AISI-3041.4301

R

AISI-316L1.4404

Funnel interior R R+

Engine room R R+

Funnel exterior - R

R+

Main engines / GeneratorsOther engines

DataInner wallAISI-3041.4301

AISI-316L1.4404

Diesel oil, Fuel Natural Gas, LPGs R R+

Boilers and steam generators Fuel Natural Gas, dry conditionsDiesel oil, dry conditions

R R+

Diesel oil, Fuel Natural Gas, LPGsT<150ºC, dry conditions

- RBoilers and steam generatorsLow temperature systems

- RIncinerator T<600ºC, dry conditions

Insulation GE50+ / GE50GE30+ GE100

Main engines / Generators O HR+

Emergency engine and motor pumps R -H

Boilers and steam generators R -H

Incinerator O HR

R Recommended optionR+ Prolonged lifespan optionO Optional, depending on the exterior temperature requirementsH Highest temperature requirements, low contact temperature- Not recommended

Velocity

The velocity in the gas ducts a�ects the total pressure of the system, the noise generated by the �ow of gases, the loss of charge introduced into the circuit and the phenomena of turbulence and other dynamic e�ects that, if not controlled, can have a negative e�ect.As a general rule, the recommended and maximum speeds for the system are the following:

Engines and generators 30 - 40

Boilers 5 - 12

Incinerators 15 - 35

40

Maximum velocity (m/s)

Recommended velocity (m/s)

The acoustic power values generated by the noise produced at di�erent speeds are gathered in the following dB chart.

Noise generated Lreg (dB)

2554565860626466676869707172

3058606264666870717273747576

3562646667707273757677787879

V (m/s)DN80

100125150200250300350400450500550600

4065676870737576777980818182

Page 15: NAVAL GE · 2018-02-23 · each sector of the company. We can only evolve constantly and securely with technical training, imagination, courage, experience, hard work and the participa-tion

14INSTALLATION CRITERIA

Supports

Selection criteria for anchorages

Installation and position of the anchorages.

The recommended installation is shown in the following charts as a general guide.

In straight sectionsIn straight sections, anchorages must be placed at least every 2 m.

For deviations As general criteria for deviations in the layout, a maximum distance between anchorages must be at 2 m measured on the axis of the duct and it will be taken into account that at least one anchorage is to be installed as close as possible to one end of the deviation.

For diameters larger than 600 mm For diameters larger than 600 mm and the GE100 range, consult with DINAK for the best possible con�guration of anchorages.

In order to avoid vibrations in the general structure of the ship, isolating the ducts is recommended. The DINAK GE Naval range has anti-vibration kits that are specially desig-ned for this purpose, also allowing the avoidance of galvanic corrosion by contact of metals with di�erent electrical potential.DINAK recommends installing the kit to each anchorage of the system.

Installation of the anti-vibration kit:·The kit consists of a carbon steel plate (1) + rubber seals that insulate the duct of the structure.·This kit is screwed on (according to the attached sketch) to the 80N/86N attachment and is welded to the carbon steel plate primed on the ship’s structure.

Anti-vibration kit

(1) Other materials are available on request

L1 + L2 + L3 + L4 < 2m(axis measurements)

Horizontal Stages

For easy installation, the use of 86N anchorages are recommended and the installation of intermediate 80N anchorages is also valid.

Vertical Stages

Intermediate 80N ancho-rages must always be used, with the exception of �nishing touches that may have special conside-rations (See page 15).

Page 16: NAVAL GE · 2018-02-23 · each sector of the company. We can only evolve constantly and securely with technical training, imagination, courage, experience, hard work and the participa-tion

15 INSTALLATION CRITERIA

This connection is generally achieved with a 90º elbow pipe + drain, code 43N or with a 45º elbow pipe with drain (code 40N) and another 45º elbow pipe (code 040). This prevents the possible entry of water to the equipment.

Connection elements between horizontal and vertical

The straight element 202 with dilator is used for applications with high gas temperatures (greater than 300ºC) in the case of main motors, generators, motor pumps, incinerators, etc.

The 020 is used for applications with gas temperatures below 300ºC, such as boiler applications, steam generators, etc.

Straight Elements : 020 or 202

This connection is generally achieved with a 90º elbow pipe + drain, code 43N or with a 45º elbow pipe with drain (code 40N) and another 45º elbow pipe (code 040). This prevents the possible entry of water to the equipment.

High resistance to corrosion ▶ Use of AISI-316L

Avoid contact of external water with the main engines and equipment:

Design prevents water from entering the insulation and minimises the entry of water into the ducts; di�erent terminals with multiple combinations of exit angles.

Special straight element module with perimetral collection and drain (code 55N)

Speci�c design to seal the cover.

Water cover with a lower band to overlap with the exit neck of the cover.

Terminal Support: According to the standard design of this �gure, it is not necessary to add an additional exterior support or additional anti-vibration systems.

In the case of increasing the free height or the cantilever, DINAK has all the stainless steel AISI-316L pieces described in this catalog to obtain the necessary design.

Alternatively other elements can be designed with speci�c geometries, materials and speci�c thicknesses.

Terminal elements

Page 17: NAVAL GE · 2018-02-23 · each sector of the company. We can only evolve constantly and securely with technical training, imagination, courage, experience, hard work and the participa-tion

16INSTALLATION CRITERIA

One of the advantages of the DINAK system is that, along the entire length of the ducts, these do not transmit expansion at the anchorage points to the structural elements of the ship or to other equipment.

However, certain equipment such as silencers, spark arresters, catalysts, motors, scrubbers, etc., can experience large expan-sions towards the DINAK ducts, which, if left unchecked and uncompensated, would cause large overloading of the ducts.

In these cases, it is necessary to compensate for these dilations, also avoiding the transmission of vibrations, and DINAK can optionally supply compensation systems and speci�c anti-vibration supports.

Connection between the outlet of the motors and the DINAK duct

The �xed point shall always be made after the dilator/anti-vi-brator (A) of the engine exhaust outlet and on the side of the modular DINAK duct (B).

Objective

Eliminate the transmission of vibrations and expansions

DINAK solution

Installation of supporting arms (C)* bolted to the �angePlace �xed anti-vibration points (D)* to these arms �xed to the structure of the ship directly or with an auxiliary substructure.

Connection with silencers / other equipment with axial dilators

The �xed point or points are made in the case that the expansion of the equipment (d) at any of the connection points is greater than 3mm (d>3mm)

Objective

Eliminate the transmission of expansion and overloads.

DINAK solution

Install supporting arms (A) bolted to the coupling �ange.Place �xed anti-vibration points (B)* to these arms �xed to the structure of the ship directly or with an auxiliary substructure.

In the example shown, the silencer expands less than 3mm on the right side, and a larger amount on the left side.

(1) It is assumed that the weight of the silencer/equipment is supported by the overall structure of the ship, for example, with the help of anti-vibrators on the supports (C) and the stabilisers (D).

Fixed points and length compensators systems

A

D

C

B

D

A B C

d < 3 mm

Page 18: NAVAL GE · 2018-02-23 · each sector of the company. We can only evolve constantly and securely with technical training, imagination, courage, experience, hard work and the participa-tion

Length compensators and anti-vibration devices

17 ACCESSORIES

As previously explained in this catalogue, the double wall DINAK ducts do not transmit signi�cant expansions to the rest of the equipment, installations or the ship’s structure.

However, in a conventional manner, it is customary to introduce equipment into exhaust systems that generate large expan-sions and vibrations. If not foreseen, they cause large deformations and/or overloads to other equipment and to the ship’s structure itself, in addition to causing noise problems.

Terminals and custom elements

As an option, Dinak o�ers clients standard or customised acoustic attenuation systems according to the actual needs of the installation.

Examples of attenuation systems

Relaxation-absorption silencers:Design especially suitable for medium to high power Motors / generators.Possibility of incorporating an anti-spark system.Possibility of incorporating a drain.

DINAK SilenkModular attenuation systems fully compatible with DINAK GE Naval range. ▶Easy installation, absence of �xed points and perfect aesthetic integration.Excellent absorption capacity at medium and high frequencies.Especially suitable for boilers and incinerators.

In addition to standardised terminals (see page 15), DINAK can supply di�erent terminal options, whether for the technical requirements (for example: materials, special geometry…) or aesthetic requirements.

For other special items, please consult with DINAK.

Acoustic attenuation systems

Fixed point support

Support element which allows the anti-vibration �xed point to be attached with bolts.

Compensators or Expansion joints

These are introduced to the system should it be necessary to absorb important expansions generated by certain equipment (for example, main silencers of engines).

Stabilisers

These control movements in a single direction and avoid the transmission of vibrations by equipment that generates them.

Fixed anti-vibration point

These support the static and dynamic loads transmitted by equipment that experiences expansion and vibration toward the ducts while it is operational.

Page 19: NAVAL GE · 2018-02-23 · each sector of the company. We can only evolve constantly and securely with technical training, imagination, courage, experience, hard work and the participa-tion

18Certi�cations

Certi�cates

Certi�cate of Quality management system according to ISO 9001 cert�ed by AENOR.

CE certi�cate according to European construction product guideline certi�ed by TÜV.

Type Approval certi�cate by Lloyd’s Register DTA Certi�cate certi�ed by the French institute CSTB for gas evacuation of motors and generator groups.

Page 20: NAVAL GE · 2018-02-23 · each sector of the company. We can only evolve constantly and securely with technical training, imagination, courage, experience, hard work and the participa-tion

‡ DINAK

EN 1856-1

Type te

sted

Production monitored

Baumuster geprüft

Produktion überwachtTUV....SUD

Type Approval certi�ed by Lloyd’s Register

ECAEUROPEAN CHIMNEYS ASSOCIA

TIO

N

DINAK S.A. Camiño do Laranxo, 1936216 VIGO - SPAIN 986 45 25 26 986 45 25 01 [email protected]

dinak.com

1.4301 (AISI 304)Ø 80 - 300 EN 1856-1 T600 H1 D Vm L20040 O40Ø 350 - 450 EN 1856-1 T600 H1 D Vm L20040 O60Ø 500 - 600 EN 1856-1 T600 H1 D Vm L20040 O80Ø 650 - 800 EN 1856-1 T600 H1 D Vm L20060 O1601.4404 (AISI 316L)Ø 80 - 300 EN 1856-1 T600 H1 D V2 L50040 O40Ø 350 - 450 EN 1856-1 T600 H1 D V2 L50040 O60Ø 500 - 600 EN 1856-1 T600 H1 D V2 L50040 O80Ø 650 - 800 EN 1856-1 T600 H1 D V2 L50060 O160

0036 CPR 90220 047

NAVAL GE GAS EXHAUST SYSTEMS

ARC RONCADOR

Gas Exhaust System: Generators: 4 x DINAK GE 50 DN200/300Auxiliary generator:1 x DN 100

ALICE ONE

Gas Exhaust System:Main engines : 2 x DINAK GE 50 DN700/800 Generators: 4 x DINAK GE 50 DN250/350 Boiler: 1 x DINAK GE30+ DN 200/260

C710 - 171

Gas Exhaust System: Generators:4 x DINAK GE 50+ DN500/600 Incinerator:1 x DINAK GE50+ DN 300/400

Some references

C710 - 171

Exhaust Gas System: GENERATORS 4 x DINAK GE 50+ DN500/600 INCINERATOR 1 x DINAK GE50+ DN 300/400

New York City Transportation Ferries

GE30+ and GE50+ Gas exhaust systems for 20 Public Transport Ferries

C710 - 171

Exhaust Gas System: GENERATORS 4 x DINAK GE 50+ DN500/600 INCINERATOR 1 x DINAK GE50+ DN 300/400

Contact Delta T Systems, Inc.for sales and service of

DINAK Naval GE MarineGas Exhaust Systems.

Delta T Systems, Inc.858 West 13th Court

Riviera Beach, Florida 33404(561) 204-1500

[email protected]