national waterways conference
TRANSCRIPT
![Page 1: NATIONAL WATERWAYS CONFERENCE](https://reader033.vdocuments.site/reader033/viewer/2022051204/6277f9c419a1922ae0670e94/html5/thumbnails/1.jpg)
BUILDING STRONG®and Taking Care of People!
NATIONAL WATERWAYS CONFERENCE
Col. Robert A. HilliardCommander, Vicksburg District
![Page 2: NATIONAL WATERWAYS CONFERENCE](https://reader033.vdocuments.site/reader033/viewer/2022051204/6277f9c419a1922ae0670e94/html5/thumbnails/2.jpg)
2
BUILDING STRONG®and Taking Care of People! 2
![Page 3: NATIONAL WATERWAYS CONFERENCE](https://reader033.vdocuments.site/reader033/viewer/2022051204/6277f9c419a1922ae0670e94/html5/thumbnails/3.jpg)
3
BUILDING STRONG®and Taking Care of People!
• Drilled over 225 holes (mostly underwater) through the concrete structure for grouting and tremieconcrete placement
• Found voids from less than a foot to as much as 12 feet deep below the structure
• Injected over 18,500 cf of grout and over 665 cy of tremie concrete into voids (equivalent of 170 truckloads of concrete and grout)
• Repaired a 2000 SF area of the lock floor using 227 CY of tremie concrete
Columbia Lock and Dam Repairs
sand boil 2018
4
![Page 4: NATIONAL WATERWAYS CONFERENCE](https://reader033.vdocuments.site/reader033/viewer/2022051204/6277f9c419a1922ae0670e94/html5/thumbnails/4.jpg)
4
BUILDING STRONG®and Taking Care of People!
JOHN H. OVERTON LOCK AND DAM DEWATERING
Background• Located at mile 74.3 on the Red River• Built in 1987• Provides a 9-ft by 200-ft wide navigation channel
extending over 230 miles.
Overton is scheduled for a 60-day closure beginning Sept 8 for inspections and minor maintenance
5
![Page 5: NATIONAL WATERWAYS CONFERENCE](https://reader033.vdocuments.site/reader033/viewer/2022051204/6277f9c419a1922ae0670e94/html5/thumbnails/5.jpg)
5
BUILDING STRONG®and Taking Care of People!
01
02
03
04
05
Completion of Columbia L&D
06
07Dewatering of Overton L&D
Dredging
Construction projects for
channel improvements
Maintenance work
Revetment
MRL work
The Effects of Sustained High Water and Flooding
6
![Page 6: NATIONAL WATERWAYS CONFERENCE](https://reader033.vdocuments.site/reader033/viewer/2022051204/6277f9c419a1922ae0670e94/html5/thumbnails/6.jpg)
6
BUILDING STRONG®and Taking Care of People!
levee surfacing
revetment scouring
pump damage
erosion/sliding
repair sites
Damage from the 2019 Flood
7
![Page 7: NATIONAL WATERWAYS CONFERENCE](https://reader033.vdocuments.site/reader033/viewer/2022051204/6277f9c419a1922ae0670e94/html5/thumbnails/7.jpg)
7
BUILDING STRONG®and Taking Care of People!
C E M V K - P A @ U S A C E . A R M Y . M I L@VicksburgUSACE6 0 1 . 6 3 1 . 5 0 0 0 o r 1 . 8 0 0 . 5 2 2 . 5 3 7 2