national institute of technology puducherry karaikal … · 2017-05-23 · national institute of...
TRANSCRIPT
NATIONAL INSTITUTE OF TECHNOLOGY PUDUCHERRY
KARAIKAL- 609 605 Annual Report 2011-12
Table of CONTENTS
s.No Particulars Page no.
1.00 INTRODUCTION 1
1.01 VISION & MISSION 2
2.00 LOCATION 2
2.01 REGISTRATION 3
3.00 ADMINISTRATION 4
3.01 DIRECTOR 4
3.02 BUILDING AND WORKS COMMITTEE 6
3.03 FINANCE COMMITTEE 9
3.04 BOARD OF GOVERNORS 10
4.00 COURSES OFFERED 11
4.01 ADMISSION 11
5.00 ACADEMIC 17
5.01 FACULTY 17
5.02 VISITING FACULTY 17
5.03 EXAMINATION AND RESULTS 21
6.00 INFRASTRUCTURE 22
6.01 LAND 22
6.02 CLASS ROOMS & ADMINISTRATION OFFICE 23
6.03 LABORATORIES 23
6.04 HOSTELS 24
6.05 MESS AND TRANSPORT FACILITIES 24
7.00 FUNCTIONS 25
8.00 FEE STRUCTURE 26
9.00 SCHOLARSHIPS 27
10.00 FINANCE 27
11.00 ACCOUNTS 28
- 1 -
NATIONAL INSTITUTE OF TECHNOLOGY,PUDUCHERRY KARAIKAL- 609 605
****
ANNUAL REPORT 2011-12
1.0 INTRODUCTION :
The National Institute of Technology,Puducherry is submitting its second report to the
Parliament.
The Government of India in order to cater to the growing need of the technical manpower
for the country established additional Ten New National Institute of Technology(NITs) during
the Eleventh Five Year Plan and conveyed the same in their order no. F-23-13/2009-TS III Dt.
30.10.2009. National Institute of Technology, Puducherry is one among the ten new NITs
established during 2009-2010.
In order to closely monitor as well as facilitate the work of establishment of these ten new
NITs, the Ministry has appointed mentor institutes from the existing well established twenty
NITs .
The National Institute of Technology, Tiruchirappalli , Tamil Nadu became mentor
institute for the National Institute of Technology, Puducherry.
As per the norms for the establishment of new National Institute of Technology
respective State/ Union Territory has to provide minimum 300 acres of land and also to provide
road, water supply and electricity connections.
The Govt.of Puducherry, in turn, has identified the land in KARAIKAL for the
establishment of National Institute of Technology, Puducherry because its location and Industrial
back ground.
- 2 -
1.01 VISION :
To be among leading Indian Institutes for Excellent, Relevant and Value based
Technical Education and Research
MISSION :
To create the Infrastructure and Academic Environment on par with best
benchmarks.
To offer Under-Graduate, Post-Graduate and Doctoral Programmes in the
Technical Fields of National Importance.
To Collaborate for Research and Consultancy works with leading National
and International Laboratories, Institutes and Industries.
To Train young minds in Intellectual and Ethical Strengths for developing
their Capacity in the areas of Science, Engineering and Technology.
To Relentlessly Pursue Professional Excellence with Ethics.
To implement continuously improving models of Comprehensive
Education.
2.0 LOCATION :
The Union Territory of Pondicherry is constituted out of the four erstwhile
French establishments of Pondicherry, Karaikal , Mahe and Yanam. Karaikal region is
embedded in the Nagapattinam and Tiruvarur Districts of Tamil Nadu state.
- 3 -
Karaikal is well connected by Road network, 320 Km from Chennai , 130
Km from Pondicherry 16 Km from Nagapattinam and 160 Km from Tiruchirappalli Also, it is to
be connected with Rail from Ernakulam , Chennai, Velankanni and construction of „Airport at
Nedungadu is in progress.
In and around Karaikal, there are many important tourist places, and holy Shiva
and Vaishnava temples are situated which are all recorded in the holy books of Nayanmars and
Alwars. Thirunallar Saniswar Temple is famous in India.
Apart from the holy & Pilgrim centres, Karaikal Port, Oil & Natural Gas Commission and many
large and medium scale industries plays vital role for the selection of the location.
Karaikal has many private schools, apart from Kendriya Vidyalaya, Navodhay
School etc. Arignar Anna Govt. Arts & Science College, Avvaiyar Govt.College for Women,
Perunthalaivar Kamaraj Institute of Technology( Govt.Engg.College), Pandit Jawaharlal Nehru
Agricultural College (Govt.Agri College) , Two Self Financing Engg.Colleges, One Private
Medical College , Govt. Industrial Training Institute, Govt. Polytechnic etc. make Karaikal as
education centre.
Above said facilities make the Govt.of Puducherry to select Karaikal as an apt
place for the National Institute of Technology, Puducherry.
Four member team formed by the Ministry of Human Resource Development,
New Delhi visited the site and accorded approval
2.01 REGISTRATION :
The Mentor Institute had registered the Institute as Society under Societies Registration
Act 1860 in the Registrar of Companies Puducherry on 25.3.2010 vide registration No.
134/2010 during March 2010 with members from Govt.of Puducherry, Ministry of Human
Resource Development,New Delhi and Mentor Institute
- 4 -
3.00 ADMINISTRATION
3.01 DIRECTOR
Dr Sandeep Sanchetti, Director, National Institute of Technology Karnataka, Surathkal
was placed as Director Incharge by the Govt.of India, Ministry of Human Resource
Development, New Delhi for the mentor Institute viz. National Institute of
Technology,Tiruchirappalli. Hence Dr.Sandeep Sanchetti has became as Director incharge of
National Institute of Technology, Puducherry also . He hold the office of the Director i/c from
1.4.2011 to 30.6.2011.
The Govt.of India,Ministry of Human Resource Development,New Delhi had appointed
Dr,S.Sundarrajan as Director for the National Institute of Technology,Tiruchirappalli and he
joined duty on 1.7.2011. Hence he became Director i/c for the National Institute of
Technology,Puducherry also. He hold the post of Director i/c from 1.7.2011 to 15.12.2011.
The Ministry has appointed Dr.(Mrs) S.K.Pandey, Professor, Chemical Engineering
Department, National Institute of Technology,Tiruchirappalli who was on lien as Director,
National Institute of Technology, Raipur till December 13,2011, as regular Director for the
National Institute of Technology, Puducherry vide Lr.No. F.23-19/2009-TS III(Pt) Dt.21.11.2011
Dr.(Mrs.) S.K.Pandey,has joined this institute on 16.12.2011 F.N. and continues till date.
Dr.(Mrs) Shashi Krishna Pandey is the First Director of National Institute of Technology,
Srinagar( J & K) ( 2003 – 2005)
She was appointed as Director, Sant Longowal Institute of Engineering & Technology,
Longowal , Punjab (Govt.of India ,MHRD funded Institution) Deemed to be University (2006-
2008)
. Then She was appointed as Director, National Institute of Technology, Raipur ( 2008-
2011)
- 5 -
As soon as Dr.(Mrs) S.K.Pandey assumed charge as Director , National Institute of
Technology,Puducherry. She planned to concentrate on following important issues :
1. Obtaining entire land for the own campus from the Govt. of Puducherry , for that she
visited to Puducherry and met with the Chief Secretary,Govt. of Puducherry.
.
2. Arrangement for conducting walk in interview to recruit additional faculty
3. Arrangement for outsourcing Mess &, Transport
4. Arrangement for additional class rooms for the Third batch of students going to be
admitted in July 2012
5. Arrangement for obtaining additional buildings for hostels for the Third batch of students
etc.
ADMINISTRATIVE BODIES :
The Govt.of India, Ministry of Human Resource Development, New Delhi had
suggested the following administrative set up based on NITs Act 2007 .
a. Building and Works Committee
b. Finance Committee
c. Senate
d. Board of Governors
- 6 -
3.02 BUILDING AND WORKS COMMITTEE
The composition of the Building and Works Committee is given below :
a. The Director , NIT Puducherry Chairman
b. One Representative of the Ministry of Human Resource
Development, New Delhi (NITs) Member
c. One member from Civil Engineer in CPWD Member
d. One Member from Electrical Engineer in CPWD Member
e. One member nominated by the Board Member
f. Dean, Planning and Development of the Institute Member
g. Registrar i/c , N.I.T.,Puducherry Member
The Second meeting of the Building and Works Committee was conducted under the
Chairmanship of Dr.(Mrs) S.K.Pandey, Director , National Institute of Technology, Puducherry
on 12-3-2012 at the Conference Hall of the Chief Engineer (South Zone), CPWD, Rajaji
Bhawan, Besant Nagar, Chennai -600 090
- 7 -
The following members attended the Second Meeting of the Building and Works
Committee
Dr.(Mrs.)S.K.Pandey, CHAIRPERSON
National Institute of Technology, Puducherry ,
Karaikal
Shri P.P.Srinivasan, MEMBER
Chief. Engineer,CPWD, South Zone,
Rajaji Bhawan, “G” Wing,
Besant Nagar,
Chennai – 600 090
Shri Rajeev Sharma, MEMBER
Supdtg.Engineer,CPWD(Elect)
26, Haddows Road,
Shastri Bhawan,
Chennai – 600 006
Er.P.Swaminathan, MEMBER
Supdtg.Engineer,
PWD,
Govt.of Puducherry
Karaikal – 609 602
Shri Y. Gopalakrishnan, MEMBER
Architect,
PWD,
Govt.of Puducherry
Puducherry
- 8 -
Dr.K.S.Pandey,
Professor, MME Dept.,
N.I.T., Tiruchirappalli
representing
The Director,
National Institute of Technology,
Tiruchirappalli
In addition to the above the following members were also attended the meeting as
special invitees.
Shri. K.Sundareswaran,
Superintending Engineer,
CPWD,
Puducherry Central Divn.,
Puducherry
Shri N.N.S.S.Rao,
Superintending.Engineer,
CPWD,
Central Circle II,
Chennai
Dr.C.Natarajan, Professor,
Civil Engineering Department,
N.I.T.,Tiruchirappalli
- 9 -
The following important decisions were taken at the meeting :
Entrusting the preparation of Zonal Master Plan for the entire Campus
Entrusting the Construction works of the buildings for the new campus
to CPWD on deposit work basis.
Approval of Entrance signage and certain instructional buildings estimate
3.03 FINANCE COMMITTEE
The Composition of the Finance Committee as per NIT Act 2007 is given below :
1. Chairman, Board of Governors is the Chairman, Finance Committee also
2. Director, N.I.T.Puducherry at Karaikal as Ex – Officio Member
3. Joint Secretary, MHRD, NIT Divison , New Delhi as Member
4. Financial Adviser, MHRD, New Delhi as Member
5. Two members nominated by the Board
6. Registrar as Member Secretary of the Finance Committee
- 10 -
Action was initiated by the Director for conduct of the meeting . Due to lack of time after
regular Director joins duty NO meeting was conducted.
3.04 BOARD OF GOVERNORS
The Government of India, Ministry of Human Resource Development, New Delhi with
the approval of the Visitor appointed Dr.Baldev Raj , Director ( Retd) Indira Gandhi Centre for
Atomic Research (IGCAR), Kalpakkam and President , Indian National Academy of
Engineering , New Delhi as First Chairman, Board of Governors of National Institute of
Technology, Puducherry at Karaikal vide MHRD lr.No. F.23-19/2010-TS II (Pt) dt. 5.1.2011
In the absence of constitution of full Board, the Ministry has instructed to obtain approval
of the Ad hoc Board consisting of following members as per Ministry lr. No. F.23-13/2009-TS
III (Pt) dt. 24.1.2012
Dr. Baldev Raj,
Former Director,
Indira Gandhi Centre for Atomic Research,
Kalpakkam
The Joint Secretary,
Government of India,
Ministry of Human Resource Development,
Dept.of Higher Education,
NEW DELHI or his nominee
The Financial Adviser,
Government of India,
Ministry of Human Resource Development,
Dept.of Higher Education,
NEW DELHI or his nominee
Dr.(Mrs.) S.K.Pandey,
Director,
National Institute of Technology Puducherry,
KARAIKAL
- 11 -
SENATE :
The National Institute of Technology, Tiruchirappalli ( Mentor Institute) Senate is adopted as
Senate for the N.I.T.Puducherry.
The syllabi for the Second year for the Electrical & Electronics Engg. Branch, Electronics
and Communication Engg. Branch and Computer Science & Engg. Branch being followed by the
National Institute of Technology, Tiruchirappalli was resolved to adopt at NIT Puducherry
4.00 COURSES OFFERED:
The following three branches of Under Graduate Courses being commenced during
2010-11 was continued for the second year also. No new branches of courses commenced due to
lack of permanent faculty and Senate for its own.
a. B.Tech. Electrical & Electronics Engineering
b. B.Tech. Electronics & Communication Engineering
c. B.Tech. Computer Science & Engineering
Each branch has been sanctioned with an intake of 30 students per annum.
4.01 ADMISSION
Similar to all National Institute of Technology in the country, the admission for the
Under Graduate courses was made based on the All India Engg.Entrance Examination – Central
Counselling Board 2011 ( AIEEE-CCB) rank basis.
- 12 -
The National Institute of Technology Puducherry has also been identified as one among the help
centre and reporting centres by the AIEEE – CCB during 2011-2012.
In addition to the sanctioned intake of 90 students , the AIEEE –CCB has allotted 12
additional students under supernumerary quota from Andaman \ Nicobar islands.
Dr.G.Swaminathan, Professor ,Civil Engineering Department and Co-ordinator for the
National Institute of Technology,Puducherry at Karaikal was Centre Incharge for admissions
during 2011-12 The National Institute of Technology,Puducherry had admitted 112 students
during 2011-12 for three branches of U.G.Courses.
The second batch of students admitted during 2011-12 is given below:
S.No. Name of the student Roll No.
1 ABHINAYA S 2011065
2 ADVITIYA GUPTA 2011109
3 AJITH RAJ R A 2011066
4 AKASH AHTURVEDI 2011095
5 AKHIL S 2011074
6 AMAN JAIN 2011011
7 AMRITTA GHOSH 2011031
8 AMUDHAN 2011061
9 ANKIT KISHEN 2011103
10 ANUGRAHA BENJAMIL S 2011002
11 ARU KAMAL PAL 2011106
12 ATHUL R 2011032
13 CHADALAVADA HANUMA RAMESH 2011012
14 CHAKKA YASWANTH SAI KIRAN 2011008
- 13 -
15
DANDE REDDY PRASAD
2011022
16 DEEPAN M 2011056
17 DHARANI D 2011081
18 DIBYAJYOTHI RABHA 2011088
19 DORAIKANNU SUSEEL 2011037
20 DUVVRU AVINASH 2011005
21 DWARKESH SOREN 2011068
22 FAISAL KAMRAN 2011043
23 GAJULA MANI KUMAR 2011004
24 GANESH 2011040
25 GOWTHAM RAJ MELLAM 2011064
26 HARIHARAN M 2011079
27 JADAV GABBAR 2011050
28 JEEVABHARATHY H 2011078
29 KADALI SAMYUKTMA DURGA 2011072
30 KALAIVANAN K 2011058
31 KANKIPATI SYDNEY ROSHAN KUMAR 2011021
32 KARTHIK D R 2011041
33 KODALI J D S SRINIVASA RAO 2011002
34 KOTA KETHAN 2011006
35 KRITHIKA U 2011026
36 LALITHA GOPAL 2011001
37 KARTHIKEYAN M 2011104
38 MAGESH YADAV 2011101
39 MONOJ KUMAR V 2011086
40 MATTAPARTHI MOHANA SIVA GANESH 2011073
- 14 -
41
MEENAKSHI
2011062
42 MOHAMMED SHAAN SAMEEM 2011075
43 MOHAN SINGH 2011069
44 MOHAMMED NIFIL K P 2011053
45 MONIKA S 2011019
46 MOUTAM SHASHIKANTH 2011018
47 NALLAMALA HEMANTH 2011016
48 NANDU R S 2011111
49 NIVEDHAN B 2011038
50 PARIDHI BHARATI P 2011030
51 PARTHIPAN M 2011107
52 PATCHIKALAYA NARENDRA 2011027
53 PATHIVADA DAMOJI RAO 2011020
54 PAVITHRA R 2011059
55 PAWAN KUMAR 2011090
56 PRAKHAR KUMAR 2011033
57 PRASANNA V 2011084
58 PRAVEEN T 2011045
59 PRAVIN KUMAR G 2011099
60 PRUDHVIRAJ T J 2011036
61 RADHA KRISHNAN 2011023
62 RAGAVAN N 2011055
63 RAJASHEKAR G 2011039
64 RAJESH R 2011089
65 RANJITH KUMAR C 2011007
66 RATHIKA SINGH 2011093
- 15 -
67 RESHAM SINGH 2011091
68 RISHABH SHAW 2011048
69 ROHIT ANAND 2011028
70 RONEET KUMAR JEENA 2011047
71 SABIT KUMAR SONU 2011063
72 SABHITHA MS 2011057
73 SACHIN SRIDHAR 2011024
74 SANDEEP XALXO 2011097
75 SANDI VENKATA DILEEP KUMAR 2011017
76 SANJENBAM CHANDRAKALA DEVI 2011060
77 SARANYA I 2011085
78 SARTHAK GAUR 2011010
79 SATHISH KUMAR C 2011044
80 SATHISH KUMAR M 2011049
81 SATYAM KUMAR YADAV 2011070
82 SHAIK IMTHIYAZ AHAMAD 2011003
83 SHAMA KHALID 2011112
84 SHANTHASEELAN S 2011052
85 SHIVANI VARMA 2011100
86 SHRIRAM R 2011025
87 SHRUTI S NAIR 2011110
88 SIDDHARATH JAIN 2011013
89 SITHUGARI NAVEEN 2011015
90 SIVARANJANI K 2011087
91 SOUMIYA SURAVITA SINGH 2011076
92 SOURASH C A 2011046
- 16 -
93 SOURAV HALDER 2011096
94 SUBBAIAH PARAMESH S 2011098
95 SUGANYA S 2011083
96 SUMAN SARKAR 2011113
97 SUNIL KUMAR REDDY K 2011009
98 SINIT SIVARAJ 2011108
99 THIRUVEEDHULA THRINATH 2011051
100 UMA MAGESHWARI R 2011080
101 VALAPALA SRAVAN KUMAR 2011035
102 VARAKANTHAM AVINASH REDDY 2011071
103 VEMULA SANDEEP 2011014
104 VENKATARAMAN R 2011082
105 VIGNESH S 2011094
106 VIJAY R 2011054
107 VIJAYA LAKSHMI MAURYA 2011092
108 VINEETH V L 2011042
109 VINITH THAMPI 2011029
110 VISHNU SANKAR K 2011105
The Category wise admissions made during the year under report is given below
Total admission made 110
S.C. Boys 13
SC Girls 5
ST Boys 5
ST Girls 2
- 17 -
5.00 ACADEMIC PROGRAMME :
The National Institute of Technology,Tiruchirappalli ( Mentor Institute)
Senate adopted the Syllabi of their institution for the National Institute of
Technology, Puducherry at Karaikal also.
SUBJECTS : Mathematics, Physics, Chemistry, Engg.Drawing & Graphics, Energy
and Environment Engg. and English subjects were taught for the first year students
and Second year branchwise syllabus EEE,ECE and CSE were taught.
5.01 FACULTY
In order to provide better coaching for the students, the following
experienced retired faculty engaged on contract basis during First year was continued
and for the second year Walk in interview was conducted during February 2012.
List of Faculty worked during 2011-12 is given below :
1. Dr. N.Sulochana,
Professor,(Retd)
Department of Chemistry
National Institute of Technology,
Tiruchirappalli
2. Prof. B. Jayaraj Ponniah,
Professor of Maths( Retd)
T.B.M.L College,
Poraiyar
- 18 -
3. Prof. S.Jayaraman,
Professor of Physics(Retd)
Arignar Anna Govt.Arts & Science College,
Karaikal
4. Prof.D. Clement Easter Raj,
Professor (Retd)
English Department,
T.B.M.L.College,
Poraiyar
5. Prof.A.Anbalagan,
Principal(Retd),
T.BML College,
Poraiyar
6. .Ms.Malathi M.Tech.
Faculty, ECE Dept.
7. .Ms.Sathya M.Tech.,
Faculty ,CSE Dept.
8. .Mr.S.Muthukumar, M.Tech.
Faculty ,CSE Dept.
9. .Mr.Ganesan, M.Tech.
Faculty ,EEE Dept
10..Mr.LankaSrinivasa, M.Tech.
Faculty,EEE Dept
- 19 -
In addition to the above the following temporary faculty were also added
consequent on the resignation of certain staff by walk in interview.
. Mr. Hemachandran, M.Tech.Faculty Mech.Engg.
Ms. Anushya Rani, M.Tech. Faculty ECE
Mr. Karthick , M.Tech. Faculty EEE
5.02 VISITING FACULTY :
Apart from the above faculty members on contract appointment, the following subject
experts were drawn from National Institute of Technology, Tiruchirappalli ( Mentor Institute)
Dr.P.Palanisamy,
Asst. Professor
Electronics & Commn. Engineering Department,
National Institute of Technology,
Tiruchirappalli
Dr. P.Alphonse,
Asst. Professor,
Computer Applications Department,
National Institute of Technology,
Tiruchirappalli
Dr.J.Karthikeyan,
Asst.Professor,
Civil Engineering Department,
National Institute of Technology,
Tiruchirappalli
- 20 -
Dr.G.Swaminathan,
Professor,
Civil Engineering Department,
National Institute of Technology,
Tiruchirappalli
Dr.R.Gnanadas,
Associate Professor,ECE,
Pondicherry Engineering College,
Pondicherry
Dr. Rami Reddy,
Professor,
Electrical & Electronics Engg.Dept.
Pondicherry Engineering College,
Pondicherry
Dr. M.Arounossalome,
Asst. Professor,
Electrical & Electronics Engg.Dept.
Pondicherry Engineering College,
Pondicherry
Dr. K.A.Selvarajou,
Asst. Professor,
Computer Science & Engg.Dept.
Pondicherry Engineering College,
Pondicherry
- 21 -
Dr.Thirusaakthimurugan,
Asst. Professor,
Electrical & Instrumentation Engg.Dept.
Pondicherry Engineering College,
Pondicherry
Dr. Alamelu Nachiappan
Asst. Professor,
Electrical & Electronics Engg.Dept.
Pondicherry Engineering College,
Pondicherry
Dr. Ajay D Vimal Raj,
Asst. Professor,
Electrical & Electronics Engg.Dept.
Pondicherry Engineering College,
Pondicherry
They have taught one full subjects each and conducted examinations also for the fourth
semester subjects.
5.03. EXAMINATION AND RESULTS:
The Examination system of National Institute of Technology,Tiruchirappalli is
being followed at N.I.T.Puducherry also.
- 22 -
Every month end there will a cycle Test. Each Cycle Test carry 20 marks. Two
such cycle test will be conducted in a semester and Internal Assessment mark will be 10. Totally
50 marks for cycle tests and Internal Assessements. Remaining 50 marks will be for the Semester
Examination. In a year 4 cycle tests and 2 semester examinations will be conducted.
Even though the Institute has retired employees only. It achieved the following
results.
Semester No.of student appeared No.of students passed % of pass
In all subjects
SECOND BATCH :
I Semester ( Nov.2011) 113 74 83.62 %
II Semester ( April 2012) 111 90 81.08 %
FIRST BATCH :
III Semester ( Nov. 2011) 103 78 75.72 %
IV Semester ( April 2012) 102 82 80.39 %
6.00 INFRASTRUCTURE :
6.01 LAND :
The Govt.of Puducherry , Dept. of Revenue and Disaster Management,
Puducherry vide G.O.Ms. No. 60 dt. 4.2.2011 transferred 16.01.50 Hectares( approx.39.5 acres)
of Govt.of Puducherry puramboke lands and completed acquiring of private lands measuring
218.5 acres . The Chief Secretary,Govt.of Puducherry has forwarded the proposal of transferring
the private lands to N.I.T.Puducherry society to Government of India, Ministry of Home Affairs
,New Delhi for their concurrence..
- 23 -
6.02. CLASS ROOMS & ADMINISTRATIVE OFFICE
During 2010-11 the Dist.Collector has arranged to provide temporary campus for
the Institute at Arignar Anna Govt.Arts College Campus, Karaikal for class rooms and
administrative office.
Two rooms in the First floor was arranged with necessary furniture, black board,
etc. and used as class rooms.
One room in the First floor was arranged as Faculty room. Necessary R.O System
for water was arranged .
Five book rackes were procured and Text and reference books for the students
were also kept in the same room
Second Floor first room was used as Office room and another room for Director
Chamber with basic facilities like toilet, water purifier etc.
First Floor rooms were converted as Class rooms for second year students..
6.03 LABORATORY FACILITIES :
First year students were given practicals for Physics and Chemistry at the Arignar
Anna Govt. Arts College Laboratories by providing additional facilities by the Institute.
Arrangements were made for the Second Year Electrical & Electronics Engg.
Students and Electronics & Commn.Engg. students at Govt. polytechnic Varichikudi.for the
Microprocessor Lab. etc.
For A.C.Machine / D.C.Machines the second year students gone to National
Institute of Technology,Tiruchirappalli..
- 24 -
6.04. HOSTEL FACILITIES :
The First batch of students were accommodated in Karaikal Municipality Motel in
Bharathiyar Road which was hired on contract basis and converted as Boys Hostel. For the
second year students , another building by name “KRISHNA” in Sethilal Nagar was hired and
the students were accommodated.
Shri S.Kannan, Hostel Manager on contract was appointed to take care of the
Boys Hostel.
One private building in Keelakasagudi with 8 houses in the same building was
taken under rent for use as Girls Hostel.
Dr. N.Sulochana ,Academic Co-ordinator, N.I.T.Puducherry looked after the Girls
Hostel as Warden.
Both the hostels were provided with Colour T.V., Water Purifier, Carrom,Chess
etc. for student use.
All the students were provided with one Steel Cot and Steel Chair in hostels.
6.05 MESS & TRANSPORT FACILITIES :
Boys Hostel is situated 2 Kms away from temporary site of the Institute.
Similarly, the Girls Hostel is situated 4 Kms away from the Institute. Hence arrangements were
made for the boarding facilities through outsourcing private caterers. Transport arrangements
was also made on contract basis for pick up and drop of the students from hostels.
- 25 -
7.00 FUNCTIONS :
INDEPENDENCE DAY CELEBRATION :
The Institute organized the function of Independence Day on 15.8.2011 Almost
all the students participated the function with great enthusiasm. The students gave variety of
programmes on the day..
Dr. N.Sulochana, Academic Co-ordinator , N.I.T.Puducherry hoisted the National
Flag and delivered Independence Day Speech. All the staff / students had participated in the
function .
FESTEMBER 2011
As usual, the National Institute of Technology,Tiruchirappalli (Mentor Institute)
has celebrated the FESTEMBER 2011 during the month of September 2011 as Cultural Festival
at Tiruchirappalli.
More than 50% of the students from National Institute of Technology Puducherry
enjoyed the function.
REPUBLIC DAY CELEBRATION :
Being the first function for the new Director, the students voluntarily made
various cultural programmes, Parade, Hindi and English speeches and make the function as
grand success.
Shri Beemsingh, Second year student arranged for the Republic Day parade.
Princy Mathew.Second year ECE and Ashwin Second year EEE students sang patriotic songs.
- 26 -
Dr. (Mrs.) S.K.Pandey, Director, National Institute of Technology , Puducherry hoisted the
National Flag and delivered the Republic Day speech. All the staff and students participated.
PRAGYAN 2011
About ten students of National Institute of Technology, Puducherry participated
the Technical Festival conducted by the mentor Institute at Tiruchirappalli
1.00 FEE STRUCTURE :
The National Institute of Technology,Tiruchirappalli fee structure was adopted for both
Institute and Hostel .
Institute fee : Rs.21850/= per Semester and Rs.4350/= as One Time refundable deposit
was collected and deposited in the Grant account opened .
Break up of Annual Institute fee structure :
Rs..
Tuition fee 35000/=
Medical Insurance fee 400/=
Examination fee 700/=
Computer & Internet fee 2600/=
Library fee 2000/=
Student Activity fee(Regn.Assn.,SAF,Sports) 3000/=
-----------
Total Rs.43700/=
- 27 -
Students belonging to S.C./S.T. were given Tuition fee exemption on par with the mentor
Institute.
Hostel fee : Rs.21000/= per semester and Rs.4000/= One time refundable deposit was
collected and the same was deposited in separate account .
Break up of Annual Hostel fee structure :
Mess Charges 22000/=
Room Rent 12000/=
Estt.Charges ( Security,Sanitation etc.) 8000/=
Total Rs. 42000/=
9.00 SCHOLARSHIP
Three Puducherry S.C. students got Govt.of India Post Matric Scholarship through the
Director of Adi Dravidar Welfare Dept.,Govt.of Puducherry.
Seven applications were forwarded to Govt.of India, Ministry of Human Resource
Development,New Delhi Top Ten centrally funded educational institution scholarship.
More than 20% students are availing Nationalised Bank Education loan facilities.
10.00 : FINANCE
Apart from the fee collected from the students, the Government of India, Ministry
of Human Resource Development, New Delhi had released a sum of Rs.8.90 Crores during the
year under report ..
Till the appointment of regular Director , the accounts were maintained at the
Mentor Institute Tiruchirappalli there after the accounts were transferred to State Bank of India
,Karaikal branch.
The Institute as well as Hostel accounts were operated from N.I.T.Puducherry
itself from 16.12.2011 onwards.
- 28 -
11.00 ACCOUNTS :
A gist of amount received and expenditure incurred out of grants /fee collection is
given below for perusal
RECEIPTS: Rs. In lakhs
Grant from MHRD Plan ( General Activities) 330.77 .
Internal Revenue Generation 107.46 437.23
PAYMENTS :
Salary Component 43.44
Other components 52.66 96.10
UNSPENT Balance Carried over to next year 339.09
GOVT.OF INDIA : PLAN
Grant for Capital expenses 560.00
Assets created during 2011-12 22.40
- 29 -
- 30 -
- 31 -
- 32 -
- 33 -
- 34 -
- 35 -
- 36 -
- 37 -
- 38 -
- 39 -
AUDIT REPORT
&
ANNUAL STATEMENT OF ACCOUNTS
2011-12
- 1 -
NATIONAL INSTITUTE OF TECHNOLOGY, PUDUCHERRY : KARAIKAL – 609 605
ANNUAL STATEMENT OF ACCOUNT-2011-12
CONTENTS
Page. No
TABLE OF CONTENTS 1
BALANCE SHEET AS ON 31-03-2012 2
SIGNIFICANT ACCOUNTING POLICIES & NOTES ON ACCOUNTS 3-4
INCOME AND EXPENDITURE ACCOUNT 5
RECEIPTS AND PAYMENTS ACCOUNTS 6
SCHEDULES 7 -19
- 2 -
NATIONAL INSTITUTE OF TECHNOLOGY, PUDUCHERRY: KARAIKAL BALANCE SHEET AS ON 31-03-2012
SI.No PARTICULARS Sch.No CURRENT YEAR 2011-2012
Rs.
PREVIOUS YEAR 2010.-11
Rs.
I LIABILITIES :
1.Capital Fund 1 43,30,587 28,66,737
2.Unutilised Grants 2 12,19,39,328 3,40,66,013
3.Other adjustable Fund 3 2,04,500 37,600
4.Refundable Deposit 4 17,08,413 4,83,200
5.Sundry Creditors 5 15,32,267 3,01,125
TOTAL 12,97,15,095 3,77,54,675
II ASSETS
FIXED ASSETS:
1.Land 6 -- --
2.Equipment 7 26,28,419 17,77,589
3.Furniture 8 16,13,043 10,61,497
4.Library 9 89,125 27,651
5.Vehicle 10 -- --
CURRENT ASSENTS:
6.Advance 11 4,54,338 12,694
7.Fixed Deposits 13 7,03,11,644 --
8. Prepaid Expenses/Accrued Int. 14 3,58,944 --
9 Sundry Debtors 15 3,03,000 3,50,300
10.Grant Sanction & Due 16 3,90,77,000
11.Closing Balance 17 1,48,79,582 3,45,24,944
TOTAL 12,97,15,095 3,77,54,675
- 3 -
` NATIONAL INSTITUTE OF TECHNOLOGY,PUDUCHERRY : KARAIKAL-609 605
SIGNIFICANT ACCOUNTING POLICIES AND NOTES ON ANNUAL ACCOUNTS – 2011-12
****
INTRODUCTORY:
The National Institute of Technology, Puducherry Savings Bank Account No. 31098206383 was maintained upto 15.12.2011 at State Bank of
India , NIT Tiruchirappalli Branch and then transferred to State Bank of India , Karaikal Branch. Till 15.12.2011 the Mentor Institute NIT Tiruchirappalli has
operated the accounts . After the appointment of regular Director, the account is being maintained at NIT Puducherry , Karaikal itself.
The Institute is functioning in the temporary campus of Arignar Anna Govt. Arts & Science College Campus , Karaikal as per order of the
Collector without any charge by making certain infrastructure changes as per our need.
The Institute is now submitting the second year account i.e. 2011-12 for certification.
BASIC FOR PREPARATION OF ACCOUNTS:
The Accounts are prepared under the historical cost of convention unless otherwise stated and generally in accrual method of accounting.
REVENUE RECOGNITION:
Apart from the Grant from the Ministry of Human Resource Development, New Delhi , the Institute major resources are fees & Deposits from
students which are accounted on accrual basis.
FIXED ASSETS:
The Govt. of Puducherry has provided Govt. poramboke land measuring 39.56 acres during Feb.2011 and there after the Govt.of Puducherry has
acquired private lands measuring 218.66 acres which are yet to be transferred to NIT.Puducherry Society. Due to non availability of value of Govt.
poramboke lands transferred no mention made in the accounts.
- 4 -
Equipment, Furniture and Library are stated at cost of acquisition including freight, taxes, installation and commissioning expenses.
DEPRECIATION : Depreciation was provided as per the rate prescribed by Income Tax Act under written down method ,irrespective of the date of purchase.
Except for land, depreciation has been worked out for the fixed assets. The depreciated value was reduced from Capital Fund in the Liability and to the respective assets workings shown in Schedule 10 A.
The Depreciation amount of Rs.7,76,754/= worked out for 2011-12 was exhibited under Income and Expenditure Account. INVENTORY VALUATION
The Institute is booking expenditure on laboratory chemicals , consumables and other petty purchases on cash basis as and when purchased and hence no closing stock for the same shown in the Balance Sheet.
No franking facility obtained for the Institute and hence the postal expenses are also incurred out of imprest and hence no stamp on account also
mentioned in the Balance Sheet. INCOME TAX
The Income of the Institute is exempt from Income Tax under Section 10(23e) of the Income Tax Act 1961 and hence no provision has been made for income tax. INVESTMENT
Short term investments made are shown at cost only.
CONTINGENT LIABILITY
Provision for payment of audit fee for certification audit amounting to Rs.1.00 lakh made in the accounts. No other Govt. dues/legal etc. are pending and hence no provision made in the accounts.
- 5 -
NATIONAL INSTITUTE OF TECHNOLOGY, PUDUCHERRY: KARAIKAL INCOME AND EXPENDITURE ACCOUNT FOR THE YEAR ENDING 31-03-2012
SI.No PARTICULAR Sch.No CURRENT YEAR 2011-2012
PREVIOUS YEAR 2010-11
I INCOME
1.Grant Sanction & Due 16 3,30,77,000 2,50,00,000
2.Fees From Students 18 72,40,540 36,32,185
3.Other Receipts From Students 19 9,83,050 5,89,200
4.AIEEE /CCB 2011 20 4,09,493 4,77,420
5.Other Miscellaneous Income 21 26,050 --
6.Interest From SBI 22 19,87,071 4,18,181
TOTAL 4,37,23,204 3,01,16,986
II EXPENDITURE
1.a) Pay Teaching Staff/Administration 23 39,89,050 14,98,695
b) Pay Non-Teaching Staff 24 3,54,940 23,200
c) Travelling Allowance/Honorarium 25 5,54,692 2,44,355
2. Administrative Expenses 26 21,83,763 26,29,922
3.Educational Expenses 27 7,41,920 4,66,852
4.AIEEE /CCB 2011 20 3,87,539 4,77,420
5.Departmental Operating Expenses 28 2,44,940 1,18,878
6.Other miscellaneous Expenses 29 610 512
7. Students Activity Expenses 30 11.51.831 12,51,290
8. Depreciation 10A 7,76,754 4,73,112
Total 1,03,86,039 71,84,236
Excess Of Income Over Expenditure Transferred to Balance Sheet
3,33,37,165 2,29,32,750
TOTAL 4,37,23,204 3,01,16,986
- 6 -
NATIONAL INSTITUTE OF TECHNOLOGY, PUDUCHERRY: KARAIKAL RECEIPTS AND PAYMENTS ACCOUNT FOR THE PERIOD FROM 1.4.2011 To 31.3.2012
PREVIOUS YEAR
RECEIPTS Sch.No CURRENT YEAR 2011-2012
PREVIOUS YEAR
PAYMENTS Sch.No CURRENT YEAR 2011-12
1,40,00,000 Opening Balance : Cash with SBI No31098206383
3,45,24,944
CAPITAL EXPENDITURE
2,50,00,000 Grants In Aid 2 5,00,00,000 20,91,281 Equipment 7 13,14,669
36,10,685 Fees From Students 18 72,40,540 11,79,441 Furniture 8 7,30,773
2,63,900 Other Receipts From Students 19 6,80,050 69,127 Library 9 1,95,162
4,77,420 AIEEE -CCB -2011 20 4,09,493 REVENUE EXPENDITURE
-- Other Misc.income 21 26,050 13,56,145 Pay of Teaching/Admn 23 34,05,260
4,18,181 Interest from SBI 22 16,28,127 23,200 Payment of Non-Teaching 24 2,98,940
DEPOSITS/ADVANCES 1,99,562 Travelling Allowance/Hon. 25 4,12,392
2,26,850 Other Adjustable Fund 3 2,74,250 25,74,922 Administrative Expenses 26 19,24,181
55,43,400 Refundable Deposits 4 1,02,60,000 4,66,852 Educational Expenses 27 7,41,920
6,44,306 Advance 11 3,87,356 4,77,420 AIEEE /CCB 2012 20 3,87,539
Sundry Debtors 15 3,50,300 1,18,878 D.O.C Expenses 28 2,44,940
Grand Sanction & Due 16 512 Other Misc. Expenses 29 610
11,92,508 Students Activity Expenses 30 7,16,236
DEPOSIT/ADVANCES
1,89,250 Other Adjustable Fund 3 1,07,350
50,63,700 Refundable Deposit 4 90,34,787
Sundry Creditors 5 2,46,125
Fixed Deposits 13 7,03,11,644
6,57,000 Advances 11 8,29,000
3,45,24,944 Balance With SBI 17 1,48,79,582
5,01,84,742 TOTAL 10,57,81,110 5,01,84,742 Total 10,57,81,110
- 7 -
NATIONAL INSTITUTE OF TECHNOLOGY, PUDUCHERRY: KARAIKAL
SCHEDULE FORMING PART OF BALANCE SHEET: LIABILITIES
SCHEDULE: 1 CAPITAL & OTHER FUNDS
SI.No PARTICULAR OPENING B/S AS ON
1.4.2011
CURRENT YEAR 2011-2012
GROSS BLOCK AS ON
31.3.2012
Dep. Up to
31.3.12
NET BLOCK As on
31.3.12
Previous Year
I.CAPITAL FUND
1. Land -- -- -- -- -- --
2. Building[Sch.6] -- -- -- -- -- --
3. Equipment[Sch.7] 20,91,281 13,14,669 34,05,950 7,77,531 26,28,419 17,77,589
4. Furniture[Sch.8] 11,79,441 7,30,773 19,10,214 2,97,171 16,13,043 10,61,497
5. Library[Sch.9] 69,127 1,95,162 2,64,289 1,75,164 89,125 27,651
6. Vehicles[Sch.10]
II.CORPUS & OTHER FUND
Depreciation Fund
TOTAL 33,39,849 22,40,604 55,80,453 12,49,866 43,30,587 28,66,737
Less. Dep. 4,73,112
28,66,737
- 8 -
SCHEDULE: 2 UNUTILISED GRANTS FROM MHRD
SCHEDULE: 3 : OTHER ADJUSTABLE FUND
SI.No PARTICULAR OPENING B/S AS ON
1.4.2011
CURRENT YEAR
2011-2012
EXPENSES 2011-2012
J.E ADJUSTMENT
CLOSING BALANCE 31.3.2012
PREVIOUS YEAR 2010-2011
1. Various State Scholarship
37,600 2,18,750 1,07,350 -- 1,49,000 37,600
2 Alumini Fund -- 55,500 55,500 --
Total 37,600 2,74,250 1,07,350 2,04,500 37,600
8
SI.No PARTICULAR OPENING B/S
AS ON 1.4.2011
CURRENT YEAR
2011-2012
EXPENSES 2011-2012
J.E ADJUSTMENT
CLOSING BALANCE 31.3.2012
PREVIOUS YEAR 2010-2011
1. Grant Plan (NR) 3,40,66,013 5,00,00,000
Sanction & Due 60,00,000
TOTAL 3,40,66,013 5,60,00,000 22,40,604 -- 8,78,25,409
Plan (R)Sanction & Due
-- 3,30,77,000
IRG -- 1,06,46,204
-- 1,03,86,039 --
Less: Depreciation 7,76,754
TOTAL 4,37,23,204 96,06,285 3,41,13,919
GRAND TOTAL 12,19,39,328 3,40,66,013
- 9 -
SCHEDULE: 4 : REFUNDABLE DEPOSITS
SI.No PARTICULAR OPENING B/S
AS ON 1.4.2011
CURRENT YEAR
2011-2012
EXPENSES 2011-2012
J.E ADJUSTMENT
CLOSING BALANCE 31.3.2012
PREVIOUS YEAR 2010-2011
1. Institute Deposits
3,06,000 3,33,000 6,39,000 3,06,000
2. Library Deposit 51,000 55,500 1,06,500 51,000
3. Student Aid Fee 40,600 85,600 1,26,200 40,600
4. Institute Fee Deposits
85,600 97,85,900 90,34,787 8,36,713 85,600
TOTAL 4,83,200 1,02,60,000 90,34,787 17,08,413 4,83,200
SCHEDULE : 5 : SUNDRY CREDITORS
SI.No PARTICULAR OPENING B/S AS ON
1.4.2011
CURRENT YEAR
2011-2012
EXPENSES 2011-2012
J.E ADJUSTMENT
CLOSING BALANCE 31.3.2012
PREVIOUS YEAR 2010-2011
1 Various heads 3,01,125 -- 2,46,125 14,77,267 15,32,267 3,01,125
- 10 -
SCHEDULE FORMING PART OF BALANCE SHEET : ASSETS
SCHEDULE: 6 : BUILDINGS
SI.No PARTICULAR VALUE AS ON 1.4.2011
ADDITIONS CURRENT
YEAR 2011-2012
JOURNAL TOTAL DERECIATION UP TO
31.3.2012
NET BLOCK 2011-2012
NIL
SCHEDULE: 7 : EQUIPMENT
SI.No PARTICULAR VALUE AS ON 1.4.2011
ADDITIONS CURRENT
YEAR 2011-2012
JOURNAL TOTAL DERECIATION UP TO
31.3.2012
NET BLOCK 2011-2012
1. CSE Department 17,55,570 -- -- 17,55,570 4,87,172 12,68,398
2. ECE Department -- -- -- -- -- --
3. EEE Department -- 5,56,883 -- 5,56,883 83,532 4,73,351
4. Physics 77,563 1,38,900 -- 2,16,463 42,358 1,74,105
5. Chemistry 1,59,836 -- -- 1,59,836 44,354 1,15,482
6. Office Equipment
98,312 5,70,886 -- 6,69,198 1,12,915 5,56,283
7 Hostel -- 48,000 -- 48,000 7,200 40,800
TOTAL 20,91,281 13,14,669 -- 34,05,950 7,77,531 26,28,419
- 11 -
SCHEDULE: 8 : FURNITURE
SI.No PARTICULAR VALUE AS ON 1.4.2011
ADDITIONS CURRENT YEAR
2011-2012
JOURNAL TOTAL DERECIATION UP TO
31.3.2012
NET BLOCK 2011-2012
1. Furniture[Institute] 11,79,441 7,30,773 -- 19,10,214 2,97,171 16,13,043
2. Furniture[Hostel] -- -- -- -- -- --
3. Common place -- -- -- -- -- --
TOTAL 11,79,441 7,30,773 -- 19,10,214 2,97,171 16,13,043
SCHEDULE: 9 : LIBRARY
SI.No PARTICULAR VALUE AS ON 1.4.2011
ADDITIONS CURRENT
YEAR 2011-2012
JOURNAL TOTAL DERECIATION UP TO
31.3.2012
NET BLOCK 2011-2012
1. Main Library 69,127 1,82,348 -- 2,51,475 1,67,476 83,999
2. Department Library
12,814 -- 12,814 7,688 5,126
TOTAL 69,127 1,95,162 -- 2,64,289 1,75,164 89,125
SCHEDULE: 10 : VEHICLE
SI.No
PARTICULAR VALUE AS ON 1.4.2011
ADDITIONS CURRENT
YEAR 2011-2012
JOURNAL TOTAL DERECIATION UP TO
31.3.2012
NET BLOCK 2011-2012
NIL
- 12 -
SCHEDULE : 10 A : DEPRECIATION ACCOUNT
S.No Particulars Rate of Dep. ASSET VALUE AS ON 31.3.2011
DEPRECIATION UPTO 31.3.2011
NET BLOCK ADDITIONS DURING 2011-12
DEPRECIATION FOR 2011-12
VALUE AS ON 31.3.2012
1 Building ( Sch.6) - - - - - - -
2 Equipment (Sch.7) 15% 20,91,281 3,13,692 17,77,589 13,14,669 4,63,839 26,28,419
3 Furniture (Sch.8) 10% 11,79,441 1,17,944 10,61,497 7,30,773 1,79,227 16,13,043
4 Library ( Sch.9) 60% 69,127 41,476 27,651 1,95,162 1,33,688 89,125
TOTAL 33,39,849 4,73,112 28,66,737 22,40,604 7,76,754 43,30,587
SCHEDULE: 11 : ADVANCES
SI.No PARTICULAR OPENING BALANCE AS ON
1.4.2011
PAYMENT 2011-2012
J.E/RECOVERY 2011-2012
BALANCE AS ON
31.3.2012
1. Rent Advances -- 4,07,000 -- 4,07,000
2. Contingent Advance 12,694 4,22,000 3,87,356 47,338
TOTAL 12,694 8,29,000 3,87,356 4,54,338
SCHEDULE: 12 : STOCK/RECOVERABLE DEPOSITS
SI.No PARTICULAR OPENING BALANCE AS ON
1.4.2011
PAYMENT 2011-2012
RECEIPTS DURING THE YEAR 2011-2012
BALANCE AS ON
31.3.2012
NIL
- 13 -
SCHEDULE: 13 : FIXED DEPOSITS
SI.No PARTICULAR OPENING BALANCE AS ON
1.4.2011
DEPOSIT DURING THE
YEAR 2011-2012
ENCASHMENT DURING THE
YEAR 2011-2012
CLOSING BALANCE AS ON
31.3.2012
1 SBI Karaikal -- 7,03,11,644 -- 7,03,11,644
SCHEDULE: 14 : ACCRUED INTEREST /PREPAID EXPENSES
SCHEDULE: 15 : SUNDRY DEBTORS
SI.No PARTICULAR OPENING BALANCE AS ON
1.4.2011
PAYMENT 2011-2012
J.E/RECOVERY 2011-2012
BALANCE AS ON
31.3.2012
1. Fees due from students 26,300 -- 26,300 -
2. Other dues 3,24,000 3,03,000 3,24,000 3,03,000
TOTAL 3,50,300 3,03,000 3,50,300 3,03,000
SI.No PARTICULAR OPENING BALANCE
AS ON 1.4.2011
PAYMENT DURING THE
YEAR 2011-2012
RECEIPTS DURING THE YEAR 2011-2012
J.E ADJUSTMENT
BALANCE AS ON 31.3.2012
1 Accrued Interest
-- -- 3,58,944 -- 3,58,944
- 14 -
SCHEDULE: 16 : GRANTS SANCTIONED AND DUE
SI.No PARTICULAR OPENING BALANCE AS ON
1.4.2011
PAYMENT 2011-2012
RECEIPT 2011-2012
BALANCE AS ON
31.3.2012
1 MHRD Grant sanction 2011-12 Plan ( N.R.) Plan ( Recurring0
-- -- 60,00,000
3,30,77,000
3,90,77,000
SHEDULE: 17 : CLOSING BALANCE OF CASH AND BANK
SI.No PARTICULAR CURRENT YEAR 2011-2012
BANK CASH
TOTAL OF BOTH
CASH & BANK
PREVIOUS YEAR 2010-2011
BANK CASH
TOTAL OF BOTH CASH & BANK
2010-2011
SBI Karaikal Saving A/C No 31098206383
1,48,79,582 -- 1,48,79,582 3,45,24,944 - 3,45,24,944
- 15 -
NATIONAL INSTITUTE OF TECHNOLOGY, PUDUCHERRY: KARAIKAL
SCHEDULE FORMATING PART OF INCOME & EXPENDITURE ACCOUNT
SCHEDULE: 18: FEES FROM STUDENTS
SI.No PARTICULAR RECEIPT AS ON 31.3.2012
J.E ADJUSTMENT
CURRENT YEAR 2011-2012
PREVIOUS YEAR 2010-2011
1. Tuition Fees 59,85,000 -- 59,85,000
2. OTHER FEES
a)Admission Fees 22,600 -- 22,600
b)Exam Fees 1,62,940 -- 1,62,940
c)Student Activity Fees 1,28,400 -- 1,28,400
d) Library fee colln. 4,28000 -- 4,28000
e)Registration Fees 5,13,600 -- 5,13,600
TOTAL 72,40,540 -- 72,40,540 36,32,185
SCHEDULE: 19 : OTHER RECEIPTS FROM STUDENTS
SI.No PARTICULAR RECEIPT AS ON 31.3.2012
J.E ADJUSTMENT
CURRENT YEAR 2011-2012
PREVIOUS YEAR 2010-2011
1. Seat Rent Collection 96,000 3,03,000 3,99,000 3,24,000
2. Computer Collection 5,56,400 -- 5,56,400 2,65,200
3. Medical Fee 27,650 -- 27,650 --
TOTAL 6,80,050 3,03,000 9,83,050 5,89,200
- 16 -
SCHEDULE: 20 : AIEEE /CCB ADMISSIONS
SI.No PARTICULAR RECEIPT AS ON
31.3.2012
J.E ADJUSTMENT
PAYMENT AS ON 31.3.2012
NET COLLECTION
AS ON 31.3.2012
PREVIOUS YEAR 2010-2011
1. CCB Admissions 4,09,493 -- 3,87,539 21,954
SCHEDULE: 21 OTHER MISCELLANEOUS INCOME
SI.No PARTICULAR RECEIPT AS ON 31.3.2012
J.E ADJUSTMENT
CURRENT YEAR 2011-2012
PREVIOUS YEAR 2010-11
1. Fine & Other Miscellaneous Income
26,050 -- 26,050 -
SCHEDULE: 22 INTEREST FROM SBI
SI.No PARTICULAR RECEIPT AS ON 31.3.2012
J.E ADJUSTMENT
CURRENT YEAR 2011-12
PREVIOUS YEAR 2010-11
1. S.B. A/C 13,16,483 13,16,483 4,18,181
2. Fixed Deposit 3,11,644 3,58,944 6,70,588
TOTAL 16,28,127 3,58,944 19,87,071 4,18,181
- 17 -
SCHEDULE: 23 PAY AND ALLOWANCES OF TEACHING/ADMISSIONS
SI.No DEPATMENT CURRENT YEAR
2011-2012
JOURNAL TOTAL 2011-12
PREVIOUS YEAR 2010-11
1. Electrical and Electronics Engineering 7,21,120 70,000 7,91,120 1,08,145
2. Electronics & Commn. Engineering 7,09,455 1,05,000 8,14,455 4,50,000
3. Computer Science & Engineering 11,14,370 1,05,000 12,19,370 4,50,000
4. Executives 3,78,269 1,32,500 5,10,769 3,48,000
5 Physics / Chemistry 4,82,046 1,71,290 6,53,336 1,42,550
TOTAL 34,05,260 5,83,790 39,89,050 14,98,695
SCHEDULE: 24 PAY AND ALLOWANCES NON- TEACHING STAFF
SI.No CATEGORY/ DEPARTMENT CURRENT YEAR 2011-2012
JOURNAL TOTAL 2011-12
PREVIOUS YEAR 2010-11
1. Technical 1,61,600 56,000 2,17,600 --
2 Administration 1,10,790 -- 1,10,790 23,200
3 Supporting 26,550 -- 26,550 --
TOTAL 2,98,940 56,000 3,54,940 23,200
SCHEDULE: 25 : TRAVELLING ALLOWANCE/ HONORARIUM
SI.No PARTICULAR PAYMENT 2011-2012
J.E ADJUSTMENT CURRENT YEAR 2011-12
PREVIOUS YEAR 2010-11
1. Honorarium 2,13,200 1,00,800 3,14,000 -
2 L.S. & P.C. 51,250 41,500 92,750 --
3 T.A. to Staff 1,47,942 -- 1,47,942 2,44,355
TOTAL 4,12,392 1,42,300 5,54,692 2,44,355
- 18 -
SCHEDULE: 26 : ADMINITRATIVE EXPENSES
SI.No PARTICULAR PAYMENT 2011-2012
J.E ADJUSTMENT CURRENT YEAR 2011-2012
PREVIOUS YEAR 2010-11
1. Stationery & Printing Charges 19,000 -- 19,000 69,590
2. Advertisement Charges 92,253 -- 92,253 2,88,332
3. Rent, Rates & Taxes 17,72,495 1,59,582 19,32,077 2,09,400
4. Repairs to Buildings 40,433 -- 40,433 20,07,600
5. Audit Fee -- 1,00,000 1,00,000 55,000
TOTAL 19,24,181 2,59,582 21,83,763 26,29,922
SCHEDULE: 27 : EDUCATIONAL EXPENSES
SI.No PARTICULAR PAYMENT 2011-2012
J.E ADJUSTMENT CURRENT YEAR 2011-2012
PREVIOUS YEAR 2010-11
1. Maint. of Equipment 69,595 -- 69,595 55,150
2. Internet Expenses 6,72,325 -- 6,72,325 4,11,702
TOTAL 7,41,920 -- 7,41,920 4,66,852
- 19 -
SCHEDULE: 28 : DEPARTMENT OPERATING COST EXPENSES
SI.No PARTICULAR PAYMENT 2011-12
J.E ADJUSTMENT CURRENT YEAR 2011-12
PREVIOUS YEAR 2010-11
1. DOC Administration Office 49,341 -- 49,341 25,483
2. DOC ECE 5,198 -- 5,198 20,000
3. DOC Chemistry 1,17,025 -- 1,17,025 9,987
4. DOC Comp.Science & Engg. 28,098 -- 28,098 63,408
5. DOC EEE 4,886 -- 4,886 --
6. DOC General 40,392 -- 40,392 --
TOTAL 2,44,940 -- 2,44,940 1,18,878
SCHEDULE: 29 BANK CHARGES/ OTHER MISCELLANEOUS EXPENSES
SI.No PARTICULAR PAYMENT 2011-2012
J.E ADJUSTMENT CURRENT YEAR 2011-12
PREVIOUS YEAR 2010-11
1. Bank Commission 610 -- 610 512
SCHEDULE: 30 STUDENT ACTIVITY EXPENSES
SI.No PARTICULAR PAYMENT 2011-12
J.E ADJUSTMENT CURRENT YEAR 2011-12
PREVIOUS YEAR 2010-11
1. Sports & Games -- -- -- 10,000
2. Functions 45,642 -- 45,642 6,53,984
3. Seminar/W.S. 4,278 -- 4,278 --
4. Clubs & Committee 1,49,883 -- 1,49,883 87,306
5 N.I.T. Transit House -- 3,00,000 3,00,000 5,00,000
6 Outsourcing Transport/Security 5,16,433 1,35,595 6,52,028 --