National Highways Authority of India (Ministry of Road Transport & Highways) ANNUITY PROJECT - NH 45 TAMBARAM TO TINDIVANAM (KM 28.000 TO KM 121.000) INDEPENDENT ENGINEER M/S. CDM SMITH INDIA PVT. LTD. 307,Thamarabarani Square, Periyar Nagar, Villupuram-626501. Submitted by CONCESSIONAIRE GMR Tambaram -Tindivanam Expressways Private Limited No.1 C/B First Floor, R.V. Street, Opposite: Govt. Arts College Chengalpattu – 603 001. MONTHLY O&M REPORT SEP-2015

Upload: ngotuong

Post on 27-May-2018

238 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: National Highways Authority of Indianhai.org.in/spw/ConcessionaireDetails/cover Sep -15.pdfNational Highways Authority of India (Ministry of Road Transport & Highways) ANNUITY PROJECT

National Highways Authority of India (Ministry of Road Transport & Highways)

ANNUITY PROJECT - NH 45

TAMBARAM TO TINDIVANAM

(KM 28.000 TO KM 121.000)

INDEPENDENT ENGINEER

M/S. CDM SMITH INDIA PVT. LTD.

307,Thamarabarani Square, Periyar Nagar,

Villupuram-626501.

Submitted by

CONCESSIONAIRE

GMR Tambaram -Tindivanam Expressways Private Limited

No.1 C/B First Floor, R.V. Street,

Opposite: Govt. Arts College

Chengalpattu – 603 001.

MONTHLY O&M REPORT

SEP-2015

2015

Page 2: National Highways Authority of Indianhai.org.in/spw/ConcessionaireDetails/cover Sep -15.pdfNational Highways Authority of India (Ministry of Road Transport & Highways) ANNUITY PROJECT

National Highways Authority of India (Ministry of Road Transport & Highways)

ANNUITY PROJECT - NH 45

TAMBARAM TO TINDIVANAM

(Km 28.000 to Km 121.000)

MONTHLY O&M REPORT

SEP- 2015

CONCESSIONAIRE

GMR TAMBARAM – TINDIVANAM EXPRESSWAYS PRIVATE LIMITED

NO.1 C/B, FIRST FLOOR, RV STREET, CHENGALPATTU-603001

INDEPENDENT ENGINEER

CDM Smith India Pvt Ltd.

Villupuram

Page 3: National Highways Authority of Indianhai.org.in/spw/ConcessionaireDetails/cover Sep -15.pdfNational Highways Authority of India (Ministry of Road Transport & Highways) ANNUITY PROJECT

Executive Summary- SEP 2015

Activities Executed along with Regular O&M

1. 10th year Periodic maintenance works comprising BC overlay & Road marking

works has been completed for 80 km in length. BC works with HIP process has

been completed for 8km in length during the month of April’2014

2. All accidental repair works like RCC Handrails, PGR, Sign boards, MBCB &

Electrical pole are completed up to date, to enhance safety.

3. Illumination level is well maintained on highway for the purpose of safety. The

maintenance of the same is in progress on daily basis.

4. Removal of encroachments like private advertisement boards, petty shops &

platform vendors are removed then and there on daily basis.

5. The painting of PGR, Crash barriers, culvert parapet wall, TLB kerb & RCC

Handrails painting works at all faded locations in between km 28-121 are in

progress under periodic maintenance

6. Over shooting Tree branches have been removed from median & Avenue to

improve safety.

7. Damaged PGR, Culvert parapet wall & Kerb on Service road, MCW are

rectified to improve safety. Hazard marker, Delineator and Guard post fixed

and being done regularly at all required locations in between km 28-121.

8. TLB & Rest place Maintenance works are in progress at all TLB’s km 70, 72, 113

& 119.

9. Sign post painting, Gantry board painting, Boundary stone fixing & shoulder

rectification at all required locations are in progress.

10. As a part of CSR Activities, Road safety, Pollution Awareness programmes

and First AID programs are being conducted for road users at our TLBs,

Junctions & Bus stops and for the Institution and School students near to the

highway for the goodwill of Road user and public in our GMR Tambaram

Tindivanam NH-45 Section.

11. For safety improvement fixing of Diamond cluster (BIG size), Tyre with reflective

sticker and painting of Kerb with Yellow and black colour are in progress at all

Median openings and junctions.

Page 4: National Highways Authority of Indianhai.org.in/spw/ConcessionaireDetails/cover Sep -15.pdfNational Highways Authority of India (Ministry of Road Transport & Highways) ANNUITY PROJECT

12. Laying of Balance PQC Works for ETC Implementation in 53 & 103 Toll plaza have

been completed

13. Laying of kerb for ETC Implementation in 53 & 103 Toll plaza have been completed.

14. Plantation for Avenue & median for this monsoon have been scheduled as

such 20,000 No’s of plants procured and 14500 plants planted on median in

between km 60-121.

15. BC surface patch laying works are completed.

Need support from client for future works:

1. Even though our continuous effort with concern local authorities, we are

unable to control the disposal of garbage on service road rendering the

same not being utilised fully at singaperumal koil, Guduvancherry &

Urappakkam. We request your intervention with district level panchayath

administration on this issue to maintain service roads clean and tidy at all

times and free flow of traffic too.

2. The construction of RCC Drain in place of panchayath brick drain is to be

considered under COS to solve flooding of drain overflow water during rainy

season on service road. The proposals along with IE recommendations are

pending at your end.

3. As part of safety improvement the kidney island at some junctions are on the

MCW are to be rectified under COS to avoid two wheelers fatal accident. The

issue still under pending at your end for the approval of the same.

4. The Regularising of unauthorised median openings as suggested by Then

CGM & as recommended by “Then independent Engineer under COS “still

pending for approval from Authority.

5. Unauthorised/illegal parking at Melmaruvathur km 91-96 BHS by devotees of

Temple & Km 72-76 BHS by sand quarry Gov. of TN, request your support to

stop this parking on the interest of road safety on NH-45.

6. Encroachment like private approaches & Commercial establishments are

developing in TT NH 45 on daily basis, we put our effort to stop & remove the same

but in vain. Need your intervention for the same to avoid such unlawful events in

future.

7. COS proposals have been submitted for the construction of Balance PQC for the ETC

Implementation and Construction of Medical, Traffic Aid post and Washroom

facilities at 53 & 103 Toll plazas for Approval.

Page 5: National Highways Authority of Indianhai.org.in/spw/ConcessionaireDetails/cover Sep -15.pdfNational Highways Authority of India (Ministry of Road Transport & Highways) ANNUITY PROJECT

Project Details

NH-45 (popularly known as GST Road) is one of the important National Highways, which connects Chennai,

the Capital City of Tamilnadu with the southern districts of the State, including major towns such as Trichy,

Madurai, etc. This National Highway has been entrusted to National Highways Authority of India (NHAI) for

development and maintenance. NHAI has taken up the project road from Km 28/0 (starting from

Tambaram at the outskirts of Chennai city) to Km 121/0 (Tindivanam junction) for development under the

Annuity Scheme. Total length of the project road is 93 Kms.

The project has been awarded to the Concessionaire, M/s GMR Tambaram-Tindivanam

Expressways Pvt. Ltd. As per the Concession Agreement signed between NHAI and the Concessionaire on 9th

October 2001. Under the provision of the Concession Agreement, the Concessionaire is awarded a

Concession to Design, Finance, Construct, Operate and Maintain the Project Highway

for a Concession Period of 17.5 years out of which the project has to be constructed within the first 30

months.

For supervision of the project works, the role of Independent Engineer has been envisaged in the

Concession Agreement and, accordingly, DORSCH Consultant has been appointed as the Independent

Engineer. The Concessionaire has appointed M/s UE Development India Pvt. Ltd., Bangalore as their EPC /

O&M Contractor for the execution / Operation & Maintenance of the project.

Salient dates are:

S.N

o

Description Date

1 Date of signing of Concession

Agreement

9 October 2001

2 Commencement date of Concession 9 May 2002

3 Schedule Commencement date of

O&M

8 Nov 2004

4 Actual Commencement date of O&M 11 Oct 2004

5 Scheduled End of Concession 8 Nov 2019

The Project details are as follows:

Sr. Description Details

1 Scope of

Construction

Four laning of the entire Project highway of length 93

kms - from Km.28/000 to Km.121/000

2 Project

Length

93 kms (Urban - 31.3 kms ; Rural - 61.7 kms)

3 Pavement 4 lane divided carriageway with raised median

Service road of 5.5/7 m – 20.265/3.750 km

4 Bridges Minor - 15 no.

Major - 2 no.

5 ROB’s 52/000 ; 55/400 & 101/118 – 3 no.

6 Trumpet One at Km.80/655

7 Culverts Pipe culverts – 96

Slab culverts - 93

Page 6: National Highways Authority of Indianhai.org.in/spw/ConcessionaireDetails/cover Sep -15.pdfNational Highways Authority of India (Ministry of Road Transport & Highways) ANNUITY PROJECT

8 Toll Plaza 12 laned at Km.52/820

10 laned at Km.103/250

9 Underpasses 91/461 ; 91/907 ; 92/072 ; 95/575 ; 100/975 – 5 no.

10 Fly over 56/1 & 61/1

11 Wayside

amenities

On RHS carriageway at km.72/208

On LHS carriageway at km.119/138

12 Other

facilities

Truck laybys-2 x 2

LHS - KM.69/900 to 70/400

RHS - KM.70/425 to 70/925

LHS & RHS – KM.113/700 to 114/200

The address and telephone Numbers of the Concessionaire, Independent Engineer are as

below: Concessionaire:

Independent Engineer:

Dedication to Nation

The road was dedicated to Nation on 19th March 2005.

Toll collection

Toll collection was started on 01st April 2005.

Registered Office:

M/s GMR Tambaram Tindivanam

Expressways Pvt.Ltd.

Skip House

25/1, Museum Road

Bangalore – 560 025

Tel: 080-2570100 Fax: 080-2075044

Managing Director: Mr. O.B.Raju

Mobile: 98450 – 10060

Site Office:

M/s GMR Tambaram Tindivanam

Expressways Pvt.Ltd.

No. 1 C/B, First Floor

Rajeswari Vedhachalam Road

Chengalpattu – 603 001

Tel: 044-27431162/27430960

Project Manager: Mr.R.Barathi.

Mobile No: 95666 99194

Registered Office:

Site Office:

M/s Wilbur Smith Associates Pvt ltd,

307, Thamirabarani Square,

Periyar nagar,

VILLUPURAM-626501

Team Leader: Mr.Rajasekhar,

Mobile No: 94435 89187

Page 7: National Highways Authority of Indianhai.org.in/spw/ConcessionaireDetails/cover Sep -15.pdfNational Highways Authority of India (Ministry of Road Transport & Highways) ANNUITY PROJECT

Maintenance Activity during “August-2015”

Highway Patrol

Highway patrolling is carried out regularly with two teams round the clock. The patrol team

monitors the traffic flow and encroachments into NH property, emergency action in case

of accidents like first aid, calling ambulance, information to all concerned, clearing

vehicles from road way to ensure smooth traffic flow. The various other activities carried

out like removal of parked vehicles, safety arrangement to breakdown vehicles, removal

of private approaches, timely assistance to road users in emergency & keep utmost

vigilant for road safety to road users and road assets.

Turf Maintenance

Turf maintenance is being carried out using the grass-cutting machine @ Km 50+000 to

60+000, Km 80+000 to 90+000 & Km 110+000 to 121+000 as per monthly task.

Sl.No Week Chainage Remarks

1 I Km 50+000 – Km 52+000,Km 80+00 – Km

82+000,Km 110+00 – Km 112+000

2 II Km 52+000 – Km 54+000, Km 82+000

– Km 85+000, Km 112+000 – Km

115+000

3 III Km 54+000 – Km 57+000, Km

85+000 – Km 87+000, Km 115+000 –

Km 118+000

4 IV Km 57+000 – Km 60+000, Km

87+000 – Km90+000, Km 118+000 –

Km121+000

Land Scalping

Watering to the plants was carried out as and when required. Basin formation and

blowing of soil to the plants were carried out. Removing the unwanted plants was carried

out. Replacing of dead/missed plants is in progress.

ROW Clearance

Removal of Undesirable growth and vegetation in areas within the ROW is being carried

out regularly using the manpower. Watering is carried out as and when required for the

ROW trees. The clearance work carried out between Km 40+000 to 60+000, Km 80+000 to

90+000 & Km 110+000 to 121+000.

Avenue plantation

Replacing of Dead/missed avenue plants has been carried out during this month from Km

28-121

Cleaning of MCW & SR

Cleaning of MCW & SR is being carried out using power Broomers and man power to the

entire project based on observation on daily basis.

Debris / Road Obstruction

Page 8: National Highways Authority of Indianhai.org.in/spw/ConcessionaireDetails/cover Sep -15.pdfNational Highways Authority of India (Ministry of Road Transport & Highways) ANNUITY PROJECT

Our patrol team & maintenance team removed debris on the carriage way regularly by

using men & machinery.

Culverts

The total no of culverts is 186. As per the schedule the cleaning of culverts are to be done

once at 6 months frequency. The cleaning of culverts between KM 55 to KM 60 - 14 nos.,

KM 84 to KM 90 – 9 nos. & KM 120 to KM 121– 6 nos. is completed during this month.

Drainage

The total length of concrete drain is 21625m. As per the schedule the Clearing of concrete

drains are to be done at 4 months frequency. The clearing work carried out between Km

33.650-34.700R (1050), Km 35.700-37.700L (200), Km76.340-76.850R (510), Km 92.00-92.240R

(240), Km 100.305-100.455L (150), Km 100.305-100.525R ( 220)

Building Maintenance

Building maintenance such as Toll plazas @ 103+000 & 53+000, Rest areas @ 72+000 RHS,

119+000 LHS & Truck lay bye @ 113+000 LHS & RHS, 70+000 LHS & RHS are done regularly.

Shoulder Maintenance

Shoulder maintenance is maintained by using the approved borrow gravel with

compaction using the Roller is in progress and grader is used for removal of excess soil and

for levelling the shoulder on weekly/daily Basis at required locations.

Electrical

Street lighting, High mast, Feeder Pillar and Building lighting are being maintained

regularly. Rectification of Damaged electrical poles, fused bulbs & other electrical faults

are progressed and in progress on daily basis with our electrical team.

Encroachment removal

Encroachments were cleared from Km 28+000 to Km 121+000 on both LHS & RHS on daily

basis with our detected team. Periodic Removal at service roads and ROW areas will also

be taken up as scheduled.

Painting works

Painting of faded locations like Median kerb, Pedestrian fencing & Road marking have

been carried out during this month in-between km 60-121.

Safety improvement plan

All median openings, Important deep curves has been highlighted with median markers

and Lane visibility Studs and All Important Junctions has been highlighted by red Rumbled

studs strips on both sides as goodwill to the project safety. This activity has been

completed in between km 28-121.

All median openings and junctions have been facilitated with Diamond (big cluster), Tyre

with reflective stickers, kerb with yellow and black paint to improve visibility during Day &

night, this work is in progress on regular basis.

Over shooting tree branches on median have been removed for road user safety in

between km 28-60 & 90-95 and remaining in progress.

Hazard markers and delineator at all Crash barriers/parapet wall has been provided in

between km 28-60 and is in progress in between km 60-121

Road safety awareness programme at schools, colleges and at all important junctions, toll

plaza and TLB locations conducted.

Periodic maintenance activities

Page 9: National Highways Authority of Indianhai.org.in/spw/ConcessionaireDetails/cover Sep -15.pdfNational Highways Authority of India (Ministry of Road Transport & Highways) ANNUITY PROJECT

To improve Raiding Quality 80 Km BC Inlay work have been completed in the month of

March-2014 as 10th year periodic maintenance.

BC Surface patches laying work is in progress

Median plantation:

14500 No’s so far planted and 20,000 No’s of Median plants procured for this monsoon.

Works Done Under COS 1. Laying of Balance PQC Works for ETC Implementation in 53 & 103 Toll plaza have been

completed

2. Laying of kerb for ETC Implementation in 53 & 103 Toll plaza have been completed.

Status of Damaged Project Facilities

Month: Sep 2015 (As of 30.09.15)

Sl. No

Date of incident

Location Side Description Remark /

compliance

1 02.01.15 57+900 RHS

Hand rails verticals -7nos, Hand rails horizontal - 21nos , Foundation - 7 nos

Completed

2 27.01.15 76+500 LHS

single arm pole-1nos, PGR 02 nos Completed

3 16.02.15 47+350 LHS

Pedestrian fencing- 05 Nos Completed

4 27.02.15 37+200 Median

Double arm pole Completed

5 28.02.15 41+850 LHS

Pedestrian fencing- 07 Nos Completed

6 04.03.15 42+400 Median

Double arm pole Completed

7 08.03.15 92+200 RHS

Pedestrian fencing- 06 Nos Completed

8 24.04.15 58+550 RHS Hand rails verticals -7nos, Hand rails horizontal - 21nos , Foundation - 7 nos

Completed

9 27.04.15 45+980 LHS single arm pole-1nos Completed

10 30.04.15 76+550 Median 1. Double Arm Electrical pole & fittings -01 nos+ Diamond cluster-01Nos

Completed

11 5.5.15 88+900 LHS LHS Metallic Beam cross barrier – 18 meters Completed

12 8.5.15 82+750 LHS LHS Metallic Beam cross barrier – 15 meters Completed

13 12.5.15 30+100 Median

Median 1. Double Arm Electrical pole & fittings -01 nos Completed

14 16.5.15 105+800 LHS LHS Metallic Beam cross barrier – 45 meters Completed

15 19.5.15 76+850 LHS LHS Pedestrian fencing- 07 Nos Completed

16 23.5.15 95+800 LHS LHS single arm pole-1nos, PGR 09 nos Completed

17 8.6.15 81+000 LHS Metallic Beam cross barrier – 45 meters, PGR -02 nos

Completed

18 19.6.15 39+750 Median Double Arm Electrical pole & fittings -01 nos

Completed

19 29.6.15 94+975 Median Double Arm Electrical pole & fittings -01 nos

Completed

Page 10: National Highways Authority of Indianhai.org.in/spw/ConcessionaireDetails/cover Sep -15.pdfNational Highways Authority of India (Ministry of Road Transport & Highways) ANNUITY PROJECT

20 9.7.15 58+500 RHS Hand rails verticals -10 nos, Hand rails horizontal -30 nos , Foundation - 10 nos

Completed

21 11.7.15 36+550 RHS single arm pole-1nos, PGR 08 nos

Completed

22 13.7.15 37+500 LHS Pedestrian fencing- 06 Nos

Completed

23 16.7.15 37+350 RHS Pedestrian fencing 5 Nos,Single arm pole & A pedestrian crossing board

Completed

24 22.7.15 80+600 LHS Metallic Beam cross barrier – 20 meters Completed

25 12.8.15 94+400 Median Double Arm Electrical pole & fittings -01 nos

Completed

26 15.8.15 88+700 RHS 1. Brick parapet wall damaged 11m*0.5m*0.6m. 2. Hazard Marker sign Board-01 nos.

Completed

27 19.8.15 77+600 Median 1. Double Arm Electrical pole & fittings -01 nos+ Diamond cluster-01Nos

Completed

28 27.8.15 76+450 Median 1. Double Arm Electrical pole & fittings -01 nos+ PGR-02 nos

Completed

29 6.9.15 54+790 RHS Hand rails verticals -8 nos, Hand rails horizontal -24 nos , Foundation - 8 nos

Completed

30 20.9.15 47+250 LHS Pedestrian fencing- 09 Nos In progress

Rectificationof Assets & Other Periodic Works completed During this month Month: Sep-15

Sl. No Date of

Rectification

Location Side

Item Description

Units QTY Remark /

compliance From To

1 60000 62000 BHS

Kerb Painting

RM

4000

2 64650 66300 BHS 3300

3 66500 74200 BHS 15400

4 75500 77600 BHS 4200

5 79350 82800 BHS 6900

6 107000 108300 BHS 2600

7 99200 101000 BHS 3600

8 90+600 91+200 LHS

rectification damaged

Drain Cover Nos

5

9 90+600 91+200 RHS 1

10 94+200 94+740 LHS 4

11 94+350 95+600 RHS 10

12 69+150 69+250 LHS 2

13 96+200 96+800 LHS 5

14 96+500 96+750 RHS 2

15 97+580 97+750 RHS 4

16 94+500 95+650 LHS rectification damaged Manhole

Cover

Nos

18

17 94+700 95+400 RHS 8

18 76+400 76+800 LHS 8

19 76+550 76+700 RHS 4

20 88+800 RHS Culvert Parapet

Wall Nos

1

21 74+200 RHS 1

22 82+720 LHS 2

23 60+000 121+000 BHS HM Stones Nos 90

24 60+000 121+000 BHS KM Stones Nos 10

Page 11: National Highways Authority of Indianhai.org.in/spw/ConcessionaireDetails/cover Sep -15.pdfNational Highways Authority of India (Ministry of Road Transport & Highways) ANNUITY PROJECT

Details of Replacement of Plants in Median From Km28-121 in 2015-2016

S.No Date Location

No of plants Remarks From To

1

13.07.15

66.400 67.000 51

2 67.000 68.000 131

3 68.000 69.000 148

4 69.000 70.000 96

5 70.000 71.000 74

6

14.07.15

71.000 72.000 151

7 72.000 73.000 170

8 73.000 74.000 167

9 74.000 75.000 158

10

15.07.15

75.000 76.000 185

11 76.000 77.000 163

12 77.000 78.000 101

13 78.000 79.000 205

14 91.800 93.000 180

15 93.000 94.400 220

16

16.07.15

79.000 80.000 292

17 80.000 81.000 332

18 94.400 95.000 50

19 95.000 96.000 230

20 96.000 97.100 170

21

17.07.15

82.000 83.000 254

22 83.000 84.000 296

23 84.000 84.800 250

24 97.100 98.000 178

25 98.000 99.000 270

26 99.000 99.400 152

27

18.07.15

84.800 85.000 53

28 85.000 86.000 197

29 86.000 87.000 250

30 87.000 88.000 204

31 88.000 88.200 46

32 90.000 90.600 81

33 99.400 100.000 203

34 100.000 101.000 125

35 101.000 101.400 141

36

20.07.15

101.400 102.000 140

37 102.000 103.000 160

38 103.000 104.000 122

39 104.000 105.000 131

40 105.000 105.400 47

41

21.07.15

105.400 106.000 80

42 106.000 107.000 175

43 107.000 108.000 160

44 108.000 109.000 185

45

24.07.15

109+000 110+000 192

46 110+000 111+000 307

47 111+000 112+000 227

48 112+000 112+400 74

49

01.08.15

112+600 113+600 150

50 113+600 114+600 180

51 114+600 115+600 170

52 02.08.15 115+600 116+600 220

Page 12: National Highways Authority of Indianhai.org.in/spw/ConcessionaireDetails/cover Sep -15.pdfNational Highways Authority of India (Ministry of Road Transport & Highways) ANNUITY PROJECT

53 116+600 117+600 280

54

03.08.15

60+000 61+400 700

55 117+600 118+000 130

56 118+000 119+000 370

57 04.08.15

88+400 89+400 300

58 119+000 120+000 500

59 19.09.15 58.000 60.000 500

60 20.09.15 56.000 58.000 340

61 22.09.15 54.000 56.000 325

62 23.09.15 49.000 54.000 750

63 24.09.15 36.000 38.000 287

64 27.09.15 41.000 43.000 320

65 29.09.15 43.000 47.000 360

66 30.09.15 32.000 36.000

720

38.000 41.000

TOTAL in Nos 14576 Balance in progress

GMR Tambaram-Tindivanam Road Project(NH-45)

Patch works done from KM28 to 121-TT

S.NO Date Location Side Quantity in SQM Remarks

1

9/4/2015

110+520 LHS 24.07

Main carriage way

2 27.72

3

118+450 to 118+570 LHS

29.5

4 135.8

5 469

6

9/5/2015

100+430 to 100+620 RHS 1099

7 100+700 to 100+760 RHS 350

8 90+760 to 90+880 LHS 721

9 91+150 to 91+180 LHS 69 Service Road

11

9/9/2015

91+020:Including BM & SDBC

LHS 126 Service Road Junction

12 90+985:including BM &

SDBC LHS 50 Service Road Junction

13 90+985 LHS 93.5 Service Road Junction

14 90+920 RHS 95.76 Service Road Junction

15

9/10/2015

78+820to 78+940 RHS 1456 Main carriage way

16 78+930: only BM RHS 30.8 Main carriage way

17 76+550 LHS 117.8 MCW & Service junction

18 9/11/2015 62+000 to 62+250 LHS 468 Palar bridge

19

9/23/2015

103+050 Median

73.5 Toll plaza on ETC lane at trichy

Side

20 73.5 Toll plaza on ETC lane on RHS at

trichy Side

21 9.5 Speed breakers on Toll plaza near

by ETC lane at trichy Side

22

102+950 Median

91 Toll plaza on ETC lane at Chennai

Side(including BM & SDBC)

23 29.75 Toll plaza on ETC lane at Chennai

Side

24 110.39 Toll plaza on ETC lane on LHS at

Chennai Side

25 16.8 Toll plaza on ETC lane on LHS at

Chennai Side

26 11.7 Speed breakers on Toll plaza near

by ETC lane at Chennai Side

27 9/24/2015 100+650 MCW-RHS 672 ROB top on RHS

Page 13: National Highways Authority of Indianhai.org.in/spw/ConcessionaireDetails/cover Sep -15.pdfNational Highways Authority of India (Ministry of Road Transport & Highways) ANNUITY PROJECT

28

100+360 to 100+540 Service Road-

BHS

28.8

Service Road-BHS(9number of spots)

29 4.14

30 3.6

31 2.24

32 3.25

33 15.5

34 7.56

35 2.25

36 1.8

37 61+950 MCW-RHS 108.8 MCW-Fast lane only(Kerb side)

38 9/25/2015 60+750 MCW-LHS 165.92

MCW 105.27

39 11.9.15 52+000-52+050 RHS 170 MCW

40

12.9.15

28+400 SR LHS 280.5 SR

41 28+500 Patch LHS 33.9 SR

42 28+530 Patch LHS 22.62 SR

43 28+600 SR LHS 440 SR

44 28+600 SR ramp LHS 40 SR

45 28+700 SR Ramp LHS 56 SR

46

16.9.15

32+200-32+280 RHS 560 MCW

47 32+380 JN LHS

52.48 SR/JN

48 31.32 SR/JN

49

23.9.15 Guduvancherry RHS

37+000-37+500 RHS

43.2

SR Patch work

50 6

51 12.45

52 12.96

53 19.5

54 13.3

55 17.2

56 16.72

57 55.08

58 19.2

59 15.04

60 7.2

61 5.5

62 3

63 20.16

64 12.96

65 9.4

66

23.9.15 Guduvancherry RHS

36+200-37+000 RHS

13.92

SR Patch work

67 10.8

68 9.12

69 21.6

70 6.24

71 24.9

72 58.9

73 21.84

74 7.26

75 7.8

76 7

77 21.06

78 18.24

79 57.6

80 17.43

81 26.7

82 6

83 35.65

84 3.84

Page 14: National Highways Authority of Indianhai.org.in/spw/ConcessionaireDetails/cover Sep -15.pdfNational Highways Authority of India (Ministry of Road Transport & Highways) ANNUITY PROJECT

85 2.52

86 1.5

87 0.5

88 2.09

89 24.9.16 Guduvancherry LHS 36+200-37+000

LHS 5.5

SR Patch work

90 0.5

91 22.44

92 3.12

93 16

94 1.44

95 2.34

96 3.01

97 2.56

98 14.72

99 7.35

100 14.64

101 72.5

102 12.16

103 4.18

104 4

105 7.68

106 14.03

107 7.92

108 19.53

109 9.86

110 1.2

111 9.18

112 51.45

113

24.9.15 31+700 Vandalur

Bridge

RHS

21.9

MCW

114 6.9

115 4.56

116 6.27

117 4.25

118 3.68

119 4.44

120 2.16

121

LHS

4.9

122 1.2

123 32.55

124

29.09.15

29+100 RHS 2

SR Patch work

125 28+850 RHS 1

126 30+450 LHS 10.08

127 30+820 LHS 1.4

128 30+910 LHS 9

129 31+030 LHS 6.3

130 31+800 LHS 16.28

131 33+600 LHS 1

132 33+650 LHS 1

133 33+800 LHS 8.4

134 33+900 LHS 8

135 34+200 LHS 1

136 34+120 MCW LHS 4

137

34+700 JN LHS

10.4

138 63

139 22

140 39+100 LHS 4

141 39+630 LHS 1

142 39+800 LHS 2.25

Page 15: National Highways Authority of Indianhai.org.in/spw/ConcessionaireDetails/cover Sep -15.pdfNational Highways Authority of India (Ministry of Road Transport & Highways) ANNUITY PROJECT

143 42+050 LHS 4

144 42+100 LHS 25

145

29.09.15 Tollplaza

LHS

27

Speed breakers rectification

146 18

147 12

148

RHS

27

149 18

150 12

O&M Performed Task for the month of SEP-2015 as per the Yearly Planner

Sl. No.

Description/Item Planed Locations for

this month as per O&M plan

Unit

Planed Qty for this month as per O&M

plan

Km 28-60

Km 60-121

Remark

1 Maintenance in ROW

a

Bushes cutting, Toe drain, slope, scatter papers removal & Avenue plantation

KM50-60, 80-90, 110-121

Km(B/S) 62 20 42 Completed

2 Median maintenance

a Grass cutting KM50-60, 80-90, 110-121

Km 31 10 21 Completed

b weeds removal Km 49-60,80-90,110-121

Km 40 20 20 Completed

c Basin work KM50-60, 80-90, 110-121

km 31 13.6 17.4 Completed

d Median plants/trees trimming

KM50-60, 80-90, 110-121

km 31 10 21 Completed

e Median drain/slot drain cleaning

KM50-60, 80-90, 110-121

Km 31 10 21 Completed

f Drain cleaning in divided kerb locations

KM50-60, 80-90, 110-121

Km 9.43 4.04 5.39 Completed

g Watering to the plantations

KM50-60, 80-90, 110-121

km 93 Is in progress on daily basis

h Monsoon Plantation Km28-121 km 61 3500 11000 Completed

3 Cleaning of Debris/Litter/ Garbage

a MCW 28-121 km 93 Repeated rounds of cleaning done in first 20 km with men & mechinery- List enclosed

As per site condition,

where ever required

weekly once

b Service road 28-121 km 22.37

c Junctions 28-121 No.s 44

d Bus bays & Bus shelters

28-121 No.s 49

e Garbage removal 28-121 Locations 10 10 Monthly Twice

4 Cleaning of C/D works

a Culverts Km 55-60(14) ,Km 84-90(9),Km 120-121(6)

No.s 29 14 15 Monsoon maintenance Completed

b Bridges Km 55-60 ,Km 84-90,Km 120-121

No.s 1 1 0

Page 16: National Highways Authority of Indianhai.org.in/spw/ConcessionaireDetails/cover Sep -15.pdfNational Highways Authority of India (Ministry of Road Transport & Highways) ANNUITY PROJECT

5 Cleaning of Drainage

33.650-34.700R, 35.700-37.700L, 76.340-76.850R,

92.00-92.240R(240), 100.305-

100.455L(150), 100.305-

100.525R(220)

Km 4170 3050 1120

Monsoon maintenance Completed

6 Cleaning of Road furniture

a Sign boards,Delinators,KM & HM stones

Km 28-39,60-70,90-100

KM 32 11 21 Completed

7 Building Maintenance

a Toilets 16 Daily No's 16 16

On daily basis b

Truck lay bys 2 Daily No's 2 2

c Public amenities 2 Daily No's 2 2

8 Electrical Maintenance

a Street lighting 28-121 Km 19.75 12.5 7.25 Maintenance on daily basis

with our electricians &

Team

b High mast 28-121 No's 47 12 35

c Building lighting 28-121 No's 2 1 1

d Bus lay byes 28-121 No's 20 15 5

9 Encroachment removal-Daily activities

Km 28-121 Nos 295 221 74

Daily - Road side vendors, Political board ,Huts & shop projections

10 Shoulder maintenance

KM 29-33BHS, 44-46 BHS, 52-54 BHS, 63-66 BHS, 84-85 BHS,

90-94 BHS.

Km 32 22 10 Monthly once

due to frequent damages

11 Repair Works

a PGR KM 28-121 RM

Accidental Damaged locations during the month of 15th May and up to 15th June-

15

48 18

Based on site observation

and damages

b RCC Handrails KM 28-121 RM 20

a MBCB KM 28-121 RM 20

d Kerb KM 28-121 RM

e Electrical poles KM 28-121 Nos 2

f KM/Hm Stones KM 28-121 Nos 60 120

g Pavement Defects KM 28-121 Sqm 3200 7000

h Potholes KM 28-121 Sqm

i Drainage Slabs KM 28-121 Nos

j Sign boards KM 28-121 Nos 10 25

12 Painting works:

Page 17: National Highways Authority of Indianhai.org.in/spw/ConcessionaireDetails/cover Sep -15.pdfNational Highways Authority of India (Ministry of Road Transport & Highways) ANNUITY PROJECT

a Kerb (Median)

28-121 Km Completed In progress

b RCC Hand rails 28-121 RM Completed

c PGR Painting 28-121 RM Completed 1900

d Road marking 28-121 Sqm Completed

Completed along with periodic

maintenance in march-2014

e Guard post 28-121 Nos Completed

f Head walls 28-121 Nos Completed

13 ERP Km 28-121 Km(B/S) 93 Patrolling 365*24 with Two patrol

teams in progress