national conference on “10 years of the electricity act, 2003: a critical review”
DESCRIPTION
NATIONAL CONFERENCE ON “10 YEARS OF THE ELECTRICITY ACT, 2003: A CRITICAL REVIEW”. Anish De New Delhi, June 11, 2003. A Peek At the Past…. 2. Summary of fundamental changes brought about by the new law. Freedom to procure Freedom to sell - PowerPoint PPT PresentationTRANSCRIPT
NATIONAL CONFERENCE ON
“10 YEARS OF THE ELECTRICITY ACT, 2003: A CRITICAL REVIEW”
Anish DeNew Delhi, June 11, 2003
A Peek At the Past….
2
3
Summary of fundamental changes brought about by the new law Freedom to procure Freedom to sell Economics in preference of
command and control structure
Slide from Electricity Act, 2003: An analysis of Open Access and Trading issues, Anish De, June 11, 2003
4
Conclusion – Freedom to buy and sell is not adequate. We need….. 1. Investments in network
infrastructure 2. Defined rules of energy exchange3. Accounting and settlement
systems4. A system “whole” for cash5. Transparent and equitable
regulation6. Institutional capability in operators
and regulators
Slide from Electricity Act, 2003: An analysis of Open Access and Trading issues, Anish De, June 11, 2003
The Fruits of Faith….
5
6
Capacity addition driven by policy reforms encouraging private sector
Capacity in excess of 75 GW added in last 5 years of which 42 GW under the competitive bidding
Increase in market share of private sector from 17 GW in 2007 to 62 GW in 2012-13
Capacity addition through RE gaining momentum, with 14 GW added in last five years.
Despite positive developments, challenges still remain…
• Domestic Fuel shortage & expensive imported coal resulting in stranded capacity• Poor management of peak load requirement still remain a cause for concern• Slow implementation of projects, delay in environment clearances or land acquisition
Source: CEA
7
Transmission System evolved from regional boundaries to national grid Improved operations backed by
institutional frameworks and standardized grid operations
Adoption of higher voltage levels up to 1200 kV, construction of HVAC & HVDC systems
SR is expected to be integrated with the NEW Grid, forming the National Grid, with more than 230 GW of installed capacity
Private sector participation encouraged IPTC and JVC model
Source: AF- Mercados EMI Analysis
However, failure of defence mechanisms such as load shedding schemes through under frequency relays, rate of change of frequency relays & islanding schemes in the NR and ER were observed (July 2012)
Volumes Lost due to Congestion – Historical Trend
- Volumes cleared after price matching are presently being lost on the exchange due to congestion in the transmission network
- In the last 6 months (Oct, 2012 – March, 2013), the average un-cleared volume was 2.7 BUs which is 21.5% of the total volumes cleared on the exchange .
Jun Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May Jun Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May Jun Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May Jun Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May Jun Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
2008 2009 2010 2011 2012 2013
-
100
200
300
400
500
600
700
800
0%
5%
10%
15%
20%
25%
30%
35%
40%
45%
Uncleared Volumes on IEX
Volumes Lost due to Congestion Volumes lost as a percentage of Constrained Volumes
MUs
Perc
enta
ge
8
A Vibrant New Competitive World…
9
10
Power Trading & Markets: Unlocking of the unused/economic capacities in the sector
2004-05
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13*
0.00%1.00%2.00%3.00%4.00%5.00%6.00%7.00%8.00%9.00%
2.16% 2.49% 2.41%3.15%
3.57%
5.25%
6.73%
7.88% 8.28%
Nearly 32% CAGR
since fo
rmatio
n of
Px
Electricity Transacted on OTC and Power Exchange in Total Electricity Generation
Power trading accounts ~9% of the total net generation
Optimum utilization of the network & efficiency gains through increased system strengthening investments
Sale of surplus captive capacity to deficit third party
Power traded via Day Ahead Market accounts to 97% of the total volumes
However, challenges do exist
• Growth of the market is deterred by poor transmission system and congestion• Improved transmission system needs to be adopted to reduce the loss of power
Source: CERC Monthly Market Monitoring Reports
Price of Short-term transactions of Electricity during 2009-13
* Data for 2012-13 available for 11 months, has been pro-rated for 12 months
• Most of the consumers are located in Tamil Nadu, Punjab, Rajasthan, Haryana, and Madhya Pradesh. • During the year 2012-13, Andhra Pradesh experience its worst ever power crisis due to shortage in gas and poor rainfall. The Industrial Consumers had to choose between either 3 continuous days power cut in a week or 12 continuous days power cut in a month. It is only post this that the Discom has granted Open Access to its Industrial Consumers. The consumption of the State has increased significantly over the earlier years.
Tamil N
adu
Punjab
Rajas
than
Andh
ra Pra
desh
Haryan
aGuja
rat
Karna
taka
Chha
ttisga
rh
Madhy
a Prad
esh
Uttarak
hand
Mahara
shtra
Aruna
chal P
radesh
Orissa
MeSEB DVC Goa J&K
West Ben
gal0
100200300400500600
482
317
10348 44 43 45 30 16 12 8 4 4 3 1 1 1 1
State-wise Number of Industrial Consumer at IEX in March 2012
No. of Open Access Consumer in March 2012
Industrial Consumers – Major States
Source: IEX website
11
But The Same Bogeyman….
12
13
Distribution Sector: Slow Improvements
Post Electricity ActPre Electricity Act
30.93%
32.86%33.98%
32.54%
32.53%
31.25%
30.42%
28.65%
27.20%
25.47%
25.39%
23.97%
22.39%
0%5%
10%15%20%25%30%35%40%
Perc
enta
ge
Policy reforms undertaken to strengthen the distribution sector
• Privatization• Franchisee• R-APDRP• Viability Gap Funding, now being
tested• Financial Restructuring Plan
R-APDRP has had reasonable impact in reducing T&D losses, however the progress has been slow
Directed by the APTEL, over the past 24 months, SERCs have regularly revised the tariffs
2007-08 2008-09 2009-10 2010-11 (RE)
2011-12 (AP)
0.001.002.003.004.005.006.00
4.044.6 4.76 4.84 4.87
3.06 3.26 3.33 3.57 3.80
0.981.34 1.43 1.27 1.07
Unit Cost Average Tariff per Unit Gap (per unit)Rs
./kW
h
Source: CEA
Source: Planning Commission Annual Report 2011-12
Trend in T&D losses
Average Gap (Rs./kWh)
Despite reforms the challenges remain
• T&D losses remain unacceptably high• The tariff revisions has not been adequate to recover increasing costs. • Unsustainable level of borrowings of utilities pose a serious threat to the banking sector
14
Unbundling of the utilities: Not able to achieve the set targets Process of unbundling was
incorporated to ensure separate companies for G, T, D
Process of unbundling began in 1995, with unbundling of Orissa SEB
Unbundling has been adopted by almost all state utilities*; although power departments are yet to unbundle their operations
*JSEB and KSEB are the only two utilities to remain bundled.
Has led to: Improved Transparency and
Accountability Increased private sector
participation Significant efficiency
improvement in generation
and transmission
Key Challenges being faced:
• Lack of coordination among unbundled utilities• Inefficiency still pertinent in the utility operations • Bureaucracy still persistent in the un-bundled set up • Utilities unable to in-corporate the corporatized structure as per the Companies Act, 1956
15
Obligation to supply & flawed framework for rural electrification
2005 2006 2007 2008 2009 2010 201130%
35%
40%
45%
50%
55%
60%
% of RHH electrified
% o
f RHH
ele
ctrifi
ed
Source: Rajiv Gandhi Rural Electrification Program Urgent Need for Mid-course Correction. Prayas Energy Group, June’11
National Electricity Policy specified the goals with respect to access & supply Several policies & programs introduced
to improve access and service quality
RGGVY India’s flagship policy to develop rural electrification Aim was to provide electricity to 23.4
million BPL households by 2009 (@ Rs 16, 000 cr)
Challenges faced by obligation to supply & RGGVY:
• Obligation to supply interpreted as obligation to connect only, while ignoring quality of supply
• RGGVY as a program has faced numerous criticism:o Exceeding initial cost estimate by 225%o Failure of franchisee models at rural levelo Lack of robust infrastructure, puts the whole system at risko New connection primarily to the subsidized BPL customers
Progress of electrification under RGGVY
Financial Health of Unbundled Utilities - Discoms
States
Energy Handled
on average -
BU
Subsidy Aggregate, 2005-2011 (in Rs. Mn.)
Net Profit Margin
Net Profit Margin
(w/o subsidy)
(ACS-ARR w/o subsidy)/ACS
A ‘-ve’ value means profits
Debtor Days
Creditor Days
Interest Coverage
Ratio
Delhi 15 0 3.06% 3.06% -3.43% 89 6 2.15West Bengal 17 0 0.93% 0.93% -1.10% 79 38 1.21Andhra Pradesh 51 269030 0.48% -27.90% 20.9% 77 53 1.13Gujarat 36 67870 0.30% -8% 7% 53 0 1.18Rajasthan 25 376430 0% -66% 36.90% 110 56 1Karnataka 30 91400 -2.20% -17.60% 15% 166 125 0.6Maharashtra 56 4283 -2.73% -2.98% 2.72% 146 49 0.13Assam 2 2520 -3.20% -3.20% 6% 116 126 -1.67Orissa 10 0 -4.60% -4.60% 4.34% 148 180 -0.24Haryana 19 140837 -8.91% -47.00% 32.00% 152 68 -1.26Chhattisgarh 11 0 -9.50% -9.50% 8.64% 101 0 -4.36
Uttarakhand 5 0 -18.50% -18.50% 15.30% 229 340 -2.44
MP 20 46860 -20.30% -32.00% 24.00% 201 118 -4.79
UP 36 93500 -34.00% -53.00% 34% 310 413 -5.17
- Even though Gujarat and Maharashtra discoms are in losses, the level of Revenue Gap is still at a very manageable level. Also, Gujarat’s operating earnings are enough to cover its interest expenses.
- UP and Rajasthan are the worst performers. In both the states’ discoms, the costs are greater than 150% of the revenues.
- In both AP and Haryana, a huge amount of subsidies is being provided to cover as much of the Revenue Gap as possible.
Unbundled Utilities - Six Year Averages (2005-11) - Ranked on basis of Net Profit Margin
Source: PFC, AF Mercados EMI Analysis
Worst Performer Bad Performer Best Performer Second Best Performer
ACS – Average Cost of Supply
ARR – Average Revenue Realized 16
Financial Health of Bundled Utilities
States Output Units - BU
Subsidy Aggregate, 2005-2010 (in Rs. Mn.)
Net Profit
Margin
Net Profit
Margin (w/o
subsidy)
(ACS-ARR w/o
subsidy)/ ACS
A ‘-ve’ value means profits
Debtor Days
Creditor Days
Debt-Equity Ratio
Interest Coverage
Ratio
Kerala 12 269130 3.72% 2.95% -3.87% 83 86 1.39 1.67Himachal 5 1214 -0.75% -2.09% 2% 46 123 10.1 0.87Meghalaya 0.8 1047 -6.65% -12.14% 13% 295 171 6.21 0.49Tripura 0.5 1690 -7.33% -19.50% 14% 27 0 0 n.aPunjab 29 147060 -9.90% -41.00% 29% 75 14 3.96 0Tamil Nadu 49 74701 -26.45% -38.80% 26% 86 40 13.69 -1.49Jharkhand 4 15708 -35% -52.00% 34% 305 259 n.a -0.64Bihar 4 49240 -36% -97% 49% 784 94 n.a -0.05
- Out of the bundled utilities, Kerala is one of the rare states with a positive profit margin. Most of the bundled utilities are suffering heavy losses.
- Bihar and Jharkhand have performed very poorly in the last five years. In fact, Bihar has losses that are almost equal to its revenue. Also, the BSEB’s debtor days are more than 2 years.
- In spite of reporting low T&D loss figures, Tamil Nadu has huge negative margin and a significant financial Gap.
Bundled Utilities - Six Year Averages (2005-11) - Ranked on basis of Net Profit Margin
Source: PFC, AF Mercados EMI Analysis
Worst Performer
Bad Performer
Best Performer
Second Best Performer
17
18
Privatization and PPP- A tepid attempts
Orissa was the first state to implement privatization of its discoms
Have faced several issues in eliminating the inefficiencies
Delhi was the second state to privatize its discoms
Delhi’s discoms were able to improve the efficiency on the base line data
However, deficits in regulation persist
0%
10%
20%
30%
40%
50%
60%
NDPL BRPL BYPL
Baseline AT&C loss Current AT&C loss
0%
10%
20%
30%
40%
50%
60%
NDPL BRPL BYPL
Baseline T&D loss Current T&D loss
0%1%2%3%4%5%6%7%8%9%
NDPL BRPL BYPL
Baseline transformer Failure rate
Current transformer failure rate
0%
20%
40%
60%
80%
100%
120%
140%
NDPL BRPL BYPL
Baseline collection efficiency Current collection efficiency
Comparison of efficiency pre and post privatization: Delhi- 2008-09
Challenges faced by Privatization model:
• Orissa’s privatization failed due to lack state Govt.’s commitment and lack of proper baseline data collection
• Delhi’s model faced issues related to deficits in regulations
19
Privatization and PPP- A tepid attempts (contd...) Second set of privatization model
implemented was the franchisee model First established in 2007, in Bhiwandi has
been able to improve efficiencies significantly
However, model adoption by other states has been slow
The Act allowed multiple distribution licensees to operate in a given area, with a rational to eradicate the monopoly of the licensees
Has faced several issues, however the provision itself is unique and makes consumer the decision maker
Parameter At the time of takeover
2010-11
Distribution Transformer Failure Rate
40% 2.80%
Load Shedding (Hours)
10-12 <3
Accurate Metering 23% 99%
AT&C losses 58%18.80
%Collection Efficiency 58% 99%Source: Torrent Power Presentation
Challenges faced by Franchisee and Multiple Licensee model:
• Franchisee model has been tried in other parts of the country, but the Bhiwandi’s results haven’t been replicated
• Multiple licensees is not feasible on a large scale without serious loss of efficiency. • Multiple licensee face issues related to tariff determination and consumer loss.
Key Improvement in Bhiwandi Circle
Monitoring the Monitor….
20
21
India’s Experience With Regulation in the Past Decade is Very Mixed....
Aspect Act section CERC Role and status SERC Role and status
Regulate the tariff of generating companies and licensees
79, 86Well set regulations
following Multi-year tariff (MYT) structure as
prescribed in the Act
Relatively weak regulations (typically annual tariff review structures, although MYT is now more prevalent)
Introduce distribution open access in such phases
42 Not relevantRegulators in several states have actively blocked open access in many states
Regulate electricity procurement by distribution licensees
86 Not relevant
In most states the utilities actual cost has been poorly estimated due to weak regulatory processes. Cost pass through mechanisms inadequately established
Determine wheeling charges, cross-subsidy surcharge and additional charges
42, 79, 86 Not relevantRegulators in several states have actively blocked open access in many states through use of exorbitantly high charges
Facilitate transmission and wheeling of electricity
79,86Has structured open
access regulations that facilitate transactions
As above
Roles have been carried out well Partial Achievement Poor Performance* AF Mercados EMI analysis/views.
22
India’s Experience With Regulation in the Past Decade is Very Mixed....
Aspect Act section CERC Role and status SERC Role and status
Specify Grid Code 79,86IEGC developed an revised regularly depending on emergent conditions
Weak state grid codes – major hindrance to open access and renewables
Specify and enforce the standards with respect to quality of supply
86 Even where established the standards are rarely enforced
Fix the trading margin 79,86 Has actively managed the market to prevent abuse Not a major role
Develop power markets 66Has actively promoted markets through trading and Px. Has also promoted renewable energy markets
Not a major role
Prevent market domination 60Formulated regulations that are presently under finalisation
Not a major role
Promote co-generation and generation of electricity from renewable sources. Fix Renewable Purchase Obligation
86 Not relevantPoorly executed. In most states with resource limitations the RPO standards are below desired levels and/or enforcement is poor.
Roles have been carried out well Partial Achievement Poor Performance
* AF Mercados EMI analysis/views.
What is In Store for the Consumer?
23
• Even with large capacity addition, peak deficits persist
• Given the baseload dominance in the capacity mix , meeting peak demand (and maintaining spinning reserves) would be a very expensive exercise where large and expensive generators would operate at part capacity
• The mix can be corrected through altering the capacity mix and/or markets
Will The Indian Customer Ever Have Reliable Electricity?
Source: AF Mercados EMI Analysis
Increase in prices
Increase in quantity supplied
24
Mar
gina
l gen
erat
ion
cost
s (R
s./kw
h)
-11.37
-1.47
-20.39
-7.45
-9.66
-25.00
-20.00
-15.00
-10.00
-5.00
0.0005,000
10,00015,00020,00025,00030,00035,00040,00045,00050,000
Northern Western Southern Eastern North Eastern
Defic
it -%
MW
Peak Deficit - 2012-13
Peak Demand (MW) Peak Met (MW) Deficit % Source: CEA Power Supply Position
25
Open Access
Provision enables consumer to chose an alternate supplier
Mandated to counter the monopolistic practices of distribution licensee
Aims to improve efficiency of operation by introducing competition
Operated at whole sale and retail market level
Challenges faced in Open Access and Retail Choice & Competition
• Resistance from licensee; in fear of loss of industrial consumers
• Unpredictability of charges based on region, e.g. West Bengal, Tamil Nadu and Punjab have high cross subsidy surcharge.
• Regulatory Gaps, no mechanism to calculate stand-by & additional charges
• Inadequate transmission facility , esp. in the SR is a bottleneck
• Retail Supply of electricity is still under distribution licensee
The buyer can procure power from either generator, discom or the trader
Grants choice and access for the consumer
Retail supply can provide tremendous cost efficiency, cost and service related gains
Retail Choice & Competition
Competition in Wholesale & Retail Markets
26
Action Plan for Short, Medium and Long Term
Strengthening of Governance
Utility Reforms
Loss Reduction and Efficiency improvement measures to be strengthened
DSM and energy efficiency at customer end to be encouraged
Tariff Revisions to be regular and should not mask inefficiencies
Rationalization of subsidies and alternate model for subsidy payment should be considered
Regulatory Independence: Proactive role in implementing change in provisions relating to Open Access, MYT and SOPs
Assessment of regulatory performance and ensuring accountability
Market Reforms
Open Access: Measures to rationalize charges and cross subsidy, augmentation of infrastructure, creation of awareness
Preventing misuse of legal safeguards such as Sec 11
Competition in Retail Supply will require legislative changes
Creating deeper competitive markets
27
Action Plan for Short, Medium and Long Term (contd…)
Building Human Capital
Expanse and complexity of the sector requires deep skills on a large scale, perhaps like no other sector
Development large scale consumer awareness is also a requisite for holistic sector development
Strengthening System & Processes
Customer Service Orientation
Efficient Power Procurement Practices and inventory planning
IT & C contributing to better network data generation, management and control systems
Monitoring & Evaluation: Regular audits by third party agencies and reviews
• The Electricity Act, 2003 has created a very strong and enabling framework for sector development
• Regulations have performed admirably at central level, however the deficit at state level are stark
• Measures needed that make regulators more independent, competent and accountable
Thank You