national centre for rural water supply and · pdf fileresettlement plan . july 2015 . viet...

47
Resettlement Plan July 2015 Viet Nam: Central Region Rural Water Supply and Sanitation Sector Project WATER SUPPLY AND SANITATION OF THANH TRACH COMMUNE, BO TRACH DISTRICT, QUANG BINH PROVINCE Prepared by National Center for Rural and Clean Water and Environmental Sanitation for the Asian Development Bank. This is an updated version of the draft originally posted in June 2008 available on http://www.adb.org/projects/documents/central-region-urban-environmental- improvement-updated-resettlement-plan.

Upload: lyliem

Post on 06-Feb-2018

222 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: NATIONAL CENTRE FOR RURAL WATER SUPPLY AND · PDF fileResettlement Plan . July 2015 . Viet Nam: Central Region Rural . Water Supply and Sanitation Sector Project . WATER SUPPLY AND

Resettlement Plan July 2015

Viet Nam: Central Region Rural Water Supply and Sanitation Sector Project WATER SUPPLY AND SANITATION OF THANH TRACH COMMUNE, BO TRACH DISTRICT, QUANG BINH PROVINCE Prepared by National Center for Rural and Clean Water and Environmental Sanitation for the Asian Development Bank. This is an updated version of the draft originally posted in June 2008 available on http://www.adb.org/projects/documents/central-region-urban-environmental-improvement-updated-resettlement-plan.

Page 2: NATIONAL CENTRE FOR RURAL WATER SUPPLY AND · PDF fileResettlement Plan . July 2015 . Viet Nam: Central Region Rural . Water Supply and Sanitation Sector Project . WATER SUPPLY AND

CURRENCY EQUIVALENTS (as of 6 July 2015)

Currency unit – dong (D)

D1.00 = $0.000046 $1.00 = D21,723

ABBREVIATIONS

ADB – Asian Development Bank AH – Affected Household AP – Affected Person CARB – Compensation Assistance Resettlement Committee CSC – Design-Build Construction Supervision Consultant CPC – Commune People's Committee CPMU – Central Project Management Unit CVWU – Communal Vietnam Women's Union D&B – Design and Build DARD – Department of Agriculture and Rural Development, Provincial DPC – District People's Committee EARF – Environmental Assessment and Review Framework EC – Environmental Protection Commitment EIA – Environmental Impact Assessment EMoP – Environmental Monitoring Plan EMP – Environmental Management Plan EO – Environmental Officer FS – Feasibility Study GoV – Government of Vietnam IEE – Initial Environmental Examination lpcd – liters per capita per day LARC – Land Acquisition and Resettlement Completion Report LARP – Land Acquisition and Resettlement Plan MARD – Ministry of Agriculture and Rural Development MOH – Ministry of Health MONRE – Ministry of Natural Resources and Environment MOU – Memorandum of Understanding NCERWASS – National Centre for Rural Water Supply and Environmental Sanitation NGO – Non-governmental Organization O&M – Operation and Maintenance ODA – Official Development Assistance OHS – Occupational Health and Safety OU – Operating Unit PCERWASS – Provincial Centre for Rural Water Supply and Environmental Sanitation PIA – Project Implementation Assistance PPC – Provincial People's Committee PPMU – Provincial Project Management Unit Project – Central Region Rural Water Supply and Sanitation Sector Project PVWU – Provincial Vietnam Women's Union REA – Rapid Environmental Assessment

NOTE

In this report, "$" refers to US dollars.

Page 3: NATIONAL CENTRE FOR RURAL WATER SUPPLY AND · PDF fileResettlement Plan . July 2015 . Viet Nam: Central Region Rural . Water Supply and Sanitation Sector Project . WATER SUPPLY AND

This resettlement plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Page 4: NATIONAL CENTRE FOR RURAL WATER SUPPLY AND · PDF fileResettlement Plan . July 2015 . Viet Nam: Central Region Rural . Water Supply and Sanitation Sector Project . WATER SUPPLY AND

CENTRAL REGION RURAL WATER SUPPLY AND SANITATION SECTOR PROJECT

{ADB Loan No. 2609-VIE(SF)}

UPDATED RESETTLEMENT PLAN

Water Supply and Sanitation of Thanh Trach Commune, Bo Trach District, Quang Binh Province

Document Stage: Implementation Loan Number: 2609 February 2014

The updated Resettlement Planning Document is the property of the borrower. The views expressed herein do not necessarily represent those of the ADB Board of Directors, Management or staff, and may be preliminary in nature.

Page 5: NATIONAL CENTRE FOR RURAL WATER SUPPLY AND · PDF fileResettlement Plan . July 2015 . Viet Nam: Central Region Rural . Water Supply and Sanitation Sector Project . WATER SUPPLY AND

List of Abbreviations ADB Asian Development Bank CPC Commune People’s Committee DPC District People’s Committee FS Feasibility Study GoV Government of Vietnam HHs Households IA Implementing Agency IMA Independent Monitoring Agency IOL Inventoryof Losses LURC Land Use Right Certificate NGO Non-Government Organization PPC Provincial People’s Committee RP Resettlement Plan RC Resettlement Committee RVS Replacement Value Survey SPS ADB Safeguards Policy Statement VND Vietnam Dong WS Water Supply WTP Water Treatment Plant

Page 6: NATIONAL CENTRE FOR RURAL WATER SUPPLY AND · PDF fileResettlement Plan . July 2015 . Viet Nam: Central Region Rural . Water Supply and Sanitation Sector Project . WATER SUPPLY AND

Central Region Rural Water Supply and Sanitation Sector Project Updated Land Acquisition and Resettlement Plan Thanh Trach commune, Bo Trach district, Quang Binh province

PPMU of Quang Binh

Table of Content

1 PROJECT DESCRIPTION ....................................................................................................................... 1 1.1 Background ................................................................................................................................................ 1 1.2 The Quang Binh Subproject Description ................................................................................................... 1

1.2.1 Thanh Trach commune ............................................................................................................ 2

2 SCOPE OF LAND ACQUISITION AND RESETTLEMENT............................................................... 4 2.1 Inventory of Losses .................................................................................................................................... 4 2.2 The Affected Land and Non-Land Assets.................................................................................................. 4

2.2.1 Permanent Acquired Land ....................................................................................................... 4 2.2.2 Relocation of Utility Structures ............................................................................................... 6 2.2.3 Cultural/Aesthetic Structures................................................................................................... 6 2.2.4 Disturbances to Livelihoods .................................................................................................... 6

3 SOCIO-ECONOMIC INFORMATION OF SUBPROJECT ................................................................. 7

4 INFORMATION DISCLOSURE .............................................................................................................. 7 4.1 Consultations.............................................................................................................................................. 7 4.2 Information Disclosure .............................................................................................................................. 8 4.3 Project Cut-Off Date .................................................................................................................................. 8

5 GRIEVANCE REDRESS MECHANISM ................................................................................................ 8

6 POLICY FRAMEWORK AND ENTITLEMENTS ................................................................................ 9 6.1 Legal Framework ....................................................................................................................................... 9 6.2 Reconciliation of Government and ADB Policy on Resettlement ........................................................... 10

7 ENTITLEMENTS, ASSISTANCE AND BENEFITS ........................................................................... 14 7.1 Objectives 14 7.2 Project Entitlements ................................................................................................................................. 15

8 RESETTLEMENT BUDGET AND FINANCING PLAN .................................................................... 23

9 IMPLEMENTATION SCHEDULE ....................................................................................................... 23

10 RECOMMENDATIONS ........................................................................................................................ 23

Page 7: NATIONAL CENTRE FOR RURAL WATER SUPPLY AND · PDF fileResettlement Plan . July 2015 . Viet Nam: Central Region Rural . Water Supply and Sanitation Sector Project . WATER SUPPLY AND

Central Region Rural Water Supply and Sanitation Sector Project Updated Land Acquisition and Resettlement Plan Thanh Trach commune, Bo Trach district, Quang Binh province

PPMU of Quang Binh

List of Figures

Figure 1 Located of Thanh Trach commune in Quang Binh province. ................................................ 2 Figure 2 Layout of the Quang Binh Subproject Water Supply System................................................ 3 Figure 3 Land to be acquired for boreholes 1, 2 and Treatment Plant................................................... 4 Figure 4 Land to be acquired for Water borehole number 3 and 4. ...................................................... 5 Figure 5 Land to be acquired for access road. ....................................................................................... 5

List of Tables

Table 1 Components of the Water Supply System. ............................................................................. 3 Table 2 Summary of Land Acquisition. ............................................................................................... 6 Table 3 Summary of Temporary Disturbances. ................................................................................... 6 Table 4 Gaps Between National Laws and ADB Policy Key Issues. ................................................. 11 Table 5 Entitlement Matrix of the Project.......................................................................................... 16

Annexes

Annex 1: Minutes of Public Consultation Annex 2: Minutes of meeting confirming public land and no resettlement

Page 8: NATIONAL CENTRE FOR RURAL WATER SUPPLY AND · PDF fileResettlement Plan . July 2015 . Viet Nam: Central Region Rural . Water Supply and Sanitation Sector Project . WATER SUPPLY AND

Central Region Rural Water Supply and Sanitation Sector Project Updated Land Acquisition and Resettlement Plan Thanh Trach commune, Bo Trach district, Quang Binh province 1

PPMU of Quang Binh

1 PROJECT DESCRIPTION

1.1 Background

The Asian Development Bank (ADB) intends to provide an investment project that will contribute to the Government’s goal of providing safe water supply and improved sanitation facilities for rural households in Vietnam. The Central Region Water Supply and Sanitation (RWSS) Project aims to improve the rural environment and enhance poverty reduction activities in six provinces of the Central Region of Vietnam, namely, Thanh Hoa, Nghe An, Ha Tinh, Quang Binh, Quang Nam and Binh Dinh provinces, located in the North and South Central Region.

The Executing Agency (EA) for the RWSS is the Ministry of Agriculture and Rural Development (MARD), with responsibility delegated to the National Centre for Water Supply and Sanitation (NCERWASS). The Implementing Agencies are the Provincial Centres for Water Supply and Environmental Sanitation (PCERWASS) established in each of the 6 provinces.

Six proposed Subprojects in six target provinces were selected during project preparation in January 2009 will involve provision of piped-water supply system and sanitation facilities. The six proposed Subprojects are:

• In Thanh Hoa province, Tien Loc commune, Hau Loc district. • In Nghe An province, Dien Yen commune, Dien Chau district. • In Ha Tinh province, Thach Bang and Thach Kim communes, Loc Ha district. • In Quang Binh province, Thanh Trach commune, Bo Trach district. • In Quang Nam province, AGrong hamlet, A Tieng commune, Tay Giang district • In Binh Dinh province, Tay Thuan and Tay Giang commune, Tay Son district.

Based on ADB Social Safeguards Policy, a resettlement report shall be prepared when land acquisition and resettlement activities are identified that cause may impacts on people’s way of life and their livelihoods that may impoverish them. For these reasons, a land acquisition and resettlement plan will be prepared for all the Subprojects of CRWSSP.

A Land Acquisition and Resettlement Plan (LARP) has been prepared specifically for Quang Binh Thanh Trach Rural Water Supply and Sanitation Subproject in 2012 and has been updated in Nov 2013. This is based on the feasibility study and detailed engineering design of the subproject.

The Thanh Trach RWSSSP will not cause any displacement to any person nor household. It will not cause any loss of livelihood, loss of trees and crops nor loss of private structures, thus will not trigger ADB’s Policy on Involuntary Resettlement.

1.2 The Quang Binh Subproject Description

The Quang Binh Subproject is located in Thanh Trach commune, Bo Trach district of Quang Binh province.

The present situation in Thanh Trach commune is that there is no piped-water supply system. People buy water (from water tank) for cooking and use dug well or drilled well water for washing and bathing. Water from the well is contaminated with alum which sometimes clogs water tube. Households buy water for cooking and drinking at the price of 150,000 VND/m3. Drinking water is bought at 15,000 VND /bottle of 20 litres. Rainwater is considered to be unclean and people do not have the habit of using rainwater.

Page 9: NATIONAL CENTRE FOR RURAL WATER SUPPLY AND · PDF fileResettlement Plan . July 2015 . Viet Nam: Central Region Rural . Water Supply and Sanitation Sector Project . WATER SUPPLY AND

Central Region Rural Water Supply and Sanitation Sector Project Updated Land Acquisition and Resettlement Plan Thanh Trach commune, Bo Trach district, Quang Binh province 2

PPMU of Quang Binh

The proposed water supply project for Thanh Trach will include the construction of a treatment plant with a capacity of 1,530 m3/day.

1.2.1 Thanh Trach commune

Figure 1 Located of Thanh Trach commune in Quang Binh province.

Households will have easy access to clean and safe piped-water to their houses. It is estimated that the construction will be undertaken within a period of 2 years. The long-term goal is to provide to 13,000 people with clean and safe piped-water by 2020.

The components of the water supply system for Thanh Trach will include:

Page 10: NATIONAL CENTRE FOR RURAL WATER SUPPLY AND · PDF fileResettlement Plan . July 2015 . Viet Nam: Central Region Rural . Water Supply and Sanitation Sector Project . WATER SUPPLY AND

Central Region Rural Water Supply and Sanitation Sector Project Updated Land Acquisition and Resettlement Plan Thanh Trach commune, Bo Trach district, Quang Binh province 3

PPMU of Quang Binh

Table 1 Components of the Water Supply System.

Qty

Items

Description

4

Water borehole wells

01 well is located in the treatment plant area

03 wells outside of the treatment plant.

1

Water treatment plant

WTP is located at Tien Phong.

Capacity to 2020 of 1,500 m3/day.

Land area of WTP is 9,077 m2.

Distribution pipeline

Transmission and service pipe lines are built from HDPE pipe with total length 46.805 m

Figure 2 Layout of the Quang Binh Subproject Water Supply System.

Page 11: NATIONAL CENTRE FOR RURAL WATER SUPPLY AND · PDF fileResettlement Plan . July 2015 . Viet Nam: Central Region Rural . Water Supply and Sanitation Sector Project . WATER SUPPLY AND

Central Region Rural Water Supply and Sanitation Sector Project Updated Land Acquisition and Resettlement Plan Thanh Trach commune, Bo Trach district, Quang Binh province 4

PPMU of Quang Binh

2 SCOPE OF LAND ACQUISITION AND RESETTLEMENT

2.1 Inventory of Losses

The Quang Binh PPMU conducted an initial survey of losses for all affected land, assets, tree in the project area in 2012

According to “Minutes of confirming public land and no resettlement” dated February 29, 2102 signed between Quang Binh PPMU, Thanh Trach Communal People Committee and Thanh Trach Women Union and Decision No. 735a/QĐ-SNN dated on 8 October 2013 promulgated by Department of Agriculture and Rural Development on approval of Detailed Design Volume 1.

• All acquired land are public land owned by the CPC • No private land, trees, and crops are affected. • No private structures will be affected or lost.

2.2 The Affected Land and Non-Land Assets

2.2.1 Permanent Acquired Land

Scope of Land Acquisition

According to the FS, four (4) borehole wells will be constructed. One (1) well will be located in treatment plant and 3 borehole wells are located out of treatment plant. The construction area of treatment plant is 9,077m2. Each borehole well will be equipped with submersible pump with a well house accommodating valves and other fittings. Land area required is 800 m2 including protection zone. The land for the borehole wells and water treatment plant are public land managed by the Commune People’s Committee. Therefore no compensation on land or properties are required.

Figure 3 Land to be acquired for boreholes 1, 2 and Treatment Plant.

Page 12: NATIONAL CENTRE FOR RURAL WATER SUPPLY AND · PDF fileResettlement Plan . July 2015 . Viet Nam: Central Region Rural . Water Supply and Sanitation Sector Project . WATER SUPPLY AND

Central Region Rural Water Supply and Sanitation Sector Project Updated Land Acquisition and Resettlement Plan Thanh Trach commune, Bo Trach district, Quang Binh province 5

PPMU of Quang Binh

Figure 4 Land to be acquired for Water borehole number 3 and 4.

The access road connection from Highway 1A to the treatment plant with a length of 500 m and width of 4 m. is sufficient for trucks and other construction vehicles to enter the treatment plant. This is public land and no crops, trees or any properties located on the access road land that will be affected.

Figure 5 Land to be acquired for access road.

Page 13: NATIONAL CENTRE FOR RURAL WATER SUPPLY AND · PDF fileResettlement Plan . July 2015 . Viet Nam: Central Region Rural . Water Supply and Sanitation Sector Project . WATER SUPPLY AND

Central Region Rural Water Supply and Sanitation Sector Project Updated Land Acquisition and Resettlement Plan Thanh Trach commune, Bo Trach district, Quang Binh province 6

PPMU of Quang Binh

Table 2 Summary of Land Acquisition.

Land Acquired

Affected area (m2)

Classification of land

Household affected

3 borehole wells outside of treatment plant

4,800 Public land

0

Water treatment plant (including 1 borehole well)

9,073

Public land

0

Access road

2,416.3

Public land

0

Pipeline

537,9

Public land

0

Total area

16,827.2

Table 3 Summary of Temporary Disturbances.

Structures Causing Temporary Disturbance

Affected area (m2)

Classification of land

Household affected

Distribution and network service pipeline

25,000

Public land

0

Drainage channel

260

Public land

0

Total area

25,260

2.2.2 Relocation of Utility Structures

There will no relocation of any utility structures.

2.2.3 Cultural/Aesthetic Structures

Based on technical design there will be no impacts on any cultural or aesthetic structures.

2.2.4 Disturbances to Livelihoods

Design of the pipeline located on the inter-hamlet roads, service roads located on the edge of the hamlets; show that there will be no impact or loss of structures, crops, as well as other assets of households during the construction of the pipeline. There will be temporary disturbances to businesses located along the road where the pipes will be laid which may cause difficulties in terms of access, and noise and dust pollutions.

To minimize temporary disturbances particularly on access to businesses, services and other activities along the road, the Contractor will provide information in advance, about the date, time and duration of the construction activities so that the affected households/businesses and/or institutions will be able to prepare. Wooden or steel boards will be placed across excavations to provide access and ease traffic movements.

Page 14: NATIONAL CENTRE FOR RURAL WATER SUPPLY AND · PDF fileResettlement Plan . July 2015 . Viet Nam: Central Region Rural . Water Supply and Sanitation Sector Project . WATER SUPPLY AND

Central Region Rural Water Supply and Sanitation Sector Project Updated Land Acquisition and Resettlement Plan Thanh Trach commune, Bo Trach district, Quang Binh province 7

PPMU of Quang Binh

Other measures and timing to minimize disturbances and impacts are:

• Pipelines will be put in parallel with the process of digging ditches to save time. Once the pipes have been laid, this will be immediately being covered with earth/soil. Estimated installation of pipes will be around 2 days per section.

• Wooden planks will be placed where there are excavations crossing the road to ensure continuous traffic movement.

• Pressure test will take about 2 days. • Total for construction of each 300-500m about 1 week.

People are aware that this project will provide benefits and meet their practical needs. Through the above measures, damages, losses and disturbances to the households will hopefully be minimized. Making people aware of the construction activities will make them ready for construction and appreciate that clean water will be provided to their households soon which will improve their health and quality of life.

3 SOCIO-ECONOMIC INFORMATION OF SUBPROJECT

The Subproject is located in Thanh Trach Commune, Bo Trach District, Quang Binh Province. This is connected to A1 Highway.

Thanh Trach has a population of 12,191 persons or 2,587 households. Of these populations, 6,088 are males and 6,103 are females. There are 1,548 female – headed household. Also, 5,822 persons belong to the working age.

There are no ethnic minorities within the proposed subproject area.

Subproject will provide latrine and septic tank for 300 poor households and near poor female- headed households.

According to 2011 Statistics, the annual income per capita is VND 16 million.

There are no affected households in the project area. Only temporary disturbances during construction period may occur as described in Section 2.2.4.

4 INFORMATION DISCLOSURE

Disclosure of information and consultations were conducted during preparation and implementation of subprojects to ensure that stakeholders are timely informed about land acquisition, project entitlement framework, and grievance redress mechanism so that they will have opportunities to participate in and express their preferences and concerns regarding the resettlement program. However, all acquired land is public land, there are no affected households, compensation and resettlement is not required.

4.1 Consultations

Consultation and information dissemination has been an integral component of the LARP preparation. During the preparation of this LARP, information about the scope of the project land acquisition has been discussed with local authorities and residents. The Public consultation was conduct on 10 October 2013 with presence of PPMU preventative and head of hamlets in Thanh Trach commune. See the Annex 1: Minutes of public consultation on water supply and sanitation subproject in Thanh Trach commune – Bo Trach district – Quang Binh province.

Page 15: NATIONAL CENTRE FOR RURAL WATER SUPPLY AND · PDF fileResettlement Plan . July 2015 . Viet Nam: Central Region Rural . Water Supply and Sanitation Sector Project . WATER SUPPLY AND

Central Region Rural Water Supply and Sanitation Sector Project Updated Land Acquisition and Resettlement Plan Thanh Trach commune, Bo Trach district, Quang Binh province 8

PPMU of Quang Binh

4.2 Information Disclosure

The PPMU and DRCC keep the population informed about the project activities. Information such as the starting date of clearing of lands acquired and construction works schedule will be disseminated.

Schedule of civil works for infrastructures shall be announced 1 month in advance.

4.3 Project Cut-Off Date

The Cut-off date is 29 February, 2012. The PPMU shall announce this date because any structure constructed on lands to be acquired or affected; and trees and crops planted after that date will not be eligible for compensation. Announcement will use all forms of media such as posters, radio, newspaper and television so that all households within the project service area will be properly informed. District and Commune authorities shall also make announcements within their constituencies.

5 GRIEVANCE REDRESS MECHANISM

Grievances related to any aspect of the Project will be handled through negotiation aimed at achieving consensus. Complaints will pass through 3 stages before they could be elevated to a court of law as a last resort.

First Stage, Commune People’s Committee

An aggrieved affected household may bring his/her complaint before any member of the Commune People’s Committee, either through the Village Chief or directly to the CPC, in writing or verbally. It is incumbent upon said member of CPC or the village chief to notify the CPC about the complaint. The CPC will meet personally with the aggrieved affected household and will have 30-45 days following the lodging of the complaint to resolve it (Note: in remote and mountainous areas, the complaint should be resolved within 45-60 days. The CPC secretariat is responsible for documenting and keeping file of all complaints that it handles.

Upon issuance of decision of CPC, the household can make an appeal within 30 days. If the second decision has been issued and the household is still not satisfied with the decision, the household can elevate his/her complaint to the DPC.

Second Stage, District People’s Committee

Upon receipt of complaint from the household, the DPC will have 30-45 days (or 45-60 days if it is in remote or mountainous areas) following the lodging of the complaint to resolve the case. The DPC is responsible for documenting and keeping file of all complaints that it handles.

Upon issuance of decision of DPC, the household can make an appeal within 30 days. If the second decision has been issued and the household is still not satisfied with the decision, the household can elevate his/her complaint to the PPC.

Third Stage, Provincial People’s Committee

Upon receipt of complaint from the household, the PPC will have 30-45 days (or 45-60 days if it is in remote or mountainous areas) following the lodging of the complaint to resolve the case. The PPC is responsible for documenting and keeping file of all complaints that reaches the same.

Upon issuance of decision of PPC, the household can make an appeal within 30 days. If the second decision has been issued and the household is still not satisfied with the decision, the

Page 16: NATIONAL CENTRE FOR RURAL WATER SUPPLY AND · PDF fileResettlement Plan . July 2015 . Viet Nam: Central Region Rural . Water Supply and Sanitation Sector Project . WATER SUPPLY AND

Central Region Rural Water Supply and Sanitation Sector Project Updated Land Acquisition and Resettlement Plan Thanh Trach commune, Bo Trach district, Quang Binh province 9

PPMU of Quang Binh

household can elevate his/her complaint to the court within 45 days. PPC will then deposit the compensation payment in an escrow account.

Final Stage, the Court of Law Arbitrates. Should the complainant file his/her case to the court and the court rule in favour of the complainant, then PPMU/DRCC will have to increase the compensation at a level to be decided by the court. In case the court will rule in favour of PPC, then the amount deposited with the court is what the complainant will receive.

The AHs will be provided with support and assistance by local based organizations, in case they have limited capacity in case they have questions or complaints.

If efforts to resolve complaints or disputes are still unresolved and unsatisfactory following the project’s grievance redress mechanism, the households have the right to send their concerns or problems directly to ADB’s Operations Department, i.e., Transport and Communications Division, Southeast Asia Department (SERD) or through ADB Viet Nam Resident Mission. If the households are still not satisfied with the responses of SERD, they can directly contact the ADB's Office of the Special Project Facilitator (OSPF) as outlined in the "Information Guide to the Consultation Phase of the ADB Accountability Mechanism.

Grievance redress mechanism will be applied if any affection is identified in detailed design process.

6 POLICY FRAMEWORK AND ENTITLEMENTS

6.1 Legal Framework

The Resettlement Legal Framework and Entitlements for the Project have been built upon the laws of the Government of Viet Nam and the ADB's Safeguard Policy Statement (2009). However, provisions and principles adopted in the Resettlement Legal Framework for the project supersede the provisions of relevant decrees currently in force in Viet Nam wherever a gap exists. The overall objective of the policy is to ensure that all people affected by the Subproject are able to maintain and, preferably, improve their pre-subproject living standards and income-earning capacity from compensation and life rehabilitation assistance for the loss of movable and immovable assets.

The policy is based on the laws and regulations of the Government of Viet Nam (GOV) and the ADB. The principal Vietnamese laws and regulations include:

The 2003 Land Law dated 26 November 2003;

Decree 181/2004/ND-CP dated 29/10/2004of the Government guiding the execution of amended land law 2003;

Decree 197/2004/ND-CP date 03/12/2004 of the Government on compensation, assistance and resettlement in the event of land recovery by the State;

Decree No. 188/2004/ND-CP dated November 16, 2004 of the Government on methods of determining land prices and land prices framework;

Circular No. 114/2004/TT-BTC dated November 16, 2004 of Ministry of Finance guiding the implementation of Decree No. 188/2004/ND-CP of the Government;

Decree No. 17/2006/ND-CP dated January 27, 2006 of the Government amending and supplementing some articles of the Decree guiding the implementation of the Land Law and Decree No. 187/2004/ND-CP on the transfer state-owned companies into joint stock companies.

Decree No. 84/2007/ND-CP dated May 25, 2007 of the Government on additional regulations on the granting of land use right certificates, land acquisition, implementation of land use

Page 17: NATIONAL CENTRE FOR RURAL WATER SUPPLY AND · PDF fileResettlement Plan . July 2015 . Viet Nam: Central Region Rural . Water Supply and Sanitation Sector Project . WATER SUPPLY AND

Central Region Rural Water Supply and Sanitation Sector Project Updated Land Acquisition and Resettlement Plan Thanh Trach commune, Bo Trach district, Quang Binh province 10

PPMU of Quang Binh

rights, compensation order and procedure, resettlement when the State recovers land and settle claims about land;

Decree No. 123/2007/ND-CP dated 27 July 2007 amending and supplementing some articles of Decree No. 188/2004/ND-CP dated 16 November 2004 on methods of determining land prices and frame land prices;

Decree 69/2009/ND-CP dated August 13, 2009 of the Government of Vietnam regulating additional planning of land use plan, land prices, land acquisition, compensation, assistance and resettlement;

Circular 14/2009/TT - BTNMT dated January 10, 2009 by MONRE regulating compensation, assistance and resettlement procedures and land acquisition, land allocation, land lease in details;

6.2 Reconciliation of Government and ADB Policy on Resettlement

With the promulgation of Decree 197/2004/ND-CP (3/12/2004) and Decree 69/2009/ND-CP and relevant decrees stated above, the policies and practices of the Government have become more consistent with ADB’s social safeguards policies. Nonetheless, provisions and principles adopted in this Resettlement Plan will supersede the provisions of the relevant decrees currently enforced in Viet Nam wherever a gap exists, as provided for under Decree 131/2006/ND-CP (November 2006), which regulates the management and use of official development assistance.

It should also be noted that as per Decree 69/2009, Article 23, it states "Apart from the support prescribed in Articles 18, 19, 20, 21 and 22 of this Decree, basing themselves on the local realities, the provincial-level People’s Committee shall decide on other supporting measures to stabilize life and production of persons who have land recovered; special cases shall be submitted to the Prime Minister for decision”, therefore, if additional gaps not mentioned below are found during LARP updating, the required assistance or support will be included in the Updated LARP.

The differences between the Government’s Laws and Decrees and ADB Policy with regard to resettlement and compensation, and how to address these gaps for this Project are shown in the table below.

Page 18: NATIONAL CENTRE FOR RURAL WATER SUPPLY AND · PDF fileResettlement Plan . July 2015 . Viet Nam: Central Region Rural . Water Supply and Sanitation Sector Project . WATER SUPPLY AND

11

Central Region Rural Water Supply and Sanitation Sector Project Updated Land Acquisition and Resettlement Plan Thanh Trach commune, Bo Trach district, Quang Binh province

PPMU of Quang Binh

Table 4 Gaps Between National Laws and ADB Policy Key Issues.

Key Issues

National Laws

ADB Policy

Project Policy

Definition of Vulnerable groups

Vulnerable groups those below the poverty line, the landless, the elderly, women and children, and Indigenous Peoples.

(i) female headed households with dependents (ii) households with disabled persons, (iii) households falling under the current MOLISA benchmark poverty line, (iv) children and elderly households who are with no other means of support, (v) landless households, and (vi) non-integrated and vulnerable ethnic minorities; and (vii) social policy households as defined by the Government

Provision of Assistance to Economically Displaced Households.

Decree 197/2004 (as amended by Decree 69/2009) states that affected households losing 30% or more of their productive land will be provided assistance.

However, Article 23 of Decree 69/2009 also states that based on actual conditions at the local area, PPC shall determine other assistance methods to ensure accommodation and life stabilization. It also states that households who are directly involved in agricultural production and derive their major income from the land that are to be acquired by the Government, PPC shall consider the assistance level on a case by case basis based on actual conditions.

Provide economically displaced persons with needed assistance. Improve the standards of living of the displaced poor and other vulnerable groups, including women, to at least national minimum standards.

Focus on strategies to avoid further impoverishment and create new opportunities to improve status of the poor and vulnerable people.

Specific measures will be provided to ensure that all vulnerable groups are assisted to improve or at least restore living standards to pre-project levels and in a manner that is culturally sensitive and appropriate.

Page 19: NATIONAL CENTRE FOR RURAL WATER SUPPLY AND · PDF fileResettlement Plan . July 2015 . Viet Nam: Central Region Rural . Water Supply and Sanitation Sector Project . WATER SUPPLY AND

12

Central Region Rural Water Supply and Sanitation Sector Project Updated Land Acquisition and Resettlement Plan Thanh Trach commune, Bo Trach district, Quang Binh province

PPMU of Quang Binh

Decree 17, 2006 also states that In any case where any household or individual from whom land is recovered has a living standard which is classifies either as a

Page 20: NATIONAL CENTRE FOR RURAL WATER SUPPLY AND · PDF fileResettlement Plan . July 2015 . Viet Nam: Central Region Rural . Water Supply and Sanitation Sector Project . WATER SUPPLY AND

13

Central Region Rural Water Supply and Sanitation Sector Project Updated Land Acquisition and Resettlement Plan Thanh Trach commune, Bo Trach district, Quang Binh province

PPMU of Quang Binh

Key Issues

National Laws

ADB Policy

Project Policy

poor household according to criteria set for poor households by MOLISA, they must be assisted to overcome the poverty. The actual amount and time of assistance will be decided by the People’s Committee of a province or city under Central control but it must not be less than 3 years and must not exceed 10 years counting from the day of completion of land recovery.

Non-titled users Clause 2 of Article 23, Decree 69/2009, the Peoples’ Committees of the provinces or centrally-run cities shall consider providing such support on case-by-case basis.

Non-titled households, including displaced tenants, sharecroppers and squatters, are not entitled to compensation for land but are entitled to payment for non-land assets and assistance to restore their pre-project living standards. If they are poor and vulnerable, appropriate assistance must be provided to help them improve their socio-economic status.

Poor and vulnerable non-titled users will be provided appropriate assistance to help them improve their socio-economic status. The type of assistance will be identified during LARP updating as per consultation with households.

Unregistered businesses

Compensate and support only registered manufacturing and business enterprise or households

Promptly compensate all economically displaced persons for the loss of income or livelihood sources at full replacement cost, and assist through credit facilities, training and employment opportunities

Assist displaced persons/households who do not fall under registered business by providing assistance in cash or in-kind during transition period.

Houses and structures

Decree 197/2004, Articles 18-20: Houses and structures constructed prior to land use plans or the right of way announcements will be assisted at 80% of replacement cost.

Structure to be compensated 100% of replacement cost, without depreciation and regardless of status of the AH on the land as long as structure was put prior to the cut- off date

Houses and other structures on land without sufficient conditions for compensation that were constructed prior to the decision on land recovery (cut-off date) will be compensated 80% of new construction price. Plus: cash assistance amounting to 20% of new construction price if at the time of construction there is no clear or proper announcement of land use plan or ROW.

Page 21: NATIONAL CENTRE FOR RURAL WATER SUPPLY AND · PDF fileResettlement Plan . July 2015 . Viet Nam: Central Region Rural . Water Supply and Sanitation Sector Project . WATER SUPPLY AND

14

Central Region Rural Water Supply and Sanitation Sector Project Updated Land Acquisition and Resettlement Plan Thanh Trach commune, Bo Trach district, Quang Binh province

PPMU of Quang Binh

Entity that Provincial and cities people’s Qualified and experienced experts will Qualified and experienced experts will be

Page 22: NATIONAL CENTRE FOR RURAL WATER SUPPLY AND · PDF fileResettlement Plan . July 2015 . Viet Nam: Central Region Rural . Water Supply and Sanitation Sector Project . WATER SUPPLY AND

15

Central Region Rural Water Supply and Sanitation Sector Project Updated Land Acquisition and Resettlement Plan Thanh Trach commune, Bo Trach district, Quang Binh province

PPMU of Quang Binh

Key Issues

National Laws

ADB Policy

Project Policy

conducts the valuation of acquired assets

committee under central authority will establish specific land prices based on the principles stated in clause 1, Article 56, Land Law. Qualified organizations may provide consultancy on land prices (Article 57, Land Law)

undertake the valuation of acquired assets engaged to conduct replacement cost surveys for the project which will be used as input by the District Compensation Boards under the District People’s Committee for determining compensation amounts.

Page 23: NATIONAL CENTRE FOR RURAL WATER SUPPLY AND · PDF fileResettlement Plan . July 2015 . Viet Nam: Central Region Rural . Water Supply and Sanitation Sector Project . WATER SUPPLY AND

14

Central Region Rural Water Supply and Sanitation Sector Project Updated Land Acquisition and Resettlement Plan Thanh Trach commune, Bo Trach district, Quang Binh province

PPMU of Quang Binh

7 ENTITLEMENTS, ASSISTANCE AND BENEFITS

7.1 Objectives

The overall objectives of the resettlement policy for this LARP are (i) to minimize, if not avoidable, resettlement impacts; (ii) if impacts are unavoidable, LARP is prepared in a way to ensure that AHs are not worse off; rather, they should be able to at least maintain or otherwise improve their pre-project living standards and income-earning capacity. Principles adopted for this Project, irrelevant to current situation but might be relevant in the future in case there will be major changes in alignment designs, are presented below:

• Involuntary resettlement and impacts on land, structures and other fixed assets will be minimized where possible by exploring all alternative options.

• Compensation will be based on the principle of replacement cost at the time of compensation.

• Displaced persons without title or any recognizable legal rights to land are eligible for resettlement assistance and compensation for non-land assets at replacement cost.

• Residential land, residential house and agricultural land for replacement should be close to the previous places as much as possible and be suitable to displaced persons.

• Meaningful consultation will be carried out with the affected households and concerned groups and ensure participation from planning up to implementation. The comments and suggestions of the AHs and communities will be taken into account.

• The LARP will be disclosed to AHs in a form and language(s) understandable to them prior to submission to ADB.

• Resettlement identification, planning and management will ensure that gender concerns are incorporated.

• Special measures will be incorporated in the resettlement plan to protect socially and economically vulnerable groups such as households headed by women, children, disabled, the elderly, landless and people living below the generally accepted poverty line.

• Existing cultural and religious practices will be respected and, to the maximum extent practical, preserved.

• Culturally appropriate and gender-sensitive social impact assessment and monitoring will be carried out in various stages of the project.

• Resettlement transition stage should be minimized. Restoration measures will be provided to displaced persons before the expected starting date of construction in the specific location.

• Budget for payment of compensation, resettlement and support will be prepared sufficiently and made available during project implementation. Sites for resettlement and restoration will be available as required.

• Reporting and independent monitoring should be defined clearly as part of the management system of resettlement. Independent assessment of the duration and results of the land recovery should be carried out.

Page 24: NATIONAL CENTRE FOR RURAL WATER SUPPLY AND · PDF fileResettlement Plan . July 2015 . Viet Nam: Central Region Rural . Water Supply and Sanitation Sector Project . WATER SUPPLY AND

15

Central Region Rural Water Supply and Sanitation Sector Project Updated Land Acquisition and Resettlement Plan Thanh Trach commune, Bo Trach district, Quang Binh province

PPMU of Quang Binh

• PPMU will not issue notice of possession to contractors until DPC has officially confirmed in writing that (i) payment has been fully disbursed to the displaced persons and rehabilitation measures are in place as per Updated LARP agreed between PPMU and ADB; (ii) already-compensated displaced persons have cleared the area in a timely manner; and (iii) the area is free from any encumbrances. No land recovery or site clearing will be done until and after the Updated LARP has been agreed between PPMU and ADB and the provisions in the Updated LARP have been implemented satisfactorily.

7.2 Project Entitlements

The project entitlements (i.e. compensation and support) developed and presented in the entitlement matrix below corresponds to the impacts identified during the IOL. It should be noted that these entitlements may be enhanced, as necessary, following the conduct of DMS and consultation with AHs. Entitlements adopted are based on government policies and decisions and ADB policies. Entitled persons are those who satisfy the cut-off-date.

Page 25: NATIONAL CENTRE FOR RURAL WATER SUPPLY AND · PDF fileResettlement Plan . July 2015 . Viet Nam: Central Region Rural . Water Supply and Sanitation Sector Project . WATER SUPPLY AND

16

Central Region Rural Water Supply and Sanitation Sector Project Updated Land Acquisition and Resettlement Plan Thanh Trach commune, Bo Trach district, Quang Binh province

PPMU of Quang Binh

Table 5 Entitlement Matrix of the Project.

No. Type of

Loss/Impacts Application Eligible Persons Entitlements

1 Productive Land (Agricultural, Aquaculture, Forest, Garden)

Marginal loss (i.e., land is still economically viable for use or meets the expected personal yield) This will be determined by the Compensation, Assistance and Resettlement Board or CARB and concurred with by the affected household during the detailed measurement survey or DMS)

Owners with LURC; in the process of acquiring LURC; are eligible to acquire LURC; and those covered by customary rights, such as members of ethnic minority groups.

• For the portion to be acquired permanently: Cash compensation at replacement cost (free from taxes and transaction costs).

• For the portion to be used temporarily during construction: (i) rental in cash which will be no less than the net income that would have been derived from the affected property duringdisruption;(ii) restorationofthelandwithin3 months after use; PCERWASS will pay full replacement cost if contractor fails to restore the affected land within 3 months after end of use.

• For non-land assets, see Items 3-5 below. • Affected households to be notified at least 4

months prior to the date that the Project will actually be acquired by the Project.

Same application as above Affected households with lease agreement over the affected land

• For the portion to be acquired permanently: (i) cash assistance equivalent to 30% of the replacement cost of the land for any improvements (e.g., landscaping, filling, leveling, etc.) invested on the affected property to make it productive; (ii) cash assistance for permanent loss of production equivalent to market value of produce on affected land per year multiplied by 3 years.

Page 26: NATIONAL CENTRE FOR RURAL WATER SUPPLY AND · PDF fileResettlement Plan . July 2015 . Viet Nam: Central Region Rural . Water Supply and Sanitation Sector Project . WATER SUPPLY AND

17

Central Region Rural Water Supply and Sanitation Sector Project Updated Land Acquisition and Resettlement Plan Thanh Trach commune, Bo Trach district, Quang Binh province

PPMU of Quang Binh

No.

Type of Loss/Impacts

Application

Eligible Persons

Entitlements

For the portion to be used temporarily during construction: rental in cash which will be no less than the net income that would have been derived from the affected property during disruption; (ii) restoration of the land within 3 months after use; Government will pay 30% of the replacement cost of the property if contractor fails to restore the affected land within 3 months after end of use.

• For non-land assets, see Items 3-5 below • Affected households to be notified at least

4 months prior to the date that the Project will actually be acquired by the Project

Severe loss (i.e., land no longer viable for continued use or does not meet the expected personal yield, therefore the entire property to be acquired.) This will be determined by the CARB and concurred with by the affected household during DMS)

Owners with LURC; in the process of acquiring LURC; is eligible to acquired LURC; and those covered by customary rights, such as members of ethnic minority groups.

• Cash compensation at replacement cost (free from transaction costs) for the entire land, or land-for-land of equivalent productive value and with secure tenure.

• For non-land assets, see Items 3-5 below • For allowances due to severe loss, see

Items 9 and 11 below • Entitled to take part in the income

restoration program • Affected households to be notified at least

4 months prior to the date that the Project will actually be acquired by the Project

Same application as above Affected households with lease agreement over the affected land

• Cash compensation equivalent to 30% of the replacement cost of the entire land for lost investments or land-for-land of equal productive value and with same lease agreement, plus cash assistance for

Page 27: NATIONAL CENTRE FOR RURAL WATER SUPPLY AND · PDF fileResettlement Plan . July 2015 . Viet Nam: Central Region Rural . Water Supply and Sanitation Sector Project . WATER SUPPLY AND

18

Central Region Rural Water Supply and Sanitation Sector Project Updated Land Acquisition and Resettlement Plan Thanh Trach commune, Bo Trach district, Quang Binh province

PPMU of Quang Binh

No.

Type of Loss/Impacts

Application

Eligible Persons

Entitlements

permanent loss of production equivalent to market value of produce on affected land per year multiplied by 3 years.

• For non-land assets, see Items 3-5 below • For allowances due to severe loss, see

Items 9 and 11 below • Entitled to income restoration program • Affected households to be notified at least

4 months prior to the date that the Project will actually be acquired by the Project

Marginal loss (i.e., land is still viable for use and not requiring relocation) This will be determined by the CARB and concurred with by the affected household during the DMS

Owners with LURC; in the process of acquiring LURC; are eligible to acquire LURC; and those covered by customary rights, such as members of ethnic minority groups.

• For the portion to be acquired permanently: Cash compensation at replacement cost (free from taxes and/or transaction costs).

• For the portion to be used temporarily during construction:

• rental in cash to be negotiated by CARB with the affected households; (ii) restoration of the land within 3 months after use; Government will pay replacement cost if contractor fails to restore the affected land within 3 months after end of use.

• For non-land assets, see Items 3-5 below • Affected household to be notified at least

6 months prior to the date that the Project will actually be acquired by the Project

2 Residential Land Severe loss (i.e., land no longer viable for continued use and the entire property to be acquired).

Owners with LURC; in the process of acquiring LURC; is eligible to acquire

• Cash compensation at replacement cost (free from taxes and transaction costs) for

Page 28: NATIONAL CENTRE FOR RURAL WATER SUPPLY AND · PDF fileResettlement Plan . July 2015 . Viet Nam: Central Region Rural . Water Supply and Sanitation Sector Project . WATER SUPPLY AND

19

Central Region Rural Water Supply and Sanitation Sector Project Updated Land Acquisition and Resettlement Plan Thanh Trach commune, Bo Trach district, Quang Binh province

PPMU of Quang Binh

No.

Type of Loss/Impacts

Application

Eligible Persons

Entitlements

This will be determined by the CARB and concurred with by the affected household during DMS

LURC; and those covered by customary rights, such as members of ethnic minority groups.

the entire land, or land-for-land of similar attributes with secure tenure

• For non-land assets, see Items 3-5 below • For allowances due to relocation of house,

see Item 10 below • Affected households to be notified at least

6 months on the • date that the Project will actually be

acquired by the Project The Project, through the CARB and the Commune People’s Committee (CPC), will acquire and develop a group relocation site if at least 8 affected households losing entire residential land in a village are willing to shift to said relocation site in lieu of cash compensation for their lost residential land. Each home plot will be not less than 200 m² in ruralareas and not less than 100 m² in urban areas and will have its own latrine. Relocation site will have basic facilities.

Marginal impact (i.e., unaffected portion of the house is still viable for use and require no relocation This will be determined by the CARB and concurred withby the affected household during the DMS.

Owners of the structures with or without acceptable proof of ownership over the land; with or without building permit

• Cash compensation at replacement cost (i.e., no depreciation and no deduction for salvage materials) for the affected portion.

• Repair allowance not less than 20% of replacement cost of the affected portion or equivalent to the actual cost of repair.

3 House and Shops Severe impact (i.e., house is no longerviable for continued use and

the entire structure is to be acquired This will be determined by the CARB and

Owners of the structures with or without acceptable proof of ownership over the land; with or without

• Cash compensation based on current market prices of materials and labour without depreciation or deductions for salvaged building materials for the entire

Page 29: NATIONAL CENTRE FOR RURAL WATER SUPPLY AND · PDF fileResettlement Plan . July 2015 . Viet Nam: Central Region Rural . Water Supply and Sanitation Sector Project . WATER SUPPLY AND

20

Central Region Rural Water Supply and Sanitation Sector Project Updated Land Acquisition and Resettlement Plan Thanh Trach commune, Bo Trach district, Quang Binh province

PPMU of Quang Binh

No.

Type of Loss/Impacts

Application

Eligible Persons

Entitlements

concurred with by the affected household during DMS.

building permit structure. • For allowances see Item 10 below

Loss of, or damage to, assets Owners of the structures with or without acceptable proof of ownership over the land; with or without building permit

• Cash compensation based on current market prices of materials and labour without depreciation or deductions for salvaged building materials

4 Secondary Structures (kitchen, latrine, etc)

Loss of, or damage to, assets Owners regardless of tenure status

• Annual crops and aquaculture products equivalent to current market value of crops/aquaculture products at the time of compensation;

• For perennial crops trees, cash compensation at replacement cost equivalent to current market value given the type, age and productive value (future production) at the time of compensation.

• Timber trees based on diameter at breast height at current market value

5 Crops and Trees, aquaculture products

Loss of, or damage to, assets EVN, Telecom, • Cash compensation to cover the cost of restoring the facilities

6 Public Facilities (Electric poles, telecom,

Loss of, or damage to, assets Irrigators’ Association • Cash compensation to cover the cost of restoring the irrigation system

7 Communal-owne d irrigation

system

Damage to graves Affected households • All costs of excavation, relocation and reburial will be reimbursed in cash to the affected family.

• Graves to be exhumed and relocated in culturally sensitive and appropriate ways

8 Graves Severe impacts due to loss of 10% or more of their total productive land and income sources

Owners with LURC; in the process of acquiring LURC;

• Transition subsistence allowance of VND24,000,000 per household, sufficient

Page 30: NATIONAL CENTRE FOR RURAL WATER SUPPLY AND · PDF fileResettlement Plan . July 2015 . Viet Nam: Central Region Rural . Water Supply and Sanitation Sector Project . WATER SUPPLY AND

21

Central Region Rural Water Supply and Sanitation Sector Project Updated Land Acquisition and Resettlement Plan Thanh Trach commune, Bo Trach district, Quang Binh province

PPMU of Quang Binh

No.

Type of Loss/Impacts

Application

Eligible Persons

Entitlements

are eligible to acquire LURC; and those covered by customary rights, such as members of ethnic minority groups and affected households with lease agreement over the affected land

to provide minimum basic needs of the household for 2 years and which amount will be given in tranches every 6 months to coincide with the cropping season while affected households are taking part in the income restoration program in order to restore their pre-project income/livelihood.

9 Loss of Income/Livelihood due to loss of productive land

Severe impacts on houses Relocating households (houses) regardless of tenure status

• Materials transport allowance not less than VND 3,000,000/ household or equivalent to the actual cost of relocation expenses (labour, transport) if relocating within the district. Affected households opting to transfer to another province will be provided not less than VND 5,000,000/ household or equivalentto the actual cost of relocation expenses (labour, transport).

• Transition subsistence allowance of not less than 6 months VND 6,000,000/household. This will cover miscellaneous/ living expenses costs rebuilding of house for a period of six months.

10 Impacts on Houses and Will Require Relocation

Severe impacts on shops Relocating shop owners) regardless of

tenure status

• Materials transport allowance not less than VND 3,000,000/ shop owner if relocating within the district or equivalent to the actual cost of relocation expenses (labour, transport). Affected shop owner opting to transfer to another province will be provided not less than VND 5,000,000/

Page 31: NATIONAL CENTRE FOR RURAL WATER SUPPLY AND · PDF fileResettlement Plan . July 2015 . Viet Nam: Central Region Rural . Water Supply and Sanitation Sector Project . WATER SUPPLY AND

22

Central Region Rural Water Supply and Sanitation Sector Project Updated Land Acquisition and Resettlement Plan Thanh Trach commune, Bo Trach district, Quang Binh province

PPMU of Quang Binh

No.

Type of Loss/Impacts

Application

Eligible Persons

Entitlements

household or equivalent to the actual cost of relocation expenses (labour, transport).

• Business disruption allowance of not less than 6 months VND 6,000,000/household to cover the loss of income during re- establishing of shops which is reckoned to take six months

11 Loss of Income/ Livelihood due to relocation of business

Loss of Land and Non-Land Assets Affected vulnerable groups regardless of severity of impacts

• Additional support allowance of not less than VND 1,200,000 per household for 12 months to cover for additional human resources to help them rebuild their houses and re-establish their livelihood.

• Entitled to take part in Income Restoration Program

12 Higher risks of impoverishment / hardship due to loss of resource base

Page 32: NATIONAL CENTRE FOR RURAL WATER SUPPLY AND · PDF fileResettlement Plan . July 2015 . Viet Nam: Central Region Rural . Water Supply and Sanitation Sector Project . WATER SUPPLY AND

23

Central Region Rural Water Supply and Sanitation Sector Project Updated Land Acquisition and Resettlement Plan Thanh Trach commune, Bo Trach district, Quang Binh province

PPMU of Quang Binh

8 RESETTLEMENT BUDGET AND FINANCING PLAN

All land is public land and thus there will be no resettlement nor affected households entitled for compensation.

9 IMPLEMENTATION SCHEDULE

Main Resettlement Plan Activities

Implementation schedule

LARP Preparation (IOL, Consultation, RCS)

11/2012

PPC submission to ADB for review and concurrence

12/2012

Updating of LARP after having detailed design

10/2013

Submission of updated LARP to ADB

11/2013

ADB review and comment

01/2014

Resubmission of revised updated LARP to ADB

02/2014

10 RECOMMENDATIONS

Thanh Trach Water Supply and Sanitation Project, Bo Trach District, Quang Binh province does not trigger the ADB’s Policy on Involuntary Resettlement because the land acquired for the water supply structures and pipeline network are all unoccupied public lands and no household is affected.

Public Consultation has been conducted as prescribed by both ADB Policy on Involuntary Resettlement and the laws of the Government of Vietnam on Land and Resettlement.

This Subproject is classified as Category C and no further action is required.

This is compliant to the social safeguards of both ADB and the Government of Vietnam’s law and decrees on land and resettlement.

Page 33: NATIONAL CENTRE FOR RURAL WATER SUPPLY AND · PDF fileResettlement Plan . July 2015 . Viet Nam: Central Region Rural . Water Supply and Sanitation Sector Project . WATER SUPPLY AND

Central Region Rural Water Supply and Sanitation Sector Project Updated Land Acquisition and Resettlement Plan Thanh Trach commune, Bo Trach district, Quang Binh province

PPMU of Quang Binh

Annex 1: Minutes of Public Consultation

Page 34: NATIONAL CENTRE FOR RURAL WATER SUPPLY AND · PDF fileResettlement Plan . July 2015 . Viet Nam: Central Region Rural . Water Supply and Sanitation Sector Project . WATER SUPPLY AND

2

Central Region Rural Water Supply and Sanitation Sector Project Updated Land Acquisition and Resettlement Plan Thanh Trach commune, Bo Trach district, Quang Binh province

PPMU of Quang Binh

Translation of original document

SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom – Happiness

MINUTES OF PUBLIC CONSULTATION ON WATER SUPPLY

AND SANITATION SUBPROJECT IN THANH TRACH COMMUNE – BO TRACH DISTRICT – QUANG BINH PROVINCE

Project: Central region rural water supply and sanitation sector project Thanh Trach commune, Bo Trach District. Venue: CPC of Thanh Trach commune, Bo Trach district. Time: 8h – 10h30, 10 October 2013. Attendance: Representatives of PPMU:

Mr. Nguyen Van Duoc Designation: Director Mr. Bui Thai Nguyen Designation: Deputy Director Mr. Le Minh Thuong Designation: Technical staff

Representatives of CPC of Thanh Trach commune:

Mr. Nguyen Van Lao Designation: Chairman Mr. Nguyen Hoai Nam Designation: Land – construction staff Mr. Truong Cong An Designation: Head of Thanh Khe commune Mr. Nguyen Chi Phuc Designation: Head of Quyet Thang commune Mr. Nguyen Van Hoa Designation: Head of Tien Phong commune Mr. Nguyen Xuan Thu Designation: Head of Thanh Vinh commune Mr.Nguyen Van Deng Designation: Head of Thanh Giang commune Mr. Nguyen Quoc Tuan Designation: Head of Thanh Xuan commune Mr. Le Van Hong Designation: Head of Thanh Hai commune Mr. Le Van Truong Designation: Head of Da Nhay commune

Content:

Purpose of the meeting is to announce the design of water supply pipeline of the Central region rural water supply and sanitation of Thanh Trach commune, Bo Trach district and help the local residents understand work construction; impacts of construction on environment; assets, land and plant compensation; resettlement issues; policies regarding to compensation and resettlement, etc.

Project overview: • Source of budget: Asia Development Bank (ADB)’s loan 87% of total investment; local

budget and contribution of beneficiaries is 5% of total investment. • The Owner: DARD of Quang Binh province. • Representative of the Owner: PPMU of Quang Binh province. • Form of project management: the Employer manages the project directly. • Expected duration: 2012-2014. • The subproject includes 2 outputs with the following objectives:

Page 35: NATIONAL CENTRE FOR RURAL WATER SUPPLY AND · PDF fileResettlement Plan . July 2015 . Viet Nam: Central Region Rural . Water Supply and Sanitation Sector Project . WATER SUPPLY AND

3

Central Region Rural Water Supply and Sanitation Sector Project Updated Land Acquisition and Resettlement Plan Thanh Trach commune, Bo Trach district, Quang Binh province

PPMU of Quang Binh

• Construction of water supply system with the volume of 1,530m3/day in order to meet the demand of 2,191 people, public facilities and production units in Thanh Trach commune, Bo Trach district, Quang Binh province by 2020.

• Improve sanitation condition of commune.

Investment items:

*Water Treatment Plant: the plant is constructed at Tien Phong hamlet, Thanh Trach commune, Bo Trach district including:

• Drilled-wells and raw water pumping station: 4 drilled-wells. • Slow filter tanks and water tank: slow filter tank with the filtering area of 210m2; the water

tank with the volume of 300m3. • Aeration tank with the contact area of 150m2. • Treated water pumping station and warehouse with the area of 88m2. • Administration house with the area of 130m2. • Electricity supply system for pumping station: consists of 100KVA transformer station;

system of power poles, power lines to water treatment area with 330m long and electricity supply system for raw water pumping station and treated water pumping station.

• Fence and ground surrounding head area with length of 208m. • Water tower with volume of 125m3 and length of 20m.

*Water supply pipeline: includes transmission pipeline, distribution and service pipelines:

• Main pipeline: installed along the left and the right of National highway 1A and the road in commune to transmit water. HDPE pipe D90-D225 is used. Total length of the pipeline is 13,600m.

• Distribution pipeline: installed along inter-commune road for transmitting water to commune. Material is HDPE pipe D40-D75 with total length 51,705m.

• Service pipeline: installed along communal inter-road and to household’s territory for transmission of water to each household. Material is HDPE pipe D20 with total length 18,500m.

Component 2: Improve public sanitation and household sanitation

• Construction of 184 pours flush latrines for 184 poor households. • Construction of 04 public latrines for 03 schools and Communal Health Station. • Construction of drainage system with 50 meters length for Thanh Khe hamlet. • Provide loan for non-poor households who have demand for latrine construction through

Sanitation Revolving Fund through Commune Women Union Areas to be acquired for project implementation:

A certain area of land is acquired for construction of water supply system. The acquired land areas are for water treatment plant, drainage system and public latrines designed on public land (already acquired at Decision No.641/QD-UBND on land acquisition, transferring land-use purpose and land handover to DARD for construction of head area belonging to CRRWSSSP, subproject Thanh Trach).

Project impacts on affected households, compensation activities, responsibilities, organization, implementation plan, progress:

According to approved construction design drawing and survey result carried out by PPMU,

Page 36: NATIONAL CENTRE FOR RURAL WATER SUPPLY AND · PDF fileResettlement Plan . July 2015 . Viet Nam: Central Region Rural . Water Supply and Sanitation Sector Project . WATER SUPPLY AND

4

Central Region Rural Water Supply and Sanitation Sector Project Updated Land Acquisition and Resettlement Plan Thanh Trach commune, Bo Trach district, Quang Binh province

PPMU of Quang Binh

no relocation due to constructing project .

Page 37: NATIONAL CENTRE FOR RURAL WATER SUPPLY AND · PDF fileResettlement Plan . July 2015 . Viet Nam: Central Region Rural . Water Supply and Sanitation Sector Project . WATER SUPPLY AND

Central Region Rural Water Supply and Sanitation Sector Project Updated Land Acquisition and Resettlement Plan Thanh Trach commune, Bo Trach district, Quang Binh province

PPMU of Quang Binh

In order to mitigate impacts of the subproject on traffic, production, business for households livelihood along the route of the project road section during installation of pipelines, the design-Build contractor and Local authorities have carried out a number of following activities:

• Disclosure of construction plan to local people so that they can arrange their life • Public disclosure of information and marking the pipelines. • Apply successive construction method, construction together with fencing and

backfilling in order to mitigate adverse impacts on traffic and households’ business.

According to Consultant, it shall take within 2 to 3 days for earthwork, installation, backfilling and land recovery.

Affected households’ opinions:

In community consultation, hamlets’ representatives have agreed as follows: the affected area of concrete ground will be recovered during construction and local environment will not be affected.

Discussion results:

After brief introduction on subproject construction as mentioned above, PPMU, leaders and land officer of Thanh Trach CPC have agreed the followings: no compensation for resettlement and determining the construction mark. All representatives attending the consultation kindly hope that the project will be soon implemented in order to improve health and sanitation condition in locals.

REPRESENTATIVES OF PPMU REPRESENTATIVES OF CPC

Page 38: NATIONAL CENTRE FOR RURAL WATER SUPPLY AND · PDF fileResettlement Plan . July 2015 . Viet Nam: Central Region Rural . Water Supply and Sanitation Sector Project . WATER SUPPLY AND

Central Region Rural Water Supply and Sanitation Sector Project Updated Land Acquisition and Resettlement Plan Thanh Trach commune, Bo Trach district, Quang Binh province

PPMU of Quang Binh

C<)NG HOA XA HOI CHlJ NGHlA VItT NAM D()c l p-Tl! do- Hl].nh PhUc

BIEN BAN CU<)C HQP TRAM VAN C<)NG DONG VE DljAN NU'OC S CH VA VSMT XA THANH T CH, HUYE;N BO T CH, TiNH QUANG BiNH

Tiu dt! an: dp nu6c s ch va vsinh moi tru<mg xa Thanh Tr ch, huyn B6

Tr ch.

Dja dmi ta chfrc: UBND xa Thanh Tr?ch, huyn B6 Tr?ch.

ThOi gian ta chfrc: Tir 8 gio dSn 1o gio 30, ngay 10 thang 1 o nam 2013.

Thanh phftn tham dt.r: Di din Ban quan ly dl! an:

- Ong: Nguyn Van Duqc

- 6ng: B.ui Thai Nguyen

- Ong: Le Minh Thu<mg

Di din UBND xa Thanh Tr ch:

- Ong: Nguyn Van Lao

- Ong: Nguyn Hoai Nam

- Ong: Truong Cong An

- Ong: Nguyn Chi Phuc

- Ong: Nguyn Van Hoa

- Ong: Nguyn Xuan Thu

- Ong: Nguyn Van Deng

- Ong:Nguyn Qu6c Tu n

- 6ng: Le Van Hflng

- 6ng: Le Van Truong

N{)i dung:

Chuc V\1: Giam d6c Cht!c

vv: Ph6 Giam d6c Cht!c

V\1: Can b9 ky thu t

Chuc vv : Chu tich

Chuc V\1 : Can b9 dia chinh - xay dl!llg

Chuc V\1 : Truang than Thanh K.he

Cht!c V\1 : Tru6ng than QuySt Th ng

Chuc V\1 : Truong than Ti€n Phong

Chuc V\1 : Tru6ng than Thanh Vinh

Chuc V\1 : Tru6ng than Thanh Gianh

Cht!c V\1 :Truong than Thanh Xuan

Cht!c V\1 :Truong th6n Thanh Hai

Chuc V\1 : Truong thon Da Nhay

M\lc dich cua cu(>c h9p thong bao cac than v€ thiSt kS mng lu6i duong 6ng c§p nu6c dl! an Cp nu6c sch va vsinh moi truong xa Thanh Tr?ch, huyn B6 Tr?ch. Giup nguoi dan hi€u ro vic xadvng cong trcp n,u6c S?Ch va vsinh? nhfrng a huang cua qua trinh xay dvng den moi truong, van de boi thu<mg thit hi ve tai san, dat va cay tr6ng, vn d€ tai dinh cu, cac chinh sach v€ h6 t rq b6i thuong, tai dinh cu 0 ••

Page 39: NATIONAL CENTRE FOR RURAL WATER SUPPLY AND · PDF fileResettlement Plan . July 2015 . Viet Nam: Central Region Rural . Water Supply and Sanitation Sector Project . WATER SUPPLY AND

Central Region Rural Water Supply and Sanitation Sector Project Updated Land Acquisition and Resettlement Plan Thanh Trach commune, Bo Trach district, Quang Binh province

PPMU of Quang Binh

)

-

;

- Ngu6n v6n d§u tu: v6n Ngan hang phat trin chau A (ADB) 87% t6ng muc d§u tu; Ngan sach dja phuang vaf Dan dong g6p 5%.

- Chu d§u tu: S6 Nong nghip va PTNT Quang Binh. - Di din chu d§u tu: Ban QLDA C§p nu6c s ch va vsinh moi trucmg n6ng

thon vung min Trung tinh Quang Binh. - Hinh thuc quan ly dt,r an: Chlt d§u tu trt,rc tip quan ly dt,r an. - Thai gian tht,rc hin dt,r an: Dt,r kin tu 2012 - 2014. Dt,r an bao g6m 02 hqp ph§n v6i cac n9i dung nhu sau: - Xay dt,rng hth6ng dp mr6c c6 c6ng su§t khai thac khoang 1.530 m3/ngay dem

nhm dap ung du nhu du sfr dt,mg nu6c cho 2.191 nguoi, cac c6ng trinh djch v1,1 cong c9ng va cac co s6 san xu§t tren dja ban xa Thanh Tr ch, huyn B6 Tr ch, tinh Quang Binh dn nam 2020.

- Cai thin diu kin vsinh m6i tru<mg tren dja ban xa. Cac h:m, g m1c dfi u tJr: Bao g6m cac h ng ml,JC:

*Tql m xl'r ly nu·o·c: Tr m xu ly nu6c duqc dt ti thon Tin Phong, xa Thanh Tr ch, huyn B6 Tr ch bao g6m:

- C1,1m gi ng khoan va trm bam dp 1: G6m 04 ging khoan . - C\Jm bS l9c chm va bchua: BIQc chm (din tfch IQc 21Om 2 ; be ch(ra nu6c

(dung tich 300m3).

- BS lam thoang, tip xuc 150m2 - Nha trm bam dp 2 + kho vt tu, d1,1ng c1,1: din tich su d1,1ng 88m2.

- Nha quan ly diu hanh: din tich sfr d1,1ng 130m 2

- Hth6ng dp din trm bam: g6m trm bi€n ap I OOKVA; hth6ng CQt di n, day dn dn nha trm bam diti 330m va hth6ng dp din cho may bam dp I va dp 2.

- IIth6ng hang rao, san be tong bao quanh cac khu VI,I'C dfiu m6i dai 208m.

::.& v

-*

- Dai chua nu6c: dung tich 125m 3 chiu cao 20m. *Mng hro·i dtritn g 6ng dlp nu·o·c: Bao g6m duong 6ng dp I, dp II va duong

6ng n6i trvc tip vao hQ gia dinh, trong d6: -Duong 6ng c§p I :Men thco phia trfti va phia phai duong Qu6c 19 1A va

duong giao thong trong xa, nhi v1,1 vn chuyn nu6c, sfr d1,1ng 6ng nht,ra HDPE tu fi90 d n fi225, t6ng chi da i I3.600m.

- Duong 6ng dp II : Men theo ducmg lien thon, nhim V\J phan ph6i mr6c dn cac thon, sfr d1,1ng 6ng nht,ra HDPE tt! ti40 d€n fi75, t6ng chiu dai 51.705m.

t - Duong 6ng n6i trt,rc ti vao hQ gia dinh: Men theo duong lien thon va vao d§t ' hQ gia dinh, phan ph6i nu6c a€n cac hQ gia dinh, sfr d\]ng 6ng nhva HDPE fi20, t6ng

chiu dai 18.500m. H<,rp phfi n 2: oii thni vsinh cong cc}ng va hv gia uinh

\

Page 40: NATIONAL CENTRE FOR RURAL WATER SUPPLY AND · PDF fileResettlement Plan . July 2015 . Viet Nam: Central Region Rural . Water Supply and Sanitation Sector Project . WATER SUPPLY AND

Central Region Rural Water Supply and Sanitation Sector Project Updated Land Acquisition and Resettlement Plan Thanh Trach commune, Bo Trach district, Quang Binh province

PPMU of Quang Binh

\

- Xay di,Tng 184 nha vsinh tham d9i nu6'c cho 184 h9 ngheovaf hooj. - Xay di,Tng 04 nha vsinh c6ng c9ng cho 03 twang h9c va Trm y txa. - Xay di,Tng hth6ng c6ng tieu thoat nu&c khu VIJC thon Thanh Khe dai 50m. - H6 trq xay di,Tng nha vsinh cho h9 gia dinh khong thu9c din ngheo b ng

khoim vay tin dt,mg uu dai thong qua H9i phv nfr.

Cac khu Vl,I"C se bi thu hBi khi trin khai thtrc hin dv· an:

Vic xay d1Jng hth6ng cfrp nu6'c va vsinh moi truong dn thu h6i m<)t din tich dfit nhfit djnh. Cac vi tri dn thu h6i afit dxay dvng Ia khu vvc trm xti ly mr&c, h th6ng c6ng tieu thoat nu6'c, nha vsinh cong c9ng duqc thit ktren dfit cong (da duqc thu h6i dfit tiiti Quyt djnh s6 641/QDD-UND vvic thu h6i dfit, chuyn mvc dich sti dvng dfit va giao dflt cho Sa Nong nghip va PTNT xay dvng khu khai thac va xti ly thu<)c Dv an Cfip mr6'c SiitCh va VSMT xa Thanh Tr ch, huyn B6 Trch).

Cac tac dc)ng cua dlf an dn nguiri bi anh hu·o·ng, cac hot dc)ng bBi tllll'irng,

trach nhi m, tB chfrc thv·c hi n, kho ch th1,1'C hi n, tin de): Theo tai liu thit kbim ve thi cong da duqc phe duyt kt hqp v&i vic khao sat

cua can b9 Ban quan ly d1,r an, kh6ng c6 h9 dan ni10 phai di doi lien quan dn vic thu h6i dfit dxay d1Jng cac cong trinh.

Dgifun thiu tac d9ng dn giao thOng, san xufit, kinh doanh d6i v6'i cac hQ dan sinh s6ng hai ben cac tuyn duong trong qua trinh lp dt 6ng dful nu6'c, nha thu thi cong va Chu du tu kt hqp v&i dja phucmg da trni khai m9t s6 vi c:

- Cong khai kho ch thi cong cua nha thu d& nguoi dan b6 tri sp xp hot d9ng cua ch inh h9 cho phu hqp v6'i kho ch thi cong.

- Thong bao r6ng rai cho nhan dan va ck m6c, huang tuyn duong 6ng di qua dS nguoi dan bit nl1m ph6i hqp t6t trong qua trinh thi cong cong trlnh.

- Vic thi cong dn ap d\mg theo phuong phap cu6n chi u, thi cong dn dau thl 5d rao ch n. dao dp dn d6 dgiam thiu anh huang dn giao thong di li va vic san xufit kinh doanh cua cac h9 dan.

Theo tu vfin ky thu?t, qua trinh dao dfit, dt 6ng, lfip dfit, horm tra mt b ng Ii se

dugc th1JC hin trong vong 2 dn 3 ngay tren CO Sa lam ti.rng don dQC th ng theo h th6ng.

Cac y l<in ciia cac he) gia dinh bj anh hu·o·ng: Di din cac thon cu9c h9p tham vfin c<)ng d6ng hoan toan nhfit tri v&i din tich

san nn be tong bj anh huang se duqc hoan tra mt b ng trong qua trinh thi cong va khong bi anh huang vsinh moi tmong a dja phuong.

• Kt qua thao lun : Sau khi gi6i thiu t6m tt thti kthi cong vtiu dv an nhu da neu a tren, Ban

qufm ly d\f an cung v6'i cac lanh d o. can b9 dja chinh UBND xa Thanh Tr ch da th6ng '

\

Page 41: NATIONAL CENTRE FOR RURAL WATER SUPPLY AND · PDF fileResettlement Plan . July 2015 . Viet Nam: Central Region Rural . Water Supply and Sanitation Sector Project . WATER SUPPLY AND

Central Region Rural Water Supply and Sanitation Sector Project Updated Land Acquisition and Resettlement Plan Thanh Trach commune, Bo Trach district, Quang Binh province

PPMU of Quang Binh

t!j 0.vdu/PI

f-- k" :- fiU-1

t \

Page 42: NATIONAL CENTRE FOR RURAL WATER SUPPLY AND · PDF fileResettlement Plan . July 2015 . Viet Nam: Central Region Rural . Water Supply and Sanitation Sector Project . WATER SUPPLY AND

Central Region Rural Water Supply and Sanitation Sector Project Updated Land Acquisition and Resettlement Plan Thanh Trach commune, Bo Trach district, Quang Binh province

PPMU of Quang Binh

Annex 2: Minutes of meeting confirming public land and no resettlement

Page 43: NATIONAL CENTRE FOR RURAL WATER SUPPLY AND · PDF fileResettlement Plan . July 2015 . Viet Nam: Central Region Rural . Water Supply and Sanitation Sector Project . WATER SUPPLY AND

Central Region Rural Water Supply and Sanitation Sector Project Updated Land Acquisition and Resettlement Plan Thanh Trach commune, Bo Trach district, Quang Binh province

PPMU of Quang Binh

Scanned files of original documents

C<)NG HOA xA H<)I CHU NGHiA Vl¢T NAM Di)c l p- Tl!do -Hnh phuc

Thanh Trr;tch, ngay 29 thimg .2 niim 2012

BIEN BAN xAc NHN BAT c6NG

VA KHONG CO TAl DJNH CU

Thea Quy€t djnh s6 3568/QD-BNN-HTQT ella BQ Nong nghip va Phat tri€n nong thon ve vic phe duyt n(>i dung Dl! an "Cp mr6c va vsinh moi truang nong thon vilng miSn Trung" do Ngan hang phat trin Chiiu A tai trg.

Thl!c hin Van ban s6 1320!ITg-QHQT ngay 03/8/2009 ella Thll tu6ng Chinh phU vS vi c phe duyt danh mvc Dl! an "Cp nu6c s ch va vsinh moi truang nong thon vimg miSn Trung" do Ngan hang phat trin Chau A tai trg.

,......._ Tren co s6 dS xut thiat ka ella TiSu d\f an Cp nu6c va vsinh moi tru<mg xa Thanh Tr ch, huyn B6 Tr ch, tinh Quang Binh, kat qua diSu tra th\fc dja vS quy dt cho d\f an nhu sau:

T H:;mg T IDl}C

Khu V\fC dAu m6i (Trm xir ly nu6c)

Mo hi sa b{) Vi tri Din tich sir dvng 9.077m 2 Khu V\fC thon bao gBm: Di n tich xay TiSn Phong, xa d\ffig 02 giang khoan, bS IQc Thanh Tr ch. ch m, b chua nu6c, dai nu6c, nha qulin ly diSu hanh, nha trbarn, san VllOn, hang rao, duang n<Ji b(\, d t cay xanh va dt dl! phong.

Tinh tr ng

ctAt

Quan

ly UBND

Xli

Anh huimg Tai

cljnh Cll Dt xay d\ffig Ia d t hoang hoa do UBND xa quan ly. Khong c6 tai san, hoa mau, cay coi,... tren dk Khong co hQ gia dinh nao bi linh huang b6i cac tai san va hot d(>ng khac tren d t

2 Cac h g Bao gBm: Khu V\fC thon D t UBND

mvc + Din tich dt xay d\fng TiSn Phong, xa cong xa ngoai du(mg cong vv: 4.500 m 2•

Thanh Tr ch ph m VI khu v\i-c + Din .tich xay d\fllg 05 du m6i giin'g khoan ngoai phvi

khu V\fC du m6i: 8.000 m 2.

+ Din tich su dvng dt dQc tuy€n 6ng d: 1.758 m 2

(L = 586m; B =3m).

3 Tuyan Di n tich tnrng dvng t m D t UBND 6ng nu6c thai khoang 20.000m2, co cong Xa s ch va tbng chiSu ctai 37.595m,

Dt xay d\fllg Ia d t thu(lc du(mg giao thong, d t hoang hoa do UBND xa quan ly, khong co tai san, hoa mau, cay c6i,... tren dk Khong co h(> gia dinh, t6 chuc, ca nhan nao bi anh huang tai dinh cu

D t su d\lfig t m thai trong qua trinh thi cong Ia d t

Page 44: NATIONAL CENTRE FOR RURAL WATER SUPPLY AND · PDF fileResettlement Plan . July 2015 . Viet Nam: Central Region Rural . Water Supply and Sanitation Sector Project . WATER SUPPLY AND

Central Region Rural Water Supply and Sanitation Sector Project Updated Land Acquisition and Resettlement Plan Thanh Trach commune, Bo Trach district, Quang Binh province

PPMU of Quang Binh

cong trinh tren tuy n

trong d6: + Duong 6ng dp I: Dung vt liu 6ng nh\fa HDPE ti.r fi90 - fi250, dai 6.71Om, nhim V\1 vn chuyn nm]c. + Du<mg 6ng dp II: Dung v t li u 6ng nhl!a HDPE fi50 - fi75, dai 11.178m, nhi m V\1 phiin ph6i nu&c dn cac thOn.

+ Men theo phia tnii va phia phai duang QUA va duang giao .thong trong xii. + Men theo duang lien thon trong xii.

thuQc duang giao thong. KMng c6 tai san gi ctia hQ gia dinh hay tA chuc, ca nhan nao tren dAt su d1,1ng d thi cong. Vi v y khong c6 hQ gia dinh, t6 chuc, ca nhiin nao bi anh huang tai dinh cu.

4 Tuy n muong thu gom nu&c thai

+ Du<mg 6ng dp III: Dung + Men theo vt li u 6ng nh\fa HDPE duang lien thon fi40, t6ng chi u dai trong xii. 19.707m, nhi m vv phiin ph6i dn nu6c dn cac di m su dvng. D9c theo hth6ng muang Khu VIJC thon dAt dung dtieu thoat nu&c Thanh Khe, xa ci1, duqc thit kb ng 6ng Thanh Tr ch. buy be tong c6t thep mac 200, du(mg kinh trong 1m, day 0,1m, t6ng chi u dai 1OOm, di n tich s(r d1,10g 260m2.

D t cong

UBND

Xii

La dAt cong do UBND qmin ly, khong c6 tai san hay hot dQng gi ctia hQ gia dinh, tA chuc, ca nhiin,... tren ctAt su d1,1ng d thi cong

Thong qua cong tac khao sat thl!c tcho thAy khu VIJC dAt cong tren duqc ch9n cho dl! an

cfip nu&c va Vsinh moi trucrng nong thon v ung min Trung Ia khong gp tra ngi, khOng phai ddt cu tru, tranh chAp hay miiu thutln gi. ....... ""'

Page 45: NATIONAL CENTRE FOR RURAL WATER SUPPLY AND · PDF fileResettlement Plan . July 2015 . Viet Nam: Central Region Rural . Water Supply and Sanitation Sector Project . WATER SUPPLY AND

Central Region Rural Water Supply and Sanitation Sector Project Updated Land Acquisition and Resettlement Plan Thanh Trach commune, Bo Trach district, Quang Binh province

PPMU of Quang Binh

Translation of original document

Socialist Republic of Vietnam Independence – Freedom – Happiness

Thanh Trach, 29 February 2012

MINUTES OF CONFIRMING PUBLIC LAND AND NO RESETTLMENT

Pursuant to Decision No. 3568/QD-BNN-HTQT of MARD on approval of content of Central Region Rural Water Supply and Sanitation Sector Project funded by ADB.

Pursuant to Document no. 1320/TTg-QHQT dated 03/8/2009 of Prime Minister on approval of Central Region Rural Water Supply and Sanitation Sector Project funded by ADB.

According to proposed design of Water Supply and Sanitation - Thanh Trach commune, Bo Trach district, Quang Binh province subproject, field survey results on land for the subproject are as follows:

No. Item Initial Description Location Land

Status Management

Unit Resettlement

Impact 1 Head gate

area (Water Treatment Plan)

Usage area: 9,077m2

including: Area for construction of 02 borehole wells, slow filter, elevated tank, management and operation house, pumping station, garden, fences, internal road, land for trees and back-up land.

Tien Phong Hamlet, Thanh Trach Commune

Public Land

CPC Land for construction is uncultivated land managed by CPC. There are no non-land assets, crops, trees, etc. There is no household affected by loss of non- land assets or

2 Items outside head gate area

Including: + Land area for construction of service road: 4,500m2

+ Land area for construction of 05 borehole wells outside key area: 8,000m2

+ Land area along transmission pipeline: 1,758m2

Tien Phong Hamlet, Thanh Trach Commune

Public Land

CPC Land for construction is land for transportation, uncultivated land managed by CPC. There are no non-land assets, crops, trees, etc. There is no household affected by resettlement.

3 Clean Water Pipeline and Works on Pipeline

Temporarily acquired land area: about 20,000m2, with total length of 37,595m, in which: + Level I pipes are

+

Public Land

CPC Temporarily acquired land during construction is land for transportation,

Page 46: NATIONAL CENTRE FOR RURAL WATER SUPPLY AND · PDF fileResettlement Plan . July 2015 . Viet Nam: Central Region Rural . Water Supply and Sanitation Sector Project . WATER SUPPLY AND

Central Region Rural Water Supply and Sanitation Sector Project Updated Land Acquisition and Resettlement Plan Thanh Trach commune, Bo Trach district, Quang Binh province

PPMU of Quang Binh

No. Item Initial Description Location Land Status

Management Unit

Resettlement Impact

HDPE pipe with diameter of 90-250mm, total length of 6,710m, used for transmission of water.

+ Level II pipes are HDPE pipe with diameter of 50-75mm, total length of 11,178m, used for distribution of water to hamlets.

+ Level III pipes are HDPE pipe with diameter of 40mm, total length of 19,707m, used for distribution of water to consumption locations

Alongside the left and right side of National Road 1A and inner-villa ge roads.

+ Alongside inter-haml et road.

+ Alongside inter-haml et road.

managed by CPC. There are no non-land assets, Thus, there is no household affected by resettlement.

4 Wastewater channel

Running along old water drainage channel, designed with reinforced concrete grade 200, inner diameter of 1m, thickness of 0.1m, total length of 100m, usage area of

Thanh Khe Hamlet, Thanh Trach Commune

Public Land

CPC Land for wastewater channel is land managed by CPC. There are no non-land assets, activities of households, organizations, individuals, etc.

Field survey shows that the above-mentioned public land which is selected for Central Region Rural Water Supply and Sanitation Sector Project encounters no obstacles, is not residential area, disputed area.

REPRENSENTATIVES OF PPMU

Director (Signed and Sealed)

REPRENSENTATIVES OF THANH TRACH CPC

(Signed and (Signed) Sealed)

REPRENSENTATIVES OF THANH TRACH CVWU

(Signed and Sealed)

Nguyen Van Duoc

Le Van Tinh

Nguyen Hoai Nam

Luu Thi Uych

Page 47: NATIONAL CENTRE FOR RURAL WATER SUPPLY AND · PDF fileResettlement Plan . July 2015 . Viet Nam: Central Region Rural . Water Supply and Sanitation Sector Project . WATER SUPPLY AND

Central Region Rural Water Supply and Sanitation Sector Project Updated Land Acquisition and Resettlement Plan Thanh Trach commune, Bo Trach district, Quang Binh province

.-.,_. ..

·-- - -- -

Clf'!M•'•••ol!

Map of Water Treatment Plant.

CHITli:T B6 TRI JBONGKHU OAT CONG TRINH CIV> IAAJC CH VA VSioiT xA TH

MAT BANG VITRI LO OAT TYLE 111u.XJ

03

18

-

.lgt ;JO. • tii)I;OIIfiiGIQI

.-afw:Ja ll-1111..

j : 04

i

c.tc.tJ,.OIIfii'•Oo\o\OO-u cW ltl .X I(tiJUol.t loll Ill l.t."-goG0:..War6W;CI'*W.llllabcC)..Irlll)l()ll. ... . ..lc(Mi'4 DI.I

•flbOt""II.OCo!it MIOOI..(.I(Jin11(11 *"- ,f16 51 .1Hbc;SON; IIIIWIIO!O&I'IIid(:N• IO"ooc:iooGuY

-ut ;;;-o;;-;;o,.:;;.,;;;,,------------111 f--11(•.... J-tl(N). s, •-•h;rt.

,. ...,_cv,cMI-·IH.DI

r-o< ·• ......GG.:-f*•"'""...-..00,.. Ulc-'o_.,.......,,,

l(f.(ll

PPMU of Quang Binh