1. DATEOF ORDER 2. CONTRACTNO. (if any) 6. SHIP TO: August 12, 2005 J NNLO5AAO1B a NAMEOFCONSIGNEE 3. ORDER NO. I~ REQUISITION/REFERENCE NO. NASA Lang ley Research Center Task Order NNLO5AB41T See Block 9 b. STREETADDRESS 5. ISSUING OFFICE (Address correspondence to) 9A Langley Boulevard SEE BLOCK 6 (ATTN: Dana Clifton, 757-864-5717) 0. CITY I d. STATE j e. ZIP CODE (FAX: 757-864-7709) Hampton j VA 23681-2199 7:TO: I. SHIP VIA a. NAME OF CONTRACTOR ATTN . 8. TYPE OF OflDER b. COMPANY NAME Science Applications International Corporation C a. PURCHASE b. DELIVERY .. Except for billing Instructions on the reverse, thIs delIvery c. STREET ADDRESS REFERENCE YOUR: I order is subject to instructions contained Please furnish the following on the terms On thlsslde only of this form and Is 10260 Campus Point Drive end conditions specified on both sides of this issued sublect, to the terms and d. CITY e. STATE I. ZIP CODE order apd on the attached sheet, IP any, I conditions of the sbove.nunibersd including delivery as IndIcated. I contract. ~San Diego I CA I 92121 I 9. ACCOUNTING AND APPROPRIATION DATA 10. REQUISITIONING OFFICE PR 4200107036 $200,000.00 (PLI#2 & 3) NASA Langley Aesearch Center 11. BUSINESS CLASSIFICATION (Checkappropriale box(es) j 12. FOB. POINT ~ LI a. SMALL b. OTHER THAN SMALL C o. DISADVANTAGED C g. SERVICE I Destination DISABLED j . C d. WOMEN.OWNED U o. HUBZone C f. EMERGING SMALL VETERAN’ I BUSINESS OWNED . , 13. PLACEOF J 14. GOVERNMENTB/LNO. I 15. DELtVERTOEO.B.POINTON I 16. DISCOUNTTERMS - a. INSPECTION I b. ACCEPTANCE . I OR BEFORE (Dale) NASALaRC NASALaRC IN/A IJuIy3l,2006 INET3O 17. SCHEDULE (See reverse for Rejections) . SUPPLIES OR SERVICES QUANTITY UNIT I QUANTITY ITEM NO. (b) ORDERED UNIT PRICE AMOUNT ACCEPTED (a) (ol (dl (a) fI) (0) 0001 Task Order entitled “Solar Terrestrial 1 JOB Estimated Cost NTE Probes (STP) Program independent Fixed Fee NTE Review Team (IRE)” in accordance with the attached Task Order Statement of *Total Cost- NTE $421,663 Work and the Contractor’s proposal Plus-Fixed Fee dated 8/I 0/2005. *NOTE: This Task Order is subject to FAR 52.232-22 Limitation of Funds. The Contractor is only authorized to incur up to the cost limitation set forth in Pages (spreadsheet). 18. SHIPPINGPOINT ID. GROSSSF{IPPtNGWEIGHT 20. INv0ICENO. . 1T(h) Tot SEE 21. MAILINVOICETO: .~ (Cant BILLING a. NAME pages) INSTAUOTIO ***SEE PARAGRAPH 8.2 OF THE BASIC CONTRACT*** ON b. STREET ADDRESS (orP.O. Box) REVERSE . 17(1) c. CITY d. STATE e. ZIP CODE NTE $421 ,603 GRAND ~ TOTAL . 23. NAME (Typed) AMERICA BY (Signature) DARLA J. CLI~ON 22. UNITED STATES OF TITLE: CONTRACTING/ORDERING OFFICER IMPORTANT: Mark all packages and papers with contract and/or order numbers. ORDER FOR SUPPLIES OR SERVICES PAGE OF PAGES 1 5 AUTHORIZED FOR LOCAL REPRODUCTION PREVIOUS EDITION NOT USABLE computer Generated OPTIONAL FORM 347 (REV. 3/2005) Prescribed by GSA/FAR 48 CFR 53.213(e)

Upload: dangcong

Post on 26-Apr-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

1. DATEOF ORDER 2. CONTRACTNO. (if any) 6. SHIP TO:

August 12, 2005 J NNLO5AAO1B a NAMEOFCONSIGNEE3. ORDER NO. I~ REQUISITION/REFERENCE NO. NASA Lang ley Research Center

Task Order NNLO5AB41T See Block 9 b. STREETADDRESS5. ISSUING OFFICE (Address correspondence to) 9A Langley Boulevard

SEE BLOCK 6 (ATTN: Dana Clifton, 757-864-5717) 0. CITY I d. STATE j e. ZIP CODE

(FAX: 757-864-7709) Hampton j VA 23681-21997:TO: I. SHIP VIA

a. NAME OF CONTRACTOR

ATTN . 8. TYPE OF OflDERb. COMPANY NAME

Science Applications International Corporation C a. PURCHASE b. DELIVERY .. Except for billingInstructions on the reverse, thIs delIveryc. STREET ADDRESS REFERENCE YOUR: I order is subject to instructions contained

Please furnish the following on the terms On thlsslde only of this form and Is10260 Campus Point Drive end conditions specified on both sides of this issued sublect, to the terms andd. CITY e. STATE I. ZIP CODE order apd on the attached sheet, IP any, I conditions of the sbove.nunibersd

including delivery as IndIcated. I contract.~San Diego I CA I 92121 I9. ACCOUNTING AND APPROPRIATION DATA 10. REQUISITIONING OFFICE

PR 4200107036 $200,000.00 (PLI#2 & 3) NASA Langley Aesearch Center

• 11. BUSINESS CLASSIFICATION (Checkappropriale box(es) ‘ j 12. FOB. POINT

~ LI a. SMALL b. OTHER THAN SMALL C o. DISADVANTAGED C g. SERVICE I DestinationDISABLED j

. C d. WOMEN.OWNED U o. HUBZone C f. EMERGING SMALL VETERAN’ IBUSINESS OWNED

. , 13. PLACEOF J 14. GOVERNMENTB/LNO. I 15. DELtVERTOEO.B.POINTON I 16. DISCOUNTTERMS -

a. INSPECTION I b. ACCEPTANCE . I ‘ OR BEFORE (Dale)

NASALaRC NASALaRC IN/A IJuIy3l,2006 INET3O17. SCHEDULE (See reverse for Rejections)

. SUPPLIES OR SERVICES QUANTITY UNIT I QUANTITYITEM NO. (b) ORDERED UNIT PRICE AMOUNT ACCEPTED

(a) (ol (dl (a) fI) (0)

0001 Task Order entitled “Solar Terrestrial 1 JOB Estimated Cost NTEProbes (STP) Program independent Fixed Fee NTEReview Team (IRE)” in accordance withthe attached Task Order Statement of *Total Cost- NTE $421,663Work and the Contractor’s proposal Plus-Fixed Feedated 8/I 0/2005.

*NOTE: This Task Order is subject toFAR 52.232-22 — Limitation of Funds.

• The Contractor is only authorized toincur up to the cost limitation set forth inPages (spreadsheet).

18. SHIPPINGPOINT ID. GROSSSF{IPPtNGWEIGHT 20. INv0ICENO.

. 1T(h) TotSEE 21. MAILINVOICETO: .~ (Cant

BILLING a. NAME pages)INSTAUOTIO ***SEE PARAGRAPH 8.2 OF THE BASIC CONTRACT***

ON b. STREET ADDRESS (orP.O. Box)REVERSE . 17(1)

c. CITY d. STATE e. ZIP CODE NTE $421 ,603 GRAND

~ TOTAL

. 23. NAME (Typed)

AMERICA BY (Signature) DARLA J. CLI~ON22. UNITED STATES OF

TITLE: CONTRACTING/ORDERING OFFICER

IMPORTANT: Mark all packages and papers with contract and/or order numbers.

ORDER FOR SUPPLIES OR SERVICES PAGEOF PAGES

1 5

AUTHORIZED FOR LOCAL REPRODUCTIONPREVIOUS EDITION NOT USABLE computer Generated

OPTIONAL FORM 347 (REV. 3/2005)Prescribed by GSA/FAR 48 CFR 53.213(e)

CONTRACT #NNL05AkCI1o ‘~ ORDER #NNLO5AB41TPage 2 of 5

Contract NNLO5AAO1 BTask Order Statement of Work

Requesting Organization: Science Mission Directorate (SMD)

1. Task Order Title: Solar Terrestrial Probes (STP) Program Independent Review Team (TRT)

2. Reference: This requirement is pursuant to contract NNLO5AAO1 B, between NASALangley Research Center and Science Applications International Corporation. Rpfer to thecontract Statement of Work, Paragraph 4.0).

3. Purpose, Objective, and Background of Work to be Performed:

3.1 The, Independent Review Team (IRT) for the Solar Terrestrial Probes (STP) shall conducta series of independent reviews of the STP Program and its projects throughout the lifecycles of the projects to’ assess the technical and programmatic plans for accomplishingproject objectives within the framework of the Program objectives as documented in theprogram and project Formulation Authorization Documents (FAD~ and/or ProgramCommitmentAgreement(PCA). The IRT shall perform independent reviews of theanalysis, definition, design, development operations and termination plans for theprojects in the program. During each phase of each project in the program, the IRT shallprovide an independent assessment of the probability of meeting project and programtechnical objectives on schedule and within cost. The IRT shall also assess the projectrisks and measures available to mitigate those risks. The STP program currentlyincludes the following missions: Solar Terrestrial Relations Observatory (STEREO) andthe Magnetospheric Multi-Scale Mission (MMS).

4. Description of the Work to be Performed: The Contractor shall perform the following taskrequirements:

4.1 The contractor shall conduct three types of reviews during the life cycle of the programdepending on the phase of the program and its projects at the time of the review. Thescope and timing of each review shall be detailed prior to conducting each type ofreview. The three types of reviews are:

4.1.1 Independent Assessment (IA) — The contractor shall conduct an IA on anindividual project contemporaneous with the scheduled reviews or milestones orat the request of the Science Mission Directorate (SMD) AssociateAdministrator(AA). The contractor shall report the results of the IA to the AA (and others at hisdiscretion).

4.1.2 Special Reviews — The contractor shall conduct two types of special reviews foreach project in the STP Program.

4.1.2.1 Confirmation Assessment (CA): During project formulation, the contractorshall conduct a CA before the project transitions from Phase A to Phase Band before the project transitions from Phase B to Phase C.

CONTRACT #NNLO5AI2o ORDER #NNLO5AB41TPage 3 of 5

4.1.2.2 During implementation, the contractor shall conduct ~ mission readinessassessment prior to launch.

4.1.3 Independent Implementation Review (llR) — The contractor shall conduct anlAIR contemporaneously With a project’s Critical Design Review, Flight ReadinessReview, or other appropriate project review, if available (approximately annually).

4.2 The contractor shall develop independent life cycle cost estimate (ICEs) in support of thelAs during project formulation.

5. Deliverables:

5.1 Report on consensus findings of the IRT panel after each major Program or missionreview

6. Government Furnished Items: None.

7. Other Information Needed for Task Performance: The following are anticipated taskingswhich may be added to this task qrder by modification at a future date. At this time, they areincluded for informational/planning purposes only and should not be included in the costproposal:

7.1 The contthctor may be required to conduct additional reviews (in addition to the reviewsdescribed in paragraph 4), but the content is not yet defined. The scope, requirements,and schedule of these reviews shall be established prior to each review. The team shallevaluate the following, as a minimum:

7.1.1 Progress against technical development plans and technical performancemetrics;

7.1.2 Progress against risk areas and adequacy of risk management plans;

7.1.3 Compliance with current, signed FAD and/or PCA;

.7.1.4 Adequacy of budget (total and phasing) and schedule, including adequatereserve allocations (financial and schedule);

7.1.5 Adequacy of workforce plan;

7.1.6 Adequacy of facilities usage plans;

7.1.7 Compatibility with NASA policy and procedures (NASA Strategic Plan, NPD7120.4B, NPG 7120.SC, etc.); and,

7.1.8 Additional objectives based on the state of the program.

7.2 The contractor may be required to conduct other special assessments (in addition to therequirements described in paragraph 4.1.2.2) may be required upon request.

CONTRACT #NNL05AKtni~ ORDER #NNLO5AB41TPage 4 of 5

7.3 The contractor may be required to develop an ICE to support other SMD requirements(in addition to the requirements described in paragraph 4.2). The scope of theseestimates will be determined at the time of request.

8. Period of Performance/Schedule:

______ Milestones

7.1 Start Date7.2 STEREO Observatory Pre Environmental Review7.3 STEREO Flight Ops Review7.4 STEREO Observatory Pre Ship Review7.5 STEREO Mission Readiness Review7.6 STEREO Flight Readiness Review7.7 STEREO Launch Readiness Review.7.8 MMS Overview meeting I

7.9 ~V1MS Mission Definition Review7.10 MMS Initial Confirmation Review7.11 STEREO Post Launch Review7.12 Completion Date

Changes to interim delivery dates shall be coordinated with and approved by the TaskMonitor. Changes to the completion date must be approved by the Contracting Officer.

9. NASA Task MonitorNASA TM: Cindy DanielsOrganization: Science Mission DirectoratePhone Number: (757)-864-9865 / Fax Number: (757)864-8894E-Mail Address: [email protected]

ADDITIONAL CONTRACT CLAUSE

In accordance with Paragraph B.4, of the Basic Contract (NNLO5AAO1 B), FAR 52.232-22 applies atthe Task Order level. NFS 1852.232-81 is incorporated as follows:

“CONTRACT FUNDING, (NFS 1852.232-81) (JUN 1990)

(a) For purposes of payment of cost, exclusive of fee, in accordance with the Limitation of Fundsclause, the total amount alloffed by the Government to this Task Order is This allotmentis for NNLO5AB41T and covers the following estimated period of performance: February 28, 2006.

(b) An additional amount of — is obligated under this Task Order for payment of fee.

(End of Clause)”

Dates

P

NOTE: Contract Summary attached.

CONTRACT #NNLO5AA)d ‘“~ ORDER #NNLO5AB41TPage 5 of 5

CONTRACT SUMMARY

. TASK SUMMARY FUNDING SUMMARY BY TASK **FUNDING TASK ORDEROBL (+)/DEOB (-) PERIOD PERIOD

CONTRACT AWARD ESTIMATED FIXED TOTAL *ESTIMAtED FIXED TOTAL OF OFACTION DATE - COST FEE CPFF COST FEE CPFF PERFORMANCE PERFORMANCE

BASIC CONTRACT 04/08/2005 N/A 04/07/2010

TASK ORDERS AND TASK MODIFICATInICNNL05AB4OT 04/21/2005 $292,148 $292,148 06/30/2006 06/30/2006NNLO5AC14T 06/02/2005 $464,157 $191,638 08/05/2005 12/31/2006NNLO5AC32T, Mod 1 06/27/2005 $217,609 $106,672 09/15/2005 03/24/2006NNLOSAC33T 06/26/2005 $556,462 $50,000 07/11/2005 07/31/2006NNLO5AC37T 08/01/2005 $488,807 $100,000 11/05/2005 07/31/2006NNLO5AC38T 06/01/2005 $926,929 $49,200 09/09/2005 11/02/2006NNLO5AC64T 08/01/2005 $17,74i $6,438 08/20/2005 10/31/2005NNLOSAC65T 08/05/2005 $469,009 $300,000 04/30/2006 10/30/2006NNLO5AB4IT 08/12/2005 $421,603 $200,000 02/26/2006 07/31/2006

TOTAL $3,854,465 $1,296,096

~ Represents the estimated cost subject to FAR 52.232-22 entitled “Limitation of Funds” and NFS 1852.232-81 “Contract Funding”** Represents the period of performance it is estimated the allotted funds will cover -

( 0’

AMENDMENT OF SOLICITATION/MODIPICATION OF CONTRACT2. AMENDMENTJMODIRCATICN NO. 3. EFFECTIVE DATE 4. REQUiSITict4jpURCi~4SE REQ. NO.

• 1 See Block 16c below See Block 12 below.S ISSUED BY CODE I ~ t”wc’meqItem~j

National Aeronautics and Space AdmInistratIon.Langley Research CenterHampton, VA 23681.2199

II. THIS ITEM ONLY A?PUES TO AMENDMENTS OF SOLICITATIONS

OMBAPPrcV&2700.0O421. CONTRACT ID CODE FADE OF PAGEIS)

112.

~ 5. PROJECT NO. (if ape&able)~ -.

The above numbered solicitation is amended 55 set forth b~ Item 14, The hourand date specified for receipt of Offers is extended, El Is not extended.

Offers must acknowledge receipt of thi. amendment prior to the hour and d.te specified In the solicItation or as amended, by one of the following methods:(a) By completing Item. a end 16, and returning one (1) copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or Cc)By separate letter or telegram which Includes a reference to the aolicitstlon and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED ATTHE PLACE DESIGNATED FOR THE RECEIET OF OFFERS PRIOR TO ThE HOUR AND DATA SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. II byvirlueof this amendment you desire to change an 017cr already submitted auch change may be mede by telegram or letter, provided each telegram or teUer makes reference to thesolicitation arid this amendment, and is received prior to the openIng hour and data specified.12. ACCOUNTING fl1DAPPROPRIATION DATA (Itrequheif)

PR: N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTSIORDER~IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

•j~_J A, THIS CHAliCE ORDER IS ISSUED PURSUANT TO: (Spect5’ertho,*~ THE CIMNOES SET FORTH IN ITEM I4ARE MADE IN THE CONTRACT ORDER NO. IN ITEM ‘Ok

— B. THE ASOVE NUMBERED CONTRACTIOROER IS MODIFIEDTO REFLECT THE ADMIMSTRATIVE CHAnGES (such as ch.ngasIn pa$ngolwce. app,cpflatron date, 61C.) SET FORTH MITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

— C. TKS SUPPLEMENTAL AGREEMENT Is ENTERED INTO PURSUANT To AUTHORITY OF:

~‘ D, OTHER Specify tjpe of mcdflcetlon end euthority)

~ FAR 52.243-2, CHANGES -- COST-REIMBURSEMENT (ALTERNATE V) (APR 1984)

E.IMPQRTANT: Contractor ~ Is not, ~ Is required to sign this document and return 1 copIes to the issuing office.14. DESCRIPTION OF MIENDIIENTThIODIFICATION (Orp.nIredbyuQp section he.&ng~ ilWIudngs*ifefoc~,frs~sue)ex maferwhere (555ltIt)

The purpose of this modification is to extend the period of performance and revise due dates for associateddeliverables. Accordingly, the task order terms and Conditions are revised as follows:

CCONnNUED)Exceptat prc,tded twain, at tetras and condltons of the doenirneni referenced In Item DA or WA, as hsr.ioftre changed, romeins wtctleslged and ki k,l force and effectiSA. NAME AND TITLE OF SIGNER (Type orpdnt) 16k NAME AND TITLE OF CONTRACTiNG OFFICER (i)~ie orprtiw

8. fLAME AND ADDRESS OF CONTRACTOR (No. Sf,,e~ cotn,Iy, State and ZIP Coors)

SCIENCE APPLICATIONS INTERNATIONAL CORPORATION10260 CAMPUS POINT DRIVESAN DIEGO, CA 92121AUN:

cODE OT5LI

(4) 9K AMENDMENT OF SOLICITATION NO:

I FACILITY CODE

95. DATED (SEE ITEM I 1)

xbA. MODIFICATION OF OONTRACTIORDER NO.

fl~NL05AA01B, NNLO5AR4IT105. DATED (SEE IWM IS)

August 12,2005

DARLA J. CLIFTONCONTRACTING OFFICER

CONTRACT: NNLD5AAOI B

C) 0TASK ORDER: NNLO5AB4IT

Modification IPage 2 of 2

1. Paragraph 7, PERIOD OF PERFORMANCE/SCHEDULE is revised to read: The period of performance forthis task shall be August 12, 2005 through August 31, 2006. Interim event dates may change based ondirection of the Task Monitor. Changes to the completion date must be approved by the Contracting Officer.

2 STEREO Observatory Pre Environmental Review3 STEREO Flight Ops Review4 STEREO Observatory Pre Ship Review5 STEREO Mission Readiness Review6 STEREO Flight Readiness Review7 STEREO Launch Readiness Review8 MMS Overview meeting9 MMS Mission Definition Review10 MMS Initial Confirmation Review11 STEREO Pre Launch Review12 STEREO Post Launch Review13 Completion Date

I‘Ii

I

I-2. In accordance with Paragraph B.4, of the Basic Contract (NNLO5AAO1 B), FAR 52.232-22 applies at the

Task Order level. In accordance with this clause, NFS 1852.232-81 as previously incorporated inNNLO5AB41T is revised to read:

“CONTRACT FUNDING, (NFS 1852.232-81) (JUN 1990)

(a) For purposes of payment of cost, exclusive of fee, in accordance with the Limitation of Funds clause, the totalamount allotted by the Government to this Task Order is This allotrnent is for NNLO5AB4IT andcovers the following estimated period of performance: AugU~f 12. 2005 through December 1. 2006.

(b) An additional amount of — is obligated under this Task Order for payment of fee.

3. All other terms and conditions remain unchanged.

(End of Clause)”

SUMMARY OF TASK ORDER VALUE! FUNDING

a,C,.,00)

wE Milestones

I Start Date

Dates

rII

IIIi

II

BASICMOD 1

I -—

TASK TASK VALUE SUMMARY TASK FUNDING SUMMARYORDER ESTIMATED FIXED TOTAL ESTIMATED FIXED TOTAL

DOCUMENT COST FEE CPFF COST FEE CPFF

~~~1$421,603$421,603

$200,000I $200,000

NOTE: Period of performance for this task order is August 12, 2005 through December31, 2006.

C)0MB Aporoval 2700.0042

• . . 1. CONTRACT ID CODE PAGE OF PAGE(S)

AMENDMENT OF. SOLICITATIONIMODIFICATION OF CONTRACT I ~1 22. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT ND. (li.ppticebia)

2 See Block iSo below. See Block 12 below.6. ISSUED BY CODE I 7. ADMINISTERED BY (IioIherIhen Item 6) CODE I

National Aeronautics and Space AdministrationLangley Research Center.Hampton, VA 23681.2199

6. NAME ANOAODRESS OF CONTRACTOR (No. Street, counfr, State and ZIP: Cod.) 9A. AMENDMENT OF SOLICITATION NO.

SCIENCE APPLICATIONS INTERNATIONAL CORPORATION 98 DATED (SEEITEM 11)

10260 CAMPUS POINT DRIVE . — _____________________

SAN DIEGO, CA 92121 . WA. MDDIFICATIONOFCONTRACT/ORDERNO.

ATTN: — .. -- x NNLO5AAOIB / NNLosAB41T~:•~.108. DATED (SEEITEM 13)

CODE OT5LI FACILITY000E — . August 12, 200511. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[] The above numbered solicitation Is amended as set fDrth In Item 14. The hour and date specified for receipt of Offers [] Is extended E Is not extended.

Offers must acknowledge receIpt of this amendment prior to the hour and date specified In the solicitation or as amended, byone of the following methods:(e) By completing Items 8 and 15, and returning one (I) copy of the amendment (b) By acknowledging receIpt of this amendment on each copy of the offer submitted; or (c)By separate letter or telegram which includes e reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED ATTHE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATA SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtueof this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to thesolicitation end this amendment, and Is received prior to the openIng hour and data specified.12. ACCOUNTING AND APPROPRIATION DATA (If reqi4rsd)

PR: N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANTTO: (Spacb~auttoii~4 ThE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM WA.

8. ThE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECTTHE ADMINISTRATIVE CI#JIGES (such as change. In pajdng oft/ca. appropriation date. alo~) SET FORTh IN1’ ITEM 14. PURSUANT To THEAUTNORITY OF FAR 43.103(b).

— C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

— P. OTHER Spetify typ. of nodSosuor, and authority)

E. IMPORTANT; Contractor ~ is not, ~ Is required to sign this document and return — copies to the issuing office.14. DESCRIPTION OFAMENDMENTIMODIFIOATiON (OrganfzedbyuCFsacl/onhascfng., /nc/udlng so it/tat/on/contract sub/sot mattarathare feasthia.)

The purpose of this modification is correct an administrative error in Modification 1.

(CONTINUED)Except at provided herein, all Isinis and condition, of lbs doa’n,ent referenced In item BA or bA. asharetoforeobanged, remain, undhangad ,nd in full force and et(soLISA. NAME AND TITLE OF SIGNER (l3ç’s or print) ISA. NAME AND TITLE OF CONTRACTING OFFICER fl)7’e orpilot)

DARLA .1. CLIFTONCONTRACTING OFFICER

158. CONTRACTOR/OFFEROR 15C. DATE SIGNED 168. UNITEDSTATESOFAMERICA . 160, DATE SIGNED

___________________________________ %~>~ August 1, 2OO&.,~

(SIgnature ofparson authorized 10 sIgn) . (SIgnaM~gGontrsctIng 0 r)MEN 7540.01-162.8070 30-105 STANDARD FORM 30 (REV. 1043)PREVIOUS EDITION UNUSABLE Ccmpular Generated Prescribed by GSA PAR (48 CFR) 53.243

C C)I,

CONTRACT: NNLO5AAOIB TASK ORDER: NNLO5AB4ITModification 2

Page 2 of 2

1. The verbiage in Paragraph 1 of NNLO5AB41T, Modification I included an administrative errorreferring to an end date of August 31, 2006 (two other references to the end date correctlyindicated an end date of December 31, 2006, as per the contractor’s request). The verbiage inParagraph 1 of NNLO5AB41T, Modification 1 is, therefore, corrected to read as follows:

“Paragraph 7, PERIOD OF PERFORMANCE/SCHEDULE is revised to read: The period ofperformance for this task shall be August 12, 2005 through December 31, 2006. Interim eventdates may change based on direction of the Task Monitor. Changes to the completion date mustbe approved by the Contracting Officer.”

2. In accordance with Paragraph B.4, of the Basic Contract (NNLO5AAO1 B), FAR 52.232-22 appliesat the Task Order level. In accordance with this clause, NFS 1852.232-81 as previouslyincorporated in NNLO5AB41T is revised to read:

“CONTRACT FUNDING, (NFS 1852.232-81) (JUN 1990)

(a) For purposes of payment of cost, exclusive of fee, in accordance with the Limitation of Fundsclause, the total amount allotted by the Government to this Task Order is . This allotmentis for NNLO5AB4IT and covers the following estimated period of performance: August12. 2005through December 1.2006.

(b) An additional amount of is obligated under this Task Order for payment of fee.

(End of Clause)”

3. All other terms and conditions remain unchanged.

SUMMARY OF TASK ORDER VALUE I FUNDING

TASK TASK VALUE SUMMARY TASK FUNDING SUMMARYORDER TOTAL TOTAL

DOCUMEN CPFF CPFFT ___________ ___________

BASIC $421,603 — $200,000MOD 1 :~ $421,603 __1 $200,000

___________ $421,603 $200,000

ESTIMATE0

COST

FIXED

MOD2

ESTIMATED

COST

FIXED

NOTE: Period of performance for this task order is August 12, 2005 through December31, 2006.

0 c~j

1. CONTRACT ID CODE PAGE OF PAGESAMENDMENT OF SOLICITATIONIMODIFICATION OF CONTRACT 1 3

2. AMENDMENTIMODIFICATION No. a EFFECTIVE DATE 4. REQUISITIDRIPURCFIASE REQ. NO. 5. PROJECT NO. (UapgfcabJe)

000003 See Block 1SC see Block 12 below.6. ISSUED BY CODE ~RC 7. ADMINISTERED BY (J(other than Ileo~ 6) CODE IT.~RcNASA/Langley Research Center NASA/Langley Research Center92 Langley Blvd., Bldg. 11952 92 Langley Blvd.. Bldg. 11952il/S 126 14/S 126Hampton VA 23681—2199 Hampton VA 23681—2199

a. NAWEANDADDRESS OF CONTRACTORtNo~ sfrset coedy. aWe emflpcodfl 9k AMENDMENT OF SOLICITATION NO.

SCIENCE APPLICATIONS INTL CORPAttn: PB. DATED (SEEITEM 11)

10260 CAMPUS POINT DRSAN DIEGO CA 92121-1522 —~ lOP. MODWICNT1ONOFCONTRACUORCER NO.

. NNLO5AAO1B

NNLO5AB41T. 106. DATED (SEE ITEM II)

CODE 1FACIUTYCOOE 08/12/2005

11. THIS ITEM ONLYAPPUESTOAMVNDMENTS OFSOUCITATION5

~ ,fme abow nuntered solicitauon iserriended as set brim in Item 14. The hou,and date sp.dfledtr rece~,t cC OtTa’s [jlsextended. I Is riot extended.OtTo., neat admov4edge receipt owls ameldment prior to the hos and date spedbed In the soa bflon or as amended, by oite 018,4 fotowing mdJiod, (a) By cocrçlebngNerve Band 15, end returnIng espies otme amendment (b) Byadmawbedging receipt of UI, amendment On each espy ecsobnluedor (c) By

separate teller er tdegamwfilth indndesa Merenc, tothe sddtatcn and ainendqrtnt nunters. FAILURE OF YOUR ACKNOWLEDGEMENTTO CE RECEIVED ATThE PI.ACEDESIGNATED FORtIE RECEIPT OF OFFERS PFBORTD THE HOURPNDDATE SPECIFIED MAYRESULT IN REJECTION OFYOIJROFFER II by~*1ue or thIs amendment you des~’e to change an offer afresdysi.4nimbcd. such change tray be made by Wegram er teller. prodded each telegram or loiter makesreference to the soroitafon arid this amendment and is receIved mior to oh. ooef*n how a~f dale ToadIed.

12.ACCOUNTINGAND APPROPRIATION DATA (if requlreo9

PR: N/A13. ~WSITEM ONLY APPUESTO MOOIFICATIONOF CONWACTSIORDCRS. IT MODIFIES ThECONTRACTIORDER NO. AS DESCRISED IN ITEM 14.

cI*cK ~ A. ThISCHANGEORDERIS ISSUED PURSUANT TO: (Spedfrauthorsy) INECRANGES SET FORTh IN ITEM 14 ARE MADE IN THE CONTRACT

B. THEABOVE NUMBERED CONTRACT/ORDER IS MODIFIEDTO REFISCTTNEADMJNISTJWTIVE CRINGES (such as changesk payi,g cute.appropda&n deja, sin) SET FORTh IN ITEM 14, PURSUANTTO ThE AUTHORiTY OF FAR 43.1030),

C. THIS SUPPtEMENTALAGREEMENT IS ENTERED INTO PURSUANTTOAUThORITYOF:

D. 0Th ER (Spec’fr 4w otmc&ffratlon end aulhoniy)

X . PAR 52.243-2, Changes -- Cost-Reimbursement (Alternate V) (APR 1984)

C. IMPORTANT: Contraclo’ Lii. not ~isreqjWed tosign tflsdoojmentand rebmi 1 ccøea to theLssi~r~ dice.

14. DESCRIPTION OFPMENDMEWTINODIFCATI0N (Organized by UCP sectk’n heaoTngs, lnc’wcnq $ Wxntrsdsubj.ctmaiferwtier. 4aabe~)

The purpose of this modification is to extend the period of performance and revise duedates for associated deliverables. Accordingly, the task order terms and conditions arerevised as follows:

14534 7540~0l-I 524070Previous edilori urweable

**4DARD FORM 30 (REV. 1043)Presolbed by GSAFAR (48 CFR) 53.243

Except as provided hereto. WI arnie aid coodWora 01 the dco.nnent referenced In. ten. DAd lop, as ?srdnfere changed, remains unchanged and to MI rorceand e{fe~iSA. ?WJ&M4D TTTLEOFJIGNER T$~eorp,3,f) ISA. NAME AND TITLE OF CONTRACTING OFFICER (T~,e o,pdnt)

~Cc%~Q~Ot~t ~ Dana J. Clifton

l≥8:CONTRACTORIOFFEROR N 15C. DATE SI NED 168. UNITED STATESOF AMEF~ ISC. DATE SIGNED

~ ~l3~ 1o~~ 12/31/2006ISthueNet O(perso, anausuzad M’nIgn) (Staninee plc free Otter)

Li

CONTRACT: NNLO5AAOIB

0 C)TASK ORDER: NNLO5AB4IT

Modification 3, Page 2 of 3

1. The Period of Performance/Schedule, Paragraph S of the Statement of Work is changed as follows:

Period of Performance!Schedule: The period of performance for this task shall be August 12, 2005through November 30, 2007. Interim event dates may change based on direction of the Task Monitor.Changes to the completion date must be approved by the Contracting Officer.

2. In accordance with Paragraph B.4, of the Basic Contract (NNLOSAAOI B), FAR 52.232-22 applies at theTask Order level. In accordance with this clause, NFS 1852.232-81 as previously incorporated inNNLO5AB4IT is revised to read:

“CONTRACT FUNDING, (NFS 1852.232-81) (JUN 1990)

(a) For purposes of payment of cost, exclusive of fee, in accordance with the Limitation of Funds clause, the totalamount allotted by the Government to this Task Order is —. This allotment is for NNLO5AB4IT andcovers the following estimated period of performance: August 12, 2005 through March 31. 2007.

(b) An additional amount of is obligated under this Task Order for payment of fee.

(End of Clause)”

4)CI-00)

=Milestones Dates

I Start Date2 STEREO Observatory Pre Environmental Review3 STEREO Fhght Ops Review4 STEREO Observatory Pre Ship Review j5 STEREO Mission Readiness Review6 STEREO Flight Readiness Review A7 STEREO Launch Readiness Review 48 MMS Overview meeting ]9 MMS Mission Definition Review j10 MMS Initial Confirmation Review

STEREO Flight Readiness Review 112 STEREO Launch Readiness Review I13 STEREO Launch .114 STEREO Post Launch Review15 Completion Date I

F

3. All other terms and conditions remain unchanged.

CONTRACT: NNLO5AAOI B

C

SUMMARY OF TASK ORDER VALUE! FUNDING

C)TASK ORDER: NNLO5AB4IT

Modification 3, Page 3 of 3

BASIC

TASK TASK VALUE SUMMARY TASK FUNDING SUMMARYORDER ESTIMATED FIXED TOTAL ESTIMATED FIXED TOTAL

DOCUMENT COST FEE CPFF COST FEE CPFF

MOD 1 ____

MOD 2 ____

MOD 3 ____

$421,603$421,603

I

$421,603$421,603

NOTE: Period of performance for this task order is August 12,2005 through November 30, 2007.

$200,000$200,000$200,000$200,000

~C) U

NASAJLangley Research Center98 Langley Blvd.. Bldg. 11958MfS 126Bançton VA 23681-2199

NASA/Langley Research Center95 Langley Blvd., Bldg. 11953K/S 126Hampton VA 23681-2199

t NAME NC CCRESS OF CONTRACTOR ia. W ~t%. ~#* aTdW C€6Ø hA. flSENDMENT OF fl)CITAItW rC.

SCIENCE APPLICATIONS INTL CORPAttn: a DATEDISEEUWW

10260 CAMPUS POINT DRSAN DIEGO CA 92121-1522 — ¶~A~ MRCATCNQtCONTRAOTdOFO1O.

“ ~1NLO5AAG1B

.bZNLO5AB41T, 100. DAIEO (SEt-STEM II)

1MWC00E 08/12/2005ii. Tile ITEM ONLYAPPUES TO flE IOMENTS OF SOUCITATTOIS

• riTt.a.RNWW.d. flonlisir.nd,da.dbIl, hi 1Mm 14. ml hourEaddat. sp.ac ~mc*I of Offe.i ~1b áWnd.d. [3S nanat- OIl. mist admo.bu~. man, of Ii. asv,&’w4 pi& nfl bo.x aid dTh spfld lit. iCdb%ion or n ammd.d. by oi. Oft. Mo.fl m.hio& (I) Sjt .~..,S4.,

Into. 8aM 15.2nd Stkflig _______ otØ.ed l..e aife&Tiet LbI By .dw’o.d.O≠g r.MpI of ~ annöw4ai lath c~y oft. dbrn.b.,O 0,10) ~ •

.~SI.I. bdW wllbgimfld, frwbjfl S No.n. lot. .adafon and amIn~MnI Rmt.rs. FMUJIE OF yourtAc,slomzcGE,,EnT 70 SE ~C8RED ATTHE PLACE 0C54GNAI~ FOR ThE ~PT OF OFFERS PROF TO THE HOUR J~D DATE 5PECI~B) MAY RESAXT IN REJECTTON OF YOUR OFF~ (by*t. Dl Tub SWflI YOU dAWE ID dwigi ai cew äSdf suomfad. tad. dung. TIny b mad by Mt.gIIn or Iflr~ pIc.a.d ..di wbgian & IMWJo.eat -

~. .— _._.._. .—..

ltACCOUNflNGn10APF~FR~TiQNoATAf%mqtaØ Net Increase: $50,000.00PR: 4200201464 - :

irna ITEM OILY *ntnm~A1nI OF CONTflCTW0a~ Or MOCIRn Tie cONTRAcVO~M tan D€ICTS~ se Si.

ocae ~ THe cTwlGa Onttt IS ISSUED FIflWJT T& i p.d~yaaM’*~ WE CHMICES SET FORTh t ITEM 14 APE MADE IN ThE CONTRACT ..

- a 7148 SWFLENENTALA~HE14F IS flJTEREO INTO PUMUANT TO AUTHOWTY OF:

0. OIlER (*ICI~’4m danea, .~nEd~)

X FAR 52.232-22, LIMITATION OF FUNDS (APR 1984)

8. NIOITtMP. Cornell t1a,a~ ~1hnq,*ed ID IJ~r. Ifs doajmrd SM MINI 1 ~jØsb I, *e*c cen.

14. OISCRWT1ON OP neNaAe4TmcdFlcATIoN 2S~d b~ UCF s.dt.i h.S,g1. LioLdog flcta&n~ttad .~.amdd.rtoma.t ãIS~b.)

The purpose of this modification is to add $50,000 on CI,IN 002 incremental funding andchange the contract administrator in accordance with the suatary of changes.

All other terms and conditions remain unchanged.

002 Funding for NNLOSAAOXB 221,603.00Incrementally Funded Amount: $50,000.00

ContinuedETNØfl ptMdtd hE., iinfl ccnddms cern. aenni rwnncd ii INni a or IOA.sa hvekzfcit e4ng.~ rnleq uah...,..J arid In *4 too. md .41.0.ISA. KANE AND 71111 OP SI~&R mm oratU ISA. NAtE AND TITlE OF CONTRICTh4G OFFICER (T1~. otp&Q

5ares-..Ca.~pbsI~ ISc. c.~..4f..ct 14.nnh./ H. Jones

lit TOROFFEROR a lit DATE BONED I isa tIlTED ATES OF lSC DAtEssie

5~j_c~~u ~.-d-~&- -

FAMENDMENt OF SOLICITXflONIMOOIFICAflON OF CONTRACT

2. ANEIC NTS~WCATICN IC,

000004SIS~JEDBY

I S’FECTTVEOATE

See Block l~C

Iia~cSee Block 127.ADIMMSTEREDBY

B. TilE ADOVE NLMISER~ COITRACTS0~ IS MODIFIED TO ~N.EC~ THE ADIAMSTRATNE CIWIGES (aW ndfln AIPL*W alIt.,#ptvp1Il~, an. .t) SET Poems WI ITEM IS P(nMNT TO THE ATJTNOPJTY OF FAR 43, I~Ø)

:--~-.‘..~

N$N 75400 1-1824070—~.eIm a.I~t

Bl’ANOA~ FOWl 3D(~V. 1031)Pm.c.t.d by GSA

CONTRACT: NNLO5AAOI B

C)TASK ORDER: NNLO5AB4IT

Modification 4Page 2 of 2

1. In accordance with Paragraph 8.4, of the Basic Contract (NNLO5AAO1 B), FAR 52.232-22 applies at theTask Order level. In accordance with this clause, NFS 1852.232-81 as previously incorporated inNNL05AB4IT is revised to read:

“CONTRACT FUNDING, (NFS 1852.232-81) (JUN 1990)

(a) For purposes of payment of cost, exclusive of fee, in accordance with the Limitation of Funds clause, the totalamount allotted by the Government to this Task Order is This allotment is for NNLO5AB4IT andcovers the following estimated period of performance: August 12, 2005 through August15. 2007.

(b) An additional amount of - —. is obligated under this Task Order for payment of fee.

Anthony S. Kram - -

-Mail Stop (MIS): Office of Procurement- 12W -. -

Phone N.umber:(757) 864-2434/ Féx Number: (757)864-7-709E-Mail Address: Anthoñy.S.Kram~nasa.gov

SUMMARY OFtASK ORDER VALUE I PUNDING

Summary of Changes

(End of Clause)”

- 2. Contract adminstration is changed-to the following:

Contract Administrator

TASKORDER

-; DOCUMEN- -T -

TASK VALUE SUMMARY- FIXEDESTIMATE

- - COST- -

BASIC

FEE

MOD

- - TOTAL

CPFF

- tASK FUNDING SUMMARY F:

MOD 2

• ESTIMAtED

COST

MOD 3

FIXED

FEE

MOD 4

TOTAL:: -

- CPFF-.-:

1,603 — $200,000421,603 ~ $200,000

$421,603 — $200,000‘1,603 $200,000‘1,603 $250,000

NOTE: Period of performance for this task order is August 12, 2005 through November30, 2007.

C)AMENDMENT OF SOUCITA71ONIMODTFICATION OF CONTRAcT 1. CONTRACT ID CODE PAGE OF PAGES

ii 22. ,~J4ENDMENT/MODIFICATION NO. c. EFFECTIVE DATE 4. REQUIsfnoNIpurlcHAss REQ. ND. 5. PROJECT NO. (tioppEusble)

000005 09/17/2007 See Schedule6. ISSUED BY CODE 7. ADMINISTERED BY ~( other than Items) CODE futnc

NASA/Langley Research Center NASA/Langley Research Center9B Langley 8lvd~, Bldg. 11958 ~3 Langley Blvd., Bldg. 11958N/S 126 N/S 126Hampton VA 23681—2199 Hampton VA 23681—2199

6. NAMEAND ADDRESS OF CONTRACTOR (We, sl~et,.cofl~ SIMs end ZIP code) BA. MIENDMENTOF SOLICITATION NO.

SCIENCE APPLICATIONS INTL CORPAttn: -- — OB.DATEDtSEEITEMII)

10260 CAMPUS POINT DRSAN DIEGO CA 92121—1522 — IDA. MODIFICA11ON OF CONTRACTIORDER NO.

~ NNLO5AAQ1B

NNLO5AB4 iT~ lOB. DATED (SEE rreMn)

CODE (FACILITYCODE 08/12/2005

II. THIS ITEM ONLYAPPLIES TOAMEE]MENTS OF SOUCITATIONSLithe above numbered soldladon is smanded as sot forth in Item 14. The hour and date specified nor reeeiptofOffots (Jisexlcoded. Flis not extended.

Offers must ad<nowledge tecoipt of Ibis amendment prior to the hour and date Specilled h the solicitation oras amended, by one ol the following methodE (a) SycomplotngItems 6 end 15, end returning copies of the amendment O~) By ac*nowledgiog receipt of this amendment on each copy of the offer submitted; or (c) Byseparate letter or telegram whIch includes a reference to the sondlallon and amendment numbera. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED ATTHE PLACE DESIGNATED FORTHE RECEIPT OF OFFERS PRIOR TO THE HOURAND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. Ilbyviptuo of this amendment you desire Ia change an elmer andy stjbnnilled, such change may be made by telegram ci- letter, pro,ddeØ each telegram cc letter makes

- reference to the sollcealion and This amendment, and Is received wit, to the orinq hour and date specified.I2.ACCOUNTINGANDAWROPRIAT~ON DATA(I1sO4IJII,€~ - Net Increase: $40,000, 00PR 4200220880

1$. THIS ITEMONLYAPPLIESTO MODIFICATIONOF CONTRACTSIORDERS, IT MODIFIES THE CCINTRACTIORDER NO. AS DESCRIBED IN ITEM ft

~-GHEtK ONe k THSCHANGE ORDER IS ISSUED PURSUANT TO’ (~ec rh0n~’) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

ORDER NO. IN ITEM WA.

B, THE ABOVE NUMBERED CONTRACT[ORDER IS MODIFIED TO REFLEC’TTHEADMINISTRATIVE CHANGES (such as changes Iepa34msg office,appn~4abbn dote, etc.) SET FORTH IN ITEM 14, PURSUANTTO THE AUThORITY OF FAR 43.103(b).

C. THIS SUPPIEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF;

D. OTHER peelifi cafloe and acwon~)

X FAR 52232—22, LIMITATION OF FUNDS (APR 1984)

E. IMPORTANT: Contraclor iclls not Ills ret~cnred to sign this document and return copIes to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organ/zed by UCF sectIon heed/ng:, hidudtng etionatonrmclsub;ea maflerw&e,e feasIble,)

The purpose of this modification is to extend the period of performance until 31 May 2008

and add $40,000.00 in incremental funding in accordance with the summary of changes.

All other terms and conditions remain unchanged.

Excoptes provIded herein, all tem,s end ccxtditions of the doaj/nent referenced in Item BA or IDA, as heretofore changed, remains unchanged end in M force end effect,ISA. NAAIEAND TITLE OF SIGNER (73’pe orpdnf) - ISA. NAME AND TI11.E OF CONTRACTINd OFFICER (lWe orprlnlj

Anthony KrarnISB.CONTRACTOR/OFFEROR 150. DATESIGNED 16~~T~ 160. DATE SIGNED

•— —--- - .:: 09/17/2007tSawac4ersoeawhonzedIoe,J fStrbraetG,pfrecL,g OIl/ce’)

NSN 7540-01-152’BOTOPrevinjus edition unusable STANDARD FORM 30 (REV. 1043)

PresoThod by GSAFAR (48 CFR) 53243

0CONTRACT: NNLOSAAOI B

Summary of Changes

0TASK ORDER: NNLOSAB4IT

Modification 05Page 2 of 2

1. The period of performance is extended from 30 November 2007 to 31 May 2008 at the request of thecontractor and at no additional cost to the Government.

2. Incremental funding in the amount of $40,000.00 ( cost an~ fee) is added to this task anddistributed In accordance with the summary chart below.

3. In accordance with Paragraph BA, of the Basic Contract (NNL05MOI B), FAR 52.232-22 applies at the TaskOrder level. In accordance with this clause, NFS 1852.232-81 as previously incorporated in NNLO5AB4IT isrevised to read:

“CONTRACT FUNDING, (NFS 1852.232-81) (JUN 1990)

(a) For purposes of payment of cost, exclusive of fee, in accordance with the Umitation of Funds clause, thetotal amount allotted by the Government to this Task Order is This allotment is for this task andcovers the following estimated period of performance: August 12, 2005 through 31 December 2007.

(b) An additional amount of_— is obligated under this Task Order for payment of fee.

4. All other terms and conditions remain unchanged.

(End of Clause)”

SUMMARY OF TASK ORDER VALUE I FUNDING

BASICMOD. 1MOD 2MODSMOD 4MODS

j $200,000$200,000$200,000$200,000$250,000$290,000

TASK TASK VALUE SUMMARY TASK FUNDING SUMMARYORDER ESTIMATED FIXED TOTAL ESTIMATED FIXED TOTAL

000UMEN COST FEE CPFF COST FEE CPFFT

$421,603$421,603$421,603

-J

NOTE:

$421,603$421,603 _J$421,603 _____

Period of performance for this task order is August 12, 2005 through SI May 2008.

C)AMENDMENT OF SOLICITATIONIMODIFICA11ON OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

ii 22, MTENDMENTIMODIFICATION NO, 3. EFFECTIVE DATE 4. REQUISITIONIPURCI4ASE REQ. NO. 5. PROJECT NO. (if applicable)

000006 See Block 16C 4200235547s. ISSUED BY I 7. ADMINISTERED BY firother than lien 6) 000! II~~RCNASA/Langley Research Center NASA/Langley Research Center98 Langley Blvd., Bldg. 1195B 9B Langley Blvd., Sldg. 1195B14/S 126 N/S 126Hampton VA 23681—2199 Hampton VA 23681—2199

8. MAMEANDADORESS OF CONTRACTOR (Na. steer. rew,t>~ &afeaneZJp Code) 9k AMENDMENT OF SOUCIFATION NO.

SCIENCE A?PLICATIONS INTL CORPAttn~ 9B.DATEO(SEEIIEMU)

10260 CANPUS POINT DRSAN DIEGO CA 92121—1522 —~

X NNLO5AAOIB

NNLO5AB41T109, DATED (SEE ITEM 11)

CODE FACIUTYCODE 08/12/2005

11. TNIS ITEM ONLYAPPUES TO AI~IN0MCNTS OF SQUCITATIONS

flThe above numbered sofidlailon is amended as sat bit hi Item 14. The hourand date specified far recelptofOffets Ohs extended. Lilt notoanonded.Offers must acknowledge reco~t of this amendment prior to the hour and date specified In the sotdlation or at amended, by one or the rolknving methods: (a) By ConipiolngItams & and 15, and rehadng oui~ies of the amendment Qi) fly acknowledging receipt Cf this amendment on oath copy of the oftnrsubn’ittedt or(c) Byseparate letter or telegram which Inohides a reference It the solidiafon and amendment numbers. FAILURE OF YOUR ACKNOWlEDGEMENT TO BE RECEIVED ATTHE PLACE DESIGNATED FOR THE RECEIPT OP OFFERS PRIORTO ThE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OFYOUR OFFER. (byvirtue of this amendment you deere to change en offer already submitted, such change maybe made by telegruen, oriatler, providad each telegram or letter makesreference to the soicitedon and this amendment, and Is received prior to the ~nlnt titer and date aoedted.

¶2.ACCOUNTINGANDAPPROPRLATIONDATA9fmquksc~ Net Increase: $67, 000 .00PR 4200235547

tt THiS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTSJORDSItS. ITMODINES ThE CONTRAC17ORDEFI No. AS DESCRIBED IN ITEM 14.

CHEOKONE A. This CHANGE ORDER IS ISSUED PURSUANTTO: (~3o*aulhonly) ThE CHANGES SETFORTH IN ITEM II ARE MADE INTl-IC CONTRACTORDER NO. IN ITEM IDA

B. THE ABOVE NUMBERED CONTRACTIORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as thangos in paying office,appropdaller, date, oIcJ SET FORTS IN ITEM 14. PURSUANT TO THEAUTHORITY OF PAR 43.103(b).

c. This SUPPLEMENTALAGREEMENT IS ENTERED INTO PURSUANT TOAUTHORITYOF:

0. OTHER (SpaclO’ 4q~e ofmodr,callen and auIhofi5~

X FAR 52.232-22, LIMITATION OF FUNDS ~APR 1984)

E. IMPORTANT: Contniotor [Ths nol. Ohs requited to sign this dtosrnant and rebrn, 0 copies to the Issuing oliice.

14. DESCRIPTION OF MIENDMENTIMODIFICATION (Organized by LICF section hearIngs, including sofltfiaiionleoefmctsu~ecfma$fe,w*e,e feasible.)The purpose of this modification is to add funding in accordance with the summary ofchanges.

All terms and conditions remain unchanged.

Excaptas provided herein, at Iarm~ and condtions of the document referenced in Item 9A of IDA, as heretofore changed, remains unchanged andhn full lerce end effect.ISA. NAME AND TITLE OF SIGNER (Type crp.thiQ ISA. NAME AND TITLE OF CONTRACTING OFFICER (7)ó~a orprlnQ

Anthony Kran153. CONTRACTOR!OFFEROR 15C. DATE SIGNED ~ I 16C. DATE SIGNED

~ 02/01/2008(Steretenefpemonsutho&~ . INSN 754041.1 524070Previous edition unusable

STANDARD FORM 30 (REV. 1043)Prescaibed by GSAFAR (48 CFR) $3,243

C) 0AMENDMENT OF SOLICITATION!MODIFICATION OF CONTRACT 1, CONTRACT ID CODE PAGE OF PAGES

11 22. AMENDMENT/MODIFICATION NO. a, EFFECTWE DATE 4, REQUISIT1ON/PURCHASE REQ. NO. S. PROJECT ND. (If eppiffable)

000007 See Block lsc N/A6. ISSUED BY CODE LARC 7. ADMINISTERED BY (If otherdAm, lIenS) CODE lIlacNASA/Langley Research Center NASA/Langley Research CenterEB Langley Blvd., Bldg. 11958 98 Langley Blvd., Bldg. 11958M/S 126 N/S 126Hampton VA 23681—2199 Hampton VA 23681—2199

5. NAME AND ADORESS OF CONTRACTORgt, Iroot, cow,5j SffiteandZIP Coda) (4]QA.AMENDMENV OF SOLICITATiON NO.

SCIENCE APPLICATIONS INTL CORP 1Attn: GB. OATED(SEEIFEM DI)

10260 CAMPUS POINT DRSAN DIEGO CA 92121—1522 — ~ MODIFIcATION OFCONTR4CTIORDERNO

X NNLO5AAO1I3

NNLO5AB4 iT106. DATED (SEEITEMI3)

CODE FACIUTYCODE 08/12/2005

It. THIS ITEM ONLYAPPLIES TOAiIINDMENTS O~ SOUCITATIONSU The above numbered solidtadon is amended as set forth in Item 14. Ttte hour and data spodiled for receipt of Offers r is extended. ‘flIt not extended,

Olfets musteclcnowIedge receipt ofitiis amertdn,antprlo, to the hourand dale apecifled In Iho solldtalton or as amended, by one of the following methods: (a) By completngItems B and 15, and returnIng copies of the amendment (1,) By ecWiowIedgmg receipt ofthla amendment on each copy of the otter submitted; or (C) Byseparate teller or telegram which hidudes is reference to Ihesolicitation end anloadniont numbor~ FAILURE OF YOURACt<NOW1.EDGEMENTTD BE RECEIVED ATTHE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO ThE HOUR MD DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If byvirtue ot’diis amendment you desire to change an otti~r already submitted, such change may be made by telegram-or letter, provided each telegram or [alter makesreference to the solicitation and thIs amendmenl, and Is received miorto the openIng hour and date aoecified,

12. ACCOUNTING MD APPROPRIATION DATA (If reqtiirocj)N/A

13. THIS ITEM ONLYAPPLIES TO MODIFICATION OF CONTRACTS)ORDER$, rTMOOIFIES THE CONTRACTIORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ‘~ A. THIS CHANGE ORDER IS ISSUED PURSUANT TO~ (Specify auIhod4~ TIlE CHANGES SET FORTH IN ITEM 14 ARE MADE IN ThE CONTRACTORDER NO. IN ITEM IGA.

B. THEABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECTTHE ADMINISTRATIVE CHANGES (such as changes /n payihg ohlce,npp,rjpdefio,, date~ Ste.) SET FORTH IN ITEIA 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b),

~

D. OTHER (Spedfy ~o of nrodil7catian and autho#dy)

X MUTUAL AGREEMENT

S. IMPORTANT: Connector L.J is noL ti is required to sIgn Iris document and return 1 copIes to the issuing offIce.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCFsocilon headings inc/ad/np ao%c/faI/na’coatract aubject matter whore %asih/o.)

Carla A Coonibs, Sc Contacts RepresentatWeisa.

fS/gnetwa grpemsai aUtIltj&ed to ate,) - -

NSN lSd0’0l’152.BoToPrevious edition untlsablu

The PUrPOSE of this modification is extend the period of performance at no Cost in

accDrdanCe with the s~mnrary of changes.

All other terms and Conditions remain Unchanged.

Except as provided herein, alt terms and conditions of he d000mentreferenced In Itopi GAo, IDA, as heretofore changed, remaIns unchanged and in lull ff,rco and offecL

~iZi~MEA14D TITLE OF SIGNER (73.po orpdnf~ 16k NAME AND TITLE OF CDNTRAc’TING OFFICER (rype or pant)

_________________________________________ Anthony Krani

15C.DATESIGNED 16B.UNIT ‘ A 16C.DATESIGNED

_________________________ o;-~q-n . - ~ 05/29/2008

STANDARD FORM 30 (REV. 10.63)Prescribed by GSAFAR (45 CFR) 53243

C)CONTRACT: NNLO5AAOIB TASK ORDER: NNLO5AB4IT

Modification 07Page 2 of 2

Summary of Changes

The period of performance is extended from 31 May 2006 to 31 May 2009 at the Contractor’s request and atno additional cost to the Government. This no cost extension is due to scheduling delays with the MMSmission. Consideration for this extension is not appropriate.

2. In accordance with Paragraph B.4, of the Basic Contract (NNLO5ARO1 B), FAR 52.232-22 applies at the TaskOrder level. In accordance with this clause, NFS 1852,232-81 as previously incorporated in NNLOSAB41T isrevised to read:

“CONTRACT FUNDING, (NFS 1852.232-81) (JUN 1990)

(a) For purposes of payment of cost exclusive of fee, in accordance with the Limitation of Funds clause, thetotal amount allotted by the Government to this Task Order is - . This allotment is for this task andcovers the following estimated period of performance: August12, 2005 through 15 February 2009.

(b) An additional amount of - is obligated under this Task Order for payment of fee.

(End of Clause)t

3. All other terms and conditions remain unchanged.

SUMMARY OF TASK ORDER VALUE I FUNDING

TASK VALUE SUMMARYESTIMATED

COST

TASKORDER

DOCUMENT

BASICMOD IMOD 2

FIXEDFEE

TOTALC PFF

p

TASK FUNDING SUMMARYESTIMATED

COSTFIXEDFEE

TOTALCPFF

MOD 3MOD 4MOD 5MOOS ____

[MOD7 L~ INOTE: Period of performi. for this1

~1.603$421,603$421,603$421,603

~ $421,603ft~ $421,603

$421,603$421,603

-irder is August 12, 20O~thTh1

EJ

$200,000$200,000$200,000$200,000$250,000$290,000$357,000$357,000 i

0JUN 05 2009 99:45 FR OP SD

AMENDMENT 0)’ SOUCITNrI0NIMODIFICA11ON OF CONTRACT 1, CONTRACT ID CODE PAGE Off PAGESii 2

2. AMENDM~NTIMODIFICATION NO. 1. EFFECTIVE DATE 4. REQUI$ITIONIPIJRCKASE REQ. ND. 5. PROJECT NO. (Irapp?iceblc)

000008 06/02)20096. ISSUED BY CODE LARC 7. ADMINISTERED DY (If other than tIem (5) CODE

NASA/Langley Research Center NASA/LangLey Reseatch Center9B I~angley Blvd., 8ldg. 1195B 9B Langley Blvd., Bldg. 11956N/S 126 H/s 126Hampton VA 2368l’-21~9 Hampton VA 23681—2199

8. NAME AND ADDRESS OF CONThACIOR (No.. avast, cow,4ç SSZtSSM7JP Code) SA. AMENDMENT OF SOLICITATION NO.

SCIENCE APPLICATIONS ‘tNTL CORPAttn: as. DATED (SEE ITEM 11)

10260 CPNPUS POINT DRSAN DIEGO CA 9212l—l~22 x IDA.Mc IFICNnDNOFOONTRAOYIORDERND. -

NNLO5AB41TICE. DATED (SEE ITEM 13)

CODE FACILIW000E 08/12/2005

11. THIS IT~S ONLY APPLIES 10 AMENDMENTS OF S~UCIYATIONS

~ Inc ~bov~ numbfld scudlatan a amended ee sot In in lIon, 14. The hats and dale SpedIlod Ia, radpt of Offers Is oxlrnded. Die not extended.Offers must scknoIMedQe receIpt .atlrns amor4,icnl p11cc to the hcLw and date apecifiod in the satdlaton eras amended, by onc of the blowing Methods: (a) Dy complodogItems B and IS. and returnIng copIes 01 the amendment: (b) By a~~c 1ed~ng receipt of Ins oni,ndment on each CC4)y Of the offer suetrjttad: or (a) By

sgparotq Icitar crteIe~taM which includes a reteronco tg Inn soIicJIeIiOn and anendmentnunfeors. FAILURE OF YOUR ACKN0WI.~OGEMENT TO BE RECEIVED ATThE PI.ACE DESIGNATED FOR Il-fE RECEIPT OF OFFERS PRIOR 10 THE HOUR AND DATE SPECIFIED blAT RESULT IN REJECTION OF YOUR OfFER. ThyvIrtue DI this offleI’dn,eiI you desire to change an offer pkqady sLtflliIted, audi change may bo made by lelewarn or letter. provIded cn ItIa~m or letter maitesreference to the solicitation and thIs amondIllert. and a received 011cr to the opqiing hour and dale s~edhiec.

12. ACCOUNTINCAND AP~ftOPRLATION DATA (If reovired)See Schedule

13. ThIS IThM ONLY APPLIES TO MDDIFIGAI1ON OF CONTRACISIORD€RS. IT MOllIFIES lIlt CONTRACTIORDER NO. Al DESCREO IN ITEM 14.

c~el ONE k THIS CHn4GE ORDER IS ISSUED PURSUANT TO: (Speclfravlhorny) ThE ORANGES SET FORTH IN ItEM 14 ARE MADE IN THE CONT1IACYORDER NO. IN ITEM IDA.

5. ThE ASOVE NUMBERED CONTIt.ACTJORDER IS MODIFIED TO REFLECT ThE ADMINISY~AYIVE Ct-tANGES(sucll as changcs /n pa)4n9 office,oppropdslioh date. etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103D).

C. TIllS SUPPLEMENTAl. AGREEMENT Is ENTERED INTO PURSUANTTO AUTHORITY dr:

6. OTHER ($pcc/fr5,pe of nIo&iicaUon arid authority)

X Mutual Ag;eemeflt

E.IMPQIITANY: Ontracia ~ ~Ii.reqdtosignmisdIrn.ntendreIurn 0 coPiDstotheitIu~1OOThCe.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organtzed by ((CF section headings. includIng soycltatios*ontixCl subject matter where tnsio.1o.)

1. The purpose of this no cost modifiCation is to extend the Period of Performance from 31Nay 2009 to 31 May 2010.

2. All other terms and conditions remain unchanged.’

STANDA~O FORM 30 ~REV.’1C-63)Presoted by GSAFAR (40 CFR) 53.243

0757 964 9774 TO 99274959 P.01/02

NSN 7540.01-1624070previous edition unusable

Escape as pcovided herein, at terms n condeoris attIre dcsumant referenced In Iton ~A or IOA, as heretofore changed. rcnI~ns unchanged and ffi Itt tome and street.ISA. NAME M1D 11TLE OF SIGNER (Tj.pq at p6.11) 18A. NAME buD T1TLE OF COhtffiACTING OFFICER (rypeorpWnO

Robin Amburn Grob, Contracts Manager <. ~ King16C. DA E SIONBOOFF ROR ISC. D it IGNED lBj/lIltD ST~E~O/3A,g~ C ~, /zfo7

1.LJ~UM~ ~cfaJoi ~~~-yf$.pnozvro otpsreat eldho&ed to won)

CONTRACT: NNLO5AAOI B

JUTS ~‘ dtT~5 ~19 47 bk UH/-4~ 757 884 9774 TO 9~7465B P. 02/g2

U

Summary of Changes

TASK ORDER: NNLO5AB4ITModifioMion 08

Page 2 of 2

1. The period of performance is extended from 31 May 2009 to 31 May 2010 at the Contractor’s request and atno additional cost to the Government. This no cost extension is due to scheduling delays with the MMSmission. Consideration for this extension is not appropriate.

1 All other terms and conditions remain unchanged.

SUMMARY OF TASK ORDER VALUE I FUNDING

TASKORDER

DOCUMENT

BASICMODIMOD2MOD3MOD4MODSMQD6MOD7

IMODB

TOTALCPFF

$200000$200,000$200,000$200,000$250000$290,000$357,000$357,000

$357,000 I

NOTE; Period of performance for this task order is 12 Aug 2005 through 31 May 2010.

TASK VALUE SUMMARYESTIMATED

COSTHXED

FEETOTALCPFF

TASK FUNDING SUMMARYESTIMATED

COST

$421,603

FIXEDFEE

$42,603$421,603$421,603$421,603$421,603$421,603

II ~$421,603

$421 ~603 I I

** TOTPL P%~SE. S2 **