1 VC Process
Agenda
VC Process2
• SAP VC Process
• Vision Scope Requirement (VSR)
• Engineering Change Process
• Unit Control Configuration
BOM Development
Items in the BOM are sequential across all KMAT’s
• Line 20 Basic Unit
• Line 50 Heat Exchanger
• Line 350 Compressor Assemblies
• Line 450 Evap. Coils
• Line 500 Cond. Coils
7 VC Process
BOM Changes
Super BOM Changes made to match the dates of the original EC.
A VC EC is created to make the appropriate changes to the Super BOM 526_45264
11 VC Process