nacanieli senibaravi. contents: 1.introduction 2.background 3.objective 4.project phases 5.tfl...
TRANSCRIPT
GIS/RS USER CONFERENCE 2011
TELECOM FIJI LTD.
Nacanieli Senibaravi
CONTENTS:
1. Introduction
2. Background
3. Objective
4. Project Phases
5. TFL Network
6. Application
7. OSS/BSS
8. Future Plans
9. Conclusion
Introduction
TFL is committed to building a better Fiji by being the best in service, providing quality communications and making it easier for people to keep in touch.
GIS is part of the development of the TFL network where it assists in providing the necessary information and network design for the framework.
Background 1994 Initial Planning looked at CAD
1996 Calling of expression of interest
July 1996 Intergraph awarded tender
January 1997 Two pilot data capture
July 1998 100% Completion of data conversion
January 1999 Awarded 100% Club for excellence in data conversion
2003-2004 Upgrade to G/Comms
OBJECTIVE
GIS project objective1. To design online all cable projects.2. Update and maintain Telecom assets.3. Easy access for our end users.
1st Phase
• CAD Conversion
• GIS Upgrade
• Wireless
• GeoMedia
• CDP
Project Phases
2nd Phase
• M6/U6 Interface
• Automated Update GIS to M6
• Monitoring System
TFL NETWORK
‘E’ Side Cable ‘D’ Side Cable
Loop
TFL Network Exchange
Cabinet DSLAM
Joint
Fibre Cable
CopperCable
Manhole Jointing Box Jointing Pit
Distibution Point
Drop-wire
Customer
RESIDENTIAL
SOHO
SME
Optical Transmission Ring
ADSL/ADSL2/ADSL2+SHDSLEthernetE1
IP
POTSISDNADSL2+VoIP
Leased linesADSL2+VDSL2
Softswitch
ClearAccess+ EMS
Video Server
BroadAccess-1000
BroadAccess-1000
BroadAccess-1000
BroadAccess-1000PSTN
BroadAccess-1000
G/TECHNOLOGY
GIS PRODUCTS
G/Technology Suite of Products• G/Administrator - 1• G/Designer - 8• G/NetViewer - 25• G/MobileViewer - 0
GeoMedia - 1
• G/Designer is the base client software component within the G/Technology suite of products. It is used for network design and maintenance activities of the feature-based asset information within the G/Technology database.
• The Designer client seat provides the user environment for accessing the corporate asset database..
Designer
PROJECT STATUS
CLOSED PROJECT
UNDER CONSTRUCTION
PROJECT
PROPOSED PROJECTS
• G/NetViewer provides view/read only access to the TFL GIS database and allows users to view, query and extract data on TFL’s External Plant network.
• G/NetViewer accesses the live G/Technology database via our (TFL) local area network connection.
KEY FEATURES
Access to predefined queries, traces, andreports for analysis.
Some types of queries are: • Locating assets,• Locating Street Name,• Trace Count,• Customer Report…..etc
QUERIES
QUERIES
QUERIES
GeoMedia can combine data from different sources, in different formats with different map projections to be viewed and analyzed in one environment. No translations required. GeoMedia just reads the data in whatever format it’s in and presents it for viewing and analysis in a user-friendly Windows environment.
Population stats with TFL plant
FUTURE
Interface (GIS-METASOLV-UNICORN)
• Provisioning• Service Activation• Inventory Management
External Plant/Cable Network
METASOLV
Building and maintaining inventory of Cable Access equipment/assets/ infrastructure
• DPs• Cabinets• Cables
New TFL solution to replace ICMS providing functionality for:
METASOLV ®S O F T W A R E
Link to GIS (proposed)Link between Metasolv & GIS. New Infrastructure captured in GIS and updated in Metasolv. Daily operational changes will be done in Metasolv and updated in GIS.
Planners : build new equipment/ infrastructure, that will be installed in the field, in Metasolv.
Initially: Manual All new plant to be captured in GIS (Planning) & also entered/built into Metasolv.
Later: Automatic Planners will be responsible for building new plant in GIS & Metasolv.
All new plant to be entered/built/captured in GIS in proposed state and will automatically be updated into Metasolv from GIS.
Future EndevourInterface and automatic syncing between GIS and Metasolv to be developed.
PROJECTS PROPOSALS
FIBER OPTIC WORKFLOW MANAGEMENT
GIS for other Utilities etc.
SUVA EXCHANGE
WALU BAY
SAMABULA EXCHANGE
BAYVIEW
SUV/A
SUV/S
SMB/G
SUV/X
SUV/B
SUV/K
SUV/V
SUV/W
SMB/W
SMB/USMB/V
SMB/T
SMB/R
SMB/A SMB/P
SMB/AA
SMB/H
SMB/S
SMB/J
SMB/N
SMB/AB
Fiji Navy
PAF
Carpenters Forster’s
FMF
Fiji Prisons
Suva Yacht Club
PWDDepot
Govt. Ship Yard
Rokobili
Neptune Ship.
CWM Hosp.
FSM.
Aust. Emb.
EXISTING NETWORK
Fintel SCC
Civic House
GreenpeacePacific
Vanua House
WesternUnion
JJ’s on thePark
Victoria Corner
- Cyberzone - SkyNET
FAVC -Ministry of Labour -
BP -Korean Embassy -
Quest -
SUKUNA PARK
CONCLUSION
• Greater efficiency resulting in cost savings• Better decision making• Managing geographically
– Better geographic information recordkeeping
.
VINAKA