n orthwest gis u sers g roup c onference – o ctober 20, 2011 dynamic gis-based pavement condition...

12
NORTHWEST GIS USERS GROUP CONFERENCE – OCTOBER 20, 2011 Dynamic GIS-based Pavement Condition Tracking

Upload: winfred-brooks

Post on 29-Dec-2015

216 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: N ORTHWEST GIS U SERS G ROUP C ONFERENCE – O CTOBER 20, 2011 Dynamic GIS-based Pavement Condition Tracking

NORTHWEST GIS USERS GROUP CONFERENCE – OCTOBER 20, 2011

Dynamic GIS-based Pavement Condition Tracking

Page 2: N ORTHWEST GIS U SERS G ROUP C ONFERENCE – O CTOBER 20, 2011 Dynamic GIS-based Pavement Condition Tracking

NORTHWEST GIS USERS GROUP CONFERENCE – OCTOBER 20, 2011

Pavement Management

BIG PICTURE• Save time and money

through more effective management of road assets.

• Enable graphical visualization and analysis of pavement conditions.

• Map your street system• Keep inventory• Track work histories• Attach photos, plans, etc.• Create reports

Page 3: N ORTHWEST GIS U SERS G ROUP C ONFERENCE – O CTOBER 20, 2011 Dynamic GIS-based Pavement Condition Tracking

NORTHWEST GIS USERS GROUP CONFERENCE – OCTOBER 20, 2011

Methodology

• Many “Schools of Thought” in Pavement Inventory– “Do Nothing” Plan– Calculated Pavement Management Plan – “Do Something!”

• PCI (Pavement Condition Index)– Grade represents a scale of current pavement

condition– Usually rated as a percentage – 0 to 100

GoverningDistress and

Other Distresses

PCIRecommended

Treatment

Estimated Treatment

Costs

Page 4: N ORTHWEST GIS U SERS G ROUP C ONFERENCE – O CTOBER 20, 2011 Dynamic GIS-based Pavement Condition Tracking

NORTHWEST GIS USERS GROUP CONFERENCE – OCTOBER 20, 2011

Planning Road Treatments

$$$ $$$$ Excellent

Good

Fair

Poor

Failed

Maintenance:Crack Sealing ($)

Preventative Maintenance:Chip Sealing; Microsurfacing ($$)

Rehabilitation:Overlays ($$$$)

Major Rehabilitation::Mill and Overlay; Reconstruction ($$$$$$)

0 20

100

PCI

Years

The cost to repair a roadway becomes greater with time. The rate of deterioration is exponential

Page 5: N ORTHWEST GIS U SERS G ROUP C ONFERENCE – O CTOBER 20, 2011 Dynamic GIS-based Pavement Condition Tracking

NORTHWEST GIS USERS GROUP CONFERENCE – OCTOBER 20, 2011

Mountain Home – Case Study

• Doesn’t want to implement additional systems or new software tools.

• Integrate the street department’s information with the city’s GIS system.

• Share with department heads and other departments city-wide.

• ASTM International – PCI methodology• Steps for PCI Calculation:

– Inventory Roads– Come up with raw deduct values– Determine final deduction value– Subtract from 100 to get final PCI

Page 6: N ORTHWEST GIS U SERS G ROUP C ONFERENCE – O CTOBER 20, 2011 Dynamic GIS-based Pavement Condition Tracking

NORTHWEST GIS USERS GROUP CONFERENCE – OCTOBER 20, 2011

Inventory Roads

• Measure road cracking in the field– Severity – High,

Medium, Low– Extent – Percentage

of sample that has covered in each type of distress

Page 7: N ORTHWEST GIS U SERS G ROUP C ONFERENCE – O CTOBER 20, 2011 Dynamic GIS-based Pavement Condition Tracking

NORTHWEST GIS USERS GROUP CONFERENCE – OCTOBER 20, 2011

Calculate Raw Deduct Values

• Use charts to find raw deduct values for each distress based on its extent and severity

Page 8: N ORTHWEST GIS U SERS G ROUP C ONFERENCE – O CTOBER 20, 2011 Dynamic GIS-based Pavement Condition Tracking

NORTHWEST GIS USERS GROUP CONFERENCE – OCTOBER 20, 2011

Calculate the PCI

Page 9: N ORTHWEST GIS U SERS G ROUP C ONFERENCE – O CTOBER 20, 2011 Dynamic GIS-based Pavement Condition Tracking

NORTHWEST GIS USERS GROUP CONFERENCE – OCTOBER 20, 2011

Examine the Results

Page 10: N ORTHWEST GIS U SERS G ROUP C ONFERENCE – O CTOBER 20, 2011 Dynamic GIS-based Pavement Condition Tracking

NORTHWEST GIS USERS GROUP CONFERENCE – OCTOBER 20, 2011

The Process

…analyze and report the results in the officeUpdate conditions in the field…

Page 11: N ORTHWEST GIS U SERS G ROUP C ONFERENCE – O CTOBER 20, 2011 Dynamic GIS-based Pavement Condition Tracking

NORTHWEST GIS USERS GROUP CONFERENCE – OCTOBER 20, 2011

GIS in Pavement Management

UpdateRoad

Network

PavementInventory

RecommendedTreatments

Planning andBudgeting

RoadImprovements

GIS

Page 12: N ORTHWEST GIS U SERS G ROUP C ONFERENCE – O CTOBER 20, 2011 Dynamic GIS-based Pavement Condition Tracking

NORTHWEST GIS USERS GROUP CONFERENCE – OCTOBER 20, 2011

Q & A

Ryan CosbyGIS SpecialistGateway Mapping, Inc.250 S. Beechwood St. Suite 201 Boise, ID 83709p: 208 376.7330 | c: 208 419.8567 | e: [email protected] THE J-U-B FAMILY OF COMPANIES:

www.jub.com | www.gatewaymapping.com | www.langdongroupinc.com Gateway Mapping software and services:www.spatialgenerations.com | www.namesinstone.com | www.spatialim.com