n. anfimov (jinr) on behalf of the ecal0 team. introduction installation and commissioning ...

15
N. Anfimov (JINR) on behalf of the ECAL0 team

Upload: clement-johnson

Post on 11-Jan-2016

214 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: N. Anfimov (JINR) on behalf of the ECAL0 team.  Introduction  Installation and commissioning  Calibration  Data taking  Preliminary result  Plans

N. Anfimov (JINR) on behalf of the ECAL0 team

Page 2: N. Anfimov (JINR) on behalf of the ECAL0 team.  Introduction  Installation and commissioning  Calibration  Data taking  Preliminary result  Plans

Introduction Installation and commissioning Calibration Data taking Preliminary result Plans for 2013 Summary

7 - 13 July SPIN-Praha-2013 2

Page 3: N. Anfimov (JINR) on behalf of the ECAL0 team.  Introduction  Installation and commissioning  Calibration  Data taking  Preliminary result  Plans

1. The geometrical size is ~ 2.0 - 2.5 m2 with a central hole ~ 0.4 - 0.8 m2 and the total length (thickness) of the calorimeter should be of about 50 cm.

2. Located downstream of RPD. ECAL0 should cover the polar angular range 0.15-0.6 Rad.                                                    3. A modular structure.

4. Energy resolution ≤ 10.0%/√E (GeV) or better.  

5. The photodetector should be insensitive to the magnetic field.     

R&D of ECAL0 prototype was being performed in 2008-2011 Final prototype had been tested in 2011.

7 - 13 July SPIN-Praha-2013 3

Requirements for ECAL0Requirements for ECAL0

Page 4: N. Anfimov (JINR) on behalf of the ECAL0 team.  Introduction  Installation and commissioning  Calibration  Data taking  Preliminary result  Plans

7 - 13 July SPIN-Praha-2013 4

ECAL0 in the COMPASS setupECAL0 in the COMPASS setup

Page 5: N. Anfimov (JINR) on behalf of the ECAL0 team.  Introduction  Installation and commissioning  Calibration  Data taking  Preliminary result  Plans

7 - 13 July SPIN-Praha-2013 5

““Shashlyk”-type calorimeter module Shashlyk”-type calorimeter module for ECAL0for ECAL0

Page 6: N. Anfimov (JINR) on behalf of the ECAL0 team.  Introduction  Installation and commissioning  Calibration  Data taking  Preliminary result  Plans

Micropixel Avalanche PhotoDiodes – MAPDMicropixel Avalanche PhotoDiodes – MAPDSurface-pixellated structure

- Pixels are on the surface- Gain is up to 106

- Has pixel density ~ 102 - 103 mm-2

- PDE is up to 40% (100 mm-2)- PDE depends on pixel density (decrease with increasing density)- Small dynamic range (depends on total number of pixels)-Typical pixel size is (25-100)x(25-100) µm

Deep micro-well structure

- Pixels are deep inside epitaxial layer- Gain is up to 105

- Has pixel density ~ 104 mm-2 (up to 40 000 mm-2)- PDE is up to 30% (15 000 mm-2)- PDE slightly depends on pixel density (decrease with increasing density)- Large dynamic range (depends on total number of pixels)-Typical pixel size is (2-5)x(2-5) µm

7 - 13 July SPIN-Praha-2013 6

Page 7: N. Anfimov (JINR) on behalf of the ECAL0 team.  Introduction  Installation and commissioning  Calibration  Data taking  Preliminary result  Plans

7 - 13 July SPIN-Praha-2013 7

Results of beam tests for 3x3 modules Results of beam tests for 3x3 modules prototypeprototype

Page 8: N. Anfimov (JINR) on behalf of the ECAL0 team.  Introduction  Installation and commissioning  Calibration  Data taking  Preliminary result  Plans

8

Modules mass-productionModules mass-productionInstitute for Scintillation Materials, Kharkov, Ukraine is playing major role in calorimeter production by JINR design (lead and sci plates, assembling, fiber insertion, pretests, etc)

injection-molding of scintillation plates

Painting scintillation plates

Assembling calorimeters

General view of assembled calorimeter module

Joint Institute for Nuclear Research is responsible for:- Has organized and is managing production in Kharkov- MAPD production (from Zecotek’s wafers) and tests - Photodetector unit production and tests- Tests of final modules, cosmic tests- Beam tests and investigation of modules

Prober setup for wafer tests

Wafer of MAPD-3N chips

Cosmic tests of modules

Production of photodetector units

Intermediate tests and studies of electronics, MAPD, photodetector units, etc

MAPD casing procedure

7 - 13 July SPIN-Praha-2013

Page 9: N. Anfimov (JINR) on behalf of the ECAL0 team.  Introduction  Installation and commissioning  Calibration  Data taking  Preliminary result  Plans

Aluminium frame filled with 56 modules

ECAL0 tests with cosmics performed in assembly zone (COMPASS DAQ used)

ECAL0 craned into final position in spectrometer

Air cooling installation

Power supplies(Bias voltage)&Thermostabization &monitoring(LED) elements were developed by HVSYS company (Dubna)

7 - 13 July SPIN-Praha-2013 9

Installation and commissioningInstallation and commissioning

The first fragment of the ECAL0 consisting of 56 modules was made for 2012 Run.

Page 10: N. Anfimov (JINR) on behalf of the ECAL0 team.  Introduction  Installation and commissioning  Calibration  Data taking  Preliminary result  Plans

The first part of ECAL0 installed in COMPASS was successfully prepared for 2012 GPD pilot run data taking and operated well during October-December. Figures show beam load over ECAL0, MAPD amplitude variation and temperature inside the ECAL0 box.

7 - 13 July SPIN-Praha-2013 10

The temperature stabilization system operating in a range 15-25 °C . MAPD temperature is maintained with an accuracy < 0.1 °C

ConditionsConditions

Page 11: N. Anfimov (JINR) on behalf of the ECAL0 team.  Introduction  Installation and commissioning  Calibration  Data taking  Preliminary result  Plans

October 12, 2013 ECAL0 calibration with muon beam

For ECAL0 module deposited fraction energy e/γ Eactive ~16%, 1 GeV e/γ -> 160 MeV

Energy deposition from muon at 160 GeV -> 34.3 MeV in cell -> muon peak corresponds to 214 MeV

All channels were roughly settled in according to this procedure.

7 - 13 July SPIN-Praha-2013 11

Calibration energy coefficient correction based on LED_in_spill / LED_out_of_spill.

This correction is different muon/pion beams due to different backgrounds.

Muon beam -> average ~1.65%

Pion beam-> 4.75%

Muon peak in different towers

Correction coefficients distribution for 504 towers.Muon beam (top), Pion beam (bottom)

Nonlinearity of MAPD response at 5GeV was measured to be about 5% and it also can be taken into account on the cluster reconstruction level.

ECAL0 IntercalibrationECAL0 Intercalibration

Page 12: N. Anfimov (JINR) on behalf of the ECAL0 team.  Introduction  Installation and commissioning  Calibration  Data taking  Preliminary result  Plans

FEM LED stability studies. FEM#1÷4 stability over 1 month: November1 – Novenmber30, 2013

7 - 13 July SPIN-Praha-2013 12

Long-term stability of FEM-systemLong-term stability of FEM-system

Monitoring system consist of 4 Light sources. Each source supplied quarter of ECAL0-prototype channels via light distributor 1 -> 16

4 PIN-photodiodes for LED light monitoring were used

LEDs amplitudes variations < 1%

Page 13: N. Anfimov (JINR) on behalf of the ECAL0 team.  Introduction  Installation and commissioning  Calibration  Data taking  Preliminary result  Plans

MAPD response stability over 1 month: November1 – Novenmber30, 2013

MAPDs amplitudes variations ≈ 1%cell# X=15 Y=1

cell# X=15 Y=4

cell# X=15 Y=22 cell# X=15 Y=25 cell# X=4 Y=13

cell# X=1 Y=13 cell# X=28 Y=13cell# X=31 Y=13

over all cells

7 - 13 July SPIN-Praha-2013 13

Long-term stability of ECAL0Long-term stability of ECAL0

Page 14: N. Anfimov (JINR) on behalf of the ECAL0 team.  Introduction  Installation and commissioning  Calibration  Data taking  Preliminary result  Plans

MIP signal obtained in inter-calibration with muon halo (all cells together).

π0 peak in γγ mass spectrum obtained in calibration with pion beam. (π0 mass is subtracted in X-axis)

γγ mass spectrum for semi- inclusive muon events (π0 calibration is not applied yet). π0 peak =127.2 MeV

14

All cells Peak width is 12% ~8% -resolution of 1 cell ~8% -cell-to-cell misalignment Intercalibration of each of the ECAL0 cells with

muon halo provides precision about 8%

Cluster reconstruction • Cluster position -position of a central cell • Cluster energy -sum of energy deposition in 9 (3x3) cells • Cluster position -position of a central cell • Cluster energy -sum of energy deposition in 9 (3x3) cells

Physical calibration:• π-beam of 190 GeV/c with intensity 0.5 106 s-1 • LH target• Special ECAL0-based trigger was developed. • ECAL0 based trigger: total energy deposition in ECAL0 >6GeV (3 GeV)• Working tracking for primary vertex reconstruction • Final calibration constants were obtained by moving π0 mass peak to it’s nominal position

Physical data sample collected with muon beam demonstrates well-visible π0 peak in γγ mass spectrum. Its position is shifted from the nominal because precise π0 calibration was not used yet for production of the data.

The time resolution of cluster depends on cluster energy and for energy above 1GeV is less 1 ns

ResultsResults

Page 15: N. Anfimov (JINR) on behalf of the ECAL0 team.  Introduction  Installation and commissioning  Calibration  Data taking  Preliminary result  Plans

1. Part (56 modules) of ECAL0 for 2012 DVCS PILOT RUN built up and put into operation. It demonstrated good performance: E and T resolutions, linearity and stability fully correspond to expectations.

2. The signal from π0 decays was seen in ECAL0

3. Data for calibration with π- was taken and are being used.

4. The full scale ECAL0 is under production. 200 modules will be produced at ISMA (Kharkov, Ukraine) till the end of this year. We are going to produce Registration Units as soon as we get new batch of photodiodes.

5. Beam tests in Bonn at ELSA: studying angular dependences

6. The design of the ECAL0 modules is could be used for the NICA/SPD ECAL.