mx3eg1(25a) test report rev 1

Upload: samiahmedmansour

Post on 06-Oct-2015

13 views

Category:

Documents


0 download

DESCRIPTION

AREVA

TRANSCRIPT

1

Gulf Cooperation Council

Interconnection Authority

GCCIATRANSMISSION & DISTRIBUTION

Engineer

GCC Interconnection Project - Phase I

MX3-EG1Site Acceptance Test Report

MX3-EG1

25ABay Ref:Substation:

SUMMARYREVISION

PAGES01

1PURPOSE OF TESTS2X

2REFERENCE DOCUMENT2X

3SCOPE2X

4RELAY TERMINLOGY 3X

5TEST EQUIPMENT3X

6PRE-REQUISTES3X

7PROCEDURES4X

8RECORD TEST SHEET6X

8.1 RELAY INFORMATION

8.2 VT DATA

8.3 PRODUCT CHECKS

8.4 MEASURMENT VALUE TEST:

8.5 SYNCHRONIZING CHECK

8.6 BINARY INPUT TEST :

8.7 BINARY OUTPUT TEST:

8.8 FIXED LED INDICATIONS TEST:

8.9 LED INDICATIONS TEST:

8.10 FINAL CHECK

1 PURPOSE OF TESTSThe purpose of the tests is to check the full functionality of the protection relay.This procedure does not intend to check that all alarms and trips are correctly sent to the DCS or SCADA level. This part is already developed into dedicated DCS or SCADA Commissioning procedures.This procedure does not intend to check all tripping matrix and PSL logic tests, this, when applicable, are described into a separate document, dedicated to the specific substation and feeder type.

2 REFERENCE DOCUMENTSDOCUMENTDOCUMENT REFERENCEVERSION/ DATEREMARKS

Protection Line Diagram

Schematic Drawing

Service Manual

Operation Manual

Protection Relay Coordination Principles

Relay setting Calculation

LED Display Configuration

3 SCOPE

Substation Name :-

Diameter:

Bay :

Panel Number :

Relay Denomination in Scheme

Scheme to be Checked Relay Functionality Test.

4 TERMINOLOGYCode ( ANSI) Terminology

25AManual Synchronizing Relay

5 TEST EQUIPMENT USED

Sl NoDescriptionMakeEquipment

Sl No.Calibration dateCalibration due date

1.Secondary Injection Kit

2.Multimeter

6 PRE - REQUISITES

PRE-REQUISITESREMARKS

All Safety Condition Are Ok

All Competent Personnel Available For The Test

Ac & Dc Supply Availability And Security

PPE Safety Available.

All Other Relevant Safety Instructions Been Followed

Coordination With Other Parties ( GIS, Transformer, Etc..)

7 TEST PROCEDURESThe following procedures are written for demonstrating the main protection functions of the MX3EG1 relay using an Omicron test set or similar. The tests do not test the boundaries of all available function characteristics. They do test that the function is operating at a point on one chosen characteristic. This document is to be referred to when performing commissioning tests in association with the commissioning section of the service manual.

NOTE :

All the Test are performed in the Test Switch.

Omicron CMC156 Test Equipment or Any Equivalent To Be Used.

7.1 Auto Synch Check

Use QUICK CMC for these checks.

Simulate Circuit breaker open condition (this is very important)

7.2.1Differential voltage check:

Apply Vg and Vb as above with 0( angle between them.

Gradually increase/decrease magnitude of one voltage (to create voltage difference). Note down value of voltage difference at which relay operates.

7.2.2Differential frequency check:

This feature can be checked by STATE SEQUENCER module.

Uncheck the box for Link frequencies of all generators to set different frequencies for two voltages.

Apply Vg and Vb as above with 0( angle between them.

Gradually increase/decrease frequency of one voltage (to create freq. difference). Note down value of freq difference at which relay operates,7.2.3 Interaction check Apply Vg and Vb as above with 0( angle between them ( Healthy condition) .

Then check the following cases

Voltage Under threshold , relay should give Voltage Increase order.

Voltage Over threshold , relay should give Voltage Decrease order

Frequency Under threshold, relay should give Frequency Increase order

Frequency Over threshold , relay should give Frequency Decrease order.

Check if all orders are given accordingly. And record the result.7.2 Testing of Binary Inputs:

Apply nominal Voltage on respective Relay terminal and Check the Healthiness of the BI is used in the scheme this BI will be tested along with scheme..

Caution : please make sure of Nominal voltage and Polarity of Terminal before apply the voltage to relay.

7.3 Testing of Binary Outputs :

This test checks that all the output relays are functioning correctly.

the device offers, in the TEST mode, the possibility of testing output relays. The relay test allows the output relays from X1 to X5 to be sequentially selected and checked for correct operation.

Choose TEST mode, then select the relevant output to be activated.

TEST MENU

By pressing the two keys for at least two seconds anywhere in the main reading menu, the TEST function, which is highlighted by the blinking of the green LED (RUN), is

enabled.

[TEST RELAY X1]

[ YES>] TEST of relay X1

[TEST RELAY X2]

[ YES>] TEST of relay X2

[TEST RELAY X3]

[ YES>] TEST of relay X3

[TEST RELAY X4]

[ YES>] TEST of relay X4

[TEST RELAY X5]

[ YES>] TEST of relay X5

The test foreseen for X.. auxiliary relay caused the tripping of the same. The associated command and/or signaling can therefore be sent. This is why, before running it, the system prompts you to further confirm:

[ CONFIRM? ]

[< NO YES>]

if, upon confirming the execution, LB or DB synchronization cycles are already present, the test is not performed and this condition is signalled by the following example:

[TEST ]

[NOT AVAILABLE ]

The test on leds and display makes these light up for two seconds and can be carried out during any operating condition.

By pressing the two keys for two seconds

anywhere in the test menu, the TEST function is disabled; the green LED (RUN) stops blinking and the system goes back to the main reading menu.

The tested relay remains energized for 150 and 200 ms. If commands are already present, the test cannot be carried out and a message appears on the display unit. The test on auxiliary relays does not affect counters, event logs and LEDs.

Note : If the Outputs are assigned for function this will be tested along with Functional test of relays.

8 RECORD TEST SHEET8.1 RELAY INFORMATION

Type No.:MX3-EG1Designation :

Model No :Nominal Current :

Serial Number Nominal Voltage` :

Firmware Version :Aux. Volts :

8.2 VT DATA:

VT 1Rated primary voltage set as

Rated secondary voltage set as

VT2Rated primary voltage set as

Rated secondary voltage set as

8.3 PRODUCT CHECKS Relay damaged?

Rating information correct for installation?

Case earth installed?

External wiring checked against diagram?

Test block connections checked?

Measured auxiliary supplyV dc

LCD front panel display

Clock set to local time?

Time maintained when aux. supply removed?

8.4 MEASURMENT VALUE TEST: Voltage Measurement

Phase injectedVoltage applied (Volts)Primary Voltage read on relay display in kV

Vg63.5

Vb63.5

8.5 SYNCHRONIZING CHECK

6.1 Relay Setting

D>LL/LBLL/DB

DU>VU