ORODHA YA MIRADI MBALIMBALI INAYOTEKELEZWA VIJIJINI KUPITIA MPANGO WA PAYMENT BY RESULTS (PbR)
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
1 ARUSHA Monduli Dc Rehabilitation of MONALO Water Supply Project at Naalarami Naaralami 18 4,5
00 14,408,2
92
Meru Dc Rehabilitation of water project suply at Shimbumbu and Kimundo Villages 2 Shimbumbu and
Kimundo 20 4,250
20,058,561
Meru DcRehabilitation of water project at Kikwe Village, 1 Kikwe 17 3,7
50 25,000,0
00
Meru DcRehabilitation of water project at Malula Village 1 Malula 8 7
50 25,000,0
00
Meru Dc Rehabilitation of water project at Olukungabo Village 1 Olukungabo 56 13,5
00 28,000,0
00
Meru Dc Rehabilitation of water project at Maji ya chai and Imbaseni Villages 1 Maji ya chai and
Imbaseni Villages 52 12,500
25,000,000
Meru Dc Rehabilitation of water project at Mbuguni Village 1 Mbuguni Village 13 2,5
00 17,000,0
00
Meru Dc Rehabilitation of water project at Kikatiti and Maroroni Villages 2 Kikatiti and Maroroni
Villages 57 13,500
30,000,000
Meru Dc Rehabilitation of water project at Ambureni Moivaro Village 1 Ambureni Moivaro
Village 23 5,250
20,000,000
Meru Dc Rehabilitation of 2 water projects at Mkuru and Nkuruny Sub Villages, 2 Mkuru and Nkuruny
Sub Villages 22 4,750
20,000,000
Arusha Dc Olchovorus Water supply scheme 1 Olchovorous 8 1,000
34,505,779
Arusha Dc Kiseliani Water supply scheme 3 Keselya,Majimoto,Mlangarini
10
2,500
28,000,000
Arusha DcRehabilitation of Tarakwa water supply scheme 2 Tarakwa and
Siwandeti 6 1,500
42,000,000
Longido Dc Noondoto water projects. 1 Noondoto 6 750
10,318,000
Longido Dc Oworendeke Water Supply Project. 1 Oworendeke 14 3,7 3,150,0
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
80 00
Longido Dc Olchoronyokie water project. 1 Olchoronyokie 2 250
450,000
Longido Dc Mangula water project. 1 Mangula 2 250
400,000
Longido Dc Erkejuloongishu water project 3 Orkejuloongishu, Lopoloseki, Maangula. 28 3,5
00 6,393,9
96
Longido Dc Olmologi water supply project 1 Olmolog 4 1,000
4,000,000
Longido Dc Tingatinga water supply Project. 1 Tingatinga 0 6,500,000
Longido Dc Kamwanga Water Project. 1 Kamwanga 2 500
4,200,000
Longido Dc Ngoswak Water Project 1 Ngoswak 6 750
2,250,000
Longido Dc Sinonik water project. 1 Sinonik 18 2,250
1,500,000
Longido Dc Gelai Lumbwa water project. 1 Gela ilumbwa 4 500
900,000
Longido Dc Losirwa water project. 1 Losirwa 4 500
900,000
Longido Dc Elerai water project 1 Elerai 6 500
10,000,000
Longido Dc Kimokouwa water project 1 Kimokouwa 10 1,250
10,000,000
Longido Dc Mairowa water project. 5 Mairowa, Mundarara, Tinga, Karao, Orgila 4 5
00 800,00
0
Karatu Dc Getamock/Mahhahha water project which has borehole capacity of 40,000lt/hour 2 Getamock &
Mahhahha 46 6,652
82,782,671
Karatu Dc Endonyawet water project which has borehole capacity of 18,000 Lts/h 1 Endonyawet
50 3,9
56 30,000,0
00
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
Karatu Dc
Rehabilitation of 40 water points in 11 villages and construction of 10 water points in 6 vilages 1 Dumbechand 1 60 8,4
00 47,000,0
00
Karatu Dc 1 Mbuga Nyekundu 2
Karatu Dc 1 Endamaghan 1
Karatu Dc 1 Kambi ya Faru 2
Karatu Dc 1 Great Arusha 2
Karatu Dc 1 Karatu Mjini 4
Karatu Dc 1 Malechand 6
Karatu Dc 1 Mang'ola Barazani 9
Karatu Dc 1 Huduma 2
Karatu Dc 1 Kilimamoja 2
Karatu Dc 1 Kambi ya simba5
Karatu Dc 1 Rhotia 4
Karatu Dc 2 Getamock/Mahhahha 3
Karatu Dc 1 Qaru 1
Karatu Dc 1 Qurus 1
Karatu Dc 1 Kitete 2
Karatu Dc 1 Slahhamo 3
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
Ngorongoro Endulen water project 2 Enduleni, Nasiporing 9 2,250
12,000,000
Ngorongoro Njoroi water project 1 Njoroi 7 1,750
15,000,000
Ngorongoro Kisangiro water project 1 Kisangiro 9 2,250
18,000,000
Ngorongoro Arash water project 1 Arash 1 250
5,000,000
Ngorongoro Oldonyosambu water project 1 Oldonyosambu 2 500
40,000,000
Ngorongoro Soitsambu Water project 1 Soitsambu 4 1,000
43,600,000
Ngorongoro
Rehabilitation and Extension of all Function but need Repair (FNR) Wps in 19 Villages 19
Kirtalo, Samunge, Sale, Wasso, Ololosokwan, Oloipir, Loliondo, Oloirobi, Ngoile, Nainokanoka, Bulati, Malambo, Madukani, maalon, Mgholo, Kisangiro, Engarasero, Nasiporiong and Arash
77 19,250
18,471,309
Sub Total Arusha 87 685 132,788
DODOMA Kongwa Dc Maintenance of Chamae Water project 1 Chamae 18 4,3
16 18,000,0
00
Kongwa DcMaintenance of Msunjulile A Water Project 1 Msunjulile A 14 6,1
92 18,000,0
00
Kongwa DcRehabilitation of Sejeli Village Water Scheme 1 Sejeli 8 4,6
37 18,000,0
00
Kondoa Dc Rehabilitation of Bukulu water supply scheme 1 Bukulu 8 2,000
5,000,000
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
Kondoa Dc Rehabilitation of Sambwa-Idindiri Water Supply
Scheme 2 Sambwa and Idindiri 10 2,500
3,000,000
Kondoa Dc
Rehabilitation of Soera Water Supply Scheme 1 Soera 6 1,500
4,500,000
Kondoa Dc Rehabilitation of Bereko-Kurasini Water Supply
Scheme 1 Bereko 6 1,500
3,500,000
Kondoa Dc Rehabilitation of Kwamafunchi Water Supply
Scheme 1 Kwamafunchi 2 500
1,000,000
Kondoa Dc Rehabilitation of Masawi-Kichangani Solar
Pump Borehole 1 Masawi 1 250
1,519,455
Kondoa Dc Rehabilitation of Isari Borehole 1 Mtiryangwi(Isari) 2 500
1,519,455
Kondoa Dc Rehabilitation of Itundwi Borehole 1 Itundwi 3 750
1,500,000
Kondoa Dc
Rehabilitation of Ihari Water Supply Scheme 1 Ihari 3 750
2,500,000
Kondoa Dc Rehabilitation of Hondomairo Water Supply
Scheme 1 Hondomairo 3 750
1,000,000
Kondoa Dc Rehabilitation of Ikengwa Borehole 1 Ikengwa 2 500
1,500,000
Kondoa Tc Rehabilitation of Chemchem water supply scheme 1 Chemchem 9 2,2
50 13,000,0
00
Kondoa Tc
Rehabilitation of Tampori water supply scheme 1 Tampori 6 1,500
12,000,000
Kondoa Tc
Rehabilitation of Choka water supply scheme 2 Choka and Gubali 16 4,000
11,000,000
Kondoa Tc
Rehabilitation of Kolo Water Supply Scheme 1 Kolo A 4 1,000
9,855,367
Bahi Rehabilitation of Mkakatika Water Supply project 2 Mkakatika and Bahi
Sokoni 14
3,500
12,000,000
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
BahiRehabilitation of Kigwe Water Supply project 2 Kigwe and Mapinduzi
12 3,0
00 26,136,0
00
BahiRehabilitation of Zejele water supply project 1 Zejele
4 1,0
00 2,500,0
00
BahiRehabilitation of Mpalanga water supply project 1 Mpalanga
- 8,500,0
00
Bahi Rehabilitation of Kisima cha ndege water supply scheme 1 Kisima cha Ndege
6 1,5
00 3,850,0
00
BahiRehabilitation of Mwitikira water supply scheme 1 Mwitikira
4 1,0
00 9,000,0
00
Bahi Rehabilitation of Nondwa water supply scheme 1 Nondwa 2
500
2,800,000
Bahi Rehabilitation of Chipanga B water supply scheme 1 Chipanga B
- 5,000,0
00
Bahi Rehabilitation of Chipanga A water supply project 1 Chipanga A
- 6,000,0
00
Mpwapwa Chinyanghuku Water supply project 1 Chinyanghuku 12 1,500
12,403,276
Mpwapwa Chunyu water supply project 1 Chunyu 30 4,525
25,830,000
Mpwapwa Kimagai Water supply project 1 Kimagai 4 1,000
2,800,000
Mpwapwa Iwondo water supply project 1 Iwondo 6 1,500
4,200,000
Mpwapwa Kibakwe water supply project 1 Kibakwe 12 1,500
8,400,000
Mpwapwa Luhundwa water supply project 1 Luhundwa 2 500
1,400,000
Mpwapwa Makutupa water supply project 1 Makutupa 2 500
1,400,000
Mpwapwa Chogola water supply project 1 Chogola 2 500
1,400,000
Mpwapwa Kisokwe water supply project 1 Kisokwe 2 5 1,400,0
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
00 00
Mpwapwa Sazima water supply project 1 Sazima 4 1,000
2,800,000
Mpwapwa Mtamba water supply project 1 Mtamba 6 1,500
4,200,000
Mpwapwa Manghangu water supply project 1 Manghangu 2 500
1,400,000
Mpwapwa Wangi water supply project 1 Wangi 2 500
1,600,000
Mpwapwa Lwihomelo water supply project 1 Lwihomelo 1 250
700,000
Mpwapwa Mwanawota water supply project 1 Mwanawota 1 250
700,000
Chamwino Dc Rehabilitation of Raising main distribution lines and 6 DPs at Nhinhi water supply project 1 Nhinhi 12 3,0
00 12,000,0
00
Chamwino Dc Rehabilitation of 5 Water Points at Mgunga
water project 1 Mgunga 10 2,500
11,500,000
Chamwino Dc Rehabilitation of 5 Water Points at Mnase water
project 1 Mnase 10 2,500
12,000,000
Chamwino Dc Rehabilitation of 4 Water Points at Segala water
project 1 Segala 8 2,000
14,000,000
Chamwino Dc Rehabilitation of 6 Water Points at Makoja
water project 1 Makoja 12 3,000
11,500,000
Chamwino Dc Rehabilitation of 3 Water Points at Wiliko
water project 1 Wiliko 6 1,500
16,379,961
Chamwino Dc Rehabilitation of 3 Water Points at Itiso water
project 1 Itiso 6 1,500
5,000,000
Chemba Rehabilitation of Itirikwi water supply scheme 1 Itirikwi 8 2,000
4,000,000
Chemba
Rehabilitation of Goima water supply scheme 1 Goima 14 3,500
42,309,001
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
Chemba Rehabilitation of Kwamtoro water supply
scheme 1 Kwamtoro 18 4,500
3,919,947
Chemba Rehabilitation of Mtakuja water supply scheme 1 Mtakuja 10 2,500
4,750,000
Chemba Rehabilitation of Makorongo water supply
scheme 1 Makorongo 5 1,250
5,000,000
Chemba Rehabilitation of Humekwa water supply scheme 1 Humekwa 4 1,0
00 13,850,0
00
Chemba Rehabilitation of Dalai water supply scheme 1 Dalai 6 1,500
2,500,000
Dodoma Cc Rehabilitation of Kikombo Water Project 2 Kikombo Makulu and Mnadani 20 5,0
00 28,627,7
66
Dodoma Cc Rehabilitation of Chololo Water Project 1 Chololo 14 3,000
5,000,000
Sub Total Dodoma 63 414 102,170
465,150,228
GEITA Chato Dc Rehabilitation of borehole fitted with hand pump at Buzirayombo village 1 Buzirayombo 1 2
50 4,500,0
00
GEITA Chato Dc Rehabilitation of borehole fitted with hand pump
at Nyabilezi village 1 Nyabilezi 1 250
4,500,000
GEITA Chato Dc Rehabilitation of borehole fitted with hand pump
at Rumasa village 1 Rumasa 1 250
4,500,000
GEITA Chato Dc Rehabilitation of borehole fitted with hand pump
at Ihanga village 1 Ihanga 1 250
4,500,000
GEITA Chato Dc Rehabilitation of borehole fitted with hand pump
at Bwanga village 1 Bwanga 1 250
4,500,000
GEITA Chato Dc Rehabilitation of borehole fitted with hand pump
at Bwera village 1 Bwera 1 250
4,500,000
GEITA Chato Dc Rehabilitation of borehole fitted with hand pump
at Igando village 1 Igando 1 250
4,500,000
GEITA Chato Dc Rehabilitation of borehole fitted with hand pump
at Busaka village 1 Busaka 1 250
4,500,000
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
GEITA Chato Dc Rehabilitation of borehole fitted with hand pump
at Ichwankima village 1 Ichwankima 1 250
4,500,000
GEITA Chato Dc Rehabilitation of borehole fitted with hand pump
at Ilemela village 1 Ilemela 1 250
4,500,000
GEITA Chato Dc Rehabilitation of borehole fitted with hand pump
at Kachwamba village 1 Kachwamba 1 250
4,500,000
GEITA Chato Dc Rehabilitation of Shallow well fitted with hand
pump at Majengo village 1 Majengo 1 250
2,000,000
GEITA Chato Dc Rehabilitation of borehole fitted with hand pump and two shallow well fitted of hand pump at Nyisanzi village
1 Nyisanzi 3 750
9,184,564
GEITA Chato Dc Rehabilitation of two Shallow well fitted with
hand pump at Mkombozi village 1 Mkombozi 2 500
4,000,000
GEITA Chato Dc Rehabilitation of Shallow well fitted with hand
pump at Muganza village 1 Muganza 1 250
2,000,000
GEITA Chato Dc Rehabilitation of two Shallow well fitted with
hand pump at Nyabilele village 1 Nyabilele 2 500
4,000,000
GEITA Chato Dc Rehabilitation of Shallow well fitted with hand
pump at Magiri village 1 Magiri 1 250
2,000,000
GEITA Chato Dc Rehabilitation of borehole fitted with hand pump
at Rubambangwe village 1 Rubambangwe 1 250
4,500,000
GEITA Chato Dc Rehabilitation of borehole fitted with hand pump
at Nyakakarango village 1 Nyakakarango 1 250
4,500,000
GEITA Chato Dc Rehabilitation of borehole fitted with hand pump
at Kanyindo village 1 Kanyindo 1 250
4,500,000
GEITA
Bukombe Dc Rehabilitation of 40 shallow wells in 19 Villages of Bukombe District 1 Nyamakunkwa 3 7
50 1,569,0
00
GEITA Bukombe Dc 1 Kabagole 3 750
1,660,000
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
GEITA Bukombe Dc 1 Kazibizyo 2 500
355,000
GEITA Bukombe Dc 1 Bufanka 1 250
275,000
GEITA Bukombe Dc 1 Msasani 1 250
485,000
GEITA Bukombe Dc 1 Katome 2 500
1,542,000
GEITA Bukombe Dc 1 Butinzya 2 500
1,070,000
GEITA Bukombe Dc 1 Silamila 4 1,000
838,000
GEITA Bukombe Dc 1 Kabuhima 1 250
405,000
GEITA Bukombe Dc 1 Uyovu 1 250
1,300,000
GEITA Bukombe Dc 1 Msonga 2 500
1,771,000
GEITA Bukombe Dc 1 Ng'anzo 6 1,500
1,266,000
GEITA Bukombe Dc 1 Mtinga 3 750
2,325,000
GEITA Bukombe Dc 1 Bulega 2 500
405,000
GEITA Bukombe Dc 1 Imalanguzu 2 500
977,000
GEITA Bukombe Dc 1 Igulwa 1 250
273,000
GEITA Bukombe Dc 1 Kagwe 1 250
105,000
GEITA Bukombe Dc 1 Bulangwa 2 500
105,000
GEITA Bukombe Dc 1 Msangila 2 500
475,000
GEITA Bukombe Dc Rehabilitation of Msasa Water Supply Scheme
in Bukombe District 1 Msasa 6 1,500
12,094,064
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
GEITA Bukombe DcImprovement of 3 deep wells by installation of hand pumps to 4 villages of Bukombe District (Rehabilitation)
3 Businda, Bugelenga and Iyogelo 3 7
50 12,000,0
00
GEITA Bukombe Dc Rehabilitation of Ibambilo Water Supply
Scheme in Bukombe District 1 Ibambilo 4 1,000
6,000,000
GEITA
Mbogwe Dc Rehabilitation of 50 non functional shallow wells 29 Bugalagala 2 500
2,570,000
GEITA Mbogwe Dc Bunigonzi 2 500
2,640,000
GEITA Mbogwe Dc Ibambula 1 250
1,450,000
GEITA Mbogwe Dc IkunguigazI 1 250
1,520,000
GEITA Mbogwe Dc Kagera 2 500
2,375,000
GEITA Mbogwe Dc Mwingilo 2 500
2,300,000
GEITA Mbogwe Dc Ilolangulu 3 500
3,900,000
GEITA Mbogwe Dc Mubamba 3 750
3,534,000
GEITA Mbogwe Dc Ishigamva 1 250
1,590,000
GEITA Mbogwe Dc Kiseke 2 500
2,530,000
GEITA Mbogwe Dc Kakumbi 1 250
2,250,000
GEITA Mbogwe Dc Nyikonga 1 250
2,300,000
GEITA Mbogwe Dc Ilangalae 4 1,000
5,400,000
GEITA Mbogwe Dc Nyambubi 1 250
1,550,000
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
GEITA Mbogwe Dc Muungano 1 250
1,470,000
GEITA Mbogwe Dc Nanda 5 1,250
6,520,000
GEITA Mbogwe Dc Nyang'wale 2 500
1,430,000
GEITA Mbogwe Dc Bulongo 1 250
1,450,000
GEITA Mbogwe Dc Bwendamwizo 2 250
1,430,000
GEITA Mbogwe Dc Nyanhwiga 1 250
1,350,000
GEITA Mbogwe Dc Ngemo 1 250
1,330,000
GEITA Mbogwe Dc Nyitundu 2 500
3,105,000
GEITA Mbogwe Dc Lwazeze 1 250
1,600,000
GEITA Mbogwe Dc Kasaka 1 250
1,531,000
GEITA Mbogwe Dc Mlange 3 750
3,970,000
GEITA Mbogwe Dc Nyasato 2 500
2,500,000
GEITA Mbogwe Dc Nhomolwa 1 250
1,650,000
GEITA Mbogwe Dc Bukandwe 2 500
2,950,000
GEITA Mbogwe Dc Shibutwe 1 250
1,476,150
GEITA Mbogwe Dc Rehabilitation 20 functional needs repair
shallow wells 18 Bugalagala 6 1,500
3,500,000
GEITA Mbogwe Dc Busabaga 2 500
1,400,000
GEITA Mbogwe Dc Ikobe 1 250
640,000
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
GEITA Mbogwe Dc Ibambula 2 500
1,300,200
GEITA Mbogwe Dc Ikunguigazi 1 250
670,000
GEITA Mbogwe Dc Kanangwe 2 500
1,740,000
GEITA Mbogwe Dc Iponya 2 500
1,617,000
GEITA Mbogwe Dc Isebya 1 250
860,000
GEITA Mbogwe Dc Kashelo 1 250
850,000
GEITA Mbogwe Dc Kabanga, 1 250
810,000
GEITA Mbogwe Dc Mtakuja 1 250
860,000
GEITA Mbogwe Dc Ilangale 5 1,250
3,800,000
GEITA Mbogwe Dc Nyakasaluma 2 500
2,150,000
GEITA Mbogwe Dc Lubeho 3 750
2,600,000
GEITA Mbogwe Dc Nyasato 2 500
1,660,000
GEITA Mbogwe Dc Mwabukwalule 1 250
852,800
GEITA Mbogwe Dc Ushetu 1 250
810,000
GEITA Mbogwe Dc Buzigula 1 250
780,000
GEITA
Geita Tc Rehabilitation of borehole fitted with handpump at Mbabani village 1 Mbabani 1 2
50 280,00
0
GEITA Geita Tc Rehabilitation of borehole fitted with handpump
at Wigembya village 1 Wigembya 1 250
2,100,000
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
GEITA Geita Tc Rehabilitation of borehole fitted with handpump
at Nyakato village 1 Nyakato 1 250
280,000
GEITA Geita Tc Rehabilitation of borehole fitted with handpump
at Bumanji village 1 Bumanji 1 250
375,000
GEITA Geita Tc Rehabilitation of borehole fitted with handpump
at Majengo village 1 Majengo 1 250
620,000
GEITA Geita Tc Rehabilitation of borehole fitted with handpump
at Ibanda village 1 Ibanda 1 250
280,000
GEITA Geita Tc Rehabilitation of borehole fitted with handpump
at Nyambogo village 1 Nyambogo 1 250
280,000
GEITA Geita Tc Rehabilitation of borehole fitted with handpump
at Mpomvu village 1 Mpomvu, 1 250
280,000
GEITA Geita Tc Rehabilitation of borehole fitted with handpump
at Samina village 1 Samina 1 250
620,000
GEITA Geita Tc Rehabilitation of borehole fitted with handpump
at Nyaseke village 1 Nyaseke 1 250
333,000
GEITA Geita Tc Rehabilitation of borehole fitted with handpump
at Nyamahuna village 1 Nyamahuna 1 250
78,000
GEITA Geita Tc Rehabilitation of borehole fitted with handpump
at Mshinde village 1 Mshinde 1 250
560,000
GEITA Geita Tc Rehabilitation of borehole fitted with handpump
at Shinamwendwa village 1 Shinamwendwa, 1 250
280,000
GEITA Geita Tc Rehabilitation of borehole fitted with handpump
at Kakonda village 1 Kakonda 1 250
620,000
GEITA Geita Tc Rehabilitation of borehole fitted with handpump
at Kasamwa village 1 Kasamwa 1 250
78,000
GEITA Geita Tc Rehabilitation of borehole fitted with handpump
at Mwembeni village 1 Mwembeni 1 250
280,000
GEITA Geita Tc Rehabilitation of borehole fitted with handpump
at Mkolani village 1 Mkolani 1 250
420,000
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
GEITA Geita Tc Rehabilitation of borehole fitted with handpump
at Mwilima village 1 Mwilima 1 250
78,000
GEITA Geita Tc Rehabilitation of borehole fitted with handpump
at Nyakahongola village 1 Nyakahongola 1 250
78,000
GEITA Geita Tc Rehabilitation of borehole fitted with handpump
at Nyabubele village 1 Nyabubele 1 250
280,000
GEITA Geita Tc
Rehabilitation of Kigoma Road water supply 1 Kigoma Road 16 4,000
3,800,000
GEITA
Geita Dc Rehabilitation of Katoro W/S Project 1 Katoro 10
2,500
8,303,688
GEITA Geita Dc Rehabilitation of 2 boreholes fitted with
handpump at Kaseme village 1 Kaseme 2
500
6,387,500
GEITA Geita Dc Rehabilitation of borehole fitted with handpump
at Bugogo village 1 Bugogo 1
250
3,198,750
GEITA Geita Dc Rehabilitation of borehole fitted with handpump
at Ikina village 1 Ikina 1
250
3,198,750
GEITA Geita Dc Rehabilitation of (2) boreholes fitted with
handpump at Bugulula village 1 Bugulula 2
500
6,387,500
GEITA Geita Dc Rehabilitation of (2) borehole fitted with
handpump at Katoro village 1 Katoro 2
500
4,393,750
GEITA Geita Dc Rehabilitation of (2) boreholes fitted with
handpump at Lwamgasa village 1 Lwamgasa 2
500
6,387,500
GEITA Geita Dc Rehabilitation of 3 shallow wells fitted with
handpump at Lubanga village 1 Lubanga 3
750
779,545
GEITA Geita Dc Rehabilitation of 2 shallow wells fitted with
handpump at Mtakuja village 1 Mtakuja 2
500
779,545
GEITA Geita Dc Rehabilitation of 2 shallow wells fitted with
handpump at Ibisabageni village 1 Ibisabageni , 2
500
779,545
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
GEITA Geita Dc Rehabilitation of shallow wells fitted with
handpump at Nyakaduha village 1 Nyakaduha 1
250
779,545
GEITA Geita Dc Rehabilitation of shallow wells fitted with
handpump at Bufunda village 1 Bufunda, Mnekezi, Kasesa
1
250
779,545
GEITA Geita Dc Rehabilitation of shallow wells fitted with
handpump at Mnekezi village 1 Mnekezi 1
250
779,545
GEITA Geita Dc Rehabilitation of shallow wells fitted with
handpump at Kasesa village 1 Kasesa 1
250
779,545
GEITA
Nyang'wale Dc Rehabilitation of 24 hand pump wells. 20 Bukwimba 1 250
350,000
GEITA Nyang'wale Dc Kasubuya 1 250
420,000
GEITA Nyang'wale Dc Izunya 1 250
1,250,000
GEITA Nyang'wale Dc Mwamakiliga 2 500
2,170,000
GEITA Nyang'wale Dc Lushimba 1 250
1,715,000
GEITA Nyang'wale Dc Bukungu 1 250
1,470,000
GEITA Nyang'wale Dc Shibalanga 2 500
2,450,000
GEITA Nyang'wale Dc Shibumba 1 250
1,150,000
GEITA Nyang'wale Dc Nyang'hwale 2 500
600,000
GEITA Nyang'wale Dc Nyaruguguna 1 250
1,603,080
GEITA Nyang'wale Dc Isonda 1 250
2,800,000
GEITA Nyang'wale Dc Kijinga 1 250
1,500,000
GEITA Nyang'wale Dc Nyugwa 1 2 780,00
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
50 0
GEITA Nyang'wale Dc Mimbili 1 250
450,000
GEITA Nyang'wale Dc Kaboha 1 250
350,000
GEITA Nyang'wale Dc Nyashilanga 1 250
450,000
GEITA Nyang'wale Dc Mwasabuka 1 250
670,000
GEITA Nyang'wale Dc Iyenze 1 250
750,000
Sub Total
146 253 62,750
306,693,114
IRINGA Iringa Dc Rehabilitation of Mwambao water gravity scheme 1 Mwambao 0 8
36 7,000,0
00
IRINGA Iringa Dc
Rehabilitation of Ikengeza Pumping schemes 1 Ikengeza 12 2,265
35,000,000
IRINGA Iringa DcRehabilitation of 49 Dps from 6 villages within the LGA 6
Igingilanyi, Kihorogota, Kitapilimwa, Mboliboli, Idodi, Migoli, Chamdindi, Mbugani
98 12,250
14,400,000
IRINGA Iringa Dc
Rehabilitation of Matembo pumping water scheme ( sub village) at Mfyome village 1 Mfyome 4 5
00 26,479,7
05
IRINGA Iringa Dc Rehabilitation of Kikombwe water supply
project 2 Kikombwe and Igunda 28 3,430
29,800,000
IRINGA Iringa Mc Rehabilitation of Ugele water project 1 Ugele 780
7,972,391
IRINGA
Change of technology from hand pump to solar pump at Ilangila water project 1 Ilangila 2 3
56 22,250,0
00
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
IRINGA
Kilolo Dc Rehabilitation of water project at Ilamba Village 1 Ilamba 0 -
8,000,000
IRINGA Kilolo Dc Rehabilitation of water project at Ipalamwa
Village 2 Ipalamwa and Lulindi 0 -
7,000,000
IRINGA Kilolo Dc Rehabilitation of grouped water project at five
Villages 5Kipaduka, Ikuka, Vitono, Iwungi and Ng'osi
7 1,500
38,000,000
IRINGA Kilolo Dc Rehabilitation of water project at Kwalamo
Village 1 Kiwalamo 16 4,000
42,500,000
IRINGA Kilolo Dc
Rehabilitation of Image water project 8Image, Lyasa, Ilawa, Uhaminyi, Iyai, Ibumu, Kilala, Kilumbwa
5 1,250
25,000,000
IRINGA
Mufindi Dc Rehabilitation of Kasanga pumping water supply project 1 Kasanga 5 2,7
18 30,340,8
89
IRINGA Mufindi Dc Rehabilitation of Udumuka pumping water
supply project 1 Udumuka 12 2,347
17,000,000
IRINGA Mufindi Dc
Rehabilitation of Usokami and Kibengu pumping water supply project 2 Usokami and Kibengu 64 8,0
00 20,000,0
00
IRINGA Mufindi Dc Repair of submerssible pump for Sawala water
supply project 1 Sawala 16 4,000
37,000,000
IRINGA Mufindi Dc Rehabilitati of Ikimilinzowo pumping water
supply project 1 Ikimilinzowo 0 2,863
7,000,000
IRINGA Mufindi DcRehabilitation of 10 medium and deep water wells 5
Mapanda , Igeleke, Mapogoro, Igombavanu and Ugesa
10 2,500
5,000,000
IRINGA
Mafinga Tc Rehabilitation of Rungemba water supply scheme 1 Rungemba 0 2,1
01 10,000,0
00
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
IRINGA
Mafinga Tc Rehabilitation of 9 water wells at Matanana , Kisada and Isalavanu villages 3 Matanana, Kisada and
Isalavanu 9 2,250
9,000,000
Sub Total
45 0 288 53,946
398,742,985
KATAVI Mpanda Dc Rehabiltation of Hand pump for 20 villages 20
Bulamata(3) ,Busongola(3), Mchakamchaka(2), Lwega(1),Karema(2) ,Mnyagala(2), Kapalamsenga(3), Songambele(2), Mgansa(3), Ipwaga(3), Rugufi(4), Mlibansi(2),Ifumbul(2)a, Isengule(1), Katuma(2), Mpembe(1), Ilangu(1), Isumbwe(1), Isubangala(2) and Mazwe(1)
40 10,000
86,611,382
KATAVI Mpanda MC Milala Water Project 1 Milala 14 3,500
42,157,080
KATAVI Mpanda MC Mtakumbuka water supply project 1 Mtakumbuka 14 3,500
2,950,000
KATAVI Mpanda MC
Hand pumps/deep well for 8 villages 9
Makongoro (1), Makanisani (1), Kalfesi A (2), Sugar (1), Shongo (1), Kalfesi B (1), Society (1) and Nguvumali (1)
9 2,250
9,042,300
KATAVI
Mpimbwe Dc Rehabilitation of two hand pump for Ikuba and Luchima villages 2 Ikuba and Luchima 2 5
00 500,00
0
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
KATAVI
Nsimbo Dc Rehabilitation of Isinde water supply project 1 Isinde 7 3,500
20,000,000
KATAVI
Nsimbo Dc Rehabilitation of Hand pumps at 15 Villages 15
Mnyaki(1), Ibindi(1), Kaburonge(1), Kambuzi Halt(1), Kaminula(1), Nduwi(1), Sokoine(1), Iwimbi(1), Ivungwe(1), Nzaga(1), Tambazi(1), Usense(1), Tumaini,Kapalala and Katambike
15 3,750
35,070,409
KATAVI
Mlele Dc Rehabilitation of three hand pump at Ipwaga,Utende and Ilunde villages 3 Ipwaga,Utende and
Ilunde 3 750
1,500,000
KATAVI
Mlele Dc Rehabilitation of Imala uduki water supply project 1 Imalauduki 7 3,5
00 74,404,1
72 Sub
Total
53 111 31,250
272,235,343
KIGOMA Buhigwe Dc Rehabilitation of 4 shallow wells at Nyamgali 1 Nyamgali 3 750
5,760,000
KIGOMA Buhigwe Dc
Rehabilitation of 1 shallow wells at Mkatanga 1 Mkatanga 1 250
1,920,000
KIGOMA Buhigwe Dc
Rehabilitation of 3 shallow wells at Munanila 1 Munanila 3 750
5,760,000
KIGOMA Buhigwe Dc
Rehabilitation of 5 shallow wells at Kitambuka 1 Kitambuka 5 1,250
9,600,000
KIGOMA Buhigwe Dc
Rehabilitation of 3 shallow wells at Bulimanyi 1 Bulimanyi 3 750
5,760,000
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
KIGOMA Buhigwe Dc Rehabilitation of 2 shallow wells at Mulungu
village. 1 Mulungu 2 500
3,840,000
KIGOMA Buhigwe Dc
Rehabilitation of 4 shallow wells at Kibande 1 Kibande 4 1,000
7,680,000
KIGOMA Buhigwe Dc
Rehabilitation of 4 shallow wells at Kilelema 1 Kilelema 4 1,000
7,680,000
KIGOMA Buhigwe Dc
Rehabilitation of 20 Springs at Mwayaya village 1 Mwayaya 20 5,000
25,148,180
KIGOMA Buhigwe Dc Rehabilitation 10DPs at Nyakoronko Water
Supply scheme. 1 Nyankoronko 10 2,500
3,488,372
KIGOMA Buhigwe Dc Rehabilitation 16 DPs at Buhigwe Water Supply
Project. 1 Buhigwe 16 4,000
5,581,395
KIGOMA Buhigwe Dc Rehabilitation 17 DPs at Mulera Water supply
project. 1 Mulera 17 4,250
5,930,233
KIGOMA Buhigwe Dc Rehabilitation DPs at 7 Janda Water Supply
Project. 1 Janda 7 1,750
19,002,192
KIGOMA Buhigwe Dc Dermacation of Mubanga Water Supply Intake
for Source Protection. 1 Mubanga -
5,429,198
KIGOMA Buhigwe Dc Rehabilitation Bukuba Village WS 1 Bukuba 8 2,000
21,716,791
KIGOMA
Kakonko Dc Rehabilitation of 2 Boreholes at Nyamtukuza 1 Nyamtukuza 2 500
5,000,000
KIGOMA Kakonko Dc
Rehabilitation of 1 Boreholes at Kiga 1 Kiga 1 250
2,400,000
KIGOMA Kakonko Dc
Rehabilitation of 1 Boreholes at Mugunzu 1 Mugunzu 1 250
1,000,000
KIGOMA Kakonko Dc
Rehabilitation of 1 Boreholes at Kasuga 1 Kasuga 1 250
2,500,000
KIGOMA Kakonko Dc
Rehabilitation of 2 Shallow wells at Kasongati 1 Kasongati 1 250
2,000,000
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
KIGOMA Kakonko Dc
Rehabilitation of 1 Shallow wells at Kanyonza 1 Kanyonza 1 250
1,800,000
KIGOMA Kakonko Dc
Rehabilitation of 1 BH at Kasanda village. 1 Kasanda 1 250
KIGOMA Kakonko Dc
Rehabilitaion of Muhange Water supply Scheme 2 Muhange and Muhange Juu 2 1,0
00 2,200,0
00
KIGOMA Kakonko Dc Supply and Installation of electrical power at
Kiga Water Supply Project. 1 Kiga 17 4,250
3,500,000
KIGOMA
Kasulu DC Rehabilitation of 2 shallow wells at Nyarugusu. 1 Nyarugusu 2 5,000
4,000,000
KIGOMA
Rehabilitation of 4 boreholes at Shunguliba 1 Shunguliba 4 2,000
7,200,000
KIGOMA
Rehabilitation of Kwaga water supply scheme. 1 Kwaga 9 9,532
21,000,000
KIGOMA Kasulu DC
Rehabilitation of Muzye Water Supply Scheme 1 Muzye 39 13,828
23,300,000
KIGOMA Kasulu DC
Rehabilitation of Lugoma water supply scheme. 1 Lugoma 28 5,250
17,000,000
KIGOMA Kasulu DC Bugaga Water Supply Scheme. 1 Bugaga 37 9,250
31,000,000
KIGOMA Kasulu DC
Rehabilitation of 5 boreholes at Titye village. 1 Titye 5 1,250
8,392,946
KIGOMA Kasulu DC
Rehabilitation of Nyenge water project 1 Nyenge 5 5,667
10,500,000
KIGOMA Kasulu DC
Rehabilitation of 3 boreholes at Kitanga. 1 Kitanga 3 750
5,500,000
KIGOMA Kasulu DC Rehabilitation of Nyachenda Water Supply
Scheme. 1 Nyachenda 47 9,103
13,000,000
KIGOMA
Kasulu Tc Rehabilitation of Mwanga B water supply scheme 1 Mwanga B 8 4,0
00 39,049,2
51
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
KIGOMA Kasulu Tc Rehabilitation of Msambara water supply
scheme 1 Msambara 40 11,139
59,049,251
KIGOMA Kasulu Tc
Rehabilitation of Murufiti water supply scheme 1 Murufiti 14 15,908
49,049,252
KIGOMA Kasulu Tc Rehabilitation of Nyansha/Nyantare water
supply scheme 1 Nyansha 13 13,406
67,229,251
KIGOMA
Uvinza Dc Rehabilitation & Extension of Katete Water Supply Scheme 1 Katete 4 2,0
00 1,500,0
00
KIGOMA Uvinza Dc 750,000
KIGOMA Uvinza Dc 10,580,000
KIGOMA Uvinza Dc Rehabilitation and installation of Hand Pumps
at Basanza Village 1 Basanza -
-
7,200,000
KIGOMA 4 1,000
1,325,694
KIGOMA
Kibondo Dc Rehabilitation of 5 non functioning DPs and construction of 5 new Dps at Kichananga village 1 Kichananga 10 5,0
00 7,000,0
00
KIGOMA Kibondo Dc
Rehabilitation of 5 non functioning BH at Bitare 1 Bitare 5 1,250
5,000,000
KIGOMA Kibondo Dc Rehabilitation of 3 non functioning BH at
Kumbanga village 1 Kumbanga 3 750
2,200,000
KIGOMA Kibondo Dc Rehabilitation of 4 non functioning BH at
Kumwambu. 1 Kumwambu 3 750
7,200,000
KIGOMA Kibondo Dc Rehabilitation of Gravity water supply scheme at
Nyaruyoba village. 1 Nyaruyoba 10 5,000
6,000,000
KIGOMA Kibondo Dc Rehabilitation of Uswahilini water supply
scheme 1 Uswahilini 4 975
3,000,000
KIGOMA
Kigoma Dc Rehabilitation of Mkongoro II water Supply scheme. 9 Chankabwimba,
Kabanga, Mahembe 170 27,500
74,000,000
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
kati, Mahembe mama, Msimba, Kamala, Simbo, Machazo and Kasuku.(rehab)
Sub Total 56 597 183,308
486,725,646
KILIMANJARO Mwanga Dc Vulue water supply 2 Vuchama ngofi and
mangio 7 4,834
14,000,000
KILIMANJARO
Mwanga DcKitoghoto water supply 1 Kitoghoto 4 4
12 13,000,0
00
KILIMANJARO
Mwanga Dc Kiverenge water supply 1 Kiverenge 14 1512 16,400,0
00
KILIMANJARO
Mwanga DcMsangeni/ Mamba water supply 2 Msangeni and
mamba 31 3695 4,700,000
KILIMANJARO
Mwanga DcLambo water supply 1 Lambo 5 2575 19,344,0
00
KILIMANJARO
Mwanga Dcmshewa water supply 1 Mshewa 5 2,088 15,710,0
00
KILIMANJARO Moshi Dc Utaruni Water Supply Projects
(Rehabilitation) . 9 Utaruni. 12 2,151
39,500,000
Moshi Dc Marangu West Water Supply scheme
( Rehabilitation). Kyala,Mbahe,Komalyangoe,Kitowo,Kiraracha and Nduweni.
12 3,545
39,500,000
Moshi Dc Boro Water Supply scheme ( rehabilitation). Boro 2 2,6
35 10,000,0
00
Moshi Dc Kilema South Water Supply Project (rehabilitation) 1 Kilema Pofo 6,1
97 5,000,0
00
Same Dc Gonjanza water supply (Rehabilitation) 1 Gonjanza, 0 1,250
12,000,000
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
Same Dc Ruvu Kombo water Suppy project (Rehabilitation) 1 Ruvu Kombo 1 9
35 10,000,0
00
Same DcKizungo water supply scheme (Rehabilitation) 2 Kizungo and Minyala 15 2,2
50 25,000,0
00
Same Dc Myombo/Sambweni water supply schemes (Rehabilitation) 2 Myombo & Sambweni 15 1,7
50 12,000,0
00
Same Dc Marien Makanya water supply project (Rehabilitation) 4 Marieni,Kasapo,Mgwa
si and Makanya 15 3,500
36,000,000
Rombo Mahida/Mahango Water Supply Scheme 1 Mahango 14 3,500
41,391,136
Hai Dc Losaa-Kia water supply scheme 10
Losaa,Kyuu, Nkwasira, Mungushi ,Sanyastation,Tindigani,Mtakuja, Kia ,Chemka na Eneo la Mlima shabaha katika mji mdogo wa Hai
2 -
123,750,000
Machame Water Supply Scheme 2 Kingereka and Lerai 0 -
1,800,000
HAI DC Lyamungo/Umbwe water Supply Scheme 1 Ngosero 0 -
24,525,289
Sub Total 40 88 32,959
463,620,425
LINDI Kilwa Dc Rehabilitation of hand pump at Kipindimbi Village 1 Kipindimbi 1 2
50 3,750,0
00
Kilwa Dc Rehabilitation of Kipatimu Water Supply Scheme 1 Kipatimu 14 2,5
00 7,200,0
00
Kilwa Dc Rehabiliatation of Mandawa Water Supply Scheme 1 Mandawa 26 5,6
26 8,420,0
00
Kilwa DcRehabilitation of 2 hand pumps at Miguruwe 1 Miguruwe 1 2
50 4,750,0
00
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
Kilwa Dc Rehabilitation of Hand pump at Nakiu Sec School 1 Nakiu 1 2
50 1,800,0
00
Kilwa DcRehabilitation of 3Hand pumps at Hongwe 2 Hongwe 3 7
50 6,750,0
00
Kilwa DcRehabilitation of 4Hand pumps at Namayuni 1 Namayuni 4 1,0
00 9,000,0
00
Kilwa DcRehabilitation of Hand pump at Nandete 1 Nandete 3 7
50 5,362,1
23
Kilwa DcRehabilitation of Hand pump at Zinga Kibaoni 1 Zinga Kibaoni 1 2
50 2,250,0
00
Kilwa DcRehabilitation of Hand pump at Somanga 1 Somanga 2 5
00 4,500,0
00
Kilwa DcRehabilitation of Hand pump at Nandembo 1 Nandembo 1 2
50 2,250,0
00
Kilwa DcRehabilitation of Hand pump at Malalani 1 Malalani 1 2
50 2,250,0
00
Kilwa Dc Rehabilitation of Hand pump at Marendengo Dispensary 1 Marendego 1 2
50 2,250,0
00
Kilwa DcRehabilitation of Hand pump at Mtoni-Miteja 1 Mtoni-Miteja 1 2
50 4,750,0
00
Kilwa DcRehabilitation of Hand pump at Likawage 1 Likawage 1 2
50 2,250,0
00
Kilwa DcRehabilitation of Hand pump at Kichonda 1 Kichonda 1 2
50 2,250,0
00
Liwale Rehabilitation of water project at Mikuyu Village 1 Mikuyu 3 750
3,000,000
Liwale Rehabilitation of water project at Kimambi Village 1 Kimambi 3 7
50 3,000,0
00
Liwale Rehabilitation of water project at Namakololo Village 1 Namakololo 3 7
50 3,000,0
00
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
Liwale Rehabilitation of water project at Naujombo Village 1 Naujombo 3 7
50 3,000,0
00
LiwaleRehabilitation of water project at Nahoro Village 1 Nahoro 3 7
50 3,000,0
00
Liwale
Rehabilitation of 5 water wells 5Mkundi, Kipelele, Kiangala, Mitunguni and Makata
5 1,250
2,724,792
Nachingwea Rehabilitation of Water Supply Village at Mnero Miembeni village 2 Mnero Miembeni and
Mkonjela Chini 12 3,000
10,000,000
Nachingwea Rehabilitation of Water Supply Scheme at Ruponda village 2 Ruponda and
Mwananyamala 25 4,005
40,478,132
Nachingwea
Rehabilitation and extension of Water Supply Scheme at Mkonjela Juu village 1 Mkonjela Juu 10 8
20 11,000,0
00
Ruangwa Dc Rehabilitation of 2 water wells at Liugulu Village 1 Liugulu 2 500
7,200,000
Ruangwa Dc Rehabilitation of one water well at Likwachu Village 1 Likwachu 1 2
50 3,600,0
00
Ruangwa Dc Rehabilitation of two water wells at Mmawa Village 1 Mmawa 2 5
00 5,000,0
00
Ruangwa Dc Rehabilitation of one water wells at Chunyu Village 1 Chunyu 1 2
50 2,500,0
00
Ruangwa Dc Rehabilitation of two water wells at Chimbila A Village 1 Chimbila A 2 5
00 5,000,0
00
Ruangwa Dc Rehabilitation of one water well at Namichiga Village 1 Namichiga A 1 2
50 3,600,0
00
Ruangwa DcRehabilitation of one water well at Ipingo Village 1 Ipingo 1 2
50 3,600,0
00
Ruangwa Dc Rehabilitation of two water wells at Litama Village 1 Litama 2 5
00 7,200,0
00
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
Ruangwa Dc Rehabilitation of two water wells at Chinongwe
Village 4Juhudi A, Juhudi B, Chinongwe A and Chinongwe B
2 500
7,200,000
Ruangwa Dc Rehabilitation of one water well at Makanjiro Village 1 Makanjiro 1 2
50 3,600,0
00
Ruangwa Dc Rehabilitation of one water well at Likunja Village 1 Likunja 1 2
50 3,600,0
00
Ruangwa Dc Rehabilitation of water Scheme at Machang'anja village 1 Mchang'anja 6 7
75 14,000,0
00
Ruangwa Dc Rehabilitation of water Scheme at Chibula Village 1 Chibula 4 1,0
00 14,000,0
00
Ruangwa Dc Rehabilitation of Mihewe Water Supply Scheme. 1 Mihewe 10 1,1
53 35,160,0
00
Ruangwa Dc Rehabilitation of Mbekenyera water supply project 2 Mbekenyera and
Naunambe 0 -
16,280,000
Ruangwa DcRehabilitation of Nkowe Water Project 1 Nkowe Village 4 1,0
00 4,514,8
79
Lindi Mc Rehabilitaion of Mkanga Chini Water Supply Scheme 1 Mkanga chini 10 4
84 6,500,0
00
Lindi McRehabilitation of 6 water points (hand pumps) at Nagiriki,Mkanga Chini, Ng'apa, Mbanja, Mitonga and Tandangongoro Villages
6
Nagiriki,Ng'apa, Mbanja,and Tandangongoro, Mitonga
6 1,500
11,553,438
Lindi Dc Rehabilitation of Nyangao Water supply Projects 4
Nyangao A,Nyangao B, Mtakuja, and Cheleweni
20 5,000
46,500,000
Lindi DcRehabilitation of Mtua Water Supply Projects 1 Mtua 9 2,2
50 33,226,0
61
Lindi DcRehabilitation of Lihimilo Water supply Projects 1 Lihimilo 1 2
50 3,500,0
00 Sub Total 65 215 43,8
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
63
MOROGORO Morogoro Mc Rehabilitation of Lugala water project 1 Lugala 14 2,9
99 20,567,6
10
Morogoro Dc Rehabilitation of of Pangawe Water Project 1 Pangawe 12 1,500
38,000,000
Morogoro Dc Rehabilitation of Kidugalo Water Supply Project 1 Kidugalo 3 750
16,500,000
Gairo Dc Rehabilitation of Madege - Chakwale Water supply 6
Madege, Chakwale, Sanganjelu, Ngholongo, Kimashale and Kilimani
20 14,275
8,454,673
Kilosa Dc Rehabilitation of 6 handpumps at Maguha ward 1 Inyunywe 3 651
4,800,000
1 Chaumbele 3 679
4,800,000
Kilosa DcRehabilitation of 6 handpumps at Tindiga ward 1 Malui 3 8
55 5,700,0
00
Kilosa Dc 1 Malangali 3 711
5,740,000
Kilosa Dc Replacement of handpumps 1 Ulelingombe 3 660
4,970,000
Kilosa Dc Rehabilitation of hand pumps 1 Mlunga 1 410
2,300,000
Kilosa Dc Rehabilitation of hand pumps 1 Kihelezo 14 2,009
25,200,000
Kilosa Dc Rehabilitation of hand pumps 1 Kitete Msingazi 6 1,866
9,940,000
Kilosa Dc Rehabilitation of hand pumps 1 Ulaya Mbuyuni 10 3,100
13,300,000
Kilosa Dc Rehabilitation of hand pumps 1 Malolo B 4 1,230
6,600,000
Kilosa DcRehabilitation of shallow wells at Mhenda 1 Mhenda 18 4,1
11 28,800,0
00
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
Kilosa DcSupply and installation of solar parnel at Dumila 3 Dumila Juu, Dumila
Kati and Matongolo 112 17,500
40,588,985
Ifakara Tc Rehabilitation of Kilama/Kikwawila water supply project 2 Kilama and Kikwawila 10 2,6
03 28,091,0
54
Ifakara TcRehabilitation of Kibaoni water supply project 1 Kibaoni 14 3,5
00 40,000,0
00
Ifakara Tc
Rehabilitation of 31 tube wells, installation of Hand pumps at 1.Michenga 2, 2.Kining'ina 2, 3.Machipi 2, 4.Mbasa 3, 5.Mlabani 3, 6.Lipangalala 2, 7.Kibaoni 3, 8.Katindiuka 3, 9.Ihanga 2, 10.Ifakara 4 , 11.Viwanja sitini 3 and 12. Lumemo 2
12
1.Michenga 2.Kining'ina 3.Machipi 4.Mbasa 5.Mlabani 6.Lipangalala 7.Kibaoni 8.Katindiuka 9.Ihanga 10.Ifakara 11.Viwanja sitini and 12. Lumemo
31 7,750
13,000,284
Kilombero Rehabilitation of Idete Water Supply 1 Idete 2 400
33,309,289
KilomberoRehabilitation of Mofu Secondary Water Supply 1 Mofu 6 3
50 8,600,0
00
KilomberoRehabilitation Namwawala Water Supply 1 Idandu 12 6
20 10,000,0
00
KilomberoRehabilitation Kamwene Water Supply 1 Kamwene 24 4,6
58 8,000,0
00
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
Kilombero Rehabilitation Masagati Secondary School Water Supply 1 Masagati 3 7
50 10,000,0
00
Kilombero Rehabilitation Uchindile Secondary School Water Supply 1 Uchindile 3 1
50 18,044,9
15
Kilombero
Rehabilitation of 50 Handpumps/water points 50
Msalise Village, Mbingu Secondary, Muhelule Secondary, Mpanga, Masagati, Ipinde, Msolwa,Miwangani,Idete,Namwawala,Idandu,Mofu,Ikwambi,Mchombe,Mngeta,Lukolongo,Njage,Mkusi,Mkangawalo,Ikule,Igima,Kalengakelo,Mlimba,Kamwene,Matema,Viwanja 60,Ngwasi,Mikoleko,Induindembo,Utengule,Taweta,Tanganyika,Chita,Merera,Makutano,Sagamaganga,Msolwa,Signal,Kiberege,Kisawasawa,Mpanga,Mwaya,Mang'ula,Mkula,Katurukila,Magombera,Kitete,Msolwa mlimba,ujamaa,Sanje,Mgudeni,Mkamba,Nyange,Uchindile,Chisano,Mgugwe,
58 7,500
45,000,000
Mvomero Rehabilitaion of 20 handpumped wells 10
Mziha(5) Bwage(2),kanga (2), Mangae(5), Mbogo(3), Manyinga(3)
20 13,200
48,125,226
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
Mvomero Rehabilitation of Kwadoli village Water scheme 1 Kwadoli 18 3,600
59,252,256
Ulanga Rehalibitation of dug wells 3 1 Kituti 1 231
1,850,000
Ulanga Rehalibitation of dug wells 3 1 Iputi 3 658
5,000,000
Ulanga Rehalibitation of dug wells 3 1 Idunda 3 690
4,980,000
Ulanga Rehalibitation of dug wells 3 1 Luhombero 3 676
4,990,000
Ulanga Rehabilitation of dug wells 3 1 Namhanga 2 463
3,360,000
Ulanga Rehabilitation of dug wells 3 1 Mdindo 1 231
1,950,000
Ulanga Rehabilitation of dug wells 3 1 Milola 1 231
1,710,000
Ulanga Rehabilitation of dug wells 3 1 Kivukoni 3 672
4,980,000
Ulanga Rehabilitation of dug wells 3 1 Mavimba 3 693
5,650,000
Ulanga Rehabilitation of dug wells 2 1 Mbuyuni 1 236
1,690,000
Ulanga Rehabilitation of dug wells 3 1 Nakafuru 1 227
1,650,000
Ulanga Rehabilitation of dug wells 2 1 Ikangao 1 237
1,650,000
Ulanga Rehabilitation of dug wells 2 1 Nanungu 1 231
1,650,000
Ulanga Rehabilitation of dug wells 2 1 Chigandugandu 3 651
4,950,000
Ulanga Rehabilitation of dug wells 2 1 Kidugaro 2 462
3,300,000
Ulanga Rehabilitation of dug wells 3 1 Mbuga 3 693
4,950,000
Ulanga Rehabilitation of dug wells 3 1 Kichangani 3 694
4,950,000
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
Ulanga Rehabilitation of dug wells 3 1 Chikuti 2 467
3,300,000
Ulanga Rehabilitation of dug wells 3 1 Magereza 3 695
4,650,000
Ulanga Rehabilitation of dug wells 1 1 Iragua 1 230
1,640,000
Ulanga Rehabilitation of dug wells 2 1 Nkongo 2 463
4,000,000
Ulanga Rehabilitation of dug wells 2 1 Euga 2 467
3,300,000
Ulanga Rehabilitation of dug wells 3 1 Mwaya 3 642
6,350,000
UlangaRehabilitation of Minepa water Supply project 1 Minepa 25 5,5
25 30,500,0
00
Malinyi Rehabilitation of Itete and Mtimbira water supply projecst. 4
Mtimbira, Usangule,Njiwa and Itete
100 14,560
11,000,000
Malinyi Rehabilitation and Extension of Lupunga water Supply 1 Lupunga 7 1,0
00 23,000,0
00
Malinyi Rehabilitation and Extension of Lupunga water Supply 1 Lupunga 7 1,0
00 23,000,0
00
Sub Total 135 617
131,412
727,684,292
4 MTWARA Masasi Dc Rehabilitation of Water project at Lupaso and
Lipumbulu villages 2 Lupaso, Lipumbulu 20 1,000
4,000,000
Masasi Dc Rehabilitation of water project at Nanganga
Villages 5NangangaA, NangangaB, Mkang'u, Chipite, Namihungo
32 1,259
6,500,000
Masasi Dc
Rehabilitation of water project at Nambawala, Nambaya, Mkalapa and Chikundi Villages 4
Nambawala, Nambaya, Chikundi, Mkalapa
36 1,500
4,500,000
Masasi Dc Rehabilitation of water project at Namajani Villages 2 Namajani, Ngalole 10 5,0
00 55,165,5
10
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
Nanyumbu Tc Extension/rehabilitation of Water Supply Project, Mangaka Town 1 Mangaka Town 20 2,5
00 10,461,7
95
Mtwara Dc Rehabilitation of Mbawala water projects 11
Mbawala, Maili kumi, Mdui, Nachenjele, Mwindi, Kawawa, Nanyati, Nyengedi, Naliendele, Mkangala, Mbawala chini
24 9,220
39,206,624
Mtwara Mc Rehabilitation of hand pumps at Mikindani, Rwelu and Ufukoni project 3
Mikindani,Rwelu,Ufukoni
4 3,100
8,193,904
Nanyamba Tc Rehabilitation and extension of Malongo water project 2 Malongo, Migombani 14 1,8
64 31,766,9
20
Newala Dc Rehabilitation of pipe network from Malatu Shuleni to Malatu Chini. 3
Malatu Juu,Mdimba,malatu chini
36 5,343
3,352,573
Tandahimba 1 Malamba 10 2,500
2,274,179
Tandahimba Rehabilitation of(35 FNRWP & NFWP)water points in 16 villages 1 Mihambwe 2 5
00 909,67
2
Tandahimba 1 Kidoo 2 500
454,836
Tandahimba 1 Likolombe 2 500
454,836
Tandahimba 1 Mchichira 8 2,000
1,819,343
Tandahimba 1 Ghana juu na Chini 6 1,500
1,364,507
Tandahimba
3Mundamkulu, Mchichira na Nanyuwila
6 1,500
1,364,507
Tandahimba 1 Mnyawa 8 2,000
1,819,343
Tandahimba 1 Mchichira 8 2,0 1,819,3
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
00 43
Tandahimba 1 Nakayaka 6 1,500
1,819,343
Tandahimba 1 Maundo juu 4 15,919,253
Tandahimba
Rehabilitation of 63mm diameter pipeline from Mkonjowano to Litehu villages 2 Litehu and Libobe 40 6,950,0
00
Sub Total 48 298 45,286
MWANZA Kwimba Rehabilitation of ten wells at Solwe, Ibindo,
Mwakuba and Nyamilama Villages 4Solwe, Ibindo,Mwakuba and Nyamilama
10 2,500
30,475,211
Kwimba Rehabilitation of water project at Dodoma Village 1 Dodoma 12 3,0
00 65,000,0
00
Sengerema Rehabilitation of water supply scheme at chamabanda Nyanta kubwa and Kasungamile 3
chamabanda, Nyanta kubwa and Kasungamile
38 9,500
46,020,000
Rehabilitation of 30 Shallow and Boreholes. 30
Igaka (Ilamata na Center), Kanyelele (Ilongamala), Kagunga (Nyarubanga, Sigu na Mwang'alanga), Nyasigu (Bulanda and Nyasigu B), Lubungo (, Nyanchenche (Nyakahunga),Nyampande (Centre), Ngoma B (Centre), Sota (Nyashimba na Kaningu), Ngoma A (Mliman and Nyabila), Nyamtelela (Kwa Peter na Isamilo),
30 7,500
19,910,109
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
Nyamizeze (Iseni 2 and Kang'washi), Mami (Mwamadulu), Kamanga (Chamagati and Kamanga B), Nyamatongo (Buzuluga A, Kachaa and Mkorani), Sima (Ishingisha and Ishingisha A), Chinfunfu (Nyegega), Mulaga (Centre), Mulaga (Centre), Butonga (Kashindaga), Lubungo (Centre and P/school), Sota (Nghano and Kaningu),
Mwanza CcRehabilitation of water project at Nhobola, Fumagila East and Fumagila West streets in Kishiri ward
3Nhobola, Fumagila East and Fumagila West
7 1,750
9,600,000
Mwanza Cc
Rehabilitation of water project at Buhongwa, Mahina, Lwanhima, Igoma and Mkolani wards 5
Kigoto,Igelegele,Sahwa,Kakebe and Nyamazobe
3 750
3,021,553
Mwanza Cc
Rehabilitation of water project at Buhongwa, Mahina, Lwanhima, Igoma and Mkolani wards 5 Mkapa,Ipuli,Kasese,Is
ebanda and Bulale 2 500
2,778,592
Ilemela Mc Rehabilitation of 10 handpump (shallow well and borehole) 10
Masemele, Igogwe, Isanzu, Magaka, Wilunya, Ilekako, Nkoroto, Kihili, Bujimile and Igombe
10 2,500
10,000,000
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
Misingwi Dc Rehabilitation of Fella water supply system 3 Fella, Ngereka and Bujingwa 42 10,5
00 18,000,0
00
Misingwi Dc
Rehabilitation of Usagara piped water scheme 2 Usagara and Sanjo 8 2,000
16,000,000
Misingwi Dc
Transmision and Installation of TANESCO Power to the existing Isesa water supply source 1 Isesa 24 6,0
00 5,666,1
01
Misingwi Dc
Rehabilitation of 15 existing boreholes 15
Isesa, Nyamatala, Ngudama, Kabale,Mabuki,Kijima, Isakamawe, Chole, Ibongoya A, Iteja, Mamaye, Mhungwe, Kanyelele Mwasonge and Igumo
15 3,750
36,000,000
Rehabilitation of 16 existing boreholes and Shallow wells 16
Buganda ,Mwagala, Igenge,Bukumbi,Mwasubi, Ntulya,Maganzo,Mondo,Koromije, Sanjo, Isenengeja, Nyang'homango(Sayona) and Mwaniko
16 4,000
32,000,000
Magu Dc Rehabilitation of Nyashimba Water Supply Project 1 Nyashimba 12 3,0
00 31,072,1
38
Magu Dc
Rehabilitation of Kisesa B Water Projects 1 Kisesa B 4 1,000
16,500,000
Magu Dc
Rehabilitation of 20 Deep Boreheoles 20
Shishani,Ihushi,Sese,Kayenze B, Iseni, Lumeji, Nyang'hanga,Bugatu,Jinjimili, Ihushi C,Mondo,Lubugu, Nkungulu,Nyashoshi,
20 5,000
70,130,642
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
Misungwi,Ng'haya,Nyamahanga,Bundilya,Isangijo and Bukandwe
Ukerewe Dc Rehabilitation of Kazirankanda Water Project 1 Muhula 4 1,000
20,000,000
Ukerewe Dc Rehabilitation of Kazirankanda Water Project 1 Buhima 5 1,250
30,000,000
Buchosa Dc Rehabilitaton of 10 BHS 10
Isenyi (Nyamafuluka, Kamuzizi, Mutukuka, Nyakwanzu), Nyakasas (Nyabintu, Kagomba and Luhiza), Kasheka (Centre), Luhama (Uwanjani), Nyamadoke (Centre and Primary), Migukulama (Centre), Nyashitale (Itobe), Buhama (Chingala), Nyamkolechiwa (Bugombe and Nyamkolechiwa B), Luholongoma (Magharibi na Kaskazini), Igwanzozu (Mkuyuni), Kabaganga (Byelele), Buswelu (Mashariki), Nyehunge (Mwabasabi), Bilulumo(1), Maisome (3), Iligamba (2)
30 7,500
21,339,981
Sub Total 132 292 73,000
483,514,326
MANYARA Mbulu Tc Rehabilitation of hand pumps in tlawi 1 Tlawi 3 7
50 6,500,9
52
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
Mbulu Tc Rehabilitation of hand pumps in tlawi 1 Bargish Uwa
Mbulu Tc Rehabilitation of hand pumps in tlawi 1 Kainam
Simanjiro Shambarai water supply project (REH) 1 Shambarai 11 2,750
10,800,000
Simanjiro M/Tembo, Magadini and Narakauo water supply project 1 M/Tembo 7,5
00 22,731,4
62
Simanjiro 1 Magadini 30
Kiteto Laiseri water supply project 1 Laiseri 16 4,000
18,414,430
Babati Dc Maganjwa Water supply Project 1 Maganjwa 11 2,500
40,000,000
Babati Dc Minjingu-Olasiti water supply project 2 Minjingu,Olasiti 20 5,000
52,500,000
Babati DcWaloha-Mwikantsi water supply project 1 Mwinkatsi 1 2
50 2,500,0
00
Babati Dc Gidabagar Water Well 1 Gidabaghar, 1 250
2,500,000
Babati Dc Gijedabong Water Well 1 Gijedabong, 1 250
2,500,000
Babati Dc Endadoshi Water Well 1 Endadosh 1 250
2,500,000
Babati Dc Sangara Water Well 1 Sangara 1 250
2,500,000
Babati Dc Long Water Wells 1 Long 1 250
2,500,000
Babati Dc Boahay Water Supply 1 Boahay 1 250
3,500,000
Babati Dc Endaberg water supply project 1 Endaberg 14 3,500
36,500,000
Babati Dc Seleto Water Supply Projct 1 Seleto 0 800
5,197,541
Hanang Dc Gidagharbu Water Supply Project 1 Gidagharbu 20 2,5 59,218,0
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
00 57
Hanang Dc Galangala water supply project 1 Galangala 14 3,500
7,000,000
Mbulu Dc Rehabilitation of seven (7) hand pumps in five villages 1 Eshkesh 7 1,7
50 31,245,3
06
Mbulu Dc 1 Domanga 2
Mbulu Dc 1 Endalat
Mbulu Dc 1 Yaeda Chini 2
Mbulu Dc 1 Endadubu
Mbulu Dc Rehabilitation of five (5) hand pumps in five villages 1 Genda 5 1,2
50 35,445,3
22
Mbulu Dc 1 Ngorati
Mbulu Dc 1 maretadu juu
Mbulu Dc 1 Endahagichan
Mbulu Dc 1 labay
Mbulu Dc
Flushing and pump test at Geterer, Bashay and Maretadu Chini Villages 1 Geterer 7
50 6,000,0
00
Mbulu Dc 1 Yaeda Kati/Bashay secondary 3
Mbulu Dc 1
Maretadu Chini
Sub Total Manyara 34 161 38,300
1 MBEYA Kyela Dc Rehabilitation of Ngamanga water supply project 3 Mpanda, Kyangala,
Lukama 80 3,048
28,000,000
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
Kyela DcRehabilitation of Makwale water supply project 1 Makwale 32 1,9
58 25,956,5
74
Kyela DcRehabilitation of Matema water project 1 Ikombe(Lyulilo) 6 7
50 18,000,0
00
Rungwe Dc Rehabilitation of Nzunda Water Supply scheme 1 Nzunda 10 2,5
00 20,000,0
00
Rungwe DcRehabilitation of Nsyamba Water Supply 2 Mpuga& Igalamu 15 3,7
50 37,375,5
53
Rungwe DcRehabilitation of Mbeye-1 Water Supplyproject 2 Mbeye-1 and Idweli 10 2,5
00 72,387,3
34
Mbalali Dc Rehabilitation of Mbarali Water project 2 Urunda, Mbarali 10 4,421
11,400,000
Mbalali Dc Rehabilitation of Chimala Water Project 5 Chimala,Mengele,Lyambogo,Isitu,Igumbilo 8 2,9
65 32,575,1
62
Chuya Dc Rehabilitation of Handpumps Water Projects at Kambikatoto Village 1 Kambikatoto 4 1,0
00 4,100,0
00
Chuya Dc Rehabilitation of Handpumps Water Projects at Bitimanyanga Village 1 Bitimanyanga 2 5
00 2,480,0
00
Chuya Dc Rehabilitation and Extension of Handpumps Water Projects at Lupa 2 Lupatingatinga and
Ifuma 10 2,500
4,992,630
Chuya Dc Rehabilitation of Handpumps Water Projects at Mwiji Village 1 Mwiji 2 5
00 690,00
0
Chuya Dc
Rehabilitation and Extension of Mapogoro Village Water Supply Project 1 Mapogoro 13 3,2
50 9,050,0
00
Mbeya Dc Rehabilitation of Isangala water project 5Lusungo, Malowe, Isangala, Nsambya, Mwaselela
25 3,750
20,000,000
Mbeya Dc Rehabilitation of Santilya project 1 Santilya 5 1,250
14,045,000
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
Mbeya Dc Rehabilitation of Igoma, Kimondo, Mwanzanzi Project 3 Igoma, Kimondo
Mwanzazi 11 1,600
20,000,000
Mbeya DcRehabilitation of Usoha/Muungano project 2 Usoha
Muungano 3 750
17,000,000
Rehabilitation of Iwiji water project 1 Iwiji 10 2,500
16,411,948
Busekelo Dc Rehabilitation of Kabembe Group Water Supply Project 2 Kabembe and Kibole 6
6 1,50
0
Busekelo Dc Rehabilitation of Nyandege Water Supply Project 3 Luteba, Kilasi and
Mpunguti 12 12
3,000
Busekelo DcRehabilitation of Kilugu Water Supply Project 1 Kilugu 5
5 1,25
0
Busekelo DcRehabilitation of Kifunda water scheme 1 Kifunda 9
9 75
0
Mbeya Cc Rehabilitation and construction of Mwasanga water supply project 2 Ndunguya, Isoso 24 2,5
00 25,856,9
01
Mbeya Cc Improvement of Mwansekwa water supply project 1 mwansekwa 4 2,2
43 10,000,0
00
Sub Total 45 316 44,267
390,327,602
RUKWA Sumbawanga Dc
Rehabilitation of Kinambo gravity water supply project 3 Kinambo,Mahenje,Lya
nza 33 6,892
9,994,625
Sumbawanga Dc
Rehabilitation of Solola gravity water supply project 1 Solola 12 3,1
77 13,000,0
00
Sumbawanga Dc Rehabilitation of malolwa protected spring 1 Malolwa 8 2,0
00 4,305,3
75
Sumbawanga Dc Rehabilitation of Miangula gravity water supply 1 Miangalua 3 1,5
00 5,000,0
00
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
Sumbawanga Dc
Rehabilitation of 3 Protected Spring at Sandulula Village 1 Sandulula 9 2,2
50 1,500,0
00
Sumbawanga Dc Rehabilitation of 2 Boreholes at Kapenta Village 1 Kapenta 2 5
00 6,000,0
00
Sumbawanga Dc
Rehabilitation of One Borehole at Kalakala Village 1 Kalakala 1 2
50 3,000,0
00
Sumbawanga Dc
Rehabilitation of three Borehole at Mbuze Village 1 Muze 6 1,5
00 5,500,0
00
Sumbawanga Dc Rehabilitation of 5 Boreholes at Kavifuti Village 1 Kavifuti 5 1,2
50 10,000,0
00
Sumbawanga Dc Rehabilitation of One Borehole at Kipeta village 1 Kipeta 1 2
50 1,000,0
00
Sumbawanga Dc Rehabilitation of 3 Boreholes at Mnokola Village 1 Mnokola 3 7
50 9,000,0
00
Sumbawanga Dc Rehabilitation of 2 Boreholes at Mshani Village 1 Mshani 2 5
00 6,000,0
00
Sumbawanga Dc Rehabilitation of 2 Boreholes at Kalole Village 1 Kalole 2 5
00 2,700,0
00
Sumbawanga Dc Rehabilitation of 3 Boreholes at Tunko Village 1 Tunko 3 7
50 8,000,0
00
Sumbawanga Dc Rehabilitation of 2 Boreholes at Movu Village 1 Movu 2 5
00 6,000,0
00
Sumbawanga Rehabilitation of 2 Boreholes at Mpui Village 2 Mpui A&Mpui B 2 5 2,000,0
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
Dc 00 00
Sumbawanga Dc
Rehabilitation of One Shallow Well at Mbwilo Village 1 Mbwilo 1 2
50 2,000,0
00
Sumbawanga Dc
Rehabilitation of 2 Shallow wellls at Mpwapwa Village 1 Mpwapwa 2 5
00 4,000,0
00
Sumbawanga Dc
Rehabilitation of 3 Shallow Wells at Kianda Igonda Village 1 Kianda Igonda 2 5
00 4,000,0
00
Sumbawanga Dc
Rehabilitation of 2 Shallow Wells at Kasekela Village 1 Kasekela 2 5
00 4,000,0
00
Sumbawanga Dc
Rehabilitation of 3 Shallow Wells at Mkunda Village 1 Mkunda 3 7
50 8,000,0
00
Sumbawanga Mc
Rehabilitaion of Kankwale water supply scheme 1 Kankwale 10 3,4
34 42,188,2
96
Sumbawanga Mc Rehabilitaion of Kisumba water supply scheme 1 Kisumba 15 3,7
08 1,740,0
00
Sumbawanga Mc
Rehabilitaion of Isesa, ulinji, Ntendo, Nambogo,fyengelezya and Luwa water supply schemes
5Isesa, ulinji, Ntendo,Nambogo fyengelezya and Luwa
36 1,250
60,000,000
Sumbawanga Mc Rehabilitation of Malonje water supply scheme 1 Malonje 6 1,5
00 6,900,0
00
Kalambo Dc Rehabilitation of Kisungamile village 1 Kisungamile 4 1,850
7,222,889
Kalambo Dc Rehabilitation of two villages at Msoma and
Mpenje 2 Msoma and Mpenje 6 2,798
5,872,889
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
Kalambo Dc Rehabilitation of Kasanga Village Water
Supply Scheme 1 Kasanga 4 1,500
5,950,000
Kalambo Dc
Rehabilitation of 13 boreholes by installing new hand pumps at Kalemasha 2, Mbuluma 2, Katapulo 2, Selengoma 2, Ilonga 1, Mlenje 1, Mkowe 1, and Mbuza 1 villages
8
Kalemasha, Mbuluma , Katapulo , Selengoma , Ilonga , Mlenje , Mkowe , and Mbuza villages
13 3,250
52,000,000
Nkasi Dc Rehabilitation of Sintali water supply scheme 1 Sintali 4 1,000
7,455,457
Nkasi Dc
Rehabilitation of 1 borehole at Lunyala Village 1 Lunyala 1 250
1,950,000
Nkasi Dc
Rehabilitation of 4 boreholes at Myula Village 1 Myula 4 1,000
3,240,000
Nkasi Dc
Rehabilitation of 1 borehole at Nkomolo Village 1 Nkomolo 1 250
3,600,000
Nkasi Dc
Rehabilitation of 1 borehole at Kipili Village 1 Kipili 1 250
1,450,000
Nkasi Dc
Rehabilitation of 2 boreholes at Mwai Village 1 Mwai 2 500
3,850,000
Nkasi Dc
Rehabilitation of 6 boreholes at Kabwe Village 1 Kabwe 6 1,500
6,460,000
Nkasi Dc Rehabilitation of 2 boreholes at Milundikwa
Village 1 Milundikwa 2 500
3,300,000
Nkasi Dc
Rehabilitation of 3 boreholes at Isale Village 1 Isale 3 750
3,600,000
Nkasi Dc
Rehabilitation of 2 shallow wells at Kalila Village 1 Kalila 2 500
2,500,000
Sub Total 54 224 51,359
334,279,530
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
RUVUMA Tunduru Dc Rehabilitation of water project at Ndenyende Village 1 Ndenyende 6 1,5
00 22,000,0
00
Tunduru Dc Rehabilitation of water project at
NaluwaleVillage 2 Naluwale and Mkwajunii 8 8
18 10,000,0
00
Tunduru Dc Rehabilitation of water project at Lipopo, Nalasi
and Chilundundu. 3 Lipepo, Nalasi and Chilundundu 48 12,0
00 20,000,0
00
Tunduru Dc Rehabilitation of Hand pumps at Misechela,Ligoma,Angalia, Mchekeni, Jakika, Legezamwendo, Mbatamila, and Machemba Villages
8
Misechela,Ligoma,Angalia, Mchekeni, Jakika, Legezamwendo, Mbatamila, and Machemba
8 2,000
21,707,932
Mbinga Tc Rehabilitation of water project at Kitanda and Masimeri Village 2 Kitanda and Masimeri 15 1,0
00 21,279,0
98
Mbinga Dc Rehabilitation of water project at Matanga Village 1 Matanga 13 1,6
90 11,123,4
60
Mbinga Dc Rehabilitation of water project Kindimba juu
village 1 Kindimba 25 2,305
21,393,269
Mbinga Dc
Rehabilitaion of water project at Unango Village 1 Unango 14 2,300
5,989,555
Numtumbo Dc Rehabilitation of Namabengo & Nambalama Water Supply project 2 Namabengo/
Nambalama 31 7,714
15,520,064
Numtumbo Dc Rehabilitation of Handpumps in 29 Villages. 29 Magazini,Likusanguse, Litola,Kumbara,Mageuzi,Mlilayoyo,Luhangano,Lumeha,Msindo,Utwango,Mdwema,Lihimbalilo,Namahoka, Matepwende,Ulamboni,,Lusewa,Mironji,Kilimasesa,Songambele,Mgombasi,Mtumbatimaji,Nambecha,Chengena
63 9,363
136,751,000
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
,Namanguli,,Ligunga,Mtonya,Ligera,Mtonya,Ligunga
Songea Mc Rehabilitation of 17 Hand pumps. 17
Makambi, Merikebu, Lilambo A, Lilambo B, Likuyufusi,Londoni, Mahilo, Mkuzo, Namanyigu, Namanditi and Masigira
17 3,500
16,357,954
Songea Dc Rehabilitation of Ndongosi piped gravity water project, 1 Ndongosi 11 1,4
00 24,567,0
00
Songea Dc Rehabilitation of Namatuhi piped gravity water
project, 1 Namatuhi 9 2,000
23,650,000
Songea Dc Rehabilitation of Mgazini piped gravity water
project, 1 Mgazini 4 600
21,340,000
Songea Dc Rehabilitation of 4 natural wells at Ngahokora
village. 1 Ngahokora 4 600
19,246,367
Songea Dc
Rehabilitation of 110 shallow wells fitted with hand pumps at Liweta village. 9
Liweta, Litisha, Magagura, Maposeni, Mpitimbi A & B, Kizuka and Nakawale
110 8,997
76,890,000
Nyasa Dc Rehibilitation of Mtipwili water supply scheme 1 Mtipwili 28 2,300
37,591,790
Rehibiltation of Mitomoni water supply scheme 1 Mitomoni 5 1,250
16,200,000
Madaba Dc Rehabilitation of Gravity Water Supply at Matetereka village 1 Matetereka 21 1,8
50 15,040,5
00
Madaba Dc Rehabilitation of hand pumps 7
Likarangilo,Luhimba,Gumbiro,Lutukila,Mbangamawe,Ngadinda and Mtyangimbole
14 2,800
23,822,787
Sub Total 90 454 65,987
560,470,776
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
SONGWE Songwe Dc Rehabilitation of Ifwenkenya water supply
project 1 Ifwenkenya 24 5,107
7,985,643
Songwe Dc Rehabilitation of Mwambani water scheme project 1 Mwambani 10 4,8
72 3,619,0
17
Mbozi Dc Rehabilitation/ Construction of treatment plant and fencing at Ihanda village water source 1 Ihanda 26 5
00 30,000,0
00
Mbozi DcRehabilitation and expansion of improved of four traditional wells at Mlangali, Chimbuya, and Mpera Villages
3 Chimbuya, Mlangali and Mpera 3 2,2
50 16,000,0
00
Mbozi Dc
Water sources protection and demacations 4 Idiwili,Chimbuya,Mkabgali and Mpera
0 -
6,000,000
Momba Dc & Tunduma Tc
Rehabilitation of Kamsamba water supply project 1 kamsamba 2 5
00 4,485,6
43
Momba Dc & Tunduma Tc
Rehabilitation of 6 borehole at katete and mpemba village 2 Mpemba and Katete 6 1,5
00 3,500,2
50
Momba Dc & Tunduma Tc
Rehabilitation of 14 water borehole at 14 villages, 14
Mkutano,Chindi,Ipata,Ntinga,Chuo,Tontela,Kapele,Nyenjele,Mpui,Nkangamo,Mweenemba,Chiwanda,Lwatwe and Namchinka.
14 3,500
5,981,919
Ileje Dc Rehabilitation and extension of Igumila Water Project 1 Igumila 8 1,8
85 35,000,0
00
Ileje Dc Rehabilitation of Yenzebwe, Ibezya, Mapogolo
and Msia hand Pump 4 Yenzebwe, Ibezya, Mapogolo and Msia 5 7,9
12 14,000,0
00
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
Ileje Dc
Rehabilitation of Sub gravity water project for Sange Secondary and Ngulugulu Dispensary 2 Sange and Ngulugulu 4 1,5
00 25,000,0
00
Ileje Dc
Water Sources Protection and Demarcation 0 0 21,671,107
Sub Total 34 102 29,526
173,243,579
SINGIDA Iramba Dc Rehabilitation of 2 hand pump at Kidaru Village 1 Kidaru 2 500
29,600,000
Iramba Dc Rehabilitation of 1 hand pump at Ndulungu Village 1 Ndulungu 1 2
50
Iramba DcRehabilitation of 1 hand pump at Luono Village 1 Luono 1 2
50
Iramba DcRehabilitation of 2 hand pump at Kisana Village 1 Kisana 1 2
50
Iramba Dc Rehabilitation of Sumersible Pump at Tyme Water Supply Project 1 Tyme 18 3,6
00
Iramba DcRehabilitation of 1 hand pump at Igumo 1 Igumo 1 2
50
Iramba DcRehabilitation of 1 hand pump at Ulemo Village 1 Ulemo 1 2
50
Iramba DcRehabilitation of 1 hand pump at Nsunsu Village 1 Nsunsu 1 2
50
Iramba Dc Rehabilitation of 1 hand pump at Lunsanga Village 1 Lunsanga 1 2
50
Iramba DcRehabilitation of 1 hand pump at Ussure Village 1 Ussure 1 2
50
Manyoni Dc Rehabilitation of MSEMEMBO water supply project 1 Msemembo 22 4,4
00 26,500,0
00
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
Manyoni Dc Rehabilitation of Chibumagwa water supply project 1 Chibumagwa 6 1,5
00 9,314,0
00
Manyoni DcRehabilitation of Mitoho Wind mill water scheme 1 Mitoo 2 5
00 5,000,0
00
Manyoni Dc Rehabilitation of MKOMBOZI Water Supply Project. 1 Chilejeho 2 5
00 3,000,0
00
Manyoni Dc Rehabilitation of 3 hand dug wells in Kintinku village 1 Kintinku 3 7
50 8,250,0
00
Manyoni Dc Rehabilitation of 1 hand dug well in Sasajila village 1 Sasajila 1 2
50 2,750,0
00
Manyoni Dc Rehabilitation of Sanza/Ntope water supply project 2 Sanza and Ntope 8 2,0
00 9,700,0
00
Itigi Mwanagembe Ws 1 Mwamagembe 10 2,000
5,000,000
Itigi Rehabilitation of hand pumps for Gurungu WS 1 Gurungu 2 500
5,119,058
Mkalama Rehabilitation of 2 hand pumps in Nkungi village 1 Nkungi 2 500
2,000,000
Mkalama Rehabilitation of 2 hand pumps in Gumanga village 1 Gumanga 2 5
00 2,000,0
00
Mkalama Rehabilitation of 3 hand pump in Nkalakala village 1 Nkalakala 3 7
50 3,000,0
00
Mkalama Rehabilitation of 2 hand pumps in Mwangeza village 1 Mwangeza 2 5
00 2,000,0
00
Mkalama Rehabilitation of 2 hand pumps in Matongo village 1 Matongo 2 5
00 2,000,0
00
MkalamaRehabilitation of 1 hand pump in Senene village 1 Senene 1 2
50 1,000,0
00
MkalamaRehabilitation of 1 hand pump in Ilunda village 1 Ilunda 1 2
50 1,000,0
00
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
MkalamaRehabilitation of 2 hand pumps in Tumuli village 1 Tumuli 3 7
50 3,000,0
00
MkalamaRehabilitation of 2 hand pumps in Ilongo village 1 Ilongo 2 5
00 2,000,0
00
MkalamaRehabilitation of 3 hand pumps in Malaja village 1 Malaja 3 7
50 3,000,0
00
Mkalama Rehabilitation of 2 hand pumps in Iguguno village 1 Iguguno 2 5
00 2,000,0
00
Mkalama Supply and installation of 3 new handpumps in Msingi village at 30m 1 Msingi 3 7
50 12,600,0
00
Mkalama
Supply and installation of 3 new handpumps in Kinampundu village at 24 1 Kinampundu 3 7
50 12,600,0
00
Mkalama
Supply and installation of 1 new handpumps in Matongo village at 30m 1 Matongo 1 2
50 4,200,0
00
Mkalama Supply and installation of 1 new handpump in Mbigigi village at 24 1 Mbigigi 1 2
50 4,200,0
00
Mkalama Supply and installation of 1 new handpumps in Mpako village at 33m 1 Mpako 1 2
50 4,200,0
00
Mkalama
Supply and installation of 1 new handpump in Mwangeza village at 21m 1 Mwangeza 1 2
50 4,200,0
00
Mkalama Supply and installation of 1 new handpump in Malaja village at 30m 1 Malaja 1 2
50 4,200,0
00
Mkalama
Supply and installation of 1 new handpumps in Iguguno village at 24m 1 Iguguno 1 2
50 4,200,0
00
Mkalama Supply and installation of 2 new handpumps in Nkungi village at 30m 1 Nkungi 2 5
00 8,400,0
00
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
MkalamaReabilitation of Miganga water supply project 1 Miganga 18 4,5
00 6,862,4
18
MkalamaRehabilitation of Kikhonda Water Supply Project 1 Kikhonda 38 9,5
00 8,000,0
00
Singida Dc Rehabilitation of four (4) hand pumps at Minyaa village. 1 Minyaa 4 1,0
00 11,093,3
32
Singida Dc Rehabilitation of one (1) hand pump at Nduu village. 1 Nduu 1 2
50 2,773,3
33
Singida Dc
Rehabilitation of one (1) hand pump at Mkulu Subvillage in Nduamughanga village. 1 Nduamughanga 1 2
50 2,773,3
33
Singida Dc Rehabilitation of four (4) hand pumps at Ng'ongoampoku village. 1 Ng'ongoampoku 4 1,0
00 11,093,3
32
Singida Dc Rehabilitation of one (1) hand pump at Msimihi village. 1 Msimihi 1 2
50 2,773,3
33
Singida Dc Rehabilitation of one (1) hand pump at Ntondo village. 1 Ntondo 2 5
00 5,546,6
66
Singida Dc Rehabilitation of one (1) hand pump at Semfuru village. 1 Semfuru 1 2
50 2,773,3
33
Singida Dc Rehabilitation of two (2) hand pumps at Kibaoni village. 1 Kibaoni 2 5
00 5,546,6
66
Singida Dc Rehabilitation of one (1) hand pump at Mikuyu village. 1 Mikuyu 1 2
50 2,773,3
33
Singida Dc Rehabilitation of two (2) hand pumps at Merya village. 1 Merya 2 5
00 5,546,6
66
Singida Dc Rehabilitation of one (1) hand pump at Minyenye village. 1 Minyenye 1 2
50 2,773,3
33
Singida Dc Rehabilitation of one (1) hand pump at Ntunduu village. 1 Ntunduu 1 2
50 2,773,3
33
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
Singida Dc Rehabilitation of one (1) hand pump at Kilimo- Ughandi "A" village. 1 Ughandi "A" 1 2
50 3,773,3
33
Singida Dc
Rehabilitation of water pump and construction of pump house at Msange Village 1 Msange
- 3,9
00 24,126,6
72
Singida Dc Rehabilitation of three (3) DPs at Ikhanoda village. 1 Ikhanoda 6 1,2
00 30,000,0
00
Singida Mc Rehabilitati of three (3) hand pumps. 1 Mtamaa 3 750
4,402,000
Singida Mc Rehabilitation of two (2) hand pump at Unyianga village. 1 Unyianga 2 5
00 2,934,6
66
Ikungi Dc Rehabilitation and extension of water project at Issuna A Village 1 Issuna A 14 3,3
64 58,545,7
77
Ikungi Dc Rehabilitation of Mgungira water supply 1 mgungira 24 4,705
15,500,000
Total 61 248 61,669
398,417,917
1 PWANI Kisarawe Dc Rehabilitation of Chole Water Suuply Scheme 1 Chole 2 500
5,900,000
Kisarawe DcRehabilitation of Kisanga Water Supply Scheme 1 Kisanga 10 1,0
00 4,000,0
00
Kisarawe DcMaintanace of Ngongele water scheme 1 Ngongele 4 8
69 4,500,0
00
Kisarawe Dc Rehabilitation of Kibuta water project 1 Kibuta 12 2,496
4,079,790
Chalinze Dc Rehabilitation of 1 Borehole at Kwamsanja village. 1 Kwamsanja 1 2
80 6,000,0
00
Chalinze DcRehabilitation of 1 Well at Kwamduma village. 1 Kwamduma 1 3
00 3,500,0
00
Chalinze DcRehabilitation of 1 Well at Kwaruhombo village. 1 Kwaruhombo 1 3
00 10,000,0
00
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
Chalinze Dc Rehabilitation of Kidogozero/Kitonga Water Supply Scheme. 1 Kitonga 2 3
46 12,000,0
00
Chalinze DcRehabilitation of Saadani Water Supply Scheme 1 Saadani 17 1,8
00 10,000,0
00
Chalinze DcRehabilitation of Kibindu Water Supply Scheme. 1 Kibindu 0
- 14,500,0
00
Chalinze Dc Rehabilitation of Matuli/Mdaula Water Supply Scheme. 2 Matuli and Mdaula 6 1,5
43 8,000,0
00
Bagamoyo Dc Rehabilitation of Water Supply Project 1 Mangesani 3 500
6,400,000
Bagamoyo Dc Rehabilitation of water hand pumps 2 Nianjema and Yombo 9 2,2
50 18,400,0
00
Kibaha Tc Rehabilitation of Sofu water project and Kidugalo water Project 2 Sofu and Kidugalo 4 1,0
00 7,262,0
33
Kibaha Dc Rehabilitation of Ngeta water supply scheme 7
Ngeta, Kikongo, Lupunga, Mwanabwito, Kisabi, Madimla and Msongola
32 8,000
30,000,000
Mkuranga Rehabilitation of 12 Hand Pump in 8 Villages 8 Tipo 2 500
9,000,000
Mkuranga 1 Kitomondo 3 750
6,000,000
Mkuranga 1 Mbezi 1 250
2,000,000
Mkuranga 1 Msufini 2 500
4,000,000
Mkuranga 1 Sunguvuni 1 250
2,000,000
Mkuranga 1 Mbulani 1 250
2,000,000
Mkuranga 1 Mlamleni 2 500
9,500,000
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
Mkuranga
Rehabilitation of 2 Water Supply Projects at Panzuo Secondary and Shungubweni Village 2 Shungubweni and
Mbulani 15 3,750
18,000,000
Rufiji Dc Rehabilitation of Mbwara water supply 1 Mbwara 2 500
Mafia Dc Rehabilitation of 29 Shallow wells 1 Ndagoni, 2 400
3,972,414
Mafia Dc Rehabilitation of chunguruma water supply scheme 1 Chunguruma, 4 1,3
00 7,944,8
28
Mafia Dc Rehabilitation of Marimbani water supply scheme 1 Marimbani, 2 1,6
00 3,972,4
14
Mafia DcRehabilitation of Kibada water supply scheme 1 Kibada 1 1,7
60 1,986,2
07
Mafia DcRehabilitation of Kungwi water supply scheme 1 Kungwi 3 2
60 5,958,6
21
Mafia DcRehabilitation of Jimbo water supply scheme 1 Jimbo 2 4
50 3,972,4
14
Mafia DcRehabilitation of Kilindoni water supply scheme 1 Kilindoni 3 4
00 5,958,6
21
Mafia DcRehabilitation of Kiegeani water supply scheme 1 Kiegeani 3 1,3
20 5,958,6
21
Mafia DcRehabilitation of Dongo water supply scheme 1 Dongo 3 2,2
52 5,958,6
21
Mafia DcRehabilitation of Gonge water supply scheme 1 Gonge 2 1,3
00 3,972,4
14
Mafia DcRehabilitation of Micheni water supply scheme 1 Micheni 4 9
58 7,944,8
28
Kibiti Dc Rehabilitation of Ruaruke water supply scheme 2 Ruaruke A and Ruaruke B 18 4,3
73 13,803,1
72 Sub Total 54 180 44,8 268,444,99
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
07 5
TABORA Igunga Simbo water supply project 2 Simbo and Idubula 18 4,500
65,000,000
Igunga Mwandihimiji water supply project 2 Mwandihimiji and Mwamagobo 10 2,5
00 7,000,0
00
Igunga Bulangamilwa water supply project 1 Bulangamilwa 18 4,500
8,000,000
Igunga Bulumbela wate supply r project 1 Bulumbela 12 3,000
3,000,000
Igunga Ulaya water project 1 Ulaya 2 2,000
6,000,000
Igunga Choma wate supply project 2 Choma cha nkola and Chamalendi 8 2,0
00 12,000,0
00
Igunga
Rehabilitation of 30 boreholes 13
Uswaya 6, Buhekela 2 , Itumba 2, Lugubu 1, Igumo 2, Mwakabuta 1,Mizanza 1, Chapela 2, Busomeke 1, Simbo 1, Iborogelo 3, Majengo 6, Utuja 2 (Pump cylinders and other related fittings)
30 7,500
24,937,945
Urambo Songambele water Scheme 1 Songambele 56 4,250
5,494,042
Urambo 13 boreholes 13
Ukondomoyo (1),Vumilia (1) ,Yelayela (1),Nsogolo(1),Tebela (1),Ugalla (1),Jionee-Mwenyewe(1),Muungano(1),Uyogo (1),Igunguli (1),Ussoke-Mjini(1),Izimbili(1)
13 3,250
12,600,000
Urambo Usisya Water scheme Village 1 Usisya 18 2,560
5,237,616
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
Urambo water Project at Ukondamoyo Village 1 Ukondamoyo 40 4,1
50 5,500,0
00
Uyui Dc Msimba and mwakashindye water supply project (rehabilitation) 2 Msimba and
Mwakashindye 9 8,000
6,501,300
Uyui Dc Borehole (Rehabilitation) 1 Ishihimulwa 12 3,000
30,000,000
Uyui Dc 1 Inonelwa 3 750
6,710,130
Uyui Dc 1 Kilungu 8 2,271
Uyui Dc 1 Igoko 7 1,750
11,000,000
Uyui Dc 1 Ikonola 5 674
Uyui Dc 1 Ilalwansimba 11 2,750
Uyui Dc 1 Isila 8 2,000
27,600,000
Uyui Dc 1 Kasisi B 3 750
Uyui Dc 1 Mbola 7 1,750
Uyui Dc 1 Kigwa 21 5,250
Uyui Dc 1 Kinamagi 4 1,000
Uyui Dc 1 Nzigala 5 1,250
Uyui Dc 1 Matanda 1 1,250
Uyui Dc 1 Mwakadala 5 2,000
Uyui Dc Nkutu Borehole 1 Nlutu 2 500
5,000,000
Sikonge Dc Ipole Pipe Water Supply Project 4 Ipole, Udongo, Makazi 20 5,0 9,000,0
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
and Ugunda 00 00
Sikonge Dc
Mibono Pipe water supply scheme 8
Kiloleli,Kanyamsenga, Ukondamoyo,Mibono mpya,Imalampaka,Mtakuja,Songambele,Lembel
31 62
15,803,887
Sikonge Dc
30 boreholes. 11
Pangale (2),Tutuo (3),Mole (3),Igigwa (1),Mpombwe (4),Mkolye (3),Chabutwa (3),Kisanga (2), Msuva (2),Mwenge (3), Kasandalala (4)
30 30
20,000,000
Sikonge Dc Majojoro water supply project 1 Majojoro 3 750
2,380,216
Nzega Dc Mihama Water Supply Scheme 3 Nkiniziwa, Ngukumo, and Mwambaha 30 7,5
00 3,000,0
00
Nzega Dc Nata Water Supply Scheme 2 Nata and Mwamalulu 64 7,886
30,000,000
Nzega Dc Bukene Water Supply Scheme 1 Bukene 4 1,000
2,000,000
Nzega Dc Sojo Water Supply Scheme 1 Sojo 8 2,000
8,819,478
Nzega Dc Itobo Water Supply Scheme 1 Itobo 6 1,500
500,000
Nzega Dc Mwaluzwilo Water Supply Scheme 1 Mwaluzwilo 4 1,000
500,000
Nzega Dc Nawa Water Supply Scheme 1 Nawa 4 1,000
500,000
Nzega Dc
Rehabilitation of Boreholes 35
Isanzu , Shigamba, Sojo, Mbutu, Mambali, Ibushi, Ugembe II, Mwakashanhala, Iyombo-Itima, Kilabili, Isanga, Mwasala,
70 17,500
146,194,785
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
Bujulu, Kakulungu, Luhumbo, Usalala, Selemi, Malolo, Kabanga, Sigili, Bulambuka, Kasela, Nindo, Kikonoka, Shilago, Wella, Kigandu, Kilino A, Ifumba, Kabale, Kanolo, Usong'wanhala, Nindo, Ibelafinga, and Magukula
Tabora Municipal
Procurement of piping materials and fittings (3km of pipes ) and rehabilitation works (Procurement of piping materials and fittings (3km of pipes ) and rehabilitation works
1 Kalunde 10 2,500
32,975,266
Kaliua Rehabilitation Boreholes project 18
Silambo(2),Kazaroho(2),Zugimlole(2), UkumbiSiganga(2), Kashishi(2),Sasu(2),,Usenye(2),Usinge(2),Igagala(2),Ushokola(2), Kamsekwa(2),Seleli(2) , Usinga(1), Pozamoyo(1), Ibambo(1), Uyowa(1), mongozo(1) and Usimba(1)
30 7,500
38,869,031
Nzega Tc Rehabilitation of Boreholes 9
Butandula, Ijanija, Kitangili, Mbogwe, Itilo, Miguwa Undomo, Zogolo na Idudumo
32 8,000
81,475,270
Total 152 682 138,3 633,598,96
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
83 7
TANGA Pangani Dc Rehabilitation of Mikinguni-Stahabu 2 mikinguni and stahabu 14 4,221
42,407,498
Pangani DcRehabilitation of RUWASA OFFICE Infrastructure and Telephone (TTCL & Internet) infrastructure
9,268,947
Handeni Dc Rehabilitation of water project at Msomera Village 1 Msomera 8 2,0
00 2,424,2
52
Mkinga Dc Rehabilitation of Moa-Mayomboni Piped Water Scheme 4
Zingibari, Moa, Ndumbani and Mayomboni
14 4,221
500,000
Mkinga Dc Rehabilitation of Daluni Kibaoni Village Piped Water Scheme 3
Daluni Kibaoni, Ng'ombeni and Mtoni Bombo
0 5,500
12,600,000
Mkinga Dc Rehabilitation of Mwanyumba Piped Water Scheme 1 Mwanyumba 6 1,5
00 1,500,0
00
Korogwe Tc Rehabilitation of Kilole Pumping Station 3 Kwamngumi,Manzese and Bagamoyo 0 8,7
40 29,000,0
00
Korogwe Tc
Rehabilitation of 5 Handpumps 5Kitifu,Lwengera,Mahenge,Mgambo and Msambiazi
5 1,250
5,000,000
Korogwe TcRehabilitation of Mtonga Pumping Station 3 Msambiazi,Mtonga
and Kwamkole 0 10,369
32,000,000
Korogwe Dc Rehabilitation of 3 water projects (Magoma,Mnyuzi/Mkwakwani and Mazinde) 7
Makangara,Mkwajuni-Sekioga, Mkwakwani, Gereza,Mheza,Bagamoyo and Mabogo
30 7,500
50,604,898
Korogwe Dc Rehabilitation of Magunga mziya water project and 1 Shallow well. 2 Magunga mziya and
Mgobe 5 1,250
8,000,000
Muheza DC Rehabilitation of piped water supply scheme at Misozwe village 2 Misozwe &
Kwemingoji 10 2,810
30,000,000
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
Muheza DC Rehabilitation of piped water supply scheme at Kigombe /Msakangoto 2 Kigombe &
Msakangoto 22 4,599
40,000,000
Muheza DC Rehabilitation of Kibanda Nkumba water supply scheme 2 KibandaNkumba &
Mamboleo Nkumba 12 1,670
11,112,164
Lushoto Dc Rehabilitation and extension of water supply project at Langoni A VILLAGE 1 Langoni A 10 1,2
50 42,000,0
00
Lushoto Dc Rehabilitation of water supply project at Mgwashi Juu village 1 Mgwashi Juu 40 5,0
00 35,000,0
00
Lushoto Dc
Rehabilitation of 24 non-functional WP to functional at different water supply projects 3
Rangwi, Sunga,Ngulwi, Kwekanga, Lunguza and Migambo
48 6,000
42,782,052
Kilindi Dc Rehabilitation of 5 domestic water points at chamtui water supply scheme 3 Chamtui, Nyamaleni,
Mtakuja 10 3,923
5,000,000
Kilindi DcRehabilitation of 02 Shallow Wells (SWN) 1 Sangeni 4 1,2
00 3,200,00.00
Kilindi DcRehabilitation of 01 Shallow Well (SWN) 1 Kigunga 2 5
00 1,600,0
00
Kilindi Dc Rehabilitation of 01 Shallow Well with Nira Pump 1 Mswaki 2 1,2
50 3,350,0
00
Kilindi Dc Rehabilitation of 01 Shallow Well with Nira Pump 1 Mafulila 2 7
50 3,350,0
00
Tanga Cc Rehabilitation of Shallow wells with Hand pump 6Ndaoya, Chongoleani, Kibafuta, Mleni, Mwarongo, Mapojoni
20 2,500
12,474,130
55 0 264 78,003
419,973,941
NJOMBE Njombe Tc Rehabilitation of water project at Yakobi Village 1 YAKOBI 9 544
36,000,000
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
Njombe TcRehabilitation of water project at Miva Village 1 MIVA 24 7,0
00 60,000,0
00
Njombe TcRehabilitation and Extension at Kifanya Village 1 KIFANYA 15 1,1
02 45,000,0
00
Njombe TcRehabilitation of water project at Matola Village 1 MATOLA 15 7
28 35,000,0
00
Njombe TcRehabilitation of water project at Iboya Village 1 IBOYA 12 8
40 50,180,0
00
Njombe TcRehabilitation and Extension at Utengule Village 1 Utengule 10 2,5
00 50,000,0
00
Ludewa Dc Rehabilitaion of Ludende water supply scheme 2 Ludende and Madindo 14
14 14,000,0
00
Ludewa DcRehabilitaion Kipingu water supply scheme 1 Kipingu 16
16 4,000,0
00
Ludewa DcConstruction of water project at Mbongo Village 1 Mbongo 4
8 60,000,0
00
Ludewa Dc Rehabilitation of water project at Lihagule , Lifua, and Kingole Village 3 Lihagule , Lifua, and
Kingole Village 12 12
43,000,000
Ludewa Dc Rehabilitation of Ludewa (K) Village water project 1 Ludewa K 10
16 17,000,0
00
Ludewa Dc Rehabilitation of water project at Mkongobaki Village 1 Mkongobaki 3
6 12,000,0
00
Ludewa Dc Rehabilitation of water project at Lumbila Village 1 Lumbila 7
7 115,000,0
00
Ludewa DcRehabilitation of water project at Luvuyo Village 1 Luvuyo 26
26 5,000,0
00
Ludewa Dc Rehabilitation of water project at Mangalanyene Village 1 Mangalanyene 6
12 20,000,0
00
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
Makete Dc Rehabilitation of 2 non functioning water Points for Ilolo water supply project 1 Ilolo 2
2 705,50
0
Makete Dc
Rehabilitation of 4 non functioning water Points for Imehe water supply project 1 Imehe 4
4 1,530,0
00
Makete Dc
Rehabilitation of 9 non functioning water Points for Magoma-Bulongwa water supply project 3 Bulongwa, Nkunga
and Unyangogo 9 9
2,962,500
Makete Dc
Rehabilitation of 7 non functioning water Points for Ikuwo water supply project 1 Nkondo 7
7 2,677,5
00
Makete Dc
Rehabilitation of 6 non functioning water Points for Ipelele water supply project 2 Ipelele and Masiwa 6
6 2,337,5
00
Makete Dc
Rehabilitation of 2 non functioning water Points for Ubiluko water supply project 1 Ubiluko 2
2 697,00
0
Makete Dc
Rehabilitation of 2 non functioning water Points for Ndulamo water supply project 1 Ndulamo 2
2 713,92
2
Makete Dc
Rehabilitation of 5 non functioning water Points for Kigala water supply project 1 Kigala 5
5 1,817,3
00
Makete DcRehabilitation of 2 non functioning WPs and renavate intake and gravity main for Ukwama water supply project
1 Ukwama 2 2
53,686,095
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
Makete Dc
Rehabilitation of 1 non functioning water Points for Utweve water supply project 1 Utweve 1
1 382,50
0
Makete Dc
Rehabilitation of 7 non functioning water Points for Ipepo water supply project 1 Ipepo 7
7 2,678,7
06
Makete Dc Rehabilitation of Mlengu-Matenga water supply project 1 Mlengu 12
12 63,005,2
87
Makete Dc Rehabilitation of water supply scheme at Makwaranga 1 Makwalanga 0
- 2,375,7
46
Makete Dc Rehabilitation of water supply scheme at Usalimwani 1 Usalimwani 0
- 34,380,0
78
Makete Dc Rehabilitation of water supply scheme at Lupila 1 Lupila 0
- 15,918,8
43
Makete Dc Rehabilitation of water supply scheme at Usililo 1 Usililo 0
- 2,402,1
00
Makete Dc Rehabilitation of Madihani Water supply project phase-I 1 Madihani 1
1 47,720,2
50
Makambako Tc
Rehabilitation and extension of Utengule water project 1 Utengule 5 3,0
93 5,766,9
63
Makambako Tc 5,766,9
63
Makambako Tc 10,200,0
00
Makambako Tc
Rehabilitation and extension of Mawande water projecte 1 Mawande 5 3,7
39 35,000,0
00
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
Makambako Tc 5,766,9
63
Makambako Tc
Wanging'ombe Dc
Rehabilation of 23 villages' water supply schemes 23
Ujindile, Igosi, Ivigo,Chalowe, Wanging'ombe, Ufwala, Kijombe, Ikwavila, Lyamluki, Ukomola, Uhenga,Itengelo, saja,Matowo, Usuka, Korintho,Mpanga, Mambegu, Lyadebwe, Itulahumba, Ihanja, Mayale, Mng'elenge
165 18,006
93,000,000
Wanging'ombe Dc
Improvement/rehabilitation of pumping water supply schemes at Uhenga, Mapogolo,Ukomola and Saja Villages
4 Uhenga, Mapogolo, Ukomola, Saja 25 6,2
59 300,000,0
00
Sub Total 67 443 43,988
1,257,671,716
1 SIMIYU MEATU Nkoma water supply project 1 Nkoma 10 5,000
66,000,000
Ngh'oboko water Supply project 1 Ngh'oboko 9 4,500
10,000,000
MEATU Rehabilitation of 127 shallowell 21
Itinje,Mwagayi,Mwasungura,Kisesa, Mwandu Kisesa,Mwaukoli,Nguguno,Ntobo,Isangijo,Mwandu,Baluli,Mwabuma,Mwakasumbi,Mwan
127 31,750
112,679,292
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
unda,Mwanunda,Mwashata,Lata,Usiulize,Longalonigha,Malwilo Mnadani,Matale,sakasaka
Maswa DC Rehabilitation of water Non-functional Shallow in the Districts 40
Igunya, jija, Kakola,Mwaliga, Mwatumbe,Shishiyu,Mwabulimbu, Mwanghonoli,Nganzu,zawa,jihu,Ikungu,Muhida,Bukangilija,Nyashimba,Nhelela,Igwata,Mwabagalu,Mwakulilima,Mwanhegele,Lali,Nyabubinza,Mwandu,Mwamihanza,Mwabayanda,Kulimi,ilamata,kadoto,Malekano,Mwanganda,Dulungwa,Malampaka,Bukigi,Gulugwashi,chugambuli,mwabalogi,Ilambamakono,Mwamahindike,Mwashegeshi,Ngulinguli
100 25,000
155,500,000
Maswa DC 1 Ng'haya 12 3,000
2,000,000
1 Bukigi 12 3,000
40,546,770
Itilima Zanzui water supply scheme 1 Zanzui 22 5,500
10,000,000
Itilima Luguru water supply scheme 1 Luguru 12 3,000
5,548,961
Itilima Inalo water supply scheme 1 Inalo 18 4,500
15,000,000
Itilima Nkoma water supply 1 Nkoma 118,544,0
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
- 65
Itilima
Shallow wells Projects 57
Chinamili,nanga, kinamweli,laili,nyishakanadi, nguno,sunzula, madiana,mwalali,mwamalizi, ndolelezi, mwabunyege, sagata,mahende,sawida, kashishi, zanzui, mwanunui,ndoselo, mwamapalala.mwamuhu,ndeme,ndasina,mwamigagani, ngwamita, nkoma bumala, mbugani itilima and kiali
57 14,250
90,383,939
Itilima
Rehabilitation of Handpumps in 63 villages 63
budalabujiga,chinamili,nanga ,senani,Sali ikindilo, mwanogesha,mtenga,nyangombe,sengwa,kinamel, mwamnemba,magilana,mhunze,manasubi,mwamalizi, chilungala, sagata and idoselo
63 15,750
35,092,500
Itilima Lagangabilili water supply 1 lagangabilili 4 1,000
5,250,000
Itilima kabale water supply 1 Bukingwamizi 4 1,000
5,250,000
Busega DC Rehabilitation of Non-functional Shallow wells 47
Mwamagigisi, malangale, ngasamo, sanga, jisesa, imalamate, ng’wang ’wenge,, malili, mwamigongwa,
60 15,000
150,860,000
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
nyangoko, ngunga, gininiga, mwamgoba, mkula, ng’wanhale, kijilishi, chabutwa, lutubiga, mwakiloba, mwasamba, mwangika, chamgasa, bushigwamhala, mayega, nyaluhande, mwamkala, mwagindi, kabita, shimanilwe,nyakaboja, nyamikoma a, nyamikoma b, bukabile, bulima, mwagulanja, , milambi, mwanangi, yitwimila a, yitwimila b, ijitu, ihale, ilumya, badugu, mwaniga, busami, nyamatembe,ihayabuyaga,
Bariadi DC Rehabilitation of shallow wells 50 Segerema, sakwe Nyamisagusa , Nkololol,Ngulyati , ng'alita , Matondo, Mwashegeta , Mwanzuya, Mwangimu, Mwandoana, Matondo, kilalo, kasoli , itumbukilo, ikungulyandili , ikungulabasheshi B, ikungulabasheshi A, Igegu , Igaganulwa,
50 12,500
92,534,726
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
Halawa, Gasuma, Damidami
Bariadi TC Rehabilitation of shallow wells 16
Giriku , Imalilo, Kidalimanda Sima, Yoma ,Somanda , Nyangokolwa , Ngogote ,Mbugani , Shimbale, Bupandagila , Gagabali, Bipyayi, Matale, Izunya, Matale
50 12,500
39,236,314
Sub Total 304 610 157,250
954,426,567
38 KAGERA Karagwe DC Rehabilitation of Nyakagoyagoye W/S project 3 Nyakagoyagoye, Chabalisa, Nyamieli 26 6,5
00 20,000,0
00
Karagwe DC Rehabilitation of Bukangara water supply scheme 1 Bukangara 5 1,2
50 5,000,0
00
Karagwe DC
Rehabilitation of 9 handpumps 4Nyakaiga, Igurwa, Kijumbura and Nyaishozi
9 2,250
28,750,129
Rehabilitation of Shanga-Mugoma water supply project 2 Shanga and Mugoma 6 1,5
00 11,000,0
00
Ngara DC Rehabilitation of Murusagamba water supply project 1 Murusagamba 4 1,0
00 11,000,0
00
Ngara DC
Rehabilitation of 9 shallow Wells by purchasing and reinstalling of 9 complete nira pumps 5
Kanyinya, Nyamawa, Keza, Murusagamba and Kashinga
9 2,250
27,000,000
Ngara DC
Rehabilitation of 23 shallow wells by supply nira pump spare parts 12
kanyinya, Nyamawa, Keza, Murusagamba, Kashinga, Nyamihaga, Chivu, Mugoma, Ibuga, Juruligwa, Bugarama and Bukiriro
23 5,750
14,000,000
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
Ngara DCRehabilitation of 16 shallow wells by supplying and installing India mark III pump spare parts (risers & roads, Cylinder complete, head, rubber, valve and bearings)
8
Rulenge, Mbuba, Murubanga, Ntanga, Kumbuga, Magamba, Mumiramira and Rwinyana
16 4,000
13,000,000
Ngara DCRehabilitation of Bulengo water supply project 1 Bulengo 6 1,5
00 10,000,0
00
Ngara DC
Rehabilitation of 5DPs and Construction of spring intake for Magamba Village 1 Magamba 5 1,2
50 12,000,0
00
Ngara DC Rehabilitation of Nyarusange water supply project 1 Nyarusange 8 2,0
00 6,000,0
00
Ngara DCRehabilitation of Murutabo water supply project 1 Murutabo 12 3,0
00 21,000,0
00
Ngara DC Rehabilitation of Kashinga and Kabanga water supply projects 2 Kashinga and
kabanga 14 3,500
25,000,000
Ngara DCRehabilitation of Runzenze water supply project 1 Runzenze 5 1,2
50 9,359,4
23
Ngara DCRehabilitation of Ntobeye water supply project 1 Ntobeye 9 2,2
50 15,000,0
00
Ngara DCRehabilitation of Nyamahwa water project 1 Nyamahwa 6 1,5
00 11,000,0
00
Muleba DC Rehabilitation of 1.4 km transmission main for Nshamba W/S 3 Nshamba,
Bunyagongo, Rutenge 19 9,500
38,002,991
Muleba DC Rehabilitation of 11 shallow wells and 8 water springs
15 Bushagara, Ibale, Kabutaiga,Mafumbo, Ngenge, Nyakahama, Rugando, Kamishango, Kishuro, Mayondwe, Mlela, Bukoki, Ilemele,
20 5,000
38,000,000
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
Buleza, Rulanda
Muleba DC Rehabilitation of Iroba W/S 1 Iroba 28 3,048
22,000,000
Muleba DC Rehabilitation of Ruteme W/S 1 Ruteme 38 4,950
15,000,000
Muleba DC Fencing of water source and BPT at Katoke W/S 2 Katoke, Kahumulo 0
- 5,000,0
00
Bukoba MC Rehabilitation of 3 tradition water sources at Kabanyoro, Kanyokampisi and Kabalekangaiza 3 Magoti, Migera and
Kabalekangaiza 3 800
4,376,012
Bukoba MC Rehabilitation of Bulibata water project 1 Bulibata 12 1,760
8,196,398
Bukoba MC Rehabilitation of Ihyoro 2 Nyarubanja and Lubumba 2 4
20 2,397,1
44
Bukoba DC Rehabilitation of Kitaya water supply project 1 Kitaya 40 10,000
29,000,000
Bukoba DC Improvement of water Quality at Bituntu water supply project 1 Bituntu 34 5,3
01 10,000,0
00
Bukoba DC
Rehabilitation of Shallow Wells 6Omubweya,Ruhunga,Mashule,Rubale,Ngarama and Katoro
20 2,500
10,000,000
Bukoba DCRehabilitation of Improved water Sources 5 Bushasha,Igombe,Rus
haka,Kishogo,Kasharu 10 2,500
10,000,000
Misenyi DC Rehabilitation of 16 shallow wells. 14
Kalagala, Kigazi, Mushasha, Kabingo, Kassambya, Kakindo, Bukwali, Kikono, Byamtemba, Igayaza, Ngando, Byeju, Gabulanga and Nyabihanga.
31 7,750
74,199,533
Misenyi DC Rehabilitation of Rukurungo piped water scheme 1 Rukurungo 12 1,8
74 13,000,0
00
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
Biharamulo DC Rehabilitation of Mavota W/S 1 Mavota 8 1,2
50 19,242,5
00
Biharamulo DC
Rehabilitation of 20 hand pumps 10
Nyarubungo, Kabukome, Katerela, Kasozibakaya, Ntungamo and Ruganzu,Lusahunga,Musenyi,Kaluguyu,Kanyoni
30 7,500
77,000,000
Biharamulo DC Rehabilitation of Kabindi water supply 3 Kabindi,chebitoke and kikomakoma 8 2,0
00 44,378,7
50
Biharamulo DC Rehabilition and extension of Nemba water supply 5 Nemba 7 1,7
50 5,000,0
00
Biharamulo DCRehabilitation of 10 shallow well and 10 Boreholes 9
Ntungamo,Lusahunga,Nyamahanga,Songambele,Kasato,Kasozibakaya,Nyantakara,Nyamigogo,Nyabusozi
20 5,000
6,000,000
Kyerwa DC Rehabilitation of kihinda and songambele Water supply schemes 3 Kihinda ,Rwenkende
and songambele 26 6,500
9,247,027
Kyerwa DCRehabilitaion of 20 Shallow Wells at Kibale 1, Magoma 1, Nyamiaga 1 ,Nkwenda 2, Songambele 3, Rwabwere 3,Kitwechenkura2, Nyakatuntu 4, Kibingo4
9
Kibale , Magoma , Nyamiaga ,Nkwenda , Songambele , Rwabwere ,Kitwechenkura, Nyakatuntu , Kibingo
20 5,000
9,000,000
Kyerwa DC Rehabilitation of Rwabikagate water supply Scheme 1 Rwabikagate 18 4,5
00 9,500,0
00 Sub Total 142 569 129,6
53 697,649,90
7
MARA TARIME DC & TC Korotambe Water Supply Scheme 1 Korotambe 20 4,3
13 16,189,4
00
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
TARIME DC & TC Nyamwaga Water Supply Scheme 1 Nyamwaga 17 4,7
11 4,500,0
00
TARIME DC & TC Nyarwana 1 Nyarwana 30 5,8
35 6,807,5
34
TARIME DC & TC
Rehabilitation of hand pumps for 14 boreholes 14
Kangarian, Kiterere, Masanga,Mtana, Rosana, Musege,Bungurere, Nyantira, Itiryo, kanisani, Matongo, Kerende, Kyoruba & Nyabisaga
14 5,600
4,500,000
RORYA DC Kirogo water Scheme at Kirogo and Wamaya Villages 2 Kirogo and Wamaya 54 13,5
00 11,671,7
56
BUNDA DC& TC Rehabilitation of hand pumps in 12 villages 12
Kiroleri,Sarawe,Bukama,Nyangere,Tiring'ati.Nyang'arang'a,Ragata,Namalebe,Sikiro,Kurusanga,Kasuguti,Butimba.
20 10,000
33,209,449
BUNDA DC& TC
Rehabilitation of Mgeta-Nyang'aranga piped scheme Project 2 Mgeta and
Nyang'arang'a 4 6,850
10,000,000
BUNDA DC& TC
Kihumbu water supply scheme AT SABASITA (UNDP). 1 Kihumbu 4 10,0
00 2,000,0
00
SERENGETI DC
Rehabilitation of Nyiboko gravity water supply scheme 1 Nyiboko 14 3,5
00 9,000,0
00
SERENGETI DC Sele gravity water supply scheme 1 Sele 4 1,000
7,500,000
SERENGETI DC Busawe gravity water supply scheme 1 Busawe 12 1,5
00 8,500,0
00
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
SERENGETI DC Musati gravity water supply scheme 1 Musati 10 2,500
14,000,000
SERENGETI DC
Rehabilitation of existing 20 handpump of deep boreholes in Busawe water suupply Scheme 4
Nyansurura, Kiisangura, Sedeko, Nyanungu
20 5,000
63,847,068
BUTIHAMA DC Magunga water supply project 1 Magunga 44 4,0
00 11,605,4
10
BUTIHAMA DC Bukabwa water supply project 1 Bukabwa 26 3,250
3,760,217
BUTIHAMA DC Kongoto water supply project 1 Kongoto 16 2,000
3,253,033
MUSOMA DC Musanja water project 2 Musanja and Nyabaengere 20 5,0
00 5,000,0
00
MUSOMA DCRehabilitation of ten (10) Hand pumps(Bukumi1, Wanyere1, Nyambono1, Buira1,Busambara 1,Tageruka 2, Mayani 1, Katalyo 2)
8
Bukumi, Wanyere, Nyambono, Busambara,Tageruka, Mayani, Katalyo,Buira
10 2,500
11,779,136
Sub Total 55 339 91,059
227,123,002
SHINYANGA KAHAMA TC Rehabilitation of Mpera ,Sagehe and
Kidungashi(MPEISA) Water Supply Project 3 Mpera, Kidunyashi na Isagehe 20 5,0
00 28,818,7
19
KAHAMA TCRehabilitation of 38 shallow wells at Sunge-2, Kahanga-3, Wendele-2, Nyambula-4, Katungulu-1, Nyandekwa-3, Lowa-3, Kilengwe-3, Bujika-2, Malenge-1, Gembe-1, Ufala-1, Ishiki-1,Ilungu-1, Kilago-2, Tulole-2,Shininga-1, Nyanhembe-2, Buduba-1,Tumaini-1 and Wame-1
21
Bujika, shininga, Tulole, Ilungu, Kilengwe, Nyambula, Katungulu, Lowa, Malenge, Ishiki, Tumaini, Nyanhembe, wame, Gembe,Ufala, Kilago, sunge, wendele,Kahananga, Buduba
38 9,500
61,173,885
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
KAHAMA TC Rehabilitation of Ubilimbi and Butegwa water Project to 0.348km 1 Ubilimbi and Butegwa 10 2,5
00 6,450,4
00
KISHAPU DC Rehabilitation of 20 water wells in 10 villages 9
Mipa 3, Itilima 3, ,sekebugoro 3 Lubaga 1, ngunga 1, Nhobola 1 Mwakipoya 1,mwigumbi 5, Mwamasololo 2
20 5,000
22,320,000
KISHAPU DC Rehabilitation of 4 Deep water wells in 4 villages 4 Iboja, Buchambi, Nyenze and Sekeididi 4 1,0
00 9,700,0
00
SHINYANGA DC
Rehabilitation of Distribution main/ system, Domestic Point and diesel engine generator 1 Bunonga 8 4,5
49 34,532,5
50
SHINYANGA DC Rehabilitation of diesel engine generator 3
DidiaChembeli and Bukumbi
25 8,555
16,700,000
SHINYANGA DC
Rehabilitation and Extension of Mahembe water supply Project 1 Mahembe 8 2,0
00 36,903,8
85
USHETURehabilitation of 20 shallow wells at Uyogo , ushetu Kinamapula, Butibu, Ulewe, Idahina, Chona and Igwamano Villages
8
Uyogo , ushetu Kinamapula, Butibu, Ulewe, Idahina, Chona and Igwamano
20 5,000
64,860,592
MSALALA DCRehabilitation of 15 Boreholes at Bushing'we, Ntobo, kalagwa, Buyange, Busindi, Nundu, Busangi and Igwamanoni
8
Bushing'we, Ntobo, Kalagwa, Buyange,Busindi,Nundu,Buasangi and Igwamanoni
23 5,750
58,000,000
MSALALA DC
Driiling of 1 Bore holes at Mwazimba village and Rehabilitation of 20 shallow wells at Bugarama, Ilogi, Buyange, Ikinda, Lunguya, Shilela, Mega, Chela, Masabi, Mhandu, Busangi, Nyamigege, Buganzo na Nyakandoni
20
Mwazimba, Bugarama, Ilogi,Byange, Ikinda,Lunguya, Shilela, Mega, Chela,
33 3,837
52,000,000
SN REGION LGA Project NameVillage
WP Popln Budget 2019/20 Total Names
Masabi, Mhandu, Busangi, Nyamigege, Buganzo na Nyakandoni.
MSALALA DC Rehabilitaion of Chela water supply project 1 Chela 22 5,5
00 14,000,0
00
SHINYANGA MC
Rehabilitation of water infrastructure at Bushola village. 1 Bushola 8 1,9
77 10,000,0
00
MSALALA DC
Rehabilitation of 09 Shallow wells at Bugayambele (2),Mwawaza (3), Bugimbagu (1) Ihapa (2), Iwelyangula (1),and installation of 09 new hand pumps.
6Bugayambelele,Mwawaza.Bugembagu,Ihapa , and Iwelyangula.
9 5,740
30,000,000
Sub Total 87 248 65,908
445,460,030
8,698
1,932,891 10,365,454,888