Page 1: MuTRG for Run12 RIKEN/RBRC Itaru Nakagawa 1. Run12 Schedule 14 Cryoweeks -> Mid Jan. ~ End of April 2 200 GeV pp (2+3 weeks) + 500 GeV pp (1+6 weeks)?

MuTRG for Run12

RIKEN/RBRCItaru Nakagawa

1

Page 2: MuTRG for Run12 RIKEN/RBRC Itaru Nakagawa 1. Run12 Schedule 14 Cryoweeks -> Mid Jan. ~ End of April 2 200 GeV pp (2+3 weeks) + 500 GeV pp (1+6 weeks)?

Run12 Schedule• 14 Cryoweeks -> Mid Jan. ~ End of April

2

200 GeV pp (2+3 weeks) + 500 GeV pp (1+6 weeks)?500 GeV pp (2+5 weeks) + 200 GeV Au-Au (2+3 weeks)?Else ?

Page 3: MuTRG for Run12 RIKEN/RBRC Itaru Nakagawa 1. Run12 Schedule 14 Cryoweeks -> Mid Jan. ~ End of April 2 200 GeV pp (2+3 weeks) + 500 GeV pp (1+6 weeks)?

Travel Schedule

Month Dec. Jan. Feb.

Week 1 2 3 4 1 2 3 4 1 2

BNL

Tasks

ItaruKatsuro

YoshimitsuKentaro

Cramp

SG1 Cosmic Run w/ SG1 TriggerCosmic

Timing Possible speed up by 20ns

Itaru?

Yoshimitsu, Sanghwa, Hide, Kentaro

Itaru

SG1+RPC1 Timing

Joe

Collision

3

Page 4: MuTRG for Run12 RIKEN/RBRC Itaru Nakagawa 1. Run12 Schedule 14 Cryoweeks -> Mid Jan. ~ End of April 2 200 GeV pp (2+3 weeks) + 500 GeV pp (1+6 weeks)?

Shift

4

Page 5: MuTRG for Run12 RIKEN/RBRC Itaru Nakagawa 1. Run12 Schedule 14 Cryoweeks -> Mid Jan. ~ End of April 2 200 GeV pp (2+3 weeks) + 500 GeV pp (1+6 weeks)?

Cosmic Data Taking pre-Run12• Purpose– SG1 trigger efficiency study for high momentum m– Real high momentum track sample collections– Cross Talk Effect before/after recapacitation– Position/Momentum Resolution

• SG1 Startup for Cosmic (Jan. 3 ~) Katsuro, Joe– LL1 Width=7, low threshold~20mV, LOGIC=OR– Run Stability Monitor

• RPC Commissioning (Jan.3 ~ mid Jan.)• RPC1 Integration (mid Jan.) Itaru, Joe?– Timing Tune with SG1 Trigger

• Need to Cover 24 hour shift by FWD group– May need to cover 3rd week of Jan. Who can travel? 5

Page 6: MuTRG for Run12 RIKEN/RBRC Itaru Nakagawa 1. Run12 Schedule 14 Cryoweeks -> Mid Jan. ~ End of April 2 200 GeV pp (2+3 weeks) + 500 GeV pp (1+6 weeks)?

6

Invariant Mass Distribution of m+m-

ϒ-states

J/Ψ

Drell Yan

charm

beauty

4 GeV < M < 10 GeVBackground (bottom,Charm) Separation using FVTX

1.2<y<2.4

New Physics with Forward VTX Detector Installed for Run12

Fwd VTX

Page 7: MuTRG for Run12 RIKEN/RBRC Itaru Nakagawa 1. Run12 Schedule 14 Cryoweeks -> Mid Jan. ~ End of April 2 200 GeV pp (2+3 weeks) + 500 GeV pp (1+6 weeks)?

New SG3/SG5 Trigger for Heavy Flavors

SG1 Trigger

MuIDTrigger

W

MuID

SG3/5

SG1

7

Page 8: MuTRG for Run12 RIKEN/RBRC Itaru Nakagawa 1. Run12 Schedule 14 Cryoweeks -> Mid Jan. ~ End of April 2 200 GeV pp (2+3 weeks) + 500 GeV pp (1+6 weeks)?

Consideration

Trigger Map

• Develop SG3/SG5 Trigger Map• John Lajoie• LANL postdoc (Jin)• From our group?

• Operating Condition• Optimized for SG1 at 500GeV• Unique optimization for SG3/5 at

200 GeV• SG3/SG5 Rates• Need prescale?• Turn on Curve Essential semi-

online analysis -> Sanghwa

8

Page 9: MuTRG for Run12 RIKEN/RBRC Itaru Nakagawa 1. Run12 Schedule 14 Cryoweeks -> Mid Jan. ~ End of April 2 200 GeV pp (2+3 weeks) + 500 GeV pp (1+6 weeks)?

Special Run

• Low B-field?• Re-cap Effect (Yoshimitsu, Kentaro)– 1x1 (3?) bunch collision • Analysis Software ready? • Hit Rates vs. Beam Clock

– Zero suppression off data taking• Peak Strip ADC vs. Negative shoot• BBC Rate Dependent Plane Hit Rate/SG1 Rate

9

Page 10: MuTRG for Run12 RIKEN/RBRC Itaru Nakagawa 1. Run12 Schedule 14 Cryoweeks -> Mid Jan. ~ End of April 2 200 GeV pp (2+3 weeks) + 500 GeV pp (1+6 weeks)?

Complete GTM Delay Scan• GTM delay needs to be optimized to get the

best SG1 trigger efficiency

10

Page 11: MuTRG for Run12 RIKEN/RBRC Itaru Nakagawa 1. Run12 Schedule 14 Cryoweeks -> Mid Jan. ~ End of April 2 200 GeV pp (2+3 weeks) + 500 GeV pp (1+6 weeks)?

Timing spectra of MuTrig

GTM delay [ns]

2BCLK width integration

3BCLK width integration

Effici

ency

Effici

ency

GTM delay [ns]

GTM delay [ns]

Efficiency ~ 0.9 /station

Efficiency ~ 0.7 /station

0.6

0.7

0.8

0.88

GTM

del

ay S

can

11

Analysis Software Needs to be Available in Beginning of Jan. (Sanghwa)

Page 12: MuTRG for Run12 RIKEN/RBRC Itaru Nakagawa 1. Run12 Schedule 14 Cryoweeks -> Mid Jan. ~ End of April 2 200 GeV pp (2+3 weeks) + 500 GeV pp (1+6 weeks)?

GTM Delay MapLOGIC

Threshold LL1 Width

[mV] 2 3

OR

2040 25 15

60 35 38

AND2 (St1) 40

60

All AND60

100

Offline Analysis By Yoshinori Fukao

OR AND2

12

Page 13: MuTRG for Run12 RIKEN/RBRC Itaru Nakagawa 1. Run12 Schedule 14 Cryoweeks -> Mid Jan. ~ End of April 2 200 GeV pp (2+3 weeks) + 500 GeV pp (1+6 weeks)?

Things to be addressed during commissioning

• GTM Delay Scan Map• Why only North Station-2 Timing is slower than other

octants?– Low Gain? -> May be resolved by Ar enriched gas mixture?

• ADTX failure mode study by test pulse• Address why North SG1 Rates is factor of 3 higher than

that of South?• Noisy channel check. High trigger rates in particular

section? – Octant by Octant SG1 rate (Do we have software?)

13

Page 14: MuTRG for Run12 RIKEN/RBRC Itaru Nakagawa 1. Run12 Schedule 14 Cryoweeks -> Mid Jan. ~ End of April 2 200 GeV pp (2+3 weeks) + 500 GeV pp (1+6 weeks)?

Errors

OK!

Bad ADTX Boards2011 May 21, Au-Au (Elog entry 878) MRG ID.74 (South Oct.3, St.2 HOct.0) Ch.5 [S, St2, Oct3, Chs4, Brd1]

2011 May 18, Au-Au (Elog entry 877) MRG ID.125 (North Oct.6 St.3 HOct.2) Ch.3 [N, St3, Oct6, Chs2, Brd2] MRG ID.72 (South Oct.1 St.2 HOct.0) Ch.5 [S, St2, Oct1, Chs4, Brd1]

Before Run11 MRG ID.115 (North Oct.4 St.3 HOct.1) Ch.5 [N, St3, Oct4, Chs7, Brd2] MRG ID.123 (North Oct.4 St.3 HOct.2) Ch.1 [N, St3, Oct4, Chs1, Brd1]

Fiber connection between ADTX <-> MRG was inspected. No anomaly was found. Frequent error may be reproduced by test pattern. (To be tested)

<- accessible

14

Page 15: MuTRG for Run12 RIKEN/RBRC Itaru Nakagawa 1. Run12 Schedule 14 Cryoweeks -> Mid Jan. ~ End of April 2 200 GeV pp (2+3 weeks) + 500 GeV pp (1+6 weeks)?

Backup

15

Page 16: MuTRG for Run12 RIKEN/RBRC Itaru Nakagawa 1. Run12 Schedule 14 Cryoweeks -> Mid Jan. ~ End of April 2 200 GeV pp (2+3 weeks) + 500 GeV pp (1+6 weeks)?

Heavy Flavor Background Suppression

16

ϒ-states

J/Ψ

Drell Yan

charm

beauty

Page 17: MuTRG for Run12 RIKEN/RBRC Itaru Nakagawa 1. Run12 Schedule 14 Cryoweeks -> Mid Jan. ~ End of April 2 200 GeV pp (2+3 weeks) + 500 GeV pp (1+6 weeks)?

Trigger Emulator Development

MuTr Detector Response

• MuTr Model• Drift Time • Charge Sharing• …

ADTX Hit

• AND OR Logic• LL1 Width • Clustering@LL1• …

Trigger Efficiency

• Trigger Map

Developed by Yoshi FukaoUnder Development by Hide

Towards absolute prediction of W and background yields

17

Page 18: MuTRG for Run12 RIKEN/RBRC Itaru Nakagawa 1. Run12 Schedule 14 Cryoweeks -> Mid Jan. ~ End of April 2 200 GeV pp (2+3 weeks) + 500 GeV pp (1+6 weeks)?

Slide made by Hide Oide 18