RESUME MUTHUKRISHNAN.B PP NO M 2895156 3-4/56,East street, Valliammal puram, Mobile +97477485800 Vallioor, Tirunelveli(dist) Email ID [email protected] Tamilnadu, India-627117 [email protected] CAREER OBJECTIVE To create a niche for myself in this challenging modern Civil Engineering environment, while working harmoniously with other team members towards the achievements of organizational goal. EDUCATIONAL QUALIFICATIONS : Qualificati on Discipli ne Year of Passing Institution Board/ University % B.E. Civil Engg. 2008 Government College of Engineering Tirunelveli, Tamilnadu, India Anna University 75 Higher Secondary Examination (Class XII). Maths, Biology, Physics, Chemistr y 2004 Government Higher Secondary School, Vallioor State Board, Tamilnadu 92.75 Secondary School Leaving Certificate Examination Maths, Science 2002 Government Higher Secondary School, Vallioor State Board,Tamiln adu 94.6 SOFTWARE PACKAGES

Upload: muthu-krishnan

Post on 21-Feb-2017

82 views

Category:

Documents


1 download

TRANSCRIPT

RESUME

MUTHUKRISHNAN.B PP NO M 28951563-4/56,East street, Valliammal puram, Mobile +97477485800 Vallioor, Tirunelveli(dist) Email ID [email protected], India-627117 [email protected]

CAREER OBJECTIVETo create a niche for myself in this challenging modern Civil Engineering environment, while working harmoniously with other team members towards the achievements of organizational goal.

EDUCATIONAL QUALIFICATIONS:

Qualification Discipline Year of Passing Institution Board/ University %

B.E. Civil Engg. 2008Government College of Engineering Tirunelveli,

Tamilnadu, IndiaAnna University 75

Higher Secondary

Examination(Class XII).

Maths, Biology, Physics,

Chemistry

2004 Government Higher Secondary School, Vallioor

State Board, Tamilnadu

92.75

Secondary School Leaving

Certificate Examination

Maths, Science 2002 Government Higher

Secondary School, VallioorState

Board,Tamilnadu94.6

SOFTWARE PACKAGES

Planning Software : - PRIMAVERA P6

Drawing software : - AUTO CAD 2D Drafting & 3D Modelling

Others : - MS OFFICE ( Word & Excel)

PROFESSIONAL EXPERIENCE:- Working as a Site Execution Engineer in AKTOR-YAPI-STFA-L&T-JEC JV DOHA

METRO:-GOLD LINE UNDERGROUND from 2104 December to till date. Working as a Senior Engineer in CONTINENTAL ENGINEERING CORPORATION INDIA

(PVT) LTD. from November 2013 Worked as a Engineer in AFCONS INFRASTRUCTURE LIMITED from December 2011

to November 2013. Worked as an Engineer in ITD CEMENTATION INDIA LIMTED from June 2008 to

December 2011.

1. PROJECT EXECUTED:-

2. Project Details from November 2013 to till date Name of Project : QATAR INTEGRATED RAILWAY PROJECT,DOHA METRO:- GOLD

LINE UNDERGROUND,Client : QATAR RAILWAYS COMPANYConsultant : QATAR PROJECT MANAGEMENT Project Value : USD 4.4bn

Roles and Responsibilities:

Execution work of Guide wall and D-wall .

Rebar cage fabrication for D-wall.

Soil Investigation works, Identification & diversion of utilities, Identification & removal of inventories along the project alignment.

Timely coordinate with Client and Contractor for timely completion of activity.

Site monitoring and Preparing Progress Report.

3. Project Details from November 2013 to till date Name of Project : Design and Construction of Tunnel between Chandpole and Badi

Chouper and reversal line by Shield TBM, Underground Metro Station at Choti Chouper and Badi Chouper by Cut & Cover Method on East-West Corridor of Jaipur Metro (Phase 1B)at Jaipur, Rajasthan, India.

Client : JMRC (Jaipur Metro Rail Corporation)Consultant : DMRC (Delhi Metro Rail Corporation) Project Value : 508 Cr

Roles and Responsibilities:

Execution of Guide wall and D-wall for shaft.

Rebar cage fabrication for D-wall.

Soil Investigation works, Identification & diversion of utilities, Identification & removal of inventories along the project alignment.

Casting Yard development work, Fabrication of Barricading Board.

Timely coordinate with Client and Contractor for timely completion of activity.

4. Project Details from December 2011 to November 2013Name of project : Design and construction of Underground Station and Associated

Tunnels at Chennai Metro.Client : CMRLConsultant : EMBYEProject Value : 2598 Cr

Roles and Responsibilities:

Diaphragm wall execution and Slab (Roof slab, Concourse slab, Base slab for the station area), Reinforcement/Cage fabrication work.

Installation of Plunged in-column in station area and installation of king post in cross over area.

Installation and monitoring of all instrumentation points ( Piezometers, Inclinometers, Load cell, Strain gauges, Tilt plate, GSM, BSM, Extensometer)

Prepared BBS for Underground station slab, column, D-wall cage

Excavation work by Bottom Up Method in Cross over area

Excavation work by Top Down Method in station area

5. Project Details from October 2010 to December2011Name of project : Second Container terminal at South Port, Mundra, Gujarat.Client : ADANIConsultant : PMC Projects India Pvt. LtdProject Value : 110 Cr

Roles and Responsibilities:

Work as a marine piling engineer.

Erection work of 2 piles Gantry & 3 piles Gantry, From land to sea Gantry shifting arrangements.

Using RT3 boring using Hoists Erection of Precast beams & pile muff.

Completed 540 piles within seven months.

6. Project Details from November 2009 to October 2010Name of Project : Design Construction Analysis & Testing Of An Iron Ore Terminal

At Ennore Port.Client : SicalProject Value : Rs. 110 Cr

Roles and Responsibilities:

Preparation of Bar Bending Schedule, Structural work, Masonry & Finishing work of a Substation Building.

Construction & Execution of a storm water drainage with 3000m long with precast slab.

7. Project Details from June 2008 to till November 2009Name of Project : Second Container Terminal at Chennai PortClient : Chennai International Terminals Pvt. Ltd (Citpl)Consultant : Consulting Engineering Services Pvt. Ltd (Ces) Project Value : Rs. 340 Cr

Roles and Responsibilities:

Preparation of Bar Bending Schedule, Structural work, Masonry & Finishing work of an Administration Building, Workshop Building & Gate Complex Building.

Construction and Execution work of an Under Ground Water Tank with Pump House. Construction, Execution & Erection work of a Sewage Treatment Plant.

PERSONAL, ATTRIBUTES AND ABILITIES:

I am fast learner with ability to adapt to changing priorities. Ability to carry out duties with minimal supervision. Ability to maintain confidentiality. Good interpersonal relation. Excellent health. Coordination with Client, Consultant and Labor.

PERSONAL PROFILEGender : MaleMarital Status : SingleDate of Birth : 15-06-1987 Nationality : Indian

Languages Known To Read, Write and Speak - Tamil, EnglishTo speak - Hindi

DECLARATION

I hereby declare that the above-mentioned information is correct up to my knowledge and I bear the responsibility for the correctness of the above-mentioned particulars

Date : (Muthukrishnan.B)