muthukrishnan resume
TRANSCRIPT
RESUME
MUTHUKRISHNAN.B PP NO M 28951563-4/56,East street, Valliammal puram, Mobile +97477485800 Vallioor, Tirunelveli(dist) Email ID [email protected], India-627117 [email protected]
CAREER OBJECTIVETo create a niche for myself in this challenging modern Civil Engineering environment, while working harmoniously with other team members towards the achievements of organizational goal.
EDUCATIONAL QUALIFICATIONS:
Qualification Discipline Year of Passing Institution Board/ University %
B.E. Civil Engg. 2008Government College of Engineering Tirunelveli,
Tamilnadu, IndiaAnna University 75
Higher Secondary
Examination(Class XII).
Maths, Biology, Physics,
Chemistry
2004 Government Higher Secondary School, Vallioor
State Board, Tamilnadu
92.75
Secondary School Leaving
Certificate Examination
Maths, Science 2002 Government Higher
Secondary School, VallioorState
Board,Tamilnadu94.6
SOFTWARE PACKAGES
Planning Software : - PRIMAVERA P6
Drawing software : - AUTO CAD 2D Drafting & 3D Modelling
Others : - MS OFFICE ( Word & Excel)
PROFESSIONAL EXPERIENCE:- Working as a Site Execution Engineer in AKTOR-YAPI-STFA-L&T-JEC JV DOHA
METRO:-GOLD LINE UNDERGROUND from 2104 December to till date. Working as a Senior Engineer in CONTINENTAL ENGINEERING CORPORATION INDIA
(PVT) LTD. from November 2013 Worked as a Engineer in AFCONS INFRASTRUCTURE LIMITED from December 2011
to November 2013. Worked as an Engineer in ITD CEMENTATION INDIA LIMTED from June 2008 to
December 2011.
1. PROJECT EXECUTED:-
2. Project Details from November 2013 to till date Name of Project : QATAR INTEGRATED RAILWAY PROJECT,DOHA METRO:- GOLD
LINE UNDERGROUND,Client : QATAR RAILWAYS COMPANYConsultant : QATAR PROJECT MANAGEMENT Project Value : USD 4.4bn
Roles and Responsibilities:
Execution work of Guide wall and D-wall .
Rebar cage fabrication for D-wall.
Soil Investigation works, Identification & diversion of utilities, Identification & removal of inventories along the project alignment.
Timely coordinate with Client and Contractor for timely completion of activity.
Site monitoring and Preparing Progress Report.
3. Project Details from November 2013 to till date Name of Project : Design and Construction of Tunnel between Chandpole and Badi
Chouper and reversal line by Shield TBM, Underground Metro Station at Choti Chouper and Badi Chouper by Cut & Cover Method on East-West Corridor of Jaipur Metro (Phase 1B)at Jaipur, Rajasthan, India.
Client : JMRC (Jaipur Metro Rail Corporation)Consultant : DMRC (Delhi Metro Rail Corporation) Project Value : 508 Cr
Roles and Responsibilities:
Execution of Guide wall and D-wall for shaft.
Rebar cage fabrication for D-wall.
Soil Investigation works, Identification & diversion of utilities, Identification & removal of inventories along the project alignment.
Casting Yard development work, Fabrication of Barricading Board.
Timely coordinate with Client and Contractor for timely completion of activity.
4. Project Details from December 2011 to November 2013Name of project : Design and construction of Underground Station and Associated
Tunnels at Chennai Metro.Client : CMRLConsultant : EMBYEProject Value : 2598 Cr
Roles and Responsibilities:
Diaphragm wall execution and Slab (Roof slab, Concourse slab, Base slab for the station area), Reinforcement/Cage fabrication work.
Installation of Plunged in-column in station area and installation of king post in cross over area.
Installation and monitoring of all instrumentation points ( Piezometers, Inclinometers, Load cell, Strain gauges, Tilt plate, GSM, BSM, Extensometer)
Prepared BBS for Underground station slab, column, D-wall cage
Excavation work by Bottom Up Method in Cross over area
Excavation work by Top Down Method in station area
5. Project Details from October 2010 to December2011Name of project : Second Container terminal at South Port, Mundra, Gujarat.Client : ADANIConsultant : PMC Projects India Pvt. LtdProject Value : 110 Cr
Roles and Responsibilities:
Work as a marine piling engineer.
Erection work of 2 piles Gantry & 3 piles Gantry, From land to sea Gantry shifting arrangements.
Using RT3 boring using Hoists Erection of Precast beams & pile muff.
Completed 540 piles within seven months.
6. Project Details from November 2009 to October 2010Name of Project : Design Construction Analysis & Testing Of An Iron Ore Terminal
At Ennore Port.Client : SicalProject Value : Rs. 110 Cr
Roles and Responsibilities:
Preparation of Bar Bending Schedule, Structural work, Masonry & Finishing work of a Substation Building.
Construction & Execution of a storm water drainage with 3000m long with precast slab.
7. Project Details from June 2008 to till November 2009Name of Project : Second Container Terminal at Chennai PortClient : Chennai International Terminals Pvt. Ltd (Citpl)Consultant : Consulting Engineering Services Pvt. Ltd (Ces) Project Value : Rs. 340 Cr
Roles and Responsibilities:
Preparation of Bar Bending Schedule, Structural work, Masonry & Finishing work of an Administration Building, Workshop Building & Gate Complex Building.
Construction and Execution work of an Under Ground Water Tank with Pump House. Construction, Execution & Erection work of a Sewage Treatment Plant.
PERSONAL, ATTRIBUTES AND ABILITIES:
I am fast learner with ability to adapt to changing priorities. Ability to carry out duties with minimal supervision. Ability to maintain confidentiality. Good interpersonal relation. Excellent health. Coordination with Client, Consultant and Labor.
PERSONAL PROFILEGender : MaleMarital Status : SingleDate of Birth : 15-06-1987 Nationality : Indian