ADDENDUM #2
MUSICK PARK IMPROVEMENTS – RESTROOM & FITNESS AREA PDS #J1401 A2-1
ISSUE DATE: September 18, 2014 TOTAL PAGES: 1 (plus attachment) CITY OF HAZELWOOD, MO 1186 TESON ROAD HAZELWOOD, MO 63042 PLANNING DESIGN STUDIO In association with WEBB ENGINEERING SERVICES, INC. 727 NORTH FIRST STREET, SUITE 360 SAINT LOUIS, MO 63102 TO: PROSPECTIVE BIDDERS SUBJECT: MUSICK PARK IMPROVEMENTS RESTROOM & FITNESS AREA
8617 LATTY, AVENUE HAZELWOOD, MO 63385 PDS Project No. J1401
This addendum forms a part of the contract documents and modifies the original bidding documents dated September 8, 2014. Contractor shall acknowledge receipt of this addendum in the space provided on the Bid Form. Failure to do so may subject bidder to disqualification. A. GENERAL
1. Response to Additional Contractor Question(s): Not applicable – There were no additional questions submitted within the time period specified.
B. SPECIFICATION REVISIONS
1. Not applicable this addendum.
C. DRAWING REVISIONS
1. Not applicable this addendum D. ADDITIONAL ATTACHMENTS
To assist bidders in the preparation of their bids, the Manufacturer’s Cut Sheets and Installation Instructions are attached for reference.
E. ATTACHMENTS
Manufacturer’s Submittal for Fitness System Components (53 pages)
END OF ADDENDUM #2
© 2013 by Landscape Structures. All rights reserved.
601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185
Document #18903300
161437 Intro SignHealthBeat®
18903300
DETAILDIRECT BURY(FITNESS POST)
Concrete
CrushedRock
FitnessFooter
(4) 3/8" x 1 1/8"BHCS w/Pin& 3/8" FlatWashers
(4) 3/8" StandardHex Nuts & 3/8" FlatWashers
18"460
20
" M
in.
51
0
34
"8
60
Intro PostAssembly
DETAILSURFACE MOUNT
Intro PostAssembly
ConcreteCrushedRock
Sign
Intro PostAssembly
53
3/ 4
"1
36
5
5" /130Minimum
(4) 3/8" x 2" DoubleExpansion Anchors(ThreadedEnd Down)
(4) 3/8" x 2 1/4"BHCS w/Pin w/ 3/8"Flat Washers
Specifications are subject to change without notice.
HealthBeat® 161437 Intro Sign
J:\INSTSPEC\SPECS\189\18903300.P65
Parts List
Part # Description Qty.160895-00 Fitness Footer, (DB), Specify Color ........................ 1161545-00 Intro Post Assembly, Specify Color ......................... 1
155083-00 Post Extension (DB) Hardware Package ............. 1100198-00 3/8" x 1 1/8" BHCS w/Pin, SST .................................. 4100327-00 3/8" Standard Hex Nut, SST ...................................... 4100362-00 3/8" Flat Washers, SST ............................................... 8
188103-00 4-Hole (SM) Hardware Package ........................... 1100199-00 3/8" x 2 1/4" BHCS w/Pin, SST .................................. 4187933-00 3/8" x 2" Double Expansion Anchor ......................... 4100362-00 3/8" Flat Washer, SST ................................................. 4
SM = Surface MountDB = Direct Bury
Specifications
Post Assembly: Weldment comprised of 1/4" HRPO steel plate and 10"O.D. x 12 GA. (.105" wall) steel tube zinc plated. Fin-ish: ProShield®, color specified. (Post Cap) Fabricatedfrom A356 sand casted aluminum. Finish: ProShield®,silver. (Sign) Digital image is transfered to a .032"thick ProShield coated aluminum plate, then infusedinto the ProShield.
Fitness Footer: Weldment comprised of 5.000" O.D. x 11 GA. galva-nized steel tube and 1/4" HRPO steel plate. Finish:ProShield, color specified.
Fasteners: Primary fasteners shall be socketed and pinnedtamperproof in design, stainless steel (SST) per ASTMF 879 unless otherwise indicated (see specific prod-uct installation/specifications).
Installation Time: (DB) 1 HourWeight: (DB) 86 lbs.
(SM) 56 lbs.Concrete: (DB) Approx. 3 cu.ft.
Installation Instructions
1) (Direct Bury) Dig footing as shown. Refer to the Direct Bury De-tail.
2) (Direct Bury) Attach intro post assembly to fitness footer, using 3/8" x1 1/8" BHCS w/pin with 3/8" flat washers & 3/8" standard hex nuts with3/8" flat washers. Refer to the Direct Bury Detail. Place the intro postassembly in footing hole, and prop in plumb position. With intropost assembly in plumb position, pour concrete footing.
(Surface Mount) With intro post assembly in final position, use acenter punch to mark expansion anchor locations on concrete slabthrough holes in intro post assembly plate.
Move intro post assembly aside and drill 3/4" x 2 1/4" deep holes intoconcrete, using a hammer drill and 3/4" masonry bit. NOTE: Drillholes perpendicular to the work surface. To assure full holding power,do not ream holes or allow the drill to wobble. Verify hole depthafter drilling. Clean holes using compressed air.
Tap double expansion anchors (with threaded end down) into drilledholes. Reposition intro post assembly. Fasten intro post assembly toexpansion anchors, using 3/8" x 2 1/4" BHCS w/pin and 3/8" flat wash-ers.
Eco #54718 Document 18903300 replaces 17645300. Replaced expansion anchors with double expansionanchors.
© 2013 by Landscape Structures. All rights reserved.
601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185
Document #18904200
161314 Ab Crunch/Leg LiftHealthBeat®
16132400
Sign
(4) 3/8" x 1 1/8"BHCS w/Pin &3/8" SAE FlatWashers
Ab CrunchPost Assembly (2) Attachment
Covers
Ab-CrunchPost Assembly
Sit-Up Footrest
DETAIL
(6) 3/8" x 7/8"BHCS w/Pin &3/8" FlatWashers
Bench
Bench Frame
Bench Frame &Sit-Up Footrest
Sheet 1 of 2
(2) AttachmentCovers
NOTE: Make sure Sit-UpFootrest is level beforetightening fasteners.
HealthBeat® 161314 Ab Crunch/Leg Lift
J:\INSTSPEC\SPECS\189\18904200.P65
Parts List
Part # Description Qty.160616-00 Bench Frame, (SM), Specify Color ......................... 1160716-00 Bench, Black .............................................................. 1161013-00 Bench Frame, (DB), Specify Color .......................... 1161336-00 Sit-Up Footrest, Specify Color ................................. 1161640-00 Attachment Cover, Silver .......................................... 2160895-00 Fitness Footer, (DB), Specify Color ........................ 1161647-00 Ab-Crunch Post Assembly, Specify Color .............. 1
161668-00 Ab-Crunch/Leg Lift Hardware Package ............ 1100196-00 3/8" x 7/8" BHCS w/Pin, SST ...................................... 6100198-00 3/8" x 1 1/8" BHCS w/Pin, SST .................................. 4100362-00 3/8" Flat Washers, SST ............................................... 6100365-00 3/8" SAE Flat Washer, SST ........................................ 4
155083-00 Post Extension (DB) Hardware Package ............. 1100198-00 3/8" x 1 1/8" BHCS w/Pin, SST .................................. 4100327-00 3/8" Standard Hex Nut, SST ...................................... 4100362-00 3/8" Flat Washers, SST ............................................... 8
188103-00 4-Hole (SM) Hardware Package ........................... 2100199-00 3/8" x 2 1/4" BHCS w/Pin, SST .................................. 8187933-00 3/8" x 2" Double Expansion Anchor ......................... 8100362-00 3/8" Flat Washer, SST ................................................. 8
SM = Surface MountDB = Direct Bury
Specifications
Bench Frame: Weldment comprised of 1.900" O.D. RS20 (.090"-.100" wall) galvanized steel tube, and 3/16" HRPO sheetsteel. Finish: ProShield®, color specified.
Sit-Up/Footrest: Weldment comprised of 1.660" O.D. RS20 (.085"-.095" wall) galvanized steel tube, 1.029" O.D. RS20(.070"-.080" wall), and 3/16" HRPO sheet steel. Fin-ish: ProShield, color specified.
Bench: Rotationally molded from U.V. stabilized linear lowdensity polyethylene, black in color.
Fitness Footer: Weldment comprised of 5.000" O.D. x 11 GA. galva-nized steel tube and 1/4" HRPO steel plate. Finish:ProShield, color specified.
Attachment Cover: Fabricated from A356 sand casted aluminum. Finish:ProShield, silver.
Post Assembly: Weldment comprised of 1/4" HRPO steel plate, 1/4"stainless steel plate, and 10" O.D. x 12 GA. (.105"wall) steel tube zinc plated. Finish: ProShield, colorspecified. (Post Cap) Fabricated from A356 sandcasted aluminum. Finish: ProShield, silver. (Sign)Digital image is transfered to a .032" thick ProShieldcoated aluminum plate, then infused into the ProShield.
Fasteners: Primary fasteners shall be socketed and pinnedtamperproof in design, stainless steel (SST) per ASTMF 879 unless otherwise indicated (see specific prod-uct installation/specifications).
Installation Time: (DB) 2 man hoursArea
Recommended: 120" x 48" (3,05 m x 1,22 m)Weight: (DB) 133 lbs.
(SM) 104 lbs.Concrete: (DB) Approx. 4.75 cu.ft.
Installation Instructions
1) (Direct Bury) Dig footings spaced as shown. Refer to the Plan View/Footing Layout. Place fitness footer in footing hole. With fitnessfooter in plumb position, pour concrete footing. Allow concrete foot-ing to cure a minimum of 72 hours before attaching post assembly tofitness footer.
2) (Direct Bury) Attach ab/crunch post assembly to fitness footer, using3/8" x 1 1/8" BHCS w/pin with 3/8" flat washers and 3/8" standard hexnuts with 3/8" flat washers. Refer to the Direct Bury Detail.
3) Attach attachment cover and bench frame to Ab-Crunch Post Assem-bly, using 3/8" x 1 1/8" BHCS w/pin & 3/8" SAE flat washers. Refer toDetail.
4) Attach attachment cover and sit-up footrest to Ab-Crunch Post As-sembly, using 3/8" x 1 1/8" BHCS w/pin & 3/8" SAE flat washers. Referto Detail. NOTE: Make sure Sit-Up Footrest is level before tighten-ing fasteners.
5) Attach bench to bench frame, using 3/8" x 7/8" BHCS w/pin & 3/8" flatwashers, as shown.
6) (Direct Bury) With bench frame in plumb position, pour concretefooting. Allow concrete footing to cure a minimum of 72 hours be-fore users are allowed to play on the fitness equipment.
(Surface Mount) With fitness post and bench frame in final posi-tion, use a center punch to mark expansion anchor locations on con-crete slab through holes in fitness post and bench frame plates.
Move fitness post and bench frame aside and drill 3/4" x 2 1/4" deepholes into concrete, using a hammer drill and 3/4" masonry bit. NOTE:Drill holes perpendicular to the work surface. To assure full holdingpower, do not ream holes or allow the drill to wobble. Verify holedepth after drilling. Clean holes using compressed air.
Tap double expansion anchors (with threaded end down) into drilledholes. Reposition fitness post and bench frame. Fasten fitness postand bench frame to expansion anchors, using 3/8" x 2 1/4" BHCS w/pinand 3/8" flat washers.
Specifications are subject to change without notice. Eco #54718 Document 18904200 replaces 17644900. Replaced expansion anchors with double expansionanchors.
© 2013 by Landscape Structures. All rights reserved.
601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185
(8) 3/8" x 2" DoubleExpansion Anchors(ThreadedEnd Down)
(8) 3/8" x 2 1/4"BHCS w/Pin w/ 3/8"Flat Washers
189031a
Document #18904200
Sheet 2 of 2161314 Ab Crunch/Leg LiftHealthBeat®
DETAILDIRECT BURY
AB-CRUNCH POST ASSEMBLY) DETAILDIRECT BURY(BENCH FRAME)
Concrete
CrushedRock
Fitness Footer
(4) 3/8" x 1 1/8"BHCS w/Pin& 3/8" FlatWashers
(4) 3/8" StandardHex Nuts & 3/8" FlatWashers
Finished Grade
18"460
20
" M
in.
51
0
34
"8
60
14"360
20
" M
in.
51
0
34
"8
60
Finished Grade
Concrete
CrushedRock
BenchFrame
Ab-CrunchPost Assembly
DETAILSURFACE MOUNT
Bench Frame & Ab-CrunchPost Assembly
Concrete CrushedRock
5" /130Minimum
© 2013 by Landscape Structures. All rights reserved.
601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185161314 Ab Crunch/Leg LiftHealthBeat®
161326b
53
3/ 4
"1
36
5
20
3/ 8
"5
17
37
1/ 4
"9
50
66"1680
PLAN VIEW
72"1830
16
5/ 8
"4
22
16
"4
10
© 2013 by Landscape Structures. All rights reserved.
601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185
Document #18903400
161316 Assisted Row/Push-UpHealthBeat®
16132600
Sign
(6) 3/8" x 1 1/8"BHCS w/Pin &3/8" SAE FlatWashers
Assisted RowPost Assembly
DETAILRAIL ATTACHMENT
(3) AttachmentCovers
(3) Rails
PLAN VIEW
High Rail
Mid Rail
Low Rail
(3) AttachmentCovers
75 1/2"1917
59 7/8"1520
47 7
/ 8"
12
16
52 3
/ 4"
13
40
20 3
/ 4"
52
7 38 3
/ 4"
98
4
Sheet 1 of 2
PLAN VIEW/FOOTING LAYOUT
Assisted RowPost Assembly
53
3 /4"
13
65
Specifications are subject to change without notice.
HealthBeat® 161316 Assisted Row/Push-Up
J:\INSTSPEC\SPECS\189\18903400.P65
Parts List
Part # Description Qty.160717-00 High Rail, (SM), Specify Color ............................... 1160718-00 Mid Rail, (SM), Specify Color ................................. 1160719-00 Low Rail, (SM), Specify Color ................................ 1160731-00 Assisted Row Post Assembly, Specify Color .......... 1160895-00 Fitness Footer (DB), Specify Color ......................... 1160941-00 High Rail, (DB), Specify Color ................................ 1160942-00 Mid Rail, (DB), Specify Color ................................. 1160943-00 Low Rail, (DB), Specify Color ................................. 1161640-00 Attachment Cover, Silver .......................................... 3
155083-00 Post Extension (DB) Hardware Package ............. 1100198-00 3/8" x 1 1/8" BHCS w/Pin, SST .................................. 4100327-00 3/8" Standard Hex Nut, SST ...................................... 4100362-00 3/8" Flat Washers, SST ............................................... 8
188103-00 4-Hole (SM) Hardware Package ........................... 4100199-00 3/8" x 2 1/4" BHCS w/Pin, SST ................................. 16187933-00 3/8" x 2" Double Expansion Anchor ........................ 16100362-00 3/8" Flat Washer, SST ................................................ 16
161672-00 Assisted Row Hardware Package ......................... 1100198-00 3/8" x 1 1/8" BHCS w/Pin, SST .................................. 6100365-00 3/8" SAE Flat Washers, SST ...................................... 6
SM = Surface MountDB = Direct Bury
Specifications
Rail: Weldment comprised of 1.660" O.D. RS20 (.085"-.095" wall) galvanized steel tube, 3/16" HRPO sheetsteel and 1/4" HRPO sheet steel. Finish: ProShield®,color specified.
Post Assembly: Weldment comprised of 1/4" HRPO steel plate, 1/4"stainless steel plate, and 10" O.D. x 12 GA. (.105"wall) steel tube zinc plated. Finish: ProShield, colorspecified. (Post Cap) Fabricated from A356 sandcasted aluminum. Finish: ProShield, silver. (Sign)Digital image is transfered to a .032" thick ProShieldcoated aluminum plate, then infused into the ProShield.
Attachment Cover: Fabricated from A356 sand casted aluminum. Finish:ProShield, silver.
Fitness Footer.: Weldment comprised of 5.000" O.D. x 11 GA. galva-nized steel tube and 1/4" HRPO steel plate. Finish:ProShield, color specified.
Fasteners: Primary fasteners shall be socketed and pinnedtamperproof in design, stainless steel (SST) per ASTMF 879 unless otherwise indicated (see specific prod-uct installation/specifications).
Installation Time: (DB) 2 man hoursArea
Recommended: 168" x 96" (4,27 m x 2,44 m)Weight: (DB) 146 lbs.
(SM) 122 lbs.Concrete: (DB) Approx. 8.25 cu.ft.
Installation Instructions
1) (Direct Bury) Dig footings spaced as shown. Refer to the Plan View/Footing Layout. Place fitness footer in footing hole. With fitnessfooter in plumb position, pour concrete footing. Allow concrete foot-ing to cure a minimum of 72 hours before attaching post assembly tofitness footer.
2) (Direct Bury) Attach Assisted Row Post Assembly to fitness footer,using 3/8" x 1 1/8" BHCS w/pin with 3/8" flat washers and 3/8" standardhex nuts with 3/8" flat washers. Refer to the Direct Bury Detail.
3) Attach attachment covers and rails to assisted row post assembly, us-ing 3/8" x 1 1/8" BHCS w/pin & 3/8" SAE flat washers. Refer to the RailAttachment Detail.
4) (Direct Bury) With rails in plumb position, pour concrete footings.Allow concrete footings to cure a minimum of 72 hours before usersare allowed to play on the fitness equipment.
(Surface Mount) With assisted row post assembly and rails in finalposition, use a center punch to mark expansion anchor locations onconcrete slab through holes in assisted row post assembly and railplates.
Move assisted row post assembly and rails aside and drill 3/4" x 2 1/4"deep holes into concrete, using a hammer drill and 3/4" masonry bit.NOTE: Drill holes perpendicular to the work surface. To assure fullholding power, do not ream holes or allow the drill to wobble. Verifyhole depth after drilling. Clean holes using compressed air.
Tap double expansion anchors (with threaded end down) into drilledholes. Reposition assisted row post assembly and rails. Fasten assistedrow post assembly and rails to expansion anchors, using 3/8" x 2 1/4"BHCS w/pin and 3/8" flat washers.
Eco #54718 Document 18903400 replaces 17645100. Replaced expansion anchors with double expansionanchors.
© 2013 by Landscape Structures. All rights reserved.
601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185
Document #18903400
161316 Assisted Row/Push-UpHealthBeat® Sheet 2 of 2
189031a
DETAILDIRECT BURY
(POST ASSEMBLY)
DETAILDIRECT BURY
(RAILS)
Concrete
CrushedRock
Fitness Footer
(4) 3/8" x 1 1/8"BHCS w/Pin& 3/8" FlatWashers
(4) 3/8" StandardHex Nuts & 3/8" FlatWashers
Finished Grade
18"460
20
" M
in.
51
0
34
"8
60
14"360
20
" M
in.
51
0
34
"8
60
Finished Grade
Concrete
CrushedRock
(3) Rails
Assisted RowPost Assembly
Assisted RowPost Assembly& (3) Rails
DETAILSURFACE MOUNT
ConcreteCrushedRock
5" /130Minimum
(16) 3/8" x 2" DoubleExpansion Anchors(ThreadedEnd Down)
(16) 3/8" x 2 1/4"BHCS w/Pin w/ 3/8"Flat Washers
© 2013 by Landscape Structures. All rights reserved.
601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185
Document #18903500
Sheet 1 of 2161315 Balance StepsHealthBeat®
16132500
(2) 3/8" x 1 1/8"BHCS w/Pin &3/8" SAE FlatWashers
Balance/Steps PostAssembly Attachment
Cover
DETAILHANDRAIL ATTACHMENT
Handrail
Handrail
(5) Steps
Balance/Steps PostAssembly
Sign
(20) 3/8" x 7/8" BHCS w/Pin &3/8" Flat Washers
(5) Bases
© 2013 by Landscape Structures. All rights reserved.
601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185
161315 Balance StepsHealthBeat®
161325a
PLAN VIEW/FOOTING LAYOUT
75 1/4"1910
TypicalConcreteFooting
17
7 /8"
45
0
21 3/4"552
39 3/4"1009
57 3/4"1466
75 3/4"1923
93 3/4"2381
8 1/4"209
12 1/4"311
16 1/4"412
8 1/4"209
12 1/4"311
53
3 /4"
13
65
50
"1
27
0
24
3 /4"
62
8
104 3/4"2660
© 2013 by Landscape Structures. All rights reserved.
601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185
Document #18903500
Sheet 2 of 2161315 Balance StepsHealthBeat®
176456a
DETAILDIRECT BURY(FITNESS POST) DETAIL
DIRECT BURY(HANDRAIL & BASES)
Concrete
CrushedRock
Fitness Footer
(4) 3/8" x 1 1/8"BHCS w/Pin& 3/8" FlatWashers
(4) 3/8" StandardHex Nuts & 3/8" FlatWashers
Finished Grade
18"460
20
" M
in.
51
0
34
"8
60
14"360
20
" M
in.
51
0
34
"8
60
Finished Grade
Concrete
CrushedRock
Handrail &(5) Bases
Balance/StepsPost Assembly
DETAILSURFACE MOUNT
Balance/Steps Post Assembly/Handrail & (5) Bases
CrushedRock
5" /130Minimum
189031a
Concrete
(28) 3/8" x 2" DoubleExpansion Anchors(ThreadedEnd Down)
(28) 3/8" x 2 1/4"BHCS w/Pin w/ 3/8"Flat Washers
Specifications are subject to change without notice.
HealthBeat® 161315 Balance Steps
J:\INSTSPEC\SPECS\189\18903500.P65
Parts List
Part # Description Qty.160368-00 Handrail, (SM), Specify Color ................................. 1160671-00 6" Base, (SM), Specify Color ................................... 2160670-00 10" Base, (SM), Specify Color ................................. 2160370-00 14" Base, (SM), Specify Color ................................. 1160937-00 6" Base, (DB), Specify Color ................................... 2160938-00 10" Base, (DB), Specify Color ................................. 2160939-00 14" Base, (DB), Specify Color ................................. 1160586-00 Step, Black .................................................................. 5160895-00 Fitness Footer (DB), Specify Color ......................... 1160940-00 Handrail, (DB), Specify Color ................................. 1161640-00 Attachment Cover, Silver .......................................... 1161646-00 Balance/Steps Post Assembly, Specify Color ......... 1
155083-00 Post Extension (DB) Hardware Package ............. 1100198-00 3/8" x 1 1/8" BHCS w/Pin, SST .................................. 4100327-00 3/8" Standard Hex Nut, SST ...................................... 4100362-00 3/8" Flat Washers, SST ............................................... 8
188103-00 4-Hole (SM) Hardware Package ........................... 7100199-00 3/8" x 2 1/4" BHCS w/Pin, SST ................................. 28187933-00 3/8" x 2" Double Expansion Anchor ........................ 28100362-00 3/8" Flat Washer, SST ................................................ 28
161669-00 Balance/Steps Hardware Package ........................ 1100196-00 3/8" x 7/8" BHCS w/Pin, SST .................................... 20100198-00 3/8" x 1 1/8" BHCS w/Pin, SST .................................. 2100362-00 3/8" Flat Washers, SST .............................................. 20100365-00 3/8" SAE Flat Washers, SST ...................................... 2
SM = Surface MountDB = Direct Bury
Specifications
Handrail: Weldment comprised of 1.660" O.D. RS20 (.085"-.095wall) galvanized steel tube, and 3/16" HRPO sheet steel.Finish: ProShield®, color specified.
Step: Rotationally molded from U.V. stabilized linear lowdensity polyethylene, black in color.
Base: Weldment comprised of 1.900" O.D. RS20 (.090"-.100" wall) galvanized steel tube, and 1/4" HRPO sheetsteel. Finish: ProShield, color specified.
Post Assembly: Weldment comprised of 1/4" HRPO steel plate, 1/4"stainless steel plate, and 10" O.D. x 12 GA. (.105"wall) steel tube zinc plated. Finish: ProShield, colorspecified. (Post Cap) Fabricated from A356 sandcasted aluminum. Finish: ProShield, silver. (Sign)Digital image is transfered to a .032" thick ProShieldcoated aluminum plate, then infused into the ProShield.
Attachment Cover: Fabricated from A356 sand casted aluminum. Finish:ProShield, silver.
Fitness Footer: Weldment comprised of 5.000" O.D. x 11 GA. galva-nized steel tube and 1/4" HRPO steel plate. Finish:ProShield, color specified.
Fasteners: Primary fasteners shall be socketed and pinnedtamperproof in design, stainless steel (SST) per ASTMF 879 unless otherwise indicated (see specific prod-uct installation/specifications).
Installation Time: (DB) 3 man hoursArea
Recommended: 144" x 72" (3,66 m x 1,83 m)Weight: (DB) 172 lbs.
(SM) 146 lbs.Concrete: (DB) Approx. 13.5 cu.ft.
Installation Instructions
1) (Direct Bury) Dig footings spaced as shown. Refer to the Plan View/Footing Layout. Place fitness footer in footing hole. With fitnessfooter in plumb position, pour concrete footing. Allow concrete foot-ing to cure a minimum of 72 hours before attaching post assembly tofitness footer.
2) (Direct Bury) Attach balance/steps post assembly to fitness footer,using 3/8" x 1 1/8" BHCS w/pin with 3/8" flat washers and 3/8" standardhex nuts with 3/8" flat washers. Refer to the Direct Bury Detail.
3) Attach attachment covers and handrail to balance/steps post assem-bly, using 3/8" x 1 1/8" BHCS w/pin & 3/8" SAE flat washers. Refer tothe Handrail Attachment Detail.
4) Attach steps to bases, using 3/8" x 7/8" BHCS w/pin & 3/8" flat washers.
5) (Direct Bury) Place bases and handrail in footing holes. With basesand handrail in plumb position, pour concrete footings. Allow con-crete footings to cure a minimum of 72 hours before users are al-lowed to play on the fitness equipment.
(Surface Mount) With balance/steps post assembly, bases and hand-rail in final position, use a center punch to mark expansion anchorlocations on concrete slab through holes in balance/steps post as-sembly, bases and handrail plates.
Move balance/steps post assembly, bases and handrail aside and drill3/4" x 2 1/4" deep holes into concrete, using a hammer drill and 3/4"masonry bit. NOTE: Drill holes perpendicular to the work surface.To assure full holding power, do not ream holes or allow the drill towobble. Verify hole depth after drilling. Clean holes using compressedair.
Tap double expansion anchors (with threaded end down) into drilledholes. Reposition balance/steps post assembly, bases and handrail.Fasten balance/steps post assembly, bases and handrail to expansionanchors, using 3/8" x 2 1/4" BHCS w/pin and 3/8" flat washers.
Eco #54718 Document 18903500 replaces 17645000. Replaced expansion anchors with double expansionanchors.
Document #18903800
161312 Cardio StepperHealthBeat®
16681900
Sheet 1 of 3
(2) Foot Pads
Stepper PostAssembly
(5) AttachmentCovers
StepperFrameAssembly
Shroud Cover
(2) ThreadedPivot Shafts
(2) StepperArms
(8) 3/8" x 7/8"BHCS w/Pin& 3/8" SAEFlat Washers
(6) 5/16" x 7/8"BHCS w/Pin &3/8" SAE FlatWashers
Sign DETAILHANDBAR/FRAME
ATTACHMENT
StepperPostAssembly
(5) AttachmentCovers
Handbar &Frame
(10) 3/8" x 1 1/8"BHCS w/Pin &3/8" SAE FlatWashers
© 2013 by Landscape Structures. All rights reserved.
601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185
Handbar
53
3/ 4
"1
36
5
(6) Bumpers
167483d
161312 Cardio StepperHealthBeat®
© 2013 by Landscape Structures. All rights reserved.
601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185
DETAILSTEPPER ARM ASSEMBLY
Stepper Shaft1" Dia.
Shaft Plate,1" Shaft
3/8" x 3/4"FHCS w/Pin
(2) StepperArms
1 1/2" O.D. x 5 5/16" Lg.Lower Inner PlasticSpacer
NOTE: Align flat on shaftwith flat on shaft plate.
161312 Cardio StepperHealthBeat®
166819b
(2) StepperArms
DETAILPIVOT SHAFT ATTACHMENT
StepperPivotAssembly
(2) SphericalRod Ends
StepperStop
StepperFrameAssembly
(2) 3/8" x 7/8"BHCS w/Pin &3/8" SAE FlatWashers
Cylinder w/RodEnd
(2) ThreadedPivot Shafts
(2) 5/16" x 7/8"BHCS w/Pin &D Washers
© 2013 by Landscape Structures. All rights reserved.
601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185
Label
Document #18903800
Sheet 2 of 3
StepperPivotAssembly
(4) 1/2" x 20 Jam NUts
DETAILBUMPER ATTACHMENT
(6) Bumpers
StepperFrameAssembly
(4) 3/8" StandardHex Nuts w/ 3/8"SAE FlatWashers
(4) 3/8" x 2"BHCS w/Pin(4) 3/8" SAE FlatWashers
161312 Cardio StepperHealthBeat®
© 2013 by Landscape Structures. All rights reserved.
601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185
189038a
DETAILSURFACE MOUNT
StepperPost Assembly
Concrete CrushedRock
DETAILDIRECT BURY
Concrete
CrushedRock
Fitness Footer
(4) 3/8" x 1 1/8"BHCS w/Pin3/8" FlatWashers
(4) 3/8" StandardHex Nuts & 3/8" FlatWashers
18"460
20
" M
in.
51
0
34
"8
60
StepperPost Assembly
Finished Grade
PLAN VIEW
43
3/ 4
"11
1118 3/4"476
5" /130Minimum
(4) 3/8" x 2" DoubleExpansion Anchors(ThreadedEnd Down)
(4) 3/8" x 2 1/4"BHCS w/Pin w/ 3/8"Flat Washers
Parts List
Part # Description Qty.160817-00 Stepper Post Assembly, Specify Color .................... 1182001-00 Stepper Frame Assembly, Specify Color ................. 1162771-00 Stepper Shaft 1" Dia., SST ....................................... 1166652-00 Stepper Arm, Specify Color ...................................... 2166586-00 Threaded Pivot Shaft, Alum. .................................... 2160829-00 Foot Pad, Black .......................................................... 2160834-00 1" O.D. x 14 1/8" Lg. Stepper Stop, Brown ............. 1160835-00 Handbar, Specify Color ............................................. 1160837-00 Shroud Cover, Specify Color .................................... 1160895-00 Fitness Footer, (DB), Specify Color ........................ 1166511-00 Spherical Rod End ..................................................... 2161640-00 Attachment Cover, Silver .......................................... 5162878-00 Shaft Plate, 1" Shaft, Specify Color ........................ 1166463-00 1 1/2" O.D. x 5 5/16" UHMW Spacer ......................... 1
155083-00 Post Extension (DB) Hardware Package ............. 1100198-00 3/8" x 1 1/8" BHCS w/Pin, SST .................................. 4100327-00 3/8" Standard Hex Nut, SST ...................................... 4100362-00 3/8" Flat Washers, SST ............................................... 8
188103-00 4-Hole (SM) Hardware Package ........................... 1100199-00 3/8" x 2 1/4" BHCS w/Pin, SST .................................. 4187933-00 3/8" x 2" Double Expansion Anchor ......................... 4100362-00 3/8" Flat Washer, SST ................................................. 4
173222-00 Cardio Stepper Hardware Package ...................... 1100196-00 3/8" x 7/8" BHCS w/Pin, SST .................................... 10100198-00 3/8" x 1 1/8" BHCS w/Pin, SST ................................. 14100327-00 3/8" Standard Hex Nut, SST ...................................... 8100365-00 3/8" SAE Flat Washers, SST ..................................... 42124911-00 1/2"-20 Hex Jam Nut, SST ......................................... 4132626-00 5/16" x 7/8" BHCS w/Pin, SST .................................... 8166836-00 Bumper ........................................................................ 6148686-00 3/8" x 3/4" FHCS w/Pin, SST ...................................... 1166456-00 D Washer H/B, SST ................................................... 2100173-00 3/8" x 2" BHCS w/Pin, SST ....................................... 4
SM = Surface MountDB = Direct Bury
Specifications
Stepper Arm: Weldment comprised of 1.660" O.D. RS40 (.111" -.121" wall) galvanized steel tube, 7 GA. (.179") HRPOsheet steel, 2.000" O.D. x 1.256" I.D. steel tube and 1/4"HRPO steel sheet. Finish: ProShield®, color specified.
Stepper Pivot: Weldment comprised of 1.500" O.D.x .75" I.D. steeltube, 3/8" HR flat steel and stainless steel threaded stub.Finish: ProShield, color specified.
Cylinder: The cylinder features a 7/8" diameter stainless steelshaft, and a 2 3/4" diameter stainless steel housing. Oil-impregnated bronze bushings are featured on all wear-surfaces.
Handbar: Weldment comprised of 1.660" O.D. RS20 (.085" -.095" wall) galvanized steel tube and 7 GA. (.179")HRPO sheet steel. Finish: ProShield, color specified.
Foot Pad: Rotationally molded from U.V. stabilized linear lowdensity polyethylene, black in color.
Stepper Frame: Weldment comprised of 1.660" O.D. RS20 (.085" -.095" wall) galvanized steel tube and 7 GA. (.179")HRPO sheet steel. Finish: ProShield, color specified.
Shroud Cover: Fabricated from 11 GA. (.120") HRPO sheet steel.Finish: ProShield, color specified.
Stepper Stop: Fabricated from 1" O.D. cold rolled steel. Finish:TenderTuff, brown in color.
Fitness Post: Weldment comprised of 1/4" HRPO steel plate, 1/4"stainless steel plate, and 10" O.D. x 12 GA. (.105"wall) steel tube zinc plated. Finish: ProShield, colorspecified. (Post Cap) Fabricated from A356 sandcasted aluminum. Finish: ProShield, silver. (Sign)Digital image is transfered to a .032" thick ProShieldcoated aluminum plate, then infused into the ProShield.
Attachment Cover: Fabricated from A356 sand casted aluminum. Finish:ProShield, silver.
Fitness Footer: Weldment comprised of 5.000" O.D. x 11 GA. galva-nized steel tube and 1/4" HRPO steel plate. Finish:ProShield, color specified.
ThreadedPivot Shaft: Fabricated from 1" diameter 2024 aluminum bar,
threaded each end.
StepperBottom Shaft: Fabricated from 3/8" stainless steel plate and 1" stain-
less steel round bar.
Cylinder Shaft: Fabricated from 1/2" stainless steel round bar.
Shaft Plate: Fabricated from 3/8" stainless steel plate.
Fasteners: Primary fasteners shall be socketed and pinnedtamperproof in design, stainless steel (SST) per ASTMF 879 unless otherwise indicated (see specific prod-uct installation/specifications).
Installation Time: (DB) 4 man hoursArea
Recommended: 96" x 60" (2,44 m x 1,52 m)Weight: (DB) 208 lbs.
(SM) 178 lbs.Concrete: (DB) Approx. 3 cu.ft.
Specifications are subject to change without notice.
HealthBeat® 161312 Cardio Stepper
J:\INSTSPEC\SPECS\189\18903800.P65
Document #18903800Sheet 3 of 3
Eco #54718 Document 18903800 replaces 18194300. Replaced expansion anchors with double expansionanchors.
Installation Instructions
1) (Direct Bury) Dig footing as shown. Place fitness footer in footinghole. With fitness footer in plumb position, pour concrete footing.Allow concrete footing to cure a minimum of 72 hours before attach-ing post assembly to fitness footer. Refer to the Direct Bury Detail.
2) (Direct Bury) Attach stepper post assembly to fitness footer, using 3/8" x1 1/8" BHCS w/pin with 3/8" flat washers and 3/8" standard hex nutswith 3/8" flat washers. Refer to the Direct Bury Detail.
3) Attach bumpers to frame, using 3/8" x 2" BHCS w/pin with 3/8" SAEflat washers and 3/8"standard hex nuts with 3/8" SAE flat washers, asshown. Refer to the Bumper Attachment Detail.
4) Turn jam nuts onto threaded pivot shafts. Turn (2) spherical rod endsonto threaded pivot shafts. Turn threaded pivot shafts into sphericalrod ends that are attached to stepper arms. NOTE: Do not tightenjam nuts to spherical rod ends at this time.
5) Attach foot pads to stepper arms, using 3/8" x 7/8" BHCS w/pin & 3/8"SAE flat washers.
6) Attach attachment covers and stepper frame to stepper post assem-bly, using 3/8" x 1 1/8" BHCS w/pin & 3/8" SAE flat washers. Refer tothe Handbar/Shroud Attachment Detail.
7) Insert stepper shaft through stepper arms and 1 1/2" O.D. x 5 5/16"long lower inner plastic spacer, as shown. Fasten stepper shaft toshaft plate, using 3/8" x 3/4" FHCS w/pin, as shown. Refer to the Step-per Arm Assembly Detail.
8) Attach stepper arm assembly to stepper frame, using 3/8" x 1 1/8" BHCSw/pin with 3/8" SAE flat washers and 3/8" standard hex nuts with 3/8"SAE flat washers.
9) Attach spherical rod ends to stepper pivot, using 5/16" x 7/8" BHCS w/pin & D washers. Refer to the Pivot Shaft Attachment Detail.
10) Tighten jam nuts to spherical rod ends.
11) Attach stepper stop to frame, using 3/8" x 7/8" BHCS w/pin & 3/8" SAEflat washers, as shown.
12) Attach attachment cover and handbar to stepper post assembly, us-ing 3/8" x 1 1/8" BHCS w/pin & 3/8" SAE flat washers. Refer to theHandbar/Frame Attachment Detail.
13) Attach shroud cover to frame, using 5/16" x 7/8" BHCS w/pin & 3/8"SAE flat washers, as shown.
14) (Surface Mount) With stepper post assembly in final position, use acenter punch to mark expansion anchor locations on concrete slabthrough holes in stepper post assembly plate.
Move stepper post assembly aside and drill 3/4" x 2 1/4" deep holesinto concrete, using a hammer drill and 3/4" masonry bit. NOTE:Drill holes perpendicular to the work surface. To assure full holdingpower, do not ream holes or allow the drill to wobble. Verify holedepth after drilling. Clean holes using compressed air.
Tap double expansion anchors (with threaded end down) into drilledholes. Reposition stepper post assembly. Fasten stepper post assem-bly to expansion anchors, using 3/8" x 2 1/4" BHCS w/pin and 3/8" flatwashers.
HealthBeat® 161312 Cardio Stepper
Specifications are subject to change without notice.
Document #18904100
Sheet 1 of 4161309 Chest/Back PressHealthBeat®
16663200
Chest/BackPostAssembly
Sign
Chest/BackFrame
Hand Bar
Seat
Back Support
Chest/BackFooter
DETAILCHEST/BACK FOOTER
ATTACHMENT
Chest/BackFooter
Chest/BackFrame
(2) 3/8" x 7/8"BHCS w/Pin& 3/8" SAE FlatWashers
(2) 3/8" StandardHex Nuts & 3/8"SAE FlatWashers
© 2013 by Landscape Structures. All rights reserved.
601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185
PLAN VIEW
53
3 /4"
13
65
21
"5
30
40
3/ 8
"1
02
5
30 5/8"777
23 5/8"600
49"1240
38 1/2"977
40 5/8"
1030
161309 Chest/Back PressHealthBeat®
© 2013 by Landscape Structures. All rights reserved.
601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185
181944c
DETAILHAND BAR ASSEMBLY
DETAILCYLINDER ASSEMBLY
Hand Bar
Shaft PlateCylinder Shaft
Bushing
Bushing
Shaft Plate
Cylinder Shaft
Cylinder w/Rod End
1 1/8" Dia. x 15/16"Spacer
1 1/8" Dia. x 15/16"Spacer
Shaft Plate
(2) .510" I.D.Thrust Washers
Shaft Plate
© 2013 by Landscape Structures. All rights reserved.
601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185
161309 Chest/Back PressHealthBeat®
Document #18904100
Sheet 2 of 4
166910a
Chest/BackPost Assembly
Sign
DETAILCHEST/BACK PRESS ASSEMBLY
Chest/BackFrame
Cylinder w/Rod End
Pipebolt
(2) 3/8" x 7/8"BHCS w/Pin &3/8" SAE FlatWashers
(4) 3/8" x 1 1/8"BHCS w/Pin &3/8" SAE FlatWashers
CylinderAssembly
(2) 1 1/8" Dia. x 15/16"Spacers
DETAIL
Chest/BackFrameBumper
(2) 3/8" x 7/8"BHCS w/Pinw/ 3/8" SAEFlat Washers
Hand Bar
Label
DETAILBUMPER ATTACHMENT
(SIDE VIEW)
SpacerNut
NOTE: ChestBack frame sidehas been re-moved pictori-ally for clarity.
StopperPlate
(4) 3/8" StandardHex Nuts & 3/8"SAE Flat Washers
Chest/BackFrame
(4) 3/8" x 1 1/8"BHCS w/Pin &3/8" SAE FlatWashers
(4) 3/8" StandardHex Nuts & 3/8"SAE Flat Washers
Hand BarAssembly
Chest/BackFrame
5/16" x 1/2"BHCS w/Pin
CylinderSpacer
CylinderPin
Important!Bevel Side
BumperPlate
3/8" x 1" FlatHead CapScrew
161309 Chest/Back PressHealthBeat®
162976b
DETAILFRAME TO POST
ATTACHMENT DETAILCAP ATTACHMENT
DETAILBACK SUPPORT/SEAT
ATTACHMENT
Chest/BackPost Assembly
Frame
(2) AttachmentCovers
(4) 3/8" x 1 3/8"BHCS w/Pin &3/8" SAE FlatWashers
Frame
Cap
(4) 5/16" x 7/8"BHCS w/Pin
Frame
Back Support
Seat
(4) 3/8" x 7/8"BHCS w/Pin &3/8" SAE FlatWashers
(4) 3/8" x 7/8"BHCS w/Pin &3/8" SAE FlatWashers
(2) AttachmentPlates Chest/Back
Post Assembly
© 2013 by Landscape Structures. All rights reserved.
601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185
161309 Chest/Back PressHealthBeat®
189041d
© 2013 by Landscape Structures. All rights reserved.
601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185
DETAILDIRECT BURY(FITNESS POST)
DETAILDIRECT BURY
(CHEST/BACK FOOTER)
Concrete
CrushedRock
Fitness Footer
(4) 3/8" x 1 1/8"BHCS w/Pin& 3/8" FlatWashers
(4) 3/8" StandardHex Nuts & 3/8" FlatWashers
Finished Grade
18"460
20
" M
in.
51
0
34
"8
60
14"360
20
" M
in.
51
0
34
"8
60
Finished Grade
Concrete
CrushedRock
Chest/BackFooter
Chest/BackPost Assembly
DETAILSURFACE MOUNT
Chest/BackPost Assembly &Chest/Back Footer
Concrete
CrushedRock
Document #18904100
Sheet 3 of 4
5" /130Minimum
(6) 3/8" x 2" DoubleExpansion Anchors(ThreadedEnd Down)
(6) 3/8" x 2 1/4"BHCS w/Pin w/ 3/8"Flat Washers
Specifications are subject to change without notice.
Parts List
Part # Description Qty.185819-00 Cylinder w/Rod End .................................................. 1161844-00 Chest/Back Footer, (SM), Specify Color ................ 1161909-00 Chest/Back Footer, (DB), Specify Color ................. 1160586-00 Seat, Black .................................................................. 1160591-00 Back Support, Black .................................................. 1160655-00 Pipebolt, Brown ......................................................... 1166386-00 Hand Bar, Specify Color ........................................... 1178448-00 Shaft Plate, SST ......................................................... 4178447-00 1/2" Dia. Cylinder Shaft, SST .................................... 2162801-00 1 1/8" Dia. x 15/16" Spacer, Alum., Specify Color ..... 2160812-00 Chest/Back Post Assembly, Specify Color .............. 1160895-00 Fitness Footer, (DB), Specify Color ........................ 1161373-00 Chest/Back Cap, Specify Color ................................ 1162908-00 Chest/Back Frame, Specify Color ............................ 1161642-00 Attachment Plate, Specify Color .............................. 2161640-00 Attachment Cover, Silver .......................................... 2
155083-00 Post Extension (DB) Hardware Package ............. 1100198-00 3/8" x 1 1/8" BHCS w/Pin, SST .................................. 4100327-00 3/8" Standard Hex Nut, SST ...................................... 4100362-00 3/8" Flat Washers, SST ............................................... 8
188103-00 4-Hole (SM) Hardware Package ........................... 1100199-00 3/8" x 2 1/4" BHCS w/Pin, SST .................................. 4187933-00 3/8" x 2" Double Expansion Anchor ......................... 4100362-00 3/8" Flat Washer, SST ................................................. 4
188105-00 2-Hole (SM) Hardware Package ........................... 1100199-00 3/8" x 2 1/4" BHCS w/Pin, SST .................................. 2187933-00 3/8" x 2" Double Expansion Anchor ......................... 2100362-00 3/8" Flat Washer, SST ................................................. 2
181935-00 Chest/Back Press Hardware Package .................. 1100196-00 3/8" x 7/8" BHCS w/Pin, SST .................................... 14131849-00 5/16" x 1/2" BHCS w/Pin, SST .................................... 1100327-00 3/8" Standard Hex Nut, SST ..................................... 10100365-00 3/8" SAE Flat Washers, SST ..................................... 36113027-00 3/8" x 1 3/8" BHCS w/Pin, SST .................................. 4166616-00 Cylinder Spacer, SST ................................................ 1166630-00 Cylinder Pin, SST ...................................................... 1132626-00 5/16" x 7/8" BHCS w/Pin, SST .................................... 4181870-00 .510 I.D. Thrust Washer, SST ................................... 2100198-00 3/8" x 1 1/8" BHCS w/Pin, SST .................................. 8166836-00 Bumper ........................................................................ 1160654-00 Oilite Bushing ............................................................ 2162177-00 Spacer, Aluminum ...................................................... 1166835-00 Bumper Plate, Aluminum .......................................... 1137091-00 3/8" x 1" Flat Head Cap Screw, SST ......................... 1
SM = Surface MountDB = Direct Bury
Specifications
Cylinder: The cylinder features a 7/8" diameter stainless steelshaft, and a 2 3/4" diameter stainless steel housing. Oil-impregnated bronze bushings are featured on all wear-surfaces.
Back Support/Seat: Rotationally molded from U.V. stabilized linear lowdensity polyethylene, black in color.
Frame: Weldment comprised of 7 GA. (.179") HRPO sheetsteel. Finish: ProShield®, color specified.
Cap: Fabricated from 11 GA. (.120") HRPO sheet steel.Finish: ProShield, color specified.
Attachment Plate: Fabricated from 3/16" HRPO steel plate. Finish:ProShield, color specified.
Post Assembly: Weldment comprised of 1/4" HRPO steel plate, 1/4"stainless steel plate, and 10" O.D. x 12 GA. (.105"wall) steel tube zinc plated. Finish: ProShield, colorspecified. (Post Cap) Fabricated from A356 sandcasted aluminum. Finish: ProShield, silver. (Sign)Digital image is transfered to a .032" thick ProShieldcoated aluminum plate, then infused into the ProShield.
Attachment Cover: Fabricated from A356 sand casted aluminum. Finish:ProShield, silver.
Chest/Back Footer: Weldment comprised of 1.660" O.D. RS20 (.085"-.095" wall) galvanized steel tube, and 1/4" HRPO steelplate. Finish: ProShield, color specified.
Fitness Footer: Weldment comprised of 5.000" O.D. x 11 GA. galva-nized steel tube and 1/4" HRPO steel plate. Finish:ProShield, color specified.
Pipebolt: Fabricated from 1.125" O.D. 6061-T6 Aluminum. Fin-ish: TenderTuff, brown in color.
Spacer: Fabricated from 1.125" O.D. 6061-T6 Aluminum. Fin-ish: ProShield, color specified.
Cylinder Shaft: Fabricated from 1/2" stainless steel round bar.
Shaft Plate: Fabricated from 3/8" stainless steel plate.
Hand Bar: Weldment comprised of 1.660" O.D. RS40 (.111"-.121" wall) galvanized steel tube, 1.500" O.D. x .750I.D. steel tube, 1.315" O.D. RS20 (.080"-.090" wall)galvanized steel tube, 2.375" O.D. RS40 (.130"-.140"wall) galvanized steel tube and 3/16" HRPO sheet steel.Finish: ProShield, color specified.
Fasteners: Primary fasteners shall be socketed and pinnedtamperproof in design, stainless steel (SST) per ASTMF 879 unless otherwise indicated (see specific prod-uct installation/specifications).
Installation Time: (DB) 3 man hoursArea
Recommended: 96" x 72" (2,44 m x 1,83 m)Weight: (DB) 187 lbs.
(SM) 158 lbs.Concrete: (DB) Approx. 4.75 cu.ft.
HealthBeat® 161309 Chest/Back Press
J:\INSTSPEC\SPECS\189\18904100.P65
Eco #54718 Document 18904100 replaces 18582100. Replaced expansion anchors with double expansionanchors.
Specifications are subject to change without notice.
Installation Instructions
1) (Direct Bury) Dig footings as shown. Place fitness footer in footinghole. With fitness footer in plumb position, pour concrete footing.Allow concrete footing to cure a minimum of 72 hours before attach-ing post assembly to fitness footer. Refer to the Direct Bury Detail.
2) (Direct Bury) Attach chest/back post assembly to fitness footer, us-ing 3/8" x 1 1/8" BHCS w/pin with 3/8" flat washers and 3/8" standardhex nuts with 3/8" flat washers. Refer to the Direct Bury Detail.
3) Attach attachment covers, attachment plates and frame to chest/backpost assembly, using 3/8" x 1 3/8" BHCS w/pin & 3/8" SAE flat washers.Refer to the Frame To Post Attachment Detail.
4) Attach chest/back footer to chest/back frame, using 3/8" x 7/8" BHCSw/pin with 3/8" SAE flat washers & 3/8" standard hex nuts with 3/8"SAE flat washers. Refer to the Chest/Back Footer Attachment De-tail.
5) Place pipebolt on the inside of frame and fasten, using 3/8" x 7/8" BHCSw/pin and 3/8" SAE flat washers, as shown. Refer to the Chest/BackPress Assembly Detail.
6) Place spacer behind stopper plate, as shown. Attach bumper plate tostopper plate and spacer using 3/8" x 1" flat head cap screw. Attachbumper to bumper plate, using 3/8" x 7/8" BHCS w/pin and 3/8" SAEflat washers. Refer to the Bumper Attachment Detail.
7) Insert (2) bushings into hand bar attachment tube. Insert cylindershaft through bushings and hand bar attachment tube. Insert cylindershaft into shaft plate slots. Refer to Hand Bar Assembly Detail.
8) Attach hand bar assembly to chest/back frame, using 3/8" x 1 1/8" BHCSw/pin with 3/8" SAE flat washers and 3/8" standard hex nuts with 3/8"SAE flat washers. Refer to Detail.
9) Insert cylinder shaft through spacers, thrust washers and cylinder, asshown. Insert cylinder shaft into shaft plate slots. Refer to CylinderAssembly Detail.
10) Attach cylinder assembly to chest/back frame, using 3/8" x 1 1/8" BHCSw/pin with 3/8" SAE flat washers and 3/8" standard hex nuts with 3/8"SAE flat washers. Refer to Detail.
11) Attach cylinder assembly to hand bar, using cylinder pin, cylinderspacer and 5/16" x 1/2" BHCS w/pin, as shown. Refer to the Chest/Back Press Assembly Detail.
12) Attach cap to the frame, using 5/16" x 7/8" BHCS w/pin, as shown.Refer to the Cap Attachment Detail.
13) Attach back support and seat to frame, using 3/8" x 7/8" BHCS w/pinand 3/8" SAE flat washers, as shown. Refer to the Back Support/SeatAttachment Detail.
HealthBeat® 161309 Chest/Back Press
Document #18904100
Sheet 4 of 4
14) (Direct Bury) With chest/back footer in plumb position, pour con-crete footing. Allow concrete footing to cure a minimum of 72 hoursbefore users are allowed to play on the fitness equipment.
(Surface Mount) With chest/back post assembly and chest/backfooter in final position, use a center punch to mark expansion anchorlocations on concrete slab through holes in chest/back post assem-bly and chest/back plates.
Move chest/back post assembly and chest/back footer aside and drill3/4" x 2 1/4" deep holes into concrete, using a hammer drill and 3/4"masonry bit. NOTE: Drill holes perpendicular to the work surface.To assure full holding power, do not ream holes or allow the drill towobble. Verify hole depth after drilling. Clean holes using compressedair.
Tap double expansion anchors (with threaded end down) into drilledholes. Reposition chest/back post assembly and chest/back footer.Fasten chest/back post assembly and chest/back footer to expansionanchors, using 3/8" x 2 1/4" BHCS w/pin and 3/8" flat washers.
Document #18903100
177722 Mobility StationHealthBeat®
18106200
Sheet 1 of 3
© 2013 by Landscape Structures. All rights reserved.
601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185
DETAILRAMP TO PLATFORM
ATTACHMENT
Ramp
(2) 3/8" x 1 1/8"BHCS w/Pinw/ 3/8" SAEFlat Washers
(2) 3/8" StandardHex Nuts 3/8" SAEFlat Washers
Platform
DETAILHANDRAIL TO SUPPORT
ATTACHMENT
(6) Supports
(2) Handrails
(12) 1/4" x 3/16"Drive Rivets
(2) Handrails
PlatformStepLadder
(2) Handrail/Deck Supports
(2) RailSupports #1
Mobility PostAssembly
(2) RailSupports #2
Ramp
DETAILSUPPORT TO RAMP
ATTACHMENT
Ramp
(2) 3/8" x 2 1/2"BHCS w/Pinw/ 3/8" SAEFlat Washers
(2) 3/8" StandardHex Nuts 3/8" SAEFlat Washers
(2) RailSupports #2
DETAILSUPPORT ATTACHMENT
(2) Handrail/Deck Supports
(4) 3/8" x 1 1/8"BHCS w/Pinw/ 3/8" SAEFlat Washers
(4) 3/8" StandardHex Nuts 3/8" SAEFlat Washers
Platform
(12) 3/8" x 1 3/8"BHCS w/Pinw/ 3/8" SAEFlat Washers
(12) 3/8" StandardHex Nuts 3/8" SAEFlat Washers
(2) Ramp FootGuards
177722 Mobility StationHealthBeat®
181062a
© 2013 by Landscape Structures. All rights reserved.
601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185
PLAN VIEW /FOOTING LAYOUT
ConcreteFooting
Mobility PostAssembly
Ramp
PlatformStep Ladder
114 1/4"290230 1/8"
765
12
1 /1
6"3
06
23
15/ 1
6"6
08
51 /
4"1
33
51 /
4"1
33
60
9 /1
6"1
53
8
122 5/16"3107
22 1/4"565
24
"6
10
Top OfPlatform
177722 Mobility StationHealthBeat®
189031c
© 2013 by Landscape Structures. All rights reserved.
601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185
Document #18903100
Sheet 2 of 3
Step Ladder
ConcreteFootings
13 1/2"343
10"254
Step Ladder
ConcreteSlab
2" 51
(2) 3/8" StandardHex Nuts w/ 3/8"SAE Flat Washers
Support
34
"8
64
DETAILSURFACE MOUNT
DETAILDIRECT BURY
UnitaryProtectiveTile
Loose FillProtectiveSurfacing
20
"/5
08
Min
imu
m
CrushedRock
CrushedRock
Subgrade
STEP LADDER DETAILS
DETAILSUPPORT TO STEP LADDER
ATTACHMENT
StepLadder
(2) RailSupports #1
(4) 3/8" x 2 1/2"BHCS w/Pinw/ 3/8" SAEFlat Washers
(4) 3/8" StandardHex Nuts 3/8" SAEFlat Washers
DETAILSTEP LADDER TO PLATFORM
ATTACHMENT
StepLadder
Platform
(2) 3/8" x 1 1/8"BHCS w/Pinw/ 3/8" SAEFlat Washers
(2) 3/8" StandardHex Nuts 3/8" SAEFlat Washers
(2) 3/8" x 1 1/8"BHCS w/Pinw/ 3/8" SAEFlat Washers
14"356
(2) 3/8" x 2" DoubleExpansion Anchors(ThreadedEnd Down)
(2) 3/8" x 2 1/4"BHCS w/Pin w/ 3/8"Flat Washers
176456a
DETAILDIRECT BURY
MOBILITY POST ASSEMBLY DETAILDIRECT BURY
(SUPPORTS)
Concrete
CrushedRock
Fitness Footer
(4) 3/8" x 1 1/8"BHCS w/Pin& 3/8" FlatWashers
(4) 3/8" StandardHex Nuts & 3/8" FlatWashers
Finished Grade
18"457
20
" M
in.
51
0
34
"8
60
14"356
20
" M
in.
50
8
34
"8
64
Finished Grade
Concrete
CrushedRock
(4) Supports
Mobility PostAssembly
DETAILSURFACE MOUNT
Supports & MobilityPost Assembly
Concrete CrushedRock
5" /130Minimum
177722 Mobility StationHealthBeat®
© 2013 by Landscape Structures. All rights reserved.
601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185
(12) 3/8" x 2" DoubleExpansion Anchors(ThreadedEnd Down)
(12) 3/8" x 2 1/4"BHCS w/Pin w/ 3/8"Flat Washers
189031a
HealthBeat® 177722 Mobility Station
J:\INSTSPEC\SPECS\189\18903100.P65
Parts List
Part # Description Qty.160895-00 Fitness Footer, (DB), Specify Color ........................ 1177027-00 Handrail/Deck Support, SM ..................................... 2177034-00 Mobility Post Assembly, Specify Color .................. 1178247-00 Ramp Foot Guard, Gray ............................................ 2178548-00 Handrail, Specify Color ............................................ 2178809-00 Rail Support #1, Specify Color ................................ 2178814-00 Rail Support #2, SM, Specify Color ........................ 2180038-00 Rail Support #2, DB, Specify Color ........................ 2180688-00 Step Ladder Support, DB, Specify Color ................ 1180840-00 Platform, Gray ............................................................ 1180841-00 Ramp, Gray ................................................................. 1180842-00 Step Ladder, Gray ...................................................... 1180946-00 Handrail/Deck Support, DB, Specify Color ........... 2
155083-00 Post Extension (DB) Hardware Package ............. 1100198-00 3/8" x 1 1/8" BHCS w/Pin, SST .................................. 4100327-00 3/8" Standard Hex Nut, SST ...................................... 4100362-00 3/8" Flat Washers, SST ............................................... 8
188103-00 4-Hole (SM) Hardware Package ........................... 1100199-00 3/8" x 2 1/4" BHCS w/Pin, SST .................................. 4187933-00 3/8" x 2" Double Expansion Anchor ......................... 4100362-00 3/8" Flat Washer, SST ................................................. 4
188105-00 2-Hole (SM) Hardware Package ........................... 5100199-00 3/8" x 2 1/4" BHCS w/Pin, SST ................................. 10187933-00 3/8" x 2" Double Expansion Anchor ........................ 10100362-00 3/8" Flat Washer, SST ................................................ 10
181068-00 Mobility Station Hardware Package .................... 1100174-00 3/8" x 2 1/2" BHCS w/Pin, SST .................................. 6100198-00 3/8" x 1 1/8" BHCS w/Pin, SST ................................. 10100327-00 3/8" Standard Hex Nut, SST ..................................... 28100365-00 3/8" SAE Flat Washer, SST ....................................... 56100609-00 1/4" x 3/16" Drive Rivet, AL/SST .............................. 12113027-00 3/8" x 1 3/8" BHCS w/Pin, SST ................................. 12
SM = Surface MountDB = Direct Bury
Specifications
Handrail/DeckSupport: Weldment comprised of 1.660" (42,16 mm) O.D. RS20
(.085"-.095") (2,16 mm-2,41 mm) wall galvanizedsteel tube, and 1/4" (6,35 mm) HRPO sheet steel. Fin-ish: ProShield®, color specified.
Step Ladder: Weldment comprised of 12 GA (.105") (2,67 mm)HRPO sheet steel conforming to ASTM A1011. Stand-ing surface is 22" (559 mm) wide x 11 5/8" (295,28mm) deep and is perforated with 5/16" (7,94 mm) di-ameter holes. Finish: TenderTuff, gray in color.
Ramp: Weldment comprised of 11 GA (.120") (3,05 mm)HRPO sheet steel and is perforated with 5/16" (7,94mm) diameter holes. Finish: TenderTuff, gray in color.
Platform: Weldment comprised of 11 GA (.120") (3,05 mm)HRPO sheet steel. Standing surface is 22" (559 mm)x 18" (457 mm) and is perforated with 5/16" (7,94 mm)diameter holes. Finish: TenderTuff, gray in color.
Step Ladder Supt.: Weldment comprised of 1.660" (42,16 mm) O.D. RS-20 (.085" - .095") (2,16 mm-2,41 mm) galvanized steeltubing and 1 1/2" (38,1 mm) diameter pipe cap. Finish:ProShield, color specified.
Rail Support #1: Weldment comprised of 1.660" (42,16 mm) O.D. RS20(.085"-.095") (2,16 mm-2,41 mm) wall galvanizedsteel tube, and 1/4" (6,35 mm) HRPO sheet steel. Fin-ish: ProShield, color specified.
Rail Support #2: Fabricated from 1.660" (42,16 mm) O.D. RS20 (.085"-.095") (2,16 mm-2,41 mm) wall galvanized steel tube.Finish: ProShield, color specified.
Handrail: Weldment comprised of 1.660" (42,16 mm) O.D. RS20(.085"-.095") (2,16 mm-2,41 mm) wall galvanizedsteel tube. Finish: ProShield, color specified.
Ramp Foot Guard: Solid color Permalene, gray in color.
Fitness Footer: Weldment comprised of 5.000" (127 mm) O.D. x 11GA. (.120") (3,05 mm) galvanized steel tube and 1/4"(6,35 mm) HRPO steel plate. Finish: ProShield, colorspecified.
Post Assembly: Weldment comprised of 1/4" (6,35 mm) HRPO steelsheet, and 10" (254 mm) O.D. x 12 GA. (.105") (2,67mm) wall steel tube zinc plated. Finish: ProShield,color specified. (Post Cap) Fabricated from A356 sandcasted aluminum. Finish: ProShield, silver. (Sign)Digital image is transfered to a .032" (0,81 mm) thickProShield coated aluminum plate, then infused intothe ProShield.
Fasteners: Primary fasteners shall be socketed and pinnedtamperproof in design, stainless steel (SST) per ASTMF 879 unless otherwise indicated (see specific prod-uct installation/specifications).
Installation Time: (DB) 6 man hours(SM) 5 man hours
AreaRecommended: 8' x 15' (2,44 m x 4,57 m)
Weight: (DB) 389 lbs.(SM) 346 lbs.
Concrete: (DB) Approx. 13.63 cu.ft.
Specifications are subject to change without notice.
Document #18903100Sheet 3 of 3
Eco #54718 Document 18903100 replaces 18106200. Replaced expansion anchors with double expansionanchors.
Installation Instructions
1) (Direct Bury) Dig footings spaced as shown. Refer to the Plan View/Footing Layout.
2) Attach step ladder support to step ladder, using 3/8" x 1 1/8" BHCS w/pin with 3/8" SAE flat washers and 3/8" standard hex nuts with 3/8"SAE flat washers. Refer to the Step Ladder Direct Bury Detail.
3) Attach step ladder to platform, using 3/8" x 1 1/8" BHCS w/pin with 3/8"SAE flat washers and 3/8" standard hex nuts with 3/8" SAE flat wash-ers. Refer to the Step Ladder To Platform Attachment Detail.
4) Attach handrail/deck supports to platform, using 3/8" x 1 1/8" BHCS w/pin with 3/8" SAE flat washers and 3/8" standard hex nuts with 3/8"SAE flat washers. Refer to the Support Attachment Detail.
5) Stand assembly in upright position, and place step ladder support andhandrail/deck supports in footing holes. Attach ramp to platform, us-ing 3/8" x 1 1/8" BHCS w/pin with 3/8" SAE flat washers and 3/8" stan-dard hex nuts with 3/8" SAE flat washers. Refer to the Ramp To Plat-form Attachment Detail.
6) Attach rail supports #1 to step ladder, using 3/8" x 2 1/2" BHCS w/pinwith 3/8" SAE flat washers and 3/8" standard hex nuts with 3/8" SAEflat washers. Refer to the Support To Step Ladder Attachment Detail.
7) Attach rail supports #2 to ramp, using 3/8" x 2 1/2" BHCS w/pin with 3/8"SAE flat washers and 3/8" standard hex nuts with 3/8" SAE flat wash-ers. Refer to the Support To Ramp Attachment Detail.
8) Place handrails onto supports. Drill 1/4" holes through supports us-ing the predrilled 1/4" holes in handrails as a guide. Insert 1/4" x 3/16"drive rivets into drilled holes and tap pin in until it is flush with rivethead. Refer to the Handrail To Support Attachment Detail.
9) Attach ramp foot guards to ramp, using 3/8" x 1 3/8" BHCS w/pin with3/8" SAE flat washers and 3/8" standard hex nuts with 3/8" SAE flatwashers, as shown.
10) Attach fitness footer to mobility post assembly, using 3/8" x 1 1/8" BHCSw/pin with 3/8" flat washers and 3/8" standard hex nuts with 3/8" flatwashers. Place mobility post assembly in footing hole, and turn inproper direction. Refer to the Direct Bury Detail.
11) With post assembly and supports in plumb position, pour concretefootings. Allow concrete footing to cure a minimum of 72 hours be-fore users are allowed to play on the fitness equipment.
HealthBeat® 177722 Mobility Station
1) (Surface Mount) Attach step ladder to platform, using 3/8" x 1 1/8"BHCS w/pin with 3/8" SAE flat washers and 3/8" standard hex nutswith 3/8" SAE flat washers. Refer to the Step Ladder To PlatformAttachment Detail.
2) Attach handrail/deck supports to platform, using 3/8" x 1 1/8" BHCS w/pin with 3/8" SAE flat washers and 3/8" standard hex nuts with 3/8"SAE flat washers. Refer to the Support Attachment Detail.
3) Stand assembly in upright position. Attach ramp to platform, using 3/8" x1 1/8" BHCS w/pin with 3/8" SAE flat washers and 3/8" standard hexnuts with 3/8" SAE flat washers. Refer to the Ramp To Platform At-tachment Detail.
4) Attach rail supports #1 to step ladder, using 3/8" x 2 1/2" BHCS w/pinwith 3/8" SAE flat washers and 3/8" standard hex nuts with 3/8" SAEflat washers. Refer to the Support To Step Ladder Attachment Detail.
5) Attach rail supports #2 to ramp, using 3/8" x 2 1/2" BHCS w/pin with 3/8"SAE flat washers and 3/8" standard hex nuts with 3/8" SAE flat wash-ers. Refer to the Support To Ramp Attachment Detail.
6) Place handrails onto supports. Drill 1/4" holes through supports us-ing the predrilled 1/4" holes in handrails as a guide. Insert 1/4" x 3/16"drive rivets into drilled holes and tap pin in until it is flush with rivethead. Refer to the Handrail To Support Attachment Detail.
7) Attach ramp foot guards to ramp, using 3/8" x 1 3/8" BHCS w/pin with3/8" SAE flat washers and 3/8" standard hex nuts with 3/8" SAE flatwashers, as shown.
8) (Post/Supports/Step Ladder) With Mobility Station in proper posi-tion, use a center punch to mark expansion anchor locations on con-crete slab through holes in post assembly plate, support plates andstep ladder.
Move Mobility Station aside and drill 3/4" x 2 1/4" deep holes intoconcrete, using a hammer drill and 3/4" masonry bit. NOTE: Drillholes perpendicular to the work surface. To assure full holding power,do not ream holes or allow the drill to wobble. Verify hole depthafter drilling. Clean holes using compressed air.
Tap double expansion anchors (with threaded end down) into drilledholes. Reposition Mobility Station. Fasten Mobility Station to expan-sion anchors, using 3/8" x 2 1/4" BHCS w/pin and 3/8" flat washers.
© 2013 by Landscape Structures. All rights reserved.
601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185
Document #18903700
161317 PlyometricsHealthBeat®
16132700
PlyometricsPost Assembly
(18) 3/8" x 7/8"BHCS w/Pin & 3/8"Flat Washers
(3) Benches
PLAN VIEW/FOOTING LAYOUT
24"610
38 1/2"977
57 1/2"1461
24
"6
10
24
"6
10
48
"1
22
091 /
2"2
41
12
"3
00
16
"4
10
8"
20
0
Sheet 1 of 2
Typical ConcreteFooting
(3) Frames
Sign
53
3 /4"
13
65
64
"1
63
0
69"1750
91 /
2"2
41
Specifications are subject to change without notice.
HealthBeat® 161317 Plyometrics
J:\INSTSPEC\SPECS\189\18903700.P65
Parts List
Part # Description Qty.160716-00 Bench, Black .............................................................. 3160895-00 Fitness Footer, (DB), Specify Color ........................ 1161273-00 14" Plyometrics Frame, (SM), Specify Color ......... 1161274-00 10" Plyometrics Frame, (SM), Specify Color ......... 1161275-00 6" Plyometrics Frame, (SM), Specify Color ........... 1161445-00 14" Plyometrics Frame, (DB), Specify Color ......... 1161446-00 10" Plyometrics Frame, (DB), Specify Color ......... 1161447-00 6" Plyometrics Frame, (DB), Specify Color ........... 1161645-00 Plyometrics Post Assembly, Specify Color ............. 1
155083-00 Post Extension (DB) Hardware Package ............. 1100198-00 3/8" x 1 1/8" BHCS w/Pin, SST .................................. 4100327-00 3/8" Standard Hex Nut, SST ...................................... 4100362-00 3/8" Flat Washers, SST ............................................... 8
188103-00 4-Hole (SM) Hardware Package ........................... 7100199-00 3/8" x 2 1/4" BHCS w/Pin, SST ................................. 28187933-00 3/8" x 2" Double Expansion Anchor ........................ 28100362-00 3/8" Flat Washer, SST ................................................ 28
161674-00 Plyometrics Hardware Package ............................ 1100196-00 3/8" x 7/8" BHCS w/Pin, SST .................................... 18100362-00 3/8" Flat Washers, SST .............................................. 18
SM = Surface MountDB = Direct Bury
Specifications
Frame: Weldment comprised of 2.375" O.D. RS20 (.095"-.105" wall) galvanized steel tube and 1/4" HRPO sheetsteel. Finish: ProShield®, color specified.
Bench: Rotationally molded from U.V. stabilized linear lowdensity polyethylene, black in color.
Post Assembly: Weldment comprised of 1/4" HRPO steel plate and 10"O.D. x 12 GA. (.105" wall) steel tube zinc plated. Fin-ish: ProShield, color specified. (Post Cap) Fabricatedfrom A356 sand casted aluminum. Finish: ProShield,silver. (Sign) Digital image is transfered to a .032"thick ProShield coated aluminum plate, then infusedinto the ProShield.
Fitness Footer: Weldment comprised of 5.000" O.D. x 11 GA. galva-nized steel tube and 1/4" HRPO steel plate. Finish:ProShield, color specified.
Fasteners: Primary fasteners shall be socketed and pinnedtamperproof in design, stainless steel (SST) per ASTMF 879 unless otherwise indicated (see specific prod-uct installation/specifications).
Installation Time: (DB) 3 man hoursArea
Recommended: 96" x 96" (2,44 m x 2,44 m)Weight: (DB) 246 lbs.
(SM) 208 lbs.Concrete: (DB) Approx. 13.5 cu.ft.
Installation Instructions
1) (Direct Bury) Dig footings spaced as shown. Refer to the Plan View/Footing Layout. Place fitness footer in footing hole. With fitnessfooter in plumb position, pour concrete footing. Allow concrete foot-ing to cure a minimum of 72 hours before attaching post assembly tofitness footer.
2) (Direct Bury) Attach plyometrics post assembly to fitness footer, us-ing 3/8" x 1 1/8" BHCS w/pin with 3/8" flat washers and 3/8" standardhex nuts with 3/8" flat washers. Refer to the Direct Bury Detail.
3) Attach plyometrics frames to benches, using 3/8" x 7/8" BHCS w/pin &3/8" flat washers, as shown.
4) (Direct Bury) Place plyometrics frames in footing holes, and prop inplumb position. With plyometrics frames in plumb position, pourconcrete footings. Allow concrete footings to cure a minimum of 72hours before users are allowed to play on the fitness equipment.
(Surface Mount) With plyometrics post assembly and plyometricsframes in final position, use a center punch to mark expansion an-chor locations on concrete slab through holes in plyometrics postassembly and plyometrics frame plates.
Move plyometrics post assembly and plyometrics frames aside anddrill 3/4" x 2 1/4" deep holes into concrete, using a hammer drill and 3/4"masonry bit. NOTE: Drill holes perpendicular to the work surface.To assure full holding power, do not ream holes or allow the drill towobble. Verify hole depth after drilling. Clean holes using compressedair.
Tap double expansion anchors (with threaded end down) into drilledholes. Reposition plyometrics post assembly and plyometrics frames.Fasten plyometrics post assembly and plyometrics frames to expan-sion anchors, using 3/8" x 2 1/4" BHCS w/pin and 3/8" flat washers.
Eco #54718 Document 18903700 replaces 17645200. Replaced expansion anchors with double expansionanchors.
© 2013 by Landscape Structures. All rights reserved.
601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185
Document #18903700
161317 PlyometricsHealthBeat® Sheet 2 of 2
DETAILDIRECT BURY(FITNESS POST) DETAIL
DIRECT BURY(BENCH FRAMES)
Concrete
CrushedRock
FitnessFooter
(4) 3/8" x 1 1/8"BHCS w/Pin& 3/8" FlatWashers
(4) 3/8" StandardHex Nuts & 3/8" FlatWashers
Finished Grade
18"460
20
" M
in.
51
0
34
"8
60
14"360
20
" M
in.
51
0
34
"8
60
Finished Grade
Concrete
CrushedRock
(3) BenchFrames
Plyometrics PostAssembly
DETAILSURFACE MOUNT
Plyometrics Post Assembly& (3) Bench Frames
Concrete CrushedRock
5" /130Minimum
(28) 3/8" x 2" DoubleExpansion Anchors(ThreadedEnd Down)
(28) 3/8" x 2 1/4"BHCS w/Pin w/ 3/8"Flat Washers
189031a
© 2013 by Landscape Structures. All rights reserved.
601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185
Document #18903900
161313 Pull-Up/DipHealthBeat®
16132300
Sign
(8) 3/8" x 1 1/8"BHCS w/Pin &3/8" SAE FlatWashers
Pull-Up/DipPost Assembly
DETAILPULL-UP/DIP BAR
ATTACHMENT
Pull-Up/Dip Bar
Pull-Up/DipBar
80
3 /8"
20
41
(4) AttachmentCovers
Sheet 1 of 2
Pull-Up/DipPost Assembly
53
3 /4"
13
65
(4) AttachmentCovers
DETAILTOP VIEW
42
1 /4"
10
73
35"890
Specifications are subject to change without notice.
HealthBeat® 161313 Pull-Up/Dip
J:\INSTSPEC\SPECS\189\18903900.P65
Parts List
Part # Description Qty.160621-00 Pull-Up/Dip Bar, Specify Color ............................... 1160771-00 Pull-Up/Dip Post Assembly, Specify Color ............ 1160895-00 Fitness Footer, (DB), Specify Color ........................ 1161640-00 Attachment Covers, Silver ........................................ 4
155083-00 Post Extension (DB) Hardware Package ............. 1100198-00 3/8" x 1 1/8" BHCS w/Pin, SST .................................. 4100327-00 3/8" Standard Hex Nut, SST ...................................... 4100362-00 3/8" Flat Washers, SST ............................................... 8
188103-00 4-Hole (SM) Hardware Package ........................... 1100199-00 3/8" x 2 1/4" BHCS w/Pin, SST .................................. 4187933-00 3/8" x 2" Double Expansion Anchor ......................... 4100362-00 3/8" Flat Washer, SST ................................................. 4
161667-00 Pull-Up/Dip Hardware Package ........................... 1100198-00 3/8" x 1 1/8" BHCS w/Pin, SST .................................. 8100365-00 3/8" SAE Flat Washers, SST ...................................... 8
SM = Surface MountDB = Direct Bury
Specifications
Pull-Up/Dip Bar: Weldment comprised of 1.660" O.D. RS40 (.111"-.121" wall) galvanized steel tube, and 3/16" HRPO sheetsteel. Finish: ProShield®, color specified.
Post Assembly: Weldment comprised of 1/4" HRPO steel plate, 1/4"stainless steel plate, and 10" O.D. x 12 GA. (.105"wall) steel tube zinc plated. Finish: ProShield, colorspecified. (Post Cap) Fabricated from A356 sandcasted aluminum. Finish: ProShield, silver. (Sign)Digital image is transfered to a .032" thick ProShieldcoated aluminum plate, then infused into the ProShield.
Attachment Cover: Fabricated from A356 sand casted aluminum. Finish:ProShield, silver.
Fitness Footer: Weldment comprised of 5.000" O.D. x 11 GA. galva-nized steel tube and 1/4" HRPO steel plate. Finish:ProShield, color specified.
Fasteners: Primary fasteners shall be socketed and pinnedtamperproof in design, stainless steel (SST) per ASTMF 879 unless otherwise indicated (see specific prod-uct installation/specifications).
Installation Time: (DB) 2 man hoursArea
Recommended: 84" x 60" (2,13 m x 1,52 m)Weight: (DB) 136 lbs.
(SM) 106 lbs.Concrete: (DB) Approx. 3 cu.ft.
Installation Instructions
1) (Direct Bury) Dig footing as shown. Place fitness footer in footinghole. With fitness footer in plumb position, pour concrete footing.Allow concrete footing to cure a minimum of 72 hours before attach-ing post assembly to fitness footer. Refer to the Direct Bury Detail.
2) (Direct Bury) Attach pull-up/dip post assembly to fitness footer, us-ing 3/8" x 1 1/8" BHCS w/pin with 3/8" flat washers and 3/8" standardhex nuts with 3/8" flat washers. Refer to the Direct Bury Detail.
3) Attach attachment covers and pull-up/dip bar to pull-up/dip post as-sembly, using 3/8" x 1 1/8" BHCS w/pin & 3/8" SAE flat washers. Referto the Pull-Up/Dip Bar Attachment Detail.
4) (Surface Mount) With pull-up/dip post assembly in final position,use a center punch to mark expansion anchor locations on concreteslab through holes in pull-up/dip post assembly plate.
Move pull-up/dip post assembly aside and drill 3/4" x 2 1/4" deep holesinto concrete, using a hammer drill and 3/4" masonry bit. NOTE:Drill holes perpendicular to the work surface. To assure full holdingpower, do not ream holes or allow the drill to wobble. Verify holedepth after drilling. Clean holes using compressed air.
Tap double expansion anchors (with threaded end down) into drilledholes. Reposition pull-up/dip post assembly. Fasten pull-up/dip postassembly to expansion anchors, using 3/8" x 2 1/4" BHCS w/pin and 3/8"flat washers.
Eco #54718 Document 18903900 replaces 17644800. Replaced expansion anchors with double expansionanchors.
© 2013 by Landscape Structures. All rights reserved.
601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185
Document #18903900
161313 Pull-Up/DipHealthBeat® Sheet 2 of 2
189039d
DETAILSURFACE MOUNT
Pull-Up/DipPost Assembly
Concrete CrushedRock
DETAILDIRECT BURY
Concrete
CrushedRock
Fitness Footer
(4) 3/8" x 1 1/8"BHCS w/Pin3/8" FlatWashers
(4) 3/8" StandardHex Nuts & 3/8" FlatWashers
18"460
20
" M
in.
51
0
34
"8
60
Pull-Up/DipPost Assembly
Finished Grade
5" /130Minimum
(4) 3/8" x 2" DoubleExpansion Anchors(ThreadedEnd Down)
(4) 3/8" x 2 1/4"BHCS w/Pin w/ 3/8"Flat Washers
Document #18903600
Sheet 1 of 4161310 Squat PressHealthBeat®
16297700
Sign
Squat PostAssembly
ShroudCover
Squat Frame
(3) AttachmentCovers
Frame Plate
(2) Shoulder PadsShoulder Bar
Cylinder
PLAN VIEW
43
7/ 1
6"11
03
66
1/ 1
6"1
67
7
© 2013 by Landscape Structures. All rights reserved.
601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-31855
53
3/ 4
"1
36
5
61 1/4"1555
20
1/ 4
"5
14
161310 Squat PressHealthBeat®
© 2013 by Landscape Structures. All rights reserved.
601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-31855
DETAILSHOULDER BAR ASSEMBLY
DETAILCYLINDER ASSEMBLY
Shoulder Bar
Shaft PlateBushing(New)
Bushing
Cylinder w/Rod
1 1/8" Dia. x 15/16"Spacer1 1/8" Dia. x 15/16"
Spacer
Cylinder Shaft
Shaft Plate
Shaft Plate
Shaft Plate
Cylinder Shaft
(2) .510" I.D.Thrust Washers
© 2013 by Landscape Structures. All rights reserved.
601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185
161310 Squat PressHealthBeat®
166633a
DETAILSQUAT PRESS ASSEMBLY
Sign
Shoulder Bar
Squat PostAssembly
Squat Frame
(3) AttachmentCovers
Cylinder
(2) 1 1/8" O.D. x 15/16"Spacers
FramePlate
(2) 3/8" x 7/8"BHCS w/Pin &3/8" SAE FlatWashers
Pipebolt
Shoulder BarAttachment Tube
Label
Document #18903600
Sheet 2 of 4
(4) 3/8" x 1 1/8"BHCS w/Pin &3/8" SAE FlatWashers
(4) 3/8" StandardHex Nuts & 3/8"SAE Flat Washers
(4) 3/8" x 1 1/8"BHCS w/Pin &3/8" SAE FlatWashers
(4) 3/8" StandardHex Nuts & 3/8"SAE Flat Washers
5/16" x 1/2"BHCS w/Pin
CylinderSpacer
CylinderPin
161310 Squat PressHealthBeat®
162977b
(2) ShoulderPads
Shoulder Bar
Shroud Cover
DETAILSHOULDER PAD/SHROUD COVER
ATTACHMENT
(4) 5/16" x 7/8" BHCS w/Pin &3/8" SAE Flat Washers
(2) 3/8" x 1 1/8"BHCS w/Pin
Squat Frame
(2) 5/8" FlatWashers
(2) 3/8" FlatWashers
DETAILSQUAT FRAME TO POST
ATTACHMENT
Squat PostAssembly
(6) 3/8" x 1 1/8"BHCS w/Pin &3/8" SAE FlatWashers
(3) AttachmentCovers
Squat Frame
© 2013 by Landscape Structures. All rights reserved.
601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185
(3) AttachmentCovers
(2) 5/8" O.D. x 3/8"Bushings
© 2013 by Landscape Structures. All rights reserved.
601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185
189036d
DETAILSURFACE MOUNT
Squat PostAssembly
ConcreteCrushedRock
DETAILDIRECT BURY
Concrete
CrushedRock
Fitness Footer
(4) 3/8" x 1 1/8"BHCS w/Pin3/8" FlatWashers
(4) 3/8" StandardHex Nuts & 3/8" FlatWashers
18"460
20
" M
in.
51
0
34
"8
60
Squat PostAssembly
Finished Grade
161310 Squat PressHealthBeat®
Document #18903600
Sheet 3 of 4
5" /130Minimum
(4) 3/8" x 2" DoubleExpansion Anchors(ThreadedEnd Down)
(4) 3/8" x 2 1/4"BHCS w/Pin w/ 3/8"Flat Washers
Specifications are subject to change without notice.
HealthBeat® 161310 Squat Press
Parts List
Part # Description Qty.185819-00 Cylinder ....................................................................... 1178448-00 Shaft Plate, SST. ........................................................ 4160614-00 Shoulder Pad, Black .................................................. 2162912-00 Squat Frame, Specify Color ...................................... 1166389-00 Shoulder Bar, Specify Color ..................................... 1160655-00 Pipebolt, Brown ......................................................... 1160657-00 Shroud Cover, Specify Color .................................... 1160659-00 Squat Post Assembly, Specify Color ........................ 1178447-00 1/2" Dia. Cylinder Shaft, SST .................................. 2162801-00 1 1/8" Dia. x 15/16" Spacer, Aluminum ....................... 2160895-00 Fitness Footer, (DB), Specify Color ........................ 1161640-00 Attachment Cover, Silver .......................................... 3
155083-00 Post Extension (DB) Hardware Package ............. 1100198-00 3/8" x 1 1/8" BHCS w/Pin, SST .................................. 4100327-00 3/8" Standard Hex Nut, SST ...................................... 4100362-00 3/8" Flat Washers, SST ............................................... 8
188103-00 4-Hole (SM) Hardware Package ........................... 1100199-00 3/8" x 2 1/4" BHCS w/Pin, SST .................................. 4187933-00 3/8" x 2" Double Expansion Anchor ......................... 4100362-00 3/8" Flat Washer, SST ................................................. 4
181939-00 Squat Press Hardware Package ............................ 1100198-00 3/8" x 1 1/8" BHCS w/Pin, SST ................................. 16131849-00 5/16" x 1/2" BHCS w/Pin, SST .................................... 1100365-00 3/8" SAE Flat Washers, SST ..................................... 28166616-00 Cylinder Spacer, SST ................................................ 1166630-00 Cylinder Pin, SST ...................................................... 1100366-00 5/8" Flat Washer, SST ................................................. 2127179-00 5/8" O.D. x 3/8" Bushing, SST .................................... 2100196-00 3/8" x 7/8" BHCS w/Pin, SST ..................................... 2160654-00 Oilite Bushing ............................................................ 2100362-00 3/8" Flat Washers, SST ............................................... 2132626-00 5/16" x 7/8" BHCS w/Pin, SST .................................... 4181870-00 .510 I.D. Thrust Washer, SST ................................... 2100327-00 3/8" Standard Hex Nut, SST ...................................... 8
SM = Surface MountDB = Direct Bury
Specifications
Squat Frame: Weldment comprised of 1.660" O.D. SCH 40 (.140"wall) steel pipe and 3/16" HRPO sheet steel. Finish:ProShield®, color specified.
Cylinder: The cylinder features a 7/8" diameter stainless steelshaft, and a 2 3/4" diameter stainless steel housing. Oil-impregnated bronze bushings are featured on all wear-surfaces.
Shoulder Pad: Rotationally molded from U.V. stabilized EVA (ethylvinyl acetate) and high density polyethylene, black incolor.
Shroud Cover: Fabricated from 11 GA. (.120") HRPO sheet steel.Finish: ProShield, color specified.
Post Assembly: Weldment comprised of 1/4" HRPO steel plate, 1/4"stainless steel plate, and 10" O.D. x 12 GA. (.105"wall) steel tube zinc plated. Finish: ProShield, colorspecified. (Post Cap) Fabricated from A356 sandcasted aluminum. Finish: ProShield, silver. (Sign)Digital image is transfered to a .032" thick ProShieldcoated aluminum plate, then infused into the ProShield.
Attachment Cover: Fabricated from A356 sand casted aluminum. Finish:ProShield, silver.
Shoulder Bar: Weldment comprised of 1.660" O.D. RS40 (.111"-.121" wall) galvanized steel tube, 1.900" O.D. RS40(.120"-.130" wall) galvanized steel tube, 3/16" sheetHRPO steel, .750" I.D. x 1.500 " O.D. steel tube and203 or 303 stainless steel welded inserts with 3/8" in-ternal threads. Finish: ProShield, color specified.
Fitness Footer: Weldment comprised of 5.000" O.D. x 11 GA. galva-nized steel tube and 1/4" HRPO steel plate. Finish:ProShield, color specified.
Pipebolt: Fabricated from 1.125" O.D. 6061-T6 Aluminum. Fin-ish: TenderTuff, Brown in color.
Cylinder Shaft: Fabricated from 1/2" stainless steel round bar.
Shaft Plate: Fabricated from 3/8" stainless steel plate.
Fasteners: Primary fasteners shall be socketed and pinnedtamperproof in design, stainless steel (SST) per ASTMF 879 unless otherwise indicated (see specific prod-uct installation/specifications).
Installation Time: (DB) 3 man hoursArea
Recommended: 108" x 48" (2,74 m x 1,22 m)Weight: (DB) 173 lbs.
(SM) 143 lbs.Concrete: (DB) Approx. 3 cu.ft.
Eco #54718 Document 18903600 replaces 18582200. Replaced expansion anchors with double expansionanchors.
Specifications are subject to change without notice.
HealthBeat® 161310 Squat Press
Installation Instructions
1) (Direct Bury) Dig footing spaced as shown. Refer to the Plan View/Footing Layout. Place fitness footer in footing hole. With fitnessfooter in plumb position, pour concrete footing. Allow concrete foot-ing to cure a minimum of 72 hours before attaching post assembly tofitness footer. Refer to the Direct Bury Detail.
2) (Direct Bury) Attach squat post assembly to fitness footer, using 3/8"x 1 1/8" BHCS w/pin with 3/8" flat washers and 3/8" standard hex nutswith 3/8" flat washers. Refer to the Direct Bury Detail.
3) Attach squat frame and attachment covers to squat post assembly, us-ing 3/8" x 1 1/8" BHCS w/pin & 3/8" SAE flat washers. Refer to theSquat Frame To Post Attachment Detail.
4) Place pipebolt on the inside of frame and fasten using 3/8" x 7/8" BHCSw/pin and 3/8" SAE flat washers, as shown.
5) Insert (2) bushings into shoulder bar attachment tube. Insert cylindershaft through bushings and shoulder bar attachment tube. Insert cyl-inder shaft into shaft plate slots. Refer to Shoulder Bar AssemblyDetail.
6) Attach shoulder bar assembly to squat frame, using 3/8" x 1 1/8" BHCSw/pin with 3/8" SAE flat washers and 3/8" standard hex nuts with 3/8"SAE flat washers. Refer to Detail.
7) Insert cylinder shaft through spacers, thrust washers and cylinder, asshown. Insert cylinder shaft into shaft plate slots. Refer to CylinderAssembly Detail.
8) Attach cylinder assembly to squat frame, using 3/8" x 1 1/8" BHCS w/pinwith 3/8" SAE flat washers and 3/8" standard hex nuts with 3/8" SAEflat washers. Refer to Detail.
9) Attach cylinder assembly to shoulder bar, using cylinder pin, cylin-der spacer and 5/16" x 1/2" BHCS w/pin, as shown. Refer to Detail.
10) Attach shroud cover to frame, using 5/16" x 7/8" BHCS w/pin and 3/8"SAE flat washers, as shown. Refer to the Shoulder Pad/Shroud CoverAttachment Detail.
11) Slide shoulder pads onto shoulder bar, and fasten using 5/8" O.D. x 3/8"bushings, 3/8" x 1 1/8" BHCS w/pin, 5/8" flat washers and 3/8" flat wash-ers, as shown. Refer to the Shoulder Pad/Shroud Cover AttachmentDetail.
12) (Surface Mount) With squat post assembly in final position, use acenter punch to mark expansion anchor locations on concrete slabthrough holes in squat post assembly plate.
Move squat post assembly aside and drill 3/4" x 2 1/4" deep holes intoconcrete, using a hammer drill and 3/4" masonry bit. NOTE: Drillholes perpendicular to the work surface. To assure full holding power,do not ream holes or allow the drill to wobble. Verify hole depthafter drilling. Clean holes using compressed air.
Tap double expansion anchors (with threaded end down) into drilledholes. Reposition squat post assembly. Fasten squat post assembly toexpansion anchors, using 3/8" x 2 1/4" BHCS w/pin and 3/8" flat wash-ers.
Document #18903600
Sheet 4 of 4
J:\INSTSPEC\SPECS\189\18903600.P65
Document #18903200
177723 Stretch StationHealthBeat®
18106300
Sheet 1 of 3
© 2013 by Landscape Structures. All rights reserved.
601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185
Stretch StationPost Assembly
DETAILFOOT PAD ATTACHMENT
(2) Foot Pads
SwivelAssembly
SwivelAssembly
(2) Foot Pads
HandleAssembly
Upright PostAssembly
Top Rail
Upright StraightPost(Direct Bury Only)
DETAILTOP RAIL ATTACHMENT
Upright Post Assembly& Upright Straight Post
Top Rail(4) 1/4" x 3/8"Drive Rivets
DETAIL
(8) 3/8" x 1 1/8"BHCS w/Pinw/ 3/8" SAEFlat Washers
Stretch StationPost Assembly
(4) AttachmentCovers
HandleAssembly &UprightPostAssembly
(8) 3/8" x 7/8"BHCS w/Pinw/ 3/8" SAEFlat Washers
(4) 1/4" x 3/16"Drive RivetsGround Pipe
Assembly
177723 Stretch StationHealthBeat®
181063a
© 2013 by Landscape Structures. All rights reserved.
601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185
PLAN VIEW /FOOTING LAYOUT
ConcreteFooting
29"737
27
1/ 8
"6
89
82 3/8"2092
10 11/16"271
69
3 /1
6"1
75
7
95
15/ 1
6"2
43
7
7 11/16"195
121 1/8"3077
71
"1
80
3
SwivelAssembly
Foot Pads
HandleAssembly
Upright PostAssembly
Top Rail
UprightStraightPost
Stretch StationPost Assembly
176456a
DETAILDIRECT BURY
STRETCH STATION POST ASSEMBLY DETAILDIRECT BURY
(GROUND PIPE & POST)
Concrete
CrushedRock
Fitness Footer
(4) 3/8" x 1 1/8"BHCS w/Pin& 3/8" FlatWashers
(4) 3/8" StandardHex Nuts & 3/8" FlatWashers
Finished Grade
18"457
20
" M
in.
50
8
34
"8
60
14"356
20
" M
in.
50
8
34
"8
64
Finished Grade
Concrete
CrushedRock
Stretch Station PostAssembly
DETAILSURFACE MOUNT
Swivel Assembly & Mobility PostAssembly
Concrete CrushedRock
5" /127Minimum
177723 Stretch StationHealthBeat®
© 2013 by Landscape Structures. All rights reserved.
601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 (763) 972-3391 1-888-LSI-INST (1-888-574-4678) FAX (763) 972-3185
Document #18903200
Sheet 2 of 3
189032c
Ground PipeAssembly(Shown) &Upright StraightPost
(8) 3/8" x 2" DoubleExpansion Anchors(ThreadedEnd Down)
(8) 3/8" x 2 1/4"BHCS w/Pin w/ 3/8"Flat Washers
HealthBeat® 177723 Stretch Station
J:\INSTSPEC\SPECS\189\18903200.P65
Parts List
Part # Description Qty.107440-00 Ground Pipe Assembly (DB) .................................... 1160829-00 Foot Pad, Black .......................................................... 2160895-00 Fitness Footer, (DB), Specify Color ........................ 1161640-00 Attachment Cover, Silver .......................................... 4176827-00 Stretch Station Post Assembly, Specify Color ........ 1176828-00 Top Rail, Specify Color ............................................. 1176829-00 Upright Post Assembly, Specify Color .................... 1176935-00 Upright Straight Post, DB, Specify Color ............... 1178047-00 Handle Assembly, Specify Color .............................. 1178049-00 Swivel Assembly, SM, Specify Color ...................... 1178053-00 Swivel Plate Assembly, DB, Specify Color ............ 1
181446-00 Stretch Station Hardware Package ...................... 1100196-00 3/8" x 7/8" BHCS w/Pin, SST ..................................... 8100198-00 3/8" x 1 1/8" BHCS w/Pin, SST .................................. 8100365-00 3/8" SAE Flat Washer, SST ....................................... 16100609-00 1/4" x 3/16" Drive Rivet, AL/SST ............................... 4100611-00 1/4" x 3/8" Drive Rivet, AL/SST ................................ 4
155083-00 Post Extension DB Hardware Package ............... 1100198-00 3/8" x 1 1/8" BHCS w/Pin, SST .................................. 4100327-00 3/8" Standard Hex Nut, SST ...................................... 4100362-00 3/8" Flat Washer, SST ................................................. 8
188103-00 4-Hole (SM) Hardware Package ........................... 2100199-00 3/8" x 2 1/4" BHCS w/Pin, SST .................................. 8187933-00 3/8" x 2" Double Expansion Anchor ......................... 8100362-00 3/8" Flat Washer, SST ................................................. 8
SM = Surface MountDB = Direct Bury
Specifications
Top Rail: Weldment comprised of 1.315" (33,4 mm) O.D. RS20(.080" - .090") (2,03 mm-2,29 mm) galvanized steeltubing and 1.900" (48,26 mm) O.D. RS40 (.120" -.130") (3,05 mm-3,30 mm) galvanized steel tubing.Finish: ProShield®, color specified.
Handle Assembly: Weldment comprised of 1.315" (33,4 mm) O.D. RS20(.080" - .090") (2,03 mm-2,29 mm) galvanized steeltubing, 1.900" (48,26 mm) O.D. RS20 (.090" - .100")(2,29 mm-2,54 mm) galvanized steel tubing, and 7 GA.(.179") (4,55 mm) HRPO sheet steel. Finish:ProShield, color specified.
Upright Post Assy.: Weldment comprised 1.900" (48,26 mm) O.D. RS40(.120" - .130") (3,05 mm-3,30 mm) galvanized steeltubing and 7 GA.(.179") (4,55 mm) HRPO sheet steel.Finish: ProShield, color specified.
StraightUpright Post: Weldment comprised 1.900" (48,26 mm) O.D. RS40
(.120" - .130") (3,05 mm-3,30 mm) galvanized steeltubing. Finish: ProShield, color specified.
Post Assembly: Weldment comprised of 1/4" (6,35 mm) HRPO steelplate, 1/4" (6,35 mm) stainless steel plate, and 10" (254mm) O.D. x 12 GA. (.105") (2,67 mm) wall steel tubezinc plated. Finish: ProShield, color specified. (PostCap) Fabricated from A356 sand casted aluminum.Finish: ProShield, silver. (Sign) Digital image istransfered to a .032" (0,81 mm) thick ProShield coatedaluminum plate, then infused into the ProShield.
Fitness Footer: Weldment comprised of 5.000" (127 mm) O.D. x 11GA. (.120") (3,05 mm) galvanized steel tube and 1/4"(6,35 mm) HRPO steel plate. Finish: ProShield, colorspecified.
Foot Pad: Rotationally molded from U.V. stabilized linear lowdensity polyethylene, black in color.
Swivel Assembly: Weldment comprised of 2.375" (60,33 mm) O.D. x.188" (4,78 mm) wall steel tubing, and 1/4" (6,35 mm)HRPO steel sheet. Finish: ProShield, color specified.
Attachment Cover: Fabricated from A356 sand casted aluminum. Finish:ProShield, silver.
Ground Pipe Assy.: Comprised of 1.660" O.D. schedule 80 black pipe,and oil impregnated bronze bearings.
Fasteners: Primary fasteners shall be socketed and pinnedtamperproof in design, stainless steel (SST) per ASTMF 879 unless otherwise indicated (see specific prod-uct installation/specifications).
Installation Time: (DB) 5 man hours(SM) 4 man hours
AreaRecommended: 6' x 14' (1,83 m x 4,27 m)
Weight: (DB) 212 lbs.(SM) 182 lbs.
Concrete: (DB) Approx. 6.51 cu.ft.
Specifications are subject to change without notice.
Eco #54718 Document 18903200 replaces 18106300. Replaced expansion anchors with double expansionanchors.
HealthBeat® 177723 Stretch Station
Document #18903200Sheet 3 of 3
Installation Instructions
1) (Direct Bury) Dig footings as shown. Place fitness footer in footinghole. With fitness footer in plumb position, pour concrete footing.Allow concrete footing to cure a minimum of 72 hours before at-taching stretch station post assembly to fitness footer. Refer to theDirect Bury Detail. Attach stretch station post assembly to fitness footer,using 3/8" x 1 1/8" BHCS w/pin with 3/8" flat washers and 3/8" standardhex nuts with 3/8" flat washers. Refer to the Direct Bury Detail.
(Surface Mount) With stretch station post assembly in final posi-tion, use a center punch to mark expansion anchor locations on con-crete slab through holes in assembly plate.
Move stretch station assembly post aside and drill 3/4" x 2 1/4" deepholes into concrete, using a hammer drill and 3/4" masonry bit. NOTE:Drill holes perpendicular to the work surface. To assure full hold-ing power, do not ream holes or allow the drill to wobble. Verifyhole depth after drilling. Clean holes using compressed air.
Tap double expansion anchors (with threaded end down) into drilledholes. Reposition stretch station post assembly. Fasten stretch stationpost assembly to expansion anchors, using 3/8" x 2 1/4" BHCS w/pinand 3/8" flat washers.
2) Attach upright post assembly and handle assembly to stretch stationpost assembly, using attachment covers, 3/8" x 1 1/8" BHCS w/pin and3/8" SAE flat washers. Refer to Detail.
3) Insert upright straight post into top rail. Place top rail onto uprightpost assembly. Drill 1/4" holes through upright straight post and up-right post assembly, using the predrilled 1/4" holes in top rail as aguide. Insert 1/4" x 3/8" drive rivets into drilled holes and tap pin inuntil it is flush with rivet head. Refer to the Top Rail AttachmentDetail.
4) (Direct Bury) Place swivel plate assembly over bearings on groundpipe assembly. Tap 1/4" x 3/16" drive rivets into holes.
(Surface Mount) With swivel assembly in final position, use a cen-ter punch to mark expansion anchor locations on concrete slabthrough holes in assembly plate.
Move swivel assembly aside and drill 3/4" x 2 1/4" deep holes intoconcrete, using a hammer drill and 3/4" masonry bit. NOTE: Drillholes perpendicular to the work surface. To assure full holding power,do not ream holes or allow the drill to wobble. Verify hole depthafter drilling. Clean holes using compressed air.
Tap double expansion anchors (with threaded end down) into drilledholes. Reposition swivel assembly. Fasten swivel assembly to expan-sion anchors, using 3/8" x 2 1/4" BHCS w/pin and 3/8" flat washers.
(Surface Mount) Place swivel plate assembly over bearings onswivel assembly. Tap 1/4" x 3/16" drive rivets into holes.
5) Attach foot pads to swivel plate assembly, using 3/8" x 7/8" BHCS w/pin and 3/8" SAE flat washers. Refer to Foot Pad Attachment Detail.
6) (Direct Bury) With upright straight post and ground pipe assemblyin plumb position, pour concrete footings. Allow concrete footingsto cure a minimum of 72 hours before users are allowed to play onthe fitness equipment.
© 2013 by Landscape Structures. All rights reserved.
601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 888-574-4678 LSI Install Help 888-438-6574 LSI Direct 763-972-5200 Int. FAX (763) 972-3185
Document #19308000
161311 Tai Chi WheelsHealthBeat®
DETAILSPEED BALL ATTACHMENT
(2) SpeedBalls
(2) 3/16" x 1 1/4"Spring Pins
(2) Tai ChiWheels
16380000
(2) 1.25" O.D. x 1.25"Bushings
Sign
(2) Tai ChiWheels
(2) Speed Balls
Right Tai Chi Arm
(4) 3/8" x 1 1/8"BHCS w/Pin &3/8" SAE FlatWashers
Tai Chi Post Assembly
DETAILWHEEL ATTACHMENT
(2) Tai ChiWheels
(2) 1.25" O.D. x 2"Bushings
(2) Tai Chi Arms
(2) 5/16" x 1/2"BHCS w/Pin
Left Tai Chi Arm
DETAILARM ATTACHMENT
(2) Tai ChiArms
Tai Chi Post Assembly
(2) AttachmentCovers
Sheet 1 of 2
ArmShaft
WheelShaft
(2) AttachmentCovers
PLAN VIEW
53
3 /4"
13
65
46
7 /8"
119
04
0"
10
20
23"580
Specifications are subject to change without notice.
HealthBeat® 161311 Tai Chi Wheels
J:\INSTSPEC\SPECS\193\19308000.P65
Parts List
Part # Description Qty.192247-00 Tai Chi Wheel, Specify Color ................................... 2160677-00 Tai Chi Arm, (RT.), Specify Color ........................... 1160682-00 Tai Chi Arm, (LT.), Specify Color ........................... 1160797-00 Tai Chi Post Assembly, Specify Color ..................... 1160895-00 Fitness Footer, (DB), Specify Color ........................ 1161640-00 Attachment Cover, Silver .......................................... 2
155083-00 Post Extension (DB) Hardware Package ............. 1100198-00 3/8" x 1 1/8" BHCS w/Pin, SST .................................. 4100327-00 3/8" Standard Hex Nut, SST ...................................... 4100362-00 3/8" Flat Washers, SST ............................................... 8
188103-00 4-Hole (SM) Hardware Package ........................... 1100199-00 3/8" x 2 1/4" BHCS w/Pin, SST .................................. 4187933-00 3/8" x 2" Double Expansion Anchor ......................... 4100362-00 3/8" Flat Washer, SST ................................................. 4
161662-00 Tai Chi Wheels Hardware Package ...................... 1100198-00 3/8" x 1 1/8" BHCS w/Pin, SST .................................. 4100365-00 3/8" SAE Flat Washers, SST ...................................... 4116788-00 3/16" x 1 1/4" Spring Pin, SST .................................... 2131849-00 5/16" x 1/2" BHCS w/Pin, SST .................................... 2160680-00 1.25" O.D. x 2" Bushing ........................................... 2160683-00 1.25" O.D. x 1.25" Bushing ..................................... 2163655-00 Speed Ball, Aluminum .............................................. 2
SM = Surface MountDB = Direct BuryRT. = RightLT. = Left
Specifications
Tai Chi Wheel: Weldment comprised of .125" thick aluminum alloy6061, aluminum round hub and aluminum shaft. Fin-ish: ProShield®, color specified.
Tai Chi Arm: Weldment comprised of 1.660" O.D. RS20 (.085"-.095" wall) galvanized steel tube, 3/16" HRPO sheetsteel and stainless steel shaft. Finish: ProShield, colorspecified.
Attachment Cover: Fabricated from A356 sand casted aluminum. Finish:ProShield, silver in color.
Post Assembly: Weldment comprised of 1/4" HRPO steel plate, 1/4"stainless steel plate, and 10" O.D. x 12 GA. (.105"wall) steel tube zinc plated. Finish: ProShield, colorspecified. (Post Cap) Fabricated from A356 sandcasted aluminum. Finish: ProShield, silver. (Sign)Digital image is transfered to a .032" thick ProShieldcoated aluminum plate, then infused into the ProShield.
Fitness Footer: Weldment comprised of 5.000" O.D. x 11 GA. galva-nized steel tube and 1/4" HRPO steel plate. Finish:ProShield, color specified.
Speed Ball: Fabricated from 6061-T6 aluminum. Finish: Clearanodize.
Fasteners: Primary fasteners shall be socketed and pinnedtamperproof in design, stainless steel (SST) per ASTMF 879 unless otherwise indicated (see specific prod-uct installation/specifications).
Installation Time: (DB) 2 man hoursArea
Recommended: 60" x 72" (1,52 m x 1,83 m)Weight: (DB) 125 lbs.
(SM) 95 lbs.Concrete: (DB) Approx. 3 cu.ft.
Installation Instructions
1) (Direct Bury) Dig footing as shown. Place fitness footer in footinghole. With fitness footer in plumb position, pour concrete footing.Allow concrete footing to cure a minimum of 72 hours before attach-ing post assembly to fitness footer.
2) (Direct Bury) Attach Tai Chi Post Assembly to fitness footer, using 3/8"x 1 1/8" BHCS w/pin with 3/8" flat washers and 3/8" standard hex nutswith 3/8" flat washers. Refer to the Direct Bury Detail.
3) Attach attachment covers and arms and to Tai Chi Post Assembly, us-ing 3/8" x 1 1/8" BHCS w/pin & 3/8" SAE flat washers. Refer to the ArmAttachment Detail.
4) Place 1.25" O.D. x 2" bushings and wheels onto arm shafts and fas-ten using 5/16" x 1/2" BHCS w/pin. Refer to the Wheel AttachmentDetail.
5) Place 1.25" O.D. x 1.25" bushings and speed balls onto wheel shafts.Tap 3/16" x 1 1/4" spring pins into holes in speed balls. Refer to theSpeed Ball Attachment Detail.
6) (Surface Mount) With Tai Chi Post Assembly in final position, use acenter punch to mark expansion anchor locations on concrete slabthrough holes in Tai Chi Post Assembly plate.
Move Tai Chi Post Assembly aside and drill 3/4" x 2 1/4" deep holes intoconcrete, using a hammer drill and 3/4" masonry bit. NOTE: Drillholes perpendicular to the work surface. To assure full holding power,do not ream holes or allow the drill to wobble. Verify hole depthafter drilling. Clean holes using compressed air.
Tap double expansion anchors (with threaded end down) into drilledholes. Reposition Tai Chi Post Assembly. Fasten Tai Chi Post Assemblyto expansion anchors, using 3/8" x 2 1/4" BHCS w/pin and 3/8" flat wash-ers.
Eco #54834 Document 19308000 replaces 18904000. Replaced Tai Chi Wheel.
© 2013 by Landscape Structures. All rights reserved.
601 7TH STREET SOUTH, DELANO, MINNESOTA 55328-8605 888-574-4678 LSI Install Help 888-438-6574 LSI Direct 763-972-5200 Int. FAX (763) 972-3185
Document #19308000
161311 Tai Chi WheelsHealthBeat® Sheet 2 of 2
DETAILSURFACE MOUNT
Tai ChiPost Assembly
ConcreteCrushedRock
DETAILDIRECT BURY
Concrete
CrushedRock
Fitness Footer
(4) 3/8" x 1 1/8"BHCS w/Pin3/8" FlatWashers
(4) 3/8" StandardHex Nuts & 3/8" FlatWashers
18"460
20
" M
in.
51
0
34
"8
60
Tai ChiPost Assembly
Finished Grade
5" /130Minimum
189039d
(4) 3/8" x 2" DoubleExpansion Anchors(ThreadedEnd Down)
(4) 3/8" x 2 1/4"BHCS w/Pin w/ 3/8"Flat Washers