Page 1: Mumbai-Ahmedabad High Speed Railway Corridor...• Mumbai-Ahmedabad corridor has huge potential as an industrial and economic growth zone in India. • To build a standard-gauge line

Dr. Toshiji TAKATSU, Executive Vice President

Mumbai-Ahmedabad High Speed Railway Corridor

Japan International Consultants for Transportation Co., Ltd. (JIC)

February 2013

Page 2: Mumbai-Ahmedabad High Speed Railway Corridor...• Mumbai-Ahmedabad corridor has huge potential as an industrial and economic growth zone in India. • To build a standard-gauge line

“Preliminary Study on the Formation of High-SpeedRailway Project in Western India”

Ministry of Land, Infrastructure, Transport andTourism of Japan

Basis of this Presentation

1

Page 3: Mumbai-Ahmedabad High Speed Railway Corridor...• Mumbai-Ahmedabad corridor has huge potential as an industrial and economic growth zone in India. • To build a standard-gauge line

Route Alignment Design and Stations (DRAFT)

③④

2(Source; Google)

Page 4: Mumbai-Ahmedabad High Speed Railway Corridor...• Mumbai-Ahmedabad corridor has huge potential as an industrial and economic growth zone in India. • To build a standard-gauge line

Gujarat Maharashtra

Area 196,024 Km2 307,713 km2

Population 60.4 million 112 million

Population Density(per km2) 308 365

Population Rank 10 2

Population Density Rank 15 12

Urban Population 37.4% 42.4%

GDP (in millions) $90,650 $190,310

GDP (per Capita) $1,510 $1,700

Basic Information on Gujarat State & Maharashtra State

3

Page 5: Mumbai-Ahmedabad High Speed Railway Corridor...• Mumbai-Ahmedabad corridor has huge potential as an industrial and economic growth zone in India. • To build a standard-gauge line

Principle of Technical Specification for HSR

・In Japan, conventional line: narrow gauge, HSR: standard gauge.

・We propose standard gauge for HSR in India (even though conventional line has broad gauge), as following reasons: Main stream of world HSR is standard gauge Capacity of the conventional line would be limited for HSR Securing safety in different speeds of railway operations

4

To build a standard-gauge HSR line completely separating from the existing network would be recommended.

Page 6: Mumbai-Ahmedabad High Speed Railway Corridor...• Mumbai-Ahmedabad corridor has huge potential as an industrial and economic growth zone in India. • To build a standard-gauge line

Design Specifications of HSR (DRAFT)Item Design Specification

Gauge 1435mmNumber of line Double track (One way)Maximum design speed 350km/hMaximum operation speed 320km/hDistance between track centerline 4.3m

Width of formation level 11.3m

5

Page 7: Mumbai-Ahmedabad High Speed Railway Corridor...• Mumbai-Ahmedabad corridor has huge potential as an industrial and economic growth zone in India. • To build a standard-gauge line

Design Specifications of HSR (DRAFT)Item Design Specification

Cross-section of tunnel 63.4m2 (double track)Maximum axle load 16tFeeder voltage AC 2x25kVSignaling system Digital-ATC

Train radio LCX (Leaky CoaXial Cable)Rolling stock Maximum 16 cars

(Number of passenger capacity:High-speed type 1300/Double-decker type 1600)

Car body width : 3.4m

6

Page 8: Mumbai-Ahmedabad High Speed Railway Corridor...• Mumbai-Ahmedabad corridor has huge potential as an industrial and economic growth zone in India. • To build a standard-gauge line

Cross section double track in embankment(Slab track)

4300

20200

11300

900

3500 3500

800 800

7

Page 9: Mumbai-Ahmedabad High Speed Railway Corridor...• Mumbai-Ahmedabad corridor has huge potential as an industrial and economic growth zone in India. • To build a standard-gauge line

Station

• The locations of Mumbai and Ahmedabad stations and big station were examined in the center of the city area.

• The intermediate stations were also examined for the convenience of passengers along the railroad line, and future development along the line.

• Small stations were examined in the location to the center of the town as close as possible.

The Basic Policy of Alignment for HSR No.1 in India

8

Stations layout in consideration of the convenience for users and city planning, etc.

Page 10: Mumbai-Ahmedabad High Speed Railway Corridor...• Mumbai-Ahmedabad corridor has huge potential as an industrial and economic growth zone in India. • To build a standard-gauge line

Between stations

• A plane and profile were determined in consideration of high speed operation for HSR.

• A national park and a sanctuary were avoided for an effect of the natural environment.

• Existing buildings were also avoided for an effect of the human community and the social environment.

• Location of the large bridge were considered where is the best way pass through the big river.

The Basic Policy of Alignment for HSR No.1 in India

9

Alignment to secure the high-speed operation in consideration of the natural and social environment

Page 11: Mumbai-Ahmedabad High Speed Railway Corridor...• Mumbai-Ahmedabad corridor has huge potential as an industrial and economic growth zone in India. • To build a standard-gauge line

Station Layout (tentative)No. of station: 11Total length: 498.5kmAverage length between stations: 49.8km

Stations layout to secure the high-speed operation and to expect maximizing demand

10

Page 12: Mumbai-Ahmedabad High Speed Railway Corridor...• Mumbai-Ahmedabad corridor has huge potential as an industrial and economic growth zone in India. • To build a standard-gauge line

Conceptual Drawing for HSR in Ahmedabad (draft)

Profile

Plan

11

Page 13: Mumbai-Ahmedabad High Speed Railway Corridor...• Mumbai-Ahmedabad corridor has huge potential as an industrial and economic growth zone in India. • To build a standard-gauge line

The future demand of current transport modes (railway, airplane,private car and bus) is estimated by using the four-step model.

Demand Forecasting

Four- Step Method of Demand Forecast

1) Trip Generation / Attraction Model

2) Trip Distribution Model

3) Modal Split Model

4) Traffic Assignment12

Page 14: Mumbai-Ahmedabad High Speed Railway Corridor...• Mumbai-Ahmedabad corridor has huge potential as an industrial and economic growth zone in India. • To build a standard-gauge line

Demographic Conditions along the proposed Line of HSR

(Source; Population Census 2001, 2011)

Population Density (2011) Annual Average Population Growth Ratio 2001 - 2011

13

Page 15: Mumbai-Ahmedabad High Speed Railway Corridor...• Mumbai-Ahmedabad corridor has huge potential as an industrial and economic growth zone in India. • To build a standard-gauge line

34,000,000

39,000,000

44,000,000

49,000,000

54,000,000

59,000,000

ALT

1(1A

*1.0

)

ALT

2( 1

A*1

.5)

ALT

3(1A

*2.0

)

Rs./

Day

HSR fare is set more than 1A class of existing railway and less than air fare. Fare revenue is the highest in case of ALT2.ALT2: HSR fare is 1.5 times fare of 1A class of existing railway.

Fare Level Setting and Fare Revenue

Fare Level Setting HSR Fare Revenue by Fare Level

14

Page 16: Mumbai-Ahmedabad High Speed Railway Corridor...• Mumbai-Ahmedabad corridor has huge potential as an industrial and economic growth zone in India. • To build a standard-gauge line

194

247247

248

248

253

235

232

186

180

Daily Boarding Passengers: 29,529 Persons/dayMaximum Sectional Passengers: 25,326 Persons/day

Unit : Persons/day

Sectional Passengers of Route No.1 HSR in 2020 (ALT2 Case)

Mumbai

Ahmedabad

Vadodara

Surat

Thane

15

Page 17: Mumbai-Ahmedabad High Speed Railway Corridor...• Mumbai-Ahmedabad corridor has huge potential as an industrial and economic growth zone in India. • To build a standard-gauge line

151,

739

194,

291

194,

986

195,

276

195,

409

199,

410

180,

967

178,

650

141,

488

136,

429

-20,000 40,000 60,000 80,000

100,000 120,000 140,000 160,000 180,000 200,000

Mum

bai -

Than

e

Than

e -V

irar

Vira

r -D

hanu

Dha

nu -

Vapi

Vapi

-Va

lsad

Vals

ad -

Sura

t

Sura

t -Bh

aruc

h

Bhar

uch

-Vad

odar

a

Vado

dara

-An

and/

Nad

iad

Anan

d/N

adia

d -

Ahm

edab

ad

Passengers (2050) ALT2

Daily Boarding Passengers: 231,522 Persons/dayMaximum Sectional Passengers: 199,410 Persons/day

Unit : Persons/day

Sectional Passengers of Route No.1 HSR in 2050 (ALT2 Case)

1517

19431950

1953

1954

1994

1810

1787

1415

1364

Mumbai

Ahmedabad

Vadodara

Surat

Thane

16

Page 18: Mumbai-Ahmedabad High Speed Railway Corridor...• Mumbai-Ahmedabad corridor has huge potential as an industrial and economic growth zone in India. • To build a standard-gauge line

Traffic Volume and Number of Trains (tentative)

year 2020 2030 2040 2050

Number of cars per train 10 10 16 16

Capacity(seat) 750 750 1270 1270

Traffic Volume(day/direction) 13000 27000 55000 100000

Number of Trains(day/direction) 25 - 30 50 - 60 60 - 70 120 - 130

Number of Trains at peak hour

(train/hour/direction)2 4 6 10

Traffic volume is tentativeness.

Traffic volume may change in the future. With it, Number of trains change, too.

17

Page 19: Mumbai-Ahmedabad High Speed Railway Corridor...• Mumbai-Ahmedabad corridor has huge potential as an industrial and economic growth zone in India. • To build a standard-gauge line

Image of Train Diagram (in 2050)

18

Mumbai – AhmedabadRapid train: 1 h 57 min.Each stop train: 2 h 40 min.

2 trains (2020)

10 trains (2050)

Number of Trains at peak hour (train/hour/direction)

Rapid train

Each stop train

Mumbai

Surat

Vadodara

Ahmedabad

Thane

Virar

Dahanu

Vapi

Valsad

Anand/Nadiad

Bharuch

7 8 9

Page 20: Mumbai-Ahmedabad High Speed Railway Corridor...• Mumbai-Ahmedabad corridor has huge potential as an industrial and economic growth zone in India. • To build a standard-gauge line

Conclusion

• Mumbai-Ahmedabad corridor has huge potential as an industrial and economic growth zone in India.

• To build a standard-gauge line completely separating from the existing network would be recommended.

• High volume of railway demand would be expected in the HSR.

• Collaboration of railway development and town development would be quite important in station planning.