multinational study for the abidjan lagos corridor … · 2019-06-29 · route optimization. 4. to...

35
AFRICAN DEVELOPMENT FUND MULTINATIONAL STUDY FOR THE ABIDJAN LAGOS CORRIDOR HIGHWAY DEVELOPMENT PROJECT DEPARTMENTS OITC/ONRI/ORNG/GHFO/TGFO/GECL September 2016 Translated document Public Disclosure Authorized Public Disclosure Authorized

Upload: others

Post on 09-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MULTINATIONAL STUDY FOR THE ABIDJAN LAGOS CORRIDOR … · 2019-06-29 · route optimization. 4. To ensure effective operations and impact of the new highway, other study activities

AFRICAN DEVELOPMENT FUND

MULTINATIONAL

STUDY FOR THE ABIDJAN – LAGOS CORRIDOR

HIGHWAY DEVELOPMENT PROJECT

DEPARTMENTS OITC/ONRI/ORNG/GHFO/TGFO/GECL

September 2016

Translated document

Pu

bli

c D

iscl

osu

re A

uth

ori

zed

Pu

bli

c D

iscl

osu

re A

uth

ori

zed

Page 2: MULTINATIONAL STUDY FOR THE ABIDJAN LAGOS CORRIDOR … · 2019-06-29 · route optimization. 4. To ensure effective operations and impact of the new highway, other study activities

TABLE OF CONTENTS

PROJECT SUMMARY ......................................................................................................................................... iv PROJECT OVERVIEW .......................................................................................................................... iv

NEEDS ASSESSMENT .......................................................................................................................... iv

BANK’S ADDED VALUE ...................................................................................................................... v

KNOWLEDGE MANAGEMENT .............................................................................................................. v

1 STRATEGIC THRUST & RATIONALE .................................................................................................... 1 1.1 PROJECT LINKAGES WITH COUNTRIES STRATEGIES AND OBJECTIVES ................................... 1

1.2 RATIONALE FOR BANK’S INVOLVEMENT............................................................................... 2

1.3 DONORS COORDINATION ....................................................................................................... 3

2 PROJECT DESCRIPTION ........................................................................................................................... 3 2.1 PROJECT DEVELOPMENT OBJECTIVES ................................................................................... 3

2.2 PROJECT DESCRIPTION AND COMPONENTS ........................................................................... 3

2.3 TECHNICAL SOLUTION RETAINED AND OTHER ALTERNATIVES EXPLORED ........................... 4

2.4 PROJECT TYPE ........................................................................................................................ 5

2.5 PROJECT COST AND FINANCING ARRANGEMENTS ................................................................. 5

2.6 PROJECT’S TARGET AREA AND BENEFICIARIES ..................................................................... 6

2.7 PARTICIPATORY PROCESS FOR PROJECT DESIGN AND IMPLEMENTATION .............................. 7

2.8 BANK GROUP EXPERIENCE, LESSONS REFLECTED IN PROJECT DESIGN ................................. 7

2.9 KEY PERFORMANCE INDICATORS .......................................................................................... 7

3 PROJECT FEASIBILITY ............................................................................................................................. 7 3.1 ECONOMIC AND FINANCIAL PERFORMANCE .......................................................................... 7

3.2 ENVIRONMENTAL AND SOCIAL IMPACTS............................................................................... 8

4 IMPLEMENTATION ................................................................................................................................... 8 4.1 IMPLEMENTATION ARRANGEMENTS ..................................................................................... 8

4.2 MONITORING ....................................................................................................................... 11

4.3 GOVERNANCE ...................................................................................................................... 11

4.4 SUSTAINABILITY .................................................................................................................. 11

4.5 RISK MANAGEMENT ............................................................................................................. 11

4.6 KNOWLEDGE BUILDING ....................................................................................................... 12

5 LEGAL INSTRUMENTS AND AUTHORITY ......................................................................................... 12 5.1 LEGAL INSTRUMENT ............................................................................................................ 12

5.2 CONDITIONS ASSOCIATED WITH BANK’S INTERVENTION .................................................... 12

6 RECOMMENDATION .............................................................................................................................. 13

APPENDIX I: COMPARATIVE SOCIO-ECONOMIC INDICATORS - COTE D’IVOIRE APPENDIX I: COMPARATIVE SOCIO-ECONOMIC INDICATORS – GHANA

APPENDIX I: COMPARATIVE SOCIO-ECONOMIC INDICATORS – TOGO

APPENDIX I: COMPARATIVE SOCIO-ECONOMIC INDICATORS –BENIN

APPENDIX I: COMPARATIVE SOCIO-ECONOMIC INDICATORS – NIGERIA

APPENDIX II TABLE OF AFDB’S PORTFOLIO IN THE FIVE COUNTRIES

APPENDIX III ABIDJAN- LAGOS RELATED PROJECTS FINANCED BY BANK AND OTHER DONORS,

MARCH 2015

APPENDIX IV: SHARE OF COMPONENT COST BY SOURCE

APPENDIX V: STUDY MAP

Page 3: MULTINATIONAL STUDY FOR THE ABIDJAN LAGOS CORRIDOR … · 2019-06-29 · route optimization. 4. To ensure effective operations and impact of the new highway, other study activities

i

Currency Equivalents As of July 2015

1 UA = 1.40639 USD

1 UA = 1.25213 EURO

1 UA = 821.34344 FCFA

1 UA = 4.56789GHS

1 UA = 236.1415 NGN

Fiscal Year

January 1 – December 31

Weights and Measures

1 metric tonne = 2204 pounds (lbs)

1 kilometer (km) = 0.62 mile

1 hectare (ha) = 2.471 acres

Page 4: MULTINATIONAL STUDY FOR THE ABIDJAN LAGOS CORRIDOR … · 2019-06-29 · route optimization. 4. To ensure effective operations and impact of the new highway, other study activities

ii

LIST OF ABBREVIATIONS

ADB African Development Bank

ADF African Development Fund

AIDS Acquired Immune Deficiency Syndrome

ALCO Abidjan-Lagos Corridor Organization

ALCoMA Abidjan-Lagos Corridor Management Authority

AU African Union

CI Cote d’Ivoire

DD Detailed Design

DFI Development Financial Institution

DPs Development Partners

EA Executing Agency

ECOWAS Economic Community of West African States

EDF European Development Fund

ESIA Environmental and Social Impact Assessment

ESMP Environmental and Social Management Plan

EVD Ebola Viral Disease

EU The Commission of European Union

FGN Federal Government of Nigeria

FS Feasibility Study

GDP Gross Domestic Product

ICB International Competitive Bidding

IDB Islamic Development Bank

LCS Least Cost Selection method

MS Member States

NEPAD New Partnership for Africa’s Development

PBA Performance based allocation

PCN Project Concept Note

PIDA the Programme for Infrastructure Development in Africa

PMC Participating Member Country

PMCs Participating Member Countries

QBS Quality Based Selection

QCBS Quality and Cost Based Selection

RISP Regional Integration Strategy Paper

RO Regional Envelope

RoB Republic of Benin

RoCI Republic of Cote d’Ivoire

RoG Republic of Ghana

RPG Regional Public Good

SDT Study Delivery Team

TA Technical Assistance

TR Togolese Republic

ToR Terms of Reference

TYS Ten Year Strategy

UA Unit of Account

WAEMU West African Economic and Monetary Union

Page 5: MULTINATIONAL STUDY FOR THE ABIDJAN LAGOS CORRIDOR … · 2019-06-29 · route optimization. 4. To ensure effective operations and impact of the new highway, other study activities

iii

Loan Information

Client’s information

BORROWER/RECIPIENT: REPUBLIC OF BENIN,

REPUBLIC OF COTE D’IVOIRE,

REPUBLIC OF GHANA,

FEDERAL REPUBLIC OF NIGERIA,

TOGOLESE REPUBLIC

ECONOMIC COMMUNITY OF WEST AFRICAN STATES

(ECOWAS).

EXECUTING AGENCY(S): THE DEPARTMENT OF INFRASTRUCTURE, ECOWAS

COMMISSION

Financing plan

SOURCE

Amount (in UA millions)

Total Instrument % Total RoCI† RoG* TR† RoB* FGN*

ECO

WAS

ADF/ PBA 1.00 1.00 1.00 1.00 1.00 - 5.00 Loan/Grant 45.13

ADF/RPG - - - - - 4.00 4.00 Grant 36.10

Sub Total 1.00† 1.00* 1.00† 1.00* 1.00* 4.00 9.00 81.23

IPPF - - - - - 1.92 1.92 Grant 17.33

ECOWAS - - - - - 0.16 0.16 Counterpart

Contribution 1.44

Total 1.00† 1.00* 1.00† 1.00* 1.00* 6.08 11.08 100%

† Grant Instruments; * Loan Instrument RPG: Regional Public Good PBA: Performance Based Allocation

Bank Group key financing information

Financing details ADF GRANT ADF LOANS

Ghana Benin Nigeria

Loan/Grant currency Unit of Account (UA) Unit of Account (UA)

Interest type

Not applicable

fixed Not applicable fixed

Interest rate margin 1% Not applicable 1%

Commitment fee on loan 0.50% pa of the undisbursed loan amount 120 days

following signature of the Loan Agreement

Service charge on loan 0.75% pa. on amount disbursed and outstanding

Other charges Not applicable

Maturity on loans (yrs) 30 40 30

Grace period on loans (yrs) 5 5 5

Timeframe - Main Milestones (expected)

Concept Note Approval 31 October 2014

Project Approval 03 November 2015

Effectiveness 31 December 2015

Last Disbursement 31 December 2018

Study Completion 30 August 2018

Page 6: MULTINATIONAL STUDY FOR THE ABIDJAN LAGOS CORRIDOR … · 2019-06-29 · route optimization. 4. To ensure effective operations and impact of the new highway, other study activities

iv

PROJECT SUMMARY

Project Overview

1. The Abidjan - Lagos Corridor is a subset of the longer Dakar-Lagos Corridor, which is

part of the Trans African Highway Network within the ECOWAS region, and its development

falls under the Programme for Infrastructure Development in Africa (PIDA). The Abidjan to

Lagos section is the eastern section of the latter and on an east-west coastal axis of the region

spanning five Participating Member Countries (PMCs), namely, Cote d’Ivoire, Ghana, Togo,

Benin and Nigeria. It covers a distance of 1,028km and eight (8) border crossings. The

corridor’s current alignment traverses all major economic centres of the five PMCs starting

from “Place de la Republique” in Abidjan and finishes at Mile 2 (Eric Moore), in Lagos. It is

critical for socio-economic development of West Africa as it connects the most densely

populated and economically active parts of the sub-region and interconnects with a rail network

and major ports/airports. It also connects with other corridors on a north-south axis linking

landlocked countries as Burkina Faso, Mali, Niger and Chad.

2. The corridor currently supports approximately 75% of the trade activities of the sub-

region and considered as the spine for multi-modal trade logistics. However, deficiencies in the

functionality of the infrastructure compounded with cumbersome border management and

customs operations weakens its impact and contribution to the economic growth of the sub-

continent as a whole. The aspirations of the PMCs is therefore to extensively transform the

corridor to an extent that drastically and sustainably enhances its performance towards social

and economic development.

3. The objective of the Abidjan-Lagos Corridor Highway Study is to undertake all the

necessary studies on the hard and soft aspects necessary for the effective implementation,

operations, and economic development of the corridor, primarily between the two nodes i.e.

Abidjan and Lagos. The new highway will be a six-lane (3-lane dual) carriageway highway

and the study to be undertaken will be based on one main principle. It shall primarily follow a

new alignment, incorporating sections of the existing alignment, where necessary, to ensure

route optimization.

4. To ensure effective operations and impact of the new highway, other study activities

and output complementary to the technical design above comprise: i) an establishment of a new

supra-national semi-autonomous corridor authority, including the corresponding institutional,

legal, operations and management framework; ii) a spatial development framework and

masterplan for the corridor; and iii) trade, transport (multi-modal), transit and border

procedures.

5. The estimated cost of the study is UA11.08million (USD15.59million) with a funding

composition of: (i) ADF, UA9.0million (81.23%), comprising a grant of UA6.0million and a

loan of UA3.0million; (ii) IPPF, UA1.92million (17.33%), and; iii) ECOWAS Commission

counterpart contribution, UA0.16million (1.44%). The ADF grant of UA6.0million includes a

contribution of UA4.0million from Regional Public Goods (RPG) window and UA2.0million

from the country’s Performance-Based Allocation (PBA) window.

Needs Assessment

6. The expected outcome of the study is a comprehensive design model to enable the

PMCs, ECOWAS, Development Financial Institutions (DFIs), investors and other stakeholders

to, in aggregate, make strategic decisions on both hard and soft infrastructure investment and

implementation. The study will be based on enhancing the value-chain of the trade activities

on the corridor through increased road transport capacity, improve trade flow, create

employment and reduce poverty levels of the populations on the corridor’s axis. This requires

Page 7: MULTINATIONAL STUDY FOR THE ABIDJAN LAGOS CORRIDOR … · 2019-06-29 · route optimization. 4. To ensure effective operations and impact of the new highway, other study activities

v

a holistic approach towards the corridor’s development and critical to sustainable development

and parameters to meet these objectives will therefore be determined.

Bank’s Added Value

7. The footprint of the Bank’s past interventions in the region is generally of national or

regional dimensions although meeting national needs has usually taken precedence over

regional. This is mainly because of the challenges associated with integrating economies in

varying phases of development. . This study, on the other hand, takes a corridor-wide approach

as the primary objective and the added value stems from its aggregated experiences and

knowledge in the respective countries. The Bank will leverage its competency gained from

developing other regional corridors on the continent such as the North-South, Northern, and

Central transport corridors to enhance the design output. The Bank’s relevance in the sector

and region will also attract development financial institutions as well as the private sector to

collaborate on projects in the subsequent investment phase. In line with the Bank’s Ten Year

Strategy (TYS), this intervention will also address one of the main barriers for infrastructure

investment, which is facilitating preparedness and readiness of projects for investment.

Knowledge Management

8. The Bank’s intervention in the subsector and in the region has largely been at country

levels and a corridor-wide approach by this study expands and complements the Bank’s

knowledge in the region. The study will reveal investment options, private sector opportunities,

trade facilitation solutions, corridor operational modalities, and leveraging national and

institutional knowledge to design appropriate interventions in various sectors. The study will

deliver a useful spatial development map of all existing projects along the corridor ensuring

coherence of multi-sector investments. It will develop models to combine for spatial

development corridor and resilience to food insecurity, market intelligence platforms across

the region and along the corridor.

Page 8: MULTINATIONAL STUDY FOR THE ABIDJAN LAGOS CORRIDOR … · 2019-06-29 · route optimization. 4. To ensure effective operations and impact of the new highway, other study activities

vi

STUDY FOR THE ABIDJAN – LAGOS CORRIDOR HIGHWAY DEVELOPMENT: Results Based Logical Framework

Country and project name: Multinational (Cote d’Ivoire, Ghana, Togo, Benin and Nigeria) Abidjan-Lagos Corridor Highway Development Study

Purpose of the project: Undertake feasibility studies, detailed design and complementary studies for the transformation of the corridor into a competitive trade and transport development

corridor

RESULTS CHAIN PERFORMANCE INDICATORS MEANS OF

VERIFICATION RISKS/MITIGATION MEASURES

Indicator (including CSI) Baseline Target

IMP

AC

T

Strengthened regional integration and accelerated

economic growth Intra-trade volume among ECOWAS

countries

11%

(2011)

15% (2025)

Upon

implementation

Government / ECOWAS/

International Statistics

Reports

OU

TC

OM

ES

ECOWAS, Member Countries, Development Financial

Institutions, Investors and Stakeholders are capable of

making informed decisions on investment interventions

and operating the corridor.

Comprehensive investment tool and

model in place for effective

implementation and operation of a new

highway development corridor.

None

Optimum model

developed by

2017/18.

Appraisal for investment

initiated.

ALCoMA continued

operations.

Spatial development

framework and

masterplan in place.

Outcome Risk:

Delays in adoption and implementation of the

Study recommendations.

Comprehensive consultations with DPs,PMC and

investment roadshows to ensure buy-in and

implementable and realistic strategies are agreed.

OU

TP

UT

S

Component 1: Feasibility Studies, Environmental &

Social Impacts Assessment (ESIA), and Detailed

Engineering Design

Component 2: PPP Structuring and Transaction

Advisory

Component 3: Corridor Spatial Development Study

Component 4: Trade and Transport Facilitation

Component 5: Establishing and Operating of Abidjan

Lagos Corridor Management Authority (ALCoMA)

Component 6: Technical Assistance to ECOWAS and

Member Countries

Component 7: Road Safety Audit

Component 8: Financial Audits

1.1 Feasibility Study and ESIA

Reports, Detailed Design

Deliverables

1.2 PPP Structuring Reports &

Transaction Documents

1.3 Corridor Development Report

1.4 Trade and Transport Facilitation

Report.

1.5 Establish and operate ALCoMA

1.6 Project Management Reports,

Progress Reports, Minutes of

workshops

1.7 Road Safety Audit Report

1.8 Financial Audit Reports

Number of

Reports Reports 1.1.to

1.7 complete by

Q4/2017.

Financial Audit

reporting

completed

Q2/2018

Study reports approved

by project proponents

Set up of ALCoMA and

operational

Delayed Delivery of Study: Mitigated by:

Effective prioritisation of components; Early

completion of ToR for FS, ESIA and DD to

facilitate early launch of procurement; Full-time

Project Coordinator appointed by ECOWAS; Close

Bank supervision and monitoring. Comprehensive

TA support to complement ECOWAS resources.

Unsatisfactory Quality of Output: Mitigated by:

Selection method for main component (FS, ESIA

and DD) by QBS; All ToRs will be thoroughly

reviewed by the Bank (OITC/ONRI/ECOWAS);

TA support to ECOWAS to manage delivery.

KE

Y A

CT

IVIT

IES

COMPONENTS INPUTS

Components UA million SOURCE Amount (in UA million)

1 Feasibility Study, Environmental & Social Impacts Assessment, and Detailed Engineering

Design 5.43 ADF/PBA

5.00

2 PPP Structuring and Transaction Advisory 1.04 ADF/RPG 4.00

3 Corridor Spatial Development Study 0.98 IPPF 1.92

4 Trade and Transport Facilitation 0.68 ECOWAS 0.16

5 Corridor Management Authority: Setting Up Study (UA0.34million)

Establishment, Operations and Capacity Building (UA0.70million) 1.04

TOTAL 11.08

6 Technical Assistance Service to ECOWAS and Member States 1.01 TOTAL 11.08

7 Road Safety Audits 0.31

8 Financial Audits 0.06

BASE COST 10.55

Contingencies 0.53

TOTAL STUDY COST 11.08

Page 9: MULTINATIONAL STUDY FOR THE ABIDJAN LAGOS CORRIDOR … · 2019-06-29 · route optimization. 4. To ensure effective operations and impact of the new highway, other study activities

vii

INDICATIVE PROJECT TIME FRAME

Page 10: MULTINATIONAL STUDY FOR THE ABIDJAN LAGOS CORRIDOR … · 2019-06-29 · route optimization. 4. To ensure effective operations and impact of the new highway, other study activities

1

REPORT AND RECOMMENDATION OF THE MANAGEMENT TO

THE BOARD OF DIRECTORS ON A PROPOSED LOAN TO THE

REPUBLIC OF GHANA, FEDERAL REPUBLIC OF NIGERIA,

REPUBLIC OF BENIN, AND GRANT TO THE REPUBLIC OF COTE

D’IVOIRE, TOGOLESE REPUBLIC AND THE ECONOMIC

COMMUNITY OF WEST AFRICAN STATES (ECOWAS).

Management submits the following Report and Recommendation for a proposed i)

UA3.0million ADF Loan to the Republic of Ghana, Federal Republic of Nigeria, Republic

of Benin; and ii) UA6.0million ADF Grant, to the Republic of Cote d’Ivoire, Togolese

Republic and ECOWAS, totalling UA9.0million, to finance part of the Study for The

Abidjan – Lagos Corridor Highway Development Project.

1. STRATEGIC THRUST & RATIONALE

Project linkages with countries strategies and objectives

The development strategies and objectives of the Economic Community of West

African States (ECOWAS) 2010-2015 Strategic Plan and the Vision 2020 has been articulated

in the spirit of the objectives of the respective strategies of Members States, namely, Cote

D’Ivoire: National Development (PND) 2012-2015; Ghana: Shared Growth and Development

Agenda II (GSGDA) 2014-2017; Togo: Accelerated Growth and Employment Promotion

Strategy (2013 – 2017); Benin: Growth and Poverty Reduction Strategy III 2011-2015, and;

Nigeria: Vision 2020. The linkages of this intervention with respective country priorities are

described below and presented in the context of the project as a whole.

Cote d’Ivoire: The PND objective is to guide the path to robust, sustained and inclusive

growth towards an emerging country by 2020. The strategy has five outcomes, of which

repositioning Cote d’Ivoire as a key regional player is identified as a key objective in addition

to meeting the social objectives. Improved connectivity with its neighbours and integrating its

economy through improved infrastructure is seen as one of the prerequisites in achieving its

regional significance.

Ghana: The GSGDA strategic direction is to lay the foundation for the structural

transformation of the economy within the decade ending 2020, through industrialization

especially manufacturing, based on modernized agriculture and sustainable exploitation of

Ghana’s natural resources. The direction is underpinned by rapid infrastructure and human

development with expenditure prioritized on policies, programmes and projects in agriculture,

infrastructure (including transport, energy, oil and gas), water and sanitation, health and

education (including ICT, science, technology and innovation).

Togo: The Strategy for Accelerated Growth and Employment Promotion (SCAPE,

2013-2017) aims to accelerate growth to reduce poverty and inequality and create jobs, with

multiplier effects on income levels and quality of life. In addition, it aims also to accelerate the

achievement of the Millennium Development Goals (MDGs). To achieve these objectives,

economic policy focuses on consolidating and instituting the foundation for growth, identifying

the following as priorities for investment: i) reduction of regional disparities; ii) strengthening

governance; (iii) employment and inclusion; and (iv) promoting grassroots development.

Benin: The Growth Strategy for Poverty Reduction (GPRS 2011-2015) is structured

primarily to improve the living conditions of the population at the end of its implementation. It

is to achieve MDGs in the areas of water, basic sanitation, primary education and accomplish

significant progress in other MDGs. GPRS covers five priority areas, namely: i) sustainable

Page 11: MULTINATIONAL STUDY FOR THE ABIDJAN LAGOS CORRIDOR … · 2019-06-29 · route optimization. 4. To ensure effective operations and impact of the new highway, other study activities

2

acceleration of growth and transformation of economy, ii) infrastructure development, iii)

strengthening of human capital, iv) improving the quality of good governance and v) balanced

and sustainable development at national level.

Nigeria: Nigeria has embarked on a long-term development agenda outlined in the

Vision 20:2020 in which the currently drawn Transformation Agenda (TA) is pinned. This

Vision is synonymous with an aspiration to be among the World’s top 20 economies by the

year 2020. The primary objectives are to: (i) create an enabling environment for sustainable

economic growth; (ii) diversify the Nigerian economy; (iii) create employment opportunities;

and (iv) reduce poverty.

To achieve the above objectives collectively, the ECOWAS Vision 2020 and Article 32

of the ECOWAS revised Treaty (1993), which embodies the requirements of Member States,

stipulates deepening regional integration. A subset of this strategy is to systematically

transform the road infrastructure on the corridor. This facilitated the decision taken in

Yamoussoukro (February 2013), by the leaders of the PMCs to collaborate for the construction

of a six-lane highway from Abidjan to Lagos. The Lagos-Abidjan Corridor Highway

Development Project was consequently conceived and a Treaty facilitating the design,

implementation, and operations was signed in March 2014. It is expected that the development

of the western section of the Dakar-Lagos Corridor, i.e. the Dakar to Abidjan section, which

will maximize the competitiveness of the region will be a sequel to this project.

Rationale for Bank’s involvement

This intervention was commissioned by the Bank, following the request and

commitment demonstrated by the PMCs, and the rationale for Bank’s intervention is based on

the linkages of the project objectives with the Bank’s developmental strategies. The project is

in line with two of the five pillars of the Bank’s 2013-2022 Ten Year Strategy (TYS), which is

to support regional integration and infrastructure development. This is also reflected in the West

Africa Regional Integration Strategy Paper (RISP) by two pillars: (i) linking regional markets

and; (ii) building capacity for effective implementation of the regional integration agenda. The

study will ensure seamless cross-border transport infrastructure and operations, aligned with

infrastructure-related pillars of the respective CSPs. As the major corridor in West Africa, its

development continues to be key to the regional integration agenda hence retained in the current

mid-term review report of the RISP.

The development impact of the corridor is recognised in PIDA, given its linkages with

the continental corridor network, and among the sixteen (16) priority continental infrastructure

projects identified for priority financing as pilot to accelerate the implementation of PIDA by

the NEPAD Dakar Agenda for Action (June 2014). Similarly, Development Partners, such as

the European Union (EU), acknowledge the corridor importance in the current 11th European

Development Fund (EDF) Regional Indicative Programme for West Africa.

The Bank has wealth of experience in preparing and implementing regional projects

and will leverage the knowledge in addressing one of the major challenges of infrastructure

development, that is, project development. The Bank would consequently leverage its

partnership with multiple DFIs and sovereign stakeholders in securing funding for investment,

leading the process towards achieving development objectives.

Page 12: MULTINATIONAL STUDY FOR THE ABIDJAN LAGOS CORRIDOR … · 2019-06-29 · route optimization. 4. To ensure effective operations and impact of the new highway, other study activities

3

Donors coordination

To complement the Bank efforts, a number of Development Partners (DP) have

interventions along the corridor, all with a common goal of improving the efficiency of the

transport infrastructure system by addressing soft (social, policy, trade, etc.) as well as hard

components. DPs operating on the corridor include the World Bank, EU, AFD, Islamic

Development Bank, Millennium Challenge Account (MCA), West African Development Bank

(BOAD), Japan International Cooperation Agency (JICA) and DANIDA. Interventions by the

DPs are listed in Appendix III.

Coordination at regional level is led by the ECOWAS Commission and this is

conducted through a number of platforms. The formal platform is the Infrastructure Thematic

Group (ITG), established in 2013, whose mandate is “coordinating technical and financial

resources for infrastructure development towards realisation of ECOWAS 2020 Vision”. The

platform, which is chaired by the Commission (Commissioner for Infrastructure), operates on

the principles of engaging with DPs on a regional level through a set of rules, procedures and

a roadmap. The Commission shares the chairmanship with the Bank.

Others coordination mechanisms include: i) the PIDA platform through which the

strategy for the implementation PIDA is examined. The Bank promoted and funded an initiative

for flagship projects allowing ECOWAS and sub-regional institutions to prioritise PIDA

projects for Bank support. This intervention of the Bank constitutes a key component of the

initiative; ii) The Abidjan-Lagos Corridor Organisation (ALCO), a World Bank and UNAIDS

jointly-funded corridor agency. It operates a data-collection platform that focuses on corridor

performance indicators and the health control of communicable diseases such as

STI/HIV/AIDS and Ebola Virus Disease (EVD) in corridor’s communities; iii) The AU,

through partnership with GIZ, is sponsoring other services, such as capacity building, in support

of the corridor’s operations; iv) Borderless Alliance, which operated advocacy platforms to

eliminate trade barriers in West Africa.

2. PROJECT DESCRIPTION

Project Development Objectives

The development objective of the project, when implemented, will generate social and

economic activities, promote cross-border trade and integrate the economies within the

ECOWAS Community. This will contribute to reducing the poverty levels of the population

that depend on the transport modes of the corridor for livelihood. An outcome of this study is

therefore to provide stakeholders with the tools and capability to make informed decisions on

investment interventions and operating the corridor to meet the above development objectives.

Project Description and Components

The tasks of the study is to define the inputs necessary for implementation and

operations of a new highway in order to meet the development objective. It comprises studies

on the hard and soft aspects of the new highway infrastructure system, including social

infrastructure. The highway will be a six-lane (3-lane dual) carriageway highway and the study

will be based on one main principle. It shall primarily follow a new alignment, incorporating

sections of the existing alignment, where necessary, for route optimization.

To ensure effective operations and impact of the new highway, other study activities

and output complementary of the technical design include: i) an establishment of a new supra-

national corridor authority, and its framework for operations; ii) a spatial development

framework and masterplan; and iii) trade, transport, transit and border procedures. The

components are described in table 2.1 below.

Page 13: MULTINATIONAL STUDY FOR THE ABIDJAN LAGOS CORRIDOR … · 2019-06-29 · route optimization. 4. To ensure effective operations and impact of the new highway, other study activities

4

Table 2.1- Description of Project Components

COMPONENT

NAME

UA

million COMPONENT DESCRIPTION

1

A) Feasibility Study,

Environmental, Social

Impacts Assessment

(ESIA), and

B) Detailed

Engineering Design

5.43

A) Comprise: (i) Feasibility study – engineering, financial, economic

analysis of the project; (ii) environment and social impact assessment,

resettlement and compensation (UA2.22million)

B) Detailed engineering design of the road and social economic

infrastructure system that is fit for purpose and in compliance with best

practice and national requirements (UA3.21million).

2 PPP Structuring and

Transaction Advisory 1.04

Analysis, design and execution of the approach on an implementable PPP

Scheme for project investment. Comprise: i) PPP viability assessment;

establishment of PPP financial model, developing PPP structure and

identification of follow-on PPP projects; ii) preparing model documentations

(e.g. RfQs, RfPs, Bidding documents, concessions agreement) and assisting

in the transaction for selected PPP viable follow-on projects.

3

Corridor Spatial

Development Study

**

0.98

An analysis of the physical, technical, policy, economic and market aspects

of the corridor to develop realistic, market feasible and implementable

masterplan, development framework and delivery strategy. Comprise, but

not limited to: baselines assessment; market analysis; market intelligence

platform and market infrastructure; multi-modal transport logistics study;

multi-sector infrastructure needs analysis; commercial viability; land-use

planning; stakeholder analysis; delivery strategy and potential funding

mechanism.

4 Trade and Transport

Facilitation ** 0.68

Comprise: i) review existing International (UN) and Regional (ECOWAS)

Trade and Transport facilitation Protocols, studies and policies in operation

on the corridor (ii) develop harmonised and simplified sub-regional

transportation and transit systems and border (one-stop) management,

including ICT connectivity and information sharing on customs,

immigration and other border agencies at national and regional level; iii)

undertake corridor performance diagnostics and the publication of corridor

efficiency indicators.

5

Corridor

Management

Authority

(ALCoMA)

A. Study

B. Establishment and

Operations

1.04

Comprise two sub-components. (A) diagnostic study: i) evaluate and review

existing institutional and operational frameworks on the continent’s corridor

against international best practices; ii) identify the requisite institutional

arrangements, character and functionalities for operating a supra-national

semi-autonomous authority; iii) accordingly, develop legal and institutional

framework, modalities and requisite capacity for the establishment of

ALCoMA (UA0.34million). (B) Setup, operationalisation and capacity

building (Setup cost and one-year operations expenditure) (0.70 million).

6

Technical Assistance

Service to ECOWAS

and Member States

1.01

Comprise capacity support to ECOWAS and Member State agencies to

effectively manage all the above service components on behalf of

ECOWAS. This will include: i) multi-discipline project management

consulting services; ii) project visibility, resource mobilisation participation;

iii) multi-lateral coordination activities, e.g. SDT and SC meetings and study

validation workshops; iv) training and capacity building programmes; vi)

procuring office equipment and logistics

7 Road Safety Audits 0.31 Developing operational road safety systems, utilising safe design practices

and international standards to ensure safety of all road users.

8 Financial Audits 0.06 Financial auditing and reporting carried out by an independent private audit

firm

BASE COST 10.55 ** Components to be 100% funded by IPPF. Refer to Annex IV

TOTAL COST 11.08

Technical solution retained and other alternatives explored

The principles of maintain the existing alignment as the primary alignment was

considered. The optimum solution will be evaluated by the study, though the aspirations of the

PMCs for a six-lane (3-lane dual) carriageway forms the basis for the design and will be

determined by factors such as economy, value for money, sustainability, and social and

environmental impact. The principles are considered adequate to guide the study and to enable

Page 14: MULTINATIONAL STUDY FOR THE ABIDJAN LAGOS CORRIDOR … · 2019-06-29 · route optimization. 4. To ensure effective operations and impact of the new highway, other study activities

5

informed investment decisions to be made by PMC, ECOWAS, the Bank and other

stakeholders.

Long term financing of operational expenditure of ALCoMA will ultimately be the

responsibility of the PMCs and excluding it from this intervention was explored. However, the

Bank recognises the significance and start-up challenges in setting up a supra-national agencies

to drive corridor-wide investment and funding structures. It has therefore been considered that

there is added value in providing some start-up support to the authority. This allows the PMCs

to learn and better prepare for the long-term operations of the authority. It is expected and

understood by the Bank that the PMCs, through ECOWAS, will take full responsibility for

long-term financing of ALCoMA operations from other sources, such as the Seed Fund, when

the Bank’s support expires after the first year.

The need for new border posts was explored. At present, a region-wide development

programme exists for the implementation and operations of OSBPs in the ECOWAS region.

Therefore the design studies of new border posts has been excluded. It is intended that a

proposed new alignment will be designed such that it merges with existing border sites and will

be complemented with new trade and transport facilitation measures being developed by the

study.

Project type

The proposed study is a standalone operation and falls under the Bank’s mandate of

transport infrastructure development and regional integration. It will be financed by both grant

and loan facilities of the Bank and form the most appropriate instruments for project

development.

Project cost and financing arrangements

The estimated cost of the study, net of taxes including contingencies, is UA11.08million

(US$15.59 million), with an approximate foreign exchange component of 78.6% (Table 2.2).

Table 2.2 – Total Project Cost Estimates by Component (Net of Taxes)

The ADF contribution is sourced from two windows: i) Country Performance-Based

Allocation (PBA), from which each of the five PMC contributed UA 1.0million; ii) ADF Grant

of UA4.0miilion. Non-ADF contributions are: i) UA1.92million from IPPF; and ii) ECOWAS

counterpart contribution of UA0.16million (Table 2.3). The ADF grant of UA6.0million has a

contribution of UA4.0million from Regional Public Goods (RPG) window and UA2.0million

Components Currency

UA millions

Currency

US$ (million)

%

Foreign

Foreign Local Total Foreig

n Local Total

1. Feasibility Study, ESIA and

Detailed Engineering Design 4.34 1.09 5.43 6.11 1.52 7.63 80.0%

2. PPP Structuring and Transaction

Advisory 0.83 0.21 1.04 1.17 0.30 1.47 80.0%

3. Corridor Spatial Development Study 0.78 0.20 0.98 1.10 0.28 1.38 80.0%

4. Trade and Transport Facilitation 0.54 0.14 0.68 0.76 0.19 0.95 80.0%

5. Corridor Management Authority-

Study, Establishment, Operations 0.83 0.21 1.04 1.17 0.29 1.46 80.0%

6. Technical Assistance to ECOWAS 0.71 0.30 1.01 1.00 0.43 1.43 70.0%

7. Road Safety Audits 0.26 0.05 0.31 0.36 0.09 0.45 80.0%

8. Financial Audits 0.00 0.06 0.06 0.00 0.08 0.08 0.0%

Base Cost 8.29 2.26 10.55 11.67 3.18 14.85 78.6%

Price contingency 0.42 0.11 0.53 0.58 0.16 0.74

Total 8.71 2.37 11.08 12.25 3.34 15.59 78.6%

Page 15: MULTINATIONAL STUDY FOR THE ABIDJAN LAGOS CORRIDOR … · 2019-06-29 · route optimization. 4. To ensure effective operations and impact of the new highway, other study activities

6

from the Performance-Based Window (PBA). The component cost share by source is given in

Appendix IV.

Table 2. 3 - Sources of Financing

The cost by procurement category and expenditure schedule are shown in Tables 2.4

and 2.5.

Table 2.4 – Project Total Cost by category of expenditures

Category

Currency

UA millions

Currency

US$ (million) %

Foreign Foreign Local Total Foreign Local Total

Services 8.28 2.21 10.49 11.64 3.11 14.75 78.9%

Goods 0.00 0.04 0.04 0.00 0.06 0.06 0.0%

Base Cost 8.28 2.25 10.53 11.64 3.17 14.81 78.6%

Price contingency 0.43 0.12 0.55 0.61 0.17 0.78

Total 8.71 2.37 11.08 12.25 3.34 15.59 78.6%

Table 2.5 – Total Expenditure Schedule by component (UA Million)

Components 2015/16 2016/17 2017/18 Total

1. Feasibility Study, ESIA, Detailed Engineering Design 1.05 4.38 0 5.43

2. PPP Structuring and Transaction Advisory 0 0.31 0.73 1.04

3. Corridor Spatial Development Study 0.49 0.49 0 0.98

4. Trade and Transport Facilitation Study 0.27 0.41 0 0.68

5. Corridor Management Authority- Study, Establishment, Operations 0.11 0.31 0.62 1.04

6. Technical Assistance Service to ECOWAS 0.41 0.60 0 1.01

7. Road Safety Audits 0.12 0.19 0 0.31

8. Financial Audits 0.00 0.03 0.03 0.06

Base Cost 2.45 6.72 1.38 10.55

Price contingency 0.12 0.34 0.07 0.53

TOTAL 2.57 7.06 1.45 11.08

Project’s Target area and Beneficiaries

The corridor is on coastal axis of the region and traverses the economic hubs and most

densely populated cities of the sub-region. The population along its axis is approximately

70million and will be the direct beneficiaries when the project is implemented. The corridor

interconnects with other transport corridors on a north-south axis linking landlocked countries

such as Burkina Faso, Mali, and Niger, and to the immediate west with Liberia and Sierra

Leone. Interconnectivity with rail network and major ports (e.g. Abidjan, Tema, Lomé,

Cotonou, Tin Can), airports, industrial and agricultural centres, markets and support services

expands the trade zone influenced by the corridor. The above target areas and beneficiaries of

the project will be identified by the study.

SOURCE (UA) (in millions) (US$)(in millions) % Total

ADF ADF/PBA 5.00 7.04 45.13%

ADF/RPG 4.00 5.62 36.10%

ADF Sub total 9.00 12.66 81.23%

IPPF 1.92 2.70 17.33%

ECOWAS 0.16 0.23 1.44%

Total Cost 11.08 15.59 100%

Page 16: MULTINATIONAL STUDY FOR THE ABIDJAN LAGOS CORRIDOR … · 2019-06-29 · route optimization. 4. To ensure effective operations and impact of the new highway, other study activities

7

Participatory process for project design and implementation

The study activities will involve consultations with broad spectrum of stakeholders

within the project area of influence, including but not limited to DPs, local communities (urban

& rural), agriculture communities and industries, markets traders, enterprises, border and

customs agencies, transport and logistics operators, infrastructure owners (ports, rail), corridor-

based organisations and Non-governmental Organizations (NGOs), Regional entities such as

WAEMU, and counterpart Regional Economic Communities (RECs). Consultation on the

environmental impact of the surrounding coastal landscape and livelihood will be carried out.

Bank Group experience, lessons reflected in project design

The Bank’s total commitments in the PMCs to date is UA 8,441.7 million. This is

equivalent to 60% of the Bank’s investments in West Africa with the transport sector having

the largest share of UA 1,769 million. The current transport portfolio in the PMCs, as of August

2015, has fourteen (14) active projects totaling UA 645.4 million, and includes two (2) projects

on the corridor. They are: i) Benin - Pahou-Ouidah-Hillacondji road upgrade and construction

of Joint Border Post at Hillacondji/ Sanvee Condji; ii) Ghana - Akatsi-Aflao road

reconstruction and upgrade of border facilities.

The main lessons from Bank-funded transport operations are generally: (i) delays on

project start-ups; (ii) longer than expected implementation period; and, (iii) the lack of

institutional capacity of the Borrower. These are compounded on multinational operations by

the: i) lack of ownership by the countries involved; ii) inadequate capacity of REC to fully

discharge its coordination role; and iii) differences of organizational structures in implementing

agencies of PMCs. The signing of the Treaty on the Lagos-Abidjan corridor highway

development project by the concerned Heads of State exemplifies project ownership and

commitment, which will assure the execution of the Study. However, weak capacity is

addressed by the provision of adequate resources to enhance project management capability of

the Executing Agency.

Key performance indicators

The performance indicators for the study are provided in the Results Based Logical

Framework (RBLF). The study outcome is the availability of design model and the output being

the study deliverables. Data collection will form part of the scope of the study and will reflect

both regional and national objectives. The main areas for which data will be collected and

analysed include, but not limited to, trade (flow and volume), transport (traffic density,

transport cost, vehicle operating cost, travel and transit times, road safety, etc.), environment

and socio-economic characteristics (employment, gender, compensations, health, etc.); border

operations (customs, transit times, etc.).

3. PROJECT FEASIBILITY

Economic and Financial performance

This is a project preparatory activity and does not in itself have direct economic impact.

Therefore, no economic performance will be determined. However, a multi-dimensional

economic analyses that encompasses national, regional and spatial dimensions will be

undertaken. The expected financial performance on the potential investment proposal will be

identified as part of the study.

Page 17: MULTINATIONAL STUDY FOR THE ABIDJAN LAGOS CORRIDOR … · 2019-06-29 · route optimization. 4. To ensure effective operations and impact of the new highway, other study activities

8

Environmental and Social impacts

Environment

This intervention has no environmental impact and no assessment is therefore required

beyond categorization. Accordingly, it was assigned a level 3 category in October 2014 by the

Bank. A full Environmental and Social Impact Assessment (ESIA) will form part of the scope

of the study, which will ensure that downstream implementation activities comply with the

Bank’s and PMCs national environmental safeguard requirements.

Climate change

The footprint of the 1028km long road is large and exposed to varying geophysical

conditions and climate change scenarios. The design of infrastructure will take into account the

sustainability of the environment and develop economic climate-change mitigation and

adaptation solutions. Some of the scenarios to be considered include vulnerability of coastal

areas to, say, rising sea levels and impact on the livelihood. Consequently, food security is

compromised by the adverse and unforeseeable climate changes. The study will conduct the

necessary studies that will take into account national and international procedures as well as

the Bank’s climate change policy and screening tools. The use of the Bank’s climate change

specialized funds to support the engineering design was considered. This is relevant where

designing adaptation measures over and above the standard design is necessary. This is,

however, premature as potential climate change adaptation measures will only be apparent

when the design concept has been identified.

Gender, Social and Involuntary Resettlement.

The ESIA, as part of the study, will undertake detailed analysis on the impact of the

project on social and health attributes associated with the multi-cultural environment and the

corresponding cost for the mitigation and management measures. The study will include the

design of socio-economic infrastructure. All affected communities, people and businesses will

be identified to evaluate the scope, cost and modalities for any involuntary settlement in

accordance with the Bank’s requirements and that of respective countries. The ESIA study will

be guided by regional and national policies including the Bank’s and international

requirements. The study will analyse the adverse impact of the change of a corridor alignment

on the existing socio-economic landscape including how the risk of social exclusion must be

mitigated.

Safety

The safety of the corridor to all road users will be studied through a detailed road safety

audit procured independently and integrated in the trade and transport facilitation and detailed

design components. The deliverables of the audit and any implementation measures will form

part of the operational documentations and responsibilities of the ALCoMA.

4. IMPLEMENTATION

Implementation Arrangements

The ECOWAS Commission will be the Executing Agency (EA). In accordance with

the project Treaty, a Steering Committee (SC) composed of representatives of the line sector

Ministries from each member of the PMC will have an oversight role. Article 22 of the Treaty

requires ALCoMA to assume the functions and powers held by the SC once the former is

instituted and operational. ECOWAS will be represented at the SC by the Commissioner for

Infrastructure and will coordinate with the PMC at ministerial level through the SC.

Page 18: MULTINATIONAL STUDY FOR THE ABIDJAN LAGOS CORRIDOR … · 2019-06-29 · route optimization. 4. To ensure effective operations and impact of the new highway, other study activities

9

The day-to-day management of the study will be undertaken by a Study Delivery Team

(SDT), which will report to the Commissioner for Infrastructure. SDT will maintain a

functional relationship with the sector ministries or agencies of the respective countries. SDT

will have a team composition commensurate of the tasks and will be led by a Project

Coordinator (PC) appointed by the Commissioner for Infrastructure, and working closely with

a team of Technical Assistance (TA) consultants. The PC role will be on a full time basis

supported on a part-time basis by representatives nominated by the respective sector agencies

of each of the five PMC, which make up the SDT. The TA resources will comprise experts in

key areas including, but not limited to, general project management, procurement, contracts

management, engineering, trade, etc. The PMC representatives on the SDT may have similar

competency mix to ensure working synergies. It is critical that the EA forms the SDT as soon

as possible to mitigate delays to the execution of the study.

Procurement

The Bank has assessed the procurement capacity of ECOWAS and its capability to

effectively undertake the procurement task. The Department of Infrastructure, under the

Commissioner for Infrastructure, has experience in the procurement and implementation of

AfDB funded projects. ECOWAS also has a Procurement Unit under the Commissioner for

Administration that operates at a corporate level and has no experience with Bank funded

projects. The Head of Procurement, however, has had some experience with World Bank

financed projects prior to joining ECOWAS. The Unit currently has a staff structure comprising

a Head of Procurement, three Procurement Officers, two Assistant Procurement Officers and

one Administrative Officer. Within the infrastructure department, the procurement tasks are

conducted by a technical team primarily comprising of Engineers and headed by a Sector

Director.

In assessing the procurement capacity, the Bank has taken a holistic approach by

evaluating the potential complementarities of the two department/unit towards enhancing

internal capacity. Leveraging the experiences and expert knowledge on procurement, the two

department/unit will collaborate in performing the procurement tasks. The procurement expert

on the technical assistance contract will be an addition to the team to further impart the relevant

capacity and promote ownership and coordination within ECOWAS.

Procurement of Consultancy services for the study will be carried out in accordance

with the Bank’s Rules and Procedures: ‘Rules and Procedures for the Use of Consultants’, dated

May 2008 Edition, (revised July 2012 or as may be revised), using the relevant Bank Standard

Bidding Documents, and the provisions stipulated in the Financing Agreement. Consultancy

services for Feasibility Studies, Detailed Design and ESIA will be selected by Quality-Based

Selection (QBS) method through an international short-listing of qualified consulting firms.

External financial audit services will be procured through national shortlists from Bank

accredited Auditors using Least Cost Selection (LCS) method. All remaining consultancy

services for other components will be selected on the basis of Quality and Cost Based Selection

(QCBS) method.

To obtain expressions of interest, EA shall include a list of expected consulting

assignments in the General Procurement Notice, and shall advertise a Specific Procurement

Notice requesting for expressions of interest for each contract for consulting firms in at least

one newspaper of national circulation in each PMC. The EA may also publish these notices in

the official gazette or an electronic portal with free access. In addition, contracts expected to

cost more than UA 200,000 shall be advertised in UNDB online and in the Bank’s Internet

Website. The EA may also advertise requests for expressions of interest in an international

newspaper or a technical magazine.

Page 19: MULTINATIONAL STUDY FOR THE ABIDJAN LAGOS CORRIDOR … · 2019-06-29 · route optimization. 4. To ensure effective operations and impact of the new highway, other study activities

10

ECOWAS has experience in the use of the Bank rules and procedures although capacity

constraints has hampered past procurement processes. The task of technical assistance

consultant will include procurement and contract management support to ECOWAS as part of

the project management role to help expedite the procurement process.

Technical Annex A9 contains the details of procurement arrangements for the study.

There is no umbrella procurement law common to the Member Countries though ECOWAS

aspires to develop one in future. In addition, there is no known public procurement assessments

conducted for ECOWAS and regional level by Development Partners, which would generate

such reports as Regional Procurement Assessment Report (RPAR) or National Competitive

Bidding (NCB) Assessment Reports (NCB Report).

For each contract to be financed by the loan/grant, the different procurement methods

or consultant selection methods, estimated costs, prior-review requirements, and time-frame as

agreed between the Borrower and the Bank will be provided in the Procurement Plan. The

procurement arrangements for the project are summarized in table 4.1 below.

Table 4.1 Procurement Arrangement

Item Project category UA 000,000

QCBS QBS LCS OTHER NBF TOTAL

1.0 GOODS

Office Equipment (ECOWAS) 0.04* 0.04

2.0 SERVICES

2.1 Feasibility Study, ESIA and Detailed Engineering Design 5.43 5.43

2.2 PPP Structural and Transaction Advisory 1.04 1.04

2.3 Corridor Spatial Development Study 0.98 0.98

2.4 Trade and Transport Facilitation 0.68 0.68

2.5 Corridor Management Authority (ALCoMA) - Study,

Establishment, Operations 0.34 0.70*** 1.04

2.6 Technical Assistance Service to ECOWAS 0.82 0.15 0.97

2.7 Road Safety Audits 0.31 0.31

2.8 Financial Audits 0.06 0.06

Base Cost 3.13 6.47 0.06 0.74 0.15 10.55

Contingencies** 0.53

**Contingency (to be distributed among itemized costs). QCBS: Quality and Cost Based Selection; QBS: Quality Based

Selection; LCS: Least Cost Selection; NBF: Non-Bank Funding. OTHERS: *National Shopping, *** ALCoMA Operations

overheads

Financial Management and Disbursement

Financial statements for the loans and grants shall be prepared on completion of all

activities and shall be audited by an independent private audit firm selected in accordance with

the Terms of Reference (ToRs) approved by the Bank. The audit fee is included in the design

of the study. The audited financial statements shall be submitted to the Bank no later than six

months after the completion of the study.

The Direct Payment Method of disbursement shall be used in payment for services

rendered by the selected firm shall be done directly by the Bank based upon a request by the

Commission and will follow the procedures outlined in the Bank’s disbursement handbook.

The disbursement method for the funding of one-year operations of ALCoMA will be through

a revolving special account in a commercial bank opened by ECOWAS and acceptable to the

Bank. The responsibility for the preparation of the Financial Statements (FS) lies with

ECOWAS and will be responsible for the selection of accounting policies and prepare the FS

in accordance with the International Public Sector Accounting Standards (IPSAS). The

Commission will engage a full time Project Accountant from the TA budget to undertake all

project accountings tasks.

Page 20: MULTINATIONAL STUDY FOR THE ABIDJAN LAGOS CORRIDOR … · 2019-06-29 · route optimization. 4. To ensure effective operations and impact of the new highway, other study activities

11

Monitoring

Monitoring of the study by the Bank will be on the project management performance

of ECOWAS and the quality of services of all the consultancies including the TA. The Bank

will monitor adherence to key schedule milestones, quality of deliverables and outputs through

periodic supervisions, mid-term reviews and quarterly reporting. The Bank will monitor closely

the activities on the ESIA to ensure compliance with the requirements and also to mitigate any

re-work of the ESIA during the appraisal for investment. The Bank’s regional office (ORNG)

located in Nigeria in collaboration with sector department (OITC), regional integration

department (ONRI), and the field offices in Ghana (GHFO) and Togo/Benin (TGFO) will be

on hand to monitor the project. The project implementation and monitoring schedule is

provided below in Table 4.2.

Table 4.2 – Implementation Monitoring Timeframe

Timeframe Milestone Monitoring process Feedback loop

Q1 - 2016 Project Launching,

Procurement workshop Field Mission Progress Reporting

Q1 - 2016 Consultants procured Field Supervision Progress reporting

Q3 - 2016 Start of Studies Supervision Progress Reporting

Q1 - 2017 Study in progress Field Mission Progress Reporting

Q3 - 2017 Study in progress Field Mission/Project Completion Report Progress Reporting

Q1 - 2018 Study completion. Project Evaluation Project Completion

Governance

The ECOWAS Commission is committed to execute the study using adequate

safeguards on public expenditure. It is a well-established Regional Economic Community,

managing several donor interventions including the Bank and benefits from various support to

strengthen its capacity.

The governance issue may arise from procurement decisions and in the modalities of

establishing ALCoMA and the latter may be in the form of conflicting roles between ECOWAS

and ALCoMA. Fiduciary risks will be mitigated through the systematic use of Bank’s rules and

periodic financial audits to provide feedback and early warning. The establishment of

ALCoMA will follow the recommendations of the study and will require extensive consultation

among PMCs prior to instituting the authority.

Sustainability

The study will evaluate economically sustainable maintenance solutions taking into

consideration private sector participation, performance-based contract methodology and the

maintenance systems in the respective countries, which will guarantee sustained performance

of the road. The corridor-wide operational and maintenance framework to be executed by

ALCoMA will be formulated by this study (Component 5).

Risk management

The potential risks and outcome indicators are:

Outcome Risks

Delays in the adoption and implementation of the study recommendations would

adversely impact investment prospects and stifle corridor’s performance. The study will entail

comprehensive consultations with DPs and PMCs with investment roadshows to ensure buy-in

and implementable and realistic strategies are agreed upon.

Page 21: MULTINATIONAL STUDY FOR THE ABIDJAN LAGOS CORRIDOR … · 2019-06-29 · route optimization. 4. To ensure effective operations and impact of the new highway, other study activities

12

Output Risks

Procurement Delays: Delays in the procurement of consultant may affect the schedule

of study completion. To mitigate, the detailed Terms of Reference (ToR) for all the components

are being developed. ECOWAS has completed the process of engaging the PMCs to collaborate

in finalizing the ToR. A final review will be conducted upon approval of funds for this study.

Study Coordination: Lack of proper coordination and efficient monitoring of the

consultant. This risk will be mitigated by appointing the Project Coordinator to manage daily

project activities and the engagement of a fully resourced TA team. Other mitigation measures

include timely interventions of the respective Bank Task Managers in each country to liaise

and facilitate communication with sector agencies at an early stage to ensure coherent approach.

Quality of Study Output: Some deliverables may not meet the required quality. This

may be due to inadequate ToR, inadequate scrutiny of the performance of service providers,

and general project and contract management inadequacies of ECOWAS, TA and SDT. The

preparation of the ToR will have the input of the Bank. The review and validation processes of

deliverables will be thorough and a well-resourced TA support to ECOWAS will strengthen

the project management capabilities.

Knowledge Building

This intervention significantly enhances the Bank’s knowledge on corridor

development leading to a broader impact. It presents further opportunity for Bank-wide

collaboration between departments and strengthen knowledge base. The study will test some

of the regional integration strategies of the Bank and provide opportunities to evaluate, refine

and build sustainable strategies. The multi-dimensional nature of the study will reveal the

complexities of the corridor to better inform future and effective interventions. The Bank will

leverage the experience of this intervention to help develop the Dakar-Abidjan section.

5. LEGAL INSTRUMENTS AND AUTHORITY

Legal instrument

The Bank’s instruments to finance this operation are an ADF Grant of UA6.0million

and an ADF Loan of UA3.0million, to the five PMCs and ECOWAS. The standard ADF Grant

and Loan financing terms and conditions are applicable.

Conditions associated with Bank’s intervention

Conditions Precedent to the Entry into Force of the ADF Grant: The Letter of

Agreement shall enter into force upon signature by the parties thereto.

Conditions Precedent to the Entry into Force of the ADF Loan: The loan agreement

shall enter into force subject to the Borrower’s fulfilment of the conditions provided for in

Section 12.0.1 of the General Conditions.

Conditions Precedent to First Disbursement of the ADF Grant: The obligation of the

Fund to make the first disbursement of the Grant shall be conditional upon the entry into force

of Agreement set forth in section 5.2.1.

Conditions Precedent to First Disbursement of the ADF Loan: The obligation of the

Fund to make the first disbursement of the Loan shall be conditional upon the entry into force

of Agreement set forth in section 5.2.2.

Other Conditions of the ADF Grant to ECOWAS: The Recipient shall provide the

following evidence in form and substance acceptable to the Fund:

Page 22: MULTINATIONAL STUDY FOR THE ABIDJAN LAGOS CORRIDOR … · 2019-06-29 · route optimization. 4. To ensure effective operations and impact of the new highway, other study activities

13

i) Evidence the appointment of a Project Coordinator for the Project within three

(3) months of the entry into force of the Project;

ii) The opening of a Special account in a bank acceptable to the Fund designated for the

replenishment of the funds for the recurrent expenditure of the Abidjan-Lagos

Corridor Management Authority (ALCoMA) within six (6) months of the entry into

force of the Grant;

iii) The opening and the replenishment of an account by the PMC with the Seed Fund

(contribution of a total amount of USD 50 million from the PMCs) within nine (9)

months of the entry into force of the Grant.

6. RECOMMENDATION

The Study aligns with the Bank’s strategies on regional integration and infrastructure

development as well as the development objectives of the respective countries and ECOWAS.

When implemented, the project will contribute significantly towards: (i) strengthening the sub-

region and continent’s aspirations to integrate, facilitate trade and boost economic

development; (ii) stimulate a regional value-chain and a network of economic platform for

development of the corridor. In addition, the outcome of the study will initiate partnerships

with the private sector on the investment on a regional scale. This study, when completed, will

constitute a critical project development milestone for the corridor as a whole.

Management recommends that the Board of Directors approves , subject to the

conditions stipulated in this report, the proposed financing: i) UA 1.0 Million ADF Loan to

the Republic of Benin; ii) UA 1.0 Million ADF Loan to the Federal Republic of Nigeria; iii)

UA 1.0 Million ADF Loan to the Republic of Ghana; iv) UA 1.0 Million ADF Grant to the

Republic of Cote d’Ivoire; v) UA 1.0 Million ADF Grant to the Togolese Republic ; and vi)

UA 4.0 Million ADF Grant to ECOWAS, to finance part of the Study for The Abidjan – Lagos

Corridor Highway Development Project.

Page 23: MULTINATIONAL STUDY FOR THE ABIDJAN LAGOS CORRIDOR … · 2019-06-29 · route optimization. 4. To ensure effective operations and impact of the new highway, other study activities

I

Appendix I: Comparative Socio-Economic Indicators - Cote d’Ivoire

YearCôte

d'IvoireAfrica

Develo-

ping

Countries

Develo-

ped

Countries

Basic Indicators

Area ( '000 Km²) 2011 322 30,323 98,458 35,811Total Population (millions) 2013 20.3 1,109.0 5,909.3 1,252.8Urban Population (% of Total) 2013 52.8 40.2 47.7 78.3Population Density (per Km²) 2013 62.5 46.9 70.7 23.5GNI per Capita (US $) 2012 1 220 1 719 3 815 38 412Labor Force Participation - Total (%) 2012-2013 39.4 37.4 67.9 72.1Labor Force Participation - Female (%) 2012-2013 38.5 42.5 38.6 44.6Gender -Related Dev elopment Index Value 2007-2011 0.468 0.502 0.694 0.911Human Dev elop. Index (Rank among 187 countries) 2012 168 ... ... ...Popul. Liv ing Below $ 1.25 a Day (% of Population)2008-2011 23.8 40.0 20.6 ...

Demographic Indicators

Population Grow th Rate - Total (%) 2013 2.4 2.5 1.3 0.3Population Grow th Rate - Urban (%) 2013 3.8 3.4 2.5 0.6Population < 15 y ears (%) 2013 41.3 40.9 28.3 16.4Population >= 65 y ears (%) 2013 3.2 3.5 6.1 16.8Dependency Ratio (%) 2013 78.5 77.9 52.4 49.9Sex Ratio (per 100 female) 2013 104.0 100.0 103.3 94.4Female Population 15-49 y ears (% of total population) 2013 23.7 24.0 53.1 45.2Life Ex pectancy at Birth - Total (y ears) 2013 50.7 59.2 68.4 77.8Life Ex pectancy at Birth - Female (y ears) 2013 51.8 60.3 70.3 81.2Crude Birth Rate (per 1,000) 2013 36.6 34.8 21.2 11.2Crude Death Rate (per 1,000) 2013 14.2 10.4 7.6 10.4Infant Mortality Rate (per 1,000) 2013 74.4 61.9 39.8 5.5Child Mortality Rate (per 1,000) 2013 106.2 97.4 56.3 6.6Total Fertility Rate (per w oman) 2013 4.9 4.6 2.6 1.7Maternal Mortality Rate (per 100,000) 2010 400.0 415.3 240.0 16.0Women Using Contraception (%) 2013 20.0 34.9 62.6 71.3

Health & Nutrition Indicators

Phy sicians (per 100,000 people) 2004-2011 14.4 47.1 117.8 297.8Nurses (per 100,000 people)* 2004-2011 48.3 132.6 202.7 842.7Births attended by Trained Health Personnel (%) 2006-2011 56.8 52.6 66.3 ...Access to Safe Water (% of Population) 2012 80.2 68.8 87.2 99.2Access to Health Serv ices (% of Population) 1988 60.0 65.2 80.0 100.0Access to Sanitation (% of Population) 2012 21.9 39.4 56.9 96.2Percent. of Adults (aged 15-49) Liv ing w ith HIV/AIDS 2012 3.2 3.9 1.2 ...Incidence of Tuberculosis (per 100,000) 2012 172.0 223.6 144.0 23.0Child Immunization Against Tuberculosis (%) 2012 99.0 83.0 81.5 96.1Child Immunization Against Measles (%) 2012 85.0 74.0 83.0 94.3Underw eight Children (% of children under 5 y ears) 2005-2012 29.4 19.7 17.0 1.4Daily Calorie Supply per Capita 2009 2 670 2 481 2 675 3 285Public Ex penditure on Health (as % of GDP) 2011-2012 1.8 2.9 3.0 7.5

Education Indicators

Gross Enrolment Ratio (%)

Primary School - Total 2012 94.2 101.9 109.4 100.9 Primary School - Female 2012 86.6 97.9 107.6 100.6 Secondary School - Total 1999-2012 24.3 47.4 69.1 100.2 Secondary School - Female 1999-2012 17.0 44.0 67.8 99.7Primary School Female Teaching Staff (% of Total) 2012 24.4 46.6 58.0 84.3Adult literacy Rate - Total (%) 2012 41.0 62.0 80.3 99.2Adult literacy Rate - Male (%) 2012 51.6 70.7 85.9 99.3Adult literacy Rate - Female (%) 2012 30.5 53.7 74.9 99.0Percentage of GDP Spent on Education 2008-2012 4.6 5.3 4.3 5.5

Environmental Indicators

Land Use (Arable Land as % of Total Land Area) 2011 9.1 7.6 10.7 10.8Annual Rate of Deforestation (%) 2000-2009 3.1 0.6 0.4 -0.2Forest (As % of Land Area) 2011 32.7 23.0 28.2 35.0Per Capita CO2 Emissions (metric tons) 2010 0.3 1.2 3.0 11.6

Sources: AfDB Statistics Department Databases; last update :

United Nations Population Division, World Population Prospects: The 2012 Revision;

World Bank: World Development Indicators; UNAIDS; UNSD; WHO, UNICEF, WRI, UNDP; Country Reports.

For any given interval, the value refers to the most recent year available during the period

Note : n.a. : Not Applicable ; … : Data Not Available.

COMPARATIVE SOCIO-ECONOMIC INDICATORS

Côte d'Ivoire

May 2014

0102030405060708090

100

20

05

20

06

20

07

20

08

20

09

20

10

20

11

20

12

20

13

Infant Mortality Rate( Per 1000 )

Côte d'Ivoi re Africa

0

200

400

600

800

1000

1200

1400

1600

1800

20

04

20

05

20

06

20

07

20

08

20

09

20

10

20

11

20

12

GNI Per Capita US $

Côte d'Ivoi re Africa

0.0

0.5

1.0

1.5

2.0

2.5

3.0

20

05

20

06

20

07

20

08

20

09

20

10

20

11

20

12

20

13

Population Growth Rate (%)

Côte d'Ivoi re Africa

111213141516171

20

05

20

06

20

07

20

08

20

09

20

10

20

11

20

12

20

13

Life Expectancy at Birth (years)

Côte d'Ivoi re Africa

Page 24: MULTINATIONAL STUDY FOR THE ABIDJAN LAGOS CORRIDOR … · 2019-06-29 · route optimization. 4. To ensure effective operations and impact of the new highway, other study activities

II

Appendix I: Comparative Socio-Economic Indicators – Ghana

Year Ghana Africa

Develo-

ping

Countries

Develo-

ped

Countries

Basic Indicators

Area ( '000 Km²) 2011 239 30,323 98,458 35,811Total Population (millions) 2013 25.9 1,109.0 5,909.3 1,252.8Urban Population (% of Total) 2013 53.2 40.2 47.7 78.3Population Density (per Km²) 2013 104.7 46.9 70.7 23.5GNI per Capita (US $) 2012 1 550 1 719 3 815 38 412Labor Force Participation - Total (%) 2012-2013 41.5 37.4 67.9 72.1Labor Force Participation - Female (%) 2012-2013 47.6 42.5 38.6 44.6Gender -Related Dev elopment Index Value 2007-2011 0.524 0.502 0.694 0.911Human Dev elop. Index (Rank among 187 countries) 2012 135 ... ... ...Popul. Liv ing Below $ 1.25 a Day (% of Population)2006-2011 28.6 40.0 20.6 ...

Demographic Indicators

Population Grow th Rate - Total (%) 2013 2.1 2.5 1.3 0.3Population Grow th Rate - Urban (%) 2013 3.3 3.4 2.5 0.6Population < 15 y ears (%) 2013 38.5 40.9 28.3 16.4Population >= 65 y ears (%) 2013 3.5 3.5 6.1 16.8Dependency Ratio (%) 2013 72.6 77.9 52.4 49.9Sex Ratio (per 100 female) 2013 98.3 100.0 103.3 94.4Female Population 15-49 y ears (% of total population) 2013 25.7 24.0 53.1 45.2Life Ex pectancy at Birth - Total (y ears) 2013 61.1 59.2 68.4 77.8Life Ex pectancy at Birth - Female (y ears) 2013 62.1 60.3 70.3 81.2Crude Birth Rate (per 1,000) 2013 30.9 34.8 21.2 11.2Crude Death Rate (per 1,000) 2013 9.0 10.4 7.6 10.4Infant Mortality Rate (per 1,000) 2013 50.7 61.9 39.8 5.5Child Mortality Rate (per 1,000) 2013 76.8 97.4 56.3 6.6Total Fertility Rate (per w oman) 2013 3.9 4.6 2.6 1.7Maternal Mortality Rate (per 100,000) 2010 350.0 415.3 240.0 16.0Women Using Contraception (%) 2013 26.3 34.9 62.6 71.3

Health & Nutrition Indicators

Phy sicians (per 100,000 people) 2004-2011 8.5 47.1 117.8 297.8Nurses (per 100,000 people)* 2004-2011 104.6 132.6 202.7 842.7Births attended by Trained Health Personnel (%) 2006-2011 68.4 52.6 66.3 ...Access to Safe Water (% of Population) 2012 87.2 68.8 87.2 99.2Access to Health Serv ices (% of Population) 2000 76.0 65.2 80.0 100.0Access to Sanitation (% of Population) 2012 14.4 39.4 56.9 96.2Percent. of Adults (aged 15-49) Liv ing w ith HIV/AIDS 2012 1.4 3.9 1.2 ...Incidence of Tuberculosis (per 100,000) 2012 72.0 223.6 144.0 23.0Child Immunization Against Tuberculosis (%) 2012 98.0 83.0 81.5 96.1Child Immunization Against Measles (%) 2012 88.0 74.0 83.0 94.3Underw eight Children (% of children under 5 y ears) 2005-2012 14.3 19.7 17.0 1.4Daily Calorie Supply per Capita 2009 2 934 2 481 2 675 3 285Public Ex penditure on Health (as % of GDP) 2011-2012 2.7 2.9 3.0 7.5

Education Indicators

Gross Enrolment Ratio (%)

Primary School - Total 2012-2013 108.8 101.9 109.4 100.9 Primary School - Female 2012-2013 108.7 97.9 107.6 100.6 Secondary School - Total 2012-2013 61.1 47.4 69.1 100.2 Secondary School - Female 2012-2013 58.2 44.0 67.8 99.7Primary School Female Teaching Staff (% of Total) 2012-2013 37.9 46.6 58.0 84.3Adult literacy Rate - Total (%) 2010-2012 71.5 62.0 80.3 99.2Adult literacy Rate - Male (%) 2010-2012 78.3 70.7 85.9 99.3Adult literacy Rate - Female (%) 2010-2012 65.3 53.7 74.9 99.0Percentage of GDP Spent on Education 2011-2012 8.1 5.3 4.3 5.5

Environmental Indicators

Land Use (Arable Land as % of Total Land Area) 2011 21.1 7.6 10.7 10.8Annual Rate of Deforestation (%) 2000-2009 1.7 0.6 0.4 -0.2Forest (As % of Land Area) 2011 21.2 23.0 28.2 35.0Per Capita CO2 Emissions (metric tons) 2010 0.4 1.2 3.0 11.6

Sources: AfDB Statistics Department Databases; last update :

United Nations Population Division, World Population Prospects: The 2012 Revision;

World Bank: World Development Indicators; UNAIDS; UNSD; WHO, UNICEF, WRI, UNDP; Country Reports.

For any given interval, the value refers to the most recent year available during the period

Note : n.a. : Not Applicable ; … : Data Not Available.

COMPARATIVE SOCIO-ECONOMIC INDICATORS

Ghana

May 2014

0102030405060708090

20

05

20

06

20

07

20

08

20

09

20

10

20

11

20

12

20

13

Infant Mortality Rate( Per 1000 )

Ghana Africa

0

200

400

600

800

1000

1200

1400

1600

1800

20

04

20

05

20

06

20

07

20

08

20

09

20

10

20

11

20

12

GNI Per Capita US $

Ghana Africa

0.0

0.5

1.0

1.5

2.0

2.5

3.0

20

05

20

06

20

07

20

08

20

09

20

10

20

11

20

12

20

13

Population Growth Rate (%)

Ghana Africa

111213141516171

20

05

20

06

20

07

20

08

20

09

20

10

20

11

20

12

20

13

Life Expectancy at Birth (years)

Ghana Africa

Page 25: MULTINATIONAL STUDY FOR THE ABIDJAN LAGOS CORRIDOR … · 2019-06-29 · route optimization. 4. To ensure effective operations and impact of the new highway, other study activities

III

Appendix I: Comparative Socio-Economic Indicators – Togo

Year Togo Africa

Develo-

ping

Countries

Develo-

ped

Countries

Basic Indicators

Area ( '000 Km²) 2011 57 30,323 98,458 35,811Total Population (millions) 2013 6.8 1,109.0 5,909.3 1,252.8Urban Population (% of Total) 2013 39.0 40.2 47.7 78.3Population Density (per Km²) 2013 135.1 46.9 70.7 23.5GNI per Capita (US $) 2012 500 1 719 3 815 38 412Labor Force Participation - Total (%) 2012-2013 45.0 37.4 67.9 72.1Labor Force Participation - Female (%) 2012-2013 50.4 42.5 38.6 44.6Gender -Related Dev elopment Index Value 2007-2011 0.494 0.502 0.694 0.911Human Dev elop. Index (Rank among 187 countries) 2012 159 ... ... ...Popul. Liv ing Below $ 1.25 a Day (% of Population)2008-2011 28.2 40.0 20.6 ...

Demographic Indicators

Population Grow th Rate - Total (%) 2013 2.6 2.5 1.3 0.3Population Grow th Rate - Urban (%) 2013 3.8 3.4 2.5 0.6Population < 15 y ears (%) 2013 41.8 40.9 28.3 16.4Population >= 65 y ears (%) 2013 2.8 3.5 6.1 16.8Dependency Ratio (%) 2013 72.5 77.9 52.4 49.9Sex Ratio (per 100 female) 2013 97.3 100.0 103.3 94.4Female Population 15-49 y ears (% of total population) 2013 24.7 24.0 53.1 45.2Life Ex pectancy at Birth - Total (y ears) 2013 56.5 59.2 68.4 77.8Life Ex pectancy at Birth - Female (y ears) 2013 78.3 60.3 70.3 81.2Crude Birth Rate (per 1,000) 2013 36.4 34.8 21.2 11.2Crude Death Rate (per 1,000) 2013 10.7 10.4 7.6 10.4Infant Mortality Rate (per 1,000) 2013 65.8 61.9 39.8 5.5Child Mortality Rate (per 1,000) 2013 102.2 97.4 56.3 6.6Total Fertility Rate (per w oman) 2013 4.6 4.6 2.6 1.7Maternal Mortality Rate (per 100,000) 2010 300.0 415.3 240.0 16.0Women Using Contraception (%) 2013 19.0 34.9 62.6 71.3

Health & Nutrition Indicators

Phy sicians (per 100,000 people) 2004-2011 5.3 47.1 117.8 297.8Nurses (per 100,000 people)* 2004-2011 27.4 132.6 202.7 842.7Births attended by Trained Health Personnel (%) 2006-2011 59.4 52.6 66.3 ...Access to Safe Water (% of Population) 2012 60.0 68.8 87.2 99.2Access to Health Serv ices (% of Population) 1980 30.0 65.2 80.0 100.0Access to Sanitation (% of Population) 2012 11.3 39.4 56.9 96.2Percent. of Adults (aged 15-49) Liv ing w ith HIV/AIDS 2012 2.9 3.9 1.2 ...Incidence of Tuberculosis (per 100,000) 2012 73.0 223.6 144.0 23.0Child Immunization Against Tuberculosis (%) 2012 97.0 83.0 81.5 96.1Child Immunization Against Measles (%) 2012 72.0 74.0 83.0 94.3Underw eight Children (% of children under 5 y ears) 2005-2012 16.5 19.7 17.0 1.4Daily Calorie Supply per Capita 2009 3 314 2 481 2 675 3 285Public Ex penditure on Health (as % of GDP) 2011-2012 4.2 2.9 3.0 7.5

Education Indicators

Gross Enrolment Ratio (%)

Primary School - Total 2012 132.8 101.9 109.4 100.9 Primary School - Female 2012 127.4 97.9 107.6 100.6 Secondary School - Total 2011-2012 54.9 47.4 69.1 100.2 Secondary School - Female 2007-2012 30.4 44.0 67.8 99.7Primary School Female Teaching Staff (% of Total) 2012 13.9 46.6 58.0 84.3Adult literacy Rate - Total (%) 2011-2012 60.4 62.0 80.3 99.2Adult literacy Rate - Male (%) 2011-2012 74.1 70.7 85.9 99.3Adult literacy Rate - Female (%) 2011-2012 48.0 53.7 74.9 99.0Percentage of GDP Spent on Education 2011-2012 4.5 5.3 4.3 5.5

Environmental Indicators

Land Use (Arable Land as % of Total Land Area) 2011 46.1 7.6 10.7 10.8Annual Rate of Deforestation (%) 2000-2009 3.4 0.6 0.4 -0.2Forest (As % of Land Area) 2011 4.9 23.0 28.2 35.0Per Capita CO2 Emissions (metric tons) 2010 0.2 1.2 3.0 11.6

Sources: AfDB Statistics Department Databases; last update :

United Nations Population Division, World Population Prospects: The 2012 Revision;

World Bank: World Development Indicators; UNAIDS; UNSD; WHO, UNICEF, WRI, UNDP; Country Reports.

For any given interval, the value refers to the most recent year available during the period

Note : n.a. : Not Applicable ; … : Data Not Available.

COMPARATIVE SOCIO-ECONOMIC INDICATORS

Togo

May 2014

0102030405060708090

20

05

20

06

20

07

20

08

20

09

20

10

20

11

20

12

20

13

Infant Mortality Rate( Per 1000 )

Togo Africa

0

200

400

600

800

1000

1200

1400

1600

1800

20

04

20

05

20

06

20

07

20

08

20

09

20

10

20

11

20

12

GNI Per Capita US $

Togo Africa

2.3

2.4

2.4

2.5

2.5

2.6

2.6

2.7

20

05

20

06

20

07

20

08

20

09

20

10

20

11

20

12

20

13

Population Growth Rate (%)

Togo Africa

111213141516171

20

05

20

06

20

07

20

08

20

09

20

10

20

11

20

12

20

13

Life Expectancy at Birth (years)

Togo Africa

Page 26: MULTINATIONAL STUDY FOR THE ABIDJAN LAGOS CORRIDOR … · 2019-06-29 · route optimization. 4. To ensure effective operations and impact of the new highway, other study activities

IV

Appendix I: Comparative Socio-Economic Indicators –Benin

Year Benin Africa

Develo-

ping

Countries

Develo-

ped

Countries

Basic Indicators

Area ( '000 Km²) 2011 113 30,323 98,458 35,811Total Population (millions) 2013 10.3 1,109.0 5,909.3 1,252.8Urban Population (% of Total) 2013 46.2 40.2 47.7 78.3Population Density (per Km²) 2013 80.8 46.9 70.7 23.5GNI per Capita (US $) 2012 750 1 719 3 815 38 412Labor Force Participation - Total (%) 2012-2013 36.9 37.4 67.9 72.1Labor Force Participation - Female (%) 2012-2013 47.7 42.5 38.6 44.6Gender -Related Dev elopment Index Value 2007-2011 0.477 0.502 0.694 0.911Human Dev elop. Index (Rank among 187 countries) 2012 166 ... ... ...Popul. Liv ing Below $ 1.25 a Day (% of Population)2003-2011 47.3 40.0 20.6 ...

Demographic Indicators

Population Grow th Rate - Total (%) 2013 2.7 2.5 1.3 0.3Population Grow th Rate - Urban (%) 2013 4.1 3.4 2.5 0.6Population < 15 y ears (%) 2013 42.8 40.9 28.3 16.4Population >= 65 y ears (%) 2013 2.9 3.5 6.1 16.8Dependency Ratio (%) 2013 86.1 77.9 52.4 49.9Sex Ratio (per 100 female) 2013 99.3 100.0 103.3 94.4Female Population 15-49 y ears (% of total population) 2013 23.8 24.0 53.1 45.2Life Ex pectancy at Birth - Total (y ears) 2013 59.3 59.2 68.4 77.8Life Ex pectancy at Birth - Female (y ears) 2013 60.7 60.3 70.3 81.2Crude Birth Rate (per 1,000) 2013 36.4 34.8 21.2 11.2Crude Death Rate (per 1,000) 2013 9.5 10.4 7.6 10.4Infant Mortality Rate (per 1,000) 2013 68.1 61.9 39.8 5.5Child Mortality Rate (per 1,000) 2013 107.3 97.4 56.3 6.6Total Fertility Rate (per w oman) 2013 4.8 4.6 2.6 1.7Maternal Mortality Rate (per 100,000) 2010 350.0 415.3 240.0 16.0Women Using Contraception (%) 2013 21.6 34.9 62.6 71.3

Health & Nutrition Indicators

Phy sicians (per 100,000 people) 2004-2011 5.9 47.1 117.8 297.8Nurses (per 100,000 people)* 2004-2011 77.1 132.6 202.7 842.7Births attended by Trained Health Personnel (%) 2006-2011 74.0 52.6 66.3 ...Access to Safe Water (% of Population) 2012 76.1 68.8 87.2 99.2Access to Health Serv ices (% of Population) 2000 42.0 65.2 80.0 100.0Access to Sanitation (% of Population) 2012 14.3 39.4 56.9 96.2Percent. of Adults (aged 15-49) Liv ing w ith HIV/AIDS2006-2012 1.1 3.9 1.2 ...Incidence of Tuberculosis (per 100,000) 2012 70.0 223.6 144.0 23.0Child Immunization Against Tuberculosis (%) 2012 94.0 83.0 81.5 96.1Child Immunization Against Measles (%) 2012 72.0 74.0 83.0 94.3Underw eight Children (% of children under 5 y ears) 2005-2012 20.2 19.7 17.0 1.4Daily Calorie Supply per Capita 2009 2 592 2 481 2 675 3 285Public Ex penditure on Health (as % of GDP) 2011-2012 2.4 2.9 3.0 7.5

Education Indicators

Gross Enrolment Ratio (%)

Primary School - Total 2012 122.8 101.9 109.4 100.9 Primary School - Female 2012 115.9 97.9 107.6 100.6 Secondary School - Total 2011-2012 47.7 47.4 69.1 100.2 Secondary School - Female 2011-2012 36.1 44.0 67.8 99.7Primary School Female Teaching Staff (% of Total) 2012 20.9 46.6 58.0 84.3Adult literacy Rate - Total (%) 2006-2012 28.7 62.0 80.3 99.2Adult literacy Rate - Male (%) 2006-2012 40.6 70.7 85.9 99.3Adult literacy Rate - Female (%) 2006-2012 18.4 53.7 74.9 99.0Percentage of GDP Spent on Education 2010-2012 5.3 5.3 4.3 5.5

Environmental Indicators

Land Use (Arable Land as % of Total Land Area) 2011 22.9 7.6 10.7 10.8Annual Rate of Deforestation (%) 2000-2009 2.3 0.6 0.4 -0.2Forest (As % of Land Area) 2011 40.0 23.0 28.2 35.0Per Capita CO2 Emissions (metric tons) 2011 0.5 1.2 3.0 11.6

Sources: AfDB Statistics Department Databases; last update :

United Nations Population Division, World Population Prospects: The 2012 Revision;

World Bank: World Development Indicators; UNAIDS; UNSD; WHO, UNICEF, WRI, UNDP; Country Reports.

For any given interval, the value refers to the most recent year available during the period

Note : n.a. : Not Applicable ; … : Data Not Available.

COMPARATIVE SOCIO-ECONOMIC INDICATORS

Benin

May 2014

0102030405060708090

20

05

20

06

20

07

20

08

20

09

20

10

20

11

20

12

20

13

Infant Mortality Rate( Per 1000 )

Benin Africa

0

200

400

600

800

1000

1200

1400

1600

1800

20

04

20

05

20

06

20

07

20

08

20

09

20

10

20

11

20

12

GNI Per Capita US $

Benin Africa

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

20

05

20

06

20

07

20

08

20

09

20

10

20

11

20

12

20

13

Population Growth Rate (%)

Benin Africa

111213141516171

20

05

20

06

20

07

20

08

20

09

20

10

20

11

20

12

20

13

Life Expectancy at Birth (years)

Benin Africa

Page 27: MULTINATIONAL STUDY FOR THE ABIDJAN LAGOS CORRIDOR … · 2019-06-29 · route optimization. 4. To ensure effective operations and impact of the new highway, other study activities

V

Appendix I: Comparative Socio-Economic Indicators – Nigeria

Year Nigeria Africa

Develo-

ping

Countries

Develo-

ped

Countries

Basic Indicators

Area ( '000 Km²) 2011 924 30,323 98,458 35,811Total Population (millions) 2013 173.6 1,109.0 5,909.3 1,252.8Urban Population (% of Total) 2013 50.9 40.2 47.7 78.3Population Density (per Km²) 2013 182.7 46.9 70.7 23.5GNI per Capita (US $) 2012 1 440 1 719 3 815 38 412Labor Force Participation - Total (%) 2012-2013 29.7 37.4 67.9 72.1Labor Force Participation - Female (%) 2012-2013 42.6 42.5 38.6 44.6Gender -Related Dev elopment Index Value 2007-2011 0.499 0.502 0.694 0.911Human Dev elop. Index (Rank among 187 countries) 2012 153 ... ... ...Popul. Liv ing Below $ 1.25 a Day (% of Population)2008-2011 68.0 40.0 20.6 ...

Demographic Indicators

Population Grow th Rate - Total (%) 2013 2.8 2.5 1.3 0.3Population Grow th Rate - Urban (%) 2013 4.0 3.4 2.5 0.6Population < 15 y ears (%) 2013 44.4 40.9 28.3 16.4Population >= 65 y ears (%) 2013 2.7 3.5 6.1 16.8Dependency Ratio (%) 2013 86.0 77.9 52.4 49.9Sex Ratio (per 100 female) 2013 103.6 100.0 103.3 94.4Female Population 15-49 y ears (% of total population) 2013 22.6 24.0 53.1 45.2Life Ex pectancy at Birth - Total (y ears) 2013 52.5 59.2 68.4 77.8Life Ex pectancy at Birth - Female (y ears) 2013 52.8 60.3 70.3 81.2Crude Birth Rate (per 1,000) 2013 41.2 34.8 21.2 11.2Crude Death Rate (per 1,000) 2013 13.2 10.4 7.6 10.4Infant Mortality Rate (per 1,000) 2013 75.1 61.9 39.8 5.5Child Mortality Rate (per 1,000) 2013 120.1 97.4 56.3 6.6Total Fertility Rate (per w oman) 2013 6.0 4.6 2.6 1.7Maternal Mortality Rate (per 100,000) 2010 630.0 415.3 240.0 16.0Women Using Contraception (%) 2013 15.9 34.9 62.6 71.3

Health & Nutrition Indicators

Phy sicians (per 100,000 people) 2004-2011 39.5 47.1 117.8 297.8Nurses (per 100,000 people)* 2004-2011 160.5 132.6 202.7 842.7Births attended by Trained Health Personnel (%) 2006-2011 38.9 52.6 66.3 ...Access to Safe Water (% of Population) 2012 64.0 68.8 87.2 99.2Access to Health Serv ices (% of Population) 2000 67.0 65.2 80.0 100.0Access to Sanitation (% of Population) 2012 27.8 39.4 56.9 96.2Percent. of Adults (aged 15-49) Liv ing w ith HIV/AIDS 2012 3.1 3.9 1.2 ...Incidence of Tuberculosis (per 100,000) 2012 108.0 223.6 144.0 23.0Child Immunization Against Tuberculosis (%) 2012 60.0 83.0 81.5 96.1Child Immunization Against Measles (%) 2012 42.0 74.0 83.0 94.3Underw eight Children (% of children under 5 y ears) 2005-2012 24.4 19.7 17.0 1.4Daily Calorie Supply per Capita 2009 2 711 2 481 2 675 3 285Public Ex penditure on Health (as % of GDP) 2011-2012 2.0 2.9 3.0 7.5

Education Indicators

Gross Enrolment Ratio (%)

Primary School - Total 2010-2012 84.8 101.9 109.4 100.9 Primary School - Female 2010-2012 81.0 97.9 107.6 100.6 Secondary School - Total 2010-2012 43.8 47.4 69.1 100.2 Secondary School - Female 2010-2012 41.2 44.0 67.8 99.7Primary School Female Teaching Staff (% of Total) 2010-2012 48.2 46.6 58.0 84.3Adult literacy Rate - Total (%) 2008-2012 51.1 62.0 80.3 99.2Adult literacy Rate - Male (%) 2008-2012 61.3 70.7 85.9 99.3Adult literacy Rate - Female (%) 2008-2012 41.4 53.7 74.9 99.0Percentage of GDP Spent on Education 2011-2012 ... 5.3 4.3 5.5

Environmental Indicators

Land Use (Arable Land as % of Total Land Area) 2011 39.5 7.6 10.7 10.8Annual Rate of Deforestation (%) 2000-2009 2.6 0.6 0.4 -0.2Forest (As % of Land Area) 2011 9.5 23.0 28.2 35.0Per Capita CO2 Emissions (metric tons) 2010 0.5 1.2 3.0 11.6

Sources: AfDB Statistics Department Databases; last update :

United Nations Population Division, World Population Prospects: The 2012 Revision;

World Bank: World Development Indicators; UNAIDS; UNSD; WHO, UNICEF, WRI, UNDP; Country Reports.

For any given interval, the value refers to the most recent year available during the period

Note : n.a. : Not Applicable ; … : Data Not Available.

COMPARATIVE SOCIO-ECONOMIC INDICATORS

Nigeria

May 2014

0

20

40

60

80

100

120

20

05

20

06

20

07

20

08

20

09

20

10

20

11

20

12

20

13

Infant Mortality Rate( Per 1000 )

Nigeria Africa

0

200

400

600

800

1000

1200

1400

1600

1800

20

04

20

05

20

06

20

07

20

08

20

09

20

10

20

11

20

12

GNI Per Capita US $

Nigeria Africa

2.2

2.3

2.4

2.5

2.6

2.7

2.8

2.9

20

05

20

06

20

07

20

08

20

09

20

10

20

11

20

12

20

13

Population Growth Rate (%)

Nigeria Africa

111213141516171

20

05

20

06

20

07

20

08

20

09

20

10

20

11

20

12

20

13

Life Expectancy at Birth (years)

Nigeria Africa

Page 28: MULTINATIONAL STUDY FOR THE ABIDJAN LAGOS CORRIDOR … · 2019-06-29 · route optimization. 4. To ensure effective operations and impact of the new highway, other study activities

VI

Appendix II Table of AfDB’s portfolio in the Five Countries

Cote d’Ivoire (as of March 3, 2015)

Sec

t Project Name

Statu

s

Windo

w

Approval

Date

Disbursem

ent

Deadline

Approved

Amount

Disb.

Ratio(%)

Wa

ter

Su

pp

ly &

san

ita

tio

n

PROJET DE GESTION INTÉGRÉE

DU BASSIN DU GOUROU - PHASE

D'URGENCE

OnGo ADF 11/24/2010 6/30/2016 23,000,000 38.29

PROMOTION ACCÈS TOILETTES &

EMPLOIS À BOUAKÉ ET KATIOLA OnGo AWF 9/4/2013 12/31/2017 984,492 2.91

Sub total Water Supply & Sanitation 23,984,492

Ag

ricu

lute

PROJET D'APPUI AUX

INFRASTRUCTURES AGRICOLES

DANS LA REGION DE L' INDENIE-

DJUABLIN

OnGo ADF 3/1/2012 02/28/2018 21600000 34.04

Sub total Agriculture 21600000

Go

ver

na

nce

PROGRAMME D'URGENCE POUR

LA RESTAURATION DES

SERVICES SOCIAUX

OnGo ADF 03/06/2011 03/31/2015 5500000 87.78

Sub total Governance 5,500,000

So

cia

l

PROGRAMME D'APPUI AU

RENFORCEMENT DE L'INCLUSION

ET DE LA COHESION SOCIALE

OnGo ADF 06/13/2014 12/31/2015 29970000 65.36

AIDE D’URGENCE POUR UNE

ASSISTANCE HUMANITAIRE AUX

VICTIMES

APV

D ADF 07/27/2011 12/31/2011 718411.45 0

PROG D'APPUI A

L'AMELIORATION DE

L'EMPLOYABILITE ET DE

L'INSERTION DES JEUNES

OnGo ADF 09/04/2013 12/31/2015 18832999.18 59.37

Sub total Social 60,521,411

Total National 112,603,903

Tra

nsp

ort

PROJET D'INTERCONNEXION DES

RESEAUX ELECTRIQUES DE LA

COTE D'IVOIRE, DU LIBERIA, DE

LA SIERRA LEONE ET DE LA

GUINEE

APV

D ADF 11/6/2013 12/31/2017 33,000,000 0

PROGRAMME D'AMENAGEMENT

DES ROUTES ET DE LA

FACILITATION DU TRANSPORT

DANS LES PAYS DU FLEUVE

MANO

OnGo ADF 12/17/2014 12/31/2017 96,830,000 0

Sub total Multinational 129,830,000

Total Public Secteur 242,433,903

Pri

va

te S

ect.

RIVIERA MARCORY TOLL BRIDGE OnGo ADB 03/01/2012

12/15/2014 43711457.13 100

RIVIERA TOLL BRIDGE STAND BY OnGo ADB 03/01/2012

12/30/2014 1968984.56 100

AZITO EXPANSION GENERATION

PLANT OnGo ADB 12/19/2012 11/15/2015 28736457.94 84.72

CIPREL COMBINED CYCLE OnGo ADB 07/24/2013 10/15/2016 39379691.11 39.45

PRISE DE PARTICIPATION AU

CAPITAL DE MCI OnGo ADB 04/16/2010 06/30/2016 718411.45 46.95

Total Private Sector 114,515,002

TOTAL GENERAL 356,948,905

Page 29: MULTINATIONAL STUDY FOR THE ABIDJAN LAGOS CORRIDOR … · 2019-06-29 · route optimization. 4. To ensure effective operations and impact of the new highway, other study activities

VII

Ghana Bank Group Ongoing Operations in Ghana as at 27 February 2015

Sector No Project Name Window Date of

Approval

Net Amount

(UA m)

Disburs

Ration (%)

Closing

date

Tra

nsp

ort

1

Awoshie Pokuase Road &

Community Dev. Project ADF 10/14/2009 53.6 60.8 12/31/2015

2 Supplementary Loan for Lot 2 of

Tema-Aflao Road ADF 12/16/2008 25.4

89.5

12/31/2014

3 Fufulso-Sawla Road Project ADF-G 11/24/2010 109.7 58.9 12/31/2015

Subtotal Transport 188.7 63.6

En

erg

y

4 Power System Reinforcement

Project ADF 11/28/2007 27.6 76.0 12/31/2014

5

Electricity Distribution System

Reinforcement

ADF 02/26/2014 28.6 0.0 03/31/2018

ADF-G 02/26/2014 19.9 0.0 03/31/2018

6 Ghana - Togo - Benin Power

Interconnection ADF 04/04/2007 14.9 79.9 12/31/2014

Subtotal Energy 90.1 75.5

Wa

ter

& S

an

7 Accra Sewerage Improvement

Project (ASIP) - (PPP) ADF 04/26/2006 46.0 57.0 11/30/2015

8 Optimization Study of Akosombo

&KP Dam AWF 08/02/2010 1.6 72.7 09/30/2014

9 A Business Approach for

Improved Sanitation in Ghana AWF 05/16/2013 0.9 21.5 12/31/2016

Subtotal Water and Sanitation 48.6 56.8

Ag

ricu

ltu

re

10 Rural Enterprises Project II (PPP)

ADF 12/19/2012 26.7 0.5 12/31/2019

ADF-G 12/19/2012 23.0 6.5 12/31/2019

11 Northern Rural Growth Program ADF 12/17/2007 40.0 43.6 12/31/2015

12 FARA Promotion of Science and

Technology ADF 11/29/2006 15.6 90.2 12/31/2014

13

Grant for Preparation-Engaging

Local Communities

ADF-G 1/22/2014 3.2 2.7 12/31/2019

SCF 1/22/2014 6.4 0.0 12/31/2019

Subtotal Agriculture 114.9 24.4

So

cia

l

14

Development of Skills for

Industry Project

ADF 06/20/2012 45.0 2.8 06/30/2018

ADF-G 06/20/2012 25.0 5.5 06/30/2018

Subtotal Social 70.0 3.8

Multi-

sector 15

ISP to Oversight and Business

Support ADF-G 09/10/2012 9.6 4.1 04/30/2017

Sub-total Multi- Sector 9.6 4.1

Total Public Sector Operations 521.9 46.3

Pri

va

te S

ecto

r

16 Cal Bank LoC ADB 07/24/2008 9.7 100.0 12/31/2015

17 Kempinski Hotel Project ADB 09/27/2010 12.9 100.0 06/29/2012

18 Takoradi Expansion Power ADB 07/11/2012 14.7 93.3 01/31/2020

19 UT Bank Ltd. LoC ADB 05/22/2013 13.2 98.8 05/18/2017

Sub-total Private Sector

Operations 50.5 97.7

Grand Total 572.4 46.0

Page 30: MULTINATIONAL STUDY FOR THE ABIDJAN LAGOS CORRIDOR … · 2019-06-29 · route optimization. 4. To ensure effective operations and impact of the new highway, other study activities

VIII

Togo (as of March 3, 2015)

Sect Project Name Status Window Approval

Date

Disbursement

Deadline

Approved

Amount

Disb.

Ratio(%)

Wa

ter

Su

pp

ly &

san

ita

tio

n Projet de mise en place d'un système

intégré d'information sur l'eau OnGo AWF 12/01/2009 30/08/2015 1,248,478 87

Projet toilettes pour tous à Sokodé et

valorisation des boues de vidange OnGo AWF 19/04/2013 30/06/2016 942,923 8

Sub total Water Supply & Sanitation 2,191,401 53

Go

ver

na

n

ce

Projet d’appui à la mobilisation des

ressources et au renforcement des

capacités institutionnelles (PAMOCI) OnGo FSF 09/10/2014 30/06/2019 5,000,000 0

Sub total Governance 5,000,000 0

So

cia

l

Projet d’appui à la reconstruction des

marchés et aux commerçants de Kara et

de Lomé OnGo ADF 22/01/2014 31/12/2018 1,930,000 0

Projet d’appui à la reconstruction des

marchés et aux commerçants de Kara et

de Lomé OnGo ADF 22/01/2014 31/12/2018 1,650,000 3

Aide d’urgence au programme d’actions

pour atténuer les effets des incendies

des marchés de Lomé et de Kara OnGo SRF 14/08/2013 31/03/2015 712,499 0

Sub total Social 4,292,499 18

Total National 11,483,901 17

Tra

nsp

ort

Mu

ltin

ati

on

als

Benin/Togo:Projet de rehabilitation

route Lome-Cotonou et facilitation de

transport coridor abidjan-lagos phase 1 OnGo ADF 05/10/2011 31/12/2016 4,810,000 3

Togo/Burkina: Projet de réhabilitation

de la route communautaire CU9 et de

facilitation de transport sur le corridor

Lomé-Ouaga OnGo ADF 27/06/2012 31/12/2017 17,800,000 33

Togo/Burkina: Projet de réhabilitation

de la route communautaire CU9 et de

facilitation de transport sur le corridor

Lomé-Ouaga OnGo ADF 27/06/2012 31/12/2017 30,230,000 22

Togo/Burkina: Projet de réhabilitation

de la route communautaire CU9 et de

facilitation de transport sur le corridor

Lomé-Ouaga OnGo FSF 27/06/2012 31/12/2017 21,500,000 1

Sub total Transport 74,340,000 17

Total multinational 74,340,000 17

Total Public Secteur 85,823,901 17

Pri

va

te

Sec

t.

Projet du Terminal à conteneurs de

Lomé OnGo ADB 15/07/2011 15/04/2015 33,817,924 91

Total Private Sector 33,817,924 91

TOTAL GENERAL 119,641,825 38

Page 31: MULTINATIONAL STUDY FOR THE ABIDJAN LAGOS CORRIDOR … · 2019-06-29 · route optimization. 4. To ensure effective operations and impact of the new highway, other study activities

IX

Benin (as of March 3, 2015)

Sect Project Name Status

Wind

ow

Approval

Date

Disbursem

ent

Deadline

Approved

Amount

Disb.

Ratio

(%)

Wa

ter

Su

pp

ly &

Sa

nit

ati

on

Projet d'appui à la Décentralisation des

Services d’Eau Potable, Hygiène et

Assainissement OnGo AFW 29/10/2012 31/12/2016 839,585 38

Amélioration de la gestion des boues de

vidange du Grand-Nokoué OnGo AFW 04/01/2013 31/03/2017 865,569 15

Sub total Water Supply & Sanitation 1,712,619 26

Tra

nsp

ort

Projet de transport urbain à Parakou APVD ADF 19/09/2014 31/12/2020 23,800,000 0

Projet de transport urbain à Parakou APVD GEF 19/09/2014 31/12/2020 1,318,750 0

Sub total Transport 25,126,370

Ag

ricu

ltu

re

Projet d'appui aux infrastructures agricole

de la vallée de l'Ouémé OnGo ADF 30/09/2013 30/06/2015 444,000 2

Projet d'appui aux infrastructures agricole

de la vallée de l'Ouémé OnGo ADF 23/10/2013 31/12/2020 39,500,000 1

Projet d'appui aux infrastructures agricole

de la vallée de l'Ouémé OnGo ADF 23/10/2013 31/12/2020 530,000 0

Projet d'appui aux infrastructures agricole

de la vallée de l'Ouémé OnGo GEF 23/10/2013 31/12/2020 5, 100, 523 0

Programme d'aide d'urgence en faveur des

communes de Malanville et Karimama

affectées par les inondations OnGo SRF 19/03/2014 31/12/2014 566 725 100

Projet d'appui aux filières lait et viande

(PAFILAV) OnGo ADF 27/11/2008 31/12/2015 25,000,000 34

Sub total Agriculture 71,173,995

Go

v-

ern

an

ce Projet d’Appui à la Gestion des Finances

Publiques et à l’Amélioration du Climat

des Affaires (PAGFPACAF) OnGo ADF 24/11/2010 31/12/2015 5,000,000 58

Sub total Gouvernance 5,000,000 58

Total National Projects

103,012,98

5 12

Mu

ltin

ati

on

al

Benin/Togo:Projet de rehab route Lome-

Cotonou et facilitation de transport coridor

abidjan-lagos phase 1 OnGo ADF 05/10/2011 31/12/2016 38,870,000 41

Benin/Togo:Projet de rehab route Lome-

Cotonou et facilitation de transport coridor

abidjan-lagos phase 1 OnGo ADF 05/10/2011 31/12/2016 34,270,000 36

BENIN - TOGO - GHANA

Interconnexion électrique OnGo ADF 04/04/2007 31/12/2015 17,390,000 23

BENIN - Projet d'appui à la filière coton-

textile OnGo ADF 29/11/2006 30/09/2015 8,000,000 79

Total Multinationalx 98,530,000 39

TOTAL 201,542,98

5 25

Page 32: MULTINATIONAL STUDY FOR THE ABIDJAN LAGOS CORRIDOR … · 2019-06-29 · route optimization. 4. To ensure effective operations and impact of the new highway, other study activities

X

Nigeria (as of March 3, 2015)

Project Name Status Sector Approval

Date

Completion

Date

Amount

approved (in

UA)

Disb.Ratio

(%)

KOMADUGU-YOBE BASIN APVD

Water

Supply/Sanitation 08/08/2014 12/31/2017 0.00 0.00

FIDELITY BANK LOC APVD Finance 07/17/2013 11/01/2020 52,497,480.12 53.33

BANK OF INDUSTRY - BO APVD Finance 05/26/2011 03/16/2021 69,996,640.16 0.00

NIGERIAN EXPORT IMPORT BANK - NEXIM OnGo Finance 05/26/2011 03/18/2021 34,998,320.08 0.00

STANBIC IBTC BANK PLC APVD Finance 03/26/2014 01/15/2028 0.00 0.00

STANBIC IBTC BANK PLC APVD Finance 05/27/2014 01/15/2028 0.00 0.00

ZENITH BANK PLC - LOC III APVD Finance 03/26/2014 01/15/2025 87,495,800.20 100.00

ACCESS BANK NIGERIA LOC II APVD Finance 05/15/2014 10/10/2023 69,996,640.16 90.00

FRB SUBSIDIARY IN NIGERIA OnGo Finance 12/12/2012 05/21/2022 53,378,509.28 100.00

LAPO MICROFINANCE BANK LTD. APVD Finance 10/01/2014 01/10/2020 0.00 0.00

RURAL ACCESS & MOBILITY PROJECT OnGo Transport 07/18/2007 12/31/2015 35,270,000.00 82.03

ECONOMIC AND POWER SECTOR

REFORM PROGRAM OnGo Power 10/28/2009 05/31/2015 100,000,000.00 67.00

PRG I N SUPPORT OF POWER SECTOR APVD Power 12/18/2013 01/19/2028 0.00 0.00

PRG I N SUPPORT OF POWER SECTOR APVD Power 12/18/2013 01/19/2028 0.00 0.00

OKIPP APVD

Agriculture/Private

sector 02/26/2014 07/27/2013 0.00 0.00

INDORAMA FERTILIZER OnGo

Power/Private

sector 01/30/2013 11/19/2016 69,996,640.16 62.72

LEKKI TOLL ROAD PROJECT OnGo

Transport/Private

sector 06/18/2008 12/31/2023 34,652,322.44 100.00

ABN MICROFINANCE TA GRANT OnGo

Finance/Private

sector 09/01/2009 12/31/2012 699,966.40 100.00

ZENITH BANK LOC II OnGo

Finance/Private

sector 12/13/2006 12/31/2013 69,996,640.16 100.00

LINE OF CREDIT TO ACCESS BANK

PLC OnGo

Finance/Private

sector 12/13/2006 12/31/2014 24,498,824.06 100.00

LINE OF CREDIT II TO GUARANTY TUST BANK OnGo

Finance/Private sector 06/23/2010 01/31/2019 62,996,976.15 100.00

ZENITH EMERGENCY LIQUIDITY

FACILITY OnGo

Finance/Private

sector 07/22/2009 12/31/2015 34,998,320.08 100.00

MIC GRANT ASSET M***** APVD Agriculture 05/30/2014 11/28/2014 0.00 0.00

AGRICULTURAL TRANSFORMATION AGENDA SUPPORT- ADF Loan APVD Agriculture 10/30/2013 06/30/2019 98,780,000.00 0.00

AGRICULTURAL TRANSFORMATION

AGENDA SUPPORT- ADF Grant APVD Agriculture 10/30/2013 06/30/2019 250,000.00 0.00

TRANSPORT SECTOR AND ECONOMIC GOVERNANCE OnGo Multi-Sector 02/27/2013 12/31/2015 209,989,920.48 50.00

SKILLS TRAINING AND VOCATIONAL

EDUCATION OnGo Social 07/27/2005 12/31/2015 30,000,000.00 57.66

EMERG. ASSIST. TO CH ***** APVD Social 07/21/2014 08/29/2014 0.00 0.00

EMERGENCY ASSIST EBOLA APVD Social 08/18/2014 02/28/2015 699,966.40 0.00

RURAL WATER & SAN SUB-PROG (YOBE & OSUN) OnGo

Water Supply/Sanitation 10/10/2007 12/31/2014 51,000,000.00 36.55

URBAN WATER & SAN IMPROVEMENT

PROJECT OnGo

Water

Supply/Sanitation 09/02/2009 04/30/2018 50,000,000.00 3.87

ZARIA WATER EXPANSION & SAN PROJ, OnGo

Water Supply/Sanitation 02/08/2012 12/31/2017 63,920,000.00 0.85

URBAN WATER REFORM & PORT

HARCOURT WSSP -ADB APVD

Water

Supply/Sanitation 03/26/2014 08/31/2019 0.00 0.00

URBAN WATER REFORM & PORT HARCOURT WSSP - ADF Loan APVD

Water Supply/Sanitation 03/26/2014 08/31/2019 0.00 0.00

Page 33: MULTINATIONAL STUDY FOR THE ABIDJAN LAGOS CORRIDOR … · 2019-06-29 · route optimization. 4. To ensure effective operations and impact of the new highway, other study activities

XI

Appendix III Abidjan- Lagos Related Projects Financed by Bank and Other Donors, March 2015

Section Length

(km) Condition Proposed or on-going works

Funding

Agency

COTE D'IVOIRE

Abidjan - Grand

Bassam 42.7

2 – lane, fair

condition

Construction of a highway: widenning from 2 to 6 lanes

of the exisiting road from Akwaba roundabout to

Gonzaqueville/ horse riding center (11.2km) plus new

alignment from the horse riding center to Moossou-

Comoe bridge: 17.45km.

China

Eximbank

and GoCI

Grand Bassam - Samo 30 2 – lane, fair

condition

Ongoing studies to turn this section into a highway .

Studies scheduled to be completed in June 2015. GoCI

Samo-Aboisso 36.4 2 – lane, fair

condition

Aboisso-Noe 60.9 2 – lane, poor

condition

rehabilitation of the existing 2 lanes plus contstruction

of a new bridge at the border between Cote d'Ivoire and

Ghana

World Bank

GHANA

Elubo-Agona Junction 110 2-lane dual Under construction World Bank

Agona Junction -

Takoradi 29.65

2-lane road, fair

condition

Engineering studies have been completed for

rehabilitation. DANIDA

Takoradi-Kasoa 193 2-lane road, fair

condition Prefeasibility studies for PPP completed. Feasibility

studies to be conducted. World Bank

Kasoa -Mallam 19 3-lane road, good

condition

Mallam -Tetteh

Quarshie (G.Bush

highway)

14 3-lane dual, Recently

rehabilitated Completed MCC

Accra Motorway -

Tema 19

2-lane dual

carriageway, fair

condition

Discussions underway for possible PPP arrangement to

develop into 3-lane dual carriageway PPP

Tema roundabout Inadequate capacity

roundabout

Engineering Studies will begin in April 2015 for the

development of an interchange. Funding for

construction of the interchange is still being discussed

JICA

Tema-Akatsi 115 2 – lane, good

condition Completed KfW

Akatsi-Aflao and

Akatsi-Akanu 58.8

2-lane road, good

condition Completed AfDB

TOGO

Aflao - Port roundabout 9.2 4 – lane, good

condition Completed

IsDB,

BOAD,

EBID

Port roundabout-

Avepozo 10.3

4 – lane, fair

condition

Ongoing studies to turn this section into a highway .

Studies scheduled to be completed in June 2015.

AfDB and

EIB

Avepozo- Aneho 28 2 – lane, fair

condition

widenning into 4 lanes works being considered to be

financed by AfDB and EUunder a new project

AfDB and

EU

Aneho-Sanvee Condji 7.76 2 – lane, good

condition Completed World Bank

BENIN

Hillacondji - Ouidah 58.75 2 – lane, fair

condition Being rehabilitated AfDB

Ouidah-Pahou 17.75 4 – lane, fair

condition Being reconstructed AfDB

Pahou-Godomey 10.3 4 – lane, fair

condition

Works Ongoing works to turn this section into a

highway. World Bank

Godomey-

Abomey/Calavi 16.5 Works completed EU

NIGERIA

Seme-Badagry 23 4 – lane, fair

condition

Badagry roundabout-

Eric Moore (Lagos) 59

4 – lane, fair

condition

Ongoing works (in phases), includes BRT and metro

rail.

Lagos State

Government

Page 34: MULTINATIONAL STUDY FOR THE ABIDJAN LAGOS CORRIDOR … · 2019-06-29 · route optimization. 4. To ensure effective operations and impact of the new highway, other study activities

XII

Appendix IV: Share of Component Cost by Source

COMPONENT NAME

Funding Source

Total

UA

million

ADF IPPF ECOWAS

Benin Cote

d'Ivoire Ghana Nigeria Togo RPG

1 Feasibility Study, Environmental, Social Impacts Assessment

(ESIA) and Detailed Engineering Design 0.78 0.78 0.78 0.78 0.78 1.79 5.69

2 PPP Structural and Transaction Advisory 0.22 0.22 0.22 0.22 0.22 - - - 1.08

3 Corridor Economic Development Study - - - - - - 1.03 - 1.03

4 Trade and Transport Facilitation - - - - - 0.71 - 0.71

5 Corridor Management – Setup Study,

Establishment and Operations

Setup Study - - - - - 0.18 0.18 - 0.36

Establishment &

Operations - - - - - 0.73 0.73

6 Technical Assistance Service to ECOWAS and Member States - - - - - 0.91 - 0.16 1.07

7 Road Safety Audits - - - - - 0.33 - - 0.33

8 Financial Audits - - - - - 0.06 - - 0.06

PROJECT COST (PLUS CONTINGENCIES) 1.00 1.00 1.00 1.00 1.00 4.00 1.92 0.16 11.08

Page 35: MULTINATIONAL STUDY FOR THE ABIDJAN LAGOS CORRIDOR … · 2019-06-29 · route optimization. 4. To ensure effective operations and impact of the new highway, other study activities

XIII

Appendix V: Study Map

Abidjan

Lagos

INDICATIVE

PROJECT AREA