Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 Project Sponsor: ARC Works of Monroe County Team Members: Team Leader George Gooch, Bill Lucas, Chris Donati, Drew Stone- Briggs, Hui Kim, Mike Hayden, Mike Levis, Jeff Coppola Team Mentor: Dr. DeBartolo (ME) and Dr. Marshall (IE) Acknowledgements: This material is based upon work supported by the National Science Foundation under Award No. BES-0527358. Any opinions, findings, and conclusions or recommendations expressed in this material are those of the author and do not necessarily reflect the views of the National Science Foundation.

Upload: hilda-summers

Post on 17-Dec-2015

215 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Multidisciplinary Engineering Senior DesignProject PO6208 – ArcWorks Closure Tube Assembly

Adaptation Preliminary Design Review02/24/2006

Project Sponsor:ARC Works of Monroe County

Team Members:Team Leader George Gooch, Bill Lucas, Chris Donati, Drew Stone-

Briggs, Hui Kim, Mike Hayden, Mike Levis, Jeff Coppola

Team Mentor:

Dr. DeBartolo (ME) and Dr. Marshall (IE)

Acknowledgements:This material is based upon work supported by the National Science Foundation under

Award No. BES-0527358.Any opinions, findings, and conclusions or recommendations expressed in this material are those of the author and do not necessarily reflect the views of the National Science

Foundation.

Page 2: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Presentation Overview Sponsor

Who they are What is their current process

Team Goals How are we going to help ArcWorks Needs, Feasibility, and Concepts

Final Concept What improvements are being made Time, Flow, Material Handling

SD II

Page 3: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

ArcWorks

ArcWorks is the vocational division of the Arc of Monroe County

Have been serving individuals with developmental disabilities and their families for over forty years.

Specialize in providing subcontracting manufacturing services

Comprised of over 250 assembly operators

Page 4: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

ArcWorks – Closure Tube Assembly (CTA) A process that supports the assembly of a

bent stem closure with a tube attachment

Quantities produced are close to 500,000 units per year

Currently there are 3 process steps The team is dealing primarily with steps 2 and 3

Page 5: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

CTA - Components

Finished Closure

Components

Closure (Various Sizes) Adapter Tube

(Various Lengths)

Page 6: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Step 1 – Straw Cutting Process Machine

10 tubes at once are inserted into the top of the automated tube cutter. The machine cycles, cuts the tubes and they drop through into a box.

Page 7: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

CTA - Step 2 (Closure/Adaptor Sub-Assembly) Process MachinesClosures are placed in the bottom fixture and Adapters are placed in the top fixture of one of two style manual presses. The presses are cycled to create the Closure / Adapter Sub-assembly.

Page 8: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

CTA - Step 3 (Final Assembly Press) Process Machine

Closure / Adapter Sub-Assemblies are placed in the top fixture of the automated press. Tubes are placed in the bottom fixture. The machine is cycled to create the final assembly.

Page 9: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Team’s Task

Lean Development – integration of sub assembly production orders/releases to ensure minimum/maximum quantities are on hand and flow as required (SD I)

Production Process – improvement of the assembly process, changeover & set-up, ergonomics/safety, and improvement of operator productivity (SD I)

Purchasing Function – ordering of the raw tubing that is cut to length for finished goods assembly (SD II)

Inventory Management – of both raw and cut tubing (SD II)

Page 10: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Needs Assessment

Tools Used

Problem Scope/Definition The mission of this design project team, PO6208, is to redesign a

process that supports the assembly of a bent stem closure with tube attachment called the Closure Tube Assembly. In this design the team hopes to improve the process flow, daily production and worker safety/comfort.

Objective Trees

5 Why’s

Page 11: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Needs Assessment - Outcome

It was decided through evaluations that this machined needed to: Combine assembly steps Decrease the number of moving parts Limit complexity of design Create fixtures that can be used for all product

sizes Use standard components Improve ergonomics Add counters

Page 12: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Feasibility Assessment

Tools Used

REST Resource, Economics, Schedule, Technical

Pugh Method Un-weighted, all attributes equally important

Weighted Comparison Method Looks at attribute importance

Page 13: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

REST Method

Compares the chance of success of each idea Rating Scale

1=low chance 5=high chance

Design Idea Avg. Score 1 - 4.10 2 - 4.13 3 - 3.36 4 - 4.10 5 - 3.90 6 - 3.83

Top 3 = Idea 2, 1, 4

Page 14: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Pugh Method

Idea 1 Idea 2 Idea 3 Idea 4 Idea 5 Idea 6

+ 7.00 7.33 6.00 8.50 5.83 4.67

- 2.60 2.60 7.50 1.33 3.17 5.00

0 12.50 12.17 8.17 11.83 12.67 12.00

Compares against a baseline considering all attributes are equally important

Top 3 – Idea 4, 1, 2

Page 15: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Weighted Method

1 2 3 4 5 6

3.854 3.663 2.786 3.779 2.953 3.115

Compares against a baseline considering all attributes are not equally important, but have a weighting Idea

Top 3 – Idea 1, 4, 2

Page 16: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Feasibility Assessment - Outcome Main concerns after feasibility assessment:

Fixtures Closure Holding and Size Variation Tube Holding and Size Variation Adapter Holding

Assembly Alignment Combining Operations Budgeting

Page 17: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Feasibility Assessment - Results Top 3 ideas from feasibility methods

Idea 1 Idea 2 Idea 4

These ideas were the basis for the teams final design.

Page 18: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Final Concept

Page 19: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Step 1 – Part Placement

Page 20: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Step 2 – Press Anti-Tie Down Buttons

Page 21: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Step 3 – Adapter Press

Page 22: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Step 3 – Close Up of Adapter Press

Page 23: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Step 4 – Cylinder Returns

Page 24: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Step 5 – Manual Sub-Assembly Move

Page 25: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Step 6 – Manual Straw Placement

Page 26: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Step 7 – Gripper Press

Page 27: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Step 8 – Dual Cylinder Press

Page 28: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Step 9 – Gripper Return

Page 29: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Step 10 – Dual Cylinder Return

Page 30: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Step 11 – Assembly Removal

Page 31: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Performance Needs

Pneumatic Design Objectives

Improve safety OSHA 1910.217(b)(6)(i)

Limit cost Limit the stroke length of the press cylinders Actuate the press cylinders simultaneously or

independently Control speed and force

Page 32: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Pneumatic Layout

Page 33: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Analysis of Design ( Mechanical ) Design Parameters

FEA Calculations

Assembly Step Force (lbs) Comments

Closure - Adapter 8.75 Max5.40 Average

24mm red closure and clear adapter create max force

Tube - Adapter 3.00 Max2.11 Average

PPCO tube and red adapter create max force

Page 34: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Engineering AnalysisResultant Displacement

Air Cylinder Bracket Support Max Displacement

5.86 x 10-4 inches Location: End of Bracket

Deformation Scale = 3464 Conclusion:

Bracket Support is Rigid

Page 35: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Engineering AnalysisVon Mises Stress Contour Plot

Air Cylinder Bracket Support Max Stress

780 PSI Location: Bracket Connection

Factor Of Safety= 65 Conclusion:

Withstands Applied Forces

Page 36: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Engineering AnalysisFatigue Analysis

Air Cylinder Bracket Support Fa=Fm= 10 lbs Fatigue Strength=Endurance Limit Factor Of Safety w/

Mod Goodman Criterion= 35 Conclusion:

Withstands Infinite Cycles

Fa, Fm

Page 37: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Engineering AnalysisBuckling Analysis

Tube Holder Section 1

Euler Method: Pcr= 11 lbs Factor Of Safety= 2

Section 2 JB Johnson Method: Pcr= 3446 lbs Factor Of Safety= 626

Conclusion: Neither Section will Buckle Possible Improvement:

Limit exposed tube length in Section 1Pcr

2

1

Page 38: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

BOM

Page 39: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Improvements - Time

Time Comparison Current Process New Design Process

Step Description Time Step Description Time (sec) (sec) Insert Closure 2 Insert Closure 2 Insert Adapter 2 Insert Adapter 2 Press 2 Press 2 Remove CA 2 Move CA 1.5 Insert Tube 2 Insert Tube 2 Insert Closure 2 Insert CA 2 Insert Adapter 2 Press 4 Press 3 Remove CTA 2 Remove CTA 2 Total Time 18 Total Time 12.5

•Estimated productivity increase of 88 CTA’s per hour

Page 40: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Improvements – Material Handling

Retrieve TubesFrom Hallway(Time – 60)

Cut Tubes(Time – 2)

Place Cut TubesIn Box

(Time – 10)

Move Tube from

Cutter to Pallet(Time - 12)

Move Tube from Pallet to

Final Assembly(Time - 10)

Retrieve Closure

And Adapters From Hallway

(Time - 45)

Transfer Parts from Boxes to

Bins(Time – 12)

Assemble ClosureWith Adapter

(Time – 8)

Place CA In Box

(Time – 2)

Move CAto Pallet

(Time - 12)

Move CA from Pallet to Final

Assembly(Time - 10)

Fill Bins with TubesAnd Closure Assembly

From Box(Time - 20)

Assemble into Final Assembly

(Time – 8)

CurrentManufacturing

Process(All times in seconds)

Box Final Assembly(Time - 5)

27 ft

1 ft

13 ft

8 ft

1 ft

1 ft

1 ft

1 ft

8 ft

12 ft

1 ft

1 ft

10 ft

Transfer Parts from Boxes to

Bins(Time - 12)

1 ft

Tube CuttingOperation 1

Closure Sub-AssemblyOperation 2

Final AssemblyOperation 3

Final Times and DistanceTube Cutting

Time - 106 secDistance - 51 ft.

Closure Sub-AssemblyTime - 99 secDistance - 33 ft.

Final AssemblyTime - 33 secDistance - 2 ft.

Retrieve TubesFrom Hallway

(Time - 60)

Cut Tubes(Time – 2)

Place Cut TubesIn Box

(Time -10)

Move Tube from

Cutter to Pallet(Time - 12)

Move Tube from Pallet to

Final Assembly(Time - 10 )

Retrieve Closure

And Adapters From Hallway

(Time - 45)

Fill Bins with Tubes,Closures, and

Adaptors From Box(Time - 20)

Assemble into Final Assembly

(Time – 8)

FutureManufacturing

Process(All times in seconds)

Box Final Assembly(Time - 5)

27 ft

1 ft

13 ft

8 ft

1 ft

1 ft

1 ft

10 ft

Transfer Parts from Boxes to

Bins(Time - 12)

1 ft

Tube Cutting Process

Operation 1Final

Assembly Operation

2 + 3(Combined)

Final Times and DistanceTube Cutting

Time - 106 secDistance - 51 ft.

Final AssemblyTime - 78 secDistance - 12 ft.

Page 41: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Improvements – New Machine Multiple operations done by one operator

Machine mounted to table for stability

Combines two process steps Eliminates material handling between stations Reduces process time

Page 42: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Improvements – Ergonomic/Safety Ergonomically friendly

Eliminates repeated manual motion Reduces ranges of motion Common plane of motion

Safety Anti-tie-down buttons E-stop

Page 43: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

SD II - plans

Investigate Warehouse/Inventory Issues Re-order Points Safety Stock Flow of Material

Desired Outcomes – Manufacturing Area Increased productivity by the ArcWorks team Fewer rejects Higher satisfaction of workers Layout Redesign

Page 44: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Economic Order Quantity -EOQ

Defines the optimal quantity to order that minimizes total variable costs required to order and hold inventory. Q * = optimal order quantity C = cost per order event (not per unit) R = monthly demand of the product P = purchase cost per unit F = holding cost factor; the factor of the purchase cost that is

used as the holding cost (this is usually set at 10-15%, though circumstances can require any setting from 0 to 1)

H = holding cost per unit per month (H = PF)

Page 45: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Questions?

Page 46: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Backup Slides

Following Slides

Page 47: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Straw Cutting Improvements Manual Tube Feeding Concept

Page 48: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Needs Worksheets

Following Slides

Page 49: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Objective Tree – Inventory Management

Inventory Management

Purchasing Warehousing Final Product

Reorder Points Warehousing

Quantity Reorderd

Frequency of Reorder

Order High Volumes

Order Low Volumes

Order Frequently Order Infrequenty

LocationSize of

Inventory

Product LocationWarehouse

locationLow Inventory

QuantityHigh Inventory

Quantity

Quantity Quality

Inspection

BadGood

Page 50: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Objective Tree – Production Process

Production Process

Material Handling Assembly Quality Inspection

Frequency of Handling

Less Manual Process

Determine good products

Determine bad products

High handling frequency

Low Handling Frequency

Failsafes ConsistencyErgonomically

Correct

Take responsibility off of workers

Leads to better Quality

Better worker enviornment

Page 51: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Objective Tree – Fixture Development

Fixture Development

Aid in AssemblyImprove

ErgonomicsIncrease Product

Quality

Produce more parts at one time

Less Manual Machine

Combine multiple processes into one

Lower range of motion

More parts at once to reduce repetition

More like parts with less variance

Go-nogo checkReduce Cycle Time

Easier to use than current process

Quicker Machine Changeover

Less Scrap Parts

Page 52: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

5 Why’s

A) Inventory Management

Why do you want us to improve your purchasing and inventory management system? Don’t want to run out of parts.

Why don’t you want to run out of parts? There is a 4 week lead time to

receive the parts from the vendor.

Why is there a 4 week lead time? That’s what the vendor gives us.

Why do you use that vendor? That’s the supplier we have

always used

Why have you always used that supplier? That’s who Nalgene used before

us and we never looked at any other options.

B) Fixture Evaluation

Why do you need new fixturing for your machines? The old ones are not efficient

enough.

Why aren’t they efficient enough for you? The current process is too

manual.

Why is the current process so manual? That’s the way the original

machines were designed.

Why were they designed like that? It met the needs at that time.

Why did it meet the needs then and not now? The demand from the customer

for Closure Tube Assemblies has increased. (This has created a bottleneck in the assembly department.)

Page 53: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Feasibility Worksheets

Following Slides

Page 54: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Weighted Method – How the weightings were achieved

Page 55: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Weighted Method – How the weightings were used

Page 56: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Top 3 Ideas

Following Slides

Page 57: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Original Concepts

Idea 1

Page 58: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Idea 2

Original Concepts

Page 59: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Original Concepts

Idea 4

Page 60: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Concepts from Peer Review

Following Slides

Page 61: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Assembly Process Improvement

Pin Style Automated Press Discussion: Pin tube support

Sliding Adapter Fixture Press Discussion: Closure Interference,

Fixture Alignment, Adapter Orientation

Page 62: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Assembly Process Improvement Two Stage CTA Press

Discussion: CTA Removal, Rotation

CTA Process w/ Magazine Feeder Discussion: Alignment

Page 63: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Feeding Concepts Automated Feeding

Discussion: Cost, Complexity, Durability, Clip Manufacturability

Also… Closure?

Feed Escapement

Tube Adapter

Page 64: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Gantt Chart – SD I

Page 65: Multidisciplinary Engineering Senior Design Project PO6208 – ArcWorks Closure Tube Assembly Adaptation Preliminary Design Review 02/24/2006 P roject Sponsor:

Gantt Chart – SD II