multicat purpose built job and business administration for australian and new zealand main...
TRANSCRIPT
MultiCATMultiCAT
Purpose built Job and Business Administration
for Australian and New Zealand Main Contractors
By Construction People for Construction PeopleBy Construction People for Construction People
.
INTRODUCTION
MultiCAT is purpose built for mid tier Main Contractors. CAT Software have been supporting
the construction industry with leading edge construction systems for 13 years and we
continuously seek ways to make our software better and keep up to date with technology.
We provide the balance between traditionally good record keeping and the electronic age
we now operate in.
MultiCAT incorporates all aspects of project and business administration from documents to
dollars and inception to completion.
MultiCAT will streamline your organisation and provide systems and structure for your staff
at all levels so they are better equipped to do their day to day job. Construction companies
using MultiCAT find they can reduce staff, make significant savings and take major steps in
increasing efficiency.
This presentation will walk you through the core functions of MultiCAT and give you an
excellent overview of MultiCAT and what it can do for your company.
.
MultiCAT MODULES
• Contact Data Base• Job Specific Contacts• Staff Contact• Outlook Synchronise• Accounting Synchronise
Contact Information
• Drawing Revision and Distribution• Completion Compliance• Concrete Register• Hire Equipment• Non contractual communication• File Notes• Meeting Minutes
Project Documentation
• Weather• Inspections• Visitors• Delays• Subcontractors on Site• Internal Plant Transfers
Daily Site Diary
• Time Entry• Productivity Overview• Summary Export for Payroll
Time Keeping and Productivity
• Purchase Orders• Standing Orders• Petty Cash• Creditor Processing• Accounting Interface• Electronic Approvals
Purchasingand Creditors
• Asset Management• Plant Compliance• Vehicle Register• Transfers to Jobs• Plant Recharge• Plant Register
Plant and Equipment
• Committed Costs• Cash Flow Forecast• Risk and Opportunity• Combined Committed Costs
Project Reporting
• Lead Management• Tender Documents• Estimating• Tender Invitations• Trade Letting• Confirmed Jobs• Project Budget
Project Establishment
• Written Communication • Variations• Claim Set Up• Progress Claims• EOT Claims
Client Administration
• Written Communication• RFI Management
Consultant Administration
• Written Communication• Variations• Progress Claims
Subcontractor Administration
• Response Management• Hyperlink to original
Incoming Communication
• Manage Company and Staff Information• Manage System Securities and Access Levels• Manage Purchasing Lists and Look Ups• Add To or Edit Pick Lists• Add To or Edit Letter Templates
System Management
Consolidated, Affordable &Purpose Built For Main Contractors
.
MultiCATMultiCAT
Timing
The main menu is logically laid out and easy to follow, the module graphic is present throughout the module making it easier to navigate.
MAIN MENU
Timing
Lead management is really good and allows you to manage leads, create a forecast, add file notes for all stages of the sales process, it also gives you follow up prompts, conversion statistics and a lead schedule for your sales meetings. Never let a lead fall through the cracks or be forgotten. All pre project information flows through if the job is successful.
LEAD MANAGEMENT
Timing
“Y” indicates the trade has
had invites
Tick to Invite
Click to Print Full Individual Invite
Click to email Invitees
Select the Trade
The tender invitation module offers you the flexibility of organising your tender invitations individually, by trade or by job as a whole if you are using an online document distribution system. The email interface is excellent and overall your administration of this process is vastly reduced. All invitations have three schedules. 1 = Conditions of Subcontract 2 = Trade Specific Scope 3 = Form of Tender. Include a scope of works where relevant.
TENDER INVITATIONS Set up the trade letting master
Click to Print Cover Letter Only
Create Templates for Trade Specific Scopes and
Append to an Invitation
Timing
Issue NTT quickly and efficiently. Simply type the information and select the individual or trade that the NTT is to go to then bulk email the document or you can print and send if you do things traditionally.
NOTICE TO TENDERERS
Timing
The estimate is organised by group codes and cost codes. Select the group and all associated codes will appear. If you use a price book the item selected will populate with rate and unit of measure, all you have to add is quantity. The bulk of your items will be auto populated from subcontractor and supplier prices that have been ticked as preferred.
ESTIMATING
Shows the tender price and any associated tags
from tender pricing submission screen
Select a code group
Type in an item or add it from your price book. Price book is optional
Select a cost code
Timing
When the subcontractor price comes in, add the value including any tags. Tick the preferred price for use with your estimate and this value and associated tags will be added to the estimate.
TENDER PRICING
Timing
When the project is confirmed change the job status from pending to successful to make it a live project then turn your estimate into a budget, assign project staff (until they are assigned they have no authorisation to access a project) and complete contractual details such as contract dates, retention dates and the retention calculation to be used for your progress claim.
At this stage you can synchronise projects with accounting so that you have two levels of job cost reporting – both committed and actual.
PROJECT CONFIRMATION
Timing
Append your estimate to the budget, notice that all items with a unit of measure of hour is showing in labour hours. You are able to transfer money between codes as relevant and keep a good audit trail of transfers and the reasons for. The budget can be locked, but only unlocked by authorised personnel.
BUDGET SETUP
Timing
The trade letting schedule works out award, close, invite and final design date to ensure the tenders are let with sufficient time to meet the start on site date. This is generally driven by the Site Manager or person who drives the program. This schedule is also great for PCG meetings for keeping the team informed and keeping focus on final design requirements.
TRADE LETTING SCHEDULE
Timing
Generate a subcontractor recommendation form for approval. On confirmation of subcontractor acceptance the subcontractor is added to the project team, the set up for payment claim is done and a letter of acceptance with a customisable subcontract agreement is generated (optional).
TRADE LETTING
CLIENT COMMUNICATION (CTC)
The client communication module is excellent, it’s fast well presented (your branding) and schedules are automated. On click the communication goes directly to outlook with the correct title and email address.
Timing
Timing
CLIENT VARIATIONS
Client variations are auto added to your progress claim and also added to the committed cost schedule regardless of status unless they are “not proceeding”. Presentation is excellent and the schedules are automatically generated.
Timing
PROGRESS CLAIM SET UP
The claim breakdown can be appended from the budget with margin either back spread or added as a line item. Alternatively you can manually enter it to suit the project.
Timing
PROGRESS CLAIM
Client Claims are efficient and speedy to generate and they are compliant. You can either work on percentage complete or on dollar values that back calculate the percentage. Retentions are calculated based on the retention calculation method selected for the project. You can keep notes against each claim for reference.
Timing
CONSULTANT COMMUNICATION (ATC)
The consultant communication module is excellent, it’s fast well presented (your branding) and schedules are automated. By clicking email as pdf the communication goes directly to outlook with the correct title and email address. RFI management has never been easier. The schedules are great for Design and PCG meetings as they really highlight any consultant who is dragging their feet.
Update responses on the fly, this adds to incoming
Add a suggested solution, only
prints if populated
Time implication identified
Timing
Base information including values, head contract retention calculation, contacts and coding is auto added on contract acceptance. Other information to be added includes insurance, contract sent and received dates and documentation requirements.
SUBCONTRACTOR SET UP
Timing
Generate Subcontractor communication, It is quick and efficient and all communication can be sent as a pdf email attachment by clicking “email” on the ribbon, this automatically turns your document into a pdf and takes you through to outlook with the correct email address. All documentation is well presented with your branding and signatures are all electronic.
SUBCONTRACTOR COMMUNICATION
Timing
ATS Variations have excellent tracking and are automatically added to subcontractor payment schedules and the project committed cost schedule proving you with forecasts that are up to date daily. Variations can be linked to Client Variations and all schedules are automated.
SUBCONTRACTOR VARIATIONS
SUBCONTRACTOR CLAIMS
Subcontractor Claims are efficient and compliant whether you are using a recipient generated invoice method or accepting invoices. You can either work on percentage complete or on dollar values that back calculate the percentage. Retentions are calculated based on the calculation method selected in contract set up and you can add reasons for variance. Retention tracking is excellent.
Timing
SUBCONTRACTOR CLAIM APPROVAL
All progress claims need to be approved by both the project manager and the contract administrator before they are released to accounts for processing for payment. Electronic approvals are a big step forward in efficiency.
Timing
INCOMING COMMUNICATION
Incoming communication can be added on the fly from client and consultant communication or can be added directly. All documents logged can be hyperlinked to the document. As most incoming communication from consultants needs to be distributed to subcontractors we have made it easy to do this and create an auto ATS.
Timing
Timing
The contact database contains all contact information, this module feeds all other modules and synchronises with Microsoft Outlook and Accounting. Enter it once and never again. From this screen you can assign a performance rating, add or update insurance information, synchronise with accounts and add or update annual contract information.
CONTACT DATABASE
Timing
Managing your reports is great, put a report into print preview and then if you would like to filter or group, click report view and filter the information you want to print. You have real power over your own data.
CONTACT DATABASE
Timing
The project specific contacts pulls information from the contacts database so you have a project specific list that limits project lists to the project team. Synchronise your contacts with Outlook.
PROJECT SPECIFIC CONTACTS
Timing
The address panel on all external communication picks up its information from here, so the letterhead is author specific and has individual phone, fax, mobile and email address.
STAFF CONTACT INFORMATION
Timing
The drawing / document register can be appended for the tender register, manually added or added from excel. You can add a hyperlink to documents if required.
ADD NEW DOCUMENTS
Click to append documents from Tender module
Timing
Track and register document revisions as they are revised. If you are still using a traditional method of document distribution you can manage and track distributions and generate document transmittals. Alternatively just manage revisions and use an on line solution for distribution.
DOCUMENT REVISION AND DISTRIBUTION
Select the document for transfer
Select the recipient from the project team
Click to print preview then post or email
Timing
The concrete register allows site staff to keep a record of all concrete pours including quantities, design mix, locations, concrete dockets and test information.
CONCRETE REGISTER
Add or update pour dockets
Add pour test information
Timing
Timing
Completion compliance is flexible and is designed to track the actions on resource consents, building consents and any other requirements associated with building completion.
PROJECT COMPETION COMPLIANCE
Timing
Meeting minutes are progressive which is great as it allows you to get consolidated meeting minutes for a project for each meeting type which is invaluable when you have a time claim and are having to research history.
ACTION PLAN \ MEETING MINUTES
Timing
General communication is for any written communication that is not to a contract party. You would also use this for any pre contact communication as it can still be linked to a job. This module can also be used for all non job specific (Job No 1) communication.
GENERAL COMMUNICATION
Timing
File notes are great whether it’s a record of conversation, an action note or just a record of an event. Use file notes instead of a personal diary as then the information is available to the team.
FILE NOTES
Timing
DAILY SITE DIARY
Daily site diaries on computer add a lot of value because its quicker for the site staff and it allows good reporting and site management information. This is great for management and office based staff to keep up with what is happening on site.
Timing
TIME KEEPING
Time entry is simple and is charged to the project at the recovery rate nominated for each person or you can use a composite position rate. There is a period report for summary entry to payroll or export depending on which software you are using. Hours can be linked to client variations where relevant and there is a budget versus actual report.
Timing
MONTHLY SALARY ALLOCATION
Monthly salary allocation is for salaried staff so that recovery costs are allocated to projects or overhead as the case maybe. A simple percentage allocation which are recharged as hours.
Timing
Raising a purchase order is simple, you can select items from your price book or use free form entry. You can set up your own auto text for items like safety notes and you can customise the conditions of order. There is also a field for adding a note such as back order. Click to print preview then email to the supplier with the document and the subject line appropriately titled.
PURCHASE ORDERS
Type in an item or add it from your price book. Price book is optional
Select site and the delivery address will look up job address
Select a paragraph to be added as auto text
Link a purchase order to an item of plant or a vehicle
Link a purchase order to a client
variation
Timing
Set up standing orders for the project for items such as concrete, toilets, waste bins, building supplies, hire equipment and anything else that you have an agreed set of rates. Your foremen can now phone order against the standing order so they can spend more time on the site. Track your expenditure against a standing order.
STANDING ORDERS
Default text is customisable
Create a budget by identifying estimated qty
Identify the validity period
Record the quote reference
Timing
Site staff can phone order against standing orders set up by the contract administrator. Select a standing order, pick an item and add a quantity so that there is a running tally against phone orders. Site staff can get on with the job and not get tied up in administration whilst still maintaining integrity of expenditure.
PLACE A STANDING ORDER
Timing
Invoices can be processed by creditor, it is quick, simply enter the invoice no and invoice date. Orders can be adjusted if there is a minor discrepancy like a delivery charge. They are added as unmatched items that do not affect original order value and require approval before processing for payment. See a list of all invoices awaiting approval by operations staff.
PROCESS CREDITOR INVOICES
Timing
Processing standing orders is also simple, select the relevant order and only items that are part of the standing order show on the list and then enter quantities. Similarly, unmatched items require approval before processed for payment.
PROCESS STANDING ORDER INVOICES
Running totals against budget
Click to view agreed rates
Timing
Project Managers and Contract Administrators can electronically approve orders, invoices don’t need to leave the accounts office. Great schedules to assist with forecasting. Approval schedule for accounting records. Unmatched invoices are highlighted for review, can be corrected and approved or returned to supplier for credit.
APPROVE CREDITOR INVOICES
Click to approve and MultiCAT captures your
name and the date.
View the details from the
invoice.
Click to return incorrect invoice to supplier for correction and credit.
Timing
Once creditor invoices are approved for payment they appear on this screen ready for upload to accounting. The payment of the invoice will then go through the usual process within accounting. No double entry and no concerns for accounting staff about unapproved transactions. This process really streamlines administration. Unapproved invoices are scheduled so they know which operations staff to chase up. The export matches company name so there can be no errors.
APPROVED INVOICES NOW LOAD TO ACCOUNTS
Click to export to accounting
Timing
MANAGE PLANT AND EQUIPMENT
Add and edit plant and equipment and set initial compliance dates (these will be updated by the operations team). Set recharge rates for projects, once an item is transferred to a project (from yard or through daily site diaries) the site will be charged at the day rate until it is transferred back to the yard or another project.
Add a daily recharge rate
Update the status for stolen or retired items
TRANSFER FROM YARD
An item can be transferred to a project from yard or through daily site diaries, the site will be charged at the day rate until it is transferred back to the yard or another project.
Timing
Timing
PLANT AND EQUIPMENT REGISTER
Know where any item of plant is at any time. Operations staff can update compliance dates here and there is colour coding to highlight items that have expired or are coming due for action.
Update certification
Timing
Project reporting is live and provides the best possible information on where the job is financially at any time.
PROJECT REPORTING
Timing
The committed cost schedule gives you a real time view of committed costs for a project at any point in time. This schedule is exceptionally good and allows management to quickly overview and drill down where necessary.
COMMITTED COST SCHEDULE
Code from budget
Code DescriptionOriginal BudgetClient variations
regardless of status
Revised contract valueSubcontracts AwardedSubcontractor variations
POs regardless of status
SOs regardless of status
Labour hours & dollars summary
Internal plant recharge Total
Commitments
Cost to Complete
Forecast final costs
Timing
The objective is to keep the committed cost schedule clean and actual. The risk and opportunity process is where you can factor in provisions and contingencies and any slush buckets so they are declared. A very powerful process for the Project Team to review each month. The assessed RO factors into the committed cost schedule forecast margin.
RISK AND OPPORTUNITY
Timing
This schedule shows all creditor and subcontract values for a nominated period regardless of status so that you have an on going view of payments due in the following month. The chances are if you ordered it this month you will have to pay for it next month. Receipts show also so that any over or under claims are very apparent.
CASH FLOW FORECAST
Timing
If you have set up a master job you can associate any amount of projects to get a consolidated committed financial position. This is useful where you have a project with several different buildings, or you want to track a department or a particular project manager.
CONSOLIDATED PROJECTS
SYSTEM ADMINISTRATION
System Administration is secure and this is the area where standard information is set up such as company information, logos, departments, staff information, cost codes, price books, pick lists, address panel information, default text and a lot more. Set up common library information to maximise pick-lists and minimise typing.
Timing
Timing
JOB COST VERSUS ACCOUNTING
Every construction business needs two types of management tools so there are effective tools for staff to perform their day to day job efficiently, A Main Contractor needs tools for: -
• the people who make the money and • the people who count the money
The MultiCAT and MoneyWorks team provides tools for both parties that are both independent yet integrated saving a significant amount of administration time. Core Accounting functions continue to be done in the accounting system by Accounting Staff in a summarised form of the traditional way. All transactions approved by operations staff are pushed through from MultiCAT so there is no duplication of data entry. Job costing and other administrative functions that were traditionally done in the accounting system can now be done, on site and off site in your CAT system. The split up of which things are done in the accounting system and which things are done in CAT is defined, almost exactly, by where the people sit.
Duplication is minimal and the demarcation points are clear. This structure keeps operations people out of the accounting system and visa versa.
MONEYWORKS
After an extensive evaluation of the main accounting systems available in Australia and New Zealand, we came to the conclusion that MoneyWorks was the best for our industry. The added benefit is that MoneyWorks is locally owned and supported and has 16 years history with 24,000 sites in Australasia which is steadily increasing.
The reasons we recommend MoneyWorks are fairly simple: from a user perspective, MoneyWorks is exceptionally easy to use, is very flexible and powerful, and has great reports. Because it is efficient, we find that it is faster to enter data, with a big saving in staff time. And because of the design of MoneyWorks, we can integrate it with CAT and push transactions into it, so you don't have to enter information twice. From an accountant's point of view, MoneyWorks has a very powerful general ledger, audit trails, excellent reports and the best handling of GST we have seen.
So it comes down as always to a simple cost-benefit analysis. MoneyWorks is faster and easier to use than most accounting systems, plus the direct integration with CAT saves a lot of time and duplication of effort. You can use CAT and stick with your current accounting system and pay your staff to enter things twice. To maximise the time, cost and efficiency benefits that are gained with an integrated system we recommend using CAT with MoneyWorks.
Timing
CAT SUPPORT
CAT Support is awesome, our people are knowledgeable and skilled with both how best to use CAT Software and Services but also in their understanding of the construction industry and how the project administration flow works.
We are Construction People!!
Timing
GETTING CAT SOFTWARE
If you are interested in purchasing MultiCAT or finding out more information please contact us by phone, fax or email.
New Zealand: +649 574 5735Victoria: +613 9981 5728Queensland: +617 3175 0559Email: [email protected] Web: www.catsoftware.biz
Thank you for your time in viewing this presentationPlease note that data used in this presentation is test data. Any reference to a job or individual is coincidental
Timing