Multi-site Pedestrian Ramp & Safety Improvement Project Project ID: HWPEDSF4 Community Board 4 Manhattan Borough President Gale Brewer Lorraine Grillo Commissioner March 2019

Upload: others

Post on 25-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Multi-site Pedestrian Ramp & Safety Improvement Project ...W. 34 thStreet between 8 Avenue and 9th Avenue. The scope of work for this project involves: Utility relocation work, the

Multi-site Pedestrian Ramp & Safety Improvement Project

Project ID: HWPEDSF4

Community Board 4

Manhattan Borough President Gale Brewer

Lorraine Grillo

Commissioner

March 2019

Page 2: Multi-site Pedestrian Ramp & Safety Improvement Project ...W. 34 thStreet between 8 Avenue and 9th Avenue. The scope of work for this project involves: Utility relocation work, the

Project Data

Project ID: HWPEDSF4

Project ID: HWPEDSF4

Bid Date: April 3, 2018

Registered Date: July 23, 2018

Notice To Proceed: September 5, 2018

Contractor: JLJ Contracting

Contract Value: $9,948,250

Contract Duration: 1095 days

Completion date: Fall 2022

Federal/State Fund: Yes

Registration No: 20181428906

Field Office: 227 W 29th Street, 4th Floor

New York, NY 10001

Page 3: Multi-site Pedestrian Ramp & Safety Improvement Project ...W. 34 thStreet between 8 Avenue and 9th Avenue. The scope of work for this project involves: Utility relocation work, the

W. 34th Street between 8th Avenue and 9th Avenue.

The scope of work for this project involves:

Utility relocation work, the installation of 12” water main, Two 6” building water main

service connections, two chute connections, catch basins, sewers, pedestrian ramps,

Granite curb, bus bulbs, bus shelters and Traffic Signals.

City DOT Approved Permit Hours:

• 10PM- 6AM Monday- Friday

• 10PM- 6AM Saturday

• 24 Hours A Day / 7 Days A Week (During Sidewalk Work)

Scope of Work

Project ID: HWPEDSF4

Page 4: Multi-site Pedestrian Ramp & Safety Improvement Project ...W. 34 thStreet between 8 Avenue and 9th Avenue. The scope of work for this project involves: Utility relocation work, the

Project Map

Project ID: HWPEDSF4

Page 5: Multi-site Pedestrian Ramp & Safety Improvement Project ...W. 34 thStreet between 8 Avenue and 9th Avenue. The scope of work for this project involves: Utility relocation work, the

Work Operations

Project ID: HWPEDSF4

Type of Work:• Utility Work (In progress)• Two 6” Wet Connections (In progress)• Chute Connection (In progress)• Catch Basins (In progress)• 12” Water Main Installation • Sewer Work• Granite Curb/Sidewalk Replacement• New Bus Stop Stations• Final Roadway Restoration

Page 6: Multi-site Pedestrian Ramp & Safety Improvement Project ...W. 34 thStreet between 8 Avenue and 9th Avenue. The scope of work for this project involves: Utility relocation work, the

Northwest Corner of 34th Street and 8th Avenue

Project ID: HWPEDSF4

34th STREET LOOKING WEST

Page 7: Multi-site Pedestrian Ramp & Safety Improvement Project ...W. 34 thStreet between 8 Avenue and 9th Avenue. The scope of work for this project involves: Utility relocation work, the

Northwest Corner of 34th Street and 8th Avenue

Project ID: HWPEDSF4

W. 34th STREET & 8TH AVENUE LOOKING WEST

Page 8: Multi-site Pedestrian Ramp & Safety Improvement Project ...W. 34 thStreet between 8 Avenue and 9th Avenue. The scope of work for this project involves: Utility relocation work, the

• DDC is committed on maintaining a work site that is safe and clean.• Pedestrian access will be maintained at all times. • Resident Engineer will monitor operations and work within DEP Noise Code regulations.• Sidewalk access from the curb may be temporarily restricted while work is conducted (coordination

will be arranged on a case by case basis)• Parking may be temporarily restricted during construction.

• Maintenance and Protection of Traffic (MPT)

• The contractor must maintain two 12 ft lanes on West 34th Street. One 12 ft lane eastbound and one 12 ft lane westbound and an 8 ft clear sidewalk for pedestrians.

• The contractor will restore all travel lanes and pedestrian access by 6:00 AM.

8

Community Impacts & What to Expect

Project ID: HWPEDSF4

Page 9: Multi-site Pedestrian Ramp & Safety Improvement Project ...W. 34 thStreet between 8 Avenue and 9th Avenue. The scope of work for this project involves: Utility relocation work, the

Water Service Interruptions:

• 72-Hour Advance Advisory will be provided, followed by 24 hour confirmation/cancellation notice.

• Specific instruction will be provided prior to water shutoff

• If your water service is not restored by the time indicated on the Shutoff Notice, please contact the Community Construction Liaison (CCL) or 311 if after hours.

Special Needs:

• The DDC staff will work specifically with individuals that have special needs who may be uniquely impacted by the project.

Rodent Control:

• A rodent survey was performed prior to construction

• Rodent Control Stations are being installed by a professional rodent control contractor

9

Community Impacts Continued

Project ID: HWPEDSF4

Page 10: Multi-site Pedestrian Ramp & Safety Improvement Project ...W. 34 thStreet between 8 Avenue and 9th Avenue. The scope of work for this project involves: Utility relocation work, the

10

Weekly Look Ahead

Project ID: HWPEDSF4

Page 11: Multi-site Pedestrian Ramp & Safety Improvement Project ...W. 34 thStreet between 8 Avenue and 9th Avenue. The scope of work for this project involves: Utility relocation work, the

11

Community Advisory

Project ID: HWPEDSF4

Page 12: Multi-site Pedestrian Ramp & Safety Improvement Project ...W. 34 thStreet between 8 Avenue and 9th Avenue. The scope of work for this project involves: Utility relocation work, the

Thank you

Lorraine GrilloCommissioner