multi-level car parking by mech ci cadd engineering pvt. ltd. chennai
TRANSCRIPT
Leads Beyond Engineering…
Incepted in the year 1995…
Leading service providers in Plant Engineering Design…
Offering a wide range of HR services…
Under the guidance of Mr. K. JAYARAMAN, Founder, Chairman and Managing
Director.
ABOUT US…
To grow rapidly in the international market by
serving our customers with the products and services
that they require with quality, cost and timeliness while
remaining fast-paced, nimble, creative, flexible and
forward-looking.
MISSION
To be the premier engineering partner for our global customers
by providing cost effective innovative design solutions and services by
meeting our customer's requirements with quality and prompt delivery.
VISION
MILESTONE
1995
Inception
1997
Started Project Division
1999
Started Serving top notch Oil&
Gas EPC
2001
Crossed Rs. 10 Million Turn
Over
2003
Started Training Division to
carter Corporate
2005
Formed as a Pvt. Ltd. Company
2006
1ST MSME Company to use PDS Software in
Chennai
2007
Started Multi level Car
parking R&D
2011
Applied for Multi Level Car
Parking Patent
2012
Entered into Energy & Solar
as E STAR
2013
Winner –Engineering
Products South India by Indiamart
INDUSTRIES AREA OF EXPERTISE SOFTWARE USED
PLANT ENGINEERING
Process & Power
Petrochemical
Oil & Gas
Infrastructure
Plant – 3D Design, Drafting & Detailing, 3D Scanning, Asset Management
Layout Preparation, Stress Analysis, Supports
Equipments, Piping & Structural Stress Analysis
Intergraph PDS, PDMS
AutoCAD, Autodesk Plant 3D
Micro Station, Revit, CAESAR II
We also support in:
STAAD.Pro , XSteel, BIM etc.,
CAD/CAM/CAE
Automotive
SPM Design
Heavy Machineries
Aerospace
Equipments
Civil & Architecture
CAD/CAM/CAE / CFD
Reverse Engineering
Mold Design &Tool Casting Design
Engineering Animation
Walk Through
Structural, GIS etc;
CATIA, SolidWorks
Pro/Engineer
Unigraphics, Ansys
NavisWorks, Inventor
AutoCAD, MicroStation
Revit Structure
BUSINESS SPECTRUM
BUSINESS VERTICAL
K. Jayaraman - Founder
Chairman and Managing
Director
M. MUNIYANDI B.E ( Mech),
M.S ( ENGG MGMT); MIE;FIV
Civil and Structural
Mr. R. DESIKACHARI ,
Consultant-Piping
Mr. RAMASWAMY,
MECH- SPM-MFG
Mr. S. RAMAN,
Consultant – Piping & Projects
M. DEVENDRAN
CONSULTANT -E&I.
OUR TEAM
Engineering Design
Elevators
Engineering Design
& Manufacturing
Employment-HR
Education
Energy
Our Services…
PROCESS
• Process Engineering
• P & ID Drafting
• As built P&ID
• Front End & Detail Engineering
• Process Deliverables
• PFD and P&ID
• Data Sheets
• Hydraulic Studies
• Equipment Design
PIPING
• Plot plan & Equipment layout
• 3D Modeling (PDMS & PDS)
• Stress analysis (static and dynamic )
• Hangers and supports engineering
• Piping arrangement drawings andIsometrics
• Material take off
• Material handling
• As built drawings
ENGINEERING CAPABILITIES – PROCESS & PIPING
• Engineering of static Equipment
• Vessels and Columns
• Storage Tanks
• Heat Exchangers
• Waste Heat Boiler
• Engineering of Rotary & Packages Equipment
• Pumps, Compressors and Blowers
• Fired Heater, incinerator & Utility (IA, Nitrogen,etc) Packages
• Refrigeration units, HVAC Systems
• Air cooled, Plate & Frame Type HeatExchangers
• Water Treatment Units
• Flare Systems
• Design and detailing of
• Pipe rack
• Pipe supports
• Pipe trestles, Towers, Anchor blocks
• Technological structures
• Industrial building structures
• Detailed Engineering conforming to
• AISC / BS / Euro Code
• Welded / Bolted connections
• Special foundations for heavy equipments
• Pile foundations
• Foundations for dynamic equipments
• Buildings for auxiliary process
• Detailed engineering with bar bending schedule
ENGINEERING CAPABILITIES – MECHANICAL & CIVIL & STRUCTURE
ELECTRICAL
•Electrical load list
• Single line diagram
• Earthling and lighting layouts
• Lighting design and location
• Cable, cable tray routing and layout
• Cathodic protection systems
INSTRUMENTATION
•Instrument index, I/O list and data
sheets
•Cable tray layout
• Instrument bulk material take off
ENGINEERING CAPABILITIES – ELECTRICAL
SUPPORT & INSTRUMENTATION SUPPORT
CAD
• Legacy data
• Drawings Conversation
• Drafting
• Concept design
• 2D/3D modeling
• Platform Migration
• CAD customization
• Reverse engineering
CAM
• NC/tool Path generation
• Manufacturing simulation
• Optimization
• Rapid Prototyping
CAE
• Finite element modelling
• Meshing
• Structural
• Thermal
• Static
• Dynamic Fatigue
• Non Linear
• CFD
Engineering Animation
• 3D Walk through
• 3D Interactive visualization & simulations
• Engineering / Product animation for automobile , aviation , architecture , defense, Education & training , Medical – virtual surgery , Manufacturing & Engineering , Oil & Gas
AND ENGINEERING ANIMATION
Our Clients…CAD , CAM, AUTOMOTIVE ,.
PLANT ENGINEERING CLIENTS
IT , IES
CLIENTS…
MEDIA & ENTERTAINMENT
Hospitals, Architect, Interior Decors.
Our Strength…
Nearly 1000+ Students Placed On Top MNC like Saipem, Technip, BHEL,
Petrofac, TATA, Reliance etc.,
One of the Successful Organization in the Industry Since 1995 for nearly 18+
years.
Highly Experienced and Qualified Faculties from the Industries.
Real Time Industrial Projects to get MNC Exposure.
Professional Industry Oriented Curriculum.
Professional Knowledge will be impaired while training.
Our Student can directly work in the industry without any fear of performance /
lack of Knowledge.
SOFTWARE RESOURCES
OUR GROWTH
0
100
200
300
400
500
600
700
1996 19982000
20022004
20062008
20102012
2014
2 1555 80 80 87 90 92 97 125
0.8 2570
110 140200
250300
515
675
No. Employees
TurnOover in Lakhs (INR)
OUR INFRASTRUCTURE
Built-up area of more than 6000+ Sq. Feet.
Over 35 High End Desktops
Adequate storage area with full Security
Round the clock power supply with backup UPS & Generators
Data Backup facility with CD Writer, Zip Drives etc.
High Speed Internet Connection
Printers: Laser Jet, Desk Jet, Plotters, etc.
Adequate fire safety systems
Ergonomically designed furniture
OFFICE INFRASTRUCTURE
MEMBERSHIPS & AWARDS
ISO 9001:2008 NSIC-CRISIL
rated SE2B
Rajiv Gandhi Shiromani
Award
2007
Designer For Manufacturability
STARS AWARD
2012
Winner South Zone
Engineering products
Leaders of tomorrow Award 2013
Date Proposal Ref. Proposal Sent
07/01/2013 MCK/GETWS/13-14/200260 GET WATER, Chennai
27/01/2013 MCK/Inter alloy/13-14/200266 Inter alloy
31/01/2013 MCK/SEWON/13-14/200267 Sewon
06/02/2013 MCK/LNTECC/13-14/200268 L&T ECC, Chennai
20/02/2013 MCK/BWIR/13-14/200269 BWIR, Chennai
26/02/2013 MCK/RANE/13-14/200270 Rane, Chennai
02/03/2013 MCK/Sewon/13-14/200273 Sewon
09/03/2013 MCK/Sewon/13-14/200275 Sewon
09/03/2013 MCK/FWIPL/13-14/200276 FWIPL, Chennai
11/03/2013 MCK/AKR/13-14/200278
AKR Engg & Construction company,
Chennai
11/03/2013 MCK/ISGEC/13-14/200279 ISGEC, Delhi
CURRENT PROPOSALS
CURRENT PROJECTS / PROPOSALS
Client Project Details
M/s. Parsons
Brinckerhoff Ress & Gari 100 MWPower Grid
3D modeling of concept plant
Atkins, UAEAdditional Raw Water Tank Facility,
RAS LAFFAN, Qatar
3D Modeling of Equipments & pipeline
routing in PDS
Daimler, India
Paint Shop for Bharat Benz, Chennai 1. 3D modeling of complete Paint
shop.
2. Engineering walk through and
3. Engineering animation of work flow.
Saipem India,
Chennai
End Client: STATSOLIE , SURINAME
Project : Surinam Expansion
Profile: Principal Structural Engineering,
Piping
1. Design of Pile Foundation for
equipments and structures..
2. Calculation & Verification of
Compressor Foundations.
3. Checking of calculation reports and
Drawings.
4. Piping modeling etc.
CURRENT PROJECT/PROPOSAL
Client Project Details
Saipem India,
Chennai
End Client: Oil & Gas Offshore plant Client
Project : Shah Gas Development Project
Profile: Piping Engineering - SP3D
1. 3D Modeling - Piping, Equipments &
Supports
2. Preparation of GA & Isometric
Extraction
3. Modeling for structure and platforms.
End Client: Kuwait Oil Corporation (KSC)
Project : NEW GATHERING CENTER-16,
West KUWAIT
Profile: Piping Stress Engineering
1. Modeling & Analysis of Critical System
using CAESAR II
MULTI-LEVEL CAR PARKINGIn MECHCI CADD…
NEED FOR CAR PARKING
•Presently demand for cars going up at the rate of 15% per annum
•Presently 15 lakhs being sold every year
•Making roads more expensive than parking infrastructure
•Cars being parked on roads causing traffic congestion and
pollution
DIFFICULTIES IN CAR PARKING
Hectic Car Parking LayoutsHours of Waiting In Car ParkingCongested Car Parking Area
Breakage & Scratches in/While Parking Chances of Car Theft
MULTI LEVEL CAR PARKING SYSTEM
AUTOMATED MULTI LEVEL CAR PARKING
• Tower(Elevator) Type
• Puzzle Type Multi Level
• 1+1/1+2 Type
• Stacked (Wing) Type
TYPES OF MULTI-LEVEL CAR PARKING
STACKED (WING) TYPE
ANALYSIS - MULTI-LEVEL CAR PARKING
PROJECT REFERENCE
•Elnet Software City, IT Park, Chennai For 105 Car Spaces (4 Level Puzzle Parking Systems)
•Peninsula Corporate Park, Mumbai For 300 Car Spaces
•21 Level Parking Tower For Akruti City Ltd. & Brihanmumbai Municipal Corporation (BMC) Near BreachCandy Hospital, Mumbai For 240 Car Spaces
•Hallmark Business Plaza, Mumbai For 198 Car Spaces
•Prime Mall At Irla, Vile Parle, Mumbai For 165 Car Spaces (3 Level Puzzle Parking Systems).
•Fair Deal Cars Pvt. Ltd. (Authorized Dealer For M/S. Maruti Udyog Ltd.), Service Center, Delhi
UPCOMING PROJECTS
Safal Pride Commercial Complex, Mumbai (13 Level Fully Automatic Car Parking Tower)
CURRENT PROPOSALS
S.NO CLIENT NAME PROJECT VALUE STATUS LOCATION
1 MURUGAPPA GROUP 2 Crores MEASUREMENT TAKEN CHENNAI
2 THE CHENNAI SILKS 3 Crores WAITING FOR CMD APPROVAL CHENNAI
3 VIJAY TV 75 Lakhs MEASUREMENT TAKEN CHENNAI
4 RAMKEE VAVHOO 1 Crore MET THECONCERNED PERSON CHENNAI
5ANDHRA CULTURAL ASSOCIATIONS 1.5 Crores
MEASUREMENT TAKEN AND DISCUSSED CHENNAI
6 GRT 2 Crores QUOTE GIVEN NEED TO MEET CEO CHENNAI
7 RMKV 2 CroresNEED TO MEET IN THE MONTH OF JUNE 2014 CHENNAI
8 RLD HOTELS 1.5 Crores NEED TO SEND DRAWING CHENNAI
9 ELNET TECHNOLOGIES 2.5 CroresWAITING FOR DRAWING FROM THE CLIENT CHENNAI
10 TVH BUILDERS 2 Crores NEED TO MEET APRIL 2014 CHENNAI
11 ARUN EXCELLO 4 Crores NEED TO FOLLOW UP CHENNAI
Domestic 60 Enquiries – 40 Cr.
International 10 Enquiries – 20 Cr.
FUTURE PLANS
Sl. No. Year Plan
1 2014 - 2015Expanding business by associating with Japanese & Chinese Companies Target to reach 25 Crores Business / 15 Installations
2 2015 -2016 Domestic Installations up to 50 Crores / 30 Installations
3 2016 -2017 Domestic Installations up to 75 Crores – 50 Installations
4 2017 - 2018
Expand business to International Installations – 150 Crores – 100
Installations
5 2018 - 2019 To reach 250 Crores turnover / 150 Installations
PLANT ENGINEERINGIn MECHCI CADD…
PARTIAL LIST OF PLANT ENGINEERING CLIENTS…
PROJECT SAMPLE- PAINT SHOP PROCESS
PROJECT SAMPLE- PAINT SHOP PROCESS -DAIMLER
PROJECT SAMPLES
As-Built 3D Model
Pelican Project
9000 Man Hours
PROJECT SAMPLES
As-Built 3D Model
Hibiscus Project
7500 Man Hours
PROJECT SAMPLES
As-Built 3D Model GC-17 Project
5500 Man Hours
PROJECT SAMPLE- PARSONS
PROJECT SAMPLE- BHEL
PROJECT SAMPLE- PETROFAC
CAD / CAMIn MECHCI CADD…
PARTIAL LIST OF CAD , CAM, AUTOMOTIVE ,.
SPM DESIGN AND MANUFACTURING
SPM DESIGN – PIPE TILTING MACHINE
FOR L&T ECC - CHENNAI
SPM DESIGN – GANTRY GUIDE FOR HMIL
CONCEPT DESIGN
WIND BLADE – RRB ENERGY
Software used:
AutoDesk Inventor
Product development of the complete
coke oven consisting of 64 Layers with
different thermal layer Properties
500 Man Hours
Coke Oven
CAD/CAM SAMPLES
Software used:
IDEAS and UNIGRAPHICS
The input given is a IGES format
imported into IDEAS for surface
modelling and drafting using
UNIGRAPHICS NX2
80 Man Hours
Door for Ford Icon car
CAD/CAM SAMPLES
MANUFACTURING SETUP
MANUFACTURING SPM