NASA Project Challenge Conference - 2007
PROJECT MANAGEMENT AT THE CROSSROADS
TheoryPractice
Dr. Jerry Mulenburg
Some Considerations for the Future
![Page 3: Mulenburg jerry](https://reader033.vdocuments.site/reader033/viewer/2022052213/55512141b4c905b1138b5381/html5/thumbnails/3.jpg)
Per
cent
Pro
j ect
Ov e
rru n
Percent of Project Funds Spent on Planning
NASA Project Cost Overruns
NASA Project Challenge Conference - 2007 Dr. Jerry Mulenburg
![Page 4: Mulenburg jerry](https://reader033.vdocuments.site/reader033/viewer/2022052213/55512141b4c905b1138b5381/html5/thumbnails/4.jpg)
What is a Project?
PMI PMBOK - A temporary endeavor undertaken to create a uniqueproduct, service, or result.
NASA 7120.5C - A specific investment identified in a Program Plan havingdefined goals, objectives, requirements, life-cycle cost, abeginning, and an end.
PRINCE 2 - A project defines what we do, (whenever we want to do something, go somewhere, build something)
Webster : project; something that is contemplated, devised, or planned
NASA Project Challenge Conference - 2007 Dr. Jerry Mulenburg
![Page 5: Mulenburg jerry](https://reader033.vdocuments.site/reader033/viewer/2022052213/55512141b4c905b1138b5381/html5/thumbnails/5.jpg)
What is Project Management?
Webster manage: to bring about, or succeed in accomplishing, sometimes despite difficulty or hardship
PMI PMBOK - The application of knowledge, skills, tools, andtechniques to project activities to meet project requirements.
NASA 7120.5C - Formulation, Approval, Implementation, Evaluation
PRINCE 2 - Project management is working out the best wayto do a project; a logical, organised way, followingdefined steps.
NASA Project Challenge Conference - 2007 Dr. Jerry Mulenburg
![Page 6: Mulenburg jerry](https://reader033.vdocuments.site/reader033/viewer/2022052213/55512141b4c905b1138b5381/html5/thumbnails/6.jpg)
ANCIENT TIMES – The birth of project management7 Wonders of the World, Stone Henge, Great Wall of China, etc.
HISTORIC TIMESTranscontinental Railroad, Suez Canal, Trans-Atlantic Cable, etc.
MODERN TIMESManhattan Project, Marshall Plan, Apollo, Space Lab, etc.
CURRENT TIMESMIR, Shuttle, ISS, Mars Rovers, Hubble, Gravity Probe B, etc.
FUTURE TIMEHumans back to the Moon, on to Mars, non-Fossil Fuel Transportation, Space Elevators, etc.
NASA Project Challenge Conference - 2007 Dr. Jerry Mulenburg
THE EVOLUTION OF PROJECT MANAGEMENT
![Page 7: Mulenburg jerry](https://reader033.vdocuments.site/reader033/viewer/2022052213/55512141b4c905b1138b5381/html5/thumbnails/7.jpg)
ANCIENT TIMES – Ad Hoc, professional, isolated
HISTORIC TIMES – Early 1900s, practice developmentTaylor’s Scientific Management (one-best-way), Gilbreths, Gantt, Fayol,...
MODERN TIMES – Mid 1900s, discipline development Cold War projects, PERT-Polaris, Hawthorne Experiments, NASA, Herzberg, Maslow, Drucker,...
CURRENT TIMES – Late 1900’s, professional developmentProject Management Software, Project Management Institute,NASA, PRINCE 2, Agile, Extreme, SCRUM, etc.
FUTURE TIME – 2000s to ...???????Is Project Management, as we know it, obsolete?
THE PROGRESSION OF PROJECT MANAGEMENT
NASA Project Challenge Conference - 2007 Dr. Jerry Mulenburg
![Page 8: Mulenburg jerry](https://reader033.vdocuments.site/reader033/viewer/2022052213/55512141b4c905b1138b5381/html5/thumbnails/8.jpg)
Profession?Discipline?Practice?
Project Management
Do we need to “reinvent”Project Management?
NASA Project Challenge Conference - 2007 Dr. Jerry Mulenburg
![Page 9: Mulenburg jerry](https://reader033.vdocuments.site/reader033/viewer/2022052213/55512141b4c905b1138b5381/html5/thumbnails/9.jpg)
TIME
QUALITY
SCOPECOST
TRIPLE CONSTRAINT
NASA Project Challenge Conference - 2007 Dr. Jerry Mulenburg
![Page 10: Mulenburg jerry](https://reader033.vdocuments.site/reader033/viewer/2022052213/55512141b4c905b1138b5381/html5/thumbnails/10.jpg)
Impact of Project Type on Project Management(Aaron Shenhar, Stevens Institute of Technology)
Novelty
Complexity
Technology
Pace
Design and development. Later design freeze
IncreasedFormality
IncreasedAutonomy
Less market data.Later requirements freeze
IncreasedSystem engineering.System integration
NCTP Model
NASA Project Challenge Conference - 2007Dr. Jerry Mulenburg
![Page 11: Mulenburg jerry](https://reader033.vdocuments.site/reader033/viewer/2022052213/55512141b4c905b1138b5381/html5/thumbnails/11.jpg)
The Project Framework: Distinguishing by Project Type
(Aaron Shenhar, Stevens Institute of Technology)
Novelty
Complexity
Technology
Pace
DerivativePlatformBreakthrough
Regular
Fast/Competitive
Time-Critical
Array
System
Assembly
Low-Tech
High-Tech
SuperHigh-Tech
Medium-Tech
NCTP Model
Blitz
ExampleProject
NASA Project Challenge Conference - 2007Dr. Jerry Mulenburg
![Page 12: Mulenburg jerry](https://reader033.vdocuments.site/reader033/viewer/2022052213/55512141b4c905b1138b5381/html5/thumbnails/12.jpg)
DerivativePlatformBreakthrough
Regular
Array
System
Assembly
Technology
Fast/Competitive
Time-Critical
Super-High Tech
Complexity
Novelty
Pace
High Tech
Medium Tech
Low Tech
Actual style
Required style
Denver Airport
NASA Project Challenge Conference - 2007 Dr. Jerry Mulenburg
![Page 13: Mulenburg jerry](https://reader033.vdocuments.site/reader033/viewer/2022052213/55512141b4c905b1138b5381/html5/thumbnails/13.jpg)
Derivative
Platform
Breakthrough
Regular
Array
System
Assembly Technology
Fast/Competitive
Time-Critical
Super-High Tech
Complexity
Novelty
Pace
High TechMedium
Tech
Low Tech
Actual style
Required style
The NCTP Space Shuttle Analysis
Blitz
(Aaron Shenhar, Stevens Institute of Technology)
NASA Project Challenge Conference - 2007 Dr. Jerry Mulenburg
![Page 14: Mulenburg jerry](https://reader033.vdocuments.site/reader033/viewer/2022052213/55512141b4c905b1138b5381/html5/thumbnails/14.jpg)
Obiter Boom Sensor System
Technology Technology
Complexity
Novelty
Pace
OBSS
Optimal Style
Observed Style
Integrated Boom
Existing Arm
Sensors (ISIS)
Forward Transitions
Manipulator Positioning
Mechanism (MPM)
Mid Transitions AFT Transitions
Integrated Boom
Existing Arm
Sensors (ISIS)
Forward Transitions
Manipulator Positioning
Mechanism (MPM)
Mid Transitions AFT Transitions
NASA Project Challenge Conference - 2007 Dr. Jerry Mulenburg
![Page 15: Mulenburg jerry](https://reader033.vdocuments.site/reader033/viewer/2022052213/55512141b4c905b1138b5381/html5/thumbnails/15.jpg)
Limitations of Project Management Today
What should a theory of Project Management be based on?
NASA Project Challenge Conference - 2007 Dr. Jerry Mulenburg
![Page 16: Mulenburg jerry](https://reader033.vdocuments.site/reader033/viewer/2022052213/55512141b4c905b1138b5381/html5/thumbnails/16.jpg)
Some thoughts about a Theory of Project Management
What is a theory?How do you develop a theory?How do you apply theory to Project Management?
NASA Project Challenge Conference - 2007 Dr. Jerry Mulenburg
![Page 17: Mulenburg jerry](https://reader033.vdocuments.site/reader033/viewer/2022052213/55512141b4c905b1138b5381/html5/thumbnails/17.jpg)
C
Can we Bridge the Theory Gap?
NASA Project Challenge Conference - 2007 Dr. Jerry Mulenburg
![Page 18: Mulenburg jerry](https://reader033.vdocuments.site/reader033/viewer/2022052213/55512141b4c905b1138b5381/html5/thumbnails/18.jpg)
General System’s Theory(Ludwig von Bertalanffy)
A Framework for Project Management
NASA Project Challenge Conference - 2007 Dr. Jerry Mulenburg
![Page 19: Mulenburg jerry](https://reader033.vdocuments.site/reader033/viewer/2022052213/55512141b4c905b1138b5381/html5/thumbnails/19.jpg)
Two key aspects of the Systems approachDescriptive:Focus is on an integrated approach to project definitionIntegration is achieved through defining a hierarchy of objectives
of the parts, as they interface with one another, and their contributionsto the objectives of the entire entity
Prescriptive:Focus is on the design and definition of system objectives, mix
of outputs, and the manner of processing including analysis, problemsolving, and change that is corrective action oriented
Two key aspects of Project ManagementProjects are complex, and ever changingHumans are complex, and variable
NASA Project Challenge Conference - 2007 Dr. Jerry Mulenburg
![Page 20: Mulenburg jerry](https://reader033.vdocuments.site/reader033/viewer/2022052213/55512141b4c905b1138b5381/html5/thumbnails/20.jpg)
Applying Systems Theory to Project Management
NASA Project Challenge Conference - 2007 Dr. Jerry Mulenburg
![Page 21: Mulenburg jerry](https://reader033.vdocuments.site/reader033/viewer/2022052213/55512141b4c905b1138b5381/html5/thumbnails/21.jpg)
Systems Dynamics Project Management Rework Cycle
WorkTo beDone
Work ReallyDone
Work Needing To be Done / Redone
Progress
Resources - Productivity - Quality
DiscoveredNew Work
KnownRework
K. Cooper Project Management Hnbk, 1998,
![Page 22: Mulenburg jerry](https://reader033.vdocuments.site/reader033/viewer/2022052213/55512141b4c905b1138b5381/html5/thumbnails/22.jpg)
Continuing the Quest
NASA Project Challenge Conference - 2007 Dr. Jerry Mulenburg
![Page 23: Mulenburg jerry](https://reader033.vdocuments.site/reader033/viewer/2022052213/55512141b4c905b1138b5381/html5/thumbnails/23.jpg)
Back to the Future
NASA Project Challenge Conference - 2007 Dr. Jerry Mulenburg