8/14/2019 MT Procedure - B2.doc http://slidepdf.com/reader/full/mt-procedure-b2doc 1/14 PVC-MS/PV EIC NDT CANDT HLJOC BLOCK 16-1 TGT FIELD DEVELOPMENT PROJECT WELLHEAD PLATFORMS AND PIPELINES Document No.: TGT-PVCMS-Q-H04-PR-0011 MAGNETIC PARTICLE TESTING  PROCEDURE Page  of  1! Revision No.: B Issued date: 0"0#"011 REVISION RECORD SHEET NN R$%" N&" C&'($'( &) R$%*+*&' D,($ 1 B1 Issued for review review by Company 16.!."11 " B" Re#issued for review review by Company ".!."11 $ % & 6 ! ' ( 1 11 1" 1$ 1% 1& N&($ )*ird co+umn is to be fi++ed in, w*en t*e document is being updated-modified

Upload: phan-hoang-diep

Post on 04-Jun-2018

230 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MT Procedure - B2.doc

8/14/2019 MT Procedure - B2.doc

http://slidepdf.com/reader/full/mt-procedure-b2doc 1/14

PVC-MS/PV EIC NDT – CANDT HLJOC

BLOCK 16-1 TGT FIELD DEVELOPMENT PROJECT

WELLHEAD PLATFORMS AND PIPELINES

Document No.:

TGT-PVCMS-Q-H04-PR-0011MAGNETIC PARTICLE TESTING

 PROCEDURE

Page  of   1!

Revision No.: B Issued date: 0"0#"011

REVISION RECORD SHEET

NN R$%" N&" C&'($'( &) R$%*+*&' D,($

1 B1 Issued for review review by Company 16.!."11

" B" Re#issued for review review by Company ".!."11

$

%

&

6

!

'

(

1

11

1"

1$

1%

1&

N&($ )*ird co+umn is to be fi++ed in, w*en t*e document is being updated-modified

Page 2: MT Procedure - B2.doc

8/14/2019 MT Procedure - B2.doc

http://slidepdf.com/reader/full/mt-procedure-b2doc 2/14

PVC-MS/PV EIC NDT – CANDT HLJOC

BLOCK 16-1 TGT FIELD DEVELOPMENT PROJECT

WELLHEAD PLATFORMS AND PIPELINES

Document No.:

TGT-PVCMS-Q-H04-PR-0011MAGNETIC PARTICLE TESTING

 PROCEDURE

Page  . of   1!

Revision No.: B Issued date: 0"0#"011

TABLE OF CONTENTS

REVISION RECORD SHEET.....................................................................................................2

TABLE OF CONTENTS............................................................................................................. 3

1.0introduction............................................................................................................................4

2.0SCOPE................................................................................................................................. 4

3.0REFERENCES......................................................................................................................4

4.0PERSONNEL !ALIFICATION............................................................................................4".0E!IP#ENT ........................................................................................................................4

".1#$%n&ti'$tion E(ui)*&nt.........................................................................................."

".2C$+i,r$tion o- E(ui)*&nt .........................................................................................."

".3Fi&+d A&*&nt......................................................................................................"

/.0CONS!#ABLE....................................................................................................................."

/.1#$%n&tic in.............................................................................................................."

/.2Dr #$%n&tic P$rtic+&..............................................................................................."

/.3Contr$t L$c(u&r......................................................................................................./

.0&$*in$tion.........................................................................................................................../

.1Sur-$c& Pr&)$r$tion.................................................................................................. /

.2Li%tin%....................................................................................................................../

.3#&tod o- &$*in$tion..............................................................................................

.4#$%n&ti'in% t&cni(u&...............................................................................................

."A))+ic$tion o- D&t&ctin% #&diu*...............................................................................

./In)&ction..................................................................................................................

.D&*$%n&ti'$tion.......................................................................................................

.5Pot In)&ction C+&$nin%...........................................................................................5

5.0INTERPRETATION OF INDICATIONS.................................................................................5

6.0EVAL!ATION OF INDICATIONS..........................................................................................5

10.0ACCEPTANCE CRITERIA..................................................................................................6

11.0RECORDS $nd REPORT....................................................................................................6

 A))&ndi 1 7 #A8NETIC PARTICLE FIELD INDICATOR.......................................................10

 A))&ndi 2 7 #A8NETIC PARTICLE E9A#INATION REPORT..............................................11

 A))&ndi 3 7 S:ETCH 7 S!PPLE#ENTAR; REPORT...........................................................12

 A))&ndi 4 7 #A8NETIC ;O:E DAIL; CAPACIT; CHEC:...................................................13

 A))&ndi " 7 #A8NETIC E9A#INATION TECHNI!E SHEET.............................................14

Page 3: MT Procedure - B2.doc

8/14/2019 MT Procedure - B2.doc

http://slidepdf.com/reader/full/mt-procedure-b2doc 3/14

PVC-MS/PV EIC NDT – CANDT HLJOC

BLOCK 16-1 TGT FIELD DEVELOPMENT PROJECT

WELLHEAD PLATFORMS AND PIPELINES

Document No.:

TGT-PVCMS-Q-H04-PR-0011MAGNETIC PARTICLE TESTING

 PROCEDURE

Page  4 of   1!

Revision No.: B Issued date: 0"0#"011

1"0 INTRODUCTION

)*is procedure specification is deve+oped to cover t*e agnetic Partic+e )esting

re/uirements for )e 0iac )rang fie+d Deve+opment Proect carried out by P2 3IC

 ND) 4 C5ND) Consotium.

"0 SCOPE

)*is procedure app+ies to t*e agnetic Partic+e 3amination met*ods use to detect

crac7s and ot*er discontinuities on surface and subsurface of ferromagnetic materia+s.

)*is procedure defines t*e conditions of performing t*e agnetic Partic+e

3amination for finis*ed we+d, a+so be carried out after remova+ of we+d defect bygouging, a++ we+d to fittings, fi++et and ot*er permanent attac*ment.

."0 REFERENCES

o 583 8ection 2: Non#Destructive 3amination.

8tructura+ we+ding and fabrication 8pecification No:. 8%%"#0P8#8#999#8P#

".

8pecification for piping fabrication insta++ation and testing No:. 8%%"#0P8##

999#8P#&

o 5;8 D1.1: 8tructure ;e+ding Code 8tee+.o 583 Code B$1.$: Process Piping Code

DN2#<8#C11: Design of <ffs*ore 8tee+ 8tructures

DN2#<8#C%1: =abrication and )esting of <ffs*ore 8tructures

5PI#11%: ;e+ding of Pipe+ines and Re+ated =aci+ities

o 58) 83 !(: 8tandard Practice for agnetic Partic+e 3amination.

o 58N) Recommended Practice 8N)#)C#15

 ND)-;P-1-1: P2 3IC ND)>s ;ritten Practice.

C5#$#1: C5ND)>s ;ritten Practice.

4"0 PERSONNEL QUALIFICATION

5++ personne+ invo+ved in t*e magnetic partic+e eamination s*a++ be /ua+ified in

accordance wit* PI tec*nicians s*a++ be /ua+ified to 58N) Recommended Practice

8N)#)C#15 +eve+ II or +eve+ III, or e/uiva+ent. 5++ personne+ invo+ved in t*e setting#

up-ca+ibration e/uipment? interpretation and t*e eva+uating of resu+ts s*a++ be /ua+ified

to minimum eve+ II or +eve+ III.

5++ tec*nicians carrying out magnetic partic+e eamination s*a++ *o+d current va+id

certification to +eve+ II in we+ds sector as a minimum. )*e certification of personne+

s*a++ be submitted to C+ient and <wner prior to wor7 commencement.

!"0 EQUIPMENT

B"

B"

B"

Page 4: MT Procedure - B2.doc

8/14/2019 MT Procedure - B2.doc

http://slidepdf.com/reader/full/mt-procedure-b2doc 4/14

PVC-MS/PV EIC NDT – CANDT HLJOC

BLOCK 16-1 TGT FIELD DEVELOPMENT PROJECT

WELLHEAD PLATFORMS AND PIPELINES

Document No.:

TGT-PVCMS-Q-H04-PR-0011MAGNETIC PARTICLE TESTING

 PROCEDURE

Page  ! of   1!

Revision No.: B Issued date: 0"0#"011

!"1 M,'$(*,(*&' E2*3$'(

agneti@ation s*a++ be induced by an 5C e+ectromagnetic yo7e Afrom t*is

 point forward ca++ed yo7e *aving adustab+e po+e pieces.

)*e type of used yo7e s*a++ be t*e 50N5=9   6, but ot*er simi+ar

e/uipment may be substituted.

!" C,5*7,(*&' &) E2*3$'(

3ac* o7e s*a++ *ave a +ifting power of at +east %.&% Eg A1bs at t*e

maimum po+e spacing t*at wi++ be used.

o7e mobi+i@ed for use on site s*a++ *ave a current va+id ca+ibration, carriedout by a recogni@ed +aboratory.

3ac* magnet s*a++ be identified by a seria+ number and )ec*nicians wi++

record eac* time any magnet is c*ec7ed for conformance to ca+ibration

standard. 8upervisors wi++ verify c*ec7ing of e/uipment by signing and dating

t*e records. )*e ca+ibration of t*e e/uipment wi++ be carried out on a dai+y

 basis w*en t*e e/uipment is mobi+i@ed to site wor7. A5ppendi % #

50N3)IC <E3 D5I C5P5CI) CF3CE.

!". F*$58 A++$++$'(

=or fie+d strengt* assessment, a fie+d indicator or Burma* castro+ f+uindicator wit* a t*in +ayer of w*ite contrast +ac/uer ad*ered on surface s*a++

 be used.

)*e fie+d strengt* is indicated w*en a c+ear+y defined +ine of magnetic

 partic+es form across t*e Copper face of t*e indicator and w*en t*e magnetic

 partic+e are app+ied simu+taneous+y wit* t*e magneti@ing force. ;*en a

c+ear+y defined +ine of partic+e is not formed in t*e desired direction, t*e

magneti@ing tec*ni/ue s*a++ be c*anged or adusted A8ee 5ppendi 1:

50N3)IC P5R)IC3 =I3D INDIC5)<R in t*is procedure.

6"0 CONSUMABLE

agnetic in7 and bac7ground contrast paint and so+vent c+eaner must meet t*e

re/uirements of 58) 3 !(. )*ey must a++ be of t*e same manufacturer.

6"1 M,'$(*9 *':  

# B+ac7 agnetic In7: N5B5E3 8#1& AEorea or e/uiva+ent.

# =+uorescent agnetic In7: N5B5E3 =#"& A=+uorescent agnetic

Partic+e 8pray

6" D7; M,'$(*9 P,7(*95$+

# Dry magnetic partic+es, w*ic* t*e type of agnaf+u G1 0ray or

agnaf+u G'5 Red s*a++ be used.

Page 5: MT Procedure - B2.doc

8/14/2019 MT Procedure - B2.doc

http://slidepdf.com/reader/full/mt-procedure-b2doc 5/14

PVC-MS/PV EIC NDT – CANDT HLJOC

BLOCK 16-1 TGT FIELD DEVELOPMENT PROJECT

WELLHEAD PLATFORMS AND PIPELINES

Document No.:

TGT-PVCMS-Q-H04-PR-0011MAGNETIC PARTICLE TESTING

 PROCEDURE

Page  6 of   1!

Revision No.: B Issued date: 0"0#"011

# )*e co+or of t*e dry powder s*a++ be c*osen so t*at provides a best

contrast to t*e surface being eamined.

# Dry magnetic partic+es eamination s*a++ not be performed if t*e surface

temperature of t*e part eceeds temperature range +imitations set by t*e

manufacturer of t*e partic+es.

6". C&'(7,+( L,92$7

In order to improve contrast, a t*in +ayer of a proprietary brand of rapid drying

*ig* opacity w*ite contrast +ac/uer is app+ied. )*e +ac/uer must ad*ere firm+y

to t*e test surface in amounts sufficient to en*ance partic+e contrast.

# Contrast paint: N5B5E3 8P#$& AEorea or e/uiva+ent.

#"0 E<AMINATION

#"1 S27),9$ P7$3,7,(*&'

8urface preparation is critica+ to t*e integrity of t*e eamination and s*a++ be

noted in report and conforming to t*e fo++owing:

# In genera+, surface of part is satisfactory as#we+ded, as ro++ed, as#cast or as

forged conditions.

# 5++ adacent areas wit*in at +east "& mm eit*er side of we+d, t*e surfaces

s*a++ be dry and free of contaminants suc* a oi+, dirt, grease, +oose rust,+oose sand, sca+e, +int, t*ic7 paint, we+ding f+u and we+d spatter or ot*er

etraneous matter t*at cou+d interfere wit* t*e eamination.

# ;e+d surfaces, upon remova+ of s+ag, s*a++ be considered suitab+e.

0rinding, mac*ining, wire brus*ing, scrapping, or ot*er met*ods may be

necessary w*ere surface irregu+arities cou+d mas7 indications due

discontinuities.

# C+eaning may be accomp+is*ed using detergents, organic so+vents and

desiccating met*ods.

# 5++ eamination surfaces s*a++ be dry prior to eamination. Dry time after

so+vent c+eaning s*a++ be 1 Aone minute as a minimum.# ;*en using wet magnetic non#f+uorescent met*ods, surface areas to be

tested s*a++ be spray painted wit* a t*in +ayer of w*ite contrast bac7ground

 paint- +ac/uer and a++ow comp+ete drying before commencement of

testing. Drying time s*a++ be a minimum of " minutes.

# In t*e area of we+d repair, t*e ecavated area and a minimum of "&mm

adacent materia+ on eac* side of t*e repair area wi++ be eamined to

ensure remova+ of defect to an ade/uate +eve+.

# )*e surface temperature of t*e part being eamined s*a++ not eceeds

temperature range +imitations set by t*e manufacturer of t*e partic+es.

#" L*=(*'

Brig*t day+ig*t conditions s*a++ be considered ade/uate. In ot*er conditions,

artificia+ +ig*ting s*a++ be used. In t*is case, a minimum +ig*t intensity of 1

Page 6: MT Procedure - B2.doc

8/14/2019 MT Procedure - B2.doc

http://slidepdf.com/reader/full/mt-procedure-b2doc 6/14

PVC-MS/PV EIC NDT – CANDT HLJOC

BLOCK 16-1 TGT FIELD DEVELOPMENT PROJECT

WELLHEAD PLATFORMS AND PIPELINES

Document No.:

TGT-PVCMS-Q-H04-PR-0011MAGNETIC PARTICLE TESTING

 PROCEDURE

Page  # of   1!

Revision No.: B Issued date: 0"0#"011

=C A1 is re/uired to ensure ade/uate sensitivity during t*e

eamination and eva+uation of indications.

#". M$(=&8 &) $>,*',(*&'

3amination s*a++ be done by t*e wet or dry continuous met*od, w*ic* is t*e

magneti@ing current remains on w*i+e t*e testing medium is being app+ied and

w*i+e t*e ecess of t*e testing medium is being removed.

)*e dry powder met*od s*a++ not be used for comp+eted we+ds. It s*ou+d on+y

 be used on *ot surface wit* t*e approva+ of t*e company. In additiona+, t*e

dry powder met*od s*a++ not be used during windy conditions.

#"4 M,'$(**' ($9='*2$

5C yo7e s*a++ be used to produce t*e +ongitudina+ magnetic fie+d in t*e part.

aimum sensitivity wi++ be to +inear discontinuities oriented perpendicu+ar to

t*e +ines of f+u.

5++ tested areas s*a++ be magneti@ed at +east twice, wit* t*e second test t*e

magnetic fie+d s*a++ be orientated approimate+y perpendicu+ar to t*e first test.

)*e magneti@ed area s*a++ be considered to be not +arger t*an a circ+e

described t*roug* t*e contact points wit* a po+e spacing of maimum 1& mm

Asee 5ppendi & for detai+s.

5++ eaminations s*a++ be conducted wit* sufficient area over+ap to assure

1H coverage at t*e correct sensitivity.

#"! A335*9,(*&' &) D$($9(*' M$8*2

)*e wet detecting medium s*a++ norma++y be app+ied by spraying over t*e

surface.

)*e dry detecting medium s*a++ be app+ied in suc* a manner t*at a +ig*t

uniform, dust# +i7e coating sett+es upon t*e surface of t*e test part w*i+e t*e

 part is being magneti@ed. 5 powder b+ower Apowder spray bu+b s*a++ be

uti+i@ed for powder app+ication.

)*e detecting medium s*a++ be app+ied immediate+y prior to and during t*e

app+ication of magnetic fie+d. )*e app+ication is comp+eted before t*e

magneti@ation is terminated.

#"6 I'+3$9(*&'

Inspection s*a++ commence immediate+y t*e detecting medium *as been

app+ied and s*a++ continue during and for a s*ort time after t*e app+ication of

t*e magnetic fie+d.

5++ tested areas s*a++ be eamined in a minimum of two mutua++y

 perpendicu+ar directions. 8ee t*e tec*ni/ue s*eets A5ppendi & for detai+s.

#"# D$,'$(*,(*&'

B"

Page 7: MT Procedure - B2.doc

8/14/2019 MT Procedure - B2.doc

http://slidepdf.com/reader/full/mt-procedure-b2doc 7/14

PVC-MS/PV EIC NDT – CANDT HLJOC

BLOCK 16-1 TGT FIELD DEVELOPMENT PROJECT

WELLHEAD PLATFORMS AND PIPELINES

Document No.:

TGT-PVCMS-Q-H04-PR-0011MAGNETIC PARTICLE TESTING

 PROCEDURE

Page  ? of   1!

Revision No.: B Issued date: 0"0#"011

5+ternating # Current A5C yo7es s*a++ be used for +oca+i@ed demagneti@ation

 by p+acing t*e po+es on t*e surface moving t*em around t*e area, and s+ow+y

wit*drawing t*e 5C yo7es w*i+e it is sti++ energi@ed. Care s*ou+d be eercised

to ensure t*at t*e part is entire+y removed from t*e inf+uenced of t*e 5C

yo7es before t*e demagneti@ing force is discontinued.

#"? P&+( I'+3$9(*&' C5$,'*'

Post c+eaning is necessary w*ere magnetic partic+e materia+s cou+d interfere

wit* subse/uent processing or wit* service re/uirements. Post c+eaning

tec*ni/ues s*a++ be as fo++ows:

# )*e drying of wet partic+e and subse/uent remova+ by brus*ing of use ofcompressed air.

# Remova+ of wet partic+e by f+us*ing wit* so+vent.

# 5ny ot*er tec*ni/ues w*ic* may be used if t*ey do not interfere wit*

subse/uent re/uirements.

?"0 INTERPRETATION OF INDICATIONS

o I++umination s*a++ conform to t*e re/uirements detai+ed in 8ection !." of t*is

 procedure.

o 5++ va+id indications formed by magnetic partic+e eamination are t*e resu+t of

magnetic f+u +ea7age fie+ds. Indications may be Re+evant or Non Re+evant.

o Indications caused by partic+es being *e+d by non magnetic force are fa+se,

eamp+es inc+ude partic+es +ying in t*e depression at t*e side of a we+d, or partic+es

wedged to t*e sca+e on t*e surface.

o Re+evant Indications produced by f+u +in7age fie+ds w*ic* are t*e resu+ts of

discontinuities t*at may or may not be acceptab+e and s*a++ be eva+uated wit*

regards to t*e acceptance standard.

o  Non Re+evant Indications can occur sing+y or in pattern as a resu+t of f+u +ea7age

fie+ds created by conditions suc* as c*anges in section, in*erent properties, etc., or

may be associated wit* a discontinuity, w*ic* is not considered detrimenta+ to t*e part.

@"0 EVALUATION OF INDICATIONS

o inear Indications are t*ose in w*ic* t*e +engt* is more t*an $ At*ree times t*e

widt*. <n+y indications wit* a dimension greater t*an 1,6 mm s*a++ be considered

as re+evant.

o Rounded indications, w*ic* are circu+ar, e++iptica+ or in any ot*er s*apes, wit* or

wit*out tai+ t*e +engt* e/ua+ to or +ess t*an t*ree times t*e widt*.

o oca+i@ed surface imperfections, w*ic* may occur from mac*ining mar7s, surface

conditions, or incomp+ete bond between base meta+ and c+adding, may produce

simi+ar indications, w*ic* are non#re+evant to t*e detection of unacceptab+e

discontinuities.

Page 8: MT Procedure - B2.doc

8/14/2019 MT Procedure - B2.doc

http://slidepdf.com/reader/full/mt-procedure-b2doc 8/14

PVC-MS/PV EIC NDT – CANDT HLJOC

BLOCK 16-1 TGT FIELD DEVELOPMENT PROJECT

WELLHEAD PLATFORMS AND PIPELINES

Document No.:

TGT-PVCMS-Q-H04-PR-0011MAGNETIC PARTICLE TESTING

 PROCEDURE

Page  @ of   1!

Revision No.: B Issued date: 0"0#"011

o 5ny /uestionab+e or doubtfu+ indication s*a++ be re#eamined to determine w*et*er

or not t*ey are re+evant.

10"0 ACCEPTANCE CRITERIA

=or structura+ we+ds: acceptance criteria s*a++ be based on 5;8 D1.1 8ection 6.1,

)ab+e 6.1, Part C.

=or piping we+ds: acceptance criteria s*a++ be base on 583 B $1.$ C*apter 2I,

)ab+e $%1.$."

=or Pipe+ine: acceptance criteria s*a++ be base on 5PI 11% 8ection (.%.".

11"0 RECORDS AND REPORT

)*e test resu+ts s*a++ be reported on form agnetic Partic+e )esting ReportJ as

formatted as in 5ppendi ". In additiona+, t*e report may be inc+uded mar7#up

drawings or s7etc*es of detected defects Asee 5ppendi $.

Identification of first repair on reports and we+d identification s*a++ be indicated, as KR>

and t*e subse/uent we+d repair s*a++ be identified as KR1> and etc... oints t*at *as been

cut out and re#we+d s*a++ be denoted as KR;>.

B"

Page 9: MT Procedure - B2.doc

8/14/2019 MT Procedure - B2.doc

http://slidepdf.com/reader/full/mt-procedure-b2doc 9/14

PVC-MS/PV EIC NDT – CANDT HLJOC

BLOCK 16-1 TGT FIELD DEVELOPMENT PROJECT

WELLHEAD PLATFORMS AND PIPELINES

Document No.:

TGT-PVCMS-Q-H04-PR-0011MAGNETIC PARTICLE TESTING

 PROCEDURE

Page  10 of   1!

Revision No.: B Issued date: 0"0#"011

A33$'8*> 1 - MAGNETIC PARTICLE FIELD INDICATOR 

 

Page 10: MT Procedure - B2.doc

8/14/2019 MT Procedure - B2.doc

http://slidepdf.com/reader/full/mt-procedure-b2doc 10/14

PVC-MS/PV EIC NDT – CANDT HLJOC

BLOCK 16-1 TGT FIELD DEVELOPMENT PROJECT

WELLHEAD PLATFORMS AND PIPELINES

Document No.:

TGT-PVCMS-Q-H04-PR-0011MAGNETIC PARTICLE TESTING

 PROCEDURE

Page  11 of   1!

Revision No.: B Issued date: 0"0#"011

A33$'8*> - MAGNETIC PARTICLE E<AMINATION REPORT

MAGNETIC PARTICLE

E<AMINATION REPORT=orm No.: 999#PR#11.1

Proect: Report No.: Re/uest No.:

Procedure No.: Item: Drawing No.:

5cceptance 8tandard: PI et*od: ateria+ )ype:

3/uipment:8eria+ No.

Current: Po+es 8pacing:

agnetic Partic+es:

Batc* No.:

Bac7ground:

ig*ting:

8urface Condition:

8urface )emperature:

E<AMINATION RESULTS No. ;e+d Identification

;e+der ID

;e+d engt* Amm

D$($9($8 D$)$9(+ Resu+tACC/ REJL&9,(*&'

L$'(=

T;3$ &)

8$)$9(

Remar7: ACC A99$3($8 REJ R$$9($8

C: Crac7 I: Interna+ ndercut =: ac7 of =usion

CR: Crater Crac7 3: 3terna+ ndercut P: ac7 of Penetration

<: <ver+ap P: Porosity CP: C+uster Porosity

MPI TECHNICIAN

 Name:

8ignature

Date

PVC-MS HLJOC C"A"

B"

Page 11: MT Procedure - B2.doc

8/14/2019 MT Procedure - B2.doc

http://slidepdf.com/reader/full/mt-procedure-b2doc 11/14

Page 12: MT Procedure - B2.doc

8/14/2019 MT Procedure - B2.doc

http://slidepdf.com/reader/full/mt-procedure-b2doc 12/14

PVC-MS/PV EIC NDT – CANDT HLJOC

BLOCK 16-1 TGT FIELD DEVELOPMENT PROJECT

WELLHEAD PLATFORMS AND PIPELINES

Document No.:

TGT-PVCMS-Q-H04-PR-0011MAGNETIC PARTICLE TESTING

 PROCEDURE

Page  1. of   1!

Revision No.: B Issued date: 0"0#"011

A33$'8*> 4 - MAGNETIC OKE DAIL CAPACIT CHECK 

MAGNETIC OKE DAIL

CAPACIT CHECK =orm No.: 999#PR#11."

MONTH OF

EQUIPMENT NAME

MODEL

SERIAL NO"

REF" BLOCK NO"

DATELIFT CAPACIT

CHECKED B WITNESSED B REMARKS

10 LBS 40 LBS

1

"

$

%

&

6!

'

(

1

11

1"

1$

1%

1&

16

1!

1'

1(

""1

""

"$

"%

"&

"6

"!

"'

"(

$

$1

B"

Page 13: MT Procedure - B2.doc

8/14/2019 MT Procedure - B2.doc

http://slidepdf.com/reader/full/mt-procedure-b2doc 13/14

PVC-MS/PV EIC NDT – CANDT HLJOC

BLOCK 16-1 TGT FIELD DEVELOPMENT PROJECT

WELLHEAD PLATFORMS AND PIPELINES

Document No.:

TGT-PVCMS-Q-H04-PR-0011MAGNETIC PARTICLE TESTING

 PROCEDURE

Page  14 of   1!

Revision No.: B Issued date: 0"0#"011

A33$'8*> ! - MAGNETIC E<AMINATION TECHNIQUE SHEET

TECHNIQUE MPI 15pp+ication : 5 ;3D? 39C3P) )..E L<IN)8

)3CFNIM3 I8)R5)I<N:

• et*od: Continuous magneti@ation, wet or dry met*od.

• ateria+: Carbon 8tee+.

• 3/uipment: 5C 3+ectromagnetic o7e 50N5=9 6 or simi+ar e/uipment.

• Po+e spacing: ! to 1&mm.

• =ie+d strengt*: $ +ine on Burma* castro+ f+u Indicator Abrass.

• agnetic Partic+es: N5B5E3 8#1& for visib+e wet met*od? N5B5E3 =#"& for f+uorescent wet met*od?

50N5=9 G1grey - G'red powder for dry met*od.

• Bac7ground: C+eaned, wire brus*ed, spray wit* w*ite contrast paint for wet met*od? =or dry and f+uorescent

met*od: C+ean meta+ surface.• 5cceptance Criteria: =or structura+ we+ds: 5;8 D1.1 8ection 6.1, )ab+e 6.1, Part C? =or piping we+ds: 583 B

$1.$ C*apter 2I, )ab+e $%1.$." and for Pipe+ine: 5PI 11% 8ection (.%.".

)38) 83M3NC3:

• F&7 W$( M$(=&8:

1. 2isua+ inspection, c+ean t*e test surface?". 8pray t*e contrast paint on test surface. ;ait unti+ it dries? A'&( ,335*$8 )&7 )52&7$+9$'(

$. P+ace o7e across t*e we+d and magneti@e it?%. 5pp+y t*e PI in7 between t*e po+es and magneti@ed t*e we+d w*i+e t*e in7 is f+owing away from t*e surface?

&. Inspection and eva+uation of indications ta7e p+ace w*i+e magnetic fie+d is being app+ied?6. Reposition t*e yo7e so t*at t*e magnetic fie+d is perpendicu+ars t*at of step $ above. Repeat steps % and &

above.

• F&7 87; $(=&81. 2isua+ inspection, c+ean t*e test surface?

". P+ace o7e across t*e we+d and magneti@e it?

$. 5pp+y t*e PI powder between t*e po+es by p+astic powder container or b+ower. agneti@e t*e we+d w*i+e t*eecess powder is b+owing away?

%. Inspection and eva+uation of indications ta7e p+ace w*i+e magnetic fie+d is being app+ied?&. Reposition t*e yo7e so t*at t*e magnetic fie+d is perpendicu+ars t*at of step " above. Repeat steps $ and %

above.NOTES

• During subse/uent magneti@ation an over+ap of at +east 1inc* over previous step is re/uired.

• ;*enever possib+e, bot* surfaces of t*e we+d wi++ be tested.

• If an indication is observed, determine w*et*er t*e indication is cause by discontinuity or irre+evant indication.

)*is can be done by removing t*e indication by +ig*t grinding, visua+ inspect and Re#PI.

 

1st position: Po+e 5 at 1, Po+e B at %

"nd position: Po+e 5 at ", Po+e B at $

$rd position: Po+e 5 at $, Po+e B at 6

%t* position: Po+e 5 at %, Po+e B at &.1 .$ .&

." .% .6 

Po+e B Po+e 5

B"

Page 14: MT Procedure - B2.doc

8/14/2019 MT Procedure - B2.doc

http://slidepdf.com/reader/full/mt-procedure-b2doc 14/14

PVC-MS/PV EIC NDT – CANDT HLJOC

BLOCK 16-1 TGT FIELD DEVELOPMENT PROJECT

WELLHEAD PLATFORMS AND PIPELINES

Document No.:

TGT-PVCMS-Q-H04-PR-0011MAGNETIC PARTICLE TESTING

 PROCEDURE

Page  1! of   1!

Revision No.: B Issued date: 0"0#"011

TECHNIQUE MPI 5pp+ication: )..E L<IN)8 <N P5)38, )B5R.

)3CFNIM3 I8)R5)I<N:

• et*od: Continuous magneti@ation, wet or dry met*od.

• ateria+: Carbon 8tee+.

• 3/uipment: 5C 3+ectromagnetic o7e 50N5=9 6 or simi+ar e/uipment.

• Po+e spacing: ! to 1&mm.

• =ie+d strengt*: $ +ine on Burma* castro+ f+u Indicator Abrass.

• agnetic Partic+es: N5B5E3 8#1& for visib+e wet met*od? N5B5E3 =#"& for f+uorescent wet met*od?

50N5=9 G1grey - G'red powder for dry met*od.

• Bac7ground: C+eaned, wire brus*ed, spray wit* w*ite contrast paint for wet met*od? =or dry and f+uorescent

met*od: C+ean meta+ surface.

• 5cceptance Criteria: =or structura+ we+ds: 5;8 D1.1 8ection 6.1, )ab+e 6.1, Part C? =or piping we+ds: 583 B

$1.$ C*apter 2I, )ab+e $%1.$." and for Pipe+ine: 5PI 11% 8ection (.%.".

)38) 83M3NC3:

• F&7 W$( M$(=&8:

1. 2isua+ inspection, c+ean t*e test surface?

". 8pray t*e contrast paint on test surface. ;ait unti+ it dries? A'&( ,335*$8 )&7 )52&7$+9$'($. P+ace o7e across t*e we+d and magneti@e it?

%. 5pp+y t*e PI in7 between t*e po+es and magneti@ed t*e we+d w*i+e t*e in7 is f+owing away from t*e

surface?

&. Inspection and 3va+uation of indications ta7e p+ace w*i+e magnetic fie+d is being app+ied?6. Reposition t*e yo7e so t*at t*e magnetic fie+d is perpendicu+ars t*at of step $ above. Repeat steps % and &

above.

• F&7 87; $(=&8

1. 2isua+ inspection, c+ean t*e test surface?". P+ace o7e across t*e we+d and magneti@e it?

$. 5pp+y t*e PI powder between t*e po+es by p+astic powder container or b+ower. agneti@e t*e we+d w*i+et*e ecess powder is b+owing away?

%. Inspection and eva+uation of indications ta7e p+ace w*i+e magnetic fie+d is being app+ied?&. Reposition t*e yo7e so t*at t*e magnetic fie+d is perpendicu+ars t*at of step " above. Repeat steps $ and %

above.

NOTES

• During subse/uent magneti@ation an over+ap of at +east 1inc* over previous step is re/uired.

• ;*enever possib+e, bot* surfaces of t*e we+d wi++ be tested.

• If an indication is observed, determine w*et*er t*e indication is cause by discontinuity or irre+evant indication.

)*is can be done by removing t*e indication by +ig*t grinding, visua+ inspect and Re#PI.

;e+d being

tested

o7e

=irst magneti@ation - Cross view 8econd magneti@ation - 8ideview

B"