PVC-MS/PV EIC NDT – CANDT HLJOC
BLOCK 16-1 TGT FIELD DEVELOPMENT PROJECT
WELLHEAD PLATFORMS AND PIPELINES
Document No.:
TGT-PVCMS-Q-H04-PR-0011MAGNETIC PARTICLE TESTING
PROCEDURE
Page of 1!
Revision No.: B Issued date: 0"0#"011
REVISION RECORD SHEET
NN R$%" N&" C&'($'( &) R$%*+*&' D,($
1 B1 Issued for review review by Company 16.!."11
" B" Re#issued for review review by Company ".!."11
$
%
&
6
!
'
(
1
11
1"
1$
1%
1&
N&($ )*ird co+umn is to be fi++ed in, w*en t*e document is being updated-modified
8/14/2019 MT Procedure - B2.doc
http://slidepdf.com/reader/full/mt-procedure-b2doc 2/14
PVC-MS/PV EIC NDT – CANDT HLJOC
BLOCK 16-1 TGT FIELD DEVELOPMENT PROJECT
WELLHEAD PLATFORMS AND PIPELINES
Document No.:
TGT-PVCMS-Q-H04-PR-0011MAGNETIC PARTICLE TESTING
PROCEDURE
Page . of 1!
Revision No.: B Issued date: 0"0#"011
TABLE OF CONTENTS
REVISION RECORD SHEET.....................................................................................................2
TABLE OF CONTENTS............................................................................................................. 3
1.0introduction............................................................................................................................4
2.0SCOPE................................................................................................................................. 4
3.0REFERENCES......................................................................................................................4
4.0PERSONNEL !ALIFICATION............................................................................................4".0E!IP#ENT ........................................................................................................................4
".1#$%n&ti'$tion E(ui)*&nt.........................................................................................."
".2C$+i,r$tion o- E(ui)*&nt .........................................................................................."
".3Fi&+d A&*&nt......................................................................................................"
/.0CONS!#ABLE....................................................................................................................."
/.1#$%n&tic in.............................................................................................................."
/.2Dr #$%n&tic P$rtic+&..............................................................................................."
/.3Contr$t L$c(u&r......................................................................................................./
.0&$*in$tion.........................................................................................................................../
.1Sur-$c& Pr&)$r$tion.................................................................................................. /
.2Li%tin%....................................................................................................................../
.3#&tod o- &$*in$tion..............................................................................................
.4#$%n&ti'in% t&cni(u&...............................................................................................
."A))+ic$tion o- D&t&ctin% #&diu*...............................................................................
./In)&ction..................................................................................................................
.D&*$%n&ti'$tion.......................................................................................................
.5Pot In)&ction C+&$nin%...........................................................................................5
5.0INTERPRETATION OF INDICATIONS.................................................................................5
6.0EVAL!ATION OF INDICATIONS..........................................................................................5
10.0ACCEPTANCE CRITERIA..................................................................................................6
11.0RECORDS $nd REPORT....................................................................................................6
A))&ndi 1 7 #A8NETIC PARTICLE FIELD INDICATOR.......................................................10
A))&ndi 2 7 #A8NETIC PARTICLE E9A#INATION REPORT..............................................11
A))&ndi 3 7 S:ETCH 7 S!PPLE#ENTAR; REPORT...........................................................12
A))&ndi 4 7 #A8NETIC ;O:E DAIL; CAPACIT; CHEC:...................................................13
A))&ndi " 7 #A8NETIC E9A#INATION TECHNI!E SHEET.............................................14
8/14/2019 MT Procedure - B2.doc
http://slidepdf.com/reader/full/mt-procedure-b2doc 3/14
PVC-MS/PV EIC NDT – CANDT HLJOC
BLOCK 16-1 TGT FIELD DEVELOPMENT PROJECT
WELLHEAD PLATFORMS AND PIPELINES
Document No.:
TGT-PVCMS-Q-H04-PR-0011MAGNETIC PARTICLE TESTING
PROCEDURE
Page 4 of 1!
Revision No.: B Issued date: 0"0#"011
1"0 INTRODUCTION
)*is procedure specification is deve+oped to cover t*e agnetic Partic+e )esting
re/uirements for )e 0iac )rang fie+d Deve+opment Proect carried out by P2 3IC
ND) 4 C5ND) Consotium.
"0 SCOPE
)*is procedure app+ies to t*e agnetic Partic+e 3amination met*ods use to detect
crac7s and ot*er discontinuities on surface and subsurface of ferromagnetic materia+s.
)*is procedure defines t*e conditions of performing t*e agnetic Partic+e
3amination for finis*ed we+d, a+so be carried out after remova+ of we+d defect bygouging, a++ we+d to fittings, fi++et and ot*er permanent attac*ment.
."0 REFERENCES
o 583 8ection 2: Non#Destructive 3amination.
8tructura+ we+ding and fabrication 8pecification No:. 8%%"#0P8#8#999#8P#
".
8pecification for piping fabrication insta++ation and testing No:. 8%%"#0P8##
999#8P#&
o 5;8 D1.1: 8tructure ;e+ding Code 8tee+.o 583 Code B$1.$: Process Piping Code
DN2#<8#C11: Design of <ffs*ore 8tee+ 8tructures
DN2#<8#C%1: =abrication and )esting of <ffs*ore 8tructures
5PI#11%: ;e+ding of Pipe+ines and Re+ated =aci+ities
o 58) 83 !(: 8tandard Practice for agnetic Partic+e 3amination.
o 58N) Recommended Practice 8N)#)C#15
ND)-;P-1-1: P2 3IC ND)>s ;ritten Practice.
C5#$#1: C5ND)>s ;ritten Practice.
4"0 PERSONNEL QUALIFICATION
5++ personne+ invo+ved in t*e magnetic partic+e eamination s*a++ be /ua+ified in
accordance wit* PI tec*nicians s*a++ be /ua+ified to 58N) Recommended Practice
8N)#)C#15 +eve+ II or +eve+ III, or e/uiva+ent. 5++ personne+ invo+ved in t*e setting#
up-ca+ibration e/uipment? interpretation and t*e eva+uating of resu+ts s*a++ be /ua+ified
to minimum eve+ II or +eve+ III.
5++ tec*nicians carrying out magnetic partic+e eamination s*a++ *o+d current va+id
certification to +eve+ II in we+ds sector as a minimum. )*e certification of personne+
s*a++ be submitted to C+ient and <wner prior to wor7 commencement.
!"0 EQUIPMENT
B"
B"
B"
8/14/2019 MT Procedure - B2.doc
http://slidepdf.com/reader/full/mt-procedure-b2doc 4/14
PVC-MS/PV EIC NDT – CANDT HLJOC
BLOCK 16-1 TGT FIELD DEVELOPMENT PROJECT
WELLHEAD PLATFORMS AND PIPELINES
Document No.:
TGT-PVCMS-Q-H04-PR-0011MAGNETIC PARTICLE TESTING
PROCEDURE
Page ! of 1!
Revision No.: B Issued date: 0"0#"011
!"1 M,'$(*,(*&' E2*3$'(
agneti@ation s*a++ be induced by an 5C e+ectromagnetic yo7e Afrom t*is
point forward ca++ed yo7e *aving adustab+e po+e pieces.
)*e type of used yo7e s*a++ be t*e 50N5=9 6, but ot*er simi+ar
e/uipment may be substituted.
!" C,5*7,(*&' &) E2*3$'(
3ac* o7e s*a++ *ave a +ifting power of at +east %.&% Eg A1bs at t*e
maimum po+e spacing t*at wi++ be used.
o7e mobi+i@ed for use on site s*a++ *ave a current va+id ca+ibration, carriedout by a recogni@ed +aboratory.
3ac* magnet s*a++ be identified by a seria+ number and )ec*nicians wi++
record eac* time any magnet is c*ec7ed for conformance to ca+ibration
standard. 8upervisors wi++ verify c*ec7ing of e/uipment by signing and dating
t*e records. )*e ca+ibration of t*e e/uipment wi++ be carried out on a dai+y
basis w*en t*e e/uipment is mobi+i@ed to site wor7. A5ppendi % #
50N3)IC <E3 D5I C5P5CI) CF3CE.
!". F*$58 A++$++$'(
=or fie+d strengt* assessment, a fie+d indicator or Burma* castro+ f+uindicator wit* a t*in +ayer of w*ite contrast +ac/uer ad*ered on surface s*a++
be used.
)*e fie+d strengt* is indicated w*en a c+ear+y defined +ine of magnetic
partic+es form across t*e Copper face of t*e indicator and w*en t*e magnetic
partic+e are app+ied simu+taneous+y wit* t*e magneti@ing force. ;*en a
c+ear+y defined +ine of partic+e is not formed in t*e desired direction, t*e
magneti@ing tec*ni/ue s*a++ be c*anged or adusted A8ee 5ppendi 1:
50N3)IC P5R)IC3 =I3D INDIC5)<R in t*is procedure.
6"0 CONSUMABLE
agnetic in7 and bac7ground contrast paint and so+vent c+eaner must meet t*e
re/uirements of 58) 3 !(. )*ey must a++ be of t*e same manufacturer.
6"1 M,'$(*9 *':
# B+ac7 agnetic In7: N5B5E3 8#1& AEorea or e/uiva+ent.
# =+uorescent agnetic In7: N5B5E3 =#"& A=+uorescent agnetic
Partic+e 8pray
6" D7; M,'$(*9 P,7(*95$+
# Dry magnetic partic+es, w*ic* t*e type of agnaf+u G1 0ray or
agnaf+u G'5 Red s*a++ be used.
8/14/2019 MT Procedure - B2.doc
http://slidepdf.com/reader/full/mt-procedure-b2doc 5/14
PVC-MS/PV EIC NDT – CANDT HLJOC
BLOCK 16-1 TGT FIELD DEVELOPMENT PROJECT
WELLHEAD PLATFORMS AND PIPELINES
Document No.:
TGT-PVCMS-Q-H04-PR-0011MAGNETIC PARTICLE TESTING
PROCEDURE
Page 6 of 1!
Revision No.: B Issued date: 0"0#"011
# )*e co+or of t*e dry powder s*a++ be c*osen so t*at provides a best
contrast to t*e surface being eamined.
# Dry magnetic partic+es eamination s*a++ not be performed if t*e surface
temperature of t*e part eceeds temperature range +imitations set by t*e
manufacturer of t*e partic+es.
6". C&'(7,+( L,92$7
In order to improve contrast, a t*in +ayer of a proprietary brand of rapid drying
*ig* opacity w*ite contrast +ac/uer is app+ied. )*e +ac/uer must ad*ere firm+y
to t*e test surface in amounts sufficient to en*ance partic+e contrast.
# Contrast paint: N5B5E3 8P#$& AEorea or e/uiva+ent.
#"0 E<AMINATION
#"1 S27),9$ P7$3,7,(*&'
8urface preparation is critica+ to t*e integrity of t*e eamination and s*a++ be
noted in report and conforming to t*e fo++owing:
# In genera+, surface of part is satisfactory as#we+ded, as ro++ed, as#cast or as
forged conditions.
# 5++ adacent areas wit*in at +east "& mm eit*er side of we+d, t*e surfaces
s*a++ be dry and free of contaminants suc* a oi+, dirt, grease, +oose rust,+oose sand, sca+e, +int, t*ic7 paint, we+ding f+u and we+d spatter or ot*er
etraneous matter t*at cou+d interfere wit* t*e eamination.
# ;e+d surfaces, upon remova+ of s+ag, s*a++ be considered suitab+e.
0rinding, mac*ining, wire brus*ing, scrapping, or ot*er met*ods may be
necessary w*ere surface irregu+arities cou+d mas7 indications due
discontinuities.
# C+eaning may be accomp+is*ed using detergents, organic so+vents and
desiccating met*ods.
# 5++ eamination surfaces s*a++ be dry prior to eamination. Dry time after
so+vent c+eaning s*a++ be 1 Aone minute as a minimum.# ;*en using wet magnetic non#f+uorescent met*ods, surface areas to be
tested s*a++ be spray painted wit* a t*in +ayer of w*ite contrast bac7ground
paint- +ac/uer and a++ow comp+ete drying before commencement of
testing. Drying time s*a++ be a minimum of " minutes.
# In t*e area of we+d repair, t*e ecavated area and a minimum of "&mm
adacent materia+ on eac* side of t*e repair area wi++ be eamined to
ensure remova+ of defect to an ade/uate +eve+.
# )*e surface temperature of t*e part being eamined s*a++ not eceeds
temperature range +imitations set by t*e manufacturer of t*e partic+es.
#" L*=(*'
Brig*t day+ig*t conditions s*a++ be considered ade/uate. In ot*er conditions,
artificia+ +ig*ting s*a++ be used. In t*is case, a minimum +ig*t intensity of 1
8/14/2019 MT Procedure - B2.doc
http://slidepdf.com/reader/full/mt-procedure-b2doc 6/14
PVC-MS/PV EIC NDT – CANDT HLJOC
BLOCK 16-1 TGT FIELD DEVELOPMENT PROJECT
WELLHEAD PLATFORMS AND PIPELINES
Document No.:
TGT-PVCMS-Q-H04-PR-0011MAGNETIC PARTICLE TESTING
PROCEDURE
Page # of 1!
Revision No.: B Issued date: 0"0#"011
=C A1 is re/uired to ensure ade/uate sensitivity during t*e
eamination and eva+uation of indications.
#". M$(=&8 &) $>,*',(*&'
3amination s*a++ be done by t*e wet or dry continuous met*od, w*ic* is t*e
magneti@ing current remains on w*i+e t*e testing medium is being app+ied and
w*i+e t*e ecess of t*e testing medium is being removed.
)*e dry powder met*od s*a++ not be used for comp+eted we+ds. It s*ou+d on+y
be used on *ot surface wit* t*e approva+ of t*e company. In additiona+, t*e
dry powder met*od s*a++ not be used during windy conditions.
#"4 M,'$(**' ($9='*2$
5C yo7e s*a++ be used to produce t*e +ongitudina+ magnetic fie+d in t*e part.
aimum sensitivity wi++ be to +inear discontinuities oriented perpendicu+ar to
t*e +ines of f+u.
5++ tested areas s*a++ be magneti@ed at +east twice, wit* t*e second test t*e
magnetic fie+d s*a++ be orientated approimate+y perpendicu+ar to t*e first test.
)*e magneti@ed area s*a++ be considered to be not +arger t*an a circ+e
described t*roug* t*e contact points wit* a po+e spacing of maimum 1& mm
Asee 5ppendi & for detai+s.
5++ eaminations s*a++ be conducted wit* sufficient area over+ap to assure
1H coverage at t*e correct sensitivity.
#"! A335*9,(*&' &) D$($9(*' M$8*2
)*e wet detecting medium s*a++ norma++y be app+ied by spraying over t*e
surface.
)*e dry detecting medium s*a++ be app+ied in suc* a manner t*at a +ig*t
uniform, dust# +i7e coating sett+es upon t*e surface of t*e test part w*i+e t*e
part is being magneti@ed. 5 powder b+ower Apowder spray bu+b s*a++ be
uti+i@ed for powder app+ication.
)*e detecting medium s*a++ be app+ied immediate+y prior to and during t*e
app+ication of magnetic fie+d. )*e app+ication is comp+eted before t*e
magneti@ation is terminated.
#"6 I'+3$9(*&'
Inspection s*a++ commence immediate+y t*e detecting medium *as been
app+ied and s*a++ continue during and for a s*ort time after t*e app+ication of
t*e magnetic fie+d.
5++ tested areas s*a++ be eamined in a minimum of two mutua++y
perpendicu+ar directions. 8ee t*e tec*ni/ue s*eets A5ppendi & for detai+s.
#"# D$,'$(*,(*&'
B"
8/14/2019 MT Procedure - B2.doc
http://slidepdf.com/reader/full/mt-procedure-b2doc 7/14
PVC-MS/PV EIC NDT – CANDT HLJOC
BLOCK 16-1 TGT FIELD DEVELOPMENT PROJECT
WELLHEAD PLATFORMS AND PIPELINES
Document No.:
TGT-PVCMS-Q-H04-PR-0011MAGNETIC PARTICLE TESTING
PROCEDURE
Page ? of 1!
Revision No.: B Issued date: 0"0#"011
5+ternating # Current A5C yo7es s*a++ be used for +oca+i@ed demagneti@ation
by p+acing t*e po+es on t*e surface moving t*em around t*e area, and s+ow+y
wit*drawing t*e 5C yo7es w*i+e it is sti++ energi@ed. Care s*ou+d be eercised
to ensure t*at t*e part is entire+y removed from t*e inf+uenced of t*e 5C
yo7es before t*e demagneti@ing force is discontinued.
#"? P&+( I'+3$9(*&' C5$,'*'
Post c+eaning is necessary w*ere magnetic partic+e materia+s cou+d interfere
wit* subse/uent processing or wit* service re/uirements. Post c+eaning
tec*ni/ues s*a++ be as fo++ows:
# )*e drying of wet partic+e and subse/uent remova+ by brus*ing of use ofcompressed air.
# Remova+ of wet partic+e by f+us*ing wit* so+vent.
# 5ny ot*er tec*ni/ues w*ic* may be used if t*ey do not interfere wit*
subse/uent re/uirements.
?"0 INTERPRETATION OF INDICATIONS
o I++umination s*a++ conform to t*e re/uirements detai+ed in 8ection !." of t*is
procedure.
o 5++ va+id indications formed by magnetic partic+e eamination are t*e resu+t of
magnetic f+u +ea7age fie+ds. Indications may be Re+evant or Non Re+evant.
o Indications caused by partic+es being *e+d by non magnetic force are fa+se,
eamp+es inc+ude partic+es +ying in t*e depression at t*e side of a we+d, or partic+es
wedged to t*e sca+e on t*e surface.
o Re+evant Indications produced by f+u +in7age fie+ds w*ic* are t*e resu+ts of
discontinuities t*at may or may not be acceptab+e and s*a++ be eva+uated wit*
regards to t*e acceptance standard.
o Non Re+evant Indications can occur sing+y or in pattern as a resu+t of f+u +ea7age
fie+ds created by conditions suc* as c*anges in section, in*erent properties, etc., or
may be associated wit* a discontinuity, w*ic* is not considered detrimenta+ to t*e part.
@"0 EVALUATION OF INDICATIONS
o inear Indications are t*ose in w*ic* t*e +engt* is more t*an $ At*ree times t*e
widt*. <n+y indications wit* a dimension greater t*an 1,6 mm s*a++ be considered
as re+evant.
o Rounded indications, w*ic* are circu+ar, e++iptica+ or in any ot*er s*apes, wit* or
wit*out tai+ t*e +engt* e/ua+ to or +ess t*an t*ree times t*e widt*.
o oca+i@ed surface imperfections, w*ic* may occur from mac*ining mar7s, surface
conditions, or incomp+ete bond between base meta+ and c+adding, may produce
simi+ar indications, w*ic* are non#re+evant to t*e detection of unacceptab+e
discontinuities.
8/14/2019 MT Procedure - B2.doc
http://slidepdf.com/reader/full/mt-procedure-b2doc 8/14
PVC-MS/PV EIC NDT – CANDT HLJOC
BLOCK 16-1 TGT FIELD DEVELOPMENT PROJECT
WELLHEAD PLATFORMS AND PIPELINES
Document No.:
TGT-PVCMS-Q-H04-PR-0011MAGNETIC PARTICLE TESTING
PROCEDURE
Page @ of 1!
Revision No.: B Issued date: 0"0#"011
o 5ny /uestionab+e or doubtfu+ indication s*a++ be re#eamined to determine w*et*er
or not t*ey are re+evant.
10"0 ACCEPTANCE CRITERIA
=or structura+ we+ds: acceptance criteria s*a++ be based on 5;8 D1.1 8ection 6.1,
)ab+e 6.1, Part C.
=or piping we+ds: acceptance criteria s*a++ be base on 583 B $1.$ C*apter 2I,
)ab+e $%1.$."
=or Pipe+ine: acceptance criteria s*a++ be base on 5PI 11% 8ection (.%.".
11"0 RECORDS AND REPORT
)*e test resu+ts s*a++ be reported on form agnetic Partic+e )esting ReportJ as
formatted as in 5ppendi ". In additiona+, t*e report may be inc+uded mar7#up
drawings or s7etc*es of detected defects Asee 5ppendi $.
Identification of first repair on reports and we+d identification s*a++ be indicated, as KR>
and t*e subse/uent we+d repair s*a++ be identified as KR1> and etc... oints t*at *as been
cut out and re#we+d s*a++ be denoted as KR;>.
B"
8/14/2019 MT Procedure - B2.doc
http://slidepdf.com/reader/full/mt-procedure-b2doc 9/14
PVC-MS/PV EIC NDT – CANDT HLJOC
BLOCK 16-1 TGT FIELD DEVELOPMENT PROJECT
WELLHEAD PLATFORMS AND PIPELINES
Document No.:
TGT-PVCMS-Q-H04-PR-0011MAGNETIC PARTICLE TESTING
PROCEDURE
Page 10 of 1!
Revision No.: B Issued date: 0"0#"011
A33$'8*> 1 - MAGNETIC PARTICLE FIELD INDICATOR
8/14/2019 MT Procedure - B2.doc
http://slidepdf.com/reader/full/mt-procedure-b2doc 10/14
PVC-MS/PV EIC NDT – CANDT HLJOC
BLOCK 16-1 TGT FIELD DEVELOPMENT PROJECT
WELLHEAD PLATFORMS AND PIPELINES
Document No.:
TGT-PVCMS-Q-H04-PR-0011MAGNETIC PARTICLE TESTING
PROCEDURE
Page 11 of 1!
Revision No.: B Issued date: 0"0#"011
A33$'8*> - MAGNETIC PARTICLE E<AMINATION REPORT
MAGNETIC PARTICLE
E<AMINATION REPORT=orm No.: 999#PR#11.1
Proect: Report No.: Re/uest No.:
Procedure No.: Item: Drawing No.:
5cceptance 8tandard: PI et*od: ateria+ )ype:
3/uipment:8eria+ No.
Current: Po+es 8pacing:
agnetic Partic+es:
Batc* No.:
Bac7ground:
ig*ting:
8urface Condition:
8urface )emperature:
E<AMINATION RESULTS No. ;e+d Identification
;e+der ID
;e+d engt* Amm
D$($9($8 D$)$9(+ Resu+tACC/ REJL&9,(*&'
L$'(=
T;3$ &)
8$)$9(
Remar7: ACC A99$3($8 REJ R$$9($8
C: Crac7 I: Interna+ ndercut =: ac7 of =usion
CR: Crater Crac7 3: 3terna+ ndercut P: ac7 of Penetration
<: <ver+ap P: Porosity CP: C+uster Porosity
MPI TECHNICIAN
Name:
8ignature
Date
PVC-MS HLJOC C"A"
B"
8/14/2019 MT Procedure - B2.doc
http://slidepdf.com/reader/full/mt-procedure-b2doc 11/14
8/14/2019 MT Procedure - B2.doc
http://slidepdf.com/reader/full/mt-procedure-b2doc 12/14
PVC-MS/PV EIC NDT – CANDT HLJOC
BLOCK 16-1 TGT FIELD DEVELOPMENT PROJECT
WELLHEAD PLATFORMS AND PIPELINES
Document No.:
TGT-PVCMS-Q-H04-PR-0011MAGNETIC PARTICLE TESTING
PROCEDURE
Page 1. of 1!
Revision No.: B Issued date: 0"0#"011
A33$'8*> 4 - MAGNETIC OKE DAIL CAPACIT CHECK
MAGNETIC OKE DAIL
CAPACIT CHECK =orm No.: 999#PR#11."
MONTH OF
EQUIPMENT NAME
MODEL
SERIAL NO"
REF" BLOCK NO"
DATELIFT CAPACIT
CHECKED B WITNESSED B REMARKS
10 LBS 40 LBS
1
"
$
%
&
6!
'
(
1
11
1"
1$
1%
1&
16
1!
1'
1(
""1
""
"$
"%
"&
"6
"!
"'
"(
$
$1
B"
8/14/2019 MT Procedure - B2.doc
http://slidepdf.com/reader/full/mt-procedure-b2doc 13/14
PVC-MS/PV EIC NDT – CANDT HLJOC
BLOCK 16-1 TGT FIELD DEVELOPMENT PROJECT
WELLHEAD PLATFORMS AND PIPELINES
Document No.:
TGT-PVCMS-Q-H04-PR-0011MAGNETIC PARTICLE TESTING
PROCEDURE
Page 14 of 1!
Revision No.: B Issued date: 0"0#"011
A33$'8*> ! - MAGNETIC E<AMINATION TECHNIQUE SHEET
TECHNIQUE MPI 15pp+ication : 5 ;3D? 39C3P) )..E L<IN)8
)3CFNIM3 I8)R5)I<N:
• et*od: Continuous magneti@ation, wet or dry met*od.
• ateria+: Carbon 8tee+.
• 3/uipment: 5C 3+ectromagnetic o7e 50N5=9 6 or simi+ar e/uipment.
• Po+e spacing: ! to 1&mm.
• =ie+d strengt*: $ +ine on Burma* castro+ f+u Indicator Abrass.
• agnetic Partic+es: N5B5E3 8#1& for visib+e wet met*od? N5B5E3 =#"& for f+uorescent wet met*od?
50N5=9 G1grey - G'red powder for dry met*od.
• Bac7ground: C+eaned, wire brus*ed, spray wit* w*ite contrast paint for wet met*od? =or dry and f+uorescent
met*od: C+ean meta+ surface.• 5cceptance Criteria: =or structura+ we+ds: 5;8 D1.1 8ection 6.1, )ab+e 6.1, Part C? =or piping we+ds: 583 B
$1.$ C*apter 2I, )ab+e $%1.$." and for Pipe+ine: 5PI 11% 8ection (.%.".
)38) 83M3NC3:
• F&7 W$( M$(=&8:
1. 2isua+ inspection, c+ean t*e test surface?". 8pray t*e contrast paint on test surface. ;ait unti+ it dries? A'&( ,335*$8 )&7 )52&7$+9$'(
$. P+ace o7e across t*e we+d and magneti@e it?%. 5pp+y t*e PI in7 between t*e po+es and magneti@ed t*e we+d w*i+e t*e in7 is f+owing away from t*e surface?
&. Inspection and eva+uation of indications ta7e p+ace w*i+e magnetic fie+d is being app+ied?6. Reposition t*e yo7e so t*at t*e magnetic fie+d is perpendicu+ars t*at of step $ above. Repeat steps % and &
above.
• F&7 87; $(=&81. 2isua+ inspection, c+ean t*e test surface?
". P+ace o7e across t*e we+d and magneti@e it?
$. 5pp+y t*e PI powder between t*e po+es by p+astic powder container or b+ower. agneti@e t*e we+d w*i+e t*eecess powder is b+owing away?
%. Inspection and eva+uation of indications ta7e p+ace w*i+e magnetic fie+d is being app+ied?&. Reposition t*e yo7e so t*at t*e magnetic fie+d is perpendicu+ars t*at of step " above. Repeat steps $ and %
above.NOTES
• During subse/uent magneti@ation an over+ap of at +east 1inc* over previous step is re/uired.
• ;*enever possib+e, bot* surfaces of t*e we+d wi++ be tested.
• If an indication is observed, determine w*et*er t*e indication is cause by discontinuity or irre+evant indication.
)*is can be done by removing t*e indication by +ig*t grinding, visua+ inspect and Re#PI.
1st position: Po+e 5 at 1, Po+e B at %
"nd position: Po+e 5 at ", Po+e B at $
$rd position: Po+e 5 at $, Po+e B at 6
%t* position: Po+e 5 at %, Po+e B at &.1 .$ .&
." .% .6
Po+e B Po+e 5
B"
8/14/2019 MT Procedure - B2.doc
http://slidepdf.com/reader/full/mt-procedure-b2doc 14/14
PVC-MS/PV EIC NDT – CANDT HLJOC
BLOCK 16-1 TGT FIELD DEVELOPMENT PROJECT
WELLHEAD PLATFORMS AND PIPELINES
Document No.:
TGT-PVCMS-Q-H04-PR-0011MAGNETIC PARTICLE TESTING
PROCEDURE
Page 1! of 1!
Revision No.: B Issued date: 0"0#"011
TECHNIQUE MPI 5pp+ication: )..E L<IN)8 <N P5)38, )B5R.
)3CFNIM3 I8)R5)I<N:
• et*od: Continuous magneti@ation, wet or dry met*od.
• ateria+: Carbon 8tee+.
• 3/uipment: 5C 3+ectromagnetic o7e 50N5=9 6 or simi+ar e/uipment.
• Po+e spacing: ! to 1&mm.
• =ie+d strengt*: $ +ine on Burma* castro+ f+u Indicator Abrass.
• agnetic Partic+es: N5B5E3 8#1& for visib+e wet met*od? N5B5E3 =#"& for f+uorescent wet met*od?
50N5=9 G1grey - G'red powder for dry met*od.
• Bac7ground: C+eaned, wire brus*ed, spray wit* w*ite contrast paint for wet met*od? =or dry and f+uorescent
met*od: C+ean meta+ surface.
• 5cceptance Criteria: =or structura+ we+ds: 5;8 D1.1 8ection 6.1, )ab+e 6.1, Part C? =or piping we+ds: 583 B
$1.$ C*apter 2I, )ab+e $%1.$." and for Pipe+ine: 5PI 11% 8ection (.%.".
)38) 83M3NC3:
• F&7 W$( M$(=&8:
1. 2isua+ inspection, c+ean t*e test surface?
". 8pray t*e contrast paint on test surface. ;ait unti+ it dries? A'&( ,335*$8 )&7 )52&7$+9$'($. P+ace o7e across t*e we+d and magneti@e it?
%. 5pp+y t*e PI in7 between t*e po+es and magneti@ed t*e we+d w*i+e t*e in7 is f+owing away from t*e
surface?
&. Inspection and 3va+uation of indications ta7e p+ace w*i+e magnetic fie+d is being app+ied?6. Reposition t*e yo7e so t*at t*e magnetic fie+d is perpendicu+ars t*at of step $ above. Repeat steps % and &
above.
• F&7 87; $(=&8
1. 2isua+ inspection, c+ean t*e test surface?". P+ace o7e across t*e we+d and magneti@e it?
$. 5pp+y t*e PI powder between t*e po+es by p+astic powder container or b+ower. agneti@e t*e we+d w*i+et*e ecess powder is b+owing away?
%. Inspection and eva+uation of indications ta7e p+ace w*i+e magnetic fie+d is being app+ied?&. Reposition t*e yo7e so t*at t*e magnetic fie+d is perpendicu+ars t*at of step " above. Repeat steps $ and %
above.
NOTES
• During subse/uent magneti@ation an over+ap of at +east 1inc* over previous step is re/uired.
• ;*enever possib+e, bot* surfaces of t*e we+d wi++ be tested.
• If an indication is observed, determine w*et*er t*e indication is cause by discontinuity or irre+evant indication.
)*is can be done by removing t*e indication by +ig*t grinding, visua+ inspect and Re#PI.
;e+d being
tested
o7e
=irst magneti@ation - Cross view 8econd magneti@ation - 8ideview
B"