EDMS No. 2316921 v1.1 Group Code: EN/CV MS-4568/EN The Primary CO2 Project Market Survey Qualification Questionnaire Design and Supply of low temperature CO 2 trans-critical refrigeration systems Abstract In order to be considered as a potential bidder for the forthcoming Invitation to Tender, the respondent shall be either a single firm or group of firms (hereinafter referred to as “the Firm”) or a group of firms (hereinafter referred to as “the Group of Firms”). The Firm or the Group of Firms shall demonstrate that it meets the applicable qualification criteria by completing this Qualification Questionnaire and by providing the requested documents and references. March 2020

Upload: others

Post on 09-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MS Qualification Questionnaire for Single Firms QQSFcds.cern.ch/record/2712804/files/MS-4568_Qualificatio… · Web viewCommissioning and Start-up engineer specialized in industrial

EDMS No. 2316921 v1.1 Group Code: EN/CV

MS-4568/EN

The Primary CO2 Project

Market Survey

Qualification QuestionnaireDesign and Supply of low temperature CO2 trans-critical

refrigeration systems

Abstract In order to be considered as a potential bidder for the forthcoming Invitation to Tender, the respondent shall be either a single firm or group of firms (hereinafter referred to as “the Firm”) or a group of firms (hereinafter referred to as “the Group of Firms”).The Firm or the Group of Firms shall demonstrate that it meets the applicable qualification criteria by completing this Qualification Questionnaire and by providing the requested documents and references.

March 2020

Page 2: MS Qualification Questionnaire for Single Firms QQSFcds.cern.ch/record/2712804/files/MS-4568_Qualificatio… · Web viewCommissioning and Start-up engineer specialized in industrial

ii EDMS No. 2316921 v1.1MS-4568/EN

TABLE OF CONTENTS

1. INFORMATION ABOUT THE FIRM..........................................................................................11.1 Name and Address..............................................................................................................................11.2 Contact Persons..................................................................................................................................12. GENERAL QUALIFICATION CRITERIA.................................................................................12.1 Administrative Situation.....................................................................................................................22.2 Subcontracting....................................................................................................................................22.3 Country of Origin...............................................................................................................................33. FINANCIAL QUALIFICATION CRITERIA INCLUDING RESOURCES.............................43.1 Size of the Firm or Group of Firms....................................................................................................43.1.1 Number of Employees.........................................................................................................................43.1.2 Global Annual Turnover....................................................................................................................73.2 Proven Production Capacity...............................................................................................................74. TECHNICAL QUALIFICATION CRITERIA.............................................................................74.1 Competence and Experience...............................................................................................................74.2 Equipment and facilities.....................................................................................................................84.2.1 Equipment...........................................................................................................................................84.2.2 Facilities.............................................................................................................................................84.3 Maintenance........................................................................................................................................94.4 Safety..................................................................................................................................................94.5 Schedule............................................................................................................................................104.6 Quality Assurance.............................................................................................................................104.6.1 Certification.....................................................................................................................................104.6.2 Quality assurance system.................................................................................................................105. ADDITIONAL INFORMATION.................................................................................................11

Page 3: MS Qualification Questionnaire for Single Firms QQSFcds.cern.ch/record/2712804/files/MS-4568_Qualificatio… · Web viewCommissioning and Start-up engineer specialized in industrial

EDMS No.: 2316921 v1.1 1MS-4568/EN

1. INFORMATION ABOUT THE FIRM

1.1 Name and Address

Firms interested in participating in the forthcoming Invitation to Tender procedure as a member of a Group of Firms1 shall return a SINGLE questionnaire for the Group of Firms, to be completed by the Lead Firm and signed by each of its members.The number of firms in the Group of Firms shall not exceed two.

Position Name of the firm Address

Single Firm

Member No. 2 of the Group of Firms (if applicable)

1.2 Contact Persons

The Firm, or the Lead Firm, shall be able to make available for the entire duration of the contract at least one English and/or French speaking commercial contact person and one English and/or French speaking technical contact person.

Technical mattersName Tel E-mail

If absent:

Commercial mattersName Tel E-mail

If absent:

2. GENERAL QUALIFICATION CRITERIA

CERN reserves the right not to consider the Firm for the forthcoming Invitation to Tender procedure in the event that: It has replied “yes” to at least one question in § 2.1; It has made a false declaration in the present Qualification Questionnaire; Notwithstanding § Error: Reference source not found, CERN reasonably concludes that the

Firm or Group of Firms will be unable to complete or fulfil its obligations under the contract due to the Firm’s or Group of Firm’s financial situation.

1 The term “Group of Firms” shall mean a consortium, joint venture or any other arrangement between legal entities for the joint submission of a bid and the joint execution of the contract but shall exclude any subcontractors.

Page 4: MS Qualification Questionnaire for Single Firms QQSFcds.cern.ch/record/2712804/files/MS-4568_Qualificatio… · Web viewCommissioning and Start-up engineer specialized in industrial

2 EDMS No. 2316921 v1.1MS-4568/EN

Only firms that have replied to the market survey and are qualified on the basis of the following criteria shall be invited to tender: The technical, financial and other qualification criteria defined in this document; CERN’s previous experience with the firm, if any; The number of firms to be selected from each Member State2, as specified in § 2.3 hereunder.

2.1 Administrative Situation

Is the Firm, or any member of the Group of Firms, involved in bankruptcy proceedings, prosecution for debt, sequestration or any analogous situation arising from a similar procedure provided for in law?

□ YES □ NOIf yes in the case of a Group of Firms, please indicate which member(s): ……………………….

Has the Firm, or any member of the Group of Firms, been found guilty for fraud, corruption or any other illegal activity?

□ YES □ NOIf yes in the case of a Group of Firms, please indicate which member(s): ……………………….

Has the Firm, or any member of the Group of Firms, been declared to be in serious breach of a CERN contract for failure to comply with its contractual obligations.

□ YES □ NO

If yes in the case of a Group of Firms, please indicate which member(s): ……………………….

2.2 Subcontracting3

Subcontracting will be permitted for the execution of the contract up to 30% of the value of the contract.However, the following parts of the Supply cannot be subcontracted: Design; Project management; Worksite supervision; Testing and commissioning;

In case of Group of Firm, the following parts of the Supply which cannot be subcontracted shall remain with the Lead Firm : Contract management; Project management;2 http://home.cern/about/member-states; except where stipulated otherwise, the term “Member State(s)” shall mean full member

state(s) of CERN, associate member state(s) of CERN and associate member state(s) in the pre-stage of accession to membership of CERN.

3 The term “subcontract(s)” shall mean any arrangement whereby the Contractor contracts with another legal entity (the subcontractor), except legal entities under its direct control, for the provision of a major part of the Supply (including sub-assemblies and components or any part of the services forming part of the Supply). The term “subcontract(s)” shall include sub-subcontract(s).

Page 5: MS Qualification Questionnaire for Single Firms QQSFcds.cern.ch/record/2712804/files/MS-4568_Qualificatio… · Web viewCommissioning and Start-up engineer specialized in industrial

EDMS No.: 2316921 v1.1 3MS-4568/EN

Design supervision; Commissioning;

Subcontracting is subject to CERN’s prior written approval of each proposed subcontractor. CERN reserves the right to refuse the participation of a subcontractor and to make checks about the proposed subcontractor(s).

Does the Firm intend to subcontract any part of the Supply? □ YES □ NO

If yes, please complete the table in § 2.3.

2.3 Country of Origin

The term “country of origin” shall mean the country(ies) of manufacture or last major transformation of the Supply (including sub-assemblies and components) by the contractor or its subcontractor(s).The Firm shall be established within one of the CERN Member States. The Supply must originate in the Member States. However, CERN reserves the right not to invite to tender the Firm if: It proposes a Supply originating in an associate member state, or an associate member state in

the pre-stage of accession to membership; and The combined annual financial value of orders, contracts and appointments already committed

for that country: Exceeds the amount of the country’s financial contribution to CERN for the financial year

concerned; or Would exceed the financial contribution if the Firm were awarded the contract.

In addition, with a view to improving the distribution of purchases among its Member States, and in order to decide on the number of potential bidders to be selected from each Member State, CERN shall take into account the Member State’s contribution, its industrial return coefficient and its estimated share of the contract (refer to the Appendix: “Selection and Adjudication Criteria for Supply Contracts”).Please indicate the origin of the Supply in the following table

In the case of a Single Firm:Supply or part of the Supply (including activities and third-party components)

Name of the Firm and, if applicable and known, of the proposed Subcontractor(s)

Country of origin

Page 6: MS Qualification Questionnaire for Single Firms QQSFcds.cern.ch/record/2712804/files/MS-4568_Qualificatio… · Web viewCommissioning and Start-up engineer specialized in industrial

4 EDMS No. 2316921 v1.1MS-4568/EN

In the case of a Group of Firms:Supply or part of the Supply (including activities and third-party components)

Name of the Lead Firm or of the member of the Group of Firms and, if applicable and known, of the proposed Subcontractor(s)

Country of origin

3. FINANCIAL QUALIFICATION CRITERIA INCLUDING RESOURCES

3.1 Size of the Firm or Group of Firms

3.1.1 Number of Employees

In the case of single Firm: The Firm (with whom the contract will be signed) shall have at least 58 employees in the last three years with:

45 technical employees specialized in industrial refrigeration (IR) systems; Three refrigeration project managers and experts specialized in the design of CO2

refrigeration systems; Four draftsmen specialized in the conception of a refrigeration systems; Three electrician & automation engineers; Three commissioning and start-up engineers specialized in industrial and CO2 applications;

In the case of a Group of Firms:The members of the Group of Firms collectively (with whom the contract will be signed) shall have at least 61 Employees in the last three years with:

Page 7: MS Qualification Questionnaire for Single Firms QQSFcds.cern.ch/record/2712804/files/MS-4568_Qualificatio… · Web viewCommissioning and Start-up engineer specialized in industrial

EDMS No.: 2316921 v1.1 5MS-4568/EN

Lead firm 35 technical employees specialized in industrial refrigeration (IR) systems; Three refrigeration project managers and experts specialized in the design of CO2

refrigeration systems; Four draftsmen specialized in the conception of a refrigeration systems; Three electrician & automation engineers; Three commissioning and start-up engineers specialized in industrial and CO2 applications;

Second firm 10 technical employees specialized in industrial refrigeration (IR) systems; One refrigeration engineer/expert specialized in the design of CO2 refrigeration systems; One electrician & automation engineer; One commissioning and start-up engineer specialized in industrial and CO2 applications;

Please complete the following table:In the case of a Single Firm:

2017 2018 2019

Number of employeesOverall (all activities

for information)

Technical employees in the field of IR

Refrigeration project managers and experts

specialized in the design of CO2

refrigeration systems

Draftsmen specialized in the conception of a refrigeration systems

Electrician & Automation engineers

Commissioning and Start-up engineer

specialized in industrial and CO2 applications

In the case of a Group of Firms:LEAD FIRM

2017 2018 2019

Number of employeesOverall (all activities)

Page 8: MS Qualification Questionnaire for Single Firms QQSFcds.cern.ch/record/2712804/files/MS-4568_Qualificatio… · Web viewCommissioning and Start-up engineer specialized in industrial

6 EDMS No. 2316921 v1.1MS-4568/EN

Technical employees in the field of IR

Refrigeration project managers and experts

specialized in the design of CO2

refrigeration systems

Draftsmen specialized in the conception of a refrigeration systems

Electrician & Automation engineers

Commissioning and Start-up engineer

specialized in industrial and CO2 applications

MEMBER No. 2 OF THE GROUP OF FIRMS

2017 2018 2019

Number of employeesOverall (all activities)

Technical employees in the field of IR

Refrigeration engineer/expert

specialized in the design of CO2

refrigeration systems

Draftsmen specialized in the conception of a refrigeration systems

Electrician & Automation engineers

Commissioning and Start-up engineer

specialized in industrial and CO2 applications

3.1.2 Global Annual Turnover

The Firm, or the members of the Group of Firms collectively shall have an average global annual turnover of at least the equivalent of 14’000’000 Swiss francs for the last three years The Lead Firm (in the case of a Group of Firms) shall have a minimal average annual turnover of at least the equivalent of 7’000’000 Swiss francs.

Page 9: MS Qualification Questionnaire for Single Firms QQSFcds.cern.ch/record/2712804/files/MS-4568_Qualificatio… · Web viewCommissioning and Start-up engineer specialized in industrial

EDMS No.: 2316921 v1.1 7MS-4568/EN

Please complete the following table:In the case of a Single Firm:

2017 2018 2019

Global Turnover

In the case of a Group of Firms:2017 2018 2019

LEAD FIRM

Global Turnover

MEMBER No. 2 OF THE GROUP OF FIRMS

Global Turnover

3.2 Proven Production Capacity

The Firm, or the members of the Group of Firms collectively shall be able to demonstrate that it has the management and production capacity to meet the provisional delivery schedule stated in section §4.2 of the Technical Description.

4. TECHNICAL QUALIFICATION CRITERIA

4.1 Competence and Experience

The Firm, or the Group of Firms, shall prove relevant competence and experience by providing the references specified hereunder. The Firm, or the members of the Group of Firms collectively shall have a proven competence and experience in the following areas that are necessary to meet the requirements of the scope, complexity and volume specified in the Technical Description.

Design, supply and installation, test and commissioning of CO2 trans-critical and subcritical technologies;

Design, supply and installation, test and commissioning for industrial low temperature applications below -45 °C and with a minimal cooling capacity of 50 kW;

Design, supply and installation, test and commissioning of large customized skids mounted project for industrial refrigeration systems with contract value of at least the equivalent of 700’000 Swiss francs.

Design, supply and installation, test and commissioning of large built-up project for industrial refrigeration systems with contract value of at least the equivalent 700’000 Swiss francs.

Is this criterion fulfilled for all the above-mentioned fields?□ YES □ NO

Page 10: MS Qualification Questionnaire for Single Firms QQSFcds.cern.ch/record/2712804/files/MS-4568_Qualificatio… · Web viewCommissioning and Start-up engineer specialized in industrial

8 EDMS No. 2316921 v1.1MS-4568/EN

If not, please explain why not:................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................The Firm, or the Lead Firm (in the case of a Group of Firms) shall provide at least three relevant references from the last five years that demonstrate that each of the above-mentioned criterion is fulfilled. CERN shall be entitled to contact such references in order to verify the potential bidder’s compliance with the above-listed eligibility criteria. In addition, the Firm or the Lead Firm (in the case of a Group of Firms) shall arrange a visit by CERN to any of its references if so requested.If CERN finds that the Firm does not meet these eligibility criteria’s then this may lead to his disqualification.Please use the annexed “Reference forms” and duplicate them as necessary.

4.2 Equipment and facilities

4.2.1 Equipment

The Firm, or the members of the Group of Firms collectively, shall have available at the time of this Market Survey the following equipment: Relevant software/programs during studies;

o AUTOCAD® and PDF® format for P&IDo CATIA® or AUTOCAD® and PDF® format for drawingso CATIA® or AUTOCAD® Revit and PDF® format for 3D modelso EPLAN® and PDF® format for electrical schemes;

Adequate testing equipment for two simultaneous commissioning & start-ups, such as, but not limited to vacuum pumps, laser alignment tool.

Are these criteria fulfilled? □ YES □ NO

If not, please explain why not:………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………

4.2.2 Facilities

The Firm, or the Lead Firm (in the case of a Group of Firms) shall have available at the time of this Market Survey the following facilities: A local assembly hall; A workshop covered from outside conditions.

Are these criteria fulfilled? □ YES □ NO

Page 11: MS Qualification Questionnaire for Single Firms QQSFcds.cern.ch/record/2712804/files/MS-4568_Qualificatio… · Web viewCommissioning and Start-up engineer specialized in industrial

EDMS No.: 2316921 v1.1 9MS-4568/EN

If not, please explain why:………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………

4.3 Maintenance

The Firm, or the members of the Group of Firms collectively shall be able to assure preventive maintenance on the CERN site at a regular interval per year based on Original Equipment Manufacturer (OEM) recommendations and mandatory EN standards in force (either by themselves or by a entrusted subcontractor).

Is this criterion fulfilled? □ YES □ NO

If not, please explain why:……………………………………………………………………………………………………………………………………………………………………………………………………………………The Firm, or the members of the Group of Firms collectively shall be able to assure corrective maintenance and be on the CERN site within a period of 48 hours from receipt of the written request from CERN.

Is this criterion fulfilled? □ YES □ NO

If not, please explain why:……………………………………………………………………………………………………………………………………………………………………………………………………………………The Firm, or each member of the Group of Firms, shall either be proficient in the use of a computerised maintenance management system or assure that a dedicated subcontractor may do this on its behalf .

Is this criterion fulfilled? □ YES □ NO

If not, please explain why:………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………

4.4 Safety

The Firm, or each member of the Group of Firms (in this case the requested information must be provided for EACH member), shall provide evidence of its commitment to ensuring Safety (safety, health, working conditions and environmental protection) by providing a description of its individual policies and actions in these fields.Please attach a description of the applicable policy and actions undertaken by the firm(s) in the field of Safety.

Page 12: MS Qualification Questionnaire for Single Firms QQSFcds.cern.ch/record/2712804/files/MS-4568_Qualificatio… · Web viewCommissioning and Start-up engineer specialized in industrial

10 EDMS No. 2316921 v1.1MS-4568/EN

4.5 Schedule

The Firm, or the Group of Firms collectively shall be able to comply with the provisional delivery, installation and commissioning schedule stated in section §4.2 of the Technical Description.Is this criterion fulfilled?

□ YES □ NOIf not, please explain why not:……………………………………………………………………………………………………………………………………………………………………………………………………………………

4.6 Quality Assurance

4.6.1 Certification

The Firm, or the Lead Firm (in the case of a Group of Firms) shall have ISO 9001:2015 and ISO 14001:2015 certification in the field of design, supply and installation of refrigeration systems, or be able to demonstrate compliance with certification or shall be willing to establish an equivalent quality assurance procedure.Is this criterion fulfilled?

□ YES □ NOIf yes, please attach a copy of the relevant certificate, which must clearly show the certification authority and date of certification.If not, please indicate details of your internal quality assurance system and how you would set up an equivalent quality assurance procedure (Use a separate sheet).

4.6.2 Quality assurance system

The Firm, or each member of the Group of Firms shall have implemented quality assurance plans for similar contracts.Is this criterion fulfilled?

□ YES □ NOIf not, please explain why not:………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………

5. ADDITIONAL INFORMATION

Indicate any other information that may be relevant to this Market Survey.................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

Page 13: MS Qualification Questionnaire for Single Firms QQSFcds.cern.ch/record/2712804/files/MS-4568_Qualificatio… · Web viewCommissioning and Start-up engineer specialized in industrial

EDMS No.: 2316921 v1.1 11MS-4568/EN

Date Signature and stamp of the Firm or of each member of the Group of Firms

Page 14: MS Qualification Questionnaire for Single Firms QQSFcds.cern.ch/record/2712804/files/MS-4568_Qualificatio… · Web viewCommissioning and Start-up engineer specialized in industrial

12 EDMS No. 2316921 v1.1MS-4568/EN

REFERENCE 1

Name of the customer

Full address

Name, telephone and e-mail of the person to be contacted in customer organisation

Scope of the contract

Refrigerant Cooling power [kW] Min. evap. Temp. [°C] Number of compressors or

units Compressor brand Compressor model

Duration (start and end dates) From:

To:

Approximate contract value [kCHF]

Other relevant technical details

Page 15: MS Qualification Questionnaire for Single Firms QQSFcds.cern.ch/record/2712804/files/MS-4568_Qualificatio… · Web viewCommissioning and Start-up engineer specialized in industrial

EDMS No.: 2316921 v1.1 13MS-4568/EN

REFERENCE 2

Name of the customer

Full address

Name, telephone and e-mail of the person to be contacted in customer organisation

Scope of the contract

Refrigerant Cooling power [kW] Min. evap. Temp. [°C] Number of compressors or

units Compressor brand Compressor model

Duration (start and end dates) From:

To:

Approximate contract value [kCHF]

Other relevant technical details

Page 16: MS Qualification Questionnaire for Single Firms QQSFcds.cern.ch/record/2712804/files/MS-4568_Qualificatio… · Web viewCommissioning and Start-up engineer specialized in industrial

14 EDMS No. 2316921 v1.1MS-4568/EN

REFERENCE 3

Name of the customer

Full address

Name, telephone and e-mail of the person to be contacted in customer organisation

Scope of the contract

Refrigerant Cooling power [kW] Min. evap. Temp. [°C] Number of compressors or

units Compressor brand Compressor model

Duration (start and end dates) From:

To:

Approximate contract value [kCHF]

Other relevant technical details