ms internal assessment power point
TRANSCRIPT
-
8/2/2019 MS Internal Assessment Power Point
1/18
The Math Studies Project
for Internal Assessment
A good project should be able to be
followed by a non-mathematician and be
self explanatory all the way through.
-
8/2/2019 MS Internal Assessment Power Point
2/18
Length
The project does not have a word limit. It is thequality of the mathematics and theprocessesused and described that is important, rather
than the number of words written.
-
8/2/2019 MS Internal Assessment Power Point
3/18
Commitment
The project is a substantial piece of work (20hours class time plus several more hours outsidethe class)
The project should demonstrate a commitmentof time and effort by the student
-
8/2/2019 MS Internal Assessment Power Point
4/18
Choice of Topic
The choice of topic must give studentssufficient scope to demonstrate theirmathematical ability.
Statistical
Chi-Squared test for Independence
Correlation/Linear regression
Student t test
Spearmans rank order correlation
-
8/2/2019 MS Internal Assessment Power Point
5/18
Choice of Topic
Algebraic Modelling
Quadratic
Exponential
Trigonometric
Calculus
i. Optimization Problems ii. Modelling
-
8/2/2019 MS Internal Assessment Power Point
6/18
Choice of Topic
Number and algebra
i Sequences and series
ii Linear programming Sets, Logic and Probability
i Venn diagrams
ii Probabilities Financial Mathematics
-
8/2/2019 MS Internal Assessment Power Point
7/18
Title page
The Project must have a clear title
Candidates name
Candidates number Date
Subject
Teachers Name
-
8/2/2019 MS Internal Assessment Power Point
8/18
Table of contents
Page numberring where each part of the projectcan be found
-
8/2/2019 MS Internal Assessment Power Point
9/18
A: Introduction
Task: What is the aim of the project? The task must focus on a distinct objective with a clear
hypothesis or direction The task must be clearly stated Plan: What must be done to achieve this aim? Include as much detail as is necessary to be clear Include a description of method of data collection
including any sampling techniques, this will be usefulfor validity
Include a description of the mathematical processes tobe used and the reason for choosing these processes
-
8/2/2019 MS Internal Assessment Power Point
10/18
B: Information / Measurement The information/measurements collected may come from a
survey, internet, calculation, etc The information/measurements must be sufficient in quantity When the information/measurements is to be split, as in the chi
squared test, more than 50 pieces of data is necessary to avoidsmall expected values, rendering the test invalid.
The information/measurements must be relevant The information/measurements must be organised The information/measurements should be reorganised each
time, to suit calculations being done eg. Male, female categories
If a questionnaire is used then include this in the project A questionnaire should be designed to collect multidimensional
mathematical data Raw data must be included to determine the accuracy of
calculations
-
8/2/2019 MS Internal Assessment Power Point
11/18
C: Mathematical Processes
Always include some relevantsimple math processes What is the mathematical process used? Explanation of
mathematical technique Why is this particular procedure useful? Relevance/validity of
mathematical technique Always state formulae used and do one calculation by hand.
The GDC can be used to perform further similar calculations Always check the accuracy of your results Interpret results/draw conclusions from the results of the
calculations (Standard deviation is often calculated but not used or
commented on.)
-
8/2/2019 MS Internal Assessment Power Point
12/18
C: Mathematical Processes
Applyrelevant sophisticated processes as thoroughly as forsimple process. Interpret results/draw conclusions from the results of the
calculations Comment on validity of results
Check the accuracy of the results For Chi-squared tests to be valid:
Frequencies must be used, not raw data or percentages No more than 20% of the expected cells should have a
number less than 5 No expected cells should have a number less than 1
For Linear correlation There is no point in finding the correlation coefficient or
regression line if the scatter graph shows that there is no
correlation
-
8/2/2019 MS Internal Assessment Power Point
13/18
D: Interpretation of results
Always give a thorough and detailed analysis anddiscussion of results
-
8/2/2019 MS Internal Assessment Power Point
14/18
E: Validity
Validity of mathematical processes used
Validity of results obtained from these processes
-
8/2/2019 MS Internal Assessment Power Point
15/18
F: Structure and Communication
The project should include the discussion in thebody of the work
Appropriate mathematical language should
always be usedThe project should be presented correctly and in
a systematic manner.
All sources should be acknowledged Include website addresses in bibliography Include raw data in body of document or in
appendix
-
8/2/2019 MS Internal Assessment Power Point
16/18
Conclusion
Did the data and calculations support your task?
Discuss limitations in its applicability within theproject.
Scope for improvement /extension of theproject
-
8/2/2019 MS Internal Assessment Power Point
17/18
Bibliography
State websites
Footnotes as necessary
Other sources of information
-
8/2/2019 MS Internal Assessment Power Point
18/18
Appendices
Raw data collected can be placed here