mrr spill over works latest 01.7.2014

3
Nos Estimate cost Spill over Cost No of Completed No of Progress No of Not Grounded 1 2 3 4 5 6 7 8 9 10 1 PRI Guntur 6 263.00 217.03 2 4 45.97 217.03 2 PRI Narasaraopet 4 194.00 116.58 3 1 77.42 116.58 3 PR Tenali 8 302.03 111.17 7 1 190.86 111.17 Guntur District: 18 759.03 444.78 12 6 314.25 444.78 * The District wise Abstract totals should tally with totals of the work wise details. Superintending Engineer Panchayat Raj, Guntur ABSTRACT - SPILL OVER MRR GRANT WORKS IN 2014-15 IN PR CIRCLE, GUNTUR Rs in lakhs Sl No Division/ District Soill over works as on 01.04.2014 Status Expenditure upto 31.05.2014 Amount required for completion

Upload: shane-rodriguez

Post on 20-Jul-2016

215 views

Category:

Documents


0 download

TRANSCRIPT

Nos Estimate cost Spill over

Cost

No of

Completed

No of

Progress

No of Not

Grounded

1 2 3 4 5 6 7 8 9 10

1 PRI Guntur 6 263.00 217.03 2 4 45.97 217.03

2 PRI Narasaraopet 4 194.00 116.58 3 1 77.42 116.58

3 PR Tenali 8 302.03 111.17 7 1 190.86 111.17

Guntur District: 18 759.03 444.78 12 6 314.25 444.78

* The District wise Abstract totals should tally with totals of the work wise details.

Superintending Engineer

Panchayat Raj, Guntur

ABSTRACT - SPILL OVER MRR GRANT WORKS IN 2014-15 IN PR CIRCLE, GUNTUR Rs in lakhs

Sl

NoDivision/ District

Soill over works as on 01.04.2014

Status

Expenditure upto

31.05.2014

Amount

required for

completion

GO No & Date Amount GO No & Date Amount Completed Progress * Not

Grounded

1 2 3 4 5 6 7 8 9 10 11 12

1 GunturPRI

Narasaraopet

Providing approach road and construction of

steps from foot hill to top of the hill of

Kondaveedu Fort in Edlapadu Mandal

347, Dt.19.3.10100.00 784, Dt.03.6.10 100.00 100.00

Revalidation of the

Admn.San. GO

awaited

2 Guntur PR TenaliTadikalapudi - Thippalakatta cross road of Kollur

Mandal

1781,

Dt.13.12.06 1.701204, Dt.08.08.08

778, Dt. 31.5.10

1.13

1.130.57 0.56

Completed FB to

be paid

3 GunturPRI

Narasaraopet

Repairs to the road from Gurazala to

Samadhanampet, via. Gottimukkala in Gurazala

Mandal Guntur District

G.O.Rt.

No.1470,

Dt.06.8.12

55.00 47.12 7.88Completed FB to

be paid

4 Guntur PR TenaliBT Renewal to NH 216 to Bhavanamvaripalem

(via) Chowdipalem20.00 12.46 7.54

Completed FB to

be paid

5 Guntur PR TenaliBT Renewal to MN R&B Road to

Nattalavaripalem12.60 9.00 3.60

Completed FB to

be paid

6 Guntur PRI GunturBT Renewal to Ponnur-Chandolu R&B Road at

Km 2/8 to Komali via Jadavalli74.00 45.97 28.03

Completed FB to

be paid

7 Guntur PRI GunturBT Renewal to TM R&B Road at Km 11/8 to

Kolakaluru (via) Manchikalapudi, KR Konduru70.00 70.00 Completed

8 GunturPRI

Narasaraopet

BT Renewal to Rompicherla Muppalla R&B Road

to Ramireddypalem34.00 25.59 8.41

Completed FB to

be paid

9 GunturPRI

Narasaraopet

BT Renewal to Nrt-Rompicherla R&B Road to

Thungapadu5.00 4.71 0.29

Completed FB to

be paid

10 Guntur PR TenaliBT Renewal to NH 216 to Ramnagar (via)

Putchakurthivaripalem32.00 22.42 9.58

Completed FB to

be paid

11 Guntur PR TenaliBT Renewal to Khajipalem-PVPalem R&B Road

to Kothapalem (via) Parisavaripalem30.00 25.21 4.79

Completed FB to

be paid

12 Guntur PR Tenali

BT Renewal to Road from PV Palem-

Nizampatnam R&B Road to Gattuvaripalem (via)

Satyanarayanapuram, Pedapalli & Srinagar in

Nagaram (M)

88.00 81.00 7.00Completed FB to

be paid

Physical Status of workIf Revalidated sanction

Reference

Expenditure

upto May

2014

G.O

.Rt.

No

.184

0, D

t.

05

.10

.20

12

DETAILS OF SPILL OVER WORKS UNDER MRR GRANT IN PR CIRCLE, GUNTUR WHICH REQUIRES REVALIDATION FOR 2014-15

NON - PLAN GRANT : Assistance to PRIs for Maintenance of Rural Roads Rs in lakhs

G.O

.Rt.

No

.184

0, D

t.

05

.10

.20

12

G.O

.Rt.

No

.184

0,

Dt.

05.1

0.2

012

Sl No Division Name of work

Balance

amount

required for

completion

(Not

exceeding

cli 5- col 8)

District

Original Admn sanction

Reference

GO No & Date Amount GO No & Date Amount Completed Progress * Not

Grounded

1 2 3 4 5 6 7 8 9 10 11 12

Physical Status of workIf Revalidated sanction

Reference

Expenditure

upto May

2014

Sl No Division Name of work

Balance

amount

required for

completion

(Not

exceeding

cli 5- col 8)

District

Original Admn sanction

Reference

13 Guntur PR TenaliBT Renewal to Road from 4/7 Gullapalli-

Nagaram R&B Road to Pudiwada46.30 40.20 6.10

Completed FB to

be paid

14 Guntur PRI GunturProviding CC roads in SC colony of Pusuluru (V),

Pedananadipadu (M), Guntur District11.00 11.00

Tenders to be

called for

15 Guntur PRI Guntur

Laying of CC roads in SC colony (Srinivasa

Nagar) in Pamidivaripalem village limits of

Pedanandipadu (M), Guntur District

18.00 18.00Tenders to be

called for

16 Guntur PRI Guntur

Laying of CC road from R & B road to

Kasarabadha Yesu in Pusuluru (V) of

Pedanadnipadu (M), Guntur District

5.00 5.00Work to be

entrusted

17 Guntur PRI GunturR/F Guntur-Amaravathi R&B road to 24/0 Km to

Kambampadu via Unguturu85.00 85.00 Estimate stage

18 Guntur PR TenaliPedaravuru Sugali Colony to tenali-Chinaparimi

road 72.00 72.00

LOA issued in

favour of

k.Venkateswar

arao,R/o

Guntur

759.60 101.13 314.25 444.78

* Note : If the work is not grounded, please mention the stage ie., Tender stage, Evaluation stage, LOA issued, Agreement entered, etc *

Superintending Engineer,

P.R. Circle, GunturG

.O.R

t.N

o.2

90

, D

t.

12

.02

.20

14

G.O

.Rt.

No

.184

0,

Dt.

05.1

0.2

012

G.O

.Rt.

No

.282

, D

t.

12

.02

.20

14