mp's three year report of progress 2012

25
MP’s THREE YEAR REPORT OF PROGRESS Dr. SHASHI THAROOR Minister of State for Human Resource Development Member Of Parliament Thiruvananthapuram Constituency INITIATIVES FOR DEVELOPMENT AND WELFARE OF CONSTITUENTS MAY 2009 – DECEMBER 2012

Upload: fixvex

Post on 31-Dec-2015

120 views

Category:

Documents


15 download

DESCRIPTION

MP's Three Year Report of Progress 2012

TRANSCRIPT

Page 1: MP's Three Year Report of Progress 2012

MP’s THREE YEAR REPORT OF PROGRESS

Dr. SHASHI THAROOR

Minister of State for Human Resource Development Member Of Parliament

Thiruvananthapuram Constituency

INITIATIVES FOR DEVELOPMENT AND WELFARE OF CONSTITUENTS

MAY 2009 – DECEMBER 2012

Page 2: MP's Three Year Report of Progress 2012

MP’s THREE YEAR REPORT OF PROGRESS - INITIATIVES FOR DEVELOPMENT AND WELFARE OF CONSTITUENTS MAY 2009 – DECEMBER 2012

ROADS

• Held discussions with Union Minister for Road Transport and Highways and

succeeded in ordering revival of the long – dormant Kovalam – Kaliyikkavila National Highway (NH-47) Bypass work. This has brought succour to thousands of families whose lands and properties had been ear-marked for acquisition as well as for the tens of thousands of road-users who had been denied a much-needed quality infrastructure facility. Subsequently, followed up to have the all-important land acquisition notification in the matter issued. Further, put forward a practical plan, immediately accepted by the NHAI, to have the Rs. 750-crore project undertaken in two parts in order to achieve a quick start and avoid any further paralysis of the entire work due to minor procedural and legal bottlenecks in respect of certain small stretches. The entire Kazhakuttam-Kaliyikavila stretch will soon be made a state-of-the art 4-lane road.

• Was successful in obtaining for Thiruvananthapuram record allocations of Rs. 15.05 crores during 2009-10 and Rs. 55.47 crores during 2010-11 from the Central Road Fund for bringing about substantial improvements in roads in Thiruvananthapuram constituency.

• As MP, substantially contributed to efforts for starting work on the widening and re-construction of the all-important stretch between Karamana – Kaliyikkavila of National Highway-47, the existing major road life-line serving the southern parts of the constituency. Successfully requested the Chief Minister to convene a break-through high-level meeting of Ministers and officials, convened under his chairmanship, following which the relevant land acquisition notification was issued, the prime action essential for getting the work started. The first stretch of the project is expected to be completed within next 2 years.

RAILWAYS

Made sustained efforts at the highest levels and achieved key advances in the development of the Railways in the constituency. These include:

• Sanctioning of Railway over bridge at Nemom

• Eleven new trains for Thiruvananthapuram.

• Additional stoppages for trains at Parassala and Kazhakuttam including stoppage for the Jayanti-Janata Express at Parassala, fulfilling a long-standing demand of the people of the region.

• The prestigious Parashuram Express extended to Nagercoil thereby providing an important direct link for people of the region with the rest of Kerala in

Page 3: MP's Three Year Report of Progress 2012

MP’s THREE YEAR REPORT OF PROGRESS - INITIATIVES FOR DEVELOPMENT AND WELFARE OF CONSTITUENTS MAY 2009 – DECEMBER 2012

addition to increasing travel facilities on the Thiruvananthapuram - Parassala sector.

• Actively worked for clearing various bottle-necks for the starting of the long-awaited MEMU train services between Kollam and Nagercoil. The service which has been started from 1st December, 2012 will significantly augment the rail travel services in the constituency.

• Improvements in services at all stations located in the constituency, including new footbridges, elevated platforms, computerized reservation facilities, etc.

• Budgetary announcement that Thiruvananthapuram Central will be elevated to world-class status in terms of amenities and other facilities.

• Was successful in getting the sanction of a special Rs. 10 crore package (as funds arranged through the Ministry of Tourism) for bringing about major infrastructural and passenger amenities improvements for Thiruvananthapuram Central station. The project encompassing a large number of items is expected to be completed in 2013.

• Took the initiative to persuade the Railway administration to create an exclusive Office of Chief Administrative Officer (a first for Kerala) to oversee development works for the two Railway Divisions in the State and to have it located in Thiruvananthapuram.

• Railway water bottling plant to be set up in Thiruvananthapuram.

• Approval for setting up a Railway Medical College in Thiruvananthapuram. When set up, this will be the only one of its kind in Kerala.

• A new Rail Reservation Counter to come up at the Civil Station, Kudappanakunnu under the MP’s 1000 PRS Scheme.

AIRPORT

• Strong and repeated personal intervention to have the work on the International Terminal at Thiruvananthapuram International Airport completed. The Airport is now fully operational.

• Took action to ensure completion of work amounting to Rs. 50 crores on the Hangar Unit of Air India at Thiruvananthapuram Airport. The Unit was made operational on 16th December, 2011.

• Intervened strongly to reduce User Development Fee in respect of new terminal at Thiruvananthapuram International Airport. Constant and effective intervention whenever necessary in all matters concerning facilities and problems of air passengers. Intervened to bring about improvements in parking facilities.

• Intervened with Central Excise and Customs to clear pending consignments of courier parcels which piled up at the Thiruvananthapuram International Airport during the Ramzan/Onam holidays, 2012.

Page 4: MP's Three Year Report of Progress 2012

MP’s THREE YEAR REPORT OF PROGRESS - INITIATIVES FOR DEVELOPMENT AND WELFARE OF CONSTITUENTS MAY 2009 – DECEMBER 2012

PORT

• Provided leadership, both as MP and as member of the Board of Directors of the Vizhinjam International Seaport Ltd. (VISL) for bringing about tangible progress on the proposal for the construction of the prestigious seaport. Played key role in pursuing with the Ministry of Environment & Forests to grant early approval for the Terms of Reference for the Environment Impact Study of the project.

• Notable efforts made to obtain the help of Barcelona, one of Europe’s major ports, for the Vizhinjam Seaport development project. Barcelona Port authorities visited Thiruvananthapuram and held discussions. Subsequently, the Ambassador of Spain in India also arrived and held talks. Invitation extended to Minister-level delegation from Kerala for further talks.

• Moved the Govt. of India to take action for developing basic rail and road infrastructural facilities for the Vizhinjam Seaport Project area. A two-km stretch from the National Highway- 47 bypass was made to be included in the National Highway Authority Scheme. The Railways have already completed survey work for a dedicated 8-km rail track from Vedivachankovil in Balaramapuram to Vizhinjam.

• Strongly took up with the Minister for Shipping Poovar’s case for being selected as the location for the new shipyard proposed to be set up on the West Coast of the country. Provided detailed suggestions for developing Poovar as a major shipyard-cum-port and maritime hub.

WATER

• Successfully intervened with the Minister of Environment and Forests for granting approval for raising the water level at Peppara Dam to augment water supply for Thiruvananthapuram city.

• Successfully intervened with the Ministry of Urban Development for allotment of an additional Rs. 10 crores under JNNURM for providing adequate water supply in the panchayats newly added to Thiruvananthapuram Corporation.

• Provided leadership and financial support for the work to clean, de-weed and develop the Valiakulam water body in Chenkal panchayat.

Page 5: MP's Three Year Report of Progress 2012

MP’s THREE YEAR REPORT OF PROGRESS - INITIATIVES FOR DEVELOPMENT AND WELFARE OF CONSTITUENTS MAY 2009 – DECEMBER 2012

POSTAL SERVICES

• Intervened successfully with the Ministry of Communications to give a major fillip to postal services in Thiruvananthapuram by getting approval for construction of three major infrastructure projects involving construction of post office complexes at Poojapura, Sasthamangalam and Karamana and for significantly enhancing postal services in the city and its environs.

INFORMATION TECHNOLOGY

• Convinced Oracle Corporation, the second largest IT company in the world, to start its operations from Technopark. Oracle is the first international IT giant to enter Kerala and its entry has already had significant impact on employment and other benefits by motivating other global majors to set up their centres in Thiruvananthapuram.

HEALTH SERVICES

• Effective intervention to ensure speedy completion of the construction of the buildings and related infrastructure of the six super-specialty departments in the Thiruvananthapuram Medical College Hospital complex involving a cost of Rs. 120 crores under the Prime Minister’s Swasthya Suraksha Yojana. These super-specialty departments have already started functioning.

• Active intervention for facilitating the next stage of expansion and development of the Sree Chitra Institute of Medical Sciences & Technology, Thiruvananthapuram.

• Took up case for including the Regional Cancer Centre, Thiruvananthapuram in the Central Government Scheme for the setting up of a National Institute for Cancer Research.

• Intervened successfully with the Union Health Ministry for including the Govt. Medical College, Thiruvananthapuram as Regional Centre for the new National Geriatric Program.

• Was successful in getting Rs. 10 crores allocated for completing building

works at the Central Ayurveda Institute at Poojappura. The work has been completed and the facility will be inaugurated soon.

• Efforts made to raise Peroorkada Mental Health Centre to the level of a ‘Centre of Excellence’ under Central Scheme. Though initially successful, the

Page 6: MP's Three Year Report of Progress 2012

MP’s THREE YEAR REPORT OF PROGRESS - INITIATIVES FOR DEVELOPMENT AND WELFARE OF CONSTITUENTS MAY 2009 – DECEMBER 2012

decision was reversed under pressure from the then LDF State Government. Central Government has nonetheless granted Rs 3 crores for Perrorkada Mental Health Centre. MP brought Central Health Minister to visit the Peroorkada Mental Health Centre and he has promised further support under the forthcoming Five-Year Plan which is being finalised.

• Made a strong intervention with the military authorities to make major improvements in the functioning of the Ex-Servicemen Contributory Health Scheme (ECHS), Thirumala, to resolve many long-pending functional and infrastructural problems. This has led to significant changes in the working of that facility, bringing relief to thousands of ex-servicemen and their families belonging to the constituency.

• Intervened immediately with the Union Health Ministry when production of

vital medicines used by patients suffering from the skin-disease Psoriasis was stopped at the Central Ayurveda Institute, Poojapura. The production of the medicines was re-started bringing great relief to tens of thousands of patients suffering from the disease in the State.

CENTRAL INSTITUTIONS

• Served effectively as elected representative of Lok Sabha on the Institute Body of the Sree Chitra Tirunal Institute of Medical Science and Technology, (SCTIMST), Thiruvananthapuram

• Also served as ex-officio member of the governing body of the Rajiv Gandhi

Center For Biotechnology (RGCB), Thiruvanathapuram. Effectively intervened with Union Health Ministry to rush testing kits and other equipment to Thiruivanathapuram for use by RGCB in the campaign to control Chickenguneya and Dengue outbreaks in the city and other parts of the State.

• Successfully intervened with the Centre for cancelling the proposed move

for closing the branch office of the National Film Development Corporation (NFDC) at Thiruvananthapuram. The office has now been allowed to be continued at new premises at Vellayani.

• Successfully intervened to ensure that the newly-created Regional Office of

the CPWD for Kerala is located at Thiruvananthapuram.

• Immediately intervened with the Centre when a proposal to shift the Office of the Bureau of Indian Standards (BIS) from Thiruvananthapuram came to notice, the proposal was put on hold following the intervention. Initiated efforts to obtain sufficient accommodation at Thiruvananthapuram for the Office, lack of which had led to the floating of the proposal for shifting it

Page 7: MP's Three Year Report of Progress 2012

MP’s THREE YEAR REPORT OF PROGRESS - INITIATIVES FOR DEVELOPMENT AND WELFARE OF CONSTITUENTS MAY 2009 – DECEMBER 2012

from the city.

• Strong action taken to retain and continue the Central Marine Fisheries Research Institute unit in Vizhinjam itself and to obtain funds for constructing new building. First installment of Rs. 1 crore released.

HIGH COURT BENCH

• Sustained intervention with Central, State and judicial authorities for the re-establishment of a High Court Bench in Thiruvananthapuram. Introduced a Private Member’s Bill for the setting up of Benches of High Courts in State Capitals to clinch the issue. Bill was listed for consideration during the Monsoon Session, 2012. The Bill could not be taken up for consideration only because of the total wash-out of the Session due to obstruction by the Opposition. Sympathetic response from concerned authorities in respect of an issue which has been lying pending for more than five decades. Efforts continue.

EDUCATION

• Arrangements made for admission with scholarships for 25 students from the BPL category for undertaking MBA/BBA courses in prominent educational institutions throughout India.

• Negotiated with prominent national universities to consider setting up campuses in Thiruvananthapuram. Inspection visits being conducted.

• Brought educational assistance to schools catering to underprivileged children in the district through the Chandran Tharoor Foundation.

• Vigorously and successfully argued in favour of locating at Thiruvananthapuram the prestigious ‘Knowledge City’ project of the State Government.

• Vigorously took up the case for locating the proposed regional office of the Central Board of Secondary Education (CBSE) at Thiruvananthapuram.

OTHER

• Obtained assistance from Central Government to the tune of Rs. 1.5 crores for modernization of Poojappura Central Jail.

• Provided a secure fibre-glass boat at Amboori crossing from the Chandran Tharoor Foundation in order to ensure safety of the local public following the tragic death of a young student in an accident there.

Page 8: MP's Three Year Report of Progress 2012

MP’s THREE YEAR REPORT OF PROGRESS - INITIATIVES FOR DEVELOPMENT AND WELFARE OF CONSTITUENTS MAY 2009 – DECEMBER 2012

• Made vigorous and sustained efforts with the Central Ministry to obtain environment clearance certificate for re-starting the renovation work of the famous pilgrimage Shrine at Vettucaud. As a result, the work has now re-started and the re-construction is expected to be completed very soon.

• Took a principled and consistent stand on the issue of banning ‘Hartals’ and ‘Bandhs’ for the greater good of the long-suffering public and the State. Your MP has not hesitated to appeal to the Chief Minister to take a lead in the matter to ensure that at least his own party and the ruling UDF coalition partners may take a lead in this regard by making an announcement that they will not make any call for observing any ‘hartals’ or ‘bandhs’ henceforth.

• Strongly took up with the Ministry of Finance the case of improving pension facilities for Employees Provident Fund (EPF) beneficiaries across the country.

• Strongly took up with the Chief Minister the case for providing reservation in the State Government services for ex-servicemen hailing from the State.

• Successfully intervened with the National Housing Bank to issue revised guidelines in respect of ‘Reverse Mortgage Loan’ by national banks to allow those who have inherited properties to also be eligible to apply for the loan. This change has been widely appreciated nation-wide by thousands of people who were enabled to apply for the loan facility which had been denied to them till now.

QUALITY OF LIFE / CULTURE

• Action taken to make Barcelona city of Spain the ‘Twin City’ of Thiruvananthapuram. Through the MP’s negotiations, avenues were opened for cooperation for development in the fields of tourism, urban development, sports, etc. The possibility of world-class training in football was also raised in liaison with FC Barcelona, including arranging training by experts from Barcelona for children of coastal areas. Representatives from Barcelona arrived in Thiruvananthapuram three times and held discussions. The agreement only required approval by the Thiruvananthapuram Corporation, but as a result of petty politics by the Left-dominated Municipal Corporation, the agreement was sadly allowed to lapse.

• As a precursor to the above-mentioned agreement, world-class artists in various disciplines were brought to Thiruvananthapuram from Barcelona and they performed in events held over three days on 23rd, 24th and 25th May 2010 in the city.

• Played a crucial role in gaining an IPL team for Kerala. This placed Kerala

Page 9: MP's Three Year Report of Progress 2012

MP’s THREE YEAR REPORT OF PROGRESS - INITIATIVES FOR DEVELOPMENT AND WELFARE OF CONSTITUENTS MAY 2009 – DECEMBER 2012

cricket on the national and world map, enhanced possibilities for local cricketers, and attracted many more visitors and tourists to our state. Despite the subsequent disbanding of the team, the boost to Kerala cricket remains, and the possibility of Thiruvananthapuram getting a cricket stadium of international standard has also been strengthened. Was effectively involved with the State Govt. to make a start in creating a state-of-the-art modern stadium at Katiyavattom in Thiruvananthapuram for the National Games that can also be used for cricket in the future.

• Personally intervened to bring the world-renowned Hay Literary Festival, which had never before been held in India, to Thiruvananthapuram in November, 2010. The annual event showcased international celebrities, writers, artists and policy makers who converged on Kerala’s capital to brighten the intellectual horizon of the city. The Festival was held successfully for the second year running in November, 2011.

• Postage stamp in honor of C.V Raman Pillai, proposed and pursued by the MP with the Union Ministry of Communications, was accepted and the stamp released.

• Successful in getting from Central Government a major allocation of Rs. 26 crores for renovating the iconic Tagore Centenary Hall Cultural Complex in Thiruvananthapuram.

NON-RESIDENT INDIANS’ WELFARE

• Successfully intervened with the Prime Minister arguing in favour of removing NRI remittances from the Service Tax net. This resulted in the Prime Minister, then holding direct charge of the Finance portfolio, getting the Central Board of Direct Taxation (CBDT) to issue a clarification that remittances by NRIs will not be brought under the new Service Tax regulations. This has provided immense relief to millions of expatriates and notably the large Keralite diaspora in the Gulf countries.

• Successfully lobbied for the setting up of the first UAE Consulate in Kerala in Thiruvananthapuram. This will provide major consular services and other conveniences in general to the people of the region and in particular to the constituents of Thiruvananthapuram Parliamentary Constituency. The move is also expected to influence other countries to locate their consulates in the city. A proposal for setting up an honorary consulate of Sri Lanka in the city, and a Trade Office of the UK High Commission, are under consideration.

Page 10: MP's Three Year Report of Progress 2012

MP’s THREE YEAR REPORT OF PROGRESS - INITIATIVES FOR DEVELOPMENT AND WELFARE OF CONSTITUENTS MAY 2009 – DECEMBER 2012

WORK AS UNION MINISTER OF STATE FOR FOREIGN AFFAIRS

• Your MP’s work as Minister of State for External Affairs (2009-10), the period in which he was holding that Office, was nationally appreciated. In that short 11 months, he succeeded in opening new vistas for India in Africa, travelled extensively to the countries under his charge, became the first Indian Minister to visit Haiti after the disastrous earthquake in that country which drew international attention due to the large number of casualties, and made path-breaking progress in relations with countries of Africa, Latin America and the Gulf region. He initiated new policy-planning activities on the Indian Ocean and represented India effectively at many global events, creating new relationships especially with the Francophone countries in Africa.

• Received appreciation from all quarters for guiding and implementing Haj pilgrimage arrangements in an exemplary manner. These efforts led to the pilgrims completing their pilgrimage with enhanced safety and without having to make any complaints.

• Made improvements in the functioning of passport offices. Action taken to start Passport Seva Kendras (PSK’s) at Neyyatinkara and Vazhuthacaud. The Neyyatinkara PSK came into existence only due to the decision made by the MP, as the Minister of State.

• Whenever such help was sought by the constituents or others from Kerala, the MP’s Office and he himself personally as the Minister of State, intervened speedily and directly in cases where they were facing problems relating to visas, repatriation, compensation claims, transportation home of mortal remains of deceased persons, etc.

AS MEMBER, LOK SABHA (IN-BETWEEN HIS TWO STINTS AS MINISTER OF STATE)

• Was Member-Convenor of the Parliamentary Forum on Disaster Management, and a member of the Standing Committee on External Affairs, the Consultative Committee on Defence, the Public Accounts Committee and the Joint Parliamentary Committee on Telecoms. The five Committee assignments reflected an unusual level of responsibility and trust in the MP.

• Participated prominently in many of the important debates which took place in the House during his tenure, including on the Lokpal Bill, the Motion of Thanks on the President’s Address, the Demand for Grants of the Ministry

Page 11: MP's Three Year Report of Progress 2012

MP’s THREE YEAR REPORT OF PROGRESS - INITIATIVES FOR DEVELOPMENT AND WELFARE OF CONSTITUENTS MAY 2009 – DECEMBER 2012

of External Affairs, the Demand for Grants of the Ministry of Commerce and Industry, on ‘Black Money’, Copyright Rules and the at the Special Sitting held to commemorate the 60th Anniversary of Parliament. Your MP’s speeches during the debates, interventions and questions have been widely appreciated by leaders and other prominent members of the parties represented in the House, cutting across political lines.

• Raised many specific issues relating to the Constituency through Parliament Questions and interventions in debates. Raised the issue of the garbage crisis in Thiruvananthapuram city through a Special Mention. Another issue which was raised through a Special Mention was the need for enforcing safety measures and guidelines for transportation of school children. Introduced a Private Member’s Bill on the all-important subject of setting up of High Court Benches in State Capitals. The Bill, which could have added momentum to the setting up of a High Court bench at Thiruvananthapuram received selection through the ballot and was slated for consideration of the House, but that day’s sitting was cancelled due to disruption of the proceedings by the opposition benches and its consideration was thus, most unfortunately, aborted.

WORK AS UNION MINISTER OF STATE FOR HUMAN RESOURCE DEVELOPMENT (FROM NOVEMBER – 2012 TO PRESENT)

• In the short period since assuming office once again as a Minister of State in the Union Council of Ministers (this time in the Ministry of Human Resource Development), your MP has already successfully intervened in a number of immediate issues pertaining to the welfare of the constituents.

• Intervened successfully for having a ‘Pen and Paper’ Examination Centre at Thiruvananthapuram for the prestigious Joint Engineering Entrance Examination (JEE). Earlier, only Kozhikode had such a Centre for the Examination.

• Intervened successfully for accommodating aspirants from Kerala appearing for the National Medical PG Entrance Examination at Centres in Kerala itself.

• Intervened successfully to have a centre for the All India PG Dental NEET Examination at Thiruvananthapuram. Earlier, Chennai was the only Centre in South India for the Examination.

Page 12: MP's Three Year Report of Progress 2012

MP’s THREE YEAR REPORT OF PROGRESS - INITIATIVES FOR DEVELOPMENT AND WELFARE OF CONSTITUENTS MAY 2009 – DECEMBER 2012

GENERAL SERVICES TO THE PUBLIC

• MP’s office set up in Pulimoodu – Govt. Press Road, Thiruvananthapuram, near the Secretariat, to make the services of the MP and his staff available daily. Solutions being found for the problems of thousands of people in the constituency through efficient services provided by the office.

• In these three years, over 5000 petitions were dealt with, forwarded and given responses. Daily “meet the public” sessions during MP’s days in Thiruvananthapuram continue to enable hundreds of citizens to directly meet their MP and to present their petitions, grievances or provide suggestions on matters relating to public welfare.

• Camp office set up in New Delhi to facilitate constituency support and follow-up.

MEMBER OF PARLIAMENT LOCAL AREA DEVELOPMENT SCHEME

(MPLADS)

• Full and equitable allocation of MPLADS funds, [Rs.2 crores each in 2009-10 & 2010-11 Rs. 5 crores each in 2011-12 and 2012-13] for creating enduring public assets in all segments of the constituency. Funds allocated in consultation with local residents, officials and stakeholders.

• The MP’s office is undertaking sustained monitoring and follow-up action with the District administration and other concerned implementing agencies to ensure that the works earmarked are completed well in time.

Full details of the works are given overleaf.

Page 13: MP's Three Year Report of Progress 2012

MP’s THREE YEAR REPORT OF PROGRESS - INITIATIVES FOR DEVELOPMENT AND WELFARE OF CONSTITUENTS MAY 2009 – DECEMBER 2012

THIRUVANANTHAPURAM CONSTITUENCY MAY 2009 – DECEMBER 2012

KAZHAKUTTAM ASSEMBLY CONSTITUENCY

Sl No Year Name of Work Allotted amount

(Rs.in lakhs)

Panchayat/Corpn ward/Municipality

1 2009 -10 Vishrama Sangetham at Medical college Hospital Tvpm 26.05 Medical college

2 2010 -11 Construction of building at B.Ed Training centre at HSS medical college 23.00 Medical College

3 2011 - 12 Construction of building at Mannanthala Govt. High School 15.00 Mannanthala

4 2011 - 12 Construction of a Library building at Kattachakonam Govt. School,Nalanchira 5.00 Nalanchira

5 2011 - 12 Setting up of a Highmast lighting System at Mannanthala Jn 4.20 Mannathala

6 2011 - 12 Infant resuscitator unit for Sree Avitom Thirunal Hospital,Thiruvananthapuram 1.20 Medical College

7 2011 - 12 Setting up a state- of- the art Paediatric oncology Intensive Care Unit at Regional Cancer Centre. 25.00 Medical College

8 2011-12 Construction of a culvert across the Kochupalam thodu to the Kumizhikkara Settlement Colony in the Kazhakuttam ward of the Tvpm Corporation (SC Work)

1.80 Kazhakuttam

9 2011-12 Construction of a side wall and concreting of the road to the Ambalathinkara Settlement Colony in the Kazhakuttam ward of the Tvpm Corporation (SC Work)

3.20 Kazhakuttam

10 2011-12 Metalling and tarring of the EMS Nagar - Kattela Road in the Cheruvaikkal Ward of the Thiruvananthapuram Corporation 4.00 Cheruvakkal

11 2012-13 Setting up of High Mast Lighting system at Prasanth Nagar Jn. in Akkulam ward of the Corporation 4.50 Akkulam

12 2012-13 Setting up of a High Mast Lighting System at the Chempazhanthi Jn in the Chempazhanthi ward of the Copn 4.50 Chempazhanthi

13 2012-13 Setting up of High Mast Lighting system at Kesavadasapuram 4.50 Kesavadaspuram

14 2012-13 Metalling and tarring of the Amballoor - Palliyamparambu - Mannara Road in the Chandavila Ward of Kazhakuttom/Tvm Corporation

5.00 Chandavila Road

15 2012-13 Setting up of a High Mast Lighting System at the Venpalavattom Junction 4.50 Kadakampalli

16 2012-13 Setting up of a High Mast Light at Madavoorpara in the No.3 Corpn. Ward Kattaikonam 4.50 Kattaikonam

17 2012-13 Purchase and installation of Medical Equipments for the SAT Hospital, Medical College, TVpm 10.00 Medical College

18 2012-13 Supply of two computers each to the St. Mary's HSS, Pattom, Govt. HS Kattachalkonam and St.Gorettii's HSS Nalanchira 1.50 Nalanchira

19 2012-13 Construction of a Bus Shelter at the Mar Ivanious College Jn. in the Nalanchira ward 1.50 Nalanchira

20 2012-13 Construction of a dining hall and a kitchen with storage facility for Pallithura Hr. Secondary School - Thiruvananthapuram 4.00 Corpn. Pallithura

Page 14: MP's Three Year Report of Progress 2012

MP’s THREE YEAR REPORT OF PROGRESS - INITIATIVES FOR DEVELOPMENT AND WELFARE OF CONSTITUENTS MAY 2009 – DECEMBER 2012

KOVALAM ASSEMBLY CONSTITUENCY

Sl No Year Name of Work Allotted amount

(Rs.in lakhs)

Panchayat/Corpn ward/Municipality

1 2011 - 12 Construction of building for Govt:UPS Puthuchal, Plavila, Athiyannoor Panchayat 11.50 Athiyannoor

2 2012-13 Supply of two Computers to Lutheran LPS, Anthiyoor 0.50 Balaramapuram

3 2012-13 Supply of two computers to the Mutharamman Kovil HSS, kOTTUKALKONAMKattachalkuzhi 0.49 Balaramapuram

4 2012-13 Nellivila SC Colony Drinking Water Supply scheme in the Balaramapuram G P 4.50 Balaramapuram

5 2012-13 Setting up of High Mast Lighting system at Balaramapuram Jn 4.50 Balaramapuram

6 2012-13 Metalling and tarring of Aithiyoor - CheruvarakuzhyRoad in Balaramapuram 3.00 Balaramapuram

7 2012-13 Side wall and earth filling for the Leader Shri K.Karunakaran road in Palachalkonam Ward of the Balaramapuram Panchayat 5.00 Balaramapuram

8 2011-12 Metalling and tarring of the Vallachal Vilakom-Puthiyal SC Colony Road in the Anthiyoor ward of the Balaramapuram GP (SC Work) 4.00 Balaramapuram

9 2009 -10 Construction of footpath and side drain in thuppanchikudi Purayidam in Vizhinjam gpt 2.50 Vizhinjam

10 2011 - 12 Installation of New High Pressure Filter at water Pumping Station for the Vizhinjam Panchayat Community Drinking Water Supply Scheme

10.00 Vizhinjam

11 2012-13 Concreting of Footpath in the Kadakulam (Fishermen Township Project Colony) in the Kottappuram ward of Tvpm Corpn. 5.00 Kottappuram

12 2012-13 Setting up of a High Mast Lighting System near St. Nicholas Church in the Karimkulam G P 4.50 Puthiyathura

13 2009 -10 School auditorium Regional Fisheries VHSS Valiyathura 7.00 Beemapally

14 2011 - 12 Setting up of a High Mast Light at Parithikuzhi junction, Kovalam Bypass road 4.20 Corpn. Kovalam

15 2012-13 Setting up of a High Mast Lighting System at the Mukkola Junction 4.50 Mulloor

16 2009 -10 Construction of Canopy shed for fish sales at Poonthura market TVPM 3.00 Poonthura

17 2011 - 12 Setting up of a High mast Light at Thiruvallam Junction 4.20 Thiruvallam

18 2009 -10 Const of muttacadu Govt hospital road at Venganoor gpt 4.00 Corpn. Venganoor

19 2012-13 Concreting of Amaravila Nellivila road and construction of drainage channel 5.00 Corpn. Venganoor

20 2011 - 12 Setting up of High Mast Light at Mohideenpalli Junction in Vizhinjam harbour 4.2 Vizhinjam

21 2011 - 12 Setting up of a High mast lighting System at the fish landing centre (South), G.V. Raja Road, Vizhinjam. 4.20 Vizhinjam

22 2010 -11 Earth filling and sidewall of chirathalavilakomThiripalliyoor temple ela road in venganoor(SC) , 15.00 CorpnVenganoor

Page 15: MP's Three Year Report of Progress 2012

MP’s THREE YEAR REPORT OF PROGRESS - INITIATIVES FOR DEVELOPMENT AND WELFARE OF CONSTITUENTS MAY 2009 – DECEMBER 2012

23 2010 -11 Construction of kunnannoor pappanoor foot bridge across valiyathodu in vizhinjam 10.00 Vizhinjam

24 2011 - 12 Purchase and installation of a 50HP VT Pump set for Vizhinjam community Drinking Water Supply Scheme 8.85 Vizhinjam

25 2009 -10 Pipeline ext and providing public tap at Kallliyoor Kurumi road 0.45 Kalliyoor

26 2010 -11 Metattaling and tarring of mannam memorial road in kalliyoor grama Panchyat 5.00 Kalliyoor

27 2010 -11 Sidewall construction and concreting at santhivila KC villas pathway 5.00 Kalliyoor

28 2011 - 12 Kannamkuzhi Settlement Colony Nadapatha concrete and Drainage Construction SC, 4.00 Kalliyoor

29 2012-13 Concreting of the Parankimamvila - Kayalkkara Road in the Kakkamoola Ward of the Kalliyoor Grama Panchayat (SC Work) 7.00 Kalliyoor

30 2012-13 Setting up of a High Mast Lighting System at the SreeVellayani Devikshethram Junction in the Kalliyoor Grama Panchayat 4.50 Kalliyoor

31 2012-13 Construction of a drainage channel and Footpath in the Kannamkuzhi settlement colony in the Kalliyoor Gramapanchyat 5.00 Kalliyoor

32 2012-13 Purchase and installation of 2 computers for SALP School in Kakkamoola in the Kalliyoor Gpt 0.50 Kalliyoor GP

33 2012-13 Metalling & Tarring of the Sasthamkovil Nada Vavila Temple road 5.00 Kalliyoor GP

34 2011 - 12 Construction of fish Marketing Shed inside Kanjiramkulam Public Market 5.00 Kanjiramkulam

35 2011 - 12 Construction of a building for the Kanjiramkulam Primary Health Centre’. 10.00 Kanjiramkulam

36 2012-13 Construction of a Samskarika Nilayam in the Puliyadichanvila Karichal Ward of the Kanjiramkulam Gpt (SC Work) 9.00 Kanjiramkulam

37 2012-13 Purchase of 10 computers for the Kanjiramkulam Govt. College in the Kanjiramkulam Gpt 3.00 Kanjiramkulam

38 2011 - 12 Construction of a Community Hall for the Karumkulam Grama Panchayat 24.00 Karimkulam

39 2009 -10 Construction of Canopy shed for fishermen at Kochupally in Karumakulam gpt, 5.00 Karumkulam

40 2010 -11 Construction of comfort station at the Leo 13th HSS pulluvila 5.00 Karumkulam

41 2011 - 12 Construction of building for an Anganwadi and a PH Sub Centre in the Karuthanvila area of Azhangal Ward No. X of the Karumkulam Gram Panchayat

10.00 Karumkulam

42 2009 -10 Tarring of pumphouse Puliyorkonam Kariyara Puthalam Road in Kottukal panchayat 5.00 Kottukal

43 2010 -11 Pipeline extention at therivila cheruvila in kottukal 1.39 Kottukal

44 2010 -11 Construction of sidewall at Attaramoola kizhakkumbhagom thekkekarathode 2.50 Kottukal

45 2011 - 12 Sree Narayanapuram Charuvila Pottavila Road - Poovar west Branch Chanel Bridge and side wall Construction at Kottukal Grama Panchayat

8.00 Kottukal

46 2012-13 Construction of a building for the Kottukal PH Centre Kottukal Panchayat 5.00 Kottukal

Page 16: MP's Three Year Report of Progress 2012

MP’s THREE YEAR REPORT OF PROGRESS - INITIATIVES FOR DEVELOPMENT AND WELFARE OF CONSTITUENTS MAY 2009 – DECEMBER 2012

47 2012-13 Metalling and side wall construction of Vettakalam Chanal bund Karinchalathottam road (SC Work) 5.00 Kottukal

48 2012-13 ‘Metalling, sidewall and side drain construction of the Karinthalivila SC Colony Road in the Kottukal Grama panchayat (SC Work)’

5.00 Kottukal

49 2009 -10 Kizhanguvila Nediyakala side wall construction and road formation in Poovar Gpt 4.00 Poovar

50 2010 -11 Installation of computer and computer at MVHSS Arumanoor in poovar 2.42 Poovar

51 2012-13 Side wall construction and concreting of the Manalivila-Kunnumala Road in the Kanjampazhanji Ward of the Poovar Gram Panchayat (SC Work)

5.00 Poovar

52 2012-13 Side wall construction, metalling and tarring of the Arumanoor - Thottuvarambu Road in the Poovar Gram Panchayat and (SC Work)

5.00 Poovar

53 2012-13

Extension of the KSEB electric lines from Arumanoor Ganapathiyan Kovil -Madathuvilakom to Chekkadi in the Ward No XV and Plankala - Kanchampazhanji footpath and Convent - Thoovaramthottam Street

3.00 Poovar

54 2012-13 Providing 2 Solar Lighting Sysytems by the Kundamathinkulam in the Soolankudi Ward of the Poovar Grama Panchayat 0.50 Poovar Gpt

55 2010 -11 Concreting kavadivilakom sisilipuram lakshamveedu Edavazhi(SC) 1.00 Venganoor

56 2010 -11 Metalling and tarring of Thiripalayoor venniyoor mahavishnu temple road 5.00 Venganoor

57 2012-13 Concreting of the Nellivilakathu Road in Ward No. V of the Venganoor Grama Panchayat (SC Work) 5.00 Venganoor

58 2011 - 12

Construction of side wall and concreting of the Kamukinkuzhy-Cherukonam Canal Bund Road in the Cherukonam IHDP Colony in the Kovalam ward of the Venganoor Gama Panchayat (SC Work)

5.00 Venganoor

59 2012-13 Setting up of a High Mast Lighting System near St. Nicholas Church in the Karimkulam G P 5.00 Venganoor

NEMOM ASSEMBLY CONSTITUENCY

Sl No Year Name of Work Allotted amount

(Rs.in lakhs)

Panchayat/Corpn ward/Municipality

1 2012-13 Providing Street Lights on every alternate electric post from the Cargo Jn. to the Valiyathura ward of the Thiruvananthapuram Corporation

2.50 Beach

2 2011 - 12 Construction of an Auditorium building for the Government UP School in the Ambalathara ward of the Thiruvananthapuram Corporation’

10.00 Ambalathaa

3 2012-13 Construction of a Dining Hall for the for the Govt. LP School, Kamaleswaram 5.00 Kamaleswaram

4 2009 -10 Installation of Focus light lamps National Highway JN Karamana(09-10), 6.10 Karamana

5 2010 -11 Construction of sidewall and cleaning of azhankalthodu Neeramankara 6.00 Karamana

6 2012-13 Setting up of a Children's Park in the Govt. Pattom Thanupillai Memorial School, Sreevraham in the Manacaud Ward of the Tvpm Corpn

4.00 Manacaud

7 2011 - 12 Construction of laboratory building for the Govt. Hospital for Women and Children, Poojappura 12.00 Poojappura

Page 17: MP's Three Year Report of Progress 2012

MP’s THREE YEAR REPORT OF PROGRESS - INITIATIVES FOR DEVELOPMENT AND WELFARE OF CONSTITUENTS MAY 2009 – DECEMBER 2012

8 2009 -10 Construction of computer room for Thirumala UPS 6.70 Thirumala

9 2012-13 Purchase and installation of 2 computers for the Govt. LPS Mangadu, Thirumala, Tvpm 0.50 Thirumala

10 2012-13 Setting up of a children’s park at Govt. VHSS for the hearing impaired, Jagathy, Tvpm 6.00 Jagathy

11 2012-13 Setting up of a computer lab in the Govt. High School, Kaladi 3.50 Kaladi

12 2012-13 Supply of two computers for WLP School, Koliyakode , Nemom ward of Tvpm Corpn. 0.50 Nemom

13 2011 - 12 Setting up of a High Mast lamp at Padasseri-Attukal Road (Corporation Road) close to Attukal Bhagavathy Temple 4.20 Attukal

14 2011 - 12 Construction of a Stage Platform in the Konchiravila Govt. UP School 1.50 Konchiravila

15 2012-13 Providing computers for the Janani Arts Club and Library building at Mudavanmugal, Poojappura, Thiruvananthapuram 1.00 Mudavanmugal

16 2012-13 Setting up of High Mast Lighting system at Plankala Jn of the Nemom ward 4.50 Nemom ward

17 2012-13 Purchase and installation two Computers for the Pachalloor LP School 0.50 Pachalloor

18 2012-13 Supply of 10 computers and a UPS System of required capacity with batteries and setting up a LA Network in the Computer lab of the Vazhamuttom Govt HS Pachalloor

5.00 Pachalloor

19 2011 - 12 Setting up of a High Mast Lamp at Estate Junction Pappanamcode 4.20 Pappanamcode

20 2012-13 Purchase of a Maruti Ambulance Van for the Govt.Hospital for Women and Children , Poojappura 3.50 Poojappura

21 2012-13 Construction of side wall for the Varuvila - Mulluvila Road in the Punchakari Ward of the Thiruvananthapuram Corporation 7.00 Punchakari ward

22 2009 -10 Purchasing of Laboratory supplies at Abraham Memorial HSS Thirumala 1.00 Thirumala

23 2012-13 Setting up of a High Mast Lighting System at the Thirumala Junction in Thirumala Corpn. ward 4.50 Thirumala

24 2012-13 Supply of two computers to Thiruvallam LP School, Thiruvallam 0.49 Thiruvallam

25 2009 -10 Cement slab cover over the Canal at CSM Nagar Vazhuthakadu 3.00 Vazhuthacaud

26 2011 - 12 Laying of SW line and construction of manholes at Pulichivila, in the Velanvilakathu Harijan Colony 7.23 Melarannur

27 2009 -10 Melarannoor Mayadevi Temple Road/Prem Nagar road earth filling, metalling and tarring 1.50 Karamana

28 2011 - 12 Construction of Thottuvarambu road adjacent to Melaranoor railway gate ,Karamana 4.00 Karamana

29 2011 - 12 Construction of Nursery building at Govt. LPS Mettukada 5.00 Thycaud

30 2012-13 Providing a fiber boat for ferry service across the Karamana River between Mudavanmugal and Estate Ward of the Thiruvananthapuram

1.00 Mudavanmugal/Estate

Page 18: MP's Three Year Report of Progress 2012

MP’s THREE YEAR REPORT OF PROGRESS - INITIATIVES FOR DEVELOPMENT AND WELFARE OF CONSTITUENTS MAY 2009 – DECEMBER 2012

NEYYATTINKARA ASSEMBLY CONSTITUENCY

Sl No Year Name of Work Allotted amount

(Rs.in lakhs)

Panchayat/Corpn ward/Municipality

1 2009 -10 Metalling and Tarring of Pongil Kurvikkala Channel bund road in Athiyannoor gpt 5.00 Athiyannoor

2 2012-13 Supply of two computers for MKM LPS, Pongin, Mulluvila 0.49 Athiyannoor

3 2011 - 12 Construction of Thoppuvila Channel Bridge at Thannimood Ward Athiyannur 7.00 Athiyannoor

4 2011 - 12 Construction of approach road for the Thoppuvila Channel Bridge in the Thannimood Ward of Athiyannur Grama Panchayat 3.00 Athiyannoor

Panchayat

5 2009 -10 Construction of box Culvert at Kollayil Branch Canal Udiyankulalngara Azhakikonam rd 3.00 Chenkal

6 2009 -10 Mariyapuram Harijan Colony road Tarring in Chenkal gpt(SC) 5.00 Chenkal

7 2010 -11 Thrikkannapuram marayikulam Ambedkar road metalling and tarring 5.00 Chenkal

8 2010 -11 Metalling of Chavaloor Potta-Uttamkulam Vaniyamkala Road(SC) 4.00 Chenkal

9 2010 -11 Metalling and Tarring of valiyakulam panayarakal Mariyapuram in chenkal 5.00 Chenkal

10 2011 - 12 Asharikulam – Amachakulam Bund Construction 5.00 Chenkal

11 2011 - 12 Construction of a building for Anganwadi at Vlathankara ward, Chenkal Panchayat 5.00 Chenkal

12 2012-13 Setting up of a High Mast Lighting System at the Udiyamkulangara Junction in the Chenkal Grama Panchayat 4.50 Chenkal

13 2011-12 Concreting of the Kollavila-Pattavila footpath in the Venkulam Ward of the Karod Grama Panchayat 10.00 Karod

14 2011 - 12 Construction of Foot Bridge above the irrigation canal near Ponkuzhi Temple in Karode Panchayat, ward-10 5.00 Karod

15 2009 -10 Const of Samskarika Nilayam at Ambanavila ward Karod gpt, 5.00 Karode

16 2010 -11 Concreting of kamparavila ponvila chanal bund road karode 5.00 Karode

17 2010 -11 Concreting of Pathway at Veliyamkottukonam- Mannaravila-Narayana Gurudeva Mandiram in Karode 6.00 Karode

18 2012-13 Construction of an Anganvadi Building in the Ambilikonam ward of Karode G P 9.00 Karode

19 2012-13 Community drinking water supply scheme 'Panayarakavila Drinking water supply scheme in the Kakkavila Ward of the Karod Gpt"

5.00 Karod

2012-13 Purchase and installation of two computers for the Govt. KVHS Ayira 0.50 Karod

20 2009 -10 M and T of Thekuthai kakkali chackochi vilakam road in perumpozhinji ward in kulathoor 5.00 Kulathoor

21 2011 - 12 Construction of Kulathoor Govt. HSS Auditorium 10.00 Kulathoor

Page 19: MP's Three Year Report of Progress 2012

MP’s THREE YEAR REPORT OF PROGRESS - INITIATIVES FOR DEVELOPMENT AND WELFARE OF CONSTITUENTS MAY 2009 – DECEMBER 2012

22 2011 - 12 Construction of a Building in Pozhiyoor Govt.Hospital, Pozhiyoor, Kulathoor Panchayat 10.00 Kulathoor

23 2012-13

Replacing the damaged and chocked G I pips with new 110MM PVC pipes for 1 kilometer distance from Neyyattinkara & Olathanni for facilitating water supply to Olathanni, Chundavila-Athazhavila and nighbouring areas of Neyyattinkara Municipality

7.00 Neyyattinkara

24 2012-13 Setting up of a High Mast Lighting System at the Neyyattinkara Hospital Junction 4.50 Neyyattinkara

25 2012-13 Supply and installation of 4 computers for the Njanapradayani Grandhashala at T B Junction Neyyattinkara 1.00 Neyyattinkara

26 2012-13 Setting up of a High Mast Lighting System at the CSI Church Junction, Amaravila in the Neyyattinkara Municipality. 4.50 Neyyattinkara

27 2010 -11 Metalling and Tarring Vadakinkara Asarivilakom road in neyyattinkara 5.00 Neyyattinkara

28 2010 -11 Metalling and Tarring at Thottahukadavu road in Neyyattinkara 5.00 Neyyattinkara

29 2010 -11 Concreting at NSS Karayogam road Neyyattinkara, 1.00 Neyyattinkara

30 2011 - 12 Construction of a Water Tank in the Panagattukari Ward of the Neyyattinkara Municipality’ 10.00 Neyyattinkara

31 2011 - 12 Setting up of a Children’s Park at Irumbil ward, Neyyattinkara Muncipality 5.00 Neyyattinkara

32 2011 - 12 Construction of side wall and concreting of the Chandramangalam Canal Bund Road in the Muttackad Ward of the Neyyattinkara Municipality (SC Work)

5.00 Neyyattinkara

33 2012-13 Extension of Water supply line to Pinnavavila Kunnathu Road in Ooruttukala ward of Neyyattinkara Municipality 5.00 Neyyattinkara

34 2009 -10 Building Construction for GOVT HSS Neyyatinkara 5.00 Neyyattinkara

35 2012-13 Supply of two computers for BFM LPS, Perumpazhuthoor-CSI Corporate Management 0.50 Neyyattinkara

36 2010 - 11 Construction of Latrine at Govt. L. P. School,Puthenkada. 2.50 Thiruppuram

37 2010 -11 Arumanoorkada laksham veedu colony road metalling and tarring(SC) 5.00 Thiruppuram

38 2011 - 12 Metalling and tarring of Cholanvila-Cherukari Harijan Colony Road in Ward No IX of Thirupuram Grama Panchayat 5.00 Thiruppuram

39 2010 -11 Metalling and Tarring of pathanvila Bund road in Thirupuram 5.00 Thirupuram

40 2012-13 Construction of a building for the Primary Health Centre at Paraniyam in Pathanavila ward of Thirupuram G P 8.00 Thirupuram

PARASSALA ASSEMBLY CONSTITUENCY

Sl No Year Name of Work Allotted amount

(Rs.in lakhs)

Panchayat/Corpn ward/Municipality

1 2009 -10 Construction of a foot brige across Neyyar Reservoir at Panthaplamood Thodumala in Amboori pt(ST) 15.00 Amboori

2 2011-12 Construction of a building for the Tribal ITI at Kuttamala in the Amboori Grama Panchayat 24.00 Amboori

Page 20: MP's Three Year Report of Progress 2012

MP’s THREE YEAR REPORT OF PROGRESS - INITIATIVES FOR DEVELOPMENT AND WELFARE OF CONSTITUENTS MAY 2009 – DECEMBER 2012

3 2012-13 Supply and installation of 2 Nos of pumping motors for the Swajal Dhara Rural Drinking Water Supply Scheme at Paparamkavu in Amboori G P-ST Work

1.60 Amboori

4 2012-13 Setting up of a High Mast Lighting System at the Amboori Junction in the Amboori G P 4.50 Amboori

5 2012-13 Construction of a Road from Shankinkonam to Puravimala ST Colonies in the Amboori Frama Panchayat. (ST Work) 10.00 Amboori

6 2012-13 Metalling & Tarring of a new road from chackapara to Thenmala settlement colony via Ayyavilakom, Karikuzhi, Sainkhinkonam, Puravimala colonies-ST work

15.00 Amboori

7 2010 -11 Construction of an Extension Hall for the Chackappara Anganwadi in the Tribal Settlement Colony of Thodumala Ward, Amboori Grama Panchayat ( ST Work)

5.00 Amboori

8 2009 -10 Const of School auditorium Govt VHSS Keezharoor 5.00 Aryancode

9 2010 -11 Metalling and side wall construction of the Mandapathara-Maryancode Kovilvila Road in the Aryancode Panchayat 5.00 Aryancode

10 2009 -10 Construction of Comfort station for Mylachal Govt HSS 2.00 Aryankode

11 2009 -10 Construction of Canopy shed for fish Sales At Aryankode Market 3.00 Aryankode

12 2012-13 Purchase and supply of a Computer for the Aided Lower Primary School, Vavode-Vazhichal 0.25 Kallikkad

13 2009 -10 Construction of sidewall and M and T in narakathinkuzhiroad in vavodu ward in kallikad pt(ST) 15.00 Kallikkad

14 2012-13 Purchase and installation of 2 computers for the UPS Mylakkara, in the Kallikkad Gpt 0.50 Kallikkad

15 2012-13 Setting up a mini Drinking Water Supply Scheme for the Pangade area in the Vavode ward of Kallikadu G P (SC Work) 4.00 Kallikkad

16 2012-13 Setting up of a High Mast Lighting System at the Neyyardam Junction 4.50 Kallikkad

17 2012-13 Construction of Moozhi Andivilakonam footpath and construction of foot bridge across Moozhithodu in Kallikkad Panchayat

4.00 Kallikkad

18 2012-13 Setting up of a High Mast Lighting System at the Karakonam Junction 4.50 Kunnathukal

20 2010 -11 Metalling and Tarring of Manjavilakom punnackal kuzhiyarathalala road in kollayil grama pt 5.00 Kollayil

21 2011 - 12 Construction of Mannamkulam Dobhighat Project (SC Fund) at Kollayil GP 8.00 Kollayil

22 2012-13 Construction of an OP Block for the Kunnathukal Primary Health Centre in the Kunnathukal GPT 10.00 Kunnathukal

23 2012-13 Purchase and installation of 2 computers for the MSC LPS Cheriyakolla, Kudayal PO in nthe Kunnathukal Gpt 0.50 Kunnathukal

24 2012-13 Launching a Mini Water Supply Scheme at Venkavila New Housing Colonyin the Kunnathukal Gpt (SC Work) 4.00 Kunnathukal

25 2011 - 12 Providing 2 Computers to the LMS L.P.S, Chemboor, Ottasekharamangalam. 0.50 Ottasekharamangalam

26 2011-12 Construction of a building for the Cultural Centre on the 2nd Floor of the Anganwadi building at Alachalkonam in the Ottasekharamangalam Gram Panchayat (SC Wok)

9.00 Ottasekharamangalam

27 2012-13 Setting up of a High Mast Lighting System at the Mandapathinkadavu Junction in the Ottasekharamangalam G P 4.50 Ottasekharamangalam

Page 21: MP's Three Year Report of Progress 2012

MP’s THREE YEAR REPORT OF PROGRESS - INITIATIVES FOR DEVELOPMENT AND WELFARE OF CONSTITUENTS MAY 2009 – DECEMBER 2012

28 2011 - 12 Concreting of Kuttara Stadium Kakkadu road in Ottasekharamangalam Pt. 5.00 Ottasekhramangalam

29 2011 - 12 Construction of Market shed in Puthenkada, Parassala. 5.00 Paassala

30 2009 -10 M and T of Padanthalumoodu Devarkulam rd in Parasala 4.00 Parassala

31 2010 -11 Metalling and tarring of mukkukada chirakulam road parassala 5.00 Parassala

32 2010 -11 Anamundaikal madhavassery harijan colony road metalling(SC) 5.00 Parassala

33 2010 -11 Thekkumkara madhavassery harijan colony road metalling and tarring(SC) 5.00 Parassala

34 2011 - 12 Construction of Manalivila-Vannyacode Bridge at Vannyacode, Parassala 5.00 Parassala

35 2011 - 12 Construction of a building for an Anganwadi (No.159) in the Parassala Grama Panchayat. 5.00 Parassala

36 2011-12 Metalling and tarring of the Kuzhivila-Vettukad- Manivila Road in the Nediyamkod ward of the Parassala Panchayat (SC Work) 5.00 Parassala

37 2012-13 Construction of a building for the Govt. LP School, Inchivila 6.00 Parassala

38 2012-13 Concreting of the Peruvila CSI Church-Pallivila Vandichira footpath in the Peruvila ward of the Parassala Panchayat 3.00 Parassala

39 2009 -10 Otichal SC colony Footpath Concrete with Drainage construction 10.00 Perumkadavila

40 2010 -11 Tarring and Side wall constn of Thathiyoor Aruvikkara Sree Bhagavathy Temple Road in Perumkadavilla 5.00 Perumkadavila

41 2011 - 12 Construction of a building for a P H Sub Centre in the Thrippalavur Ward of the Perunkadavila Grama Panchayat. 5.00 Perumkadavila

42 2011 - 12 Construction of a building for Marayamuttam Govt. H.S.S, Marayamuttam, Perumkadavila Panchayat 13.00 Perumkadavila

43 2011 - 12 Construction of building for a Cultural Centre on the 10 Cents of land available in the IHDP Colony, Perunkadavila ( SC Work) 18.00 Perumkadavila

44 2012-13 Construction of an Anganwadi Building in the Pazhamala ward of Perumkadavila G P 4.75 Perumkadavila

45 2012-13 Setting up of a High Mast Light at Perumkadavila Jn. 4.50 Perumkadavila

46 2009 -10 Construction of side wall and concreting of Pathway Vadakara Bhagavathy Temple rd in vadakara ward 5.00 Perunkadavila

47 2009 -10 Construction of Vellarada Karimaram Colony Anganawdi Building 4.00 Vellarada

48 2009 -10 Njankuzhi Pockali Ramp Construction in Vellarada gpt 8.00 Vellarada

49 2011-12 Side wall construction and concreting of footpath in the Kakkathookki ward of Vellarada Panchayat (SC Work) 3.00 Vellarada

50 2012-13 Construction of a building for a mini Community Hall at Kallimood Jn. in the Vellarada GP 9.00 Vellarada

51 2012-13 Purchase and installation of 2 computers for the for the Jayamatha UPS Manoor, Dalumugham in the Vellarada Gpt 0.50 Vellarada

52 2012-13 Mini Water Supply Scheme for the Orukuzhy area in the Meethi Ward of the Vellarada Grama Panchayat 1.50 Vellarada

Page 22: MP's Three Year Report of Progress 2012

MP’s THREE YEAR REPORT OF PROGRESS - INITIATIVES FOR DEVELOPMENT AND WELFARE OF CONSTITUENTS MAY 2009 – DECEMBER 2012

53 2012-13 Concreting of the footpath to the Malayankavu Harijancolony on the Krishnapuram Ward of the Vellarada Grama Panchayatco (SC Work)

4.00 Vellarada

54 2010 -11 Construction of Alikkode - Kaithottumoola Edathara Road 5.00 Vellarada

THIRUVANANTHAPURAM ASSEMBLY CONSTITUENCY

Sl No Year Name of Work Allotted amount

(Rs.in lakhs)

Panchayat/Corpn ward/Municipality

1 2012-13 Construction of a road from the Kannamthura St. Peter's Church towards Shankumukham in the Shankumukham ward of the Tvpm Corpn.

3.00 Shankumukham

3 2012-13 Construction of a dressing room and providing truss-work roofing for the stage platform at Barton Hill in the Kunnukuzhy ward of the Tvpm Corporation (SC Work)

5.00 Kunnukuzhy

2 2011 - 12 Setting up of High Mast light at PMG Junction ,Thiruvananthapuram 4.50 Palayam

4 2011 - 12 Supply of 20 Computers for the Computer Lab in the St. Joseph Higher Secondary School, Tvpm 5.00 Palayam

5 2012-13

Purchase of a vehicle for the Cornea Retrieval Unit under the Community Outreach Services of the Regional Institute of Ophthalmology (Govt. Ophthalmic Hospital), Thiruvananthapuram

4.10 Palayam

6

Purchase and fabrication of a Van and supply of equipments for the Mobile Medical Unit to be operated under the District Progamme Manager, NRHM, Thiruvananthapuam

20.00 Palayam

7 2012-13 Setting up of a High Mast Lighting System at Poonthura Jn. in front of the Sree Sastha Temple in the Manikyavilakom ward of the Tvpm Corpn’

4.50 Poonthura

8 2010 -11 Construction of compound wall at C V smaraka Grandhasala 0.60 Thycaud

9 2012-13 Purchase and installation of 2 Computers for the St. Antony High School, in Valiyathura 0.50 Valiyathura

10 2012-13 Setting up of a High Mast Lighting System at Beemapalli Pathekkar Jn. in the Beemapalli Ward of the Thiruvananthapuam Corpn’

4.50 Beemapally

11 2011 - 12 Setting up of a High Mast Light at Killipalam, 4.2 Karamana

12 2011 - 12 Construction of building at Poonthura St. Thomas School, Poonthura 15.00 Poonthura

13 2011 - 12 Construction of overhead Water Tank, Santhi Nagar 10.00 Thampanoor

14 2012-13 Purchase of a High Tech Ambulance for the Janasree Sustinable Development Mission, Tvpm Dist. Office 13.00 Thampanoor

15 2012-13 Supply of 10 computers and a UPS System of required capacity with batteries for the Govt. Aided St. Roch's Convent School in the Valiyathura ward of the Tvpm Corporation.

3.50 Valiyathura

16 2012-13 Setting up of a High Mast Light in the Vanchiyoor Jn. 4.50 Vanchiyoor

17 2012-13 Supply of 5 computers and a UPS System of required capacity with batteries for the Sree Sharadadevi Sishuvihar Upper Primary School, Vazhuthacaud

1.75 Vazhuthacaud

Page 23: MP's Three Year Report of Progress 2012

MP’s THREE YEAR REPORT OF PROGRESS - INITIATIVES FOR DEVELOPMENT AND WELFARE OF CONSTITUENTS MAY 2009 – DECEMBER 2012

18 2012-13 Construction of a stage platform with tress-work roofing for Govt. UP GS (Verakupura kotta School, Fort, Tvpm) 5.00 Fort

19 2011 - 12 Construction of casualty new block building at Govt. Ayurveda college,TVPM 16.75 Vanchiyoor

VATTIYOORKAVU ASSEMBLY CONSTITUENCY

Sl No Year Name of Work Allotted amount

(Rs.in lakhs)

Panchayat/Corpn ward/Municipality

1 2012-13 Construction of a gallery and a front arch in the Kanjirampara VKP Nagar Harijan Colony, Vattiyoorkavu (SCWork) 6.00 Kanjirampara

2 2012-13 Construction of a Mini Community Hall in the Kannammoola ward in the Trivandrum Corpn 7.00 Kannamoola

3 2010-11

Construction of Class Rooms (Patana Kalari) on the first floor of the existing building in the premises of the Guru Gopinath Nadana Gramam in the Kodunganoor ward of the Thiruvananthapuram Corporation’

15.00 Kodunganoor

4 2010 -11 Providing drinking water facility at vrindavan gardens 2.86 Kowdiar

5 2009 -10 Construction of Comfort station at Concordiya UPS Mannamoola 1.15 Mannamoola

6 2012-13 Setting up of a High Mast Lighting System at the Nandancod Jn of the of the Nandancod ward of the Copn 4.50 Nandancod

7 2012-13 Construction of a Waiting Shed opposite the Peroorkada Bapuji Grandhashala at Peroorkada Jn. 1.50 Pathirapally

8 2012-13 Construction of a Waiting Shed at the Maruthamkuzhi Thiruvananthapuram. 1.50 PTP Nagar

9 2012-13 Construction of a drainage channel and metalling and tarring of the Jann villa lane in the Sasthamangalam Ward of the Corporation

6.00 Sasthamangalam

10 2012-13 Setting up of a Day Shelter for the aged and 2 slides for children inside the Soorya garden Public Park at Sasthamangalam 3.00 Sasthamangalam

11 2012-13 Mettalling, tarring and construction of a drainage facility for the Vettikonam-Kuzhivila Road in the Thuruthummoola ward of the Tvpm Corporation

5.00 Thuruthummoola

12 2009 -10 Const of sidewall at Vayalikkada Kadayil Mudambu Thodu Chembukonam ward in Vattiyoorkavu gpt 4.00 Vazhottukonam

13 2010 -11 Construction of Nilamel Karimankulam Devikshethram Bund cum Road 5.00 Vattiyoorkavu

14 2012-13 Setting up of a high Mast Lighting System at the SAP Camp Junction at Peroorkada 4.50 Kawadiyar

15 2012-13 Construction of a small bridge across the Choozhampala-Anchumukku Canal in the Kinavoor ward, Nalanchira of the Tvpm Corp.

8.50 Kinavoor

16 2012-13 Metalling & Tarring of the Pulikuzhivila Jn. -Sivaji Lane-Elakkara-Kodunganoor Leksham Veedu-Kodunganoor Devi Temple Bund road - SC Work

7.00 Koduganoor

17 2012-13 Metalling and tarring of the Kulasekharam-Plavode Kalagramam Road in the Kodunganoor ward of the Corp 7.00 Kodunganoor

18 2012-13 Supply of two computers to the Kulasekharm Govt. LP School 0.50 Kulasekharam

19 2009 -10 Construction of Children’s park at pandit colony pond Kuravankonam 10.75 Kuravanconam

Page 24: MP's Three Year Report of Progress 2012

MP’s THREE YEAR REPORT OF PROGRESS - INITIATIVES FOR DEVELOPMENT AND WELFARE OF CONSTITUENTS MAY 2009 – DECEMBER 2012

20 2011 - 12 Setting up of a High Mast Light at Devaswom Board Jn(11-12), 4.20 Kuravanconam

21 2012-13 Construction of a Computer Room and purchase of computers for LFMSCLP School, Vettikonam, Manikandeswaram 5.00 Manikandeswaram

22 2012-13 Construction of a canteen building at the Armed Reserve Police camp at Nandavanam in the Palayam Ward of the Tvpm Corporation

10.00 Palayam

23 2012-13 Laying of Slabs over the Erappukuzhy thodu for 100 m from the Laksham Veedu Colony Bridge towards Oottukuzhy in the Pathirippally ward of the Tvpm Corpoation’

5.00 Pathirippalli

24 2011 - 12 Construction of Waiting Room for the patients of the Govt. Hospital, Peroorkada 20.00 Peroorkada

25 2011 - 12 Construction of a Library Building for Bappuji Grandha Shala at Peroorkada 14.50 Peroorkada

26 2012-13 Metalling & tarring of the road in the NPP Nagar, Peroorkada 4.00 Peroorkada

27 2012-13 Setting up of a High Mast Lighting System at the Thoppumukku Junction, Vattiyoorkavu 4.50 Vattiyoorkavu

28 2011 - 12 Bridge construction at Vayalikada Kadayilmudumbu Road 20.50 Vazhottukonam

29 2011 - 12 Setting up of High Mast Light at Vellaikadavu, Vattiyoorkavu 4.2 Vazhottukonam

30 2012-13 Setting up of High Mast Lighting system at Paruthipara Jn. 4.50 Kesavadasapuram

CONTACT NEW DELHI THIRUVANANTHAPURAM

OFFICE RESIDENCE CONSTITUENCY OFFICE RESIDENCE

C-126, Shastri Bhavan New Delhi-110001 : +91-11- 2338-4073, 2338-6163

97 Lodhi Estate New Delhi 110003 India : +91-11-2464-4035

TC 26/1592 Pulimoodu, Govt Press Road Thiruvananthapuram 695 001, Kerala : +91-471-2324-555

Apt GJ, Condor Marigold Bhakthy Vilasam Rd Vazhuthacaud Thiruvananthapuram 695014 Kerala,India : +91-471- 2324-555

Email [email protected]

Twitter http://twitter.com/ShashiTharoor

Web www.tharoor.in

Page 25: MP's Three Year Report of Progress 2012

MP’s THREE YEAR REPORT OF PROGRESS - INITIATIVES FOR DEVELOPMENT AND WELFARE OF CONSTITUENTS MAY 2009 – DECEMBER 2012

THANKS...