Page 1: MOULD ASSESSMENT REPORT - Amazon S3scope of work, remediation management and quality assurance as per CSA 82-04 mould guidelines for large scale mechanical rooms. There were evident

Project No. 12620

Prepared for:

PEI Dept. Transportation & Infrastructure Renewal

P.O. Box 2000 Charlottetown, PE

C1A 7N7

March 24, 2011

Mould & Moisture Assessment Colonel Gray High School

92 Queen Street, Suite 201 Charlottetown, PE C1A 4B1 www.alltechenvironmental.com

Page 2: MOULD ASSESSMENT REPORT - Amazon S3scope of work, remediation management and quality assurance as per CSA 82-04 mould guidelines for large scale mechanical rooms. There were evident

EXECUTIVE SUMMARY

ALL-TECH Environmental Services Limited was retained by the PEI Department of Transportation & Infrastructure Renewal (TIR) to conduct a mould assessment at Colonel Gray High School located at 175 Spring Park Road in Charlottetown, Prince Edward Island.

The assessment was carried out on January 31, and February 1, 2011 to evaluate building components for potential water intrusion and the possibility of hidden mould contamination as well as signs of visible mould within the school. The findings were then used to provide recommendations for appropriate remedial actions and/or to recommend further investigative strategies, if necessary. Based on the assessment findings, the following conclusions and recommendations have been summarized: Conclusions & Recommendations Results of our mould assessment conducted on January 31 and February 1, 2011 indicate that overall, the extent of visible and potential mould growth throughout the school is relatively minor in each location identified (i.e. <10ft2 of visible/anticipated mould growth). However, in spaces where occupancy is limited (i.e. basement; fan room) there were larger scale mould issues. All of these locations have been noted in Table II. It appears that the conditions noted for the basement are primarily the result of water intrusion through the building envelope (foundation) which, if left unattended, may result in more extensive water damage and further mould contamination in the future. Further assessment into identifying the source(s) of water infiltration into the basement level is the key quality assurance to avoid additional structural damage and mould amplification. Although no significant impact is anticipated for the remainder of the school, the basement level should not be used for occupancy or storage of books or the like. Access should be limited by all and restricted to people with asthma, allergies or compromised immune systems. Visible mould was reported on mechanical air handling duct insulation in several areas throughout fan room. These materials should be considered suspect asbestos containing materials (ACM). Have materials tested for asbestos prior to disturbance work. Remediation work should be completed after hours. Air handling units should be shut off, critical openings and materials sealed/protected. Consult with Health & Safety professional for development of scope of work, remediation management and quality assurance as per CSA 82-04 mould guidelines for large scale mechanical rooms. There were evident signs of water stains on several ceiling tiles throughout the school as noted in Table III. There were only two areas identified with visible mould on the ceiling tiles as noted in table II. All ceiling tiles exhibiting evidence of water damage are recommended to be removed and replaced as a precautionary measure and to assist in detecting further water leaks. Removal of mould affected ceiling tiles should be completed using Level 1 precautions. Leaks noted on ceiling tiles were mainly related to mechanical issues with leaking pipes and condensation. No water intrusion issues were reported from roof leaks. Inspection above stained ceiling tile at end of corridor 1050 revealed debris that is suspect

Page 3: MOULD ASSESSMENT REPORT - Amazon S3scope of work, remediation management and quality assurance as per CSA 82-04 mould guidelines for large scale mechanical rooms. There were evident

ACM. Therefore, treat debris as ACM unless material has been tested and analyzed. Have materials removed by certified asbestos abatement workers. Areas noted with elevated moisture and / or minor visible mould around windows that require further investigation are summarized in Table III. Areas noted with visible mould on mechanical pipe insulation have been noted in Table II. It is recommended to have suspect materials tested prior to any disturbance work and to follow the applicable provincial asbestos regulations. Levels of remediation for any noted mould affected areas have been summarized in Table II based on the surface area. All work should be performed by workers who are properly trained in the hazards of mould remediation. The removal of water-damaged building materials and mould-contaminated building materials should be completed following Level 1, 2, and 3 mould remediation procedures as outlined the CCA Mould Guidelines for the Canadian Construction Industry, 2004, or equivalent. As a minimum, it is recommended that an independent inspection be conducted after remediation and repairs to verify adequate completion. Part of this inspection may include microbial air sampling to assist in the evaluation and aid in confirming appropriate conditions. If you have any questions concerning this report, please contact the undersigned directly.

Larry G. Koughan, CET, CRSP Branch Manager / Senior Project Consultant

Page 4: MOULD ASSESSMENT REPORT - Amazon S3scope of work, remediation management and quality assurance as per CSA 82-04 mould guidelines for large scale mechanical rooms. There were evident

TABLE OF CONTENTS

1.0 INTRODUCTION .................................................................................................. 2

2.0 BACKGROUND ................................................................................................... 2

3.0 MOULD IN INDOOR ENVIRONMENTS ............................................................... 3

4.0 MOULD ASSESSMENT & REMEDIATION GUIDELINES .................................. 3

5.0 MOULD ASSESSMENT METHODOLOGY ......................................................... 5 5.1 Visual Assessment & Moisture Content Readings ................................. 6

6.0 OBSERVATIONS & FINDINGS ........................................................................... 7

7.0 CONCLUSIONS & RECOMMENDATIONS ......................................................... 8

8.0 LIMITATIONS ....................................................................................................... 9

REFERENCES

Appendix I - Site Floor Plan

Appendix II - School Background Mould Investigation Form

Page 5: MOULD ASSESSMENT REPORT - Amazon S3scope of work, remediation management and quality assurance as per CSA 82-04 mould guidelines for large scale mechanical rooms. There were evident

Mould & Moisture Assessment Report Colonel Gray High School Page 2

1.0 INTRODUCTION ALL-TECH Environmental Services Limited was retained by the PEI Department of Transportation & Infrastructure Renewal (TIR) to conduct a mould assessment at Colonel Gray High School located at 175 Spring Park Road in Charlottetown, Prince Edward Island.

The assessment was carried out on January 31, and February 1, 2011 to evaluate building components for potential water intrusion and the possibility of hidden mould contamination as well as signs of visible mould within the school. The findings were then used to provide recommendations for appropriate remedial actions and/or to recommend further investigative strategies, if necessary. 2.0 BACKGROUND

Constructed buildings must attain many goals to meet its intended purpose. The building must provide a comfortable, healthy environment for its occupants, it must be structurally sound, it must keep out elements such as rain, wind, snow, cold and heat, and it must provide these functions over an extended period of time. All of these functions are affected by moisture in one way or another. Uncontrolled moisture in buildings can cause adverse health effects to its occupants due to the growth of microorganisms, such as mould. Uncontrolled moisture can reduce the life span of buildings through premature degradation of building components. The building structure itself can become unsound due to uncontrolled moisture causing structural damage to wood and steel. In summary, uncontrolled moisture will virtually negate the goals of building designs. According to ASTM Practices for Increasing Durability of Building Constructions Against Water-Induced Damage (E241), except for structural errors, about 90 percent of all building construction problems are associated with water in some way. However, it will be impossible to completely eliminate moisture from buildings. In fact, moisture is necessary to prevent wood products from drying out and to alleviate upper respiratory discomfort, up to a point. The issue then is not to eliminate moisture from buildings but to properly control moisture as it cycles through the building. Indoor and outdoor environments naturally harbour a great variety of microscopic organisms such as mould. Prolonged exposure to excessive moisture enables microbes to flourish. If conditions are such that moisture is limited, then these microbes have a stable relationship with the built environment. However, when moisture accumulates more rapidly than the natural drying process, the ecology changes and favours the rapid amplification of mould.[1]

When dealing with mould/water damaged materials, the remediation will usually involve the removal of some building materials (i.e. drywall, wood, etc.).

Page 6: MOULD ASSESSMENT REPORT - Amazon S3scope of work, remediation management and quality assurance as per CSA 82-04 mould guidelines for large scale mechanical rooms. There were evident

Mould & Moisture Assessment Report Colonel Gray High School Page 3

3.0 MOULD IN INDOOR ENVIRONMENTS Mould is a naturally occurring and essential part of our environment as they act as decomposers, breaking down dead organic material (such as leaves, wood and other plant debris) which they use as a food source. Mould spores are brought into indoor environments through ventilation systems, open windows or doors, or tracked in on footwear. Therefore, mould is found in almost every indoor environment and a normal background population of mould spores on indoor surfaces and within indoor air should be expected. If conditions exist that allow mould to grow indoors, concentrations will increase to levels that are typically not found in buildings. Indoor mould growth occurs primarily as a result of water damage to cellulose-containing building materials and/or furnishings (such as wood, drywall, wallpaper, ceiling tiles, etc.) during catastrophic or chronic events such as leaks, floods, condensation (associated with high humidity or cold spots), improper design or operation of humidification systems, and building envelope failures. Under these conditions, mould growth may present a risk to the building structure itself (through decomposition of building materials) as well as to occupants in the building (through potentially adverse health effects). 4.0 MOULD ASSESSMENT & REMEDIATION GUIDELINES Regardless of the type or severity of health effects that may be caused by exposure to mould, mould growth inside a building should be considered unacceptable from a building operations and maintenance standpoint as well as from a health risk standpoint. Several government agencies and special interest groups have developed guidelines for the proper assessment and remediation of mould-contaminated buildings. In Canada, recent guidelines have been published by the Canadian Construction Association (CCA) entitled “Mould Guidelines for the Canadian Construction Industry” (March 2004)2. The above guidelines are similar in nature and incorporate elements common to several other guidelines issued by groups such as Health Canada4, the Manitoba Department of Labour7, the New York City Department of Health8, the Institute of Inspection, Cleaning and Restoration Certification (IICRC)6, and the U.S. Environmental Protection Agency (EPA)10. Common to all is the need to remediate contaminated building materials under controlled conditions, with the extent of safety measures employed based partially on the extent of contamination. In general, more stringent remediation methods, engineering controls and worker protection is required the more extensive the mould contamination. These requirements have generally been distinguished in the guidelines by employing different Levels of Remediation (e.g., Level 1, 2 or 3).

Page 7: MOULD ASSESSMENT REPORT - Amazon S3scope of work, remediation management and quality assurance as per CSA 82-04 mould guidelines for large scale mechanical rooms. There were evident

Mould & Moisture Assessment Report Colonel Gray High School Page 4

ALL-TECH recognizes and follows the practices and procedures outlined in the most current mould remediation guidelines available. General recommendations for remediation procedures, engineering controls and work practices that are common to several of the above-mentioned guidelines and used by ALL-TECH are summarized below in Table I.

TABLE I Summary of Mould Remediation Requirements by Level of Remediation

Level of

Remediation Level 1 Level 2 Level 3

Estimated Area of Mould Growth

<10 ft2 (<1 m2) 10-100 ft2 (1-10 m2) >100 ft2 (>10 m2)

Level of Containment

Polyethylene drop sheet Polyethylene enclosure

Polyethylene enclosure and two-chambered worker/waste decontamination facilities

Engineering Controls

Turn off HVAC system and seal over openings, use dust

suppression methods

Isolate/seal the HVAC system, use dust

suppression methods, maintain negative

pressure through use of HEPA vacuum or HEPA-filtered negative air unit

Isolate/seal the HVAC system, use dust suppression methods, maintain negative pressure (that

is to be continually measured and recorded) through use of HEPA-filtered negative air unit

Worker Protection

Dust impermeable gloves, half-face air purifying respirator (N95 minimum), full

body dust-impervious coveralls

Dust impermeable gloves, half-face air purifying

respirator (100 Series), full body dust-impervious

coveralls and boot covers or separate work boots

Dust impermeable gloves, full-face PAPRs or full face non-

powered air purifying respirator (100 Series), full body dust-

impervious coveralls and boot covers or separate work boots

Clean Up Procedures

Double-bag waste in 6-mil polyethylene

bags, HEPA-vacuum and/or wet wipe

exposed surfaces with a detergent

solution

Double-bag waste in 6-mil polyethylene bags, HEPA-

vacuum and wet wipe exposed surfaces with a

detergent solution

Bag waste in 6-mil polyethylene bag within work area and then within double bagging room of waste decontamination facility, HEPA-vacuum and wet wipe

exposed surfaces with a detergent solution

Project Quality Assurance

Project authority should consider

whether removal of occupants adjacent to

the work area is necessary.

Project authority should consider whether removal of occupants adjacent to

the work area is necessary. Consult with qualified Health & Safety

professional prior to remediation work and for monitoring of compliance

with guidelines. A competent supervisor to

be present during all contaminated work and a competent person should inspect the work area for enclosure defects on a

regular basis.

Project should be conducted following a site-specific work plan or specification. Project authority should consider whether removal

of occupants adjacent to the work area is necessary. Consult

with qualified Health & Safety professional prior to remediation

work and for monitoring of compliance with guidelines. A

competent supervisor to be present during all contaminated work and a competent person

should inspect the work area for enclosure defects on a regular

basis. Project authority or representative should

periodically inspect work activities and inspect the work area for acceptable completion via visual inspection and have clearance testing (air and/or

surface sampling) conducted.

Page 8: MOULD ASSESSMENT REPORT - Amazon S3scope of work, remediation management and quality assurance as per CSA 82-04 mould guidelines for large scale mechanical rooms. There were evident

Mould & Moisture Assessment Report Colonel Gray High School Page 5

It should be noted that the remediation procedures summarized in Table I are not meant to be comprehensive. The summary is general in nature only, as specific recommended requirements vary slightly from guideline to guideline. Each applicable guideline should be consulted for a full description of their recommended remedial procedures. In addition, the procedures outlined above may not necessarily reflect procedures to be employed on every project, as specific procedures to be followed should be determined on a project by project basis, based on professional judgment. The general procedures outlined above also do not account for specific conditions that may be encountered, such as remediation in locations where immuno-compromised or other susceptible occupants may be present (e.g., hospitals or other health care facilities) or remediation of biohazards other than mould that may be present due to sewer backups, environmental floods or bird and bat droppings. Under these conditions, additional precautions may apply. There are no specific regulations in P.E.I. addressing mould contamination. However, according to Health Canada and the Canadian Construction Association (CCA) guidelines on assessment and remediation of fungi in indoor environments, building materials supporting mould growth should be remediated as rapidly as possible in order to ensure a healthy environment. Remediation of mould growth is based on an approximation of the extent of visible mould growth including the estimated extent of any hidden mould growth.

5.0 MOULD ASSESSMENT METHODOLOGY Our assessment determination of the presence of mould growth and the extent included initial discussions with administration and / or safety chair about concerns and specific issues. A school background mould investigation form was sent to the school to complete and review with the on-site assessor. A site floor plan was provided for the school to visually assess each room as it related to the drawing. In order to assess the potential for and extent of mould growth (if any), our assessment consisted of a visual inspection of accessible areas and moisture content readings of representative building materials. If visible mould is observed, it is documented and noted based on the location and extent. If conditions are observed as extensive and categorized as high risk, than the Department of Education and TIR would be consulted for immediate action. In areas noted with cracked surfaces, blistering, water stains, etc., moisture content readings are taken from these surfaces to evaluate if conditions are conducive to potential hidden mould sources. In areas where no elevated moisture readings are encountered they are noted but no further action is reported. In areas where elevated moisture is present and there is no access, further investigation is required and intrusive testing of wall cavities is carried out.

Page 9: MOULD ASSESSMENT REPORT - Amazon S3scope of work, remediation management and quality assurance as per CSA 82-04 mould guidelines for large scale mechanical rooms. There were evident

Mould & Moisture Assessment Report Colonel Gray High School Page 6

5.1 Visual Assessment & Moisture Content Readings The focus of our visual assessment was to identify and quantify locations within the areas assessed that may be affected by water damage and/or mould growth. Evidence of water damage may include water staining and/or discolouration to building material surfaces and deterioration to building surface components (such as cracking or peeling paint or plaster, delamination of wallpaper, efflorescence to plaster and concrete surfaces, etc.). Degraded building materials (such as soft or crumbling drywall and plaster) also provide an indication of potential chronic water infiltration. Mould growth was visually identified as spotty discolouration to surfaces or as a mass of fuzzy discolouration, depending on the extent of growth. The colour of mould growth will vary depending on the mould species present and the material that it is growing on. It is commonly found to be black, grayish, white, brown or green. Differentiation between mould growth and other staining or discolouration was made based on past experience and/or by confirmation of mould growth on similar surfaces through surface sampling. Special attention was paid to building materials and furnishings that are typically conducive to mould growth due to their cellulose content. This included materials such as drywall, cardboard, lay-in ceiling tiles, carpeting, wallpaper, wood framing, plywood, particleboard, oriented strand board (OSB), etc., if present. Our visual assessment was non-destructive in nature as classrooms were occupied at the time of the assessment. If locations were encountered where there was visual evidence of water damage and/or elevated moisture content readings, then the potential for “hidden” mould growth could exist between building elements, underneath the surface of the affected material or within wall/ceiling cavities, etc. In this case, further investigation would be required and intrusive investigation would follow to open up areas to inspect them. In order to determine the moisture content of building materials present within the areas assessed, moisture content (MC) readings were taken using a Drieaz non-penetrating moisture meter. This unit is able to detect moisture content within wood, drywall and plaster/brick surfaces. Measurements are reported in the range of 0 - 100% as an investigative tool. Values less than 30% are relative readings. From 30 – 70% indicates above normal moisture and greater than 70% indicates saturation of a material and further investigation. Results of MC readings were used in conjunction with our visual assessment results to further define the extent of water damage. Elevated readings indicate recent or chronic water damage. In addition, elevated MC readings indicate the potential for hidden mould growth on the unexposed side of the material being measured. It should be noted that even if normal MC readings are obtained, areas that have been subjected to water damage in the past and have since dried out may have hidden mould growth.

Page 10: MOULD ASSESSMENT REPORT - Amazon S3scope of work, remediation management and quality assurance as per CSA 82-04 mould guidelines for large scale mechanical rooms. There were evident

Mould & Moisture Assessment Report Colonel Gray High School Page 7

Under these conditions, further assessment activities (such as intrusive investigation) would have to be performed to rule out the presence of mould growth. 6.0 OBSERVATIONS & FINDINGS

Results of our mould and moisture assessment are summarized in Tables II and III. Areas with visible or concealed mould are noted and an estimated Level of Remediation has been provided based on our findings. Room numbers identified correspond to Site Floor Plans (Appendix 1) and not necessarily on site room numbers.

Table II Summary of Visible Mould affected areas

Room No. / Description

Comments / Observations Level of Remediation

Rms 1022; 1171

Visible mould on ceiling tile. No elevated moisture detected at the time of the assessment.

Level 1 <10 ft2 (<1 m2)

(discard and replace)

Rms MPC-1; 0017; 0018; 1009

Visible mould on mechanical pipe insulation.

Have suspect materials tested for asbestos and treated accordingly.

Level 1 Mould Remediation <10 ft2 (<1 m2).

(removal of affected areas)

Rm 226 (storage rm - Physics

lab)

Visible mould (minor) on wood bracket

Level 1 (Removal and replacement of

affected materials)

Basement areas

Visible mould on concrete walls, pipe insulation and contents.

High moisture readings throughout rooms.

Due to area affected by mould growth, the volume of stored items and amount of moisture present.

The basement area shall be classified as a Level 3 mould

remediation.

Fan Room Second Floor

Visible mould on mechanical air handling duct insulation noted in

several areas throughout fan room. Materials considered suspect ACM. Have materials

tested for asbestos prior to disturbance work.

Remediation work should be completed after hours. Air handling

units would be shut off, critical openings and materials

sealed/protected. Consult with Health & Safety

professional for development of scope of work, remediation

management and quality assurance as per CSA 82-04 mould guidelines for large scale mechanical rooms.

Page 11: MOULD ASSESSMENT REPORT - Amazon S3scope of work, remediation management and quality assurance as per CSA 82-04 mould guidelines for large scale mechanical rooms. There were evident

Mould & Moisture Assessment Report Colonel Gray High School Page 8

Table III Summary of Moisture affected areas

Room No. / Description Comments / Observations Action required

Rms 153; 0021; 1006; 1020; 1022; 1041; 1049; 1050; 1054; 1055; 1061; 1062; 1064; 1065; 1071; 1082; 1097; 1102; 1106; 1109; 1111; 1117; 1118; 1120; 1124; 1150; 1161; 1162; 1171; 1186; 1189;

1197; 2002; 2005; 2079; 2086; 2092

Stained ceiling tiles observed and reported throughout the

building on both levels (see site floor plan - Appendix I for

location markings).

Replace ceiling tiles as precautionary measure and to assist in detecting further water

leaks. Some leaks were reported at the time of assessment.

Rms 1071; 1155,1202

Visible damage to window structure. Visible mould

(minor). Elevated moisture detected on wood and floor under carpet.

Further investigation required into addressing water infiltration and

potential hidden mould; Level 1 (<10 ft2 (<1 m2) clean up of

mould affected areas

Rm 1195 women’s washroom

Significant visible water damage on ceiling.

Further investigation required into addressing water infiltration and

potential hidden mould

7.0 CONCLUSIONS & RECOMMENDATIONS Results of our mould assessment conducted on January 31 and February 1, 2011 indicate that overall, the extent of visible and potential mould growth throughout the school is relatively minor in each location identified (i.e. <10ft2 of visible/anticipated mould growth). However, in spaces where occupancy is limited (i.e. basement; fan room) there were larger scale mould issues. All of these locations have been noted in Table II. It appears that the conditions noted for the basement are primarily the result of water intrusion through the building envelope (foundation) which, if left unattended, may result in more extensive water damage and further mould contamination in the future. Further assessment into identifying the source(s) of water infiltration into the basement level is the key quality assurance to avoid additional structural damage and mould amplification. Although no significant impact is anticipated for the remainder of the school, the basement level should not be used for occupancy or storage of books or the like. Access should be limited by all and restricted to people with asthma, allergies or compromised immune systems.

Page 12: MOULD ASSESSMENT REPORT - Amazon S3scope of work, remediation management and quality assurance as per CSA 82-04 mould guidelines for large scale mechanical rooms. There were evident

Mould & Moisture Assessment Report Colonel Gray High School Page 9

Visible mould was reported on mechanical air handling duct insulation in several areas throughout fan room. These materials should be considered suspect asbestos containing materials (ACM). Have materials tested for asbestos prior to disturbance work. Remediation work should be completed after hours. Air handling units should be shut off, critical openings and materials sealed/protected. Consult with Health & Safety professional for development of scope of work, remediation management and quality assurance as per CSA 82-04 mould guidelines for large scale mechanical rooms. There were evident signs of water stains on several ceiling tiles throughout the school as noted in Table III. There were only two areas identified with visible mould on the ceiling tiles as noted in table II. All ceiling tiles exhibiting evidence of water damage are recommended to be removed and replaced as a precautionary measure and to assist in detecting further water leaks. Removal of mould affected ceiling tiles should be completed using Level 1 precautions. Leaks noted on ceiling tiles were mainly related to mechanical issues with leaking pipes and condensation. No water intrusion issues were reported from roof leaks. Inspection above stained ceiling tile at end of corridor 1050 revealed debris that is suspect ACM. Therefore, treat debris as ACM unless material has been tested and analyzed. Have materials removed by certified asbestos abatement workers. Areas noted with elevated moisture and / or minor visible mould around windows that require further investigation are summarized in Table III. Areas noted with visible mould on mechanical pipe insulation have been noted in Table II. It is recommended to have suspect materials tested prior to any disturbance work and to follow the applicable provincial asbestos regulations. Levels of remediation for any noted mould affected areas have been summarized in Table II based on the surface area. All work should be performed by workers who are properly trained in the hazards of mould remediation. The removal of water-damaged building materials and mould-contaminated building materials should be completed following Level 1, 2, and 3 mould remediation procedures as outlined the CCA Mould Guidelines for the Canadian Construction Industry, 2004, or equivalent. As a minimum, it is recommended that an independent inspection be conducted after remediation and repairs to verify adequate completion. Part of this inspection may include microbial air sampling to assist in the evaluation and aid in confirming appropriate conditions. 8.0 LIMITATIONS The investigations, assessments and recommendations detailed in this report were carried out in a manner consistent with the level of care and skill normally exercised by reasonable members of the environmental and industrial hygiene consulting profession

Page 13: MOULD ASSESSMENT REPORT - Amazon S3scope of work, remediation management and quality assurance as per CSA 82-04 mould guidelines for large scale mechanical rooms. There were evident

Mould & Moisture Assessment Report Colonel Gray High School Page 10

currently practicing under similar conditions in the area. There are no other warranties, expressed or implied, that apply to the professional services provided under the terms of our assignment and included in this report. In preparing this report, ALL-TECH relied on information supplied by others. Except as expressly set out in this report, we have not made any independent verification of such information. The investigation, assessments and recommendations in this report have been made based on conditions observed at the time of the assessment and are limited to the areas investigated. Mould growth conditions can change with time and mould growth additional to that noted in this report may occur if water infiltration/humidity conditions persist or reoccur. Unaccounted mould growth may also be present in the areas assessed due to concealed or subsurface conditions that can vary from those encountered (if accessed).

The investigation, assessments and recommendations in this report have been made in the context of existing industry accepted guidelines which were in place at the date of this report. The investigation did not take account of any government regulations not in effect or not generally promulgated at the date of this report. This report is for the sole use of the person or entity to whom it is addressed. No other person or entity is entitled to use or rely upon this report.

Larry G. Koughan, CET, CRSP

Branch Manager

Page 14: MOULD ASSESSMENT REPORT - Amazon S3scope of work, remediation management and quality assurance as per CSA 82-04 mould guidelines for large scale mechanical rooms. There were evident

Mould & Moisture Assessment Report Colonel Gray High School Page 11

References: 1. American Industrial Hygiene Association: Report of Microbial Growth Task Force, ISBN 1-931504-26-

1. May 2001. 2. Canadian Construction Association: Mould Guidelines for the Canadian Construction Industry,

Standard Construction Document CCA 82. March 2004. 3. Environmental Abatement Council of Ontario: EACO Mould Abatement Guidelines. 2010. 4. Health Canada: Fungal Contamination in Public Buildings: A Guide to Recognition and Management.

June 1995. 5. Institute of Inspection, Cleaning and Restoration Certification: S500-2006, Standard and Reference

Guide for Professional Water Damage Restoration, 3rd Edition. 2006. 6. Institute of Inspection, Cleaning and Restoration Certification: S520-2008, Standard and Reference

Guide for Professional Mold Remediation. 2nd Edition. 2008. 7. Manitoba Department of Labour, Workplace Safety and Health Division: Guidelines for the

Investigation, Assessment, & Remediation of Mould in Workplaces. March 2001. 8. New York City Department of Health & Mental Hygiene, Bureau of Environmental & Occupational

Disease Epidemiology: Guidelines on Assessment and Remediation of Fungi in Indoor Environments. November 2008.

9. United States Environmental Protection Agency: Mould Remediation in Schools and Commercial Buildings, EPA 402-K-01-001. March 2001.

Page 15: MOULD ASSESSMENT REPORT - Amazon S3scope of work, remediation management and quality assurance as per CSA 82-04 mould guidelines for large scale mechanical rooms. There were evident

APPENDIX I Site Floor Plans

Page 16: MOULD ASSESSMENT REPORT - Amazon S3scope of work, remediation management and quality assurance as per CSA 82-04 mould guidelines for large scale mechanical rooms. There were evident

APPENDIX II School Background Mould Investigation Form

Page 17: MOULD ASSESSMENT REPORT - Amazon S3scope of work, remediation management and quality assurance as per CSA 82-04 mould guidelines for large scale mechanical rooms. There were evident
Page 18: MOULD ASSESSMENT REPORT - Amazon S3scope of work, remediation management and quality assurance as per CSA 82-04 mould guidelines for large scale mechanical rooms. There were evident

UP

UP UP

RAMP UPDN

DN

UP

DN

DN

DN

UP

UP

UP

DN

UP

DN

S.S.

1004

WAITING1007

W.R.

1011

PRINCIPAL

1005

RECEPTION

1010

VAULT1009

RECORDS

1008

VP 2

1012

VP 1

CORRIDOR 1006

VENDING

CORRIDOR 1003

1041

STORAGE

1043

MENS1044

WOMEN

1040

STOR.

1025

OFFICE

1031

STORAGE

1022

CAFETERIA

1030

KITCHEN

1029

STORAGE

STAIRS #3

1022

W.R.

1017

WOMEN

1019

MEN

1022

CAFETERIA

1100

FAN ROOM

1094

OFFICE 1095

OFFICE

PREP. 1101

1102

BIOLOGY

1092

ECOLOGY

1106

MATH 3

1109

MATH 2

1111

MATH 1

CORRIDOR 1088

1124

MATH 4

1089

CORRIDOR

1121

STOR.

1115

SERVICES

STUDENT

1117

OFFICE1118

OPTIONS

1120

OFFICE

1162

INTERVIEW

1140

FINISHING

1138

WOOD LAB

1127

STORAGE

1128

ART

1129

OFFICE

CORRIDOR 1150

1134

STORAGE

1135

LAB

CLEAN METAL

1146

OFFICE

1147

WR

1148

WR

1145

SEMINAR

1142

OFFICE

1143

OFFICE

1139

STORAGE

1136

METAL LAB

1137

POWER TOOLS

1155

COMM

GRAPHIC

COMPOUND

PR

OP

AN

E T

AN

KS

1153

TRACTOR

1151

POWER MECHANICS LAB

1154

COMPUTER

1149

JAN.

1156

FITNESS ROOM

1165

GYMNASIUM

CORRIDOR 1164

1177

W.R.

WOMEN

1173

INSTR.

1186

INST.

1186

W.R.

1189

HEALTH

1195

WOMEN

1193

MENS

1202

MUSIC

1207

PR

1206

PR

1205

PR

1203

OFFICE

1208

PR

1209

PR

1210

PR

CORRIDOR 1211

1216

PR

1215

PR 1214

PRACTICE

1213

STORAGE1212

PRACTICE

1218

LECTURE THEATRE

1221

VEST.

1065

CONFERENCE

1066

SEMINAR 1

1067

SEMINAR 2

1068

SEMINAR 3

1064

RESOURCE

1059

FANROOM

1062

COMPUTER

1061

OFFICE

1054

TPC

1082

BUSINESS

CORRIDOR 1051

1048

SEMINAR

BUSINESS

1055

OFFICE

BUSINESS

102

COMPUTER LAB

153

COMPUTER LAB

1204

LISTEN.

1201

CORRIDOR

1219

CONTROL

1197

CORRIDOR

1032

KIT.

RM.

HUB

1037

STOR.

GOWN

1050

CORRIDOR

1058B

CORRIDOR

1063

STORAGE

1091

CORRIDOR

1079

SCIENCE

SOCIAL

1049

TYPING

BUSINESS

1057

CORRIDOR

1049

TYPING

BUSINESS

1071

SCIENCE

SPECIAL

1069

JAN.

1060

STORAGE

WORKROOM/

CORRIDOR 1047

1049

TYP.

BUS.

1024

1

SEMIN.

1023

2

SEMIN.

1020

EDUCATION

SPECIAL

1021

CORR.

1002

CORRIDOR

1013

ROOM

COPY

1014

CONFERENCE

1116

CONFER.

1093

EARTH SCI.

1105

CB

CENTRE

WORK

1104

OFFICE

MATH

1103

CLASS

MATH

1097

15

SC. CLASS

1176

TEAM

WOMEN

1175

CHANGE

WOMEN

1171

LAUND.

1179

CHANGE

WOMEN

1180

TEAM

MENS

1174

VEST.

1175

VEST.

1184

CHANGE

MENS

1182

W.R.

MENS

1183

TEAM

MENS

1169

ROOM

CLEAT

1168

1

STORAGE

1167

2

STORAGE

1153A

ELECT.

150

CORRIDOR1

1141

TOOL STORAGE

1144

STOR.

1158

RM

DR

1159

RM

DR

1161

OFFICE

CO-OP

1133

BRUSH

AIR-

1130

STOR.

STUDENT

V:\SCHOOLS\110\Cas Fnd\110AFP01.dgn

Scale :

Drawn By :

Design By :

Date :

Drawing # :

of

Project No.:

1/1

0/2

011

ME

TRIC A

1 A

EC

1:1

7:2

8 P

M

V:\

Asset

Manage

ment\Bld

g C

adStn

d\P

EIP

W-C

AD\W

orkspace\Sta

ndards\P

enta

bles\G

enPlotC

FG.tbl

-

Drawing Title :

Project Title :

ABB CC

A = Detail #

BB = Sheet # ( Where Detail Required )

http://www.gov.pe.ca/ Canada C1A 7N8

Prince Edward Island

Charlottetown

PO Box 2000

CC = Sheet # ( Where Detailed )

C A N A D A

-

-

0000 A1 0

NOT FOR CONSTRUCTION

PRELIMINARY

Fax 902 569 0590

Tel 902 368 5100

Infrastructure Renewal

Transportation and

GENERAL NOTES

MAY AFFECT THE WORK.THEMSELVES FAMILIAR WITH CONDITIONS THAT SITE PRIOR TO SUBMITTING A TENDER & MAKE CONTRACTOR IS RESPONSIBLE TO VISIT THE CONFIRMED ON SITE BY THE CONTRACTOR.

1. ALL DIMENSIONS & SITE CONDITIONS ARE TO BE

Colonel Gray Senior High

Main Floor Plan

January 2011MAIN FLOOR

SCALE = 1:250

1:250

110

Larry
CT - visible mould
Larry
CT
Larry
CT
Larry
CT
Larry
CT
Larry
CT
Larry
CT
Larry
windows - visible water damage. Elevated moisture detected
Larry
windows - visible mould (minor). Elevated moisture detected
Larry
Visible water damage to ceiling. No elevated moisture detected
Larry
Rm MPC-1 CT - visible mould Pipe insulation visible mould
Larry
CT - affected ceiling tile area
Larry
CT
Larry
CT
Larry
CT
Larry
CT
Larry
CT
Larry
CT
Larry
CT
Larry
CT
Larry
CT
Larry
CT
Larry
CT
Larry
CT
Larry
CT
Larry
CT
Larry
CT
Larry
CT
Larry
CT
Larry
CT
Larry
CT - visible mould
Larry
CT
Larry
CT
Larry
CT
Larry
CT
Larry
CT
Larry
CT
Larry
CT
Larry
CT
Larry
CT
Larry
window - elevated moisture reading
Larry
CT - staining and moisture. Caution - suspect ACM above CT
Larry
Visible mould on pipe insulation above CT
Page 19: MOULD ASSESSMENT REPORT - Amazon S3scope of work, remediation management and quality assurance as per CSA 82-04 mould guidelines for large scale mechanical rooms. There were evident

WD

DN

DN

DN

CORRIDOR 1003

2034

MENS2038

WOMEN2010

WOMEN

2012

MEN

2081

OFFICE

CORRIDOR 2072

1089

CORRIDOR

2054

DRAMA

2057

SEMINAR

CORRIDOR 2045

2041

STORAGE

CORRIDOR 2030

2022

OFFICE

2022

STOR.

2021

KITCHEN

2020

TCP

2003

CL

2094

SCIENCE 13

2955

STOR.

2076

OFFICE

2085

EMPTY

2086

CHEMISTRY

2087

PREP.

2099

PHYSICS

STAGE

UPPER

2040

WALKWAY

2050

CORRIDOR

2058

CLASS

LANGUAGE

2065

CLASS 7

LANGUAGE

2048

CLASS 8

LANGUAGE

2046

CLASS 9

LANGUAGE

2056

WORK

STUDENT

2051

corridor

2044

corridor

2039

CLASS

LANGUAGE

2032

OFFICE

LANGUAGE

COURTYARD

EXTERIOR

2029

STOR.

2025

STOR.

A/V/

2026

COUNCIL

STUDENT

2027

STAFF

SUPPORT

2023

CARE

CHILD

2001

CORRIDOR

2002

TEXTILE

CLOTH/

2004

CHRM

2005

LAB

FOOD

2017

ROOM

STAFF

CORR. 2016

2102

CLASS B

FRENCH

2069

CLASS 1

FRENCH

2029

CLASS 2

FRENCH2092

SCIENCE 14

2089

SCIENCE 15

2078

LAB

LIST.

2079

CLASS

FRENCH

2080

LAB

LIST.

2088

SCIENCE

GENERAL

2082

LAB 16

SCIENCE

2075

CORRIDOR

2062

CLASS 5

LANGUAGE

2063

CLASS 6

LANGUAGE

V:\SCHOOLS\110\Cas Fnd\110AFP01.dgn

Scale :

Drawn By :

Design By :

Date :

Drawing # :

of

Project No.:

1/1

0/2

011

ME

TRIC A

1 A

EC

1:1

7:0

9 P

M

V:\

Asset

Manage

ment\Bld

g C

adStn

d\P

EIP

W-C

AD\W

orkspace\Sta

ndards\P

enta

bles\G

enPlotC

FG.tbl

-

Drawing Title :

Project Title :

ABB CC

A = Detail #

BB = Sheet # ( Where Detail Required )

http://www.gov.pe.ca/ Canada C1A 7N8

Prince Edward Island

Charlottetown

PO Box 2000

CC = Sheet # ( Where Detailed )

C A N A D A

-

-

0000 0

NOT FOR CONSTRUCTION

PRELIMINARY

Fax 902 569 0590

Tel 902 368 5100

Infrastructure Renewal

Transportation and

GENERAL NOTES

MAY AFFECT THE WORK.THEMSELVES FAMILIAR WITH CONDITIONS THAT SITE PRIOR TO SUBMITTING A TENDER & MAKE CONTRACTOR IS RESPONSIBLE TO VISIT THE CONFIRMED ON SITE BY THE CONTRACTOR.

1. ALL DIMENSIONS & SITE CONDITIONS ARE TO BE

Colonel Gray Senior High

January 2011

1:250

110 A2

Second Floor Plan

SECOND FLOOR

SCALE = 1:250

No access

226

Larry
CT
Larry
CT
Larry
CT
Larry
CT
Larry
CT
Larry
visible mould (minor) on lumber bracket
Larry
CT - affected ceiling tile area
Page 20: MOULD ASSESSMENT REPORT - Amazon S3scope of work, remediation management and quality assurance as per CSA 82-04 mould guidelines for large scale mechanical rooms. There were evident

1004

WAITING

1007

W.R.

1013

COPY ROOM

1014

CONFERENCE

1011

PRINCIPAL

1005

RECEPTION

1010

VAULT

1009

RECORDS

1008

VP 2

1012

VP 1

CORRIDOR 1006

UP

UP UP

1049

BUSINESS TYPING

1048

BUSINESS SEMINAR

RAMP UP

DN

DN

UP

1049

BUSINESS TYPING

1049

BUSINESS TYPING

1049

BUSINESS TYPING

CORRIDOR 1047

CORRIDOR 1002

CORRIDOR 1003

1041

STORAGE

1043

MENS

1044

WOMEN

1040

STOR.

1037

GOWN STOR.

1020

SPECIAL EDUCATION

1025

OFFICE

1024

SEMINAR 1

1023

SEMINAR 2

1022

W.R.

CORR. 1021

1017

WOMEN

1019

MEN

CORRIDOR 1088

1124

MATH 4

1053

BUSINESS LAB

1082

BUSINESS

CORRIDOR 1051

CO

RRID

OR 1050

0002

MECHANICAL

0003

OFFICE

0006

EMPTY

0009

EMPTY

UNEXCAVATED

CORRIDOR 0008

0011

EMPTY

0013

EMPTY

0015

EMPTY

0017

EMPTY

0011

EMPTY

0018

EMPTY

0014

EMPTY

0012

EMPTY

0011

EMPTY

0021

ELECTRICAL

0010

CORR

DN

DN

SECOND FLOOR PLAN

FAN ROOM

V:\SCHOOLS\110\Cas Fnd\110AFP01.dgn

Scale :

Drawn By :

Design By :

Date :

Drawing # :

of

Project No.:

1/1

0/2

011

ME

TRIC A

1 A

EC

1:1

6:5

5 P

M

V:\

Asset

Manage

ment\Bld

g C

adStn

d\P

EIP

W-C

AD\W

orkspace\Sta

ndards\P

enta

bles\G

enPlotC

FG.tbl

-

Drawing Title :

Project Title :

ABB CC

A = Detail #

BB = Sheet # ( Where Detail Required )

http://www.gov.pe.ca/ Canada C1A 7N8

Prince Edward Island

Charlottetown

PO Box 2000

CC = Sheet # ( Where Detailed )

C A N A D A

-

-

0000

NOT FOR CONSTRUCTION

PRELIMINARY

Fax 902 569 0590

Tel 902 368 5100

Infrastructure Renewal

Transportation and

GENERAL NOTES

MAY AFFECT THE WORK.THEMSELVES FAMILIAR WITH CONDITIONS THAT SITE PRIOR TO SUBMITTING A TENDER & MAKE CONTRACTOR IS RESPONSIBLE TO VISIT THE CONFIRMED ON SITE BY THE CONTRACTOR.

1. ALL DIMENSIONS & SITE CONDITIONS ARE TO BE

Colonel Gray Senior High

January 2011

1:250

110 A3

BASEMENT

SCALE = 1:250

FAN ROOM

SCALE = 1:250

3

Basement & Fan Room

0203

Larry
visible mould on insulated duct in various areas throughout fan room
Larry
visible mould on concrete wall above ceiling
Larry
visible mould on wood storage shelving and concrete wall
Larry
visible mould on pipe insulation and concrete wall
Larry
visible mould on pipe insulation.
Larry
CT
Larry
visible mould on concrete wall
Larry
visible mould on concrete wall.