Motorway from Lahore to Islamabad

Page 4: Motorway from lahore to islamabad

1).Milestone 2).Executive Summary 2.1Normal 2.2Exceptive 2.3Excited 3).Work break down structure 4).Responsibility Assignment Matrix 5).Scope Management Document 6).Issue Management Document 7).Risk Management Document 8).Quality Assurance Document

Contents

Page 5: Motorway from lahore to islamabad

Motorway from Lahore to Islamabad.

Milestone

Executive SummaryWhen this project is start first built the both boundary of the road .the road is start to build from Lahore. We has sponsors is pak Industry. In work breakdown structure we divide the work in subtask that is equipment, planning, foods, worker, staff, security, engineer, and team member. In worker the work is dividing into number of work in the person. Worker has divided into server, sweeper, shopper and sub engineer.

Page 6: Motorway from lahore to islamabad

we complete project if the some people using the motorway. The mostly people which using the road is citizen of Lahore and Islamabad

Normal

ExceptiveThe profit for built motorway also increasing .Some of popular company also introduce at different place of the motorway.

Page 7: Motorway from lahore to islamabad

The export and Import Company is also using the motorway from Lahore to Islamabad.

Petrol pump is also open so that people can refill our vehicles.

Less traffic Pakistan's Motorways are part of Pakistan's

National Trade Corridor Project

Excited

Page 8: Motorway from lahore to islamabad

It is macro level of work dividing. We have divided the project by staff, foods, equipment, planning, engineer, workers and security

Work Break down structure

Page 9: Motorway from lahore to islamabad

It is micro level of work dividing. We have divided the project by staff, foods, equipment, planning, engineer, workers and security

Responsibility Assignment Matrix

Page 10: Motorway from lahore to islamabad

Difference b/w RAM and WBS RAM WBS

1. In Detail2. Worker Name3. Lower level

1. Assign Work to head2. Worker head3. It is upper level

Page 11: Motorway from lahore to islamabad

Employee can easly reach lahore to islamabad on daily basis. Islamabad to lahore motorway have economical Inflation impact wealth accumulation and distribution is also impact. Transport of our country also improve and reduce other

expensive . Industry level also increasing when lahore to islamabad motoway

bulit. In social this project Impact on services health and education.

Scope Management Document

Page 12: Motorway from lahore to islamabad

If material is not good for motorway If the track of the motorway is turn because the

soil of some city is not good for the motorway. If the motorway is bend because used material is

low.

Issue Management Document

Page 13: Motorway from lahore to islamabad

When we built the bridge on the rivers of the Ravi and Chenab. The bridge will be fall down.

Season is not suitable. If our Budget will be less for complete the

project.

Risk Management Document

Page 14: Motorway from lahore to islamabad

Image of Motorways

Page 15: Motorway from lahore to islamabad