moss effects on river stage - bureau of reclamation · -2-1.8-1.6-1.4-1.2-1-0.8-0.6-0.4-0.2 0...

23
Moss Effects on River Stage (2009)

Upload: others

Post on 28-May-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Moss Effects on River Stage - Bureau of Reclamation · -2-1.8-1.6-1.4-1.2-1-0.8-0.6-0.4-0.2 0 10/1/2008 10/15/2008 10/29/2008 11/12/2008 11/26/2008 12/10/2008 12/24/2008 1/7/2009

Moss Effects on River Stage(2009)

Page 2: Moss Effects on River Stage - Bureau of Reclamation · -2-1.8-1.6-1.4-1.2-1-0.8-0.6-0.4-0.2 0 10/1/2008 10/15/2008 10/29/2008 11/12/2008 11/26/2008 12/10/2008 12/24/2008 1/7/2009
Page 3: Moss Effects on River Stage - Bureau of Reclamation · -2-1.8-1.6-1.4-1.2-1-0.8-0.6-0.4-0.2 0 10/1/2008 10/15/2008 10/29/2008 11/12/2008 11/26/2008 12/10/2008 12/24/2008 1/7/2009
Page 4: Moss Effects on River Stage - Bureau of Reclamation · -2-1.8-1.6-1.4-1.2-1-0.8-0.6-0.4-0.2 0 10/1/2008 10/15/2008 10/29/2008 11/12/2008 11/26/2008 12/10/2008 12/24/2008 1/7/2009
Page 5: Moss Effects on River Stage - Bureau of Reclamation · -2-1.8-1.6-1.4-1.2-1-0.8-0.6-0.4-0.2 0 10/1/2008 10/15/2008 10/29/2008 11/12/2008 11/26/2008 12/10/2008 12/24/2008 1/7/2009

Lenny’s Fist Experience with the BHR

Page 6: Moss Effects on River Stage - Bureau of Reclamation · -2-1.8-1.6-1.4-1.2-1-0.8-0.6-0.4-0.2 0 10/1/2008 10/15/2008 10/29/2008 11/12/2008 11/26/2008 12/10/2008 12/24/2008 1/7/2009
Page 7: Moss Effects on River Stage - Bureau of Reclamation · -2-1.8-1.6-1.4-1.2-1-0.8-0.6-0.4-0.2 0 10/1/2008 10/15/2008 10/29/2008 11/12/2008 11/26/2008 12/10/2008 12/24/2008 1/7/2009

1,900 cfs12/2007

Page 8: Moss Effects on River Stage - Bureau of Reclamation · -2-1.8-1.6-1.4-1.2-1-0.8-0.6-0.4-0.2 0 10/1/2008 10/15/2008 10/29/2008 11/12/2008 11/26/2008 12/10/2008 12/24/2008 1/7/2009
Page 9: Moss Effects on River Stage - Bureau of Reclamation · -2-1.8-1.6-1.4-1.2-1-0.8-0.6-0.4-0.2 0 10/1/2008 10/15/2008 10/29/2008 11/12/2008 11/26/2008 12/10/2008 12/24/2008 1/7/2009
Page 10: Moss Effects on River Stage - Bureau of Reclamation · -2-1.8-1.6-1.4-1.2-1-0.8-0.6-0.4-0.2 0 10/1/2008 10/15/2008 10/29/2008 11/12/2008 11/26/2008 12/10/2008 12/24/2008 1/7/2009

Bighorn River near St. Xavier MT Gage Height Shift (Feet) Oct. 08-Sept. 09

-2

-1.8

-1.6

-1.4

-1.2

-1

-0.8

-0.6

-0.4

-0.2

0

10/1

/200

8

10/1

5/20

08

10/2

9/20

08

11/1

2/20

08

11/2

6/20

08

12/1

0/20

08

12/2

4/20

08

1/7/

2009

1/21

/200

9

2/4/

2009

2/18

/200

9

3/4/

2009

3/18

/200

9

4/1/

2009

4/15

/200

9

4/29

/200

9

5/13

/200

9

5/27

/200

9

6/10

/200

9

6/24

/200

9

7/8/

2009

7/22

/200

9

8/5/

2009

8/19

/200

9

9/2/

2009

9/16

/200

9

9/30

/200

9

Gage Height Shift (feet)

Dat

e

Page 11: Moss Effects on River Stage - Bureau of Reclamation · -2-1.8-1.6-1.4-1.2-1-0.8-0.6-0.4-0.2 0 10/1/2008 10/15/2008 10/29/2008 11/12/2008 11/26/2008 12/10/2008 12/24/2008 1/7/2009

Bighorn River System near St. Xavier MT Gage Height Shift 1999 to 2010 (in feet)

Shift Shift Shift Riv. Drop Riv. Drop

Year Nov. Flow Oct/Nov Jan/Feb Mar/Apr (Oct/Nov) (Oct/Nov)

(CFS) Max Min Min to (Jan/Feb) to (Mar/Apr)

2009 2500 1.55 0.05 0.05 1.5 1.5

2008 1,900 1.06 0.14 0.05 0.92 1.01

2007 1,500 1.2 0.15 0.08 1.05 1.12

2006 2,500 1.46 0.12 0.12 1.34 1.34

2005 1,500 1.15 0.2 0.11 0.95 1.04

2004 1,500 1.08 0.27 0.13 0.81 0.95

2003 1,300 1.04 0.28 0.17 0.76 0.87

2002 1,500 1.12 0.4 0.15 0.72 0.97

2001 2,000 0.99 0.06 0.04 0.93 0.95

2000 2,750 1.16 0.06 0.06 1.1 1.1

1999 3,500 0.96 0.14 0.14 0.82 0.82

Projections for 2010

2010 2500 183 0.17 0.10 1.66 1.73

Page 12: Moss Effects on River Stage - Bureau of Reclamation · -2-1.8-1.6-1.4-1.2-1-0.8-0.6-0.4-0.2 0 10/1/2008 10/15/2008 10/29/2008 11/12/2008 11/26/2008 12/10/2008 12/24/2008 1/7/2009

1,900 cfs12/2007

Page 13: Moss Effects on River Stage - Bureau of Reclamation · -2-1.8-1.6-1.4-1.2-1-0.8-0.6-0.4-0.2 0 10/1/2008 10/15/2008 10/29/2008 11/12/2008 11/26/2008 12/10/2008 12/24/2008 1/7/2009

1,900 cfs12/2007

RiverSt Xavier

Gage Approximate River Mile

DateFlow (cfs) Shift (ft) 1 3 6 11 15 20

August 6, 2009 3348 -0.16 2.32 2.29 1.53 1.30 1.70 1.29

September 16, 2009 3106 -1.68 3.68 2.80 1.82 1.50 1.70 1.39

September 24, 2009 2970 -1.83 3.64 2.80 1.80 1.55 1.75 1.38

Difference 378 -1.67 1.32 0.51 0.27 0.25 0.05 0.09

Page 14: Moss Effects on River Stage - Bureau of Reclamation · -2-1.8-1.6-1.4-1.2-1-0.8-0.6-0.4-0.2 0 10/1/2008 10/15/2008 10/29/2008 11/12/2008 11/26/2008 12/10/2008 12/24/2008 1/7/2009

Option One to Reduce Impact of Stage Shift

Constant Modified Estimated Drop (ft.) Total2009 Flow CFS Flow CFS Shift Gage Ht. Increment Drop (ft.)

Oct 2700 2,400 1.83 61.75Nov 2700 2,500 1.5 61.5 0.25 0.25Dec 2700 2,600 0.8 60.88 0.62 0.87Jan 2700 2,800 0.25 60.49 0.39 1.26Feb 2700 2,850 0.15 60.43 0.06 1.32Mar 2700 2,875 0.12 60.42 0.01 1.33Apr 2700 2,875 0.1 60.4 0.02 1.35

Avg. 2,700 2,700 Total Shift 1.35

Shift Reduced.38

Page 15: Moss Effects on River Stage - Bureau of Reclamation · -2-1.8-1.6-1.4-1.2-1-0.8-0.6-0.4-0.2 0 10/1/2008 10/15/2008 10/29/2008 11/12/2008 11/26/2008 12/10/2008 12/24/2008 1/7/2009

1,900 cfs12/2007

RiverSt Xavier

Gage Approximate River Mile

DateFlow (cfs) Shift (ft) 1 3 6 11 15 20

August 6, 2009 3348 -0.16 2.32 2.29 1.53 1.30 1.70 1.29

September 16, 2009 3106 -1.68 3.68 2.80 1.82 1.50 1.70 1.39

September 24, 2009 2970 -1.83 3.64 2.80 1.80 1.55 1.75 1.38

Difference 378 -1.67 1.32 0.51 0.27 0.25 0.05 0.09

Page 16: Moss Effects on River Stage - Bureau of Reclamation · -2-1.8-1.6-1.4-1.2-1-0.8-0.6-0.4-0.2 0 10/1/2008 10/15/2008 10/29/2008 11/12/2008 11/26/2008 12/10/2008 12/24/2008 1/7/2009

Option 2 to Reduce Impact of Stage Shift

Constant Modified Estimated Drop (ft.) Total2009 Flow CFS Flow CFS Shift Gage Ht. Increment Drop (ft.)

Oct 2700 2,250 1.83 61.63Nov 2700 2,350 1.5 61.38 0.25 0.25Dec 2700 2,700 0.8 60.96 0.42 0.67Jan 2700 2,900 0.25 60.57 0.39 1.06Feb 2700 2,900 0.15 60.47 0.1 1.16Mar 2700 2,900 0.12 60.44 0.03 1.19Apr 2700 2,900 0.1 60.42 0.02 1.21

Avg. 2,700 2,700 Total 1.21

Shift Reduced 0.52

Page 17: Moss Effects on River Stage - Bureau of Reclamation · -2-1.8-1.6-1.4-1.2-1-0.8-0.6-0.4-0.2 0 10/1/2008 10/15/2008 10/29/2008 11/12/2008 11/26/2008 12/10/2008 12/24/2008 1/7/2009

1,900 cfs12/2007

RiverSt Xavier

Gage Approximate River Mile

DateFlow (cfs) Shift (ft) 1 3 6 11 15 20

August 6, 2009 3348 -0.16 2.32 2.29 1.53 1.30 1.70 1.29

September 16, 2009 3106 -1.68 3.68 2.80 1.82 1.50 1.70 1.39

September 24, 2009 2970 -1.83 3.64 2.80 1.80 1.55 1.75 1.38

Difference 378 -1.67 1.32 0.51 0.27 0.25 0.05 0.09

Page 18: Moss Effects on River Stage - Bureau of Reclamation · -2-1.8-1.6-1.4-1.2-1-0.8-0.6-0.4-0.2 0 10/1/2008 10/15/2008 10/29/2008 11/12/2008 11/26/2008 12/10/2008 12/24/2008 1/7/2009

Questions?Questions?

Page 19: Moss Effects on River Stage - Bureau of Reclamation · -2-1.8-1.6-1.4-1.2-1-0.8-0.6-0.4-0.2 0 10/1/2008 10/15/2008 10/29/2008 11/12/2008 11/26/2008 12/10/2008 12/24/2008 1/7/2009

Moss Effects on River Stage(2009)

Page 20: Moss Effects on River Stage - Bureau of Reclamation · -2-1.8-1.6-1.4-1.2-1-0.8-0.6-0.4-0.2 0 10/1/2008 10/15/2008 10/29/2008 11/12/2008 11/26/2008 12/10/2008 12/24/2008 1/7/2009

Option to Reduce Impact of Stage Shift

2009 Flow CFS Shift Gage Ht. Drop (ft.) Total

Oct 2,000 1.55 61.13 Increment Drop (ft.)

Nov 2,100 1.45 61.13 0 0

Dec 2,400 0.8 60.72 0.41 0.41

Jan 2,800 0.25 60.49 0.23 0.64

Feb 2,900 0.18 60.5 -0.01 0.63

Mar 2,800 0.18 60.42 0.08 0.71

Avg. 2,500 Total 0.71

Page 21: Moss Effects on River Stage - Bureau of Reclamation · -2-1.8-1.6-1.4-1.2-1-0.8-0.6-0.4-0.2 0 10/1/2008 10/15/2008 10/29/2008 11/12/2008 11/26/2008 12/10/2008 12/24/2008 1/7/2009

1,900 cfs12/2007

RiverSt Xavier

Gage Approximate River Mile

DateFlow (cfs) Shift (ft) 1 3 6 11 15 20

August 6, 2009 3348 -0.16 2.32 2.29 1.53 1.30 1.70 1.29September 16, 2009 3106 -1.68 3.68 2.80 1.82 1.50 1.70 1.39September 24, 2009 2970 -1.83 3.64 2.80 1.80 1.55 1.75 1.38

Difference 378 -1.67 1.32 0.51 0.27 0.25 0.05 0.09

Rating Curve GH Flow

60.37 2970Differen ce 62.04 61.69 60.88 60.64 60.62 60.42 60.46

Page 22: Moss Effects on River Stage - Bureau of Reclamation · -2-1.8-1.6-1.4-1.2-1-0.8-0.6-0.4-0.2 0 10/1/2008 10/15/2008 10/29/2008 11/12/2008 11/26/2008 12/10/2008 12/24/2008 1/7/2009

Option to Protect Rearing Habitat and Reduce Impact of Shift

Constant Modified Estimated Drop (ft.) Total

2009 Flow CFS Flow CFS Shift Gage Ht. Increment Drop (ft.)

Oct 2500 1,900 1.55 61.04

Nov 2500 2,000 1.45 61.03 0.01 0.01

Dec 2500 2,300 0.8 60.64 0.39 0.4

Jan 2500 2,400 0.25 60.17 0.47 0.87

Feb 2500 2,500 0.18 60.18 -0.01 0.86

Mar 2500 2,500 0.18 60.18 0 0.86

Apr 1900 2,400 0.11 60.03 0.15 1.01

May 1900 2,400 0.11 60.03 0 1.01

June 1900 2,300 0.11 59.95 0.08 1.09

Avg. 2,300 2,300 Total 1.09

Page 23: Moss Effects on River Stage - Bureau of Reclamation · -2-1.8-1.6-1.4-1.2-1-0.8-0.6-0.4-0.2 0 10/1/2008 10/15/2008 10/29/2008 11/12/2008 11/26/2008 12/10/2008 12/24/2008 1/7/2009

Bighorn River near St. Xavier MT Gage Height Shift (Feet) Oct. 06-Sept. 08