mos projects old
TRANSCRIPT
-
7/28/2019 MOS Projects Old
1/13
hammad Safeer 2005078
syed omer hassan 2005266
M. Ahsan Naseem 2005150Ali Asghar Noorani 2005019
Muammad Ali 2005152
Mohammad Ali 205132
Taha Mustafa 2005267
Usman Ghani 2005285
Osman Umar 2005202
Hashir Sultan 2005083
Fazal rehman Thebo 2005070Huzaifa Hussain 2005094
Mian M. Asim 2005128
Shehryar Khan 2005239
Zain-ul-Abideen Mughal 2005297
Shehryar Masood 2005240
Uzair Khaleeq-uzZaman
Fawad Kazmai
Mohammad Ali 2005151
Tajdar Nasir 2005270
Awais Ahmed 2005041
Awais Ather 2005042
Hammad Safeer 2005078
Syed Omer Hassan 2005266
Razi-ur-Rehman 2005210
M. Meraj-ud-din 2005165
Muhammad Rameezuddin 2004099Naveed Hussain 2005193
Malik Raza Hussain 2005124
Junaid Bin Naseer 2005108
M.Bilal Naeem 2004085
Muhammad Yousuf 2005136
Mos Project groups
G13
G14
G15
G16
G7
G8
G9
G10
G11
G12
G1
G2
G3
G4
G5
G6
-
7/28/2019 MOS Projects Old
2/13
Adil Iftikhar 2005007
Qasim 2005205
Kamil Rasheed
Sultan Mehmood
Shehryar Ali 2005238
Mubashir Rasheed 2005144
M. ahsan Naseem 2005150
Ali Asghar Noorani 2005019
Bilal Hassan 2005047
Fahad Bakhtyar 2005052
Khayam ateeq Kiani 2005117
Ali Jibran 2005022
Khubain Ahmad 2005118
Abdullah Khan 2005004
Muhammad Ali
Tajdar Nasir
G25 Ali Rashwn sheikh 2004019
M. Tauseef Akhtar 2005177
M. ali Khan 2005153
Saad Naseem 2005214
Abdur Rehman Mazhar 2005005
Shaikh Zubairudin Nizami 2005235
Sharoon Saleem 2005237
Shahid Aziz 2005231
Uzair Syed Ahmed 2004195
Talha Zahid 2005272
Ziyad Khan 2005301
M. Ibrahim 2005164
Faizan Nasir 2005060Mohsin Ahmad 2005137
Kanza Malik 2005114
Khulood Tahir 2005119
Sidra Khan 2005247
G23
G24
G17
G18
G32
G26
G27
G28
G29
G30
G31
G21
G22
G19
G20
-
7/28/2019 MOS Projects Old
3/13
Verification of Equation =MC/I by strain guage
Gears and Torsion
Torsion test of shaft
Analysis of single and double shear in pin block assembly
Deformation in circular shafts
Setup a gear train
Application of Mos Principle of trusses
To Calculate the moment of inertia of a body using "Torsion Pendulum"
Design analysis and practical applications of re-inforced concrete.
To select most appropriate beam for the given load, Choosing the orientation of the beam
N
Torsion in gears power transmission
To dtermine the deflection (Angle of twist) of shaft in gear shaft assembly in the elastic range.
To dtermine the deflection (Angle of twist) of shaft in gear shaft assembly in the elastic range.
Shaft and gear linkages
-
7/28/2019 MOS Projects Old
4/13
Truss
Torsion (using AL piece, of rectangular cross sectional area)
Stress analysis of a cantilever beam, find with a pin
N
Torsion (select an appropriate material for the given torque i.e. orientation, dimensions)
To analyse the stresses and strains in a steel reinforced concrete beam
Demonstration of force transmissions through gears
Torsional effects on a rotating shaft.
Stress, Strain demonstration, analysis with formulae
To find the bearing stress, shear stress produced in the nails, and the beams
Verification of the angle of twist in a circular shaft under torsion, its assumtions OR =TL/JG
Analysis of power transmission in shafts
Demonstration of bearing stresses
Torsion
-
7/28/2019 MOS Projects Old
5/13
Group# Name Reg#
Hammad Safeer 2005078
Syed omer hassan 2005266
Muammad Ali 2005152
Mohammad Ali 2005132
Taha Mustafa 2005267
Usman Ghani 2005285
Osman Umar 2005202
Hashir Sultan 2005083
Fazal rehman Thebo 2005070
Huzaifa Hussain 2005094
Mian M. Asim 2005128
Shehryar Khan 2005239M. Ibrahim 2005164
Zain-ul-Abideen Mughal 2005297
Shehryar Masood 2005240
Uzair Khaleeq-uzZaman 2005288
Fawad Kazmai 2005258
Awais Ahmed 2005041
Awais Ather 2005042
Razi-ur-Rehman 2005210M. Meraj-ud-din 2005165
Muhammad Rameezuddin 2004099
Naveed Hussain 2005193
M.Bilal Naeem 2004085
Muhammad Yousuf 2005136
Adil Iftikhar 2005007
Qasim 2005205
Kamil Rasheed
Sultan Mehmood
M. ahsan Naseem 2005150
Ali Asghar Noorani 2005019
Bilal Hassan 2005047
Fahad Bakhtyar 2005052
Shehryar Ali 2005238
G14
G15
G12
G13
G9
G10
G11
G16
G6
Mos Project groups
G1
G2
G3
G8
G7
G4
G5
-
7/28/2019 MOS Projects Old
6/13
Mubashir Rasheed 2005144
Khayam ateeq Kiani 2005117
Ali Jibran 2005022
Kanza Malik 2005114
Khulood Tahir 2005119Sidra Khan 2005247
Khubain Ahmad 2005118
Abdullah Khan 2005004
Malik Raza Hussain 2005124
Junaid Bin Naseer 2005108
Massab Junaid 2005126
Hassan Ahmed 2005085
Mohammad Ali 2005151Tajdar Nasir 2005270
Omer Qaisrani 2001128
Saad Naseem 2005214
Abdur Rehman Mazhar 2005005
Shaikh Zubairudin Nizami 2005235
Sharoon Saleem 2005237
hamayun
Shahid Aziz 2005231
Uzair Syed Ahmed 2004195
Talha Zahid 2005272
Ziyad Khan 2005301
M. Tauseef Akhtar 2005177
M. ali Khan 2005153
Ali Rashwn sheikh 2004019
Faizan Nasir 2005060
Mohsin Ahmad 2005137
G23
G27
G28
G29
G24
G19
G21
G22
G25
G26
G20
G18
-
7/28/2019 MOS Projects Old
7/13
Relation between stresses in the composite beam under bending
Torsion of shaft
Study of single and double shear stress
Deformation in circular shafts
Torsion and gears
design and analysis of a beam on the basis of pure bending
Analysis of gear and shaft systems
Application of Mos Principles of trusses
To Calculate the moment of inertia using "Torsion Pendulum"
Trusses and shearing strains
Analysis of a Truss
Gear train
Torsion and Transmission in gears
Torsional effects
Torsion (select an appropriate material for the given torque i.e. orientation, dimensions)
Design analysis and practical applications of re-inforced concrete.
-
7/28/2019 MOS Projects Old
8/13
Analysis of shaft
dm/dx=v
To find the bearing stress, shear stress produced in the nails, and the beams
Demonstration of shearing stresses
Shearing stresses in thin-walled members
Stress analysis of Pratt Truss Bridge
Torsion
force transmissions through gears
Analysis of power transmission: Study of shafts and gears
Angle of twist of an object under torsion
To analyse the stresses and strains in a steel reinforced concrete beam
Torsional effects on a rotating shaft.
-
7/28/2019 MOS Projects Old
9/13
Presentation time/25th April
5:30 PM
Ethics class
5:35 PM
5:40 PM
5:45 PM
5:50 PM
Ethics class
5:55 PM
6:00 PM
6:05 PM
6:10 PM
6:15 PM
6:20 PM
6:25 PM
Ethics class
6:30 PM
6:35 PM
-
7/28/2019 MOS Projects Old
10/13
6:40 PM
-
7/28/2019 MOS Projects Old
11/13
Group# Name Reg#
Hammad Safeer 2005078
Syed omer hassan 2005266
Muammad Ali 2005152
Mohammad Ali 2005132
Taha Mustafa 2005267
Usman Ghani 2005285
Osman Umar 2005202
Hashir Sultan 2005083
Fazal rehman Thebo 2005070
Huzaifa Hussain 2005094
Mian M. Asim 2005128
Shehryar Khan 2005239M. Ibrahim 2005164
Zain-ul-Abideen Mughal 2005297
Shehryar Masood 2005240
Uzair Khaleeq-uzZaman 2005288
Fawad Kazmai 2005258
Awais Ahmed 2005041
Awais Ather 2005042
Razi-ur-Rehman 2005210M. Meraj-ud-din 2005165
Muhammad Rameezuddin 2004099
Naveed Hussain 2005193
M.Bilal Naeem 2004085
Muhammad Yousuf 2005136
Adil Iftikhar 2005007
Qasim 2005205
Kamil Rasheed
Sultan Mehmood
M. ahsan Naseem 2005150
Ali Asghar Noorani 2005019
Bilal Hassan 2005047
Fahad Bakhtyar 2005052
Khayam ateeq Kiani 2005117
Mos Project groups
G1Relation between stresses in the composite beam
under bending
G2
Torsion of shaft
G5Gear train
G6Application of Mos Principles of trusses
G3Study of single and double shear stress
G4Deformation in circular shafts
G9design and analysis of a beam on the basis of pure
bending
G10 Torsion and Transmission in gears
G7To Calculate the moment of inertia using "Torsion
Pendulum"
G8Design analysis and practical applications of re-
inforced concrete.
G13Analysis of a Truss
G14
Torsional effects
G11Analysis of gear and shaft systems
G12
Trusses and shearing strains
To analyse the stresses and strains in a steel
G15Torsion and gears
G16Torsion (select an appropriate material for the given
torque i.e. orientation, dimensions)
-
7/28/2019 MOS Projects Old
12/13
Ali Jibran 2005022 reinforced concrete beam
-
7/28/2019 MOS Projects Old
13/13
Presentation time/25th April
5:30 PM
Ethics class
5:35 PM
5:40 PM
5:45 PM
5:50 PM
Ethics class
5:55 PM
6:00 PM
6:05 PM
6:10 PM
6:15 PM
6:20 PM
6:25 PM
Ethics class
6:30 PM
6:40 PM