more wind at sea needed for green hydrogen...2019/10/02 · seaports (soluforce) • future proof...
TRANSCRIPT
Erik Bertholet | Business Manager Offshore Wind
MORE WIND AT SEA NEEDED FOR GREEN HYDROGEN
EEMSHAVEN: MAIN HUB IN OFFFSHORE WIND INDUSTRY
Eemshaven – unique position for offshore wind farms (close to the North Sea)
• 16 windfarms (partly) installed from Eemshaven
• 4 windfarms O&M from Eemshaven
Hydroville, Oostende (B)
1. Alpha Ventus (D)
2. Bard Offshore I (D)
3. Borkum Riffgat (D)
4. Riffgrund I (D)
5. Trianel Windpark Borkum I (D)
6. Global Tech I (D)
7. Gemini (NL)
8. Gode Wind I (D)
9. Veja Mate (D)
10. Race Bank (UK)
11. Nordsee One (D)
12. Merkur Offshore (D)
13. Borkum Riffgrund II (D)
14. Hohe See (D)
15. Albatros (D)
16. Trianel Windpark Borkum II (D)
Impressive track record
Logistics:
• 16 projects
• 5,4 GW (of which 2,2 GW turbines)
• 1020 turbines
O&M:
• 4 windfarms
• 1,7 GW
• 316 turbines
Growth potential: greening industries
Eneco Windfarm Delfzijl North
More wind at sea needed for green hydrogen (7 GW)
CIRCULAR ECONOMY
33 hydrogen
projects until
2030 in the
Northern Netherlands
Opportunities | H2 storage
Magnum as a superbattery
Utilities Delfzijl | (Future) hydrogen infrastructure
Utilities Delfzijl
Hydrogen Backbone Delfzijl
Existing infrastructure
Indication route infrastructure to build
Future extension
Hydrogen filling station
Hydrogen filling station Delfzijl
H2 | green hydrogen (rest product from MCA plant Nouryon)
Capacity: 5x40 kg / 24 hour)
• Cooperation between Pipelife and Groningen
Seaports (SoluForce)
• Future proof solution to play a prominent role
in the region’s energy transition
• Upscaling the product to the worlds
Hydrogen Society
• 25% to 35% cheaper then conventional pipe
systems
Flexible infrastructure (plastic pipeline for H2 transport)
Erik Bertholet
E-mail: [email protected]
Phone:
+31 (0)6 53 93 92 75
Twitter:
@GroningerHavens
WWW.GRONINGEN-SEAPORTS.COM/OFFSHORE
What can we do for you?