moon garden 8.5x11 - sweaterscapes garden cardigan.pdf · 2009-01-01 · moon garden an intarsia...
TRANSCRIPT
Moon Garden An intarsia design by Borealis Sweaterscapes
Finished Sweater Measurements Chest: 39” (41”) Length: 24” (26”)
Gauge 4½ stitches/inch by 6 rows/inch, using size 7 needles and working in Stockinette Stitch
Yarn - Peace Fleece worsted weight yarn, skeins
are 4 oz / 200 yds. 5½ skeins Baikal-Superior Green; 1½ skeins Antarctica White; 1 Grass Roots, 1 Negotiation Grey
Equipment Size 5 and size 7 needles; Size 6 short double pointed needles, for the buttonbands; Bobbins; Tapestry Needle; Row counter (suggested)
Notes To shape the neck openings, we recommend the ‘short-row wrapping’ method. It makes a much nicer neck opening than binding-off and picking-up stitches. Do not bind off stitches when you reach the top of the chart for the front and back sweater pieces. They will be bound off together when all three pieces are complete. Illustrated instructions may be found at our website, www.sweaterscapes.com.
Sweater Back & Fronts (see pages 2 & 3)
Sleeves (see chart on page 4)
Finishing • Weave in the ends from the intarsia knitting.
• Block the sweater pieces.
• Bind off fronts and back together at shoulders.
• Sew side seams together, using invisible stitch.
• Work optional embroidery on left front.
Neck band With size 7 needle knit stitches of right front neck off the circular needle, hiding the wraps. Pick up 15 (14) stitches along remaining edge of right front neck and knit across back neck stitches. Pick up 15 (14) stitches along edge of left front neck edge, then knit the stitches off the circular needle, again hiding the wraps. There should be 84 (88) stitches. Knit neckband in a K1, P1, pattern for 1¼ inches. Change to Stockinette Stitch, so that the purl side of the fabric rolls to the outside. Bind off after 1 inch.
Buttonband Pattern Wrong side: *K1, P1 through back of stitch*, repeat between *s.
Right side: Slip first stitch knitwise, *P1, K1 through back of stitch*, repeat between *s, ending with P1.
Front Right Buttonband Remember to work 7 buttonholes, evenly spaced, up the band. Using the double pointed needles, cast on 6 stitches. Pick up the first stitch at the bottom of the sweater’s front edge. Work this stitch together with the first stitch on the double pointed needle. Every other row, when you are at the sweater edge, pick up a stitch and work it together with the first stitch on your needle, so that you are attaching the band to the sweater as you knit. Bind off when the band reaches the top of the neckband rib, before the rolled edge begins.
Left Front Buttonband Begin the band at the top of the sweater edge, just below the rolled edge, and work down in the same manner and pattern as the Right Front Buttonband, omitting the buttonholes.
More Finishing Sew on sleeves. Sew an invisible seam under sleeves. Sew buttons onto left buttonband, matching the buttonholes on the right band.
= Antarctica W
hite
94
= Negotiation Grey
90
85
80
75
70
65
60
55
50
45
= Grass Roots
35
40
30
= Baikal-Superior Green
10
25
20
15
50515
10
20
30
25
35
45
40
50
Larg
e F
ron
t -
to a
llow
for
the c
ard
igan b
and,
stitc
hes a
re e
limin
ate
d
from
sid
es o
f fr
ont, r
ath
er
than a
t cente
r, leavin
g the d
esig
n
unin
terr
upte
d.
Op
tio
nal -
em
bro
ider
short
ste
m w
ith F
rench K
not
at th
e e
nd u
sin
g
gre
y y
arn
.
Sw
eate
r B
ack
Cast
on 8
5 (
91)
stitc
hes u
sin
g s
ize 5
needle
s a
nd G
rass R
oots
yarn
. W
ork
in K
1, P
1 p
att
ern
for
2 inches. C
hange to s
ize 7
needle
s a
nd
knit a
cro
ss, in
cre
asin
g 3
stitc
hes,
evenly
spaced. P
url 1
row
, th
en
follo
w c
hart
. S
mall -
knit s
titc
hes 4
-91 a
nd follo
w b
lack lin
e a
t ro
w 1
31 f
or
the
neck s
hapin
g.
Larg
e -
knit s
titc
hes 1
-94,
and f
ollo
w b
lack lin
e a
t ro
w 1
37 to s
hape
neck.
In
str
uctions f
or
short
-row
shapin
g o
f th
e n
eck m
ay b
e found a
t our
website w
ww
.sw
eate
rscapes.c
om
.
Sw
ea
ter
Fro
nts
C
ast
on 4
1 (
45)
stitc
hes u
sin
g s
ize 5
needle
s a
nd G
rass R
oots
yarn
. W
ork
in K
1, P
1, pattern
for
2 inches. C
hange to s
ize 7
needle
s a
nd k
nit
1 r
ow
, purl 1
row
, th
en f
ollo
w c
hart
. S
mall -
knit s
titc
hes 4
-44 f
or
the left fro
nt of th
e s
weate
r and s
titc
hes
51-9
1 for
the r
ight fr
ont. N
eck s
hapin
g b
egin
s o
n r
ow
117.
Larg
e -
knit s
titc
hes 3
-47 f
or
the left fro
nt of th
e s
weate
r and s
titc
hes
48-9
2 for
the r
ight fr
ont. N
eck s
hapin
g b
egin
s o
n r
ow
123.
55
60
65
70
75
140
135
130
144
125
120
115
110
105
100
95
90
85
80
70
94
90
85
80
75
65
60
55
50
45
40
30
35
25
20
15
10
5
0
5
10
15202530
3540
80
75
50
45
55
65
60
70
90
85
95100
= Grass Roots
= Baikal-Superior Green
= Negotiation Grey
= Antarctica W
hite
Sle
ev
es
C
ast
on 4
1 s
titc
hes u
sin
g
siz
e 5
needle
s a
nd G
rass
Roots
yarn
.
Work
in K
1, P
1 p
att
ern
for
2 inches.
Change t
o s
ize 7
needle
s a
nd
knit 1
row
, in
cre
asin
g 1
stitc
h
in t
he c
ente
r. P
url 1
row
, th
en
follo
w c
hart
. B
egin
sm
all
on
row
4, and b
egin
larg
e o
n r
ow
1.
Bin
d o
ff w
hen s
leeve m
easure
s
18”
(19”)
or
when s
leeve is d
esired
length
.
© 2
00
8 S
wea
ters
cap
es
kn
it@
sw
ea
ters
ca
pes.c
om
ww
w.s
we
ate
rscap
es.c
om