montrin richview gp inc. stormwater management report€¦ · stormwater management report project...
TRANSCRIPT
Montrin Richview GP Inc.
Stormwater Management Report
Richview Square
4620 Eglinton Avenue West and 250 Wincott Drive
APRIL 24, 2018
WSP Canada Inc.
Stormwater Management Report
Richview Square
4620 Eglinton Avenue West and 250 Wincott Drive
Montrin Richview GP Inc.
Rezoning Application
Project No.: 15M-00048-03
Date: April 2018
WSP
100 Commerce Valley Drive West
Thornhill, ON, Canada L3T 0A1
Tel.: +1 905 882-1100
Fax: +1 905 882-0055
wsp.com
Q u a l i t y M a n a g e m e n t
ISSUE/REVISION FIRST ISSUE REVISION 1 REVISION 2 REVISION 3
Remarks Rezoning
Application
Date 2018/04/24
Prepared by Jennifer Chan
Signature
Checked by Bhavika Patel
Signature
Project number 15M-00048-03
Stormwater Management Report Project No. 15M-00048-03 Montrin Richview GP Inc.
WSPApril 2018
Page iii
S i g n a t u r e s
Prepared by
Jennifer Chan, EIT
Designer
Reviewed by
Bhavika Patel, P.Eng, CFM
Project Engineer
This report was prepared by WSP Canada Group Limited for the account of Montrin Richview
GP Inc., in accordance with the professional services agreement. The disclosure of any
information contained in this report is the sole responsibility of the intended recipient. The
material in it reflects WSP Canada Group Limited’s best judgment in light of the information
available to it at the time of preparation. Any use which a third party makes of this report, or
any reliance on or decisions to be made based on it, are the responsibility of such third parties.
WSP Canada Group Limited accepts no responsibility for damages, if any, suffered by any
third party as a result of decisions made or actions based on this report. This limitations
statement is considered part of this report.
The original of the technology-based document sent herewith has been authenticated and will
be retained by WSP for a minimum of ten years. Since the file transmitted is now out of WSP’s
control and its integrity can no longer be ensured, no guarantee may be given with regards to
any modifications made to this document.
Stormwater Management Report Project No. 15M-00048-03 Montrin Richview GP Inc.
WSPApril 2018
Page v
P r o d u c t i o n T e a m
CLIENT
Montrin Richview GP Inc.
WSP
Designer (EIT) Jennifer Chan
Reviewer Bhavika Patel
Stormwater Management Report Project No. 15M-00048-03 Montrin Richview GP Inc.
WSPApril 2018
Page vii
TABLE OF CONTENTS
1 Introduction .............................................................. 1
1.1 Scope ............................................................................... 1
1.1 Site Location ..................................................................... 1
1.2 Stormwater Management Plan Objectives ........................ 1
1.3 Design Criteria .................................................................. 1
2 Pre-Development Conditions .................................. 3
2.1 General ............................................................................ 3
2.2 Rainfall Information ........................................................... 3
2.3 Allowable Flow Rates ....................................................... 4
3 Post-Development Conditions ................................ 6
3.1 General ............................................................................ 6
3.2 Water Balance .................................................................. 7
3.3 Water Quality Control ....................................................... 8
3.4 Erosion Control ............................................................... 11
3.5 Water Quantity Control ................................................... 11
3.6 Groundwater, Hydrogeology and Groundwater
Characterization ............................................................. 13
4 Conclusions ............................................................ 15
5 Standard Limitations .............................................. 17
WSP April 2018 Page viii
Stormwater Management ReportProject No. 15M-00048-03 Montrin Richview GP Inc.
Tables
TABLE 1: RAINFALL PARAMETERS ................................... 3
TABLE 2: PRE-DEVELOPMENT PEAK FLOW RATE CALCULATIONS – CATCHMENT 101 .......... 4
TABLE 3: PRE-DEVELOPMENT PEAK FLOW RATE CALCULATIONS – CATCHMENT 102 .......... 5
TABLE 4: PROPOSED CONDITIONS AREA BREAKDOWN – CATCHMENT 201 .............. 6
TABLE 5: PROPOSED CONDITIONS AREA BREAKDOWN – CATCHMENT 202 .............. 7
TABLE 6: WATER BALANCE – CATCHMENT 201 .............. 8
TABLE 7: WATER BALANCE – CATCHMENT 202 .............. 8
TABLE 8: SEDIMENT LOADING ANALYSIS (TYPICAL RESIDENTIAL SITE) – CATCHMENT 201 & 202 ............................... 9
TABLE 9: SEDIMENT LOADING ANALYSIS (PROPOSED SITE) – CATCHMENT 201 ............................................................... 10
TABLE 10: SEDIMENT LOADING ANALYSIS (PROPOSED SITE) – CATCHMENT 202 ............................................................... 10
TABLE 11: SUMMARY OF MODELLING RESULTS – CATCHMENT 201 ........................................ 12
TABLE 12: SUMMARY OF MODELLING RESULTS – CATCHMENT 202 ........................................ 13
Figures
Figure 1: Site Location ................................................. 1 Figure 2: Existing Conditions ........................................ 3 Figure 3: Proposes Conditions ..................................... 6
Appendices
A Stormwater Management Calculations
B Hydrologic Model Output (Hydrocad)
C Typical Sediment Loading Reference Material
Stormwater Management Report Project No. 15M-00048-03 Montrin Richview GP Inc.
WSPApril 2018
Page 1
1 Introduction
1.1 Scope
WSP has been retained by Montrin Richview GP Inc. to prepare a Stormwater Management
(SWM) Report to support the zoning by-law amendment application for the proposed
development at 4620 Eglinton Avenue West and 250 Wincott Drive, in The City of Toronto.
This SWM report examines the potential water balance, water quality, and water quantity
impacts of the proposed development and summarizes how each will be addressed in
accordance with the City of Toronto’s Wet Weather Flow Management Guidelines (WWFMG).
1.1 Site Location
The site is located on the northwest corner of Eglinton Avenue W and Wincott Drive. The
location of the proposed re-development is illustrated below in Figure 1.
1.2 Stormwater Management Plan Objectives
The objectives of the stormwater management plan are as follows:
— Determine site specific stormwater management requirements to ensure that the proposals
are in conformance with the City of Toronto WWFMG document;
— Evaluate various stormwater management practices that meet the requirements of the City
and recommend a preferred strategy; and
— Prepare a stormwater management report documenting the strategy along with the
technical information necessary for the justification and preliminary sizing of the proposed
stormwater management facilities.
1.3 Design Criteria
The City of Toronto issued the WWFMG document in November 2006 to provide direction on
the management of rainfall and runoff inside the City’s jurisdiction. A summary of the
stormwater management criteria applicable to this project follows:
SITELOCATION
FIG
UR
E 1.dw
g - S
ite Location S
:\38-41\15M
-00048-03-S
W1\F
IG
UR
ES
\ A
pr 20, 2018 - 5:44pm
FIG
UR
E 1.dw
g - S
ite Location S
:\38-41\15M
-00048-03-S
W1\F
IG
UR
ES
\ A
pr 20, 2018 - 5:44pm
@2018 Google - Map data @2018 Tele Atlas3000 100 200 400m
WSP April 2018 Page 2
Stormwater Management ReportProject No. 15M-00048-03 Montrin Richview GP Inc.
— Water Balance – The WWFMG requires a site to ‘retain stormwater on-site, to the extent
practicable, to achieve the same level of annual volume of overland runoff allowable from
the development site under pre-development conditions’. According to the guidelines, if the
allowable annual runoff volume from the development site under post-development
conditions is less than the pre-development conditions, then the maximum allowable
annual runoff is 50% of the total average annual rainfall depth. Typically, the minimum on-
site runoff retention will require the site to retain all runoff from a 5 mm storm event through
infiltration, evapotranspiration or rainwater reuse.
— Water Quality – Under the WWFMG, the site is required to target a long-term removal of
80% of total suspended solids (TSS) on an annual loading basis.
— Erosion Control –As indicated in WWFMG, ‘For small infill/redevelopment sites < 2 ha,
erosion control in the form of stormwater detention is normally not required, provided the
on-site minimum runoff retention from a small design rainfall event (typically 5 mm) is
achieved under the Water Balance Criteria.’ The developable area of the site is slightly
greater than 2 ha. However, the proposed site will be delineated into two catchments that
are both less than 2 ha and each will have its own stormwater management strategy.
During construction, appropriate erosion and sediment controls will be implemented.
— Water Quantity Control and Discharge to Municipal Infrastructure – Runoff from the 2-
year to 100-year design storms must not exceed the allowable release rate as stated in the
WWFMG. The allowable release rate to the municipal storm sewer system from the
development site is the 2-year pre-development flow rate based on a runoff coefficient of
0.50 or the capacity of the receiving sewer.
Stormwater Management Report Project No. 15M-00048-03 Montrin Richview GP Inc.
WSPApril 2018
Page 3
2 Pre-Development Conditions
2.1 General
The 3.04 ha site is currently partially developed, hosting a few buildings, surface parking and
vacant lands. For the purposes of the stormwater management strategy, only the planned
development area of 2.26 ha to be re-developed as Richview Square will be taken into
consideration, and will be referred to as the site. The existing runoff coefficient of the site is
estimated at 0.60, as the site is comprised of pervious grassed areas, impervious roof and
impervious paving. The existing site has a drainage split, draining to Widdicombe Hill on the
northwest side and Wincott Drive on the east side, delineated as catchments 101 and 102
respectively. The site currently does not receive external drainage from adjacent areas.The
existing condition of the site is shown in Figure 2.
2.2 Rainfall Information
The rainfall intensity for the site was calculated using the following equation:� = ���
Where;
I = rainfall intensity in mm/hour
T = time of concentration in hours
A and C = constant parameters (see below)
The parameters (A, C) recommended for use by the City of Toronto (per Section 3.1 of the Wet
Weather Flow Management Guidelines) are summarized in Table 1.
Table 1: Rainfall Parameters
Return Period
(Years) 2 5 10 25 50 100
A 21.8 32.0 38.7 45.2 53.5 59.7
C -0.78 -0.79 -0.80 -0.80 -0.80 -0.80
Source: City of Toronto Wet Weather Flow Management Guidelines (November, 2006)
HEDGE
HEDGE
GRASS
AREA
RO
W O
F C
ON
IF
ER
OU
S T
RE
ES
(23 T
RE
ES
, D
IA
=0.10, E
AC
H)
SH
RU
BS
SH
RU
B
E
D
G
E
O
F
T
R
E
E
S
E
D
G
E
O
F
T
R
E
E
S
GRASS AREA
GRASS AREA
GR
AS
S
AR
EA
GRASS AREA
CH
AIN
LIN
K F
EN
CE
SIG
N
CURB CUT
ASPHALT EDGE
CURB
SIG
N
S
I
G
N
SIG
N
LS
CONCRETE SIDEWALK
MH
CB
BO
L
BO
L
BU
ILD
IN
G
CU
RB
CHAIN LINK FENCE
LS
LS
SP
SIGN
SIG
N
AS
PH
ALT
E
DG
E
SIG
N
AS
PH
ALT
E
DG
E
CU
RB
H
CURB
BUILDING
CB
CB
MH
LS
LS
LS
LS
LS
LS
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
SIG
N
BU
ILD
IN
G
GRATE
SP
MH
SIG
NS
IG
N
SIG
N
GU
ID
E R
AIL
BUILDING
SIG
N
CB
CB
C/L O
F R
OA
D
C/L O
F R
OA
D
C/L OF ROAD
SIGN
SIG
N
CU
RB
AS
PH
ALT
E
DG
E
AS
PH
ALT
E
DG
E
CU
RB
AS
PH
ALT
E
DG
E
CU
RB
CURB
ASPHALT EDGE
ASPHALT EDGE
ASPHALT EDGE
ASPHALT EDGE
CURB
BO
L
BO
LB
OL
CURB CUT
CURB
ASPHALT EDGE
CURB
CO
NC
RE
TE
WA
LK
WA
Y
CO
NC
RE
TE
WA
LK
WA
Y
CU
RB
AS
PH
ALT
E
DG
E
G M
ET
ER
SP
BO
L
G M
ET
ER
WK
OV
ER
HA
NG
LS
CB
CB
MH
MH
MH
MH
CU
RB
AS
PH
ALT
E
DG
E
PA
RK
IN
G C
UR
B
HA
ND
RA
IL
CURB
ASPHALT EDGE
CONCRETE
WALKWAY
BO
LB
OL
G M
ET
ER
GK
SOLID PAINT LINE
SO
LID
P
AIN
T LIN
ES
OLID
P
AIN
T LIN
ES
OLID
P
AIN
T LIN
E
SO
LID
P
AIN
T LIN
E
BUILDING OVERHANG
L
S
B
O
A
R
D
F
E
N
C
E
C
H
A
I
N
L
I
N
K
F
E
N
C
E
CB
CB
CB
MH
MH
BO
AR
D F
EN
CE
CH
AIN
LIN
K F
EN
CE
LS
BO
TT
OM
O
F S
LO
PE
SIG
N
SIG
N
OV
ER
HA
NG
OVERHANG
HA
ND
RA
IL
WV
BS
P
SIG
N
LS
SIG
N
SIG
N
AS
PH
ALT
E
DG
E
CU
RB
ASPHALT EDGE
CURB
ASPHALT EDGE
CURB
ASPHALT EDGE
CURB
G M
ET
ER
GK
GK
WK
WK
HA
ND
RA
IL
SIG
N
CB
C/L O
F S
UR
FA
CE
CURB CUT
ASPHALT EDGE
CURBCURB
CB
BO
L
BO
L
BO
L
BO
L
PA
RK
IN
G
CU
RB
BS
P
G M
ET
ER
H
MH
MH
CB
CB
CURB
ASPHALT EDGE
CURB CUT
CB
CURB CUT
CURB
CURB
ASPHALT EDGE
GK
SIG
N
C/L OF ROAD
CO
NC
RE
TE
AR
EA
G M
ET
ER
GU
ID
E R
AIL
WK
MH
MH
SIG
N
SIG
N
C
U
R
B
C
U
T
CU
RB
C
UT
ELE
CT
RIC
AL
BO
X
LS
CB
S
P
E
E
D B
U
M
P
MH
SIG
N
SIG
N
A
S
P
H
A
L
T
E
D
G
E
CB
A
S
P
H
A
L
T
E
D
G
E
C
U
R
B
LS
BO
L
G M
ET
ER
WK
WK
GU
ID
E R
AIL
SIG
N
MH
BA
CK
O
F C
UR
B
CU
RB
AS
PH
ALT
ED
GE
CO
NC
RE
TE
A
RE
A
C
U
R
B
C
U
T
LS
CURB CUT
C
U
R
B
CURB
ASPHALT EDGE
CURB CUT
SIG
NS
C
U
R
B
VE
NT
OV
ER
HA
NG
RE
TA
IN
IN
G W
ALL
HA
ND
RA
IL
ST
EP
S
HA
ND
RA
IL
AS
PH
ALT
E
DG
E
ASPHALT EDGE
SIG
N
CU
RB
C
UT
C
U
R
B
WK
WK
GU
ID
E R
AIL
ASPHALT EDGE
CURB
AS
PH
ALT
E
DG
E
1-S
TO
RE
Y
BR
IC
K B
UILD
IN
G
1-S
TO
RE
Y
BR
IC
K B
UILD
IN
G
1-S
TO
RE
Y
BR
IC
K B
UILD
IN
G
1-S
TO
RE
Y
BR
IC
K B
UILD
IN
G
CO
LU
MN
S
CO
LU
MN
S
BU
ILD
IN
G
OV
ER
HA
NG
BU
ILD
IN
G
OV
ER
HA
NG
1-S
TO
RE
Y
BR
IC
K B
UILD
IN
G
" B
EE
R S
TO
RE
"
MH
LS
CONCRETE
SIDEWALK
C
U
R
B
C
U
T
OVERHEAD ELECTRIC
CO
NC
RE
TE
W
ALK
WA
Y
P
A
R
K
IN
G
C
U
R
BS
ME
TA
L G
UA
RD
S
PA
RK
IN
G
CU
RB
S
CONCRETE
AREA
CONCRETE
SIDEWALK
GU
ID
E
RA
IL
ME
TA
L S
TA
IR
S (4)
CO
NC
RE
TE
AR
EA
B
O
A
R
D
F
E
N
C
E
C
H
A
I
N
L
I
N
K
F
E
N
C
E
LS
CHAIN LINK FENCE
CO
NC
.
ST
EP
CONCRETE SIDEWALK
CHAIN LINK FENCE
A
S
P
H
A
L
T
C
O
N
C
R
E
T
E
S
I
D
E
W
A
L
K
A
S
P
H
A
L
T
E
D
G
E
C
U
R
B
PA
RK
IN
G
CU
RB
S
SIG
N
LS
S
P
E
E
D
B
U
M
P
HW
CONCRETE SIDEWALK
RETAINING WALLS
CONCRETE WALKWAY
CO
NC
RE
TE
W
ALK
WA
Y
RETAINING WALL
CONCRETE WALKWAY
BO
L
BO
L
BO
L
CB
C
U
R
B
C
U
T
CURB CUT
CURB CUTCURB CUT
CURB CUT
CB
CB
ST
M M
H
SA
N M
HST
M M
H
CB
CB
C
U
R
B
C
U
T
CB
CB
C
U
R
B
C
U
R
B
CU
RB
C
U
R
B
C
U
T
C
U
R
B
C
U
T
CURB CUT
CURB CUT
CURB CUT
C
U
R
B
ASPHALT EDGE
C
O
N
C
R
E
T
E
W
A
L
K
LS
MH
C
U
R
B
C
U
T
C
U
R
B
C
U
T
C
U
R
B
C
U
T
C
U
R
B
C
U
T
CB
PA
RK
IN
G
CU
RB
S
CU
RB
CU
T
PA
RK
IN
G
CU
RB
S
HA
ND
RA
IL
BO
L
C
O
N
C
R
E
T
E
W
A
L
K
C
O
N
C
R
E
T
E
W
A
L
K
C
O
N
C
R
E
T
E
W
A
L
K
C
U
R
B
E
D
G
E
O
F
A
S
P
H
A
L
T
R
O
A
D
E
D
G
E
O
F
A
S
P
H
A
L
T
R
O
A
D
C
U
R
B
A
S
P
H
A
L
T
E
D
G
E
A
S
P
H
A
L
T
E
D
G
E
CB
MH
MH
MH
CHAIN LINK FENCE
PAVING
STONES
PAVING
STONES
TE
LE
PH
ON
E
BO
OT
H
PAVING
STONES
MH
MH
LS
WV
WV
LS
LS
MH
MH
HW
LS
SIG
N
GA
RB
AG
E
BIN
HP
GM
TL
TL
HW
TL
TS
C
HW
TL
SIG
NH
P
LS
LS
C/L O
F D
IT
CH
HP
HP
HP
LS
LS
SA
N M
H
CURB CUT
CURB CUT
C
U
R
B
C
U
T
C
U
R
B
C
U
T
CB
CB
CB
CONCRETE AREA
C
U
R
B
C
U
T
MH
C/L O
F R
OA
D
C
/L
O
F
R
O
A
D
C/L OF ROAD
C/L OF ROAD
CURB
CURB
ASPHALT EDGE
ASPHALT EDGE
CURB
CURB
ASPHALT EDGE
ASPHALT EDGE
C
U
R
B
C
U
T
C
U
R
B
C
U
T
C
U
R
B
C
U
T
C
U
R
B
C
U
T
C
U
R
B
C
U
T
SIG
N
AS
PH
ALT
W
ALK
ED
GE
O
F A
SP
HA
LT
AS
PH
ALT
AS
PH
ALT
AS
PH
ALT
W
ALK
ED
GE
O
F A
SP
HA
LT
EDGE OF ASPHALT ROAD
EDGE OF ASPHALT ROAD
EDGE OF ASPHALT ROAD
CONC WALK
CO
NC
W
ALK
CO
NC
W
ALK
C
B
CB
CB
CB
CONC WALK
C/L OF ROAD
CU
RB
&
G
UT
TE
R
CU
RB
&
G
UT
TE
R
CURB
GUTTER
GUTTER
CURB
MH
CO
NC
RE
TE
P
AD
A
S
P
H
A
L
T
E
D
G
E
C
U
R
B
C
U
T
C
U
R
B
C
U
T
C
/
L
O
F
R
O
A
D
BIC
YC
LE
ST
AN
DS
WV
H
WV
H
WV
WV
AS
PH
ALT
E
DG
E
PA
IN
T LIN
EP
AIN
T LIN
E
TR
AF
FIC
LIN
E
TR
AF
FIC
LIN
E
TR
AF
FIC
LIN
E
TR
AF
FIC
LIN
E
TR
AF
FIC
LIN
E
TR
AF
FIC
LIN
E
TR
AF
FIC
LIN
E
TR
AF
FIC
LIN
E
TR
AF
FIC
LIN
E
TR
AF
FIC
LIN
E
AS
PH
ALT
E
DG
E
AS
PH
ALT
E
DG
E
CONCRETE WALK
ASPHALT EDGE
ASPHALT EDGE
LS
TL
HP
LS
HW
SIG
N
LS
HP
TOP OF SLOPE
BOTTOM OF SLOPE
C
U
R
B
A
S
P
H
A
L
T
E
D
G
E
A
S
P
H
A
L
T
E
D
G
E
C
U
R
B
CURB
ASPHALT EDGE
ASPHALT EDGE
CURB
BO
AR
D
FE
NC
E
1
5
9
1
5
8
1
6
0
1
6
0
BEMERSYDE P
ARK
WK
EG
LIN
TO
N A
VE
NU
E W
ES
T
WA
TE
RF
OR
D D
RIV
E
WINCOTT DRIVE
W
I
D
D
I
C
O
M
B
E
H
I
L
L
10
2
1.9
9
0.9
0
10
1
0.2
7
0.9
0
FIG
UR
E 2
.d
wg
- E
xistin
g C
on
ditio
ns S
:\3
8-4
1\1
5M
-0
00
48
-0
3-S
W1
\F
IG
UR
ES
\ A
pr 2
0, 2
01
8 - 5
:4
6p
mF
IG
UR
E 2
.d
wg
- E
xistin
g C
on
ditio
ns S
:\3
8-4
1\1
5M
-0
00
48
-0
3-S
W1
\F
IG
UR
ES
\ A
pr 2
0, 2
01
8 - 5
:4
6p
m
010
30
20
40
50m
PR
OP
ER
TY
B
OU
ND
AR
Y
LE
GE
ND
SIT
E B
OU
ND
AR
Y
SU
B-C
AT
CH
ME
NT
B
OU
ND
AR
Y
101
0.27
0.90
SU
B-C
AT
CH
ME
NT
ID
.
DR
AIA
NG
E A
RE
A (h
a)
RU
NO
FF
C
OE
FF
IC
IE
NT
OV
ER
LA
ND
F
LO
W D
IV
ID
E
OV
ER
LA
ND
F
LO
W D
IR
EC
TIO
N
WSP April 2018 Page 4
Stormwater Management ReportProject No. 15M-00048-03 Montrin Richview GP Inc.
An initial time of concentration, TC, of 10 minutes (or 0.167 hours) is recommended in the
WWFMG document.
2.3 Allowable Flow Rates
The site is located within a suburban area and drains to the municipal storm sewers. As noted
in section 1.4, relevant policies from the WWFMG require the discharge rate from this site to
be controlled to the allowable rate for discharge to municipal sewers. The pre-development
catchments 101 and 102 were delineated based on existing topographic features and storm
service connections.
According to the WWFMG, section 2.2.3.8, the target release rate to the municipal storm
sewer system is based on the 2-year pre-development flow rate calculated with a maximum
runoff coefficient value of 0.50 as required by the City of Toronto WWFMG. This results in
target release rates of 33.1 L/s and 243.9 L/s for catchments 101 and 102, respectively. The
calculated peak flow rates for the site under pre-development conditions are summarized
below in Tables 2 and 3. Detailed calculations are contained within Appendix A.
Table 2: Pre-Development Peak Flow Rate Calculations – Catchment 101
Return Period
(Years)
Rainfall Intensity, I
(mm/Hour)
Existing Peak Flow
Rate, Q
(L/s)
WWFMG Allowable
Release Rate, Qa*
(L/s)
2 88.2 33.1
33.1
5 131.8 49.5
10 162.3 60.9
25 189.5 71.1
50 224.3 84.2
100 250.3 93.9
*C=0.50, area of 0.27 ha and time of concentration of 10 minutes
Stormwater Management Report Project No. 15M-00048-03 Montrin Richview GP Inc.
WSPApril 2018
Page 5
Table 3: Pre-Development Peak Flow Rate Calculations – Catchment 102
Return Period
(Years)
Rainfall Intensity, I
(mm/Hour)
Existing Peak Flow
Rate, Q
(L/s)
WWFMG Allowable
Release Rate, Qa*
(L/s)
2 88.2 243.9
243.9
5 131.8 364.6
10 162.3 448.8
25 189.5 524.2
50 224.3 620.5
100 250.3 692.4
*C=0.50, area of 1.99 ha and time of concentration of 10 minutes
WSP April 2018 Page 6
Stormwater Management ReportProject No. 15M-00048-03 Montrin Richview GP Inc.
3 Post-Development Conditions
3.1 General
The proposed development consists of the construction of 3 new residential and commercial
mixed-use buildings. The proposed Building A will be 16 storeys and both Buildings B and C
will be 22 storeys. A common underground parking structure will be shared by each of the
buildings, with the parking structure underlying almost the entire development footprint.
Vehicular access to the site will be provided via Wincott Drive, Eglinton Avenue West and
Widdicombe Hill. The loading areas and ramp to the basement parking will be entirely covered
by the canopy of the building above.
The site will have two separate stormwater control cisterns and as such, the proposed
development will be divided into two catchments – 201 and 202. Note that due to site grading
and layout, these catchments are slightly different than the existing catchments. Catchment
201, which includes Building A, will have a total area of 0.40 ha, while Catchment 202 will
control an area of 1.86 ha which will include Buildings B and C. In accordance with the Toronto
Municipal Code, a green roof area of 116 m2 for Building A (located on the second storey) and
a combined area of 2,605 m² for Buildings B and C (located on the third, eleventh and twelfth
storey for both) shall be provided. An area breakdown for the new site layout is provided below
in Tables 4 and 5. Please refer to Figure 3 for details of the post-development condition land-
uses and stormwater catchments.
Table 4: Proposed Conditions Area Breakdown – Catchment 201
Land-Use Area (m2) % Coverage Runoff Coefficient, C
Pervious At-Grade 402 9.9 0.25
Impervious At-Grade 2,134 52.4 0.90
Impervious Roof 1,422 34.9 0.90
Green Roof 116 2.8 0.45
Total Site Area 4,073 100% 0.82
HP
GM
TL
TL
HW
TL
TSC
HW
TL
SIGN HP
LS
LS
C/L OF DITCH
HP
HP
HP
LS
LS
MH
BE
ME
RS
YD
E P
AR
K
EGLINTON AVENUE WEST
WATERFORD DRIVE
WIN
CO
TT
D
RIV
E
W
I
D
D
I
C
O
M
B
E
H
I
L
L
C 01
PROPERTY LINE
PR
OP
ER
TY
LIN
EP
RO
PE
RT
Y LIN
E
PR
OP
ER
TY
LIN
E
PROPERTY LINE
PR
OP
ER
TY
LIN
E
PROPERTY L
INE
P
R
O
P
E
R
T
Y
L
I
N
E
PR
OP
ER
TY
LIN
E
PROPERTY LINE
PR
OP
ER
TY
LIN
EP
RO
PE
RT
Y LIN
E
PR
OP
ER
TY
LIN
E
PROPERTY LINE
PR
OP
ER
TY
LIN
E
PROPERTY L
INE
P
R
O
P
E
R
T
Y
L
I
N
E
PR
OP
ER
TY
LIN
E
EGLINTON AVE. WEST
W
I
D
D
I
C
O
M
B
E
H
I
L
L
WIN
CO
TT
D
RIV
E
PRIVATE ROAD
WATERFORD
PROPOSED 9 STOERY
RETIREMENT HOME
10 (39.0m)
11 (43.0m)
2 (14.0m)
22 STOREYS
(82.30m incl. 6m MechPenthouse)
1 STOREY
16 S
TO
RE
YS
(60.3m
incl. 6m
M
echP
enthouse)
22 STOREYS
(82.30m incl. 6m MechPenthouse)
11 (43.0m)
10 (39.0m)
2 (14.0m)
2(7.0m)
3 (14.0m)
16 (54.3m
)
EXISTING BUILDING D
BUILDING B
BUILDING C
BU
IL
DIN
G A
P.O.P.S
(491.55 m
2
)
PR
IV
AT
E R
OA
D
DR
OP
-O
FF
DR
OP
-O
FF
DR
OP
-O
FF
LINE OF U/G GARAGE
2 STOREYS
PROPOSED
TRAFFIC LIGHTS
PROPOSED
TRAFFIC LIGHT
PROPERTY LINE
PR
OP
ER
TY
LIN
EP
RO
PE
RT
Y LIN
E
PR
OP
ER
TY
LIN
E
PROPERTY LINE
PR
OP
ER
TY
LIN
E
PROPERTY L
INE
P
R
O
P
E
R
T
Y
L
I
N
E
PR
OP
ER
TY
LIN
E
APPROXIMATE LOCATION OF
PROPOSED SWM TANK
APPROXIMATE
LOCATION OF
PROPOSED SWM TANK
201
0.40
0.82
202
1.86
0.79
FIGURE 3.dwg - Proposed Conditions S:\38-41\15M-00048-03-SW1\FIGURES\ Apr 20, 2018 - 5:47pmFIGURE 3.dwg - Proposed Conditions S:\38-41\15M-00048-03-SW1\FIGURES\ Apr 20, 2018 - 5:47pm
0 10 3020 40 50m
PROPERTY BOUNDARY
LEGEND
SITE BOUNDARY
SUB-CATCHMENT BOUNDARY
201
0.38
0.83
SUB-CATCHMENT ID.
DRAIANGE AREA (ha)
RUNOFF COEFFICIENT
Stormwater Management Report Project No. 15M-00048-03 Montrin Richview GP Inc.
WSPApril 2018
Page 7
Table 5: Proposed Conditions Area Breakdown – Catchment 202
Land-Use Area (m2) % Coverage Runoff Coefficient, C
Pervious At-Grade 1,464 7.9 0.25
Impervious At-Grade 10,130 54.4 0.90
Impervious Roof 4,431 23.8 0.90
Green Roof 2,605 14.0 0.45
Total Site Area 18,631 100% 0.79
3.2 Water Balance
As noted in section 1.4, the WWFMG state that the proponent should target the retention of 5
mm of stormwater runoff from all surfaces, in order to ensure 50% of the total average annual
rainfall volume is retained on site.
For both catchments 201 and 202, the primary mechanism to capture rainwater will be a
stormwater cistern with a dedicated sump volume for reuse purposes. Discharge from all roof
and at-grade areas will be directed to the underground cisterns. Allowing for an initial abstraction
of 1 mm for all impervious surfaces and 5 mm for all pervious surfaces results in a water balance
volume of 14.2 m3 and 58.2 m3 for catchment 201 and 202, respectively.
The re-use methods for the captured stormwater are still being assessed in conjunction with the
mechanical design of the building’s water supply systems. Proposed reuse options include
flushing of toilets in the interior amenity areas on the ground floor level, irrigation of the green
roof and landscaped areas as well as any additional non-potable demand in the communal
building areas. It is believed that sufficient opportunities exist within the development to re-use
the full volume of retained stormwater within the required drawdown time. The mechanical
design of the rainwater re-use pump systems from the cistern will ensure that the cistern is empty
prior to switching to the City’s water supply. A summary of the water balance provision on site is
provided below in Tables 6 and 7.
WSP April 2018 Page 8
Stormwater Management ReportProject No. 15M-00048-03 Montrin Richview GP Inc.
Table 6: Water Balance – Catchment 201
Surface Type Area
(m2)
5 mm
Volume
(m3)
IA
(m)
Volume
Abstracted
(m3)
Water
Balance
(m3)
Pervious At-Grade 402 2.01 0.005 2.01 0.00
Impervious At-Grade 2,134 10.67 0.001 2.13 8.54
Impervious Roof 1,422 7.11 0.001 1.42 5.69
Green Roof 116 0.58 0.005 0.58 0.00
Total Site Area 4,073 20.37 - 6.14 14.22
Table 7: Water Balance – Catchment 202
Surface Type Area
(m2)
5 mm
Volume
(m3)
IA
(m)
Volume
Abstracted
(m3)
Water
Balance
(m3)
Pervious At-Grade 1,464 7.32 0.005 7.32 0.00
Impervious At-Grade 10,130 50.65 0.001 10.13 40.52
Impervious Roof 4,431 22.15 0.001 4.43 17.72
Green Roof 2,605 13.03 0.005 13.03 0.00
Total Site Area 18,631 93.15 - 34.91 58.24
3.3 Water Quality Control
Architectural plans indicate that the site area will be covered by building rooftop surfaces with
some impervious and pervious landscaping for both catchments. As rooftop areas are free of
typical sediment-generating activities (e.g. vehicle traffic) runoff will leave them effectively
unchanged, and can be considered clean for the purposes of water quality assessment.
Attempting to incorporate treatment for runoff from areas such as these, with such low TSS
loadings, requires significant treatment processes that are chasing diminishing returns on
improved water quality. Thus, a practical approach is necessary that focuses on those
surfaces with higher loading potential to arrive at an overall acceptable discharge loading
equivalent with the intent of the water quality requirements.
Stormwater Management Report Project No. 15M-00048-03 Montrin Richview GP Inc.
WSPApril 2018
Page 9
To check if the site requires any specific water quality treatment measures an analysis of
typical sediment loadings has been undertaken. These calculations were based on values
provided in two documents; (1) “Evaluation of an Extensive Green roof, York University,
Toronto, Ontario”, Final Report, STEP Program, Toronto & Region Conservation Authority,
July 2006; and (2) “Wet Weather Flow Management Master Plan, Area 1; Combined System
Sewershed”, Final Report, July 2003, City of Toronto. Pertinent sections from both of these
documents are reproduced in Appendix C for reference.
Table 6.13 of the STEP program report provides event mean concentrations (EMC) for various
water quality parameters (including TSS) for the control roof area of the study (a typical,
shingle impervious roof surface) and the green roof surface itself. EMC TSS loadings quoted
for these surfaces are 6.3 mg/l and 2.2 mg/l respectively.
Table 5.7 from the WWFMP provides event mean concentration values for various water
quality parameters based on typical land uses. This table quotes a mean figure of 91 mg/l for
TSS loading from a typical residential development.
Table 8: Sediment Loading Analysis (Typical Residential Site) – Catchment 201 & 202
Catchment Area (m2) TSS Loading
(EMC) (mg/L) TSS Removal (%)
Remaining TSS
Load (mg/L)
201 4,073 91.0(1) 80% 18.2
202 18,631 91.0(1) 80% 18.2
(1) From WWFMP report for typical residential development area.
WSP April 2018 Page 10
Stormwater Management ReportProject No. 15M-00048-03 Montrin Richview GP Inc.
Table 9: Sediment Loading Analysis (Proposed Site) – Catchment 201
Surface Area
(m2)
TSS Loading
(EMC)
(mg/L)
Remaining
TSS Load
(mg/L)
Pervious Areas (1) 402 2.2 0.2
Controlled Impervious At-Grade
Areas (2)
2,134 91.0 47.7
Roof Areas* (3) 1,422 6.3 2.2
Green Roof Areas (4) 116 2.2 0.1
Uncontrolled Impervious At-Grade
Areas (5)
0 - -
Totals (6) 4,073 - 50.2
(1) From STEP program report for impervious roof. (2) From STEP program report for green roof.
(3) From WWFMP report for typical residential development area.
(4) From STEP program report, landscaping assumed to have same loading as green roof.
(5) TSS Loadings weighted based on area coverage.
Table 10: Sediment Loading Analysis (Proposed Site) – Catchment 202
Surface Area
(m2)
TSS Loading
(EMC)
(mg/L)
Remaining
TSS Load
(mg/L)
Pervious Areas (1) 1,464 2.2 0.2
Controlled Impervious At-Grade
Areas (2)
10,130 91.0 49.5
Roof Areas* (3) 4,431 6.3 1.5
Green Roof Areas (4) 2,605 2.2 0.3
Uncontrolled Impervious At-Grade
Areas (5)
0 - -
Totals (6) 18,631 51.5
(1) From STEP program report for impervious roof. (2) From STEP program report for green roof.
(3) From WWFMP report for typical residential development area.
(4) From STEP program report, landscaping assumed to have same loading as green roof.
(5) TSS Loadings weighted based on area coverage.
Stormwater Management Report Project No. 15M-00048-03 Montrin Richview GP Inc.
WSPApril 2018
Page 11
As presented in Tables 8-10, Stormwater runoff from the at-grade impervious areas in contact with motorized vehicles will require water quality treatment. The standard for water quality treatment is an 80% TSS removal on a long-term average annual loading basis.
The water quality objective for this development will be achieved through a combination of oil
grit separators (OGS) upstream of each of the storm water cisterns and CB shields at each
catch basin.
3.4 Erosion Control
As mentioned in Section 1.4, this development is an overall small footprint development.
According to the WWFMG, ‘For small infill/redevelopment sites <2 ha, erosion control in the
form of stormwater detention is normally not required, provided the on-site minimum runoff
retention from a small design rainfall event (typically 5 mm) is achieved under the Water
Balance Criteria.’
The site area for each of the catchments (0.40 ha for catchment 201 and 1.86 ha for
catchment 202) is below the 2.0 ha guideline, and the 5 mm water balance requirement has
been addressed – therefore additional measures for erosion control are not recommended.
3.5 Water Quantity Control
The target release rate to the municipal sewer system from the site for catchments 201 and
202 is 33.1 L/s and 243.9 L/s, respectively. This is equivalent to the peak runoff rate under pre-
development conditions during a 2 year design storm event using a runoff coefficient of 0.50
for both catchments.
A HydroCAD model of the project was constructed and utilized to determine the required
storage volume in the stormwater cistern, and to calculate the discharge rates achieved by the
proposed flow controls under all storm events. The Modified Rational Method (an inherent
subroutine of the HydroCAD software) has been used for the modelling exercise.
An emergency overflow will be provided at the top of the cistern, with discharge to street level
and the adjacent right of way. This will prevent flow backing up into the building pipework if the
primary outlet is blocked, or if a storm event in excess of the 100-year return period occurs.
WSP April 2018 Page 12
Stormwater Management ReportProject No. 15M-00048-03 Montrin Richview GP Inc.
For catchment 201, the cistern was designed to provide a storage volume of 180 m3, with a
base area of 90 m². The primary gravity outlet is set 0.16 m above the base, to provide a
sufficient re-use volume to satisfy the water balance. A 100 mm diameter orifice tube is
proposed as the primary outlet – this provides sufficient flow restriction to control release rates
to within the target rate set by the WWFMG.
For catchment 202, the cistern was designed to provide a storage volume of 650 m3, with a
base area of 325 m² and the primary gravity outlet set 0.18 m above the base. Based on the
tank dimensions this will provide sufficient volume to satisfy the water balance. A 250 mm
diameter orifice tube is proposed as the primary outlet – this provides sufficient flow restriction
to control release rates to within the target rate set by the WWFMG.
A summary of the modelling results is provided below in Tables 11 and 12. HydroCAD
modelling output is provided in Appendix B.
Table 11: Summary of Modelling Results – Catchment 201
Return Period
(Years)
Modelled Post-
Development Peak
Flow Rate (L/s)
Target
Release Rate
(L/s)
Utilized
Cistern
Storage
(m3)
Peak Water
Elevation In
Cistern (m)
Time Of
Peak
(min)
2 17.1
33.1
53.1 0.590 21
5 22.0 75.0 0.833 21
10 24.8 90.4 1.005 23
25 27.2 105.1 1.168 24
50 30.1 124.3 1.381 27
100 32.1 138.9 1.543 27
Stormwater Management Report Project No. 15M-00048-03 Montrin Richview GP Inc.
WSPApril 2018
Page 13
Table 12: Summary of Modelling Results – Catchment 202
Return Period
(Years)
Modelled Post-
Development Peak
Flow Rate (L/s)
Target
Release Rate
(L/s)
Utilized
Cistern
Storage
(m3)
Peak Water
Elevation In
Cistern (m)
Time Of
Peak
(min)
2 98.1
243.9
202.4 0.623 15
5 130.0 280.5 0.863 16
10 149.0 337.6 1.039 16
25 165.0 391.5 1.205 18
50 183.9 462.6 1.423 18
100 197.1 516.4 1.589 19
The modelling results demonstrate that the post-development peak flow rates for all events up
to the 100-year storm are lower than the target release rate established in accordance with the
WWFMG. The maximum required storage volume to control the 100-year post-development
runoff is 138.9 m3 and 516.4 m3 for the cisterns in catchment 201 and 202 respectively. Note
that the total utilized storage volumes include the sump volume designated for reuse.
As all flow rates are controlled by the project cistern, the rainfall intensity and storm duration
resulting in the maximum utilized storage produces the largest flows. This has been iteratively
determined at td = 27 and td = 19 minutes (for the 100-year event) for catchment 201 and 202
respectively.
3.6 Hydrogeology and Groundwater Characterization
A Hydrogeological investigation was conducted in August 2017 by Terraprobe in order to
assess the groundwater conditions and soil characteristics of the development, and test for the
presence of groundwater contamination.
Water depths were encountered between 6 m and 20 m below ground surface elevations. A
representative ground water sample was collected in July 2017 and analyzed for parameters
included within the City of Toronto Municipal Code Chapter 681 Table 1 and Table 2. Given
the exceedances for total manganese, total zinc and total suspended solids, the groundwater
is unsuitable for discharge to the municipal storm sewer system without pre-treatment.
WSP April 2018 Page 14
Stormwater Management ReportProject No. 15M-00048-03 Montrin Richview GP Inc.
Therefore, groundwater collected from the foundation drains will be sent to the sanitary sewer
system where the total manganese, total zinc and total suspended solids are within the
acceptable limits for discharge.
Long term groundwater dewatering is estimated at 1,500 L/day, however the hydrogeological
assessment notes that this volume may change depending on the final foundation design of
the building.
Stormwater Management Report Project No. 15M-00048-03 Montrin Richview GP Inc.
WSPApril 2018
Page 15
4 Conclusions A stormwater management plan has been prepared to support the rezoning application for the
proposed redevelopment of 4620 Eglinton Avenue West and 250 Wincott Drive in the City of
Toronto. The key points are summarized below.
WATER BALANCE
The site is required to retain 5 mm of runoff from each rainfall event for reuse on site to meet
the WWFMG requirements. Water balance strategies will be addressed through provision of
green roof surfaces and sump volume (equivalent to the post-development 5 mm runoff
volume) at the base of the proposed cisterns for both catchments 201 and 202. Re-use
methods for the captured stormwater are still being assessed in conjunction with the
mechanical design of the buildings’ water supply systems.
WATER QUANTITY
Runoff from the area within catchment 201 will be directed to a 180 m3 stormwater cistern and
runoff from catchment 202 will be directed to a 650 m3 stormwater cistern. Post-development
flows have been controlled to below 33.1 L/s for catchment 201 and 243.9 L/s for catchment
202 in compliance with the target release rate to the municipal storm sewer system.
WATER QUALITY
An oil grit separator and CB shields will be used to capture and retain the runoff volume from
the 25 mm water quality event will provide sufficient treatment for runoff originating from at-
grade sediment-generating impervious surfaces and meet the 80% TSS requirement.
The report has demonstrated that the proposed stormwater management strategy will address
stormwater management related impacts from this project in adherence with City of Toronto’s
Wet Weather Flow Management Guidelines.
Respectfully submitted,
WSP April 2018 Page 16
Stormwater Management ReportProject No. 15M-00048-03 Montrin Richview GP Inc.
WSP Canada Group Limited
Bhavika Patel, P.Eng., CFM April 24 2018
Project Engineer, Water Resources
Jennifer Chan, EIT
Designer, Water Resources
Stormwater Management Report Project No. 15M-00048-03 Montrin Richview GP Inc.
WSPApril 2018
Page 17
5 Standard Limitations This report was prepared by WSP Group Canada Limited for the client in accordance with the
agreement between WSP and the client. This report is based on information provided to WSP
which has not been independently verified.
The disclosure of any information contained in this report is the sole responsibility of the client.
The material in this report, accompanying spreadsheets and all information relating to this
activity reflect WSP’s judgment in light of the information available to us at the time of
preparation of this report. With the exception of the City of Toronto who can rely on this report,
any use which a third party makes of this report, or any reliance on or decisions to be made
based on it, are the responsibility of such third parties. WSP accepts no responsibility for
damages, if any, suffered by a third party as a result of decisions made or actions based on
this report.
WSP warrants that it performed services hereunder with that degree of care, skill, and
diligence normally provided in the performance of such services in respect of projects of similar
nature at the time and place those services were rendered. WSP disclaims all other
warranties, representations, or conditions, either express or implied, including, without
limitation, warranties, representations, or conditions of merchantability or profitability, or fitness
for a particular purpose.
This Standard Limitations statement is considered part of this report.
APPENDIX
A STORMWATER
MANAGEMENT
CALCULATIONS
By: Date: 19/04/2018 Page:
Checked: Checked: 1
Calculation of existing runoff rate is undertaken using the Rational Method: Q = 2.78 CIA
Where: Q = Peak flow rate (litres/second)
C = Runoff coefficient
I = Rainfall intensity (mm/hour)
A = Catchment area (hectares)
Project Area, A 0.27 hectares
Runoff Coef, C* 0.50
Where: A and C = Parameters defined in WWFMG section 3.1.
I = Rainfall intensity (mm/hour)
T = Time of concentration (hours)
2 5 10 25 50 100
21.8 32.0 38.7 45.2 53.5 59.7
-0.78 -0.79 -0.80 -0.80 -0.80 -0.80
10 10 10 10 10 10
0.167 0.167 0.167 0.167 0.167 0.167
88.2 131.8 162.3 189.5 224.3 250.3
33.1 49.5 60.9 71.1 84.2 93.9
0.033 0.049 0.061 0.071 0.084 0.094
** Note recommended minimum value for time of concentration for small sites (<2.0ha) is 10 minutes.
Allowable release rate to municipal storm sewer system is therefore 33.1 litres/second.
(As per City of Toronto WWFMG section 2.2.3.7)
Satellite
Stormwater Management
Calculations
Q (m3/sec)
Q (litres/sec)
I (mm/hr)
T (hrs)
T (mins) **
C
15M-00048-03No.:Richview Square
BP
JKC
A
Allowable Offsite Discharge Rate
Catchment 101
Return Period (Years)
* Note - actual site runoff coefficient is approximately 0.90, however City of Toronto WWFMG states maximum runoff
coefficient to be used in calculation of pre-development peak flow is 0.50 (section 2.2.3.8).
Project:
CATI =
By: Date: 19/04/2018 Page:
Checked: Checked: 1
Calculation of existing runoff rate is undertaken using the Rational Method: Q = 2.78 CIA
Where: Q = Peak flow rate (litres/second)
C = Runoff coefficient
I = Rainfall intensity (mm/hour)
A = Catchment area (hectares)
Project Area, A 1.99 hectares
Runoff Coef, C* 0.50
Where: A and C = Parameters defined in WWFMG section 3.1.
I = Rainfall intensity (mm/hour)
T = Time of concentration (hours)
2 5 10 25 50 100
21.8 32.0 38.7 45.2 53.5 59.7
-0.78 -0.79 -0.80 -0.80 -0.80 -0.80
10 10 10 10 10 10
0.167 0.167 0.167 0.167 0.167 0.167
88.2 131.8 162.3 189.5 224.3 250.3
243.9 364.6 448.8 524.2 620.5 692.4
0.244 0.365 0.449 0.524 0.621 0.692
** Note recommended minimum value for time of concentration for small sites (<2.0ha) is 10 minutes.
Allowable release rate to municipal storm sewer system is therefore 243.9 litres/second.
(As per City of Toronto WWFMG section 2.2.3.7)
Satellite
Stormwater Management
CalculationsProject: Richview Square No.: 15M-00048-03
Allowable Offsite Discharge Rate
Catchment 102
JKC
BP
I (mm/hr)
Q (litres/sec)
Q (m3/sec)
* Note - actual site runoff coefficient is approximately 0.60, however City of Toronto WWFMG states maximum runoff
coefficient to be used in calculation of pre-development peak flow is 0.50 (section 2.2.3.8).
Return Period (Years)
A
C
T (mins) **
T (hrs)
CATI =
By: Date: 19/04/2018 Page:
Checked: Checked: 2
The City of Toronto Wet Weather Flow Management Guidelines (WWFMG) require a site "to retain water on-site to the extent practicable,
- Section 2.2.1.1 (a)
The current area measurements and land use types for the site are as follows:
Land Use Area (m2) Runoff C Impervious CN % Coverage
Pervious At-Grade 402 0.25 0% 74 9.9
Impervious At-Grade 2,134 0.90 100% 98 52.4
Impervious Roof 1,422 0.90 100% 98 34.9
Green Roof 116 0.45 0% 81 2.8
Total Site Area: 4,073 0.82 87% 95 100
Pervious 402 2.01 0.005 2.01 0.00
Impervious At-Grade 2,134 10.67 0.001 2.13 8.54
Roof 1,422 7.11 0.001 1.42 5.69
Green Roof 116 0.58 0.005 0.58 0.00
Total Site Area: 4,073 20.37 - 6.14 14.22
producing any runoff.
weights).
It is assumed that the remaining hard surfaces on the site can abstract 1 mm of rainfall, and that all soft landscaped areas
can absorb 5 mm
Therefore, volume of runoff during a 5 mm storm event: 14.22 m3
This is supported by EPA analysis of green roof manufacturer data sheets (dry unit weights versus saturated unit
No.:Project: 15M-00048-03Richview SquareStormwater Management
Calculations
Surface TypeArea
(m2)
Volume
Abstracted
(m3)
5 mm
Volume
(m3)
For the purposes of the water balance calculation it is assumed that green roofs can accept 10 mm of rainfall without
Water
Balance
(m3)
IA
(m)
JKC
BP
In this case, the minimum on-site runoff retention will require the site to retain all runoff from 5 mm storm event through evapotranspiration
infiltration, or rainwater reuse. WWFMG Section 2.2.1.1 (d).
to achieve the same level of annual volume of overland runoff allowable from the development site under pre-development conditions”.
Abstractions and Water Balance
Catchment 201
By: Date: 19/04/2018 Page:
Checked: Checked: 2
The City of Toronto Wet Weather Flow Management Guidelines (WWFMG) require a site "to retain water on-site to the extent practicable,
- Section 2.2.1.1 (a)
The current area measurements and land use types for the site are as follows:
Land Use Area (m2) Runoff C Impervious CN % Coverage
Pervious At-Grade 1464 0.25 0% 74 7.9
Impervious At-Grade 10130 0.90 100% 98 54.4
Impervious Roof 4431 0.90 100% 98 23.8
Green Roof 2605 0.45 0% 81 14.0
Total Site Area: 18631 0.79 78% 94 100
Pervious 1,464 7.32 0.005 7.32 0.00
Impervious At-Grade 10,130 50.65 0.001 10.13 40.52
Roof 4,431 22.15 0.001 4.43 17.72
Green Roof 2,605 13.03 0.005 13.03 0.00
Total Site Area: 18,631 93.15 - 34.91 58.24
producing any runoff.
weights).
It is assumed that the remaining hard surfaces on the site can abstract 1 mm of rainfall, and that all soft landscaped areas
can absorb 5 mm
Therefore, volume of runoff during a 5 mm storm event: 58.24 m3
Water
Balance
(m3)
Stormwater Management
CalculationsProject: Richview Square No.: 15M-00048-03
Abstractions and Water Balance
Catchment 202
JKC
BP
For the purposes of the water balance calculation it is assumed that green roofs can accept 10 mm of rainfall without
This is supported by EPA analysis of green roof manufacturer data sheets (dry unit weights versus saturated unit
to achieve the same level of annual volume of overland runoff allowable from the development site under pre-development conditions”.
In this case, the minimum on-site runoff retention will require the site to retain all runoff from 5 mm storm event through evapotranspiration
infiltration, or rainwater reuse. WWFMG Section 2.2.1.1 (d).
Surface TypeArea
(m2)
IA
(m)
Volume
Abstracted
(m3)
5 mm
Volume
(m3)
By: Date: 19/04/2018 Page:
Checked: Checked: 3
Refer to Section 3.3 of SWM Report for further details.
Analysis based on typical EMC TSS values provoded in the following documents:
(1) “Evaluation of an Extensive Greenroof, York University, Toronto, Ontario”, Final Report, STEP Program, TRCA, July 2006.
(2) “Wet Weather Flow Management Master Plan, Area 1; Combined System Sewershed”, Final Report, July 2003, City of Toronto.
Typical Residential Site:Remaining TSS
Load (mg/l)
18.2(1)
From WWFMP report for typical residential development area.
Proposed Development Site:Remaining TSS
Load (mg/l)
0.2
47.7
2.2
0.1
-
50.2
(1) From STEP program report, landscaping assumed to have same loading as green roof.
(2) From WWFMP report for typical residential development area.
(3) From STEP program report for impervious roof.
(4) From STEP report for green roof.
(5) This area cannot be treated as it is uncontrolled.
(6) TSS Loadings weighted based on area coverage.
Satellite
- -
Stormwater Management
CalculationsProject: No.: 15M-00048-03Richview Square
STEP Loading Calculation - Water
Quality Catchment 201
Surface
Pervious Areas (1)
Surface
Total Site Area (1)
Totals (6)
Green Roof Areas (4)
Roof Areas* (3)
Controlled Impervious At-Grade Areas (2)
Uncontrolled Impervious At-Grade Areas (5)
Area
(m2)
JKC
BP
-
-
TSS Removal
(%)
TSS Removal
(%)
91.0 80%
2.2
116
2,134
Area
(m2)
4,073
1,422
402
0
TSS Loading
EMC (mg/l)
4,073
-
-
-
2.2
91.0
TSS Loading
EMC (mg/l)
6.3
By: Date: 19/04/2018 Page:
Checked: Checked: 3
Refer to Section 3.3 of SWM Report for further details.
Analysis based on typical EMC TSS values provoded in the following documents:
(1) “Evaluation of an Extensive Greenroof, York University, Toronto, Ontario”, Final Report, STEP Program, TRCA, July 2006.
(2) “Wet Weather Flow Management Master Plan, Area 1; Combined System Sewershed”, Final Report, July 2003, City of Toronto.
Typical Residential Site:Remaining TSS
Load (mg/l)
18.2(1)
From WWFMP report for typical residential development area.
Proposed Development Site:Remaining TSS
Load (mg/l)
0.2
49.5
1.5
0.3
-
51.5
(1) From STEP program report, landscaping assumed to have same loading as green roof.
(2) From WWFMP report for typical residential development area.
(3) From STEP program report for impervious roof.
(4) From STEP report for green roof.
(5) This area cannot be treated as it is uncontrolled.
(6) TSS Loadings weighted based on area coverage.
Satellite
Stormwater Management
CalculationsProject: Richview Square No.: 15M-00048-03
STEP Loading Calculation - Water
Quality Catchment 202
JKC
BP
SurfaceArea
(m2)
TSS Loading
EMC (mg/l)
TSS Removal
(%)
Total Site Area (1) 18,631 91.0 80%
SurfaceArea
(m2)
TSS Loading
EMC (mg/l)
TSS Removal
(%)
Pervious Areas (1) 1,464 2.2 -
- -
Controlled Impervious At-Grade Areas (2) 10,130 91.0 -
Roof Areas* (3) 4,431 6.3 -
Totals (6) 18,631 -
Green Roof Areas (4) 2,605 2.2 -
Uncontrolled Impervious At-Grade Areas (5) 0
APPENDIX
B HYDROLOGIC
MODEL OUTPUT
(HydroCAD)
3
Impervious Roof
4
Pervious Landscaping
7S
Green Roof8S
At-Grade Impervious
36S
Impervious Roof
37S
Pervious Landscaping
38S
Green Roof39S
At-Grade Impervious
15R
Catchment 201 (A)
16R
Catchment 202 (BC)
5
SWM Tank (33.1L/s)
6P
Green Roof
40P
SWM Tank (243.9L/s)
41P
Green Roof
Routing Diagram for Richview SquarePrepared by {enter your company name here}, Printed 19/04/2018HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Subcat Reach Pond Link
Richview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 2HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Area Listing (all nodes)
Area
(sq-meters)
C Description
(subcatchment-numbers)
10,130.4 0.90 (39S)
2,721.3 0.45 Green Roof (7S, 38S)
5,852.6 0.90 Impervious Roof (3, 36S)
2,134.0 0.90 Paved Areas (8S)
1,866.4 0.25 Pervious Area (4, 37S)
22,704.7 0.79 TOTAL AREA
Richview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 3HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Soil Listing (all nodes)
Area
(sq-meters)
Soil
Group
Subcatchment
Numbers
0.0 HSG A
0.0 HSG B
0.0 HSG C
0.0 HSG D
22,704.7 Other 3, 4, 7S, 8S, 36S, 37S, 38S, 39S
22,704.7 TOTAL AREA
Richview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 4HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Notes Listing (all nodes)
Line# Node
Number
Notes
1 3 Collection from various impervious roof areas
2 4 Remaining landscaped areas to be defined (pavestone, grass, ect)
3 36S Collection from various impervious roof areas
4 37S Remaining landscaped areas to be defined (pavestone, grass, ect)
Toronto 2-Year Duration=19 min, Inten=53.5 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 5HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Time span=0.00-6.00 hrs, dt=0.01 hrs, 601 pointsRunoff by Rational method, Rise/Fall=1.0/1.0 xTc
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=1,422.0 m² 0.00% Impervious Runoff Depth=15 mmSubcatchment 3: Impervious Roof Tc=10.0 min C=0.90 Runoff=0.0190 m³/s 21.7 m³
Runoff Area=402.0 m² 0.00% Impervious Runoff Depth=4 mmSubcatchment 4: Pervious Landscaping Tc=10.0 min C=0.25 Runoff=0.0015 m³/s 1.7 m³
Runoff Area=116.0 m² 0.00% Impervious Runoff Depth=8 mmSubcatchment 7S: Green Roof Tc=10.0 min C=0.45 Runoff=0.0008 m³/s 0.9 m³
Runoff Area=2,134.0 m² 0.00% Impervious Runoff Depth=15 mmSubcatchment 8S: At-Grade Impervious Tc=10.0 min C=0.90 Runoff=0.0285 m³/s 32.5 m³
Runoff Area=4,430.6 m² 0.00% Impervious Runoff Depth=15 mmSubcatchment 36S: Impervious Roof Tc=10.0 min C=0.90 Runoff=0.0592 m³/s 67.5 m³
Runoff Area=1,464.4 m² 0.00% Impervious Runoff Depth=4 mmSubcatchment 37S: Pervious Landscaping Tc=10.0 min C=0.25 Runoff=0.0054 m³/s 6.2 m³
Runoff Area=2,605.3 m² 0.00% Impervious Runoff Depth=8 mmSubcatchment 38S: Green Roof Tc=10.0 min C=0.45 Runoff=0.0174 m³/s 19.8 m³
Runoff Area=10,130.4 m² 0.00% Impervious Runoff Depth=15 mmSubcatchment 39S: At-Grade Tc=10.0 min C=0.90 Runoff=0.1354 m³/s 154.3 m³
Reach 15R: Catchment 201 (A)
Reach 16R: Catchment 202 (BC)
Peak Elev=0.589 m Storage=53.0 m³ Inflow=0.0490 m³/s 56.1 m³Pond 5: SWM Tank (33.1L/s) Outflow=0.0171 m³/s 55.1 m³
Peak Elev=100.001 m Storage=0.9 m³ Inflow=0.0008 m³/s 0.9 m³Pond 6P: Green Roof Outflow=0.0000 m³/s 0.3 m³
Peak Elev=0.620 m Storage=201.5 m³ Inflow=0.2002 m³/s 234.5 m³Pond 40P: SWM Tank (243.9L/s) Outflow=0.0976 m³/s 231.6 m³
Peak Elev=100.011 m Storage=19.0 m³ Inflow=0.0174 m³/s 19.8 m³Pond 41P: Green Roof Outflow=0.0020 m³/s 6.5 m³
Total Runoff Area = 22,704.7 m² Runoff Volume = 304.6 m³ Average Runoff Depth = 13 mm100.00% Pervious = 22,704.7 m² 0.00% Impervious = 0.0 m²
Toronto 2-Year Duration=19 min, Inten=53.5 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 6HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 3: Impervious Roof
Runoff = 0.0190 m³/s @ 0.17 hrs, Volume= 21.7 m³, Depth= 15 mm
Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsToronto 2-Year Duration=19 min, Inten=53.5 mm/hr
Area (m²) C Description
1,422.0 0.90 Impervious Roof
1,422.0 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (meters) (m/m) (m/sec) (m³/s)
10.0 Direct Entry, Direct Entry
Subcatchment 3: Impervious Roof
Runoff
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.021
0.02
0.019
0.018
0.017
0.016
0.015
0.014
0.013
0.012
0.011
0.01
0.009
0.008
0.007
0.006
0.005
0.004
0.003
0.002
0.001
0
Toronto 2-Year
Duration=19 min,
Inten=53.5 mm/hr
Runoff Area=1,422.0 m²
Runoff Volume=21.7 m³
Runoff Depth=15 mm
Tc=10.0 min
C=0.90
0.0190 m³/s
Toronto 2-Year Duration=19 min, Inten=53.5 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 7HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 4: Pervious Landscaping
Runoff = 0.0015 m³/s @ 0.17 hrs, Volume= 1.7 m³, Depth= 4 mm
Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsToronto 2-Year Duration=19 min, Inten=53.5 mm/hr
Area (m²) C Description
402.0 0.25 Pervious Area
402.0 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (meters) (m/m) (m/sec) (m³/s)
10.0 Direct Entry, Direct Entry
Subcatchment 4: Pervious Landscaping
Runoff
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.002
0.002
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.000
0.000
0.000
0.000
0
0
Toronto 2-Year
Duration=19 min,
Inten=53.5 mm/hr
Runoff Area=402.0 m²
Runoff Volume=1.7 m³
Runoff Depth=4 mm
Tc=10.0 min
C=0.25
0.0015 m³/s
Toronto 2-Year Duration=19 min, Inten=53.5 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 8HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 7S: Green Roof
Runoff = 0.0008 m³/s @ 0.17 hrs, Volume= 0.9 m³, Depth= 8 mm
Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsToronto 2-Year Duration=19 min, Inten=53.5 mm/hr
Area (m²) C Description
116.0 0.45 Green Roof
116.0 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (meters) (m/m) (m/sec) (m³/s)
10.0 Direct Entry, Direct Entry
Subcatchment 7S: Green Roof
Runoff
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0
0
0
Toronto 2-Year
Duration=19 min,
Inten=53.5 mm/hr
Runoff Area=116.0 m²
Runoff Volume=0.9 m³
Runoff Depth=8 mm
Tc=10.0 min
C=0.45
0.0008 m³/s
Toronto 2-Year Duration=19 min, Inten=53.5 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 9HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 8S: At-Grade Impervious
Runoff = 0.0285 m³/s @ 0.17 hrs, Volume= 32.5 m³, Depth= 15 mm
Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsToronto 2-Year Duration=19 min, Inten=53.5 mm/hr
Area (m²) C Description
2,134.0 0.90 Paved Areas
2,134.0 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (meters) (m/m) (m/sec) (m³/s)
10.0 Direct Entry, Direct Entry
Subcatchment 8S: At-Grade Impervious
Runoff
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.03
0.028
0.026
0.024
0.022
0.02
0.018
0.016
0.014
0.012
0.01
0.008
0.006
0.004
0.002
0
Toronto 2-Year
Duration=19 min,
Inten=53.5 mm/hr
Runoff Area=2,134.0 m²
Runoff Volume=32.5 m³
Runoff Depth=15 mm
Tc=10.0 min
C=0.90
0.0285 m³/s
Toronto 2-Year Duration=19 min, Inten=53.5 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 10HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 36S: Impervious Roof
Runoff = 0.0592 m³/s @ 0.17 hrs, Volume= 67.5 m³, Depth= 15 mm
Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsToronto 2-Year Duration=19 min, Inten=53.5 mm/hr
Area (m²) C Description
4,430.6 0.90 Impervious Roof
4,430.6 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (meters) (m/m) (m/sec) (m³/s)
10.0 Direct Entry, Direct Entry
Subcatchment 36S: Impervious Roof
Runoff
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.065
0.06
0.055
0.05
0.045
0.04
0.035
0.03
0.025
0.02
0.015
0.01
0.005
0
Toronto 2-Year
Duration=19 min,
Inten=53.5 mm/hr
Runoff Area=4,430.6 m²
Runoff Volume=67.5 m³
Runoff Depth=15 mm
Tc=10.0 min
C=0.90
0.0592 m³/s
Toronto 2-Year Duration=19 min, Inten=53.5 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 11HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 37S: Pervious Landscaping
Runoff = 0.0054 m³/s @ 0.17 hrs, Volume= 6.2 m³, Depth= 4 mm
Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsToronto 2-Year Duration=19 min, Inten=53.5 mm/hr
Area (m²) C Description
1,464.4 0.25 Pervious Area
1,464.4 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (meters) (m/m) (m/sec) (m³/s)
10.0 Direct Entry, Direct Entry
Subcatchment 37S: Pervious Landscaping
Runoff
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.006
0.005
0.005
0.004
0.004
0.003
0.003
0.002
0.002
0.001
0.001
0.000
0
Toronto 2-Year
Duration=19 min,
Inten=53.5 mm/hr
Runoff Area=1,464.4 m²
Runoff Volume=6.2 m³
Runoff Depth=4 mm
Tc=10.0 min
C=0.25
0.0054 m³/s
Toronto 2-Year Duration=19 min, Inten=53.5 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 12HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 38S: Green Roof
Runoff = 0.0174 m³/s @ 0.17 hrs, Volume= 19.8 m³, Depth= 8 mm
Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsToronto 2-Year Duration=19 min, Inten=53.5 mm/hr
Area (m²) C Description
2,605.3 0.45 Green Roof
2,605.3 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (meters) (m/m) (m/sec) (m³/s)
10.0 Direct Entry, Direct Entry
Subcatchment 38S: Green Roof
Runoff
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.019
0.018
0.017
0.016
0.015
0.014
0.013
0.012
0.011
0.01
0.009
0.008
0.007
0.006
0.005
0.004
0.003
0.002
0.001
0
Toronto 2-Year
Duration=19 min,
Inten=53.5 mm/hr
Runoff Area=2,605.3 m²
Runoff Volume=19.8 m³
Runoff Depth=8 mm
Tc=10.0 min
C=0.45
0.0174 m³/s
Toronto 2-Year Duration=19 min, Inten=53.5 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 13HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 39S: At-Grade Impervious
Runoff = 0.1354 m³/s @ 0.17 hrs, Volume= 154.3 m³, Depth= 15 mm
Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsToronto 2-Year Duration=19 min, Inten=53.5 mm/hr
Area (m²) C Description
10,130.4 0.90
10,130.4 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (meters) (m/m) (m/sec) (m³/s)
10.0 Direct Entry, Direct Entry
Subcatchment 39S: At-Grade Impervious
Runoff
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.15
0.14
0.13
0.12
0.11
0.1
0.09
0.08
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0
Toronto 2-Year
Duration=19 min,
Inten=53.5 mm/hr
Runoff Area=10,130.4 m²
Runoff Volume=154.3 m³
Runoff Depth=15 mm
Tc=10.0 min
C=0.90
0.1354 m³/s
Toronto 2-Year Duration=19 min, Inten=53.5 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 14HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Reach 15R: Catchment 201 (A)
[40] Hint: Not Described (Outflow=Inflow)
Toronto 2-Year Duration=19 min, Inten=53.5 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 15HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Reach 16R: Catchment 202 (BC)
[40] Hint: Not Described (Outflow=Inflow)
Toronto 2-Year Duration=19 min, Inten=53.5 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 16HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Pond 5: SWM Tank (33.1L/s)
Inflow Area = 4,074.0 m², 0.00% Impervious, Inflow Depth = 14 mm for 2-Year eventInflow = 0.0490 m³/s @ 0.31 hrs, Volume= 56.1 m³Outflow = 0.0171 m³/s @ 0.43 hrs, Volume= 55.1 m³, Atten= 65%, Lag= 6.9 minPrimary = 0.0171 m³/s @ 0.43 hrs, Volume= 55.1 m³
Routing by Stor-Ind method, Time Span= 0.00-6.00 hrs, dt= 0.01 hrs / 3Starting Elev= 0.150 m Surf.Area= 90.0 m² Storage= 13.5 m³Peak Elev= 0.589 m @ 0.43 hrs Surf.Area= 90.0 m² Storage= 53.0 m³ (39.5 m³ above start)
Plug-Flow detention time= 45.9 min calculated for 41.5 m³ (74% of inflow)Center-of-Mass det. time= 33.0 min ( 48.0 - 15.1 )
Volume Invert Avail.Storage Storage Description
#1 0.000 m 180.0 m³ 1.00 mW x 90.00 mL x 2.00 mH Cistern + Orifice
Device Routing Invert Outlet Devices
#1 Primary 0.160 m 100 mm Vert. Orifice/Grate C= 0.800
Primary OutFlow Max=0.0171 m³/s @ 0.43 hrs HW=0.589 m (Free Discharge)1=Orifice/Grate (Orifice Controls 0.0171 m³/s @ 2.18 m/s)
Pond 5: SWM Tank (33.1L/s)
InflowPrimary
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.05
0.045
0.04
0.035
0.03
0.025
0.02
0.015
0.01
0.005
0
Inflow Area=4,074.0 m²
Peak Elev=0.589 m
Storage=53.0 m³
0.0490 m³/s
0.0171 m³/s
Toronto 2-Year Duration=19 min, Inten=53.5 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 17HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Pond 5: SWM Tank (33.1L/s)
Primary
Stage-Discharge
Discharge (m³/s)0.0360.0340.0320.030.0280.0260.0240.0220.020.0180.0160.0140.0120.010.0080.0060.0040.0020
Ele
vati
on
(m
ete
rs)
2
1
0
Orifice/Grate
Toronto 2-Year Duration=19 min, Inten=53.5 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 18HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Pond 6P: Green Roof
Inflow Area = 116.0 m², 0.00% Impervious, Inflow Depth = 8 mm for 2-Year eventInflow = 0.0008 m³/s @ 0.17 hrs, Volume= 0.9 m³Outflow = 0.0000 m³/s @ 0.48 hrs, Volume= 0.3 m³, Atten= 97%, Lag= 18.5 minPrimary = 0.0000 m³/s @ 0.48 hrs, Volume= 0.3 m³
Routing by Stor-Ind method, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsPeak Elev= 100.001 m @ 0.48 hrs Surf.Area= 647.0 m² Storage= 0.9 m³
Plug-Flow detention time= 134.5 min calculated for 0.3 m³ (29% of inflow)Center-of-Mass det. time= 127.0 min ( 141.5 - 14.5 )
Volume Invert Avail.Storage Storage Description
#1 99.990 m 0.6 m³ 1.00 mW x 116.00 mL x 0.01 mH Green Roof Media Storage1.2 m³ Overall x 50.0% Voids
#2 100.000 m 42.5 m³ 1.00 mW x 531.00 mL x 0.08 mH Green Roof
43.1 m³ Total Available Storage
Device Routing Invert Outlet Devices
#1 Primary 100.000 m 100 mm Horiz. Orifice/Grate X 3.00 C= 0.800 Limited to weir flow at low heads
Primary OutFlow Max=0.0000 m³/s @ 0.48 hrs HW=100.001 m (Free Discharge)1=Orifice/Grate (Weir Controls 0.0000 m³/s @ 0.04 m/s)
Pond 6P: Green Roof
InflowPrimary
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0
0
0
Inflow Area=116.0 m²
Peak Elev=100.001 m
Storage=0.9 m³
0.0008 m³/s
0.0000 m³/s
Toronto 2-Year Duration=19 min, Inten=53.5 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 19HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Pond 6P: Green Roof
Primary
Stage-Discharge
Discharge (m³/s)0.0220.020.0180.0160.0140.0120.010.0080.0060.0040.0020
Ele
vati
on
(m
ete
rs)
100.08
100.075
100.07
100.065
100.06
100.055
100.05
100.045
100.04
100.035
100.03
100.025
100.02
100.015
100.01
100.005
100
99.995
99.99
Orifice/Grate
Toronto 2-Year Duration=19 min, Inten=53.5 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 20HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Pond 40P: SWM Tank (243.9L/s)
Inflow Area = 18,630.7 m², 0.00% Impervious, Inflow Depth > 13 mm for 2-Year eventInflow = 0.2002 m³/s @ 0.31 hrs, Volume= 234.5 m³Outflow = 0.0976 m³/s @ 0.40 hrs, Volume= 231.6 m³, Atten= 51%, Lag= 5.6 minPrimary = 0.0976 m³/s @ 0.40 hrs, Volume= 231.6 m³
Routing by Stor-Ind method, Time Span= 0.00-6.00 hrs, dt= 0.01 hrs / 3Starting Elev= 0.180 m Surf.Area= 325.0 m² Storage= 58.5 m³Peak Elev= 0.620 m @ 0.40 hrs Surf.Area= 325.0 m² Storage= 201.5 m³ (143.0 m³ above start)
Plug-Flow detention time= 41.4 min calculated for 172.8 m³ (74% of inflow)Center-of-Mass det. time= 27.9 min ( 44.2 - 16.4 )
Volume Invert Avail.Storage Storage Description
#1 0.000 m 650.0 m³ 1.00 mW x 325.00 mL x 2.00 mH Cistern + Orifice
Device Routing Invert Outlet Devices
#1 Primary 0.180 m 250 mm Vert. Orifice/Grate C= 0.800
Primary OutFlow Max=0.0976 m³/s @ 0.40 hrs HW=0.620 m (Free Discharge)1=Orifice/Grate (Orifice Controls 0.0976 m³/s @ 1.99 m/s)
Pond 40P: SWM Tank (243.9L/s)
InflowPrimary
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.22
0.21
0.2
0.19
0.18
0.17
0.16
0.15
0.14
0.13
0.12
0.11
0.1
0.09
0.08
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0
Inflow Area=18,630.7 m²
Peak Elev=0.620 m
Storage=201.5 m³
0.2002 m³/s
0.0976 m³/s
Toronto 2-Year Duration=19 min, Inten=53.5 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 21HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Pond 40P: SWM Tank (243.9L/s)
Primary
Stage-Discharge
Discharge (m³/s)0.220.20.180.160.140.120.10.080.060.040.020
Ele
vati
on
(m
ete
rs)
2
1
0
Orifice/Grate
Toronto 2-Year Duration=19 min, Inten=53.5 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 22HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Pond 41P: Green Roof
Inflow Area = 2,605.3 m², 0.00% Impervious, Inflow Depth = 8 mm for 2-Year eventInflow = 0.0174 m³/s @ 0.17 hrs, Volume= 19.8 m³Outflow = 0.0020 m³/s @ 0.46 hrs, Volume= 6.5 m³, Atten= 88%, Lag= 17.6 minPrimary = 0.0020 m³/s @ 0.46 hrs, Volume= 6.5 m³
Routing by Stor-Ind method, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsPeak Elev= 100.011 m @ 0.46 hrs Surf.Area= 3,136.3 m² Storage= 19.0 m³
Plug-Flow detention time= 74.6 min calculated for 6.5 m³ (33% of inflow)Center-of-Mass det. time= 67.5 min ( 82.0 - 14.5 )
Volume Invert Avail.Storage Storage Description
#1 99.990 m 13.0 m³ 1.00 mW x 2,605.29 mL x 0.01 mH Green Roof Media Storage26.1 m³ Overall x 50.0% Voids
#2 100.000 m 42.5 m³ 1.00 mW x 531.00 mL x 0.08 mH Green Roof
55.5 m³ Total Available Storage
Device Routing Invert Outlet Devices
#1 Primary 100.000 m 100 mm Horiz. Orifice/Grate X 3.00 C= 0.800 Limited to weir flow at low heads
Primary OutFlow Max=0.0020 m³/s @ 0.46 hrs HW=100.011 m (Free Discharge)1=Orifice/Grate (Weir Controls 0.0020 m³/s @ 0.19 m/s)
Pond 41P: Green Roof
InflowPrimary
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.019
0.018
0.017
0.016
0.015
0.014
0.013
0.012
0.011
0.01
0.009
0.008
0.007
0.006
0.005
0.004
0.003
0.002
0.001
0
Inflow Area=2,605.3 m²
Peak Elev=100.011 m
Storage=19.0 m³
0.0174 m³/s
0.0020 m³/s
Toronto 2-Year Duration=19 min, Inten=53.5 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 23HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Pond 41P: Green Roof
Primary
Stage-Discharge
Discharge (m³/s)0.0220.020.0180.0160.0140.0120.010.0080.0060.0040.0020
Ele
vati
on
(m
ete
rs)
100.08
100.075
100.07
100.065
100.06
100.055
100.05
100.045
100.04
100.035
100.03
100.025
100.02
100.015
100.01
100.005
100
99.995
99.99
Orifice/Grate
Toronto 5-Year Duration=19 min, Inten=79.4 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 24HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Time span=0.00-6.00 hrs, dt=0.01 hrs, 601 pointsRunoff by Rational method, Rise/Fall=1.0/1.0 xTc
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=1,422.0 m² 0.00% Impervious Runoff Depth=23 mmSubcatchment 3: Impervious Roof Tc=10.0 min C=0.90 Runoff=0.0282 m³/s 32.2 m³
Runoff Area=402.0 m² 0.00% Impervious Runoff Depth=6 mmSubcatchment 4: Pervious Landscaping Tc=10.0 min C=0.25 Runoff=0.0022 m³/s 2.5 m³
Runoff Area=116.0 m² 0.00% Impervious Runoff Depth=11 mmSubcatchment 7S: Green Roof Tc=10.0 min C=0.45 Runoff=0.0012 m³/s 1.3 m³
Runoff Area=2,134.0 m² 0.00% Impervious Runoff Depth=23 mmSubcatchment 8S: At-Grade Impervious Tc=10.0 min C=0.90 Runoff=0.0423 m³/s 48.3 m³
Runoff Area=4,430.6 m² 0.00% Impervious Runoff Depth=23 mmSubcatchment 36S: Impervious Roof Tc=10.0 min C=0.90 Runoff=0.0879 m³/s 100.2 m³
Runoff Area=1,464.4 m² 0.00% Impervious Runoff Depth=6 mmSubcatchment 37S: Pervious Landscaping Tc=10.0 min C=0.25 Runoff=0.0081 m³/s 9.2 m³
Runoff Area=2,605.3 m² 0.00% Impervious Runoff Depth=11 mmSubcatchment 38S: Green Roof Tc=10.0 min C=0.45 Runoff=0.0258 m³/s 29.5 m³
Runoff Area=10,130.4 m² 0.00% Impervious Runoff Depth=23 mmSubcatchment 39S: At-Grade Tc=10.0 min C=0.90 Runoff=0.2010 m³/s 229.1 m³
Reach 15R: Catchment 201 (A)
Reach 16R: Catchment 202 (BC)
Peak Elev=0.831 m Storage=74.8 m³ Inflow=0.0728 m³/s 83.6 m³Pond 5: SWM Tank (33.1L/s) Outflow=0.0219 m³/s 82.5 m³
Peak Elev=100.001 m Storage=1.3 m³ Inflow=0.0012 m³/s 1.3 m³Pond 6P: Green Roof Outflow=0.0001 m³/s 0.6 m³
Peak Elev=0.861 m Storage=279.7 m³ Inflow=0.3000 m³/s 354.6 m³Pond 40P: SWM Tank (243.9L/s) Outflow=0.1297 m³/s 351.4 m³
Peak Elev=100.025 m Storage=26.1 m³ Inflow=0.0258 m³/s 29.5 m³Pond 41P: Green Roof Outflow=0.0066 m³/s 16.1 m³
Total Runoff Area = 22,704.7 m² Runoff Volume = 452.2 m³ Average Runoff Depth = 20 mm100.00% Pervious = 22,704.7 m² 0.00% Impervious = 0.0 m²
Toronto 5-Year Duration=19 min, Inten=79.4 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 25HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 3: Impervious Roof
Runoff = 0.0282 m³/s @ 0.17 hrs, Volume= 32.2 m³, Depth= 23 mm
Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsToronto 5-Year Duration=19 min, Inten=79.4 mm/hr
Area (m²) C Description
1,422.0 0.90 Impervious Roof
1,422.0 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (meters) (m/m) (m/sec) (m³/s)
10.0 Direct Entry, Direct Entry
Subcatchment 3: Impervious Roof
Runoff
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.03
0.028
0.026
0.024
0.022
0.02
0.018
0.016
0.014
0.012
0.01
0.008
0.006
0.004
0.002
0
Toronto 5-Year
Duration=19 min,
Inten=79.4 mm/hr
Runoff Area=1,422.0 m²
Runoff Volume=32.2 m³
Runoff Depth=23 mm
Tc=10.0 min
C=0.90
0.0282 m³/s
Toronto 5-Year Duration=19 min, Inten=79.4 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 26HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 4: Pervious Landscaping
Runoff = 0.0022 m³/s @ 0.17 hrs, Volume= 2.5 m³, Depth= 6 mm
Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsToronto 5-Year Duration=19 min, Inten=79.4 mm/hr
Area (m²) C Description
402.0 0.25 Pervious Area
402.0 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (meters) (m/m) (m/sec) (m³/s)
10.0 Direct Entry, Direct Entry
Subcatchment 4: Pervious Landscaping
Runoff
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.002
0.002
0.002
0.002
0.002
0.002
0.002
0.002
0.002
0.002
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.000
0.000
0.000
0.000
0
Toronto 5-Year
Duration=19 min,
Inten=79.4 mm/hr
Runoff Area=402.0 m²
Runoff Volume=2.5 m³
Runoff Depth=6 mm
Tc=10.0 min
C=0.25
0.0022 m³/s
Toronto 5-Year Duration=19 min, Inten=79.4 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 27HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 7S: Green Roof
Runoff = 0.0012 m³/s @ 0.17 hrs, Volume= 1.3 m³, Depth= 11 mm
Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsToronto 5-Year Duration=19 min, Inten=79.4 mm/hr
Area (m²) C Description
116.0 0.45 Green Roof
116.0 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (meters) (m/m) (m/sec) (m³/s)
10.0 Direct Entry, Direct Entry
Subcatchment 7S: Green Roof
Runoff
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0
0
Toronto 5-Year
Duration=19 min,
Inten=79.4 mm/hr
Runoff Area=116.0 m²
Runoff Volume=1.3 m³
Runoff Depth=11 mm
Tc=10.0 min
C=0.45
0.0012 m³/s
Toronto 5-Year Duration=19 min, Inten=79.4 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 28HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 8S: At-Grade Impervious
Runoff = 0.0423 m³/s @ 0.17 hrs, Volume= 48.3 m³, Depth= 23 mm
Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsToronto 5-Year Duration=19 min, Inten=79.4 mm/hr
Area (m²) C Description
2,134.0 0.90 Paved Areas
2,134.0 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (meters) (m/m) (m/sec) (m³/s)
10.0 Direct Entry, Direct Entry
Subcatchment 8S: At-Grade Impervious
Runoff
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.046
0.044
0.042
0.04
0.038
0.036
0.034
0.032
0.03
0.028
0.026
0.024
0.022
0.02
0.018
0.016
0.014
0.012
0.01
0.008
0.006
0.004
0.002
0
Toronto 5-Year
Duration=19 min,
Inten=79.4 mm/hr
Runoff Area=2,134.0 m²
Runoff Volume=48.3 m³
Runoff Depth=23 mm
Tc=10.0 min
C=0.90
0.0423 m³/s
Toronto 5-Year Duration=19 min, Inten=79.4 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 29HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 36S: Impervious Roof
Runoff = 0.0879 m³/s @ 0.17 hrs, Volume= 100.2 m³, Depth= 23 mm
Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsToronto 5-Year Duration=19 min, Inten=79.4 mm/hr
Area (m²) C Description
4,430.6 0.90 Impervious Roof
4,430.6 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (meters) (m/m) (m/sec) (m³/s)
10.0 Direct Entry, Direct Entry
Subcatchment 36S: Impervious Roof
Runoff
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.095
0.09
0.085
0.08
0.075
0.07
0.065
0.06
0.055
0.05
0.045
0.04
0.035
0.03
0.025
0.02
0.015
0.01
0.005
0
Toronto 5-Year
Duration=19 min,
Inten=79.4 mm/hr
Runoff Area=4,430.6 m²
Runoff Volume=100.2 m³
Runoff Depth=23 mm
Tc=10.0 min
C=0.90
0.0879 m³/s
Toronto 5-Year Duration=19 min, Inten=79.4 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 30HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 37S: Pervious Landscaping
Runoff = 0.0081 m³/s @ 0.17 hrs, Volume= 9.2 m³, Depth= 6 mm
Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsToronto 5-Year Duration=19 min, Inten=79.4 mm/hr
Area (m²) C Description
1,464.4 0.25 Pervious Area
1,464.4 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (meters) (m/m) (m/sec) (m³/s)
10.0 Direct Entry, Direct Entry
Subcatchment 37S: Pervious Landscaping
Runoff
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.009
0.009
0.008
0.007
0.007
0.006
0.006
0.005
0.005
0.004
0.004
0.003
0.003
0.002
0.002
0.001
0.001
0.000
0
Toronto 5-Year
Duration=19 min,
Inten=79.4 mm/hr
Runoff Area=1,464.4 m²
Runoff Volume=9.2 m³
Runoff Depth=6 mm
Tc=10.0 min
C=0.25
0.0081 m³/s
Toronto 5-Year Duration=19 min, Inten=79.4 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 31HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 38S: Green Roof
Runoff = 0.0258 m³/s @ 0.17 hrs, Volume= 29.5 m³, Depth= 11 mm
Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsToronto 5-Year Duration=19 min, Inten=79.4 mm/hr
Area (m²) C Description
2,605.3 0.45 Green Roof
2,605.3 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (meters) (m/m) (m/sec) (m³/s)
10.0 Direct Entry, Direct Entry
Subcatchment 38S: Green Roof
Runoff
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.028
0.026
0.024
0.022
0.02
0.018
0.016
0.014
0.012
0.01
0.008
0.006
0.004
0.002
0
Toronto 5-Year
Duration=19 min,
Inten=79.4 mm/hr
Runoff Area=2,605.3 m²
Runoff Volume=29.5 m³
Runoff Depth=11 mm
Tc=10.0 min
C=0.45
0.0258 m³/s
Toronto 5-Year Duration=19 min, Inten=79.4 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 32HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 39S: At-Grade Impervious
Runoff = 0.2010 m³/s @ 0.17 hrs, Volume= 229.1 m³, Depth= 23 mm
Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsToronto 5-Year Duration=19 min, Inten=79.4 mm/hr
Area (m²) C Description
10,130.4 0.90
10,130.4 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (meters) (m/m) (m/sec) (m³/s)
10.0 Direct Entry, Direct Entry
Subcatchment 39S: At-Grade Impervious
Runoff
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.22
0.21
0.2
0.19
0.18
0.17
0.16
0.15
0.14
0.13
0.12
0.11
0.1
0.09
0.08
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0
Toronto 5-Year
Duration=19 min,
Inten=79.4 mm/hr
Runoff Area=10,130.4 m²
Runoff Volume=229.1 m³
Runoff Depth=23 mm
Tc=10.0 min
C=0.90
0.2010 m³/s
Toronto 5-Year Duration=19 min, Inten=79.4 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 33HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Reach 15R: Catchment 201 (A)
[40] Hint: Not Described (Outflow=Inflow)
Toronto 5-Year Duration=19 min, Inten=79.4 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 34HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Reach 16R: Catchment 202 (BC)
[40] Hint: Not Described (Outflow=Inflow)
Toronto 5-Year Duration=19 min, Inten=79.4 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 35HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Pond 5: SWM Tank (33.1L/s)
Inflow Area = 4,074.0 m², 0.00% Impervious, Inflow Depth > 21 mm for 5-Year eventInflow = 0.0728 m³/s @ 0.31 hrs, Volume= 83.6 m³Outflow = 0.0219 m³/s @ 0.43 hrs, Volume= 82.5 m³, Atten= 70%, Lag= 7.4 minPrimary = 0.0219 m³/s @ 0.43 hrs, Volume= 82.5 m³
Routing by Stor-Ind method, Time Span= 0.00-6.00 hrs, dt= 0.01 hrs / 3Starting Elev= 0.150 m Surf.Area= 90.0 m² Storage= 13.5 m³Peak Elev= 0.831 m @ 0.43 hrs Surf.Area= 90.0 m² Storage= 74.8 m³ (61.3 m³ above start)
Plug-Flow detention time= 46.8 min calculated for 69.0 m³ (83% of inflow)Center-of-Mass det. time= 36.7 min ( 52.1 - 15.4 )
Volume Invert Avail.Storage Storage Description
#1 0.000 m 180.0 m³ 1.00 mW x 90.00 mL x 2.00 mH Cistern + Orifice
Device Routing Invert Outlet Devices
#1 Primary 0.160 m 100 mm Vert. Orifice/Grate C= 0.800
Primary OutFlow Max=0.0219 m³/s @ 0.43 hrs HW=0.831 m (Free Discharge)1=Orifice/Grate (Orifice Controls 0.0219 m³/s @ 2.79 m/s)
Pond 5: SWM Tank (33.1L/s)
InflowPrimary
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.08
0.075
0.07
0.065
0.06
0.055
0.05
0.045
0.04
0.035
0.03
0.025
0.02
0.015
0.01
0.005
0
Inflow Area=4,074.0 m²
Peak Elev=0.831 m
Storage=74.8 m³
0.0728 m³/s
0.0219 m³/s
Toronto 5-Year Duration=19 min, Inten=79.4 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 36HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Pond 5: SWM Tank (33.1L/s)
Primary
Stage-Discharge
Discharge (m³/s)0.0360.0340.0320.030.0280.0260.0240.0220.020.0180.0160.0140.0120.010.0080.0060.0040.0020
Ele
vati
on
(m
ete
rs)
2
1
0
Orifice/Grate
Toronto 5-Year Duration=19 min, Inten=79.4 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 37HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Pond 6P: Green Roof
Inflow Area = 116.0 m², 0.00% Impervious, Inflow Depth = 11 mm for 5-Year eventInflow = 0.0012 m³/s @ 0.17 hrs, Volume= 1.3 m³Outflow = 0.0001 m³/s @ 0.47 hrs, Volume= 0.6 m³, Atten= 93%, Lag= 18.1 minPrimary = 0.0001 m³/s @ 0.47 hrs, Volume= 0.6 m³
Routing by Stor-Ind method, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsPeak Elev= 100.001 m @ 0.47 hrs Surf.Area= 647.0 m² Storage= 1.3 m³
Plug-Flow detention time= 121.8 min calculated for 0.6 m³ (48% of inflow)Center-of-Mass det. time= 116.7 min ( 131.2 - 14.5 )
Volume Invert Avail.Storage Storage Description
#1 99.990 m 0.6 m³ 1.00 mW x 116.00 mL x 0.01 mH Green Roof Media Storage1.2 m³ Overall x 50.0% Voids
#2 100.000 m 42.5 m³ 1.00 mW x 531.00 mL x 0.08 mH Green Roof
43.1 m³ Total Available Storage
Device Routing Invert Outlet Devices
#1 Primary 100.000 m 100 mm Horiz. Orifice/Grate X 3.00 C= 0.800 Limited to weir flow at low heads
Primary OutFlow Max=0.0001 m³/s @ 0.47 hrs HW=100.001 m (Free Discharge)1=Orifice/Grate (Weir Controls 0.0001 m³/s @ 0.06 m/s)
Pond 6P: Green Roof
InflowPrimary
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.000
0.000
0.000
0.000
0
0
Inflow Area=116.0 m²
Peak Elev=100.001 m
Storage=1.3 m³
0.0012 m³/s
0.0001 m³/s
Toronto 5-Year Duration=19 min, Inten=79.4 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 38HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Pond 6P: Green Roof
Primary
Stage-Discharge
Discharge (m³/s)0.0220.020.0180.0160.0140.0120.010.0080.0060.0040.0020
Ele
vati
on
(m
ete
rs)
100.08
100.075
100.07
100.065
100.06
100.055
100.05
100.045
100.04
100.035
100.03
100.025
100.02
100.015
100.01
100.005
100
99.995
99.99
Orifice/Grate
Toronto 5-Year Duration=19 min, Inten=79.4 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 39HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Pond 40P: SWM Tank (243.9L/s)
Inflow Area = 18,630.7 m², 0.00% Impervious, Inflow Depth > 19 mm for 5-Year eventInflow = 0.3000 m³/s @ 0.31 hrs, Volume= 354.6 m³Outflow = 0.1297 m³/s @ 0.41 hrs, Volume= 351.4 m³, Atten= 57%, Lag= 6.3 minPrimary = 0.1297 m³/s @ 0.41 hrs, Volume= 351.4 m³
Routing by Stor-Ind method, Time Span= 0.00-6.00 hrs, dt= 0.01 hrs / 3Starting Elev= 0.180 m Surf.Area= 325.0 m² Storage= 58.5 m³Peak Elev= 0.861 m @ 0.41 hrs Surf.Area= 325.0 m² Storage= 279.7 m³ (221.2 m³ above start)
Plug-Flow detention time= 37.5 min calculated for 292.9 m³ (83% of inflow)Center-of-Mass det. time= 27.6 min ( 44.4 - 16.8 )
Volume Invert Avail.Storage Storage Description
#1 0.000 m 650.0 m³ 1.00 mW x 325.00 mL x 2.00 mH Cistern + Orifice
Device Routing Invert Outlet Devices
#1 Primary 0.180 m 250 mm Vert. Orifice/Grate C= 0.800
Primary OutFlow Max=0.1296 m³/s @ 0.41 hrs HW=0.860 m (Free Discharge)1=Orifice/Grate (Orifice Controls 0.1296 m³/s @ 2.64 m/s)
Pond 40P: SWM Tank (243.9L/s)
InflowPrimary
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.32
0.3
0.28
0.26
0.24
0.22
0.2
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
Inflow Area=18,630.7 m²
Peak Elev=0.861 m
Storage=279.7 m³
0.3000 m³/s
0.1297 m³/s
Toronto 5-Year Duration=19 min, Inten=79.4 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 40HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Pond 40P: SWM Tank (243.9L/s)
Primary
Stage-Discharge
Discharge (m³/s)0.220.20.180.160.140.120.10.080.060.040.020
Ele
vati
on
(m
ete
rs)
2
1
0
Orifice/Grate
Toronto 5-Year Duration=19 min, Inten=79.4 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 41HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Pond 41P: Green Roof
Inflow Area = 2,605.3 m², 0.00% Impervious, Inflow Depth = 11 mm for 5-Year eventInflow = 0.0258 m³/s @ 0.17 hrs, Volume= 29.5 m³Outflow = 0.0066 m³/s @ 0.44 hrs, Volume= 16.1 m³, Atten= 75%, Lag= 16.3 minPrimary = 0.0066 m³/s @ 0.44 hrs, Volume= 16.1 m³
Routing by Stor-Ind method, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsPeak Elev= 100.025 m @ 0.44 hrs Surf.Area= 3,136.3 m² Storage= 26.1 m³
Plug-Flow detention time= 54.0 min calculated for 16.1 m³ (55% of inflow)Center-of-Mass det. time= 49.7 min ( 64.2 - 14.5 )
Volume Invert Avail.Storage Storage Description
#1 99.990 m 13.0 m³ 1.00 mW x 2,605.29 mL x 0.01 mH Green Roof Media Storage26.1 m³ Overall x 50.0% Voids
#2 100.000 m 42.5 m³ 1.00 mW x 531.00 mL x 0.08 mH Green Roof
55.5 m³ Total Available Storage
Device Routing Invert Outlet Devices
#1 Primary 100.000 m 100 mm Horiz. Orifice/Grate X 3.00 C= 0.800 Limited to weir flow at low heads
Primary OutFlow Max=0.0065 m³/s @ 0.44 hrs HW=100.025 m (Free Discharge)1=Orifice/Grate (Weir Controls 0.0065 m³/s @ 0.28 m/s)
Pond 41P: Green Roof
InflowPrimary
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.028
0.026
0.024
0.022
0.02
0.018
0.016
0.014
0.012
0.01
0.008
0.006
0.004
0.002
0
Inflow Area=2,605.3 m²
Peak Elev=100.025 m
Storage=26.1 m³
0.0258 m³/s
0.0066 m³/s
Toronto 5-Year Duration=19 min, Inten=79.4 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 42HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Pond 41P: Green Roof
Primary
Stage-Discharge
Discharge (m³/s)0.0220.020.0180.0160.0140.0120.010.0080.0060.0040.0020
Ele
vati
on
(m
ete
rs)
100.08
100.075
100.07
100.065
100.06
100.055
100.05
100.045
100.04
100.035
100.03
100.025
100.02
100.015
100.01
100.005
100
99.995
99.99
Orifice/Grate
Toronto 10-Year Duration=19 min, Inten=97.1 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 43HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Time span=0.00-6.00 hrs, dt=0.01 hrs, 601 pointsRunoff by Rational method, Rise/Fall=1.0/1.0 xTc
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=1,422.0 m² 0.00% Impervious Runoff Depth=28 mmSubcatchment 3: Impervious Roof Tc=10.0 min C=0.90 Runoff=0.0345 m³/s 39.3 m³
Runoff Area=402.0 m² 0.00% Impervious Runoff Depth=8 mmSubcatchment 4: Pervious Landscaping Tc=10.0 min C=0.25 Runoff=0.0027 m³/s 3.1 m³
Runoff Area=116.0 m² 0.00% Impervious Runoff Depth=14 mmSubcatchment 7S: Green Roof Tc=10.0 min C=0.45 Runoff=0.0014 m³/s 1.6 m³
Runoff Area=2,134.0 m² 0.00% Impervious Runoff Depth=28 mmSubcatchment 8S: At-Grade Impervious Tc=10.0 min C=0.90 Runoff=0.0518 m³/s 59.0 m³
Runoff Area=4,430.6 m² 0.00% Impervious Runoff Depth=28 mmSubcatchment 36S: Impervious Roof Tc=10.0 min C=0.90 Runoff=0.1076 m³/s 122.6 m³
Runoff Area=1,464.4 m² 0.00% Impervious Runoff Depth=8 mmSubcatchment 37S: Pervious Landscaping Tc=10.0 min C=0.25 Runoff=0.0099 m³/s 11.3 m³
Runoff Area=2,605.3 m² 0.00% Impervious Runoff Depth=14 mmSubcatchment 38S: Green Roof Tc=10.0 min C=0.45 Runoff=0.0316 m³/s 36.0 m³
Runoff Area=10,130.4 m² 0.00% Impervious Runoff Depth=28 mmSubcatchment 39S: At-Grade Tc=10.0 min C=0.90 Runoff=0.2459 m³/s 280.3 m³
Reach 15R: Catchment 201 (A)
Reach 16R: Catchment 202 (BC)
Peak Elev=1.002 m Storage=90.2 m³ Inflow=0.0891 m³/s 102.4 m³Pond 5: SWM Tank (33.1L/s) Outflow=0.0248 m³/s 101.3 m³
Peak Elev=100.002 m Storage=1.5 m³ Inflow=0.0014 m³/s 1.6 m³Pond 6P: Green Roof Outflow=0.0001 m³/s 0.9 m³
Peak Elev=1.036 m Storage=336.8 m³ Inflow=0.3690 m³/s 436.8 m³Pond 40P: SWM Tank (243.9L/s) Outflow=0.1487 m³/s 433.4 m³
Peak Elev=100.033 m Storage=30.4 m³ Inflow=0.0316 m³/s 36.0 m³Pond 41P: Green Roof Outflow=0.0101 m³/s 22.7 m³
Total Runoff Area = 22,704.7 m² Runoff Volume = 553.3 m³ Average Runoff Depth = 24 mm100.00% Pervious = 22,704.7 m² 0.00% Impervious = 0.0 m²
Toronto 10-Year Duration=19 min, Inten=97.1 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 44HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 3: Impervious Roof
Runoff = 0.0345 m³/s @ 0.17 hrs, Volume= 39.3 m³, Depth= 28 mm
Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsToronto 10-Year Duration=19 min, Inten=97.1 mm/hr
Area (m²) C Description
1,422.0 0.90 Impervious Roof
1,422.0 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (meters) (m/m) (m/sec) (m³/s)
10.0 Direct Entry, Direct Entry
Subcatchment 3: Impervious Roof
Runoff
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.038
0.036
0.034
0.032
0.03
0.028
0.026
0.024
0.022
0.02
0.018
0.016
0.014
0.012
0.01
0.008
0.006
0.004
0.002
0
Toronto 10-Year
Duration=19 min,
Inten=97.1 mm/hr
Runoff Area=1,422.0 m²
Runoff Volume=39.3 m³
Runoff Depth=28 mm
Tc=10.0 min
C=0.90
0.0345 m³/s
Toronto 10-Year Duration=19 min, Inten=97.1 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 45HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 4: Pervious Landscaping
Runoff = 0.0027 m³/s @ 0.17 hrs, Volume= 3.1 m³, Depth= 8 mm
Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsToronto 10-Year Duration=19 min, Inten=97.1 mm/hr
Area (m²) C Description
402.0 0.25 Pervious Area
402.0 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (meters) (m/m) (m/sec) (m³/s)
10.0 Direct Entry, Direct Entry
Subcatchment 4: Pervious Landscaping
Runoff
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.003
0.003
0.003
0.002
0.002
0.002
0.002
0.002
0.001
0.001
0.001
0.001
0.001
0.000
0.000
0
Toronto 10-Year
Duration=19 min,
Inten=97.1 mm/hr
Runoff Area=402.0 m²
Runoff Volume=3.1 m³
Runoff Depth=8 mm
Tc=10.0 min
C=0.25
0.0027 m³/s
Toronto 10-Year Duration=19 min, Inten=97.1 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 46HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 7S: Green Roof
Runoff = 0.0014 m³/s @ 0.17 hrs, Volume= 1.6 m³, Depth= 14 mm
Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsToronto 10-Year Duration=19 min, Inten=97.1 mm/hr
Area (m²) C Description
116.0 0.45 Green Roof
116.0 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (meters) (m/m) (m/sec) (m³/s)
10.0 Direct Entry, Direct Entry
Subcatchment 7S: Green Roof
Runoff
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.002
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.000
0.000
0.000
0.000
0
0
Toronto 10-Year
Duration=19 min,
Inten=97.1 mm/hr
Runoff Area=116.0 m²
Runoff Volume=1.6 m³
Runoff Depth=14 mm
Tc=10.0 min
C=0.45
0.0014 m³/s
Toronto 10-Year Duration=19 min, Inten=97.1 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 47HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 8S: At-Grade Impervious
Runoff = 0.0518 m³/s @ 0.17 hrs, Volume= 59.0 m³, Depth= 28 mm
Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsToronto 10-Year Duration=19 min, Inten=97.1 mm/hr
Area (m²) C Description
2,134.0 0.90 Paved Areas
2,134.0 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (meters) (m/m) (m/sec) (m³/s)
10.0 Direct Entry, Direct Entry
Subcatchment 8S: At-Grade Impervious
Runoff
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.055
0.05
0.045
0.04
0.035
0.03
0.025
0.02
0.015
0.01
0.005
0
Toronto 10-Year
Duration=19 min,
Inten=97.1 mm/hr
Runoff Area=2,134.0 m²
Runoff Volume=59.0 m³
Runoff Depth=28 mm
Tc=10.0 min
C=0.90
0.0518 m³/s
Toronto 10-Year Duration=19 min, Inten=97.1 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 48HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 36S: Impervious Roof
Runoff = 0.1076 m³/s @ 0.17 hrs, Volume= 122.6 m³, Depth= 28 mm
Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsToronto 10-Year Duration=19 min, Inten=97.1 mm/hr
Area (m²) C Description
4,430.6 0.90 Impervious Roof
4,430.6 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (meters) (m/m) (m/sec) (m³/s)
10.0 Direct Entry, Direct Entry
Subcatchment 36S: Impervious Roof
Runoff
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.12
0.115
0.11
0.105
0.1
0.095
0.09
0.085
0.08
0.075
0.07
0.065
0.06
0.055
0.05
0.045
0.04
0.035
0.03
0.025
0.02
0.015
0.01
0.005
0
Toronto 10-Year
Duration=19 min,
Inten=97.1 mm/hr
Runoff Area=4,430.6 m²
Runoff Volume=122.6 m³
Runoff Depth=28 mm
Tc=10.0 min
C=0.90
0.1076 m³/s
Toronto 10-Year Duration=19 min, Inten=97.1 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 49HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 37S: Pervious Landscaping
Runoff = 0.0099 m³/s @ 0.17 hrs, Volume= 11.3 m³, Depth= 8 mm
Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsToronto 10-Year Duration=19 min, Inten=97.1 mm/hr
Area (m²) C Description
1,464.4 0.25 Pervious Area
1,464.4 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (meters) (m/m) (m/sec) (m³/s)
10.0 Direct Entry, Direct Entry
Subcatchment 37S: Pervious Landscaping
Runoff
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.011
0.01
0.01
0.009
0.009
0.008
0.008
0.007
0.007
0.006
0.006
0.005
0.005
0.004
0.004
0.003
0.003
0.002
0.002
0.001
0.001
0.000
0
Toronto 10-Year
Duration=19 min,
Inten=97.1 mm/hr
Runoff Area=1,464.4 m²
Runoff Volume=11.3 m³
Runoff Depth=8 mm
Tc=10.0 min
C=0.25
0.0099 m³/s
Toronto 10-Year Duration=19 min, Inten=97.1 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 50HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 38S: Green Roof
Runoff = 0.0316 m³/s @ 0.17 hrs, Volume= 36.0 m³, Depth= 14 mm
Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsToronto 10-Year Duration=19 min, Inten=97.1 mm/hr
Area (m²) C Description
2,605.3 0.45 Green Roof
2,605.3 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (meters) (m/m) (m/sec) (m³/s)
10.0 Direct Entry, Direct Entry
Subcatchment 38S: Green Roof
Runoff
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.034
0.032
0.03
0.028
0.026
0.024
0.022
0.02
0.018
0.016
0.014
0.012
0.01
0.008
0.006
0.004
0.002
0
Toronto 10-Year
Duration=19 min,
Inten=97.1 mm/hr
Runoff Area=2,605.3 m²
Runoff Volume=36.0 m³
Runoff Depth=14 mm
Tc=10.0 min
C=0.45
0.0316 m³/s
Toronto 10-Year Duration=19 min, Inten=97.1 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 51HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 39S: At-Grade Impervious
Runoff = 0.2459 m³/s @ 0.17 hrs, Volume= 280.3 m³, Depth= 28 mm
Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsToronto 10-Year Duration=19 min, Inten=97.1 mm/hr
Area (m²) C Description
10,130.4 0.90
10,130.4 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (meters) (m/m) (m/sec) (m³/s)
10.0 Direct Entry, Direct Entry
Subcatchment 39S: At-Grade Impervious
Runoff
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.26
0.24
0.22
0.2
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
Toronto 10-Year
Duration=19 min,
Inten=97.1 mm/hr
Runoff Area=10,130.4 m²
Runoff Volume=280.3 m³
Runoff Depth=28 mm
Tc=10.0 min
C=0.90
0.2459 m³/s
Toronto 10-Year Duration=19 min, Inten=97.1 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 52HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Reach 15R: Catchment 201 (A)
[40] Hint: Not Described (Outflow=Inflow)
Toronto 10-Year Duration=19 min, Inten=97.1 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 53HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Reach 16R: Catchment 202 (BC)
[40] Hint: Not Described (Outflow=Inflow)
Toronto 10-Year Duration=19 min, Inten=97.1 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 54HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Pond 5: SWM Tank (33.1L/s)
Inflow Area = 4,074.0 m², 0.00% Impervious, Inflow Depth > 25 mm for 10-Year eventInflow = 0.0891 m³/s @ 0.31 hrs, Volume= 102.4 m³Outflow = 0.0248 m³/s @ 0.44 hrs, Volume= 101.3 m³, Atten= 72%, Lag= 7.6 minPrimary = 0.0248 m³/s @ 0.44 hrs, Volume= 101.3 m³
Routing by Stor-Ind method, Time Span= 0.00-6.00 hrs, dt= 0.01 hrs / 3Starting Elev= 0.150 m Surf.Area= 90.0 m² Storage= 13.5 m³Peak Elev= 1.002 m @ 0.44 hrs Surf.Area= 90.0 m² Storage= 90.2 m³ (76.7 m³ above start)
Plug-Flow detention time= 47.8 min calculated for 87.6 m³ (86% of inflow)Center-of-Mass det. time= 39.5 min ( 54.9 - 15.4 )
Volume Invert Avail.Storage Storage Description
#1 0.000 m 180.0 m³ 1.00 mW x 90.00 mL x 2.00 mH Cistern + Orifice
Device Routing Invert Outlet Devices
#1 Primary 0.160 m 100 mm Vert. Orifice/Grate C= 0.800
Primary OutFlow Max=0.0248 m³/s @ 0.44 hrs HW=1.002 m (Free Discharge)1=Orifice/Grate (Orifice Controls 0.0248 m³/s @ 3.15 m/s)
Pond 5: SWM Tank (33.1L/s)
InflowPrimary
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.095
0.09
0.085
0.08
0.075
0.07
0.065
0.06
0.055
0.05
0.045
0.04
0.035
0.03
0.025
0.02
0.015
0.01
0.005
0
Inflow Area=4,074.0 m²
Peak Elev=1.002 m
Storage=90.2 m³
0.0891 m³/s
0.0248 m³/s
Toronto 10-Year Duration=19 min, Inten=97.1 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 55HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Pond 5: SWM Tank (33.1L/s)
Primary
Stage-Discharge
Discharge (m³/s)0.0360.0340.0320.030.0280.0260.0240.0220.020.0180.0160.0140.0120.010.0080.0060.0040.0020
Ele
vati
on
(m
ete
rs)
2
1
0
Orifice/Grate
Toronto 10-Year Duration=19 min, Inten=97.1 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 56HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Pond 6P: Green Roof
Inflow Area = 116.0 m², 0.00% Impervious, Inflow Depth = 14 mm for 10-Year eventInflow = 0.0014 m³/s @ 0.17 hrs, Volume= 1.6 m³Outflow = 0.0001 m³/s @ 0.47 hrs, Volume= 0.9 m³, Atten= 91%, Lag= 17.9 minPrimary = 0.0001 m³/s @ 0.47 hrs, Volume= 0.9 m³
Routing by Stor-Ind method, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsPeak Elev= 100.002 m @ 0.47 hrs Surf.Area= 647.0 m² Storage= 1.5 m³
Plug-Flow detention time= 112.7 min calculated for 0.9 m³ (56% of inflow)Center-of-Mass det. time= 108.4 min ( 122.9 - 14.5 )
Volume Invert Avail.Storage Storage Description
#1 99.990 m 0.6 m³ 1.00 mW x 116.00 mL x 0.01 mH Green Roof Media Storage1.2 m³ Overall x 50.0% Voids
#2 100.000 m 42.5 m³ 1.00 mW x 531.00 mL x 0.08 mH Green Roof
43.1 m³ Total Available Storage
Device Routing Invert Outlet Devices
#1 Primary 100.000 m 100 mm Horiz. Orifice/Grate X 3.00 C= 0.800 Limited to weir flow at low heads
Primary OutFlow Max=0.0001 m³/s @ 0.47 hrs HW=100.002 m (Free Discharge)1=Orifice/Grate (Weir Controls 0.0001 m³/s @ 0.08 m/s)
Pond 6P: Green Roof
InflowPrimary
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.002
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.000
0.000
0.000
0.000
0
0
Inflow Area=116.0 m²
Peak Elev=100.002 m
Storage=1.5 m³
0.0014 m³/s
0.0001 m³/s
Toronto 10-Year Duration=19 min, Inten=97.1 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 57HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Pond 6P: Green Roof
Primary
Stage-Discharge
Discharge (m³/s)0.0220.020.0180.0160.0140.0120.010.0080.0060.0040.0020
Ele
vati
on
(m
ete
rs)
100.08
100.075
100.07
100.065
100.06
100.055
100.05
100.045
100.04
100.035
100.03
100.025
100.02
100.015
100.01
100.005
100
99.995
99.99
Orifice/Grate
Toronto 10-Year Duration=19 min, Inten=97.1 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 58HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Pond 40P: SWM Tank (243.9L/s)
Inflow Area = 18,630.7 m², 0.00% Impervious, Inflow Depth = 23 mm for 10-Year eventInflow = 0.3690 m³/s @ 0.31 hrs, Volume= 436.8 m³Outflow = 0.1487 m³/s @ 0.42 hrs, Volume= 433.4 m³, Atten= 60%, Lag= 6.6 minPrimary = 0.1487 m³/s @ 0.42 hrs, Volume= 433.4 m³
Routing by Stor-Ind method, Time Span= 0.00-6.00 hrs, dt= 0.01 hrs / 3Starting Elev= 0.180 m Surf.Area= 325.0 m² Storage= 58.5 m³Peak Elev= 1.036 m @ 0.42 hrs Surf.Area= 325.0 m² Storage= 336.8 m³ (278.3 m³ above start)
Plug-Flow detention time= 36.8 min calculated for 374.9 m³ (86% of inflow)Center-of-Mass det. time= 28.3 min ( 45.1 - 16.8 )
Volume Invert Avail.Storage Storage Description
#1 0.000 m 650.0 m³ 1.00 mW x 325.00 mL x 2.00 mH Cistern + Orifice
Device Routing Invert Outlet Devices
#1 Primary 0.180 m 250 mm Vert. Orifice/Grate C= 0.800
Primary OutFlow Max=0.1487 m³/s @ 0.42 hrs HW=1.036 m (Free Discharge)1=Orifice/Grate (Orifice Controls 0.1487 m³/s @ 3.03 m/s)
Pond 40P: SWM Tank (243.9L/s)
InflowPrimary
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.4
0.38
0.36
0.34
0.32
0.3
0.28
0.26
0.24
0.22
0.2
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
Inflow Area=18,630.7 m²
Peak Elev=1.036 m
Storage=336.8 m³
0.3690 m³/s
0.1487 m³/s
Toronto 10-Year Duration=19 min, Inten=97.1 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 59HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Pond 40P: SWM Tank (243.9L/s)
Primary
Stage-Discharge
Discharge (m³/s)0.220.20.180.160.140.120.10.080.060.040.020
Ele
vati
on
(m
ete
rs)
2
1
0
Orifice/Grate
Toronto 10-Year Duration=19 min, Inten=97.1 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 60HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Pond 41P: Green Roof
Inflow Area = 2,605.3 m², 0.00% Impervious, Inflow Depth = 14 mm for 10-Year eventInflow = 0.0316 m³/s @ 0.17 hrs, Volume= 36.0 m³Outflow = 0.0101 m³/s @ 0.43 hrs, Volume= 22.7 m³, Atten= 68%, Lag= 15.6 minPrimary = 0.0101 m³/s @ 0.43 hrs, Volume= 22.7 m³
Routing by Stor-Ind method, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsPeak Elev= 100.033 m @ 0.43 hrs Surf.Area= 3,136.3 m² Storage= 30.4 m³
Plug-Flow detention time= 47.6 min calculated for 22.7 m³ (63% of inflow)Center-of-Mass det. time= 43.8 min ( 58.3 - 14.5 )
Volume Invert Avail.Storage Storage Description
#1 99.990 m 13.0 m³ 1.00 mW x 2,605.29 mL x 0.01 mH Green Roof Media Storage26.1 m³ Overall x 50.0% Voids
#2 100.000 m 42.5 m³ 1.00 mW x 531.00 mL x 0.08 mH Green Roof
55.5 m³ Total Available Storage
Device Routing Invert Outlet Devices
#1 Primary 100.000 m 100 mm Horiz. Orifice/Grate X 3.00 C= 0.800 Limited to weir flow at low heads
Primary OutFlow Max=0.0101 m³/s @ 0.43 hrs HW=100.033 m (Free Discharge)1=Orifice/Grate (Weir Controls 0.0101 m³/s @ 0.33 m/s)
Pond 41P: Green Roof
InflowPrimary
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.034
0.032
0.03
0.028
0.026
0.024
0.022
0.02
0.018
0.016
0.014
0.012
0.01
0.008
0.006
0.004
0.002
0
Inflow Area=2,605.3 m²
Peak Elev=100.033 m
Storage=30.4 m³
0.0316 m³/s
0.0101 m³/s
Toronto 10-Year Duration=19 min, Inten=97.1 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 61HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Pond 41P: Green Roof
Primary
Stage-Discharge
Discharge (m³/s)0.0220.020.0180.0160.0140.0120.010.0080.0060.0040.0020
Ele
vati
on
(m
ete
rs)
100.08
100.075
100.07
100.065
100.06
100.055
100.05
100.045
100.04
100.035
100.03
100.025
100.02
100.015
100.01
100.005
100
99.995
99.99
Orifice/Grate
Toronto 25-Year Duration=19 min, Inten=113.4 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 62HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Time span=0.00-6.00 hrs, dt=0.01 hrs, 601 pointsRunoff by Rational method, Rise/Fall=1.0/1.0 xTc
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=1,422.0 m² 0.00% Impervious Runoff Depth=32 mmSubcatchment 3: Impervious Roof Tc=10.0 min C=0.90 Runoff=0.0403 m³/s 46.0 m³
Runoff Area=402.0 m² 0.00% Impervious Runoff Depth=9 mmSubcatchment 4: Pervious Landscaping Tc=10.0 min C=0.25 Runoff=0.0032 m³/s 3.6 m³
Runoff Area=116.0 m² 0.00% Impervious Runoff Depth=16 mmSubcatchment 7S: Green Roof Tc=10.0 min C=0.45 Runoff=0.0016 m³/s 1.9 m³
Runoff Area=2,134.0 m² 0.00% Impervious Runoff Depth=32 mmSubcatchment 8S: At-Grade Impervious Tc=10.0 min C=0.90 Runoff=0.0605 m³/s 69.0 m³
Runoff Area=4,430.6 m² 0.00% Impervious Runoff Depth=32 mmSubcatchment 36S: Impervious Roof Tc=10.0 min C=0.90 Runoff=0.1256 m³/s 143.2 m³
Runoff Area=1,464.4 m² 0.00% Impervious Runoff Depth=9 mmSubcatchment 37S: Pervious Landscaping Tc=10.0 min C=0.25 Runoff=0.0115 m³/s 13.1 m³
Runoff Area=2,605.3 m² 0.00% Impervious Runoff Depth=16 mmSubcatchment 38S: Green Roof Tc=10.0 min C=0.45 Runoff=0.0369 m³/s 42.1 m³
Runoff Area=10,130.4 m² 0.00% Impervious Runoff Depth=32 mmSubcatchment 39S: At-Grade Tc=10.0 min C=0.90 Runoff=0.2872 m³/s 327.4 m³
Reach 15R: Catchment 201 (A)
Reach 16R: Catchment 202 (BC)
Peak Elev=1.162 m Storage=104.6 m³ Inflow=0.1041 m³/s 119.7 m³Pond 5: SWM Tank (33.1L/s) Outflow=0.0272 m³/s 118.5 m³
Peak Elev=100.002 m Storage=1.8 m³ Inflow=0.0016 m³/s 1.9 m³Pond 6P: Green Roof Outflow=0.0002 m³/s 1.1 m³
Peak Elev=1.203 m Storage=391.1 m³ Inflow=0.4335 m³/s 512.4 m³Pond 40P: SWM Tank (243.9L/s) Outflow=0.1649 m³/s 508.9 m³
Peak Elev=100.040 m Storage=34.2 m³ Inflow=0.0369 m³/s 42.1 m³Pond 41P: Green Roof Outflow=0.0135 m³/s 28.7 m³
Total Runoff Area = 22,704.7 m² Runoff Volume = 646.2 m³ Average Runoff Depth = 28 mm100.00% Pervious = 22,704.7 m² 0.00% Impervious = 0.0 m²
Toronto 25-Year Duration=19 min, Inten=113.4 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 63HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 3: Impervious Roof
Runoff = 0.0403 m³/s @ 0.17 hrs, Volume= 46.0 m³, Depth= 32 mm
Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsToronto 25-Year Duration=19 min, Inten=113.4 mm/hr
Area (m²) C Description
1,422.0 0.90 Impervious Roof
1,422.0 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (meters) (m/m) (m/sec) (m³/s)
10.0 Direct Entry, Direct Entry
Subcatchment 3: Impervious Roof
Runoff
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.044
0.042
0.04
0.038
0.036
0.034
0.032
0.03
0.028
0.026
0.024
0.022
0.02
0.018
0.016
0.014
0.012
0.01
0.008
0.006
0.004
0.002
0
Toronto 25-Year
Duration=19 min,
Inten=113.4 mm/hr
Runoff Area=1,422.0 m²
Runoff Volume=46.0 m³
Runoff Depth=32 mm
Tc=10.0 min
C=0.90
0.0403 m³/s
Toronto 25-Year Duration=19 min, Inten=113.4 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 64HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 4: Pervious Landscaping
Runoff = 0.0032 m³/s @ 0.17 hrs, Volume= 3.6 m³, Depth= 9 mm
Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsToronto 25-Year Duration=19 min, Inten=113.4 mm/hr
Area (m²) C Description
402.0 0.25 Pervious Area
402.0 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (meters) (m/m) (m/sec) (m³/s)
10.0 Direct Entry, Direct Entry
Subcatchment 4: Pervious Landscaping
Runoff
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.003
0.003
0.003
0.003
0.003
0.002
0.002
0.002
0.002
0.002
0.001
0.001
0.001
0.001
0.001
0.000
0.000
0
Toronto 25-Year
Duration=19 min,
Inten=113.4 mm/hr
Runoff Area=402.0 m²
Runoff Volume=3.6 m³
Runoff Depth=9 mm
Tc=10.0 min
C=0.25
0.0032 m³/s
Toronto 25-Year Duration=19 min, Inten=113.4 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 65HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 7S: Green Roof
Runoff = 0.0016 m³/s @ 0.17 hrs, Volume= 1.9 m³, Depth= 16 mm
Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsToronto 25-Year Duration=19 min, Inten=113.4 mm/hr
Area (m²) C Description
116.0 0.45 Green Roof
116.0 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (meters) (m/m) (m/sec) (m³/s)
10.0 Direct Entry, Direct Entry
Subcatchment 7S: Green Roof
Runoff
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.002
0.002
0.002
0.002
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.000
0.000
0.000
0.000
0
0
Toronto 25-Year
Duration=19 min,
Inten=113.4 mm/hr
Runoff Area=116.0 m²
Runoff Volume=1.9 m³
Runoff Depth=16 mm
Tc=10.0 min
C=0.45
0.0016 m³/s
Toronto 25-Year Duration=19 min, Inten=113.4 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 66HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 8S: At-Grade Impervious
Runoff = 0.0605 m³/s @ 0.17 hrs, Volume= 69.0 m³, Depth= 32 mm
Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsToronto 25-Year Duration=19 min, Inten=113.4 mm/hr
Area (m²) C Description
2,134.0 0.90 Paved Areas
2,134.0 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (meters) (m/m) (m/sec) (m³/s)
10.0 Direct Entry, Direct Entry
Subcatchment 8S: At-Grade Impervious
Runoff
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.065
0.06
0.055
0.05
0.045
0.04
0.035
0.03
0.025
0.02
0.015
0.01
0.005
0
Toronto 25-Year
Duration=19 min,
Inten=113.4 mm/hr
Runoff Area=2,134.0 m²
Runoff Volume=69.0 m³
Runoff Depth=32 mm
Tc=10.0 min
C=0.90
0.0605 m³/s
Toronto 25-Year Duration=19 min, Inten=113.4 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 67HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 36S: Impervious Roof
Runoff = 0.1256 m³/s @ 0.17 hrs, Volume= 143.2 m³, Depth= 32 mm
Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsToronto 25-Year Duration=19 min, Inten=113.4 mm/hr
Area (m²) C Description
4,430.6 0.90 Impervious Roof
4,430.6 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (meters) (m/m) (m/sec) (m³/s)
10.0 Direct Entry, Direct Entry
Subcatchment 36S: Impervious Roof
Runoff
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.14
0.13
0.12
0.11
0.1
0.09
0.08
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0
Toronto 25-Year
Duration=19 min,
Inten=113.4 mm/hr
Runoff Area=4,430.6 m²
Runoff Volume=143.2 m³
Runoff Depth=32 mm
Tc=10.0 min
C=0.90
0.1256 m³/s
Toronto 25-Year Duration=19 min, Inten=113.4 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 68HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 37S: Pervious Landscaping
Runoff = 0.0115 m³/s @ 0.17 hrs, Volume= 13.1 m³, Depth= 9 mm
Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsToronto 25-Year Duration=19 min, Inten=113.4 mm/hr
Area (m²) C Description
1,464.4 0.25 Pervious Area
1,464.4 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (meters) (m/m) (m/sec) (m³/s)
10.0 Direct Entry, Direct Entry
Subcatchment 37S: Pervious Landscaping
Runoff
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.013
0.012
0.011
0.011
0.01
0.01
0.009
0.009
0.008
0.008
0.007
0.007
0.006
0.006
0.005
0.005
0.004
0.004
0.003
0.003
0.002
0.002
0.001
0.001
0.000
0
Toronto 25-Year
Duration=19 min,
Inten=113.4 mm/hr
Runoff Area=1,464.4 m²
Runoff Volume=13.1 m³
Runoff Depth=9 mm
Tc=10.0 min
C=0.25
0.0115 m³/s
Toronto 25-Year Duration=19 min, Inten=113.4 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 69HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 38S: Green Roof
Runoff = 0.0369 m³/s @ 0.17 hrs, Volume= 42.1 m³, Depth= 16 mm
Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsToronto 25-Year Duration=19 min, Inten=113.4 mm/hr
Area (m²) C Description
2,605.3 0.45 Green Roof
2,605.3 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (meters) (m/m) (m/sec) (m³/s)
10.0 Direct Entry, Direct Entry
Subcatchment 38S: Green Roof
Runoff
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.04
0.038
0.036
0.034
0.032
0.03
0.028
0.026
0.024
0.022
0.02
0.018
0.016
0.014
0.012
0.01
0.008
0.006
0.004
0.002
0
Toronto 25-Year
Duration=19 min,
Inten=113.4 mm/hr
Runoff Area=2,605.3 m²
Runoff Volume=42.1 m³
Runoff Depth=16 mm
Tc=10.0 min
C=0.45
0.0369 m³/s
Toronto 25-Year Duration=19 min, Inten=113.4 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 70HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 39S: At-Grade Impervious
Runoff = 0.2872 m³/s @ 0.17 hrs, Volume= 327.4 m³, Depth= 32 mm
Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsToronto 25-Year Duration=19 min, Inten=113.4 mm/hr
Area (m²) C Description
10,130.4 0.90
10,130.4 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (meters) (m/m) (m/sec) (m³/s)
10.0 Direct Entry, Direct Entry
Subcatchment 39S: At-Grade Impervious
Runoff
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.32
0.3
0.28
0.26
0.24
0.22
0.2
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
Toronto 25-Year
Duration=19 min,
Inten=113.4 mm/hr
Runoff Area=10,130.4 m²
Runoff Volume=327.4 m³
Runoff Depth=32 mm
Tc=10.0 min
C=0.90
0.2872 m³/s
Toronto 25-Year Duration=19 min, Inten=113.4 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 71HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Reach 15R: Catchment 201 (A)
[40] Hint: Not Described (Outflow=Inflow)
Toronto 25-Year Duration=19 min, Inten=113.4 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 72HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Reach 16R: Catchment 202 (BC)
[40] Hint: Not Described (Outflow=Inflow)
Toronto 25-Year Duration=19 min, Inten=113.4 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 73HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Pond 5: SWM Tank (33.1L/s)
Inflow Area = 4,074.0 m², 0.00% Impervious, Inflow Depth > 29 mm for 25-Year eventInflow = 0.1041 m³/s @ 0.31 hrs, Volume= 119.7 m³Outflow = 0.0272 m³/s @ 0.44 hrs, Volume= 118.5 m³, Atten= 74%, Lag= 7.8 minPrimary = 0.0272 m³/s @ 0.44 hrs, Volume= 118.5 m³
Routing by Stor-Ind method, Time Span= 0.00-6.00 hrs, dt= 0.01 hrs / 3Starting Elev= 0.150 m Surf.Area= 90.0 m² Storage= 13.5 m³Peak Elev= 1.162 m @ 0.44 hrs Surf.Area= 90.0 m² Storage= 104.6 m³ (91.1 m³ above start)
Plug-Flow detention time= 49.4 min calculated for 104.8 m³ (88% of inflow)Center-of-Mass det. time= 41.9 min ( 57.4 - 15.5 )
Volume Invert Avail.Storage Storage Description
#1 0.000 m 180.0 m³ 1.00 mW x 90.00 mL x 2.00 mH Cistern + Orifice
Device Routing Invert Outlet Devices
#1 Primary 0.160 m 100 mm Vert. Orifice/Grate C= 0.800
Primary OutFlow Max=0.0272 m³/s @ 0.44 hrs HW=1.162 m (Free Discharge)1=Orifice/Grate (Orifice Controls 0.0272 m³/s @ 3.46 m/s)
Pond 5: SWM Tank (33.1L/s)
InflowPrimary
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.115
0.11
0.105
0.1
0.095
0.09
0.085
0.08
0.075
0.07
0.065
0.06
0.055
0.05
0.045
0.04
0.035
0.03
0.025
0.02
0.015
0.01
0.005
0
Inflow Area=4,074.0 m²
Peak Elev=1.162 m
Storage=104.6 m³
0.1041 m³/s
0.0272 m³/s
Toronto 25-Year Duration=19 min, Inten=113.4 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 74HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Pond 5: SWM Tank (33.1L/s)
Primary
Stage-Discharge
Discharge (m³/s)0.0360.0340.0320.030.0280.0260.0240.0220.020.0180.0160.0140.0120.010.0080.0060.0040.0020
Ele
vati
on
(m
ete
rs)
2
1
0
Orifice/Grate
Toronto 25-Year Duration=19 min, Inten=113.4 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 75HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Pond 6P: Green Roof
Inflow Area = 116.0 m², 0.00% Impervious, Inflow Depth = 16 mm for 25-Year eventInflow = 0.0016 m³/s @ 0.17 hrs, Volume= 1.9 m³Outflow = 0.0002 m³/s @ 0.46 hrs, Volume= 1.1 m³, Atten= 89%, Lag= 17.7 minPrimary = 0.0002 m³/s @ 0.46 hrs, Volume= 1.1 m³
Routing by Stor-Ind method, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsPeak Elev= 100.002 m @ 0.46 hrs Surf.Area= 647.0 m² Storage= 1.8 m³
Plug-Flow detention time= 106.3 min calculated for 1.1 m³ (61% of inflow)Center-of-Mass det. time= 102.3 min ( 116.8 - 14.5 )
Volume Invert Avail.Storage Storage Description
#1 99.990 m 0.6 m³ 1.00 mW x 116.00 mL x 0.01 mH Green Roof Media Storage1.2 m³ Overall x 50.0% Voids
#2 100.000 m 42.5 m³ 1.00 mW x 531.00 mL x 0.08 mH Green Roof
43.1 m³ Total Available Storage
Device Routing Invert Outlet Devices
#1 Primary 100.000 m 100 mm Horiz. Orifice/Grate X 3.00 C= 0.800 Limited to weir flow at low heads
Primary OutFlow Max=0.0002 m³/s @ 0.46 hrs HW=100.002 m (Free Discharge)1=Orifice/Grate (Weir Controls 0.0002 m³/s @ 0.09 m/s)
Pond 6P: Green Roof
InflowPrimary
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.002
0.002
0.002
0.002
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.000
0.000
0.000
0.000
0
0
Inflow Area=116.0 m²
Peak Elev=100.002 m
Storage=1.8 m³
0.0016 m³/s
0.0002 m³/s
Toronto 25-Year Duration=19 min, Inten=113.4 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 76HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Pond 6P: Green Roof
Primary
Stage-Discharge
Discharge (m³/s)0.0220.020.0180.0160.0140.0120.010.0080.0060.0040.0020
Ele
vati
on
(m
ete
rs)
100.08
100.075
100.07
100.065
100.06
100.055
100.05
100.045
100.04
100.035
100.03
100.025
100.02
100.015
100.01
100.005
100
99.995
99.99
Orifice/Grate
Toronto 25-Year Duration=19 min, Inten=113.4 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 77HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Pond 40P: SWM Tank (243.9L/s)
Inflow Area = 18,630.7 m², 0.00% Impervious, Inflow Depth = 28 mm for 25-Year eventInflow = 0.4335 m³/s @ 0.31 hrs, Volume= 512.4 m³Outflow = 0.1649 m³/s @ 0.42 hrs, Volume= 508.9 m³, Atten= 62%, Lag= 7.1 minPrimary = 0.1649 m³/s @ 0.42 hrs, Volume= 508.9 m³
Routing by Stor-Ind method, Time Span= 0.00-6.00 hrs, dt= 0.01 hrs / 3Starting Elev= 0.180 m Surf.Area= 325.0 m² Storage= 58.5 m³Peak Elev= 1.203 m @ 0.42 hrs Surf.Area= 325.0 m² Storage= 391.1 m³ (332.6 m³ above start)
Plug-Flow detention time= 36.2 min calculated for 449.7 m³ (88% of inflow)Center-of-Mass det. time= 29.2 min ( 45.9 - 16.7 )
Volume Invert Avail.Storage Storage Description
#1 0.000 m 650.0 m³ 1.00 mW x 325.00 mL x 2.00 mH Cistern + Orifice
Device Routing Invert Outlet Devices
#1 Primary 0.180 m 250 mm Vert. Orifice/Grate C= 0.800
Primary OutFlow Max=0.1648 m³/s @ 0.42 hrs HW=1.203 m (Free Discharge)1=Orifice/Grate (Orifice Controls 0.1648 m³/s @ 3.36 m/s)
Pond 40P: SWM Tank (243.9L/s)
InflowPrimary
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.48
0.46
0.44
0.42
0.4
0.38
0.36
0.34
0.32
0.3
0.28
0.26
0.24
0.22
0.2
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
Inflow Area=18,630.7 m²
Peak Elev=1.203 m
Storage=391.1 m³
0.4335 m³/s
0.1649 m³/s
Toronto 25-Year Duration=19 min, Inten=113.4 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 78HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Pond 40P: SWM Tank (243.9L/s)
Primary
Stage-Discharge
Discharge (m³/s)0.220.20.180.160.140.120.10.080.060.040.020
Ele
vati
on
(m
ete
rs)
2
1
0
Orifice/Grate
Toronto 25-Year Duration=19 min, Inten=113.4 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 79HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Pond 41P: Green Roof
Inflow Area = 2,605.3 m², 0.00% Impervious, Inflow Depth = 16 mm for 25-Year eventInflow = 0.0369 m³/s @ 0.17 hrs, Volume= 42.1 m³Outflow = 0.0135 m³/s @ 0.42 hrs, Volume= 28.7 m³, Atten= 63%, Lag= 15.1 minPrimary = 0.0135 m³/s @ 0.42 hrs, Volume= 28.7 m³
Routing by Stor-Ind method, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsPeak Elev= 100.040 m @ 0.42 hrs Surf.Area= 3,136.3 m² Storage= 34.2 m³
Plug-Flow detention time= 42.8 min calculated for 28.6 m³ (68% of inflow)Center-of-Mass det. time= 40.0 min ( 54.5 - 14.5 )
Volume Invert Avail.Storage Storage Description
#1 99.990 m 13.0 m³ 1.00 mW x 2,605.29 mL x 0.01 mH Green Roof Media Storage26.1 m³ Overall x 50.0% Voids
#2 100.000 m 42.5 m³ 1.00 mW x 531.00 mL x 0.08 mH Green Roof
55.5 m³ Total Available Storage
Device Routing Invert Outlet Devices
#1 Primary 100.000 m 100 mm Horiz. Orifice/Grate X 3.00 C= 0.800 Limited to weir flow at low heads
Primary OutFlow Max=0.0135 m³/s @ 0.42 hrs HW=100.040 m (Free Discharge)1=Orifice/Grate (Weir Controls 0.0135 m³/s @ 0.36 m/s)
Pond 41P: Green Roof
InflowPrimary
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.04
0.038
0.036
0.034
0.032
0.03
0.028
0.026
0.024
0.022
0.02
0.018
0.016
0.014
0.012
0.01
0.008
0.006
0.004
0.002
0
Inflow Area=2,605.3 m²
Peak Elev=100.040 m
Storage=34.2 m³
0.0369 m³/s
0.0135 m³/s
Toronto 25-Year Duration=19 min, Inten=113.4 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 80HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Pond 41P: Green Roof
Primary
Stage-Discharge
Discharge (m³/s)0.0220.020.0180.0160.0140.0120.010.0080.0060.0040.0020
Ele
vati
on
(m
ete
rs)
100.08
100.075
100.07
100.065
100.06
100.055
100.05
100.045
100.04
100.035
100.03
100.025
100.02
100.015
100.01
100.005
100
99.995
99.99
Orifice/Grate
Toronto 50-Year Duration=19 min, Inten=134.2 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 81HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Time span=0.00-6.00 hrs, dt=0.01 hrs, 601 pointsRunoff by Rational method, Rise/Fall=1.0/1.0 xTc
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=1,422.0 m² 0.00% Impervious Runoff Depth=38 mmSubcatchment 3: Impervious Roof Tc=10.0 min C=0.90 Runoff=0.0477 m³/s 54.4 m³
Runoff Area=402.0 m² 0.00% Impervious Runoff Depth=11 mmSubcatchment 4: Pervious Landscaping Tc=10.0 min C=0.25 Runoff=0.0037 m³/s 4.3 m³
Runoff Area=116.0 m² 0.00% Impervious Runoff Depth=19 mmSubcatchment 7S: Green Roof Tc=10.0 min C=0.45 Runoff=0.0019 m³/s 2.2 m³
Runoff Area=2,134.0 m² 0.00% Impervious Runoff Depth=38 mmSubcatchment 8S: At-Grade Impervious Tc=10.0 min C=0.90 Runoff=0.0716 m³/s 81.6 m³
Runoff Area=4,430.6 m² 0.00% Impervious Runoff Depth=38 mmSubcatchment 36S: Impervious Roof Tc=10.0 min C=0.90 Runoff=0.1487 m³/s 169.5 m³
Runoff Area=1,464.4 m² 0.00% Impervious Runoff Depth=11 mmSubcatchment 37S: Pervious Tc=10.0 min C=0.25 Runoff=0.0137 m³/s 15.6 m³
Runoff Area=2,605.3 m² 0.00% Impervious Runoff Depth=19 mmSubcatchment 38S: Green Roof Tc=10.0 min C=0.45 Runoff=0.0437 m³/s 49.8 m³
Runoff Area=10,130.4 m² 0.00% Impervious Runoff Depth=38 mmSubcatchment 39S: At-Grade Tc=10.0 min C=0.90 Runoff=0.3400 m³/s 387.5 m³
Reach 15R: Catchment 201 (A)
Reach 16R: Catchment 202 (BC)
Peak Elev=1.370 m Storage=123.3 m³ Inflow=0.1232 m³/s 141.8 m³Pond 5: SWM Tank (33.1L/s) Outflow=0.0300 m³/s 140.6 m³
Peak Elev=100.003 m Storage=2.1 m³ Inflow=0.0019 m³/s 2.2 m³Pond 6P: Green Roof Outflow=0.0003 m³/s 1.5 m³
Peak Elev=1.423 m Storage=462.5 m³ Inflow=0.5154 m³/s 608.9 m³Pond 40P: SWM Tank (243.9L/s) Outflow=0.1839 m³/s 605.3 m³
Peak Elev=100.048 m Storage=38.7 m³ Inflow=0.0437 m³/s 49.8 m³Pond 41P: Green Roof Outflow=0.0181 m³/s 36.4 m³
Total Runoff Area = 22,704.7 m² Runoff Volume = 764.8 m³ Average Runoff Depth = 34 mm100.00% Pervious = 22,704.7 m² 0.00% Impervious = 0.0 m²
Toronto 50-Year Duration=19 min, Inten=134.2 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 82HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 3: Impervious Roof
Runoff = 0.0477 m³/s @ 0.17 hrs, Volume= 54.4 m³, Depth= 38 mm
Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsToronto 50-Year Duration=19 min, Inten=134.2 mm/hr
Area (m²) C Description
1,422.0 0.90 Impervious Roof
1,422.0 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (meters) (m/m) (m/sec) (m³/s)
10.0 Direct Entry, Direct Entry
Subcatchment 3: Impervious Roof
Runoff
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.05
0.045
0.04
0.035
0.03
0.025
0.02
0.015
0.01
0.005
0
Toronto 50-Year
Duration=19 min,
Inten=134.2 mm/hr
Runoff Area=1,422.0 m²
Runoff Volume=54.4 m³
Runoff Depth=38 mm
Tc=10.0 min
C=0.90
0.0477 m³/s
Toronto 50-Year Duration=19 min, Inten=134.2 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 83HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 4: Pervious Landscaping
Runoff = 0.0037 m³/s @ 0.17 hrs, Volume= 4.3 m³, Depth= 11 mm
Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsToronto 50-Year Duration=19 min, Inten=134.2 mm/hr
Area (m²) C Description
402.0 0.25 Pervious Area
402.0 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (meters) (m/m) (m/sec) (m³/s)
10.0 Direct Entry, Direct Entry
Subcatchment 4: Pervious Landscaping
Runoff
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.004
0.004
0.004
0.003
0.003
0.003
0.003
0.003
0.002
0.002
0.002
0.002
0.002
0.001
0.001
0.001
0.001
0.001
0.000
0.000
0
Toronto 50-Year
Duration=19 min,
Inten=134.2 mm/hr
Runoff Area=402.0 m²
Runoff Volume=4.3 m³
Runoff Depth=11 mm
Tc=10.0 min
C=0.25
0.0037 m³/s
Toronto 50-Year Duration=19 min, Inten=134.2 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 84HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 7S: Green Roof
Runoff = 0.0019 m³/s @ 0.17 hrs, Volume= 2.2 m³, Depth= 19 mm
Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsToronto 50-Year Duration=19 min, Inten=134.2 mm/hr
Area (m²) C Description
116.0 0.45 Green Roof
116.0 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (meters) (m/m) (m/sec) (m³/s)
10.0 Direct Entry, Direct Entry
Subcatchment 7S: Green Roof
Runoff
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.002
0.002
0.002
0.002
0.002
0.002
0.002
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.000
0.000
0.000
0.000
0
0
Toronto 50-Year
Duration=19 min,
Inten=134.2 mm/hr
Runoff Area=116.0 m²
Runoff Volume=2.2 m³
Runoff Depth=19 mm
Tc=10.0 min
C=0.45
0.0019 m³/s
Toronto 50-Year Duration=19 min, Inten=134.2 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 85HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 8S: At-Grade Impervious
Runoff = 0.0716 m³/s @ 0.17 hrs, Volume= 81.6 m³, Depth= 38 mm
Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsToronto 50-Year Duration=19 min, Inten=134.2 mm/hr
Area (m²) C Description
2,134.0 0.90 Paved Areas
2,134.0 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (meters) (m/m) (m/sec) (m³/s)
10.0 Direct Entry, Direct Entry
Subcatchment 8S: At-Grade Impervious
Runoff
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.08
0.075
0.07
0.065
0.06
0.055
0.05
0.045
0.04
0.035
0.03
0.025
0.02
0.015
0.01
0.005
0
Toronto 50-Year
Duration=19 min,
Inten=134.2 mm/hr
Runoff Area=2,134.0 m²
Runoff Volume=81.6 m³
Runoff Depth=38 mm
Tc=10.0 min
C=0.90
0.0716 m³/s
Toronto 50-Year Duration=19 min, Inten=134.2 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 86HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 36S: Impervious Roof
Runoff = 0.1487 m³/s @ 0.17 hrs, Volume= 169.5 m³, Depth= 38 mm
Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsToronto 50-Year Duration=19 min, Inten=134.2 mm/hr
Area (m²) C Description
4,430.6 0.90 Impervious Roof
4,430.6 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (meters) (m/m) (m/sec) (m³/s)
10.0 Direct Entry, Direct Entry
Subcatchment 36S: Impervious Roof
Runoff
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.16
0.15
0.14
0.13
0.12
0.11
0.1
0.09
0.08
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0
Toronto 50-Year
Duration=19 min,
Inten=134.2 mm/hr
Runoff Area=4,430.6 m²
Runoff Volume=169.5 m³
Runoff Depth=38 mm
Tc=10.0 min
C=0.90
0.1487 m³/s
Toronto 50-Year Duration=19 min, Inten=134.2 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 87HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 37S: Pervious Landscaping
Runoff = 0.0137 m³/s @ 0.17 hrs, Volume= 15.6 m³, Depth= 11 mm
Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsToronto 50-Year Duration=19 min, Inten=134.2 mm/hr
Area (m²) C Description
1,464.4 0.25 Pervious Area
1,464.4 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (meters) (m/m) (m/sec) (m³/s)
10.0 Direct Entry, Direct Entry
Subcatchment 37S: Pervious Landscaping
Runoff
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.015
0.014
0.013
0.012
0.011
0.01
0.009
0.008
0.007
0.006
0.005
0.004
0.003
0.002
0.001
0
Toronto 50-Year
Duration=19 min,
Inten=134.2 mm/hr
Runoff Area=1,464.4 m²
Runoff Volume=15.6 m³
Runoff Depth=11 mm
Tc=10.0 min
C=0.25
0.0137 m³/s
Toronto 50-Year Duration=19 min, Inten=134.2 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 88HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 38S: Green Roof
Runoff = 0.0437 m³/s @ 0.17 hrs, Volume= 49.8 m³, Depth= 19 mm
Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsToronto 50-Year Duration=19 min, Inten=134.2 mm/hr
Area (m²) C Description
2,605.3 0.45 Green Roof
2,605.3 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (meters) (m/m) (m/sec) (m³/s)
10.0 Direct Entry, Direct Entry
Subcatchment 38S: Green Roof
Runoff
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.048
0.046
0.044
0.042
0.04
0.038
0.036
0.034
0.032
0.03
0.028
0.026
0.024
0.022
0.02
0.018
0.016
0.014
0.012
0.01
0.008
0.006
0.004
0.002
0
Toronto 50-Year
Duration=19 min,
Inten=134.2 mm/hr
Runoff Area=2,605.3 m²
Runoff Volume=49.8 m³
Runoff Depth=19 mm
Tc=10.0 min
C=0.45
0.0437 m³/s
Toronto 50-Year Duration=19 min, Inten=134.2 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 89HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 39S: At-Grade Impervious
Runoff = 0.3400 m³/s @ 0.17 hrs, Volume= 387.5 m³, Depth= 38 mm
Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsToronto 50-Year Duration=19 min, Inten=134.2 mm/hr
Area (m²) C Description
10,130.4 0.90
10,130.4 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (meters) (m/m) (m/sec) (m³/s)
10.0 Direct Entry, Direct Entry
Subcatchment 39S: At-Grade Impervious
Runoff
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.38
0.36
0.34
0.32
0.3
0.28
0.26
0.24
0.22
0.2
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
Toronto 50-Year
Duration=19 min,
Inten=134.2 mm/hr
Runoff Area=10,130.4 m²
Runoff Volume=387.5 m³
Runoff Depth=38 mm
Tc=10.0 min
C=0.90
0.3400 m³/s
Toronto 50-Year Duration=19 min, Inten=134.2 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 90HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Reach 15R: Catchment 201 (A)
[40] Hint: Not Described (Outflow=Inflow)
Toronto 50-Year Duration=19 min, Inten=134.2 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 91HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Reach 16R: Catchment 202 (BC)
[40] Hint: Not Described (Outflow=Inflow)
Toronto 50-Year Duration=19 min, Inten=134.2 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 92HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Pond 5: SWM Tank (33.1L/s)
Inflow Area = 4,074.0 m², 0.00% Impervious, Inflow Depth > 35 mm for 50-Year eventInflow = 0.1232 m³/s @ 0.31 hrs, Volume= 141.8 m³Outflow = 0.0300 m³/s @ 0.44 hrs, Volume= 140.6 m³, Atten= 76%, Lag= 8.0 minPrimary = 0.0300 m³/s @ 0.44 hrs, Volume= 140.6 m³
Routing by Stor-Ind method, Time Span= 0.00-6.00 hrs, dt= 0.01 hrs / 3Starting Elev= 0.150 m Surf.Area= 90.0 m² Storage= 13.5 m³Peak Elev= 1.370 m @ 0.44 hrs Surf.Area= 90.0 m² Storage= 123.3 m³ (109.8 m³ above start)
Plug-Flow detention time= 52.1 min calculated for 127.1 m³ (90% of inflow)Center-of-Mass det. time= 44.9 min ( 60.4 - 15.5 )
Volume Invert Avail.Storage Storage Description
#1 0.000 m 180.0 m³ 1.00 mW x 90.00 mL x 2.00 mH Cistern + Orifice
Device Routing Invert Outlet Devices
#1 Primary 0.160 m 100 mm Vert. Orifice/Grate C= 0.800
Primary OutFlow Max=0.0300 m³/s @ 0.44 hrs HW=1.370 m (Free Discharge)1=Orifice/Grate (Orifice Controls 0.0300 m³/s @ 3.82 m/s)
Pond 5: SWM Tank (33.1L/s)
InflowPrimary
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.13
0.12
0.11
0.1
0.09
0.08
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0
Inflow Area=4,074.0 m²
Peak Elev=1.370 m
Storage=123.3 m³
0.1232 m³/s
0.0300 m³/s
Toronto 50-Year Duration=19 min, Inten=134.2 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 93HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Pond 5: SWM Tank (33.1L/s)
Primary
Stage-Discharge
Discharge (m³/s)0.0360.0340.0320.030.0280.0260.0240.0220.020.0180.0160.0140.0120.010.0080.0060.0040.0020
Ele
vati
on
(m
ete
rs)
2
1
0
Orifice/Grate
Toronto 50-Year Duration=19 min, Inten=134.2 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 94HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Pond 6P: Green Roof
Inflow Area = 116.0 m², 0.00% Impervious, Inflow Depth = 19 mm for 50-Year eventInflow = 0.0019 m³/s @ 0.17 hrs, Volume= 2.2 m³Outflow = 0.0003 m³/s @ 0.46 hrs, Volume= 1.5 m³, Atten= 87%, Lag= 17.5 minPrimary = 0.0003 m³/s @ 0.46 hrs, Volume= 1.5 m³
Routing by Stor-Ind method, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsPeak Elev= 100.003 m @ 0.46 hrs Surf.Area= 647.0 m² Storage= 2.1 m³
Plug-Flow detention time= 99.3 min calculated for 1.5 m³ (66% of inflow)Center-of-Mass det. time= 96.2 min ( 110.7 - 14.5 )
Volume Invert Avail.Storage Storage Description
#1 99.990 m 0.6 m³ 1.00 mW x 116.00 mL x 0.01 mH Green Roof Media Storage1.2 m³ Overall x 50.0% Voids
#2 100.000 m 42.5 m³ 1.00 mW x 531.00 mL x 0.08 mH Green Roof
43.1 m³ Total Available Storage
Device Routing Invert Outlet Devices
#1 Primary 100.000 m 100 mm Horiz. Orifice/Grate X 3.00 C= 0.800 Limited to weir flow at low heads
Primary OutFlow Max=0.0003 m³/s @ 0.46 hrs HW=100.003 m (Free Discharge)1=Orifice/Grate (Weir Controls 0.0003 m³/s @ 0.10 m/s)
Pond 6P: Green Roof
InflowPrimary
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.002
0.002
0.002
0.002
0.002
0.002
0.002
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.000
0.000
0.000
0.000
0
0
Inflow Area=116.0 m²
Peak Elev=100.003 m
Storage=2.1 m³
0.0019 m³/s
0.0003 m³/s
Toronto 50-Year Duration=19 min, Inten=134.2 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 95HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Pond 6P: Green Roof
Primary
Stage-Discharge
Discharge (m³/s)0.0220.020.0180.0160.0140.0120.010.0080.0060.0040.0020
Ele
vati
on
(m
ete
rs)
100.08
100.075
100.07
100.065
100.06
100.055
100.05
100.045
100.04
100.035
100.03
100.025
100.02
100.015
100.01
100.005
100
99.995
99.99
Orifice/Grate
Toronto 50-Year Duration=19 min, Inten=134.2 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 96HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Pond 40P: SWM Tank (243.9L/s)
Inflow Area = 18,630.7 m², 0.00% Impervious, Inflow Depth = 33 mm for 50-Year eventInflow = 0.5154 m³/s @ 0.31 hrs, Volume= 608.9 m³Outflow = 0.1839 m³/s @ 0.43 hrs, Volume= 605.3 m³, Atten= 64%, Lag= 7.3 minPrimary = 0.1839 m³/s @ 0.43 hrs, Volume= 605.3 m³
Routing by Stor-Ind method, Time Span= 0.00-6.00 hrs, dt= 0.01 hrs / 3Starting Elev= 0.180 m Surf.Area= 325.0 m² Storage= 58.5 m³Peak Elev= 1.423 m @ 0.43 hrs Surf.Area= 325.0 m² Storage= 462.5 m³ (404.0 m³ above start)
Plug-Flow detention time= 37.2 min calculated for 546.8 m³ (90% of inflow)Center-of-Mass det. time= 30.5 min ( 47.2 - 16.7 )
Volume Invert Avail.Storage Storage Description
#1 0.000 m 650.0 m³ 1.00 mW x 325.00 mL x 2.00 mH Cistern + Orifice
Device Routing Invert Outlet Devices
#1 Primary 0.180 m 250 mm Vert. Orifice/Grate C= 0.800
Primary OutFlow Max=0.1839 m³/s @ 0.43 hrs HW=1.423 m (Free Discharge)1=Orifice/Grate (Orifice Controls 0.1839 m³/s @ 3.75 m/s)
Pond 40P: SWM Tank (243.9L/s)
InflowPrimary
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.55
0.5
0.45
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
Inflow Area=18,630.7 m²
Peak Elev=1.423 m
Storage=462.5 m³
0.5154 m³/s
0.1839 m³/s
Toronto 50-Year Duration=19 min, Inten=134.2 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 97HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Pond 40P: SWM Tank (243.9L/s)
Primary
Stage-Discharge
Discharge (m³/s)0.220.20.180.160.140.120.10.080.060.040.020
Ele
vati
on
(m
ete
rs)
2
1
0
Orifice/Grate
Toronto 50-Year Duration=19 min, Inten=134.2 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 98HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Pond 41P: Green Roof
Inflow Area = 2,605.3 m², 0.00% Impervious, Inflow Depth = 19 mm for 50-Year eventInflow = 0.0437 m³/s @ 0.17 hrs, Volume= 49.8 m³Outflow = 0.0181 m³/s @ 0.41 hrs, Volume= 36.4 m³, Atten= 59%, Lag= 14.7 minPrimary = 0.0181 m³/s @ 0.41 hrs, Volume= 36.4 m³
Routing by Stor-Ind method, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsPeak Elev= 100.048 m @ 0.41 hrs Surf.Area= 3,136.3 m² Storage= 38.7 m³
Plug-Flow detention time= 38.7 min calculated for 36.4 m³ (73% of inflow)Center-of-Mass det. time= 36.4 min ( 50.9 - 14.5 )
Volume Invert Avail.Storage Storage Description
#1 99.990 m 13.0 m³ 1.00 mW x 2,605.29 mL x 0.01 mH Green Roof Media Storage26.1 m³ Overall x 50.0% Voids
#2 100.000 m 42.5 m³ 1.00 mW x 531.00 mL x 0.08 mH Green Roof
55.5 m³ Total Available Storage
Device Routing Invert Outlet Devices
#1 Primary 100.000 m 100 mm Horiz. Orifice/Grate X 3.00 C= 0.800 Limited to weir flow at low heads
Primary OutFlow Max=0.0181 m³/s @ 0.41 hrs HW=100.048 m (Free Discharge)1=Orifice/Grate (Weir Controls 0.0181 m³/s @ 0.40 m/s)
Pond 41P: Green Roof
InflowPrimary
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.048
0.046
0.044
0.042
0.04
0.038
0.036
0.034
0.032
0.03
0.028
0.026
0.024
0.022
0.02
0.018
0.016
0.014
0.012
0.01
0.008
0.006
0.004
0.002
0
Inflow Area=2,605.3 m²
Peak Elev=100.048 m
Storage=38.7 m³
0.0437 m³/s
0.0181 m³/s
Toronto 50-Year Duration=19 min, Inten=134.2 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 99HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Pond 41P: Green Roof
Primary
Stage-Discharge
Discharge (m³/s)0.0220.020.0180.0160.0140.0120.010.0080.0060.0040.0020
Ele
vati
on
(m
ete
rs)
100.08
100.075
100.07
100.065
100.06
100.055
100.05
100.045
100.04
100.035
100.03
100.025
100.02
100.015
100.01
100.005
100
99.995
99.99
Orifice/Grate
Toronto 100-Year Duration=19 min, Inten=149.8 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 100HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Time span=0.00-6.00 hrs, dt=0.01 hrs, 601 pointsRunoff by Rational method, Rise/Fall=1.0/1.0 xTc
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=1,422.0 m² 0.00% Impervious Runoff Depth=43 mmSubcatchment 3: Impervious Roof Tc=10.0 min C=0.90 Runoff=0.0533 m³/s 60.7 m³
Runoff Area=402.0 m² 0.00% Impervious Runoff Depth=12 mmSubcatchment 4: Pervious Landscaping Tc=10.0 min C=0.25 Runoff=0.0042 m³/s 4.8 m³
Runoff Area=116.0 m² 0.00% Impervious Runoff Depth=21 mmSubcatchment 7S: Green Roof Tc=10.0 min C=0.45 Runoff=0.0022 m³/s 2.5 m³
Runoff Area=2,134.0 m² 0.00% Impervious Runoff Depth=43 mmSubcatchment 8S: At-Grade Impervious Tc=10.0 min C=0.90 Runoff=0.0799 m³/s 91.1 m³
Runoff Area=4,430.6 m² 0.00% Impervious Runoff Depth=43 mmSubcatchment 36S: Impervious Roof Tc=10.0 min C=0.90 Runoff=0.1659 m³/s 189.1 m³
Runoff Area=1,464.4 m² 0.00% Impervious Runoff Depth=12 mmSubcatchment 37S: Pervious Tc=10.0 min C=0.25 Runoff=0.0152 m³/s 17.4 m³
Runoff Area=2,605.3 m² 0.00% Impervious Runoff Depth=21 mmSubcatchment 38S: Green Roof Tc=10.0 min C=0.45 Runoff=0.0488 m³/s 55.6 m³
Runoff Area=10,130.4 m² 0.00% Impervious Runoff Depth=43 mmSubcatchment 39S: At-Grade Tc=10.0 min C=0.90 Runoff=0.3794 m³/s 432.4 m³
Reach 15R: Catchment 201 (A)
Reach 16R: Catchment 202 (BC)
Peak Elev=1.527 m Storage=137.4 m³ Inflow=0.1375 m³/s 158.3 m³Pond 5: SWM Tank (33.1L/s) Outflow=0.0319 m³/s 157.1 m³
Peak Elev=100.003 m Storage=2.3 m³ Inflow=0.0022 m³/s 2.5 m³Pond 6P: Green Roof Outflow=0.0003 m³/s 1.7 m³
Peak Elev=1.589 m Storage=516.4 m³ Inflow=0.5768 m³/s 681.0 m³Pond 40P: SWM Tank (243.9L/s) Outflow=0.1971 m³/s 677.4 m³
Peak Elev=100.055 m Storage=42.4 m³ Inflow=0.0488 m³/s 55.6 m³Pond 41P: Green Roof Outflow=0.0196 m³/s 42.2 m³
Total Runoff Area = 22,704.7 m² Runoff Volume = 853.5 m³ Average Runoff Depth = 38 mm100.00% Pervious = 22,704.7 m² 0.00% Impervious = 0.0 m²
Toronto 100-Year Duration=19 min, Inten=149.8 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 101HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 3: Impervious Roof
Runoff = 0.0533 m³/s @ 0.17 hrs, Volume= 60.7 m³, Depth= 43 mm
Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsToronto 100-Year Duration=19 min, Inten=149.8 mm/hr
Area (m²) C Description
1,422.0 0.90 Impervious Roof
1,422.0 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (meters) (m/m) (m/sec) (m³/s)
10.0 Direct Entry, Direct Entry
Subcatchment 3: Impervious Roof
Runoff
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.055
0.05
0.045
0.04
0.035
0.03
0.025
0.02
0.015
0.01
0.005
0
Toronto 100-Year
Duration=19 min,
Inten=149.8 mm/hr
Runoff Area=1,422.0 m²
Runoff Volume=60.7 m³
Runoff Depth=43 mm
Tc=10.0 min
C=0.90
0.0533 m³/s
Toronto 100-Year Duration=19 min, Inten=149.8 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 102HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 4: Pervious Landscaping
Runoff = 0.0042 m³/s @ 0.17 hrs, Volume= 4.8 m³, Depth= 12 mm
Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsToronto 100-Year Duration=19 min, Inten=149.8 mm/hr
Area (m²) C Description
402.0 0.25 Pervious Area
402.0 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (meters) (m/m) (m/sec) (m³/s)
10.0 Direct Entry, Direct Entry
Subcatchment 4: Pervious Landscaping
Runoff
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.005
0.004
0.004
0.004
0.004
0.004
0.003
0.003
0.003
0.003
0.003
0.002
0.002
0.002
0.002
0.002
0.001
0.001
0.001
0.001
0.001
0.000
0.000
0
Toronto 100-Year
Duration=19 min,
Inten=149.8 mm/hr
Runoff Area=402.0 m²
Runoff Volume=4.8 m³
Runoff Depth=12 mm
Tc=10.0 min
C=0.25
0.0042 m³/s
Toronto 100-Year Duration=19 min, Inten=149.8 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 103HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 7S: Green Roof
Runoff = 0.0022 m³/s @ 0.17 hrs, Volume= 2.5 m³, Depth= 21 mm
Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsToronto 100-Year Duration=19 min, Inten=149.8 mm/hr
Area (m²) C Description
116.0 0.45 Green Roof
116.0 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (meters) (m/m) (m/sec) (m³/s)
10.0 Direct Entry, Direct Entry
Subcatchment 7S: Green Roof
Runoff
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.002
0.002
0.002
0.002
0.002
0.002
0.002
0.002
0.002
0.002
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.000
0.000
0.000
0.000
0
Toronto 100-Year
Duration=19 min,
Inten=149.8 mm/hr
Runoff Area=116.0 m²
Runoff Volume=2.5 m³
Runoff Depth=21 mm
Tc=10.0 min
C=0.45
0.0022 m³/s
Toronto 100-Year Duration=19 min, Inten=149.8 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 104HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 8S: At-Grade Impervious
Runoff = 0.0799 m³/s @ 0.17 hrs, Volume= 91.1 m³, Depth= 43 mm
Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsToronto 100-Year Duration=19 min, Inten=149.8 mm/hr
Area (m²) C Description
2,134.0 0.90 Paved Areas
2,134.0 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (meters) (m/m) (m/sec) (m³/s)
10.0 Direct Entry, Direct Entry
Subcatchment 8S: At-Grade Impervious
Runoff
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.085
0.08
0.075
0.07
0.065
0.06
0.055
0.05
0.045
0.04
0.035
0.03
0.025
0.02
0.015
0.01
0.005
0
Toronto 100-Year
Duration=19 min,
Inten=149.8 mm/hr
Runoff Area=2,134.0 m²
Runoff Volume=91.1 m³
Runoff Depth=43 mm
Tc=10.0 min
C=0.90
0.0799 m³/s
Toronto 100-Year Duration=19 min, Inten=149.8 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 105HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 36S: Impervious Roof
Runoff = 0.1659 m³/s @ 0.17 hrs, Volume= 189.1 m³, Depth= 43 mm
Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsToronto 100-Year Duration=19 min, Inten=149.8 mm/hr
Area (m²) C Description
4,430.6 0.90 Impervious Roof
4,430.6 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (meters) (m/m) (m/sec) (m³/s)
10.0 Direct Entry, Direct Entry
Subcatchment 36S: Impervious Roof
Runoff
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.18
0.17
0.16
0.15
0.14
0.13
0.12
0.11
0.1
0.09
0.08
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0
Toronto 100-Year
Duration=19 min,
Inten=149.8 mm/hr
Runoff Area=4,430.6 m²
Runoff Volume=189.1 m³
Runoff Depth=43 mm
Tc=10.0 min
C=0.90
0.1659 m³/s
Toronto 100-Year Duration=19 min, Inten=149.8 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 106HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 37S: Pervious Landscaping
Runoff = 0.0152 m³/s @ 0.17 hrs, Volume= 17.4 m³, Depth= 12 mm
Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsToronto 100-Year Duration=19 min, Inten=149.8 mm/hr
Area (m²) C Description
1,464.4 0.25 Pervious Area
1,464.4 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (meters) (m/m) (m/sec) (m³/s)
10.0 Direct Entry, Direct Entry
Subcatchment 37S: Pervious Landscaping
Runoff
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.017
0.016
0.015
0.014
0.013
0.012
0.011
0.01
0.009
0.008
0.007
0.006
0.005
0.004
0.003
0.002
0.001
0
Toronto 100-Year
Duration=19 min,
Inten=149.8 mm/hr
Runoff Area=1,464.4 m²
Runoff Volume=17.4 m³
Runoff Depth=12 mm
Tc=10.0 min
C=0.25
0.0152 m³/s
Toronto 100-Year Duration=19 min, Inten=149.8 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 107HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 38S: Green Roof
Runoff = 0.0488 m³/s @ 0.17 hrs, Volume= 55.6 m³, Depth= 21 mm
Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsToronto 100-Year Duration=19 min, Inten=149.8 mm/hr
Area (m²) C Description
2,605.3 0.45 Green Roof
2,605.3 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (meters) (m/m) (m/sec) (m³/s)
10.0 Direct Entry, Direct Entry
Subcatchment 38S: Green Roof
Runoff
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.05
0.045
0.04
0.035
0.03
0.025
0.02
0.015
0.01
0.005
0
Toronto 100-Year
Duration=19 min,
Inten=149.8 mm/hr
Runoff Area=2,605.3 m²
Runoff Volume=55.6 m³
Runoff Depth=21 mm
Tc=10.0 min
C=0.45
0.0488 m³/s
Toronto 100-Year Duration=19 min, Inten=149.8 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 108HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment 39S: At-Grade Impervious
Runoff = 0.3794 m³/s @ 0.17 hrs, Volume= 432.4 m³, Depth= 43 mm
Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsToronto 100-Year Duration=19 min, Inten=149.8 mm/hr
Area (m²) C Description
10,130.4 0.90
10,130.4 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description(min) (meters) (m/m) (m/sec) (m³/s)
10.0 Direct Entry, Direct Entry
Subcatchment 39S: At-Grade Impervious
Runoff
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.42
0.4
0.38
0.36
0.34
0.32
0.3
0.28
0.26
0.24
0.22
0.2
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
Toronto 100-Year
Duration=19 min,
Inten=149.8 mm/hr
Runoff Area=10,130.4 m²
Runoff Volume=432.4 m³
Runoff Depth=43 mm
Tc=10.0 min
C=0.90
0.3794 m³/s
Toronto 100-Year Duration=19 min, Inten=149.8 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 109HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Reach 15R: Catchment 201 (A)
[40] Hint: Not Described (Outflow=Inflow)
Toronto 100-Year Duration=19 min, Inten=149.8 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 110HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Reach 16R: Catchment 202 (BC)
[40] Hint: Not Described (Outflow=Inflow)
Toronto 100-Year Duration=19 min, Inten=149.8 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 111HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Pond 5: SWM Tank (33.1L/s)
Inflow Area = 4,074.0 m², 0.00% Impervious, Inflow Depth > 39 mm for 100-Year eventInflow = 0.1375 m³/s @ 0.31 hrs, Volume= 158.3 m³Outflow = 0.0319 m³/s @ 0.44 hrs, Volume= 157.1 m³, Atten= 77%, Lag= 8.1 minPrimary = 0.0319 m³/s @ 0.44 hrs, Volume= 157.1 m³
Routing by Stor-Ind method, Time Span= 0.00-6.00 hrs, dt= 0.01 hrs / 3Starting Elev= 0.150 m Surf.Area= 90.0 m² Storage= 13.5 m³Peak Elev= 1.527 m @ 0.44 hrs Surf.Area= 90.0 m² Storage= 137.4 m³ (123.9 m³ above start)
Plug-Flow detention time= 53.9 min calculated for 143.6 m³ (91% of inflow)Center-of-Mass det. time= 47.1 min ( 62.6 - 15.5 )
Volume Invert Avail.Storage Storage Description
#1 0.000 m 180.0 m³ 1.00 mW x 90.00 mL x 2.00 mH Cistern + Orifice
Device Routing Invert Outlet Devices
#1 Primary 0.160 m 100 mm Vert. Orifice/Grate C= 0.800
Primary OutFlow Max=0.0319 m³/s @ 0.44 hrs HW=1.526 m (Free Discharge)1=Orifice/Grate (Orifice Controls 0.0319 m³/s @ 4.07 m/s)
Pond 5: SWM Tank (33.1L/s)
InflowPrimary
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.15
0.14
0.13
0.12
0.11
0.1
0.09
0.08
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0
Inflow Area=4,074.0 m²
Peak Elev=1.527 m
Storage=137.4 m³
0.1375 m³/s
0.0319 m³/s
Toronto 100-Year Duration=19 min, Inten=149.8 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 112HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Pond 5: SWM Tank (33.1L/s)
Primary
Stage-Discharge
Discharge (m³/s)0.0360.0340.0320.030.0280.0260.0240.0220.020.0180.0160.0140.0120.010.0080.0060.0040.0020
Ele
vati
on
(m
ete
rs)
2
1
0
Orifice/Grate
Toronto 100-Year Duration=19 min, Inten=149.8 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 113HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Pond 6P: Green Roof
Inflow Area = 116.0 m², 0.00% Impervious, Inflow Depth = 21 mm for 100-Year eventInflow = 0.0022 m³/s @ 0.17 hrs, Volume= 2.5 m³Outflow = 0.0003 m³/s @ 0.46 hrs, Volume= 1.7 m³, Atten= 86%, Lag= 17.4 minPrimary = 0.0003 m³/s @ 0.46 hrs, Volume= 1.7 m³
Routing by Stor-Ind method, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsPeak Elev= 100.003 m @ 0.46 hrs Surf.Area= 647.0 m² Storage= 2.3 m³
Plug-Flow detention time= 95.3 min calculated for 1.7 m³ (69% of inflow)Center-of-Mass det. time= 92.4 min ( 106.9 - 14.5 )
Volume Invert Avail.Storage Storage Description
#1 99.990 m 0.6 m³ 1.00 mW x 116.00 mL x 0.01 mH Green Roof Media Storage1.2 m³ Overall x 50.0% Voids
#2 100.000 m 42.5 m³ 1.00 mW x 531.00 mL x 0.08 mH Green Roof
43.1 m³ Total Available Storage
Device Routing Invert Outlet Devices
#1 Primary 100.000 m 100 mm Horiz. Orifice/Grate X 3.00 C= 0.800 Limited to weir flow at low heads
Primary OutFlow Max=0.0003 m³/s @ 0.46 hrs HW=100.003 m (Free Discharge)1=Orifice/Grate (Weir Controls 0.0003 m³/s @ 0.10 m/s)
Pond 6P: Green Roof
InflowPrimary
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.002
0.002
0.002
0.002
0.002
0.002
0.002
0.002
0.002
0.002
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.000
0.000
0.000
0.000
0
Inflow Area=116.0 m²
Peak Elev=100.003 m
Storage=2.3 m³
0.0022 m³/s
0.0003 m³/s
Toronto 100-Year Duration=19 min, Inten=149.8 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 114HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Pond 6P: Green Roof
Primary
Stage-Discharge
Discharge (m³/s)0.0220.020.0180.0160.0140.0120.010.0080.0060.0040.0020
Ele
vati
on
(m
ete
rs)
100.08
100.075
100.07
100.065
100.06
100.055
100.05
100.045
100.04
100.035
100.03
100.025
100.02
100.015
100.01
100.005
100
99.995
99.99
Orifice/Grate
Toronto 100-Year Duration=19 min, Inten=149.8 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 115HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Pond 40P: SWM Tank (243.9L/s)
Inflow Area = 18,630.7 m², 0.00% Impervious, Inflow Depth = 37 mm for 100-Year eventInflow = 0.5768 m³/s @ 0.31 hrs, Volume= 681.0 m³Outflow = 0.1971 m³/s @ 0.43 hrs, Volume= 677.4 m³, Atten= 66%, Lag= 7.5 minPrimary = 0.1971 m³/s @ 0.43 hrs, Volume= 677.4 m³
Routing by Stor-Ind method, Time Span= 0.00-6.00 hrs, dt= 0.01 hrs / 3Starting Elev= 0.180 m Surf.Area= 325.0 m² Storage= 58.5 m³Peak Elev= 1.589 m @ 0.43 hrs Surf.Area= 325.0 m² Storage= 516.4 m³ (457.9 m³ above start)
Plug-Flow detention time= 37.3 min calculated for 617.8 m³ (91% of inflow)Center-of-Mass det. time= 31.6 min ( 48.2 - 16.7 )
Volume Invert Avail.Storage Storage Description
#1 0.000 m 650.0 m³ 1.00 mW x 325.00 mL x 2.00 mH Cistern + Orifice
Device Routing Invert Outlet Devices
#1 Primary 0.180 m 250 mm Vert. Orifice/Grate C= 0.800
Primary OutFlow Max=0.1971 m³/s @ 0.43 hrs HW=1.589 m (Free Discharge)1=Orifice/Grate (Orifice Controls 0.1971 m³/s @ 4.02 m/s)
Pond 40P: SWM Tank (243.9L/s)
InflowPrimary
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.6
0.55
0.5
0.45
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
Inflow Area=18,630.7 m²
Peak Elev=1.589 m
Storage=516.4 m³
0.5768 m³/s
0.1971 m³/s
Toronto 100-Year Duration=19 min, Inten=149.8 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 116HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Pond 40P: SWM Tank (243.9L/s)
Primary
Stage-Discharge
Discharge (m³/s)0.220.20.180.160.140.120.10.080.060.040.020
Ele
vati
on
(m
ete
rs)
2
1
0
Orifice/Grate
Toronto 100-Year Duration=19 min, Inten=149.8 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 117HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Summary for Pond 41P: Green Roof
Inflow Area = 2,605.3 m², 0.00% Impervious, Inflow Depth = 21 mm for 100-Year eventInflow = 0.0488 m³/s @ 0.17 hrs, Volume= 55.6 m³Outflow = 0.0196 m³/s @ 0.42 hrs, Volume= 42.2 m³, Atten= 60%, Lag= 14.8 minPrimary = 0.0196 m³/s @ 0.42 hrs, Volume= 42.2 m³
Routing by Stor-Ind method, Time Span= 0.00-6.00 hrs, dt= 0.01 hrsPeak Elev= 100.055 m @ 0.42 hrs Surf.Area= 3,136.3 m² Storage= 42.4 m³
Plug-Flow detention time= 37.3 min calculated for 42.2 m³ (76% of inflow)Center-of-Mass det. time= 34.8 min ( 49.3 - 14.5 )
Volume Invert Avail.Storage Storage Description
#1 99.990 m 13.0 m³ 1.00 mW x 2,605.29 mL x 0.01 mH Green Roof Media Storage26.1 m³ Overall x 50.0% Voids
#2 100.000 m 42.5 m³ 1.00 mW x 531.00 mL x 0.08 mH Green Roof
55.5 m³ Total Available Storage
Device Routing Invert Outlet Devices
#1 Primary 100.000 m 100 mm Horiz. Orifice/Grate X 3.00 C= 0.800 Limited to weir flow at low heads
Primary OutFlow Max=0.0196 m³/s @ 0.42 hrs HW=100.055 m (Free Discharge)1=Orifice/Grate (Orifice Controls 0.0196 m³/s @ 0.83 m/s)
Pond 41P: Green Roof
InflowPrimary
Hydrograph
Time (hours)6543210
Flo
w
(m³/
s)
0.05
0.045
0.04
0.035
0.03
0.025
0.02
0.015
0.01
0.005
0
Inflow Area=2,605.3 m²
Peak Elev=100.055 m
Storage=42.4 m³
0.0488 m³/s
0.0196 m³/s
Toronto 100-Year Duration=19 min, Inten=149.8 mm/hrRichview Square Printed 19/04/2018Prepared by {enter your company name here}
Page 118HydroCAD® 10.00-21 s/n 05585 © 2018 HydroCAD Software Solutions LLC
Pond 41P: Green Roof
Primary
Stage-Discharge
Discharge (m³/s)0.0220.020.0180.0160.0140.0120.010.0080.0060.0040.0020
Ele
vati
on
(m
ete
rs)
100.08
100.075
100.07
100.065
100.06
100.055
100.05
100.045
100.04
100.035
100.03
100.025
100.02
100.015
100.01
100.005
100
99.995
99.99
Orifice/Grate
APPENDIX
C TYPICAL SEDIMENT LOADING REFERENCE MATERIAL