montreal's mega project the reseau express metropolitan (rem) · the reseau express...

23
Montreal's Mega Project The Reseau Express Metropolitan (REM) By: Dr. Roger Woodhead, Ph.D., ing., P Eng, Jonathan Gouin, ing., P. Eng., B.Com., Vice President, Infrastucture, SNC-Lavalin Infrastructure, SNC-Lavalin

Upload: others

Post on 28-Jun-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Montreal's Mega Project The Reseau Express Metropolitan (REM) · The Reseau Express Metropolitan (REM) 4. Challenges in the engineering delivery of a $ 5 billion Fast Track project

Montreal's Mega Project The Reseau Express Metropolitan (REM)

By: Dr. Roger Woodhead, Ph.D., ing., P Eng, Jonathan Gouin, ing., P. Eng., B.Com., Vice President, Infrastucture, SNC-Lavalin Infrastructure, SNC-Lavalin

Page 2: Montreal's Mega Project The Reseau Express Metropolitan (REM) · The Reseau Express Metropolitan (REM) 4. Challenges in the engineering delivery of a $ 5 billion Fast Track project

• What is REM ?

• When is it happening ?

• Who are the Stakeholders?

• Challenges in the engineering delivery of a $ 5 billion Fast Track project

• How to keep it balanced and moving

• From engineering to construction

The Reseau Express Metropolitan (REM)

Page 3: Montreal's Mega Project The Reseau Express Metropolitan (REM) · The Reseau Express Metropolitan (REM) 4. Challenges in the engineering delivery of a $ 5 billion Fast Track project

The Reseau Express Metropolitan (REM)

1. What is REM ? Fully Automated system (Driverless)

20 hours per day

24 000 pphpd (Ultimate

capacity)

Page 4: Montreal's Mega Project The Reseau Express Metropolitan (REM) · The Reseau Express Metropolitan (REM) 4. Challenges in the engineering delivery of a $ 5 billion Fast Track project

The Reseau Express Metropolitan (REM)

67 km of track

8 km of tunnel

26 stations

Universal access

105 bus platforms

+- 9500 parking spots

+- 1400 bike racks

3 maintenance and storage facilities

1. What is REM ?

Page 5: Montreal's Mega Project The Reseau Express Metropolitan (REM) · The Reseau Express Metropolitan (REM) 4. Challenges in the engineering delivery of a $ 5 billion Fast Track project

The Reseau Express Metropolitan (REM)

2. When is it happening ?

Contract Signature

Delivery of Test Track

Delivery of Seg 1.1 and 2

Delivery of Seg 3

Delivery of all segments

Page 6: Montreal's Mega Project The Reseau Express Metropolitan (REM) · The Reseau Express Metropolitan (REM) 4. Challenges in the engineering delivery of a $ 5 billion Fast Track project

The Reseau Express Metropolitan (REM)

2. When is it happening ?

Page 7: Montreal's Mega Project The Reseau Express Metropolitan (REM) · The Reseau Express Metropolitan (REM) 4. Challenges in the engineering delivery of a $ 5 billion Fast Track project

The Reseau Express Metropolitan (REM)

2. When is it happening ?

2020

Page 8: Montreal's Mega Project The Reseau Express Metropolitan (REM) · The Reseau Express Metropolitan (REM) 4. Challenges in the engineering delivery of a $ 5 billion Fast Track project

The Reseau Express Metropolitan (REM)

2. When is it happening ?

2022

Page 9: Montreal's Mega Project The Reseau Express Metropolitan (REM) · The Reseau Express Metropolitan (REM) 4. Challenges in the engineering delivery of a $ 5 billion Fast Track project

The Reseau Express Metropolitan (REM)

2. When is it happening ?

2023

Page 10: Montreal's Mega Project The Reseau Express Metropolitan (REM) · The Reseau Express Metropolitan (REM) 4. Challenges in the engineering delivery of a $ 5 billion Fast Track project

The Reseau Express Metropolitan (REM)

2. When is it happening ?

2024

Page 11: Montreal's Mega Project The Reseau Express Metropolitan (REM) · The Reseau Express Metropolitan (REM) 4. Challenges in the engineering delivery of a $ 5 billion Fast Track project

3. Who are the Stakeholders ? CDPQ Infra

EPC ContractConstruction Joint Venture

Engineering Joint Venture

RSSOM ContractRolling Stock,

Operation and MaintenanceInterface

The Reseau Express Metropolitan (REM)

Page 12: Montreal's Mega Project The Reseau Express Metropolitan (REM) · The Reseau Express Metropolitan (REM) 4. Challenges in the engineering delivery of a $ 5 billion Fast Track project

The Reseau Express Metropolitan (REM)

4. Challenges in the engineering delivery of a $ 5 billion Fast Track project

XXX person working on a daily basis

XX countries

Multiple languages

Overlaping of Engineering and

Site supervision

Over 10 municipalities

XX documents per week

XX comments response per week

Page 13: Montreal's Mega Project The Reseau Express Metropolitan (REM) · The Reseau Express Metropolitan (REM) 4. Challenges in the engineering delivery of a $ 5 billion Fast Track project

The Reseau Express Metropolitan (REM)

5. How to keep it balanced and moving ? SCHEDULE

COSTQUALITY

Page 14: Montreal's Mega Project The Reseau Express Metropolitan (REM) · The Reseau Express Metropolitan (REM) 4. Challenges in the engineering delivery of a $ 5 billion Fast Track project

The Reseau Express Metropolitan (REM)

SCHEDULE

COSTQUALITY

…through Organization Structure: • ONE TEAM approach

• Colocation

• Flexible and agile

5. How to keep it balanced and moving ?

Page 15: Montreal's Mega Project The Reseau Express Metropolitan (REM) · The Reseau Express Metropolitan (REM) 4. Challenges in the engineering delivery of a $ 5 billion Fast Track project

The Reseau Express Metropolitan (REM)

SCHEDULE

COSTQUALITY

…through use of technologies: • 3D design and modeling

• BIM and collaborative platform

5. How to keep it balanced and moving ?

Page 16: Montreal's Mega Project The Reseau Express Metropolitan (REM) · The Reseau Express Metropolitan (REM) 4. Challenges in the engineering delivery of a $ 5 billion Fast Track project

The Reseau Express Metropolitan (REM)

SCHEDULE

COSTQUALITY

…through work environment: • Open and clear communication

• Who, what, and when

5. How to keep it balanced and moving ?

Page 17: Montreal's Mega Project The Reseau Express Metropolitan (REM) · The Reseau Express Metropolitan (REM) 4. Challenges in the engineering delivery of a $ 5 billion Fast Track project

The Reseau Express Metropolitan (REM)

SCHEDULE

COSTQUALITY

…through engagement of people: • Focus on them

• It is marathon, we are here for the long run

5. How to keep it balanced and moving ?

Page 18: Montreal's Mega Project The Reseau Express Metropolitan (REM) · The Reseau Express Metropolitan (REM) 4. Challenges in the engineering delivery of a $ 5 billion Fast Track project

The Reseau Express Metropolitan (REM)

Key to ensure sustainable

team performance:

BE PROUD OF YOUR WORK

STAY HEALTHY

HAVE HOBBIES

5. How to keep it balanced and moving ?

Page 19: Montreal's Mega Project The Reseau Express Metropolitan (REM) · The Reseau Express Metropolitan (REM) 4. Challenges in the engineering delivery of a $ 5 billion Fast Track project

The Reseau Express Metropolitan (REM)

6. From engineering to construction

Page 20: Montreal's Mega Project The Reseau Express Metropolitan (REM) · The Reseau Express Metropolitan (REM) 4. Challenges in the engineering delivery of a $ 5 billion Fast Track project

The Reseau Express Metropolitan (REM)

6. From engineering to construction

Page 21: Montreal's Mega Project The Reseau Express Metropolitan (REM) · The Reseau Express Metropolitan (REM) 4. Challenges in the engineering delivery of a $ 5 billion Fast Track project

The Reseau Express Metropolitan (REM)

6. From engineering to construction

Page 22: Montreal's Mega Project The Reseau Express Metropolitan (REM) · The Reseau Express Metropolitan (REM) 4. Challenges in the engineering delivery of a $ 5 billion Fast Track project

The Reseau Express Metropolitan (REM)

6. From engineering to construction

Page 23: Montreal's Mega Project The Reseau Express Metropolitan (REM) · The Reseau Express Metropolitan (REM) 4. Challenges in the engineering delivery of a $ 5 billion Fast Track project

The Reseau Express Metropolitan (REM)

END