    MONTHLY REPORT

    Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)

    CONTENTS

    1.0 Project Background 2

    2.0 Major Activities and Review Meetings of the Month 3

    3.0 Out Line Tasks to be carried out 3

    4.0 Activities of Third Party Quality Audit Consultant 5

  • 7/27/2019 Monthly Progress Report for July 2013

    3/131

    MONTHLY REPORT

    Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)

    1. Project Background

    Andhra Pradesh (AP) state has one of the longest coastal belts in India. Out of 67,362 Km of road

    network in the state, the nine coastal districts cover 26,000 km of road length. Every year during the

    period of April-May and September-December, cyclonic situations set in to the Bay of Bengal. With

    the recent changes in climatic conditions, the catastrophic events are increasing resulting in very

    devastating cyclones like Laila, Jal etc where the loss is enormous. In the 97 years ranging from 1892

    to 1989, there were as many as 67 cyclones within the State.

    It is essential to provide safe residential accommodation to the vulnerable population during any

    eventuality or disaster due to natural calamities such as cyclones and associated tidal waves and

    storm surges. The project is formulated based on experiences of Government of Andhra Pradesh in

    mitigating such disasters during the past and also keeping in view the existing facilities available in

    the project area in Andhra Pradesh.

    The Government of India has applied for a credit of US$ 255 Million equivalent from the International

    Development Association (IDA) toward the cost of National Cyclone Risk Mitigation Project (NCRMP),

    and it intends to apply the proceeds to payments for goods, works, related services and consulting

    services under this Project.

    National Cyclone Risk Mitigation Project (NCRMP) Project Implementation Unit (PIU), Andhra

    P d h h d t d t H d b d h i it d th lt t t b it l f idi

  • 7/27/2019 Monthly Progress Report for July 2013

    4/131

    MONTHLY REPORT

    Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)

    2. Major Activities and Review Meetings of the Month

    S.No Place Date Activity

    1 Prakasam 18.07.2013Conducted workshop for Engineers and Contractors on QualityAssurance on NCRMP works at Chief Planning office, Ongole

    2 Hyderabad 29.07.2013Attended NCRMP Review meeting at 'H' Block, AP Secretariat,Hyderabad

    3. Outline of tasks to be carried out

    The scopes of services for the Third Party Quality Audit (TPQA) assignment are

    A. The consultant will prepare an inception report within 30 days from signing of the contract that

    details the method agreed during negotiations to be employed in performing the services.

    B. Assist SPIU in resolving issues related to Non compliances.

    C. The field testing being conducted by the implementation staff will be observed and when doubts

    arise in such observations another sample will be taken and will be tested independently to verify

    whether it is as per the standards or not.

    D The consultant will review civil work components of the cyclone shelters and related roads &

  • 7/27/2019 Monthly Progress Report for July 2013

    5/131

    MONTHLY REPORT

    Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)

    compliances of the works, the remedial measured suggested & taken up for non-compliances and

    the modifications needed in the work plan basing on the experiences in the lapsed quarter.

    H. The consultant will assist SPIU in ensuring the works, by way of reporting, are carried out as per

    specifications, quality & quantity and towards achieving the desired results. Any defective work

    noticed by the consultant shall be reported immediately and suggest corrective measures to the

    field engineers, for immediate rectification and give feedback to SPIU with regards to compliance

    of suggested corrective measures. Wherever compliances are not happening, a report will be

    submitted to the SPIU& line department.

    I. The consultant will participate in the workshops / trainings administrated by the PIUs / line

    departments, quarterly and also as and when called for to give their inputs and also to act as

    resource persons as and when needed.

    J. The competency of the implementation staff will be verified and reported to SPIU and suitable

    suggestions will be made.

    K. The work plans of the implementation agency will be observed and suitable modifications will be

    suggested basing on the past experiences in the sites.

    L. The consultant will prescribe suitable formats for progress reporting and the same formats will be

    used to report regularly.

    M. The consultant will advise on the required site audit procedures for individual duties and

    responsibilities including detailed inspection schedules and check lists

  • 7/27/2019 Monthly Progress Report for July 2013

    6/131

    MONTHLY REPORT

    Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)

    S. At the end of every week the Consultant will submit a report containing the details of field visits

    undertaken during the week indicating the date of visit. In addition to the site level reports and

    weekly report, consolidated reports would be submitted every month and quarter, compiling the

    findings in the site reports, summary audit opinion, corrective actions, progress of works and

    issues etc. The Consultant will also make presentations on audit findings at the designated forums

    as and when required by the client.

    4. Activities of Third Party Quality Audit Consultant.

    All the activities of TPQA consultant, such as status of TPQA visits, Quality Audit reports, NCR status

    reports, status of Quality Control tests and other reports are summarized in the tables and furnished

    in this Monthly Progress Report as detailed below.

    Status of NCRMP Year-1 works are given in Table-1

    Final QCRs to be submitted for the Year-1 works statement is given in Table-2

    Spillover works statement for the Year-1 works are given in Table-3

    Details of Spillover works for the year-1 works are given in Table-4

    Agreements communicated for NCRMP Year-2 works statement given in Table-5

    O e all statement of Ag eements comm nicated Yea 2 o ks + Spillo e Yea 1 o ks

  • 7/27/2019 Monthly Progress Report for July 2013

    7/131

    RHB

    RCS

    MPCS

    B

    ridges

    Roa

    ds(R&B)

    Total

    RHB

    RCS

    MPCS

    B

    ridges

    Roa

    ds(R&B)

    Total

    RHB

    RCS

    MPCS

    B

    ridges

    Roa

    ds(R&B)

    Total

    1 Srikakulam 6 8 2 4 1 21 3 8 0 3 1 15 12 3 0 2 1 0 6 0

    2 Vizianagaram - - - 2 1 3 0 0 0 2 1 3 3 0 0 0 0 0 0 0

    3 Visakhapatnam 8 6 7 - - 21 8 6 5 0 0 19 14 0 0 1 0 0 1 1

    4 East Godavari 2 8 3 - - 13 2 7 2 0 0 11 8 0 0 1 0 0 1 1

    5 West Godavari 10 - - - - 10 10 0 0 0 0 10 10 0 0 0 0 0 0 0

    6 Krishna 5 3 - - - 8 5 3 0 0 0 8 8 0 0 0 0 0 0 0

    7 Guntur 3 12 - 2 - 17 3 11 0 1 0 15 9 0 1 0 1 0 2 0

    8 Prakasham 14 7 2 1 - 24 14 7 2 1 0 24 24 0 0 0 0 0 0 0

    9 Nellore 16 10 - - - 26 16 8 0 0 0 24 24 0 2 0 0 0 2 0

    Total 64 54 14 9 2 143 61 50 9 7 2 129 112 3 3 4 2 0 12 2

    Total No. of works entrusted in Year-1 = 143 nos No. of works deleted = 2 nos

    No. of works completed by 14.04.2013 = 129 nos Spillover works in to Year 2 = 143 2 129 = 12 nos

    No. of works for which Final QCRs submitted = 112 nos No. of works for which Final QCRs to be submitted = 17 nos

    S.no

    District

    No. of works(Under Concluded

    Agreements)No. of works Completed No. of works under Progress

    No

    .ofworksnot

    started

    No.

    ofFinalReports

    Submitted

    Status of NCRMP Year-1 works up to 14.04.2013 TABLE - 1

    Page 6 of 130

  • 7/27/2019 Monthly Progress Report for July 2013

    8/131

    Sl.

    No

    Dist

    rict

    Categ

    ory

    Packages allotted under

    Phase - 1s.no Names of works under each package Work Status Remarks

    1 1 Road from DPN R&B road to Uddandapalem Work completedEOAT and Approval of working estimate

    awaited

    2 2 Road from K. Umilada Junction to Koduru (Link Road) Work completedEOAT and Approval of working estimate

    awaited

    3 3

    Road from Borubhadra, Malagam to Kollipadu via

    Seepuram, Gantapeta Work completed

    EOAT and Approval of working estimate

    awaited

    4 1 Construction of CS at Gajapathinagaram Work completed Approval of working estimate awaited

    5 2 Construction of CS at Ratnayampeta Work completed Approval of working estimate awaited

    6 3 Construction of CS at Patimeeda Work completed working estimate approval not received

    7 4 Construction of CS at Mullaparra Work completed working estimate approval not received

    8 5 Construction of CS at Bangarampeta Work completed working estimate approval not received

    9 RCSNCRMP/B-W/AP/RCS/PRED/

    04/Uppalaguptam/0031 Road from R&B Road to Chinaraghavulapeta CS Work completed

    Approval of working estimate awaited &

    ATRs not received

    10NCRMP/B-W/AP/MPCS/PRED/

    04/Thondangi/0012 Construction of CS at Lakshmanudipeta in Thondangi Work completed working estimate approval not received

    11NCRMP/B-W/AP/MPCS/PRED/

    04/Thondangi/0013 Construction of CS at Avulamanda Work completed working estimate approval not received

    12NCRMP/B-W/AP/RCS/PRED/

    07/PV Palem/0011 Road from R&B road to Mandevaripalem Work completed Approval of working estimate awaited

    13 2Road from Ganapavaram R&B Road to

    PedamarpuvaripalemWork completed

    Approval of working estimate awaited &

    ATR not received

    14 3 Road from R&B Road to Chinapuluguvaripalem Work completed

    Approval of working estimate awaited &

    ATR not received

    15 4 From R&B road to Yaramvaripalem Work completedApproval of working estimate awaited &

    ATR not received

    16 5 Road from R&B Road to Pedagollapalem CS Work completedApproval of working estimate awaited &

    ATR not received

    17 6 Pedagollapalem PR road to Bonthagoralapalem Work completedApproval of working estimate awaited &

    ATR not received

    RCS

    RHBNCRMP/B-W/AP/RHB/PRED/

    01/Santhabommali/003

    List of Works which are completed and final QCRs to be submitted by TPQA (awaiting approval of W.E/R.E) TABLE - 2

    Srikakulam

    NCRMP/B-W/AP/RCS/PRED/

    07/Karlapalem/002

    NCRMP/B-W/AP/MPCS/PRED

    /03/Payakaraopeta/003

    Guntur

    NCRMP/B-W/AP/MPCS/PRED

    /03/Nakkapalli/002Visakhapatnam

    MPCS

    MPCS

    EastGodavari

    Page 7 of 130

  • 7/27/2019 Monthly Progress Report for July 2013

    9/131

    Packages Works Packages Works Packages Works Packages Works Packages Works Packages Works Packages Works

    1 Srikakulam 1 2 0 0 2 3 3 5 1 1 0 0 4 6

    2 Vizianagaram 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    3 Visakhapatnam 1 1 0 0 0 0 1 1 0 0 0 0 1 1

    4 East Godavari 1 1 0 0 0 0 1 1 0 0 0 0 1 1

    5 West Godavari 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    6 Krishna 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    7 Guntur 0 0 1 1 0 0 1 1 1 1 0 0 2 2

    8 Prakasam 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    9 Nellore 0 0 1 2 0 0 1 2 0 0 0 0 1 2

    3 4 2 3 2 3 7 10 2 2 0 0 9 12Total

    Details of Spill over (NCRMP Year-1) works which are not completed by 14.04.2013 TABLE - 3

    Sl.

    No.District

    PR R&B I & CADTOTAL

    MPCS RCS RHB TOTAL Bridges Saline Embankment

    Page 8 of 130

  • 7/27/2019 Monthly Progress Report for July 2013

    10/131

    Sl.

    NoDistrict

    Categ

    ory

    Packages allotted under

    Phase - 1s.no Names of works under each package

    Agreement

    No. / Date

    Work

    StatusRemarks

    1 1Road from R&B road Mobagam to

    Duubakavanipeta via Gajapathinagaram

    /2010-11, Dt.

    30.04.2011Completed

    2 2Road from Talasamudram to Dola

    Regulator

    /2010-11, Dt.

    30.04.2011Completed

    3 NCRMP/B-W/AP/RHB/PRED/01/Polaki/005

    3 Road from R&B road Edulavalasa - Killamto Jonnam via Talasamudram

    /2011-12, Dt.30.04.2011

    Completed

    4R&B

    bridge

    NCRMP/B-W/AP/Br/R&B/

    01/Uppugedda/0024

    Construction of High level bridge across

    Uppugedda at KM 7/6 of Srikakulam

    muncipal limits to Pukkalapeta via

    Killipalem in Srikakulam Dt, A.P.

    47/2010-2011,

    Dt17.12.2010

    Work in

    Progress

    Bridge hand rails and finishing work is in

    progress, Approach road earth work completed

    5 5 Construction of CS at KollipaduG.o rt No 451

    dt 06.04.2010

    Work in

    Progress

    Finishings is in progress, & compound wall work

    is in progress

    6 6 Construction of CS at RunkuG.o rt No 451

    dt 06.04.2010

    Work in

    Progress

    Finishings is in progress, & Sump, Septic tank

    anfd compound wall execavation is in progress.

    7Visakhapa

    tnamMPCS

    NCRMP/B-W/AP/MPCS/PRED

    /03/Rambilli/0041 Construction of CS at Venkayyapalem

    /2011-12, Dt.

    03.10.2011

    work in

    progress

    All slabs, brick work, plastering, wood

    joinery, flooring, plumbing, painting

    completed. One side compound wall is to be

    construct.

    8East

    GodavariMPCS

    NCRMP/B-W/AP/MPCS/PRED/

    04/ Uppalaguptam/0021

    Construction of CS at Pedaraghavulapeta

    of Uppalaguptam Mandal

    78/2011-12

    Dt:17.10.2011Completed

    9 BridgesNCRMP/B-W/AP/Br/R&B/

    07/Bapatla/0114

    Reconstruction of HLB @Km2/4 of Bapatla -

    Pandurangapuram Road across perali drain

    78/2010-11

    1.12.2010

    work in

    progress

    Bridge completed Approaches Pending due to LA

    problem

    10 RCSNCRMP/B-W/AP/RCS/PRED/

    07/PV Palem/0016

    Road from R&B Road Alluru to

    Yadavapalem

    2011-2012

    1.11.2011Completed

    11 3Road from @ 56/8 to C.K road to

    Periyavettu kuppam CS14.09.2012

    work in

    progressWBM Gr-II progress

    12 2Providing BT road to Pedapannamgadu in

    Tada Mandal14.09.2012

    Work

    completedRoad furniture is balance

    NCRMP/B-W/AP/RCS/PRED/09/TADA/009

    RCSSPSRNellore

    Guntur

    SPILL OVER (NCRMP YEAR-1) WORKS STATUS TABLE - 4

    Srikaulam

    RHB

    NCRMP/B-W/AP/RHB/PRED/

    01/Polaki/006

    MPCSNCRMP/B_W/AP/MPCS/PRED/

    01/Santhabommalli/005

    Page 9 of 130

  • 7/27/2019 Monthly Progress Report for July 2013

    11/131

    Packages Works Packages Works Packages Works Packages Works Packages Works Packages Works Packages Works

    1 Srikakulam 11 22 4 11 4 10 19 43 0 0 0 0 19 43

    2 Vizianagaram 1 1 1 5 0 0 2 6 0 0 0 0 2 6

    3 Visakhapatnam 1 1 3 4 3 5 7 10 0 0 0 0 7 10

    4 East Godavari 3 5 6 9 5 8 14 22 2 2 0 0 16 24

    5 West Godavari 0 0 4 9 8 24 12 33 0 0 0 0 12 33

    6 Krishna 0 0 8 26 8 23 16 49 0 0 0 0 16 49

    7 Guntur 2 2 2 3 1 1 5 6 1 1 0 0 6 7

    8 Prakasam 0 0 3 11 8 23 11 34 1 1 0 0 12 35

    9 Nellore 0 0 10 18 9 19 19 37 0 0 0 0 19 37

    18 31 41 96 46 113 105 240 4 4 0 0 109 244Total

    Details of Agreements Communicated by SPIU to TPQA Consultant during Quarter 1 ending with June 2013 TABLE - 5

    R&B I & CADTOTAL

    MPCS RCS RHB

    PR

    TOTAL Bridges Saline EmbankmentDistrictSl.

    No.

    Page 10 of 130

  • 7/27/2019 Monthly Progress Report for July 2013

    12/131

    TABLE - 6

    Packages Works Packages Works Packages Works Packages Works Packages Works Packages Works Packages Works

    1 Srikakulam 12 24 4 11 6 13 22 48 1 1 0 0 23 49

    2 Vizianagaram 1 1 1 5 0 0 2 6 0 0 0 0 2 6

    3 Visakhapatnam 2 2 3 4 3 5 8 11 0 0 0 0 8 11

    4 East Godavari 4 6 6 9 5 8 15 23 2 2 0 0 17 25

    5 West Godavari 0 0 4 9 8 24 12 33 0 0 0 0 12 33

    6 Krishna 0 0 8 26 8 23 16 49 0 0 0 0 16 49

    7 Guntur 2 2 3 4 1 1 6 7 2 2 0 0 8 9

    8 Prakasam 0 0 3 11 8 23 11 34 1 1 0 0 12 35

    9 Nellore 0 0 11 20 9 19 20 39 0 0 0 0 20 39

    21 35 43 99 48 116 112 250 6 6 0 0 118 256Total

    RCS RHB

    Details of Agreements Communicated by SPIU to TPQA Consultant during Quarter 1 ending with June 2013 + Spill over works of Year-1

    Sl.

    No.District

    PR I & CAD

    TOTALMPCS

    Saline

    Embankment

    R&B

    TOTAL Bridges

    Page 11 of 130

  • 7/27/2019 Monthly Progress Report for July 2013

    13/131

    PR

    R&B-Brid

    ges

    I&CAD

    D

    Started

    Notstart

    ed

    Progres

    s

    Completed

    Stopped

    /

    Deleted

    CivilEngineers

    visits

    Env&Social

    visits

    ElectricalE

    ngg

    visits

    TotalVisits

    Issued

    Closed

    Pending

    CivilAud

    it

    Reports

    Social&E

    nv

    Auditrepo

    rts

    ElectricalA

    udit

    reports

    1 Srikakulam 48 1 0 49 40 5 40 0 4 192 32 2 226 168 15 1 14 17 23 2

    2 Vizianagaram 6 0 0 6 6 0 6 0 0 28 5 0 33 48 0 0 0 5 0 -

    3 Visakhapatnam 11 0 0 11 11 0 11 0 0 122 18 13 153 528 10 1 9 20 9 17

    4 East Godavari 23 2 0 25 17 8 17 1 0 114 1 5 120 135 1 1 0 4 0 3

    5 West Godavari 33 0 0 33 31 2 31 0 0 164 1 0 165 229 16 16 0 8 0 -

    6 Krishna 49 0 0 45 38 11 38 0 0 59 11 0 70 57 5 2 3 4 8 -

    7 Guntur 7 2 0 9 6 3 5 1 0 70 2 0 72 26 0 0 0 1 0 -

    8 Prakasam 34 1 0 35 35 0 35 0 0 187 36 0 223 654 19 10 9 29 18 -

    9 Nellore 39 0 0 39 39 0 39 0 0 150 46 0 196 1030 15 9 6 27 24 -

    250 6 0 252 223 29 222 2 4 1086 152 20 1258 2875 81 40 41 115 82 22Total

    ABSTRACT OF NCRMP WORKS PROGRESS STATUS UP TO JULY 2013 TABLE - 7

    Cummulative Visits of TPQA

    Cummulative Audit

    Reports submitted

    by TPQA

    Sl.

    No.

    District

    Work Entrusted Status of Works

    TotalNo.ofQCtests

    conducted

    NCRs By TPQA

    Review

    ofContract

    Doc

    ument

    Page 12 of 130

  • 7/27/2019 Monthly Progress Report for July 2013

    14/131

    Annexure - A

    Status of Works

  • 7/27/2019 Monthly Progress Report for July 2013

    15/131

    RATE OF PROGRESS OF WORKS No of works

    up to 10% 92

    11 to 40% 78

    41 to 70% 19

    71 to 100% 34

    Works Not Started 29

    Deleted 4

    Total No of Works 256

    Consolidated Abstract Status of NCRMP Works to the end of July 2013

  • 7/27/2019 Monthly Progress Report for July 2013

    16/131

    RATE OF PROGRESS OF WORKS No of works

    up to 10% 20

    11 to 40% 13

    41 to 70% 0

    71 to 100% 7

    works Deleted 4

    Works Not Started 5

    Completed 3

    Total No of works 49

    Abstract Status of NCRMP Works in Srikakulam District to the

    end of July 2013

  • 7/27/2019 Monthly Progress Report for July 2013

    17/131

    MPCS 1 Y2-001Construction of CS in

    Kollipadu110.00 7.10.2011 19.10.2011 5.07.13

    Finishings is in progress,

    & compound wall work is

    in progress

    95% _ Sand Material is not available

    for 6 months.

    MPCS 2 Y2-002Construction of CS in

    Runku109.42

    Decebmer

    2012Dec-12 5.07.13

    Finishings is in progress,& Sump, Septic tank anfd

    compound wall

    execavation is in

    progress.

    90% _

    Site handed over to contractor

    in december 2012, Sand not

    available for 6 Months.

    MPCS 3 Y2-005Construction of CS in

    Amalpadu

    MPCS 4 Y2-006Construction of CS in

    Angavanipeta82.50 _ _ 18.04.14 Not started

    PR engineers took position of

    the requuired land in

    Gramkantam.The villagers

    wanted to cinstruct the cyclone

    shelter at Amalapadu. PR

    officers informed that it will be

    resolved after elections.

    MPCS 5 Y2-007Construction of CS in

    Ch.Batsalavanipeta

    MPCS 6 Y2-008Construction of CS in

    Chintavanipeta

    MPCS 7 Y2-009Construction of CS in

    U.Narasingupalli85.00 _ _ 18.09.14 Not started

    PR engineers took position of

    the requuired land in

    Gramkantam.The villagers

    wanted to cinstruct the cyclone

    shelter at Amalapadu. PR

    officers informed that it will be

    resolved after elections.

    MPCS 8 Y2-010Construction of CS in

    Bypalli85.00 25.03.2013 18.04.13 18.09.14

    Reinforcement for

    footings is in progress15% _

    MPCS 9 Y2-011Construction of CS in

    Chinavanka85.00 25.03.2013 20.04.13 18.09.14 PCC completed 15% _

    MPCS 10 Y2-012Construction of CS in

    Chinnakothuru74.20 25.03.2013 20.05.13 18.09.14 Earth work completed 10% _

    MPCS 11 Y2-013

    Construction of CS in

    Chinnajittuvani palam

    4

    NCRMP/B-

    W/AP/MPCS/PRED/

    01/Ranasthalam/008

    MPCS 12 Y2-018

    Construction of A type

    CS in Kommaravanipeta,

    Ranasthalam mandal

    74.20 20.3.13 _ 14.03.14 Not started

    Contractor has informed that the

    work will be started before 15-

    08-2013

    5NCRMP/B-W/AP/MPCS/

    PRED/ 01/Kaviti/011MPCS 13 Y2-023

    Construction of MPCS in

    Ch. Karrivanipalem

    (Type B), Kaviti mandal

    85.00 23.05.2013 _ 19.03.14 Not started

    Contractor has informed that the

    work will be started before 15-

    08-2013

    Deleted

    1

    NCRMP/B-

    W/AP/MPCS/PRED

    /01/Santhabommali/005

    2

    NCRMP/B-

    W/AP/MPCS/PRED/

    01/V.Kotturu/003

    3

    NCRMP/B-

    W/AP/MPCS/PRED/

    01/V.Kotturu/004

    Deleted

    Deleted

    Deleted

    Date of

    commencem

    ent of work

    DFC Stage of work

    % of

    work

    done

    Reasons for non-started

    worksRemarks

    Status of NCRMP works in Srikakulam District to the end of July 2013

    Sl.

    No

    .

    Package Nos.Catag

    ory

    S.n

    o

    Projec

    t codeWork Name

    Length

    (Mts)

    Estimate

    Value

    (Rs.lakhs)

    DHS

    Page 16 of 130

  • 7/27/2019 Monthly Progress Report for July 2013

    18/131

    Date of

    commencem

    ent of work

    DFC Stage of work

    % of

    work

    done

    Reasons for non-started

    worksRemarks

    Status of NCRMP works in Srikakulam District to the end of July 2013

    Sl.

    No

    .

    Package Nos.Catag

    ory

    S.n

    o

    Projec

    t codeWork Name

    Length

    (Mts)

    Estimate

    Value

    (Rs.lakhs)

    DHS

    6NCRMP/B-W/AP/MPCS/

    PRED/ 01/Sompeta/012MPCS 14 Y2-024

    Construction of MPCS in

    Ramayyapatnam (Type

    B)

    85.00 23.05.2013 19.06.13 14.03.14 Earth work is in progress 5% _

    MPCS 15 Y2-025Construction of MPCS in

    Metturu (Type D)

    82.50 20.03.13 4.05.13 14.06.14Foundation concrete is in

    progress

    10% _ With in the mile stone

    MPCS 16 Y2-026Construction of MPCS in

    Nuvvalarevu (Type D)82.50 20.03.13 _ 14.06.14 Not started

    Contractor has informed that the

    work will be started before 15-

    08-2013

    8

    NCRMP/B-

    W/AP/MPCS/PRED/

    01/Santhabommali/014

    MPCS 17 Y2-027

    Construction of MPCS in

    Reddica Sunnapalli

    (Type C)

    74.20 03.04.13 28.06.13 02.04.14 Earth work is in progress 5% _

    MPCS 18 Y2-028Construction of MPCS in

    Calingapatnam (Type D)110.00 20.03.13 15.04.13 14.06.14

    Foundation completed,

    Back filling is in progress20% With in the mile stone

    MPCS 19 Y2-029

    Construction of MPCS in

    Bandravanipeta (Type

    D)

    110.00 20.3.13 05.05.13 14.06.14Foundation concrete is in

    progress15% With in the mile stone

    10

    NCRMP/B-

    W/AP/MPCS/PRED/

    01/Polaki/018

    MPCS 20 Y2-030Construction of MPCS in

    Akkuvaram (Type B)85.00 15.03.13 10.04.13 14.03.14 PCC work is in progress 10% within milestones

    MPCS 21 Y2-031

    Construction of MPCS in

    Jaganadhapuram (Type

    B)

    82.50 20.03.13 28.06.13 14.06.13 PCC completed 10%

    Progress slow. Some problem

    in availability of materials. Site

    is located in interior area.

    MPCS 22 Y2-032Construction of MPCS in

    Kothamukkam (Type A)82.50 20.03.13 30.07.13 14.06.13 Earth work is in progress 5%

    Progress slow. Some problem

    in availabilit of materials. Site

    is located in interior area.

    MPCS 23 Y2-036

    Construction of MPCS in

    Bonthalakoduru (Type

    B)

    82.50 15.04.13 10.07.13 2.07.14 Earth work is in progress 5%

    Progress slow. Some problem

    in availability of materials. Site

    is located in interior area.

    MPCS 24 Y2-037

    Construction of MPCS in

    Pathadibbalapalem

    (Type A)

    82.50 15.04.13 26.06.13 2.07.14 Earth work completed 5%

    Progress slow. Some problem

    in availability of materials. Site

    is located in interior area.

    RCS 25 Y2-145 Road from Chinnavankato Gopaladavooru

    3675 62.00 25.03.13 18.04.13 14.03.14 Road widening is inprogress

    10% With in the mile stones

    RCS 26 Y2-146

    Road from MN peta

    Road to Kondavooru and

    to CS

    500 23.00 25.03.13 18.04.13 14.03.14Road widening is in

    progress10% With in the mile stones

    RCS 27 Y2-147Road from R&B Road to

    S.J. Puram265 18.00 25.03.13 18.04.13 14.03.14 GSB layer completed 20% With in the mile stones

    RCS 28 Y2-148Road from Kothapeta

    Road to Sainooru CS785 27.00 25.03.13 18.04.13 14.03.14

    Road widening is in

    progress10% With in the mile stones

    12

    NCRMP/B-

    W/AP/MPCS/PRED/

    01/Etcherla/017A

    13

    NCRMP/B-

    W/AP/RCS/PRED/

    01/V.Kottoru/001

    7 NCRMP/B-W/AP/MPCS/PRED/

    01/V.Kothuru/013

    11

    NCRMP/B-

    W/AP/MPCS/PRED/

    01/Ranasthalam/016

    9

    NCRMP/B-

    W/AP/MPCS/PRED/

    01/Gara/015

    Page 17 of 130

  • 7/27/2019 Monthly Progress Report for July 2013

    19/131

    Date of

    commencem

    ent of work

    DFC Stage of work

    % of

    work

    done

    Reasons for non-started

    worksRemarks

    Status of NCRMP works in Srikakulam District to the end of July 2013

    Sl.

    No

    .

    Package Nos.Catag

    ory

    S.n

    o

    Projec

    t codeWork Name

    Length

    (Mts)

    Estimate

    Value

    (Rs.lakhs)

    DHS

    14

    NCRMP/B-W/AP

    /RCS/PRED/01/

    Santhabommali/008

    RCS 29 Y2-150

    Borubhadra -

    Meghavaram Road to M.

    Maruvada

    2000 82.00 03.04.13 20.05.13 14.01.14

    Road widening work is in

    progress and culverts

    completed.

    20% With in mile stones

    RCS 30 Y2-154

    Road from

    Yeeramukkam Rati

    R&B road to

    Dunnavooru

    350 15.75 18.03.13 29.04.13 14.03.14Road widening is in

    progress 10% With in mile stones

    RCS 31 Y2-155

    Road from

    Yeeramukkam Rati

    R&B road Geddavooru

    600 27.75 18.03.13 29.04.13 14.03.14Road widening is in

    progress10% With in mile stones

    RCS 32 Y2-156

    Road from R&B road

    Ganguwada to ro ad to

    Sigalaputtuga

    875 31.43 18.03.13 29.04.13 14.03.14Road widening is in

    progress10% With in mile stones

    RCS 33 Y2-157Road from R&B road to

    Akkuvaram585 25.76 18.03.13 17.04.13 14.03.14

    CC road completed,

    Shoulders work is in

    progress.

    90% With in mile stones

    RCS 34 Y2-158Road from R&B road to

    Pathadibbalapalem3500 100.00 20.03.13 5.04.13 14.03.14

    Road widening is in

    progress and culverts

    completed.

    10% With in mile stones

    RCS 35 Y2-159 Road from R & B road toPothayyapeta CS 1300 54.00 20.03.13 15.04.13 14.03.14 Road widening is inprogress 5% With in mile stones

    17NCRMP/B-W/AP/RHB/

    PRED/01/Polaki/005RHB 36 Y1-096

    Road from R&B road

    Edulavalasa - Killam to

    Jonnam via

    Talasamudram

    2700 76.10 30.04.2011 11.10.2011 31.05.13 Completed 100%

    RHB 37 Y1-097

    Road from R&B road

    Mobagam to

    Duubakavanipeta via

    Gajapathinagaram

    2750 100.40 30.04.2011 11.10.2011 31.05.13 Completed 100%

    RHB 38 Y1-098

    Road from

    Talasamudram to Dola

    Regulator

    1600 43.00 30.04.2011 11.10.2011 31.05.13 Completed 100%

    RHB 39 Y2-265Road from B.M (R&B)

    Road to Simmayyapeta1350 30.03.13 10.05.13 24.06.14

    Road widening is in

    progress10% With in mile stones

    RHB 40 Y2-266Road from R&B road to

    Marripadu400 30.03.13 7.05.13 24.06.14 GSB laying is in progress 20% With in mile stones

    RHB 41 Y2-267Road from R&B Road to

    Kakarapalli1200 30.03.13 1.05.13 24.06.14

    Road widening is in

    progress10% With in mile stones

    RHB 42 Y2-268Road from R&B road to

    Marripadu700 30.03.13 7.05.13 24.06.14 GSB laying is in progress 20% With in mile stones

    107.50

    15

    NCRMP/B-

    W/AP/RCS/PRED/

    01/Mandasa/010

    16

    NCRMP/B-

    W/AP/RCS/PRED/

    01/Etcherla &

    Ranasathalam/012

    18NCRMP/B-W/AP/RHB/

    PRED/01/Polaki/006

    19

    NCRMP/B-W/AP

    /RHB/PRED/01/

    Santhabommali/001A

    Page 18 of 130

  • 7/27/2019 Monthly Progress Report for July 2013

    20/131

    Date of

    commencem

    ent of work

    DFC Stage of work

    % of

    work

    done

    Reasons for non-started

    worksRemarks

    Status of NCRMP works in Srikakulam District to the end of July 2013

    Sl.

    No

    .

    Package Nos.Catag

    ory

    S.n

    o

    Projec

    t codeWork Name

    Length

    (Mts)

    Estimate

    Value

    (Rs.lakhs)

    DHS

    RHB 43 Y2-269Road from R&B road to

    Pathalingudu500 _ _ 24.06.14

    Jungle clearence is in

    progress

    Adjoining land oweners(Paddy

    fields) are objecting to earthwork

    widening, Department officers

    are trying to reslove the issue.

    20

    NCRMP/B-

    W/AP/RHB/PRED/

    01/Santhabommali/001

    B

    RHB 44 Y2-270

    Road from DPN road to

    Gangaram Village via

    Palatalagam,

    Srikrishnapuram

    3700 204.00 03.04.13 5.04.13 22.09.14

    Sub grade layer

    completed from km 0/000

    to Km 3/200, Bridge earth

    work completed.

    25%

    Bridge designs are under

    revision due to short fall in

    number of spans

    RHB 45 Y2-273

    DPN road to D.L.Puram

    jn. via Koduru,

    Magathapadu,

    Guppidipeta

    2350 100.00 25.03.13 18.04.2013 19.03.14

    Road widening and

    culverts work completed,

    WBM gr-II collection is in

    progress

    30% With in mile stones

    RHB 46 Y2-274Guppidipeta road to

    Chinnakoviripeta1340 54.00 25.03.13 18.04.2013 19.03.14

    WBM GR-II laying is in

    progress30% With in mile stones

    RHB 47 Y2-275

    K.C. Road to

    Rajarampuram via

    Ampalem Revuamplam

    900 44.00 29.03.13 18.04.13 24.03.14Road widening and

    culverts work completed.20% With in mile stones

    RHB 48 Y2-276KC road to Amplam

    (via) Urjam, Nandigam1.6 54.00 29.03.13 18.04.13 24.03.14

    Road widening and

    culverts work completed.20% With in mile stones

    23

    NCRMP/B-

    W/AP/Br/R&B/

    01/Uppugedda/002

    R&B-

    Br49 Y2-438

    Construction of High

    level bridge across

    Uppugedda at KM 7/6 of

    Srikakulam muncipal

    limits to Pukkalapeta via

    Killipalem

    128.00 17.12.2010 25.08.12 31.07.13

    Bridge hand rails and

    finishing work is in

    progress, Approach road

    earth work completed

    90%

    Delayed due to revision of

    Drawings. EOAT shall be

    obtained

    21

    NCRMP/B-

    W/AP/RHB/PRED/

    01/Polaki/007

    22NCRMP/B-W/AP/RHB/

    PRED/ 01/Polaki/008

    l

    Page 19 of 130

  • 7/27/2019 Monthly Progress Report for July 2013

    21/131

    RATE OF PROGRESS OF WORKS No of works

    up to 10% 6

    11 to 40% 0

    41 to 70% 0

    71 to 100% 0

    Works Not Started 0

    Total No of works 6

    Abstract Status of NCRMP Works in Vizianagaram District to theend of July 2013

  • 7/27/2019 Monthly Progress Report for July 2013

    22/131

    1

    NCRMP/B-

    W/AP/MPCS/

    PRED/02/Pusapatir

    ega/003

    MPCS 1 Y2-041Construction of MPCS inBoddugurayyapeta (Type A)

    80 14.03.2013 12.06.2013 13.03.2014

    Earthwork Excavation, PCC

    for footings, RCC footings,

    pedestals and columns uptobottom of plinth beam work

    completed. Back filling infoundation completed.

    20%

    RCS 2 Y2-160Road from R & B Road to

    Gudepuvalasa CS440 14 14.03.2013 14.03.2013 13.03.2014

    Earth work for widening is

    in progress.2%

    Progress of work is

    slow

    RCS 3 Y2-161Road from R&B road toKavulawada CS

    150 16 14.03.2013 14.03.2013 13.03.2014Earth work for widening is

    in progress.2%

    Progress of work isslow

    RCS 4 Y2-162Road from R & B Road to

    Roluchappidi CS550 18.5 14.03.2013 14.03.2013 13.03.2014

    Earth work for widning, GSB

    work completed.12%

    RCS 5 Y2-163Road from R&B road to

    Chinapathiwada CS60 4.5 14.03.2013 14.03.2013 13.03.2014

    Earth work for widning, GSB

    work completed.7%

    Progress of work is

    slow

    RCS 6 Y2-164Road from R&B road to BV

    peta770 28 14.03.2013 14.03.2013 13.03.2014

    Earth work for widning, GSB

    work completed.7%

    progress of work is

    slow

    % of

    work

    done

    Reasons

    for non-

    started

    works

    Remarks

    Status of NCRMP works in Vizianagaram District to the end of July 2013

    Sl.

    No.

    Package

    Nos.

    catag

    ory

    S.

    no

    Project

    codeWork Name

    Length

    (Mts)

    Estimate

    Value in

    (Rs.Lakh

    s)

    DHS

    2

    NCRMP/B-

    W/AP/RCS/PRED/

    02/Bhogapur

    am/001

    Date of

    commence

    ment of

    work

    DFC Stage of work

    Page 21 of 130

  • 7/27/2019 Monthly Progress Report for July 2013

    23/131

    RATE OF PROGRESS OF WORKS No of works

    up to 10% 1

    11 to 40% 1

    41 to 70% 2

    71 to 100% 7

    Works Not Started 0

    Total No of works 11

    Abstract Status of NCRMP Works in Visakhapatnam District tothe end of July 2013

  • 7/27/2019 Monthly Progress Report for July 2013

    24/131

    1

    NCRMP/B-W/

    AP/MPCS/

    PRED/03/Rambillii/004

    MPCS 1 Y2-048

    Construction of

    cyclone shelter at

    Venkayyapalem

    70 03.10.11

    Re startafter getting

    approval of

    foundationre design on29.06.2012

    02.07.2012EOAT

    approved

    up to17.06.2013

    All slabs, brick work,plastering, wood joinery,

    flooring,plumbing, painting

    completed. One sidecompound wall is to beconstruct.

    97%

    EOAT shall be

    obtained from

    competentauthority

    2

    NCRMP/B-W/AP/MPCS/

    PRED/03/ S.

    Rayavaram/009

    MPCS 2 Y2-057

    Construction of CS

    at Bangarampalem I

    & II H/o Vakadu.

    (Type D)

    110 20.04.13 20.04.2013 19.04.13

    Earthwork excavationstarted and stop due to site

    dispute. Alternate site is

    identified and approval ispending.

    0

    Initially Contractor

    started earthwork on asite handed over to

    him. The site belongsto forest department.

    Revenue officialspromised to hand over

    a revenue site

    adjacent to the forestsite. The site is likely

    to be handed overafter elections.

    RCS 3 Y2-165

    Road from R & Broad to

    Chinanagamayyapal

    em CS

    1525

    Meters73 11.03.13 11.03.2013 10.12.13

    WBM Gr-II From KM 0.000

    to Km 0.800 completed.

    Three nos. CD workscompleted.

    WBM Gr-III From KM 0.000

    to Km 0.800 spreadingcompleted, compaction

    work is in progress.

    35%

    From KM 0.800to KM 1.525 is

    not started.

    (This stretchfalls under

    forest land.).

    PIU pursuingthe mater with

    forest

    department.

    RCS 4 Y2-166Road from R & Broad to Annavaram

    CS

    1100

    Meters73 11.03.13 11.03.2013 10.12.13

    WBM Gr-II ( From km0.00to 1.057 ) and CC Road

    work ( From km 1.057 toKM 1.107 ) completed .

    WBM Gr-III From KM 0.000

    to Km 0.800 spreading

    completed, compactionwork is in progress.

    51%

    Status of NCRMP works in Visakhapatnam District to the end of July 2013

    Sl.

    No.Package Nos.

    catago

    ryS.no

    Project

    codeWork name

    Length

    (Mts)

    Estimate

    Value in

    Lakhs

    (Rs.lakhs)

    DHS DFC Stage of work

    % of

    work

    done

    Reasons for non-

    started worksRemarks

    3

    NCRMP/B-W/

    AP/RCS/PRED/

    03/Bheemili/00

    5

    Date of

    commence

    ment of

    work

    Page 23 of 130

  • 7/27/2019 Monthly Progress Report for July 2013

    25/131

    Status of NCRMP works in Visakhapatnam District to the end of July 2013

    Sl.

    No.Package Nos.

    catago

    ryS.no

    Project

    codeWork name

    Length

    (Mts)

    Estimate

    Value in

    Lakhs

    (Rs.lakhs)

    DHS DFC Stage of work

    % of

    work

    done

    Reasons for non-

    started worksRemarks

    Date of

    commence

    ment of

    work

    4

    NCRMP/B-W/

    AP/RCS/PRED/03/S.Rayavara

    am/006

    RCS 5 Y2-167

    Road from R & B

    road to

    Revupolavaram CS

    1065Meters

    56.46 07.03.13 07.03.2013 06.12.13

    Earth work for widening, CC

    Road work completed fromKM 0.000 to KM 0.8538 and

    from KM 0.8845 KM 1.072

    98%

    5

    NCRMP/B-W/

    AP/RCS/PRED/

    03/Rambilli/007

    RCS 6 Y2-168

    Road from R & B

    road toKothapatnam CS

    650

    Meters37 11.03.13 11.03.2013 10.09.13

    Earth work, sub grade,GSB

    and CC Road work

    completed from KM 0.000to KM 0.610

    98%

    RHB 7 Y2-280Road from R & B

    road to Rajavaram

    425

    Meters168 07.03.13 07.03.2013 06.06.14

    One pipe culvert, WBM Gr-

    II, Gr-III and OGPC seal

    coat Work is completedFrom KM 0.0 to KM 0.425

    95%

    RHB 8 Y2-281Road from Rajala R& B Road to

    Rajaraidupalem

    1764Meters

    168 07.03.13 07.03.2013 06.06.14

    Sub grade with selectedearth(Gravel): From km 0.640to 0.750, from KM 1.190 to Km

    1.764 completed. Earth workand WBM Gr-II completed

    From KM 0.000 to KM 0.012,from KM 0.030 to KM 1.764.

    GSB : 1488 Meters From KM

    0.030 to KM 0.094, from KM0.340 to KM 1.764 completed.

    45%

    RHB 9 Y2-282

    Road from R & B

    road toGajareddipalem via

    Venkaypalem

    2614Meters

    168 07.03.13 07.03.2013 06.06.14

    4 Nos pipe culverts completed.

    From Km 0/106 to Km 1/600and from km 2/0 to km 2/620GSB,WBM Gr-II,Grade-III and

    OGPC + Seal coat completed.

    From KM 1.600 to Km 2.0 andFrom KM 2.620 to KM 2.720

    GSB work completed.

    85%

    From KM 1.600

    to Km 2.000and in KM

    2.620 to KM2.720, The

    local peoplestopped the

    work by

    demandingshifting of

    electrical poles.

    6

    NCRMP/B-W/

    AP/RHB/PRED/03/Payakaraop

    eta/005

    Page 24 of 130

  • 7/27/2019 Monthly Progress Report for July 2013

    26/131

    Status of NCRMP works in Visakhapatnam District to the end of July 2013

    Sl.

    No.Package Nos.

    catago

    ryS.no

    Project

    codeWork name

    Length

    (Mts)

    Estimate

    Value in

    Lakhs

    (Rs.lakhs)

    DHS DFC Stage of work

    % of

    work

    done

    Reasons for non-

    started worksRemarks

    Date of

    commence

    ment of

    work

    7NCRMP/B-W/AP/RHB/PRED/

    03/Payakaraop

    eta/008

    RHB 10 Y2-283Road from Z.P RoadPalmanpeta to

    Korlayyapeta

    1110

    Meters58 07.03.13 07.03.2013 06.12.13

    One single row and one tworow pipe culvert works

    completed.

    Retaining wall work completed

    for 62.55 Meters ( 62.55m inkm 0/600 ).Earth work, GSB and CC

    pavement From Km 0/0323to Km 0/4021, from Km 0/689

    to 0/9294 and Cross Road

    from Km 0/328 to 0/498Completed

    93%

    8

    NCRMP/B-W/

    AP/RHB/PRED/

    03/Atchutapuram/009

    RHB 11 Y2-284Road from R & B

    Road to Vadapalem

    450

    Meters23 07.03.13 07.03.2013 06.09.13

    CC Road completed from

    KM 0.000 to KM 0.424495%

    Page 25 of 130

  • 7/27/2019 Monthly Progress Report for July 2013

    27/131

    RATE OF PROGRESS OF WORKS No of works

    up to 10% 12

    11 to 40% 3

    41 to 70% 1

    71 to 100% 1

    Works Not Started 8

    Total No of works 25

    Abstract Status of NCRMP Works in East Godavari District to the

    end of July 2013

  • 7/27/2019 Monthly Progress Report for July 2013

    28/131

    1

    NCRMP/B-

    W/AP/MPCS/PRED/

    04/

    Uppalaguptam/002

    MPCS 1 Y2-062

    Construction of Cyclone Shelter

    at Pedaraghavulapeta of

    Uppalaguptam Mandal

    105.65 17.10.11 24.02.12 16.07.13 Completed 100% _

    MPCS 2 Y2-074Construction of CS at

    Kesavadasupalem (Type D) 120 23.04.13 22.07.14 Nil Nil

    site handed over on 29-

    06-2013. Contractor is

    making arrangements to

    commence the work

    MPCS 3 Y2-075Construction of CS at Pallipalem

    (Type D)120 23.04.13 12.07.2013 22.07.14

    Gravel collected for

    Cattle Ramp0.1 _

    MPCS 4 Y2-076Construction of CS at

    Padamatapalem (Type D)106.94 22.04.13 21.06.13 21.07.14

    Footings and Columns

    completed ( F1, F4,CF2,

    CF1, F3, SF2, CF3, SF1

    )up to Plinth beam.

    5% _

    MPCS 5 Y2-077Construction of CS at

    Kesanapalli (Type D)106.94 22.04.13 No 21.07.14 Nil Nil

    4

    NCRMP/B-

    W/AP/MPCS/PRED/

    04/Mamidikuduru/01

    2

    MPCS 6 Y2-078Construction of CS at Karavaka

    (Type B)94 22.04.13 No 21.04.14 Nil Nil

    5

    NCRMP/B-

    W/AP/RCS/PRED/

    04/U. Kothapalli/002

    RCS 7 Y2-169Road from R&B road to

    Samanthkurru Pallepalem CS120 9 26.03.13 06.07.13 25.12.13

    Carting Earth

    Completed.12% _

    RCS 8 Y2-170Approach Road from R & B

    Road to Turupupalem CS100 7.5 04.04.13 No 03.03.14 Nil Nil

    Contractor has Not not

    yet startedNot started

    RCS 9 Y2-171Road from R & B Road to

    Kesanapalli (New) CS100 7 04.04.13 No 03.03.14 Nil Nil

    Contractor has Not not

    yet startedNot started

    RCS 10 Y2-172Road from R & B Road to

    Padamatipalem CS1880 70.5 04.04.13 14.06.13 03.03.14

    Widening with Earth

    work Completed.5%

    RCS 11 Y2-173

    Road from R & B Road to

    Katrenipadu Lanka CS 640 20.5 29.04.13 08.06.13 30.10.13

    OGPC + Seal coat

    completed from Km.0.000 to Km 0.500.

    55%

    RCS 12 Y2-174Road from R & B road to

    Kesavadasupalem (New) CS430 29.5 29.04.13 16.07.13 30.10.13

    Widening and Carting

    Earth work Completed.5%

    8

    NCRMP/B-

    W/AP/RCS/PRED/

    04/Mamidikuduru/01

    3

    RCS 13 Y2-175Road from R&B road to

    Karavaka CS800 33 08.03.13 18.06.13 07.09.13

    2no. Pipe Culvert

    Completed3%

    2NCRMP/B-W/AP/MPCS/PRED/

    04/Sakhinetipally/01

    0

    Villge people abjected

    on the location and

    Contractor has Not yet

    started. Departmentalofficers wanted to resole

    the issue after elections.

    7NCRMP/B-W/AP/RCS/PRED/

    04/Razole &

    Sakhinetipalli/010

    6

    NCRMP/B-

    W/AP/RCS/PRED/

    04/Malikipuram/009

    3

    NCRMP/B-

    W/AP/MPCS/PRED/

    04/Malikipuram/011

    % of

    work

    done

    Reasons for non-started

    worksRemarks

    Status of NCRMP works in East Godavari District to the end of July 2013

    Sl.

    No.Package Nos.

    categor

    yS.no

    Project

    codeWork Name

    Length

    (Mts)

    Estimate

    Value

    (Rs.lakhs)

    DHS

    Date of

    commencem

    ent of work

    DFC Stage of work

    Page 27 of 130

  • 7/27/2019 Monthly Progress Report for July 2013

    29/131

    % of

    work

    done

    Reasons for non-started

    worksRemarks

    Status of NCRMP works in East Godavari District to the end of July 2013

    Sl.

    No.Package Nos.

    categor

    yS.no

    Project

    codeWork Name

    Length

    (Mts)

    Estimate

    Value

    (Rs.lakhs)

    DHS

    Date of

    commencem

    ent of work

    DFC Stage of work

    9

    NCRMP/B-

    W/AP/RCS/PRED/

    04/Katrenikona/015

    RCS 14 Y2-176

    CC Road from main proposed

    road to Neellarevu II CS in

    Neellarevu

    540 29 08.03.13 06.07.13 07.02.14Widening and Carting

    Earth work Completed.5%

    10

    NCRMP/B-

    W/AP/RCS/PRED/

    04/Allavaram/016

    RCS 15 Y2-177Road from R&B road to

    Samanthakurru CS380 41 29.04.13 02.06.13 30.10.13

    Retaining wall

    Completed.11%

    RHB 16 Y2-289Road from R&B road to

    Korukondavari Group1000 44.5 30.03.13 06.06.13 29.02.14

    Widening and Carting

    Earth work Completed.6%

    RHB 17 Y2-290Road from R&B road to Gondi

    Kodapa830 49.5 30.03.13 12.06.13 29.02.14

    Widening and Carting

    Earth work Completed.7%

    RHB 18 Y2-293BT road fr om Komaragiripatnam

    to Kadadari and to CS3500 93 30.03.13 09.07.13 29.03.14

    Widening and Carting

    Earth work Completed.6%

    RHB 19 Y2-294

    Road from R&B road

    Samanthakurru to

    Chakkavaripeta Rameswaram

    880 55 30.03.13 14.07.13 29.03.14Widening work

    Completed.7%

    RHB 20 Y2-295Road from Guthena deevi to

    Gogullanka1920 105 27.04.13 No 26.04.14 Nil _

    Contractor has Not not

    yet startedNot started

    RHB 21 Y2-296Road from R&B road to

    Ramalayampeta Pallamkurru (v)1350 105 27.04.13 No 26.04.14 Nil _

    Contractor has Not not

    yet startedNot started

    14

    NCRMP/B-

    W/AP/RHB/PRED/

    04/Katrenikona/016

    RHB 22 Y2-297Road from N. Kothapalli to

    G.Pora in Katrenikone (v)3500 157 30.03.13 No 29.03.14 Nil _

    Contractor has Not not

    yet startedNot started

    15

    NCRMP/B-

    W/AP/RHB/PRED/

    04/Razole/020

    RHB 23 Y2-298Road from R&B road to

    Aravapalem740 13 25.03.13 04.07.13 24.09.13

    WBM Grade III

    Spreding completed for

    200m.

    7%

    16

    NCRMP/B-

    W/AP/Br/R&B/

    04/Pampa Yeru-

    1/015

    Bridge 24 Y2-444

    Construction of Bridge at Km

    43/10 of Vakalapudi - Edatam

    road across Pampa Yeru in EG

    District.

    8374 505 26.03.13 13.04.13 25.09.14

    Pier 1,2,3 and 4 Wells

    concrete and shinking

    in progress.

    18%

    17

    NCRMP/B-

    W/AP/Br/R&B/

    04/Pampa Yeru-

    2/016

    Bridge 25 Y2-445

    Construction of Bridge at Km

    43/6 of Vakalapudi - Edatam

    road across Pampa Yeru in EG

    District.

    5054 355 25.03.13 20.05.13 24.09.14

    Pier 2 cutting Edge and

    Kerb completed and

    Pier 2 cutting Edge and

    Kerb Reinforcement is

    in Progress.

    8%

    13

    NCRMP/B-

    W/AP/RHB/PRED/

    04/Katrenikona/014

    11

    NCRMP/B-

    W/AP/RHB/PRED/

    04/Sakhinetipalli/00

    8

    12

    NCRMP/B-

    W/AP/RHB/PRED/

    04/Allavaram/012

    Page 28 of 130

  • 7/27/2019 Monthly Progress Report for July 2013

    30/131

    RATE OF PROGRESS OF WORKS No of works

    up to 10% 7

    11 to 40% 21

    41 to 70% 2

    71 to 100% 1

    Works Not Started 2

    Total No of works 33

    Abstract Status of NCRMP Works in West Godavari District to theend of July 2013

  • 7/27/2019 Monthly Progress Report for July 2013

    31/131

    1

    NCRMP/B-

    W/AP/RCS/PRED/

    05/Achanta/002

    RCS 1 Y2-178Road from R&B road to Ayodya

    lanka Marrimula CS. (CC Road)2500 136.00 30.03.2013 05.04.2013 29.03.2014 Sub grade completed. 6.00

    2

    NCRMP/B-

    W/AP/RCS/PRED/

    05/Bhimavaram/004

    RCS 2 Y2-181

    Construction of approach road to

    CS in Losari of Bhimavaram

    Mandal.

    100 7.00 08.03.2014 16.05.2013 07.09.2013Sub grade, GSB

    completed.14.00

    RCS 3 Y2-182Road from R&B road to

    Kothakayalathippa CS1200 51.70 02.04.2013

    Sub grade, GSB, CD Works

    completed.27.00

    RCS 4 Y2-183Road from Narsapur Perupalem

    R&B road to Mandavarithota1500 59.35 02.04.2013

    Sub grade, GSB, CD Works

    completed.33.70

    RCS 5 Y2-184Road from Mollaparru R & B road

    to Mollaparru Patha Colony850 58.80 02.04.2013

    Sub grade,GSB completed.

    CD works is in Progress.13.35

    RCS 6 Y2-185

    oa rom K . al em ( )

    Panchayat office to Metturevu Palli

    palem

    880 36.15 02.04.2013 Scarifying is in progress. 10.09

    RCS 7 Y2-186 R&B road to Chinamynavanilanka 1300 58.70 02.07.2013 Sub grade completed. 5.23

    RCS 8 Y2-187 PR road to Ramanujapuram 1200 61.30 02.07.2013 Sub grade completed. 10.16

    RCS 9 Y2-188Road from P.R road to

    Prakasapuram750 30.00 02.07.2013 Sub grade completed. 10.45

    5

    NCRMP/B-

    W/AP/RHB/PRED/

    05/Kalla/004

    RHB 10 Y2-299K.G. R&B Road to Mamidipudi of

    Kalawapudi.2080 91.00 08.03.2013 15.04.2013 07.12.2013 GSB Material collection. 5.09

    6

    NCRMP/B-

    W/AP/RHB/PRED/

    05/Mogaltur/006

    RHB 11 Y2-302Khalipatnam R&B Road to

    Khalipatnam ferry1800 77.00 21.03.2013 12.04.2013 20.12.2013

    Scarifying completed.

    Earth Work is in Progress.6.54

    RHB 12 Y2-306

    oa rom arsapur erupalem

    R&B Road to Melamvaripalem

    Peru alem S

    800 41.00 15.04.2013Sub grade,GSB completed.

    CD works is in Progress.30.41

    RHB 13 Y2-307

    Road from Perupalem Mollaparru

    R&B road via Sattinenivarimeraka

    to K.D. Pallavapalem

    730 34.20 15.04.2013Sub grade,GSB completed.

    CD works is in Progress.22.45

    RHB 14 Y2-308oa rom erupalem

    Dibbalapallipalem R&B road to

    Mellapallavapalem

    1860 77.25 15.04.2013Sub grade & CD Works is in

    Progress.6.06

    RHB 15 Y2-309

    Road from Perupalem beach R&B

    Road to Challavarimeraka via

    Mucherlavarimeraka

    1760 76.55 15.04.2013Sub grade 950 m

    Completed.4.14

    7

    NCRMP/B-

    W/AP/RHB/PRED/

    05/Mogaltur/008

    06.03.2013 05.06.2014

    3

    NCRMP/B-

    W/AP/RCS/PRED/

    05/Mogaltur/005

    20.03.2013 29.06.14

    4

    NCRMP/B-

    W/AP/RCS/PRED/

    05/Narsapur/006

    21.03.2013 20.03.2014

    Remarks

    Status of NCRMP works in West Godavari District to the end of July 2013

    Sl.

    No.Package Nos.

    catago

    ry

    S.

    no

    Project

    codeWork Name

    Length

    (Mts)

    Estimate

    Value Rs. in

    Rs.lakhs

    DHS

    Date of

    commenceme

    nt of work

    DFC Stage of work

    % of

    work

    done

    Reasons for non-

    started works

    Page 30 of 130

  • 7/27/2019 Monthly Progress Report for July 2013

    32/131

    Remarks

    Status of NCRMP works in West Godavari District to the end of July 2013

    Sl.

    No.Package Nos.

    catago

    ry

    S.

    no

    Project

    codeWork Name

    Length

    (Mts)

    Estimate

    Value Rs. in

    Rs.lakhs

    DHS

    Date of

    commenceme

    nt of work

    DFC Stage of work

    % of

    work

    done

    Reasons for non-

    started works

    RHB 16 Y2-310Road from Perupalem R&B road to

    Dindla1600 62.25 15.04.2013

    Sub grade completed. CD

    works is in Progress.19.00

    RHB 17 Y2-311

    Road from Narsapur Perupalem

    R&B road to Nellipallipalem via

    Ambedkar colony Harijanapeta

    4600 175.35 15.04.2013

    Sub grade, GSB 1.000 KM

    completed. CD works is in

    Progress.

    19.36

    RHB 18 Y2-312Road from Perupalem R&B Road to

    Kouruvaripalem1800 82.15 15.04.2013

    Sub grade completed. CD

    works is in Progress.10.32

    RHB 19 Y2-313Road from SP R&B road to

    Pasaladeevi2650 140.00 20.03.2013

    Sub grade & CD works

    completed.26.51

    RHB 20 Y2-314 LT R&B road to Modi 800 34.53 20.03.2013 Sub grade completed.. 12.63

    RHB 21 Y2-315SP R&B road to Gannabathulavari

    palem of Chamakuripalem3750 149.47 20.03.2013

    Sub grade & CD works

    completed.22.53

    RHB 22 Y2-316Road from R&B road to SC Colony

    of Pedalanka750 47.60 Not Started 0.00

    Villagers are objected.

    Now the problem is

    resolved. Work will

    commence shortly

    RHB 23 Y2-317R&B road to Rajeev Nagar of

    Darbharevu1600 76.20 Not Started 0.00

    Some villagers went tocourt not to proceed with

    work.

    RHB 24 Y2-318SP R&B road to Pedathota of

    Turputallu250 18.10 01.04.2013

    Sub grade, GSB, WMM, CD

    Works completed.

    Shoulders Work is in

    pro ress.

    52.92

    RHB 25 Y2-319 R&B road to Peta of Turputallu 920 45.70 01.04.2013

    Scarifying completed.

    Earth Work & Sub grade

    work is in Progress.

    12.14

    RHB 26 Y2-320R&B road to Pedathota of

    Turputallu380 19.40 01.04.2013

    Sub grade, GSB, WMM, CD

    Works completed.

    Shoulders Work is in

    pro ress.

    54.28

    RHB 27 Y2-321 R&B road to Guttulavar imeraka 970 40.80 01.04.2013Sub grade & GSB

    completed.14.00

    RHB 28 Y2-322Road from R & B Road to

    Pulaparthivaripalem2000 85.65 01.04.2013 Sub grade completed. 20.12

    RHB 29 Y2-323 R&B road to Pedaedigapa lem 630 39.50 01.04.2013Sub grade, GSB, CD Works

    completed.22.07

    RHB 30 Y2-324 R&B road to Evanivarimeraka 190 14.05 01.04.2013 GSB Material collection. 5.16

    11

    NCRMP/B-

    W/AP/RHB/PRED/

    05/Narsapur/013

    25.03.2013 24.03.2014

    8

    NCRMP/B-

    W/AP/RHB/PRED/

    05/Mogaltur/009

    18.03.2013 17.06.2014

    9

    NCRMP/B-

    W/AP/RHB/PRED/

    05/Narsapur/010

    14.03.2013 13.06.2014

    10

    NCRMP/B-

    W/AP/RHB/PRED/

    05/Narsapur/012

    27.03.2013 26.06.2014

    Page 31 of 130

  • 7/27/2019 Monthly Progress Report for July 2013

    33/131

  • 7/27/2019 Monthly Progress Report for July 2013

    34/131

    RATE OF PROGRESS OF WORKS No of works

    up to 10% 31

    11 to 40% 6

    41 to 70% 1

    71 to 100% 0

    Works Not Started 11

    Total No of works 49

    Abstract Status of NCRMP Works in Krishna District to the end of

    July 2013

    35

  • 7/27/2019 Monthly Progress Report for July 2013

    35/131

    RCS 1 Y2-189Road from R&B road to CS @

    Ullipalem690 43.25 21.03.13 28.05.13 20.06.14

    CD work, GSB

    completed. WMM is in

    progress

    40

    RCS 2 Y2-190Road from R & B Road to CS

    at Jaruguvanipalem500 31.08 21.03.13 22.07.13 20.06.14 sub grade is in progress 9

    RCS 3 Y2-191

    Road from R&B road to CS @

    Utagundam 290 16.16 21.03.13 22.07.13 20.06.14

    Earth work and

    scrarifying completed 3

    RCS 4 Y2-192Road from R&B road to CS @

    Ramakrishna puram390 21.39 21.03.13 28.05.13 20.06.14

    GSB completed,wmm is

    in progess40

    RCS 5 Y2-193Road from R&B road to CS @

    Chintakolla1950 95.16 21.03.13 20.07.13 20.06.14 GSB work in progress 20

    RCS 6 Y2-194Road from R&B road to CS @

    Padalavaripalem510 30.15 21.03.13 04.06.13 20.06.14

    Earth work completed

    and material collected

    for CD works

    4.8

    RCS 7 Y2-195Road from R&B road to CS @

    Mandapakala590 34.55 21.03.13 04.06.13 20.06.14

    Widening completed

    GSB collection is in

    progress.

    5.3

    RCS 8 Y2-196

    Road from R&B road to

    Ramakrishna puram R & B

    Road via Pathaupakali

    3300 179.04 21.03.13 29.07.13 20.03.14Jungle clearance, earth

    work completed1

    RCS 9 Y2-197R & B Road to CS at

    Kothaupakali510 32.26 21.03.13 29.07.13 20.03.14

    jungle clearance, earth

    work in progress1

    RCS 10 Y2-198Road from Uppu Canal drain to

    CS at Nali630 33.90 25.03.13 29.07.13 24.06.14

    Jungle clearance is in

    progress1

    RCS 11 Y2-199Road from Nali R & B Road to

    Barrankula CS2430 99.78 25.03.13 29.07.13 24.06.14

    Jungle clearance

    ,Scarifying earth work

    excavation is in

    progress

    3

    RCS 12 Y2-200From R&B road to

    Bhavadevarapalli230 29.85 25.03.13 29.07.13 24.06.14

    Jungle clearance is in

    progress1

    RCS 13 Y2-201Road from R&B road to CS at

    Pedapalem570 37.23 20.03.13 29.07 .13 19 .06.14

    Jungle clearance

    ,Scarifying earth work

    excavation is in

    progress

    3.5

    RCS 14 Y2-202 Road from Gullalamoda R&Broad to Etimoga

    183 19.65 20.03.13 27.07 .13 19 .06.14 Material collected forCD works

    1

    RCS 15 Y2-203Road from R&B to CS at China

    Etimoga210 33.79 20.03.13 25.05 .13 19 .06.14

    RCC slab compled,

    earth work excavation

    complted

    2

    RCS 16 Y2-204Road from R & B Road to CS

    at China Kammavaripalem300 26.51 20.03.13 27.07 .13 19 .06.14

    Jungle clearance work

    is in progress1

    NCRMP/B-

    W/AP/RCS/P

    RED/

    06/koduru/00

    2

    3

    NCRMP/B-

    W/AP/RCS/P

    RED/

    06/Nagayala

    nka/003

    Reasons for

    non-started

    works

    4

    NCRMP/B-

    W/AP/RCS/P

    RED/

    06/Nagayala

    nka/004

    5

    NCRMP/B-

    W/AP/RCS/PRED/

    06/Nagayala

    nka/005

    1

    NCRMP/B-

    W/AP/RCS/P

    RED/

    06/koduru/001

    2

    Remarks

    Status of NCRMP works in Krishna District to the end of July 2013

    Sl.

    No.

    Package

    Nos.

    catago

    ryS.no

    Project

    codeWork Name

    Length

    of Road

    (Mts)

    Estimate

    Value

    (Rs.Lakh

    s)

    DHS

    Date of

    commence

    ment of

    work

    DFC Stage of work

    % of

    work

    done

    Page 34 of 130

  • 7/27/2019 Monthly Progress Report for July 2013

    36/131

    Reasons for

    non-started

    works

    Remarks

    Status of NCRMP works in Krishna District to the end of July 2013

    Sl.

    No.

    Package

    Nos.

    catago

    ryS.no

    Project

    codeWork Name

    Length

    of Road

    (Mts)

    Estimate

    Value

    (Rs.Lakh

    s)

    DHS

    Date of

    commence

    ment of

    work

    DFC Stage of work

    % of

    work

    done

    RCS 17 Y2-205

    Road from China Zinkapalem

    to Gollamanda via Peda

    Zinkapalem

    2030 103.90 22.03.13 21.06.14 Work not started

    RCS 18 Y2-206Road from R&B road to CS at

    Gollamanda900 47.92 22.03.13 21.06.14 Work not started

    RCS 19 Y2-207Road from ZP Road to CS at

    Natchugunta300 17.31 22.03.13 21.06.14 Work not started

    RCS 20 Y2-208Road from Krishna River to

    Elichetladibba CS720 58.85 22.03.13 21.06.14 Work not started

    RCS 21 Y2-211

    Road from

    Kammavanicheruvu R&B road

    to Venkata durgambapuram in

    Machilipatnam Mandal

    4100 203.77 22.03.13 13.04.13 21.04.14

    Earth work started and

    GSB material collection

    in progress

    19.5

    RCS 22 Y2-212Road from R&B Road

    Pedayadara to Harijanawada1100 66.33 22.03.13 02.07.13 21.04.14

    Material collected for

    CD works1

    RCS 23 Y2-215Road from R&B Road

    Karagraharam to Pallipalem630 41.49 04.06.13 01.09.14 Work not started

    RCS 24 Y2-216 Road from R&B RoadKammavaricheruvu to KPT

    palem

    820 62.74 04.06.13 01.09.14 Work not started

    RCS 25 Y2-217

    Road from R&B Road

    Kammavaricheruvu to

    Malakayalanka

    450 32.50 04.06.13 01.09.14 Work not started

    RCS 26 Y2-218

    Road from R&B Road

    Pallithumalapalem to

    Nelithippa

    245 17.48 04.06.13 01.09.14 Work not started

    Materials are to

    transported

    across salt creek

    using punts. Due

    to the problem ofapproach roads

    during rainy

    season, the works

    can be taken up

    after the rainy

    season only. Prior

    to the onset of

    monsoon some

    work should have

    been done.

    Contractor has

    now informed

    that the works

    would be

    completed before

    agreement time.

    7

    NCRMP/B-

    W/AP/RCS/P

    RED/

    06/Machilipat

    nam/008

    8

    NCRMP/B-W/AP/RCS/P

    RED/

    06/Machilipat

    nam/010

    Contractor is

    making

    arrangements to

    commence thework. He has

    informed the

    works would be

    completed well

    before agreement

    time.

    6

    NCRMP/B-

    W/AP/RCS/P

    RED/

    06/Nagayala

    nka/006

    Page 35 of 130

  • 7/27/2019 Monthly Progress Report for July 2013

    37/131

    Reasons for

    non-started

    works

    Remarks

    Status of NCRMP works in Krishna District to the end of July 2013

    Sl.

    No.

    Package

    Nos.

    catago

    ryS.no

    Project

    codeWork Name

    Length

    of Road

    (Mts)

    Estimate

    Value

    (Rs.Lakh

    s)

    DHS

    Date of

    commence

    ment of

    work

    DFC Stage of work

    % of

    work

    done

    9

    -

    W/AP/RHB/

    PRED/

    06/Koduru/0

    04

    RHB 27 Y2-328Road from R&B Road to

    Narsimhapuram3550 155.10 22.03.13 19.04.13 21.03.14

    CD work& GSB, WMM

    completed.58.06

    RHB 28 Y2-329Road from R&B Road to

    Krishnapuram2530 118.60 22.03.13 25.07.13 21.03.14

    Material collected for

    CD works1

    RHB 29 Y2-330Road from R&B road to

    Pedagudumotu1850 87.40 22.03.13 17.05.13 21.03.14 CD work is in progress. 2

    RHB 30 Y2-335Road from R&B Road to Parra

    chivara800 51.58 25.03.13 17.07.13 24.06.14

    Jungle clearance work

    is in progress1

    RHB 31 Y2-336Road from R&B road to

    Pedagowdapalem810 54.90 25.03.13 17.07.13 24.06.14

    jungle clearance

    completed & road

    widening is in progress

    2

    RHB 32 Y2-337Road from R & B Road to

    Mulapalem660 36.05 25.03.13 17.07.13 24.06.14

    Jungle clearance work

    is in progress1

    RHB 33 Y2-338Road from Ganapeswaram

    R&B Road to Pullaiahgaridibba1810 132.16 25.03.13 17.07.13 24.06.14

    jungle clearance

    completed & road

    widening is in progress

    4

    RHB 34 Y2-343Road from R & B Road toIndiramma Tank in

    Gullalamoda

    1600 114.24 22.03.13 29.07.13 21.06.14Jungle clearance work

    is in progress0.1

    RHB 35 Y2-344Construction of road from ST

    colony to Uppu drain in Dindi.1260 104.43 22.03.13 29.07.13 21.06.14

    Jungle clearance work

    is in progress0.1

    RHB 36 Y2-345Road from Z.P.road to

    Sorlagondi1380 110.23 22.03.13 29.07.13 21.06.14

    Jungle clearance work

    is in progress0.1

    RHB 37 Y2-346Road from R & B road toMPUP School in

    Sangameswaram

    610 44.21 22.03.13 29.07.13 21.06.14Jungle clearance work

    is in progress0.1

    10

    -

    W/AP/RHB/PRED/

    06/Koduru/0

    11

    NCRMP/B-

    W/AP/RHB/P

    RED/

    06/Nagayala

    nka/008

    Just startrd

    Contractor has

    received

    mobilization

    advance on

    19.07.13.

    Contractor has

    informed that

    he was making

    arrangements

    commence

    other items of

    work and

    complete theseworks well

    before

    agreement time.

    12

    NCRMP/B-

    W/AP/RHB/P

    RED/

    06/Nagayala

    nka/010

    Page 36 of 130

  • 7/27/2019 Monthly Progress Report for July 2013

    38/131

    Reasons for

    non-started

    works

    Remarks

    Status of NCRMP works in Krishna District to the end of July 2013

    Sl.

    No.

    Package

    Nos.

    catago

    ryS.no

    Project

    codeWork Name

    Length

    of Road

    (Mts)

    Estimate

    Value

    (Rs.Lakh

    s)

    DHS

    Date of

    commence

    ment of

    work

    DFC Stage of work

    % of

    work

    done

    RHB 38 Y2-347

    Road from Matlam Z.P road to

    Govindarajuladibba in

    Kruthivennu mandal

    1320 72.94 14.03.13 20.05.13 13.02.14

    jungle clearance

    completed & road

    widening is in progress

    10

    RHB 39 Y2-348

    Road from R&B road to

    Amudalapalli (Pennamdibba)

    in Kruthivennu mandal

    2000 118.63 14.03.13 01.04.13 13.02.14

    CD works completed

    &.road widening is in

    progress

    11

    RHB 40 Y2-349

    Road from Seethannapalli

    R&B Road to Gollagudem in

    Kruthivennu mandal

    720 51.83 14.03.13 01.04.13 13.02.14

    CD works completed

    &.road widening is in

    pro ress

    9

    RHB 41 Y2-350

    Road from R&B Road to

    Bolugondi in Kruthivennu

    mandal

    1200 77.44 14.03.13 01.04.13 13.02.14

    CD works completed

    &.road widening is in

    progress

    12

    RHB 42 Y2-351Road from R&B Road to

    Ramapuram1370 96.05 18.03.13 17.06.14 Work not started

    RHB 43 Y2-352Road from Chinapandraka R&B

    Road to Uppuluru 3920 271.11 18.03.13 17.06.14 Work not started

    RHB 44 Y2-353 Road from B.L road to Matlam 1950 152.00 26.03.13 17.06.13 25.06.14Gravel collection is in

    progress for Sub Base5

    RHB 45 Y2-354Road from Interu R&B road to

    Parvathipuram3054 309.90 26.03.13 25.06.14 Work not started

    Contractor

    making

    arrangements to

    commence the

    work

    RHB 46 Y2-366Road from Gokavaram R & B

    road to Vodarevupalem1060 50.90 18.03.13 25.07.13 16.04.14

    Jungle clearance

    completed & road

    widening is in progress

    1

    RHB 47 Y2-367Road from Gokavaram R & B

    road to Baduguvaripalem 470 35.07 18.03.13 25.07.13 16.04.14

    Jungle clearance

    completed & roadwidening is in progress

    1

    RHB 48 Y2-368Road from R&B Road

    Thallapalem to Rayapalli470 29.49 18.03.13 25.07.13 16.04.14

    Jungle clearance

    completed & road

    widening is in progress

    1

    RHB 49 Y2-369Road from Manginapudi R & B

    Road to Pathareddypalem515 39.55 18.03.13 25.07.13 16.04.14

    Jungle clearance

    completed & road

    widening is in progress

    1

    15

    NCRMP/B-

    W/AP/RHB/P

    RED/

    06/Kruthiven

    nu/014

    16

    NCRMP/B-

    W/AP/RHB/P

    RED/

    06/Machilipat

    nam/020

    13

    NCRMP/B-

    W/AP/RHB/P

    RED/

    06/Kruthiven

    nu/011

    14

    NCRMP/B-

    W/AP/RHB/P

    RED/

    06/Kruthiven

    nu/013

    Contractor is

    making

    arrangements to

    commence the

    work. He has

    informed the

    works would be

    completed wellbefore agreement

    time.

    Page 37 of 130

  • 7/27/2019 Monthly Progress Report for July 2013

    39/131

    RATE OF PROGRESS OF WORKS No of works

    up to 10% 3

    11 to 40% 1

    41 to 70% 0

    71 to 100% 2

    Works Not Started 3

    Total No of works 9

    Abstract Status of NCRMP Works in Guntur District to the end ofJuly 2013

    Status of NCRMP works in Guntur District to the end of July 2013

  • 7/27/2019 Monthly Progress Report for July 2013

    40/131

    1

    NCRMP/B-W/

    AP/MPCS/

    PRED/07/

    Nizampatham/00

    3

    MPCS 1 Y2-097Construction of CS in Sanjeevanagar

    of Kothapalem (Type B)35x40 85 22.3.2013 - 21.3.2014 Work not Started 0%

    Contractor sick.

    Deprtment issued

    notice. Praposed

    to start the work in

    August.

    2

    NCRMP/B-

    W/AP/MPCS/PRED/

    07/Repalle/005

    MPCS 2 Y2-101 Construction of CS inLankavanidibba (Type D)

    35x40 110 22.3.2013 - 21.3.2014 Work not Started 0%

    Contractor sick.

    Department issued

    notice. Proposed

    start the work in

    August

    3

    NCRMP/B-

    W/AP/RCS/PRED

    /

    07/Nizampatnam

    /005

    RCS 3 Y2-225

    Road from R&B

    Koosureiyuvaripalem Road to

    Marakavaripalem

    1050 54 21.3.2013 3.6.2013 20.12.2013 GSB is in progress 15%

    4

    NCRMP/B-

    W/AP/RCS/PRED

    / 07/PV

    Palem/001

    RCS 4 Y2-219Road from R&B Road Alluru to

    Yadavapalem1033 51 1.11.2011 15.5.2012 30.4.2013 Work completed 100%

    -

    RCS 5 Y2-226

    Road from Adavipallipalem R& B

    road to New Tsunami colony (via)

    Krupanagar Colony, Adavi Village

    751 52 1.4.2013 - 20.12.2013 Work not Started 0%

    Contractor has

    informed that the

    work would be

    started before 15-

    08-2013

    RCS 6 Y2-227Road from R & B road to

    Pattapupalem750 46 1.4.2013 18.6.2013 31.3.2014 Earth work is in progress 5% -

    6

    NCRMP/B-W

    /AP/RHB/

    PRED/07/

    Nagaram/007

    RHB 7 Y2-379Road from R&B road to

    Gattuvaripalem2175 124 21.3.2013 3.6.2013 20.3.2014 Earth work is in progress 10% -

    7

    NCRMP/B-W

    /AP/Br/ R&B/07/

    Bapatla/011

    Bridge 8 Y2-450

    Reconstruction of HLB @Km2/4 of

    Bapatla-Pandurangapuram Road

    across perali drain

    355 370 1.12.2010 7.7.2011 31.8.2012

    Bridge completed

    Approaches Pending due

    to LA problem

    90%

    -

    8

    NCRMP/B-W/

    AP/Br/R&B/07/

    Peddapalli/022

    Bridge 9 Y2-453

    Reconstruction of bridge across

    Peddapalli drain at km 14/6 of

    Chandole bridge to Nizampatnam

    road

    193 145 12.3.2012 9.5.2013 11.3.2014 Earth work is in progress 5% -

    % of

    work

    done

    Reasons for non-

    started worksRemarks

    Status of NCRMP works in Guntur District to the end of July 2013

    Sl.

    No.Package Nos.

    catagor

    yS.no

    Project

    codeWork Name

    Length

    (Mts)

    Estimate

    Value

    (Rs.lakhs)

    DHS

    5

    NCRMP/B-

    W/AP/RCS/PRED

    / 07/Bapatla/006

    Date of

    commence

    ment of

    work

    DFC Stage of work

    Page 39 of 130

  • 7/27/2019 Monthly Progress Report for July 2013

    41/131

    RATE OF PROGRESS OF WORKS No of works

    up to 10% 9

    11 to 40% 13

    41 to 70% 4

    71 to 100% 9

    Works Not Started 0

    Total No of works 35

    Abstract Status of NCRMP Works in Prakasam District to the endof July 2013

  • 7/27/2019 Monthly Progress Report for July 2013

    42/131

    RCS 1 Y2-228Road from R&B road to

    Motupalli CS870 49 25.03.2013 15.05.2013 25.05.2014 Eatrh work in progress 10%

    RCS 2 Y2-229

    Roa rom Km1 2+186 o

    Chinaganjam Railway gate-

    Bapaianagar ZP Road to

    Ramachandranagar H/o

    Kotha alem

    836 39.1 25.03.2013 15.05.2013 25.05.2014 Eatrh work in progress 10%

    RCS 3 Y2-230

    Roa rom Motupa i R&B Roa

    to Nirikshanagiri (via)

    Rudramambapuram CS in

    Motupalli G.P.

    2276 88.4 25.03.2013 15.05.2013 25.05.2014 GSB in progress 15%

    RCS 4 Y2-231Road from R&B road to

    Mattigunta CS363 12.47 25.03.2013 15.05.2013 25.05.2014 Eatrh work in progress 10%

    RCS 5 Y2-232Vedullapalli Vodarevu R&B road

    to CS at Vijayalakshmipuram482 19 25.03.2013 15.05.2013 25.05.2014 Eatrh work in progress 10%

    RCS 6 Y2-233Road from Pakala PR Road to

    Chellammagaripattapupalem CS1200 55 14.03.2013 02.04.2013 14.05.2014

    1) GSB Work completed.

    2) C.C Work progress.

    3) WBM Grade-II, Spreading in

    progress.

    30%

    RCS 7 Y2-234

    Road from Pakala PR road to

    Potthaiahgaripalem CS,

    Kranthinagar Revu.

    2150 102 14.03.2013 02.04.2013 14.05.2014 GSB work in progress. 20%

    RCS 8 Y2-235Road from Woollapalem R&B

    road to Devalampallipalem CS1200 47 14.03.2013 02.04.2013 14.05.2014 GSB work in progress. 20%

    RCS 9 Y2-236Road from Tangutur to

    Ananthavaram640 42 14.03.2013 02.04.2013 14.05.2014 GSB work in progress. 20%

    RCS 10 Y2-238Road from Z.P. road to

    Srirampattapupalem2040 108 11.03.2013 15.03.2013 10.03.2014

    1)GSB & C.C Work completed

    2) Shoulders to be done.95%

    RCS 11 Y2-239Road from ZP road to

    Pallipalem of Chakicharala800 47.79 11.03.2013 15.03.2013 10.03.2014

    GSB Comp ete , CC Comp ete CD

    Completed & WBM Gr-II Completed.

    WBM Gr-III Completed, OGPC + SC

    Completed, CD Works Completed

    Shoulders in Progress.

    98%

    3

    % of

    work

    done

    1NCRMP/B-W/AP/RCS/PRED/

    08/Chinaganjam

    & Chirala/006

    2

    NCRMP/B-W/AP

    /RCS/PRED/08/S.Konda &

    Tangutur/010

    Reasons for

    non-started

    works

    NCRMP/B-W/AP

    /RCS/PRED/08/

    Ulavapadu/009

    Remarks

    Status of NCRMP works in Prakasam District to the end of July 2013

    Sl.

    No.Package Nos.

    catago

    ryS.no

    Project

    codeWork Name

    Length

    (Mts)

    Estimate

    Value in

    Lakhs

    DHS

    Date o

    commenc

    ement of

    work

    DFC Stage of work

    Page 41 of 130

  • 7/27/2019 Monthly Progress Report for July 2013

    43/131

    RATE OF PROGRESS OF WORKS No of works

    up to 10% 3

    11 to 40% 20

    41 to 70% 9

    71 to 100% 7

    Works Not Started 0

    Total No of works 39

    Abstract Status of NCRMP Works in SPSR Nellore District to the

    end of July 2013

  • 7/27/2019 Monthly Progress Report for July 2013

    44/131

    RCS 1 Y2-240

    Road from @ 56/8 to C.K

    road to Periyavettu kuppam

    cyclone shelter

    2000 85 14.09.2012 15.09.2012 13.09.2013WBM Gr-II

    progress55% NIL

    RCS 2 Y2-241

    Providing BT road to

    Pedapannamgadu in TadaMandal

    1015 37.5 14.09.2012 15.09.2012 13.09.2013 BT completed 90% NIL

    2NCRMP/B-W/AP/RCS/

    PRED/09/Alluru/012RCS 3 Y2-242

    Approach road to

    Labbipalem420 21.97 ` 1.05.2013 17.09.13

    CC pavement is

    progress85% NIL

    3NCRMP/B-W/AP/RCS/

    PRED/09/Bogole/013RCS 4 Y2-243

    Road from R & B road to

    Pathakadapalem1400 52.37 20.03.13 1.05.2013 19.09.13

    Earth work is

    progress20% NIL

    RCS 5 Y2-244Road from Ramudupalem

    on R&B road to Pallipalem3600 203 20.03.13 10.04.2013 19.06.14 GSB is progress 50% NIL

    RCS 6 Y2-245Road from Korutur to

    Pattapupalem2250 148 20.03.13 1.06.2013 19.06.14

    CD works

    complete Gsb

    progress,

    34% NIL

    5 NCRMP/B-W/AP/RCS/PRED/09/Kavali/020 RCS 7 Y2-246 Road from 230/6 Km of M.CRaod to Pedapattapupalem 6200 197.92 28.02.13 1.03.2013 27.02.14 GSB completed. 41% NIL

    RCS 8 Y2-247Road from R&B road to

    Utukuru Pallipalem3800 138 20.03.13 1.04.13 19.06.14 GSB is progress 24% NIL

    RCS 9 Y2-248Road Ponnapudi R&B Road

    to Ramachendrapuram.2000 114 20.03.13 1.04.13 19.06.14 GSB completed 40% NIL

    RCS 10 Y2-249Ponnapudi R&B road to

    Busagadipalem1900 92 20.03.13 1.04.13 19.06.14 GSB progress 25% NIL

    RCS 11 Y2-250Road from Ponnapudi R&B

    Road to Lakshimipuram1000 51.5 20.03.13 12.04.2013 19.06.14

    su gra e

    completed. CC

    road in progress

    20% NIL

    RCS 12 Y2-251 Road from R&B Road toRamalingapuram

    1700 75.5 20.03.13 12.04.2013 19.06.14 Eath work inprogress

    20% NIL

    7NCRMP/B-W/AP/RCS/PRED/

    09/Chillakur/ 014RCS 13 Y2-252

    Road from R&B Road

    Lingavaram to

    Narravaripalem

    6808 338.86 21.03.13 22.03.2013 20.03.14 GSB progress 25% NIL

    8NCRMP/B-W/AP/RCS/PRED/

    09/Chillakur/015RCS 14 Y2-253

    Road from R&B road (via)

    Narravaripalrm to Srinivasa

    Satram

    2260 100.72

    21.03.13

    1.04.2013 20.03.14GSB is

    completed.30% NIL

    Remarks

    Status of NCRMP works in SPSR Nellore District to the end of July 2013

    Sl.

    No.Package Nos.

    Catagor

    yS.no

    Project

    codeWork Name

    Length

    Mts

    Estimate

    Value in

    lakhs

    DHS

    Date of

    commence

    ment of

    work

    DFC Stage of work

    % of

    work

    done

    Reasons

    for non-

    started

    works

    1NCRMP/B-W/AP/RCS/PRED/

    09/TADA/009

    4NCRMP/B-W/AP/RCS/PRED/

    09/I. Pet/018

    6NCRMP/B-W/AP/RCS/PRED/

    09/Vidavaluru/ 021

    Page 43 of 130

  • 7/27/2019 Monthly Progress Report for July 2013

    45/131

    Remarks

    Status of NCRMP works in SPSR Nellore District to the end of July 2013

    Sl.

    No.Package Nos.

    Catagor

    yS.no

    Project

    codeWork Name

    Length

    Mts

    Estimate

    Value in

    lakhs

    DHS

    Date of

    commence

    ment of

    work

    DFC Stage of work

    % of

    work

    done

    Reasons

    for non-

    started

    works

    9NCRMP/B-W/AP/RCS/PRED/

    09/Kota/016RCS 15 Y2-254

    Road from R&B Road to

    Doruvukatta road (via)

    Allmpadu, Deyyaladibba

    4320 181.32 20.03.13

    21.03.13

    19.03.14 BT completed 90% NIL

    RCS 16 Y2-255

    Road from Kotha Kudur

    Katepalli road to PathaPattapupalem

    600 35 15.03.13 1.07.2013 14.06.14Eath work in

    progress 10% NIL

    RCS 17 Y2-256Road from C.S. Puram to

    Edurupalem2200 96 15.03.13 1.05.2013 14.06.14 GSB progress 25% NIL

    RCS 18 Y2-257

    Road from Mahlakshmi

    puram to Sagara

    Sangamam (via)

    Muthyalathopu

    Pattapupalem

    2600 81 15.03.13 1.05.2013 14.06.14 B.T.completed 90% NIL

    RCS 19 Y2-258

    Road from R&B road

    Nelaturu to Ananthavaram

    CS

    100 11 15.03.13 1.07.2013 14.06.14Eath work in

    progress5% NIL

    11 NCRMP/B-W/AP/RCS/PRED/09/Tada/024

    RCS 20 Y2-259

    Road from @ Km 65/4 of

    CK Road to Tada Kuppam

    CS

    1900 83.63 22.03.13 23.03.2013 21.03.14

    Gsb

    completed,WMM

    is progress

    54% NIL

    12NCRMP/B-W/AP/RHB/PRED/

    09/Allur/018RHB 21 Y2-419

    Road from R.I Road to C.R.

    Palem (via) Sambhunipalem4000 110.01 18.03.13 1.06.2013 17.03.14

    Vented road dam

    is progress10% NIL

    RHB 22 Y2-420

    Salt Road from Iskapalli to

    Salt fields at Kotha

    Kurrupattapupalem

    3000 131 18.03.13 19.03.2013 17.03.14

    Gsb

    completed,WMM

    progress

    55% NIL

    RHB 23 Y2-421Road from R&B road to

    Zuvvagu Lakshmipuram1800 81 18.03.13 19.03.2013 17.03.14 GSB progress 12% NIL

    RHB 24 Y2-422Road from R&B Road to

    Zuvvagu

    2100 28 18.03.13 19.03.2013 17.03.14

    Gsb

    completed,WMM

    progress

    58% NIL

    RHB 25 Y2-423

    Road from Annagaripalem

    R&B road to Pedanattu

    Pattapupalem

    2100 71 04.03.13 1.06.2013 03.03.14Eath work in

    progress23% NIL

    RHB 26 Y2-424

    Roa rom

    Pedapattapupalem to

    Nandempuram

    2800 94 04.03.13 4.3.2013 03.03.14

    Gs

    completed,WMM

    progress

    40.00% NIL

    10

    NCRMP/B-W/AP/RCS/PRED/

    09/T.P.Gudur&

    Muthukur/019

    13NCRMP/B-W/AP/RHB/PRED/

    09/Allur/019

    14NCRMP/B-W/AP/RHB/PRED/

    09/Kavali/024

    Page 44 of 130

  • 7/27/2019 Monthly Progress Report for July 2013

    46/131

    Remarks

    Status of NCRMP works in SPSR Nellore District to the end of July 2013

    Sl.

    No.Package Nos.

    Catagor

    yS.no

    Project

    codeWork Name

    Length

    Mts

    Estimate

    Value in

    lakhs

    DHS

    Date of

    commence

    ment of

    work

    DFC Stage of work

    % of

    work

    done

    Reasons

    for non-

    started

    works

    RHB 27 Y2-425Ponnapudi-Utukur road to

    Pattapupalem2800 133.5 20.03.13 21.3.2013 19.03.14

    Eath work in

    progress25% NIL

    RHB 28 Y2-426Road from R&B road to

    Venkatareddypalem1100 54.5 20.03.13 21.3.2013 19.03.14

    Eath work in

    progress45% NIL

    RHB 29 Y2-427Ponnapudi R&B road to

    Anjanayapuram950 49 20.03.13 21.3.2013 19.03.14

    sub grade is in

    progress25% NIL

    RHB 30 Y2-428Ponnapudi Utukur road to

    Srigowripuram1100 64 20.03.13 21.3.2013 19.06.14

    sub grade is in

    progress20% NIL

    RHB 31 Y2-429

    Road from Ponnapudi

    Utukur R&B road To

    Kothuru

    800 59 20.03.13 21.3.2013 19.06.14 GSB Completed. 25% NIL

    RHB 32 Y2-430

    Road from Ponnapud i

    Utukur R&B road to

    Prasanthi giri colony

    1200 64.5 20.03.13 21.3.2013 19.06.14

    Gsb

    completed,WMM

    in progress

    45% NIL

    RHB 33 Y2-431Ponnapudi R & B road to

    Venkatanarayanapuram

    1200 64.5 20.03.13 21.3.2013 19.06.14

    GSB

    Completed,WMM

    in progress

    40% NIL

    RHB 34 Y2-432Road from Ponnapudi R &

    B road to Ponnapudi500 35 20.03.13 21.3.2013 19.06.14

    CC pavement

    completd90% NIL

    RHB 35 Y2-433Road from Mypadu R&B

    Road to Kollimittapalem2350 123.5 20.03.13 21.03.2013 19.03.14

    GSB

    completed,WMM

    is in ro ress

    45% NIL

    RHB 36 Y2-434

    Road from Nellore

    Mypadu R&B Road to West

    Pattapupalem

    900 56.5 20.03.13 20.06.2013 19.03.14GSB is in

    progress20% NIL

    18NCRMP/B-W/AP/RHB/PRED/

    09/V.Chalam/021RHB 37 Y2-435

    Road from

    Thirumalammapalem R&B

    Road to Gajulapalli Koneru

    2400 95.88 08.02.13 9.2.2013 07.11.13 BT completed 90% NIL

    19NCRMP/B-W/AP/RHB/PRED/

    09/Kota/022RHB 38 Y2-436

    Road from R&B road

    Kothapatnam to

    Yamadinnepalem (via)

    Srinivasasatram

    6100 267.31 19.03.13 20.03.2013 18.06.14 GSB completed 25% NIL

    20NCRMP/B-W/AP/RHB/PRED/

    09/Kota/023RHB 39 Y2-437

    Road from at km 22/5 of

    Yamadinne palem road to

    Gunnampadia

    1320 71.78 08.02.13 9.2.2013 07.11.13 BT completed 90% NIL

    17NCRMP/B-W/AP/RHB/PRED/

    09/I.Peta/027

    15NCRMP/B-W/AP/RHB/PRED/

    09/Vidavaluru/025

    16NCRMP/B-W/AP/RHB/PRED/

    09/Vidavaluru/026

    Page 45 of 130

  • 7/27/2019 Monthly Progress Report for July 2013

    47/131

    Annexure - B

    NCR Status of Works

  • 7/27/2019 Monthly Progress Report for July 2013

    48/131

  • 7/27/2019 Monthly Progress Report for July 2013

    49/131

    Sl.

    No.Package No.

    catag

    ory

    Project

    codeWork name

    Date of

    Issued

    NCR

    No.Observations Remedial meassures Present status of NCR

    SRIKAKULAM DISTRICT NCR STATUS AS ON 31.07.2013

    13NCRMP/B-W/AP/RCS/PRED/

    01/V.Kotturu/001.RCS Y2-148

    Road from Kotharoad to

    Sainoore6.7.13 12

    At some locations, Raingullies are observed,

    insists to rectify the same.

    NCR no-12 Issued to the contractor/Line

    department is requested to take suitable

    remedial action.

    Pending

    14NCRMP/B-W/AP/MPCS/PRED/

    01/Gara/015.MPCS Y2-028

    Construction of Cyclone

    shelter at Calingapatnam8.7.13 13

    Saftey equipment was not provided to

    concrete workers,insists to provide the safety

    euipment to workers.

    NCR no-13 Issued to the contractor/Line

    department is requested to take suitable

    remedial action.

    Pending

    15NCRMP/B-W/AP/MPCS/PRED/

    01/Santhabommali/005.MPCS Y2-001

    Construction of Cyclone

    shelter at Kollipadu8.7.13 14

    Saftey equipment was not provided to

    concrete workers,insists to provide the safety

    euipment to workers.

    NCR no-14 Issued to the contractor/Line

    department is requested to take suitable

    remedial action.

    Pending

    Page 48 of 130

  • 7/27/2019 Monthly Progress Report for July 2013

    50/131

    Sl.

    No.Package No.

    catago

    ry

    Project

    codeWork name

    Date of

    Issued

    NCR

    No.Observations Remedial meassures Present status of NCR

    VIZIANAGARAM DISTRICT NCR STATUS AS ON 31.07.2013

    Page 49 of 130

  • 7/27/2019 Monthly Progress Report for July 2013

    51/131

    Sl.

    No.Package No.

    catago

    ry

    Project

    codeWork name

    Date of

    Issued

    NCR

    No.Observations Remedial meassures Present status of NCR

    1 NCRMP/B-W/AP/RCS/PRED/

    03/Bheemili/005

    RCS Y2-165 Road from R&B road to

    Chinanagamayyapalem

    cyclone shelter

    20.05.2013 1 WBM Gr-III sample collected and condut the

    sive analysis test .The test results are IS sieve

    45mm size at percentage of 96.13 as agaist of

    60% to 90%. The mateial is under size in IS

    sieve 45mm size.

    NCR-1 Issued to take suitable remedial action

    before proceding with further work. The rejected

    material to be removed from the site and

    replaced with suitable material

    NCR pending

    2 NCRMP/B-W/AP/RHB/PRED/03/Payakaraopeta/005

    RHB Y2-282 Road from R&B road toGajareddypalem

    25.05.13 2 Right side compound wall is in obstructionKm2/652 to 2/658 approximaty 1mt.leftside

    formers place is there.no contractor and line

    department are tackling the land acqusition

    issue at Km1/6 to