GOVERNMENT OF ODISHA WORKS DEPARTMENT
ODISHA STATE ROADS PROJECT
Construction Supervision for the balance work of Widening of Strengthening
of Existing Carriage Way to 2 lane road for Bhadrak-Pirhat Road (0/000 Km. to
27/500 of SH-9 (Balance work)- Package OSRP-Bal-P02A
MONTHLY PROGRESS REPORT
LEA Associates South Asia Pvt. Ltd., New Delhi
June, 2018
ICB Package OSRP-Bal-P02A under Civil Works Agreement No.- 4 of 2016-17
Page 1 of 30
CONTENTS
CHAPTER 1. EXECUTIVE SUMMARY ..................................................................................................................... 3
1.1 PROJECT BACKGROUND ............................................................................................................................... 3 1.2 THE PROJECT .................................................................................................................................................. 3 1.3 CONTRACT MANAGEMENT FRAME WORK ................................................................................................... 4 1.4 PROJECT DETAILS .......................................................................................................................................... 5 1.5 SALIENT FEATURES ........................................................................................................................................ 5 1.6 MILESTONES .................................................................................................................................................... 6
CHAPTER 2. PHYSICAL PERFORMANCE AND PROGRAMME OF WORK ......................................................... 7
2.1 PROGRESS OF ROAD WORK ......................................................................................................................... 7 2.2 PROGRESS OF CD WORKS AND STRUCTURE:- .......................................................................................... 7 2.3 PROGRESS IN QUANTITIES ........................................................................................................................... 8 2.4 PROGRESS PHOTOGRAPHS ........................................................................................................................ 10 2.5 ROUTINE MAINTENANCE .............................................................................................................................. 11 2.6 PROGRAMME OF WORK ............................................................................................................................... 11 2.7 ‘TIME ELAPSED’ V/S ‘BALANCE TIME’......................................................................................................... 12 2.8 ‘WORK DONE’ V/S ‘BALANCE WORK’.......................................................................................................... 12 2.9 FORECAST FOR NEXT MONTH- ................................................................................................................... 13 2.10 STATUS OF EXTENSION OF TIME................................................................................................................ 14
CHAPTER 3. FINANCIAL PERFORMANCE .......................................................................................................... 15
3.1 MONTH WISE FINANCIAL PROGRESS ......................................................................................................... 15 3.2 MOBILIZATION ADVANCE ............................................................................................................................. 16 3.3 STATEMENT OF IPC ...................................................................................................................................... 16
CHAPTER 4. STATUS OF RISK ............................................................................................................................. 17
4.1 HANDING OVER OF SECTION ...................................................................................................................... 17 4.2 STATUS OF UTILITY SHIFTING ..................................................................................................................... 17 4.3 ANY OTHER ISSUE;- ...................................................................................................................................... 17 4.4 RISK INVOLVED ............................................................................................................................................. 17
CHAPTER 5. ENVIRONMENTAL MONITORING AND SAFETY ........................................................................... 18
5.1 ENVIRONMENT MANAGEMENT PLAN ......................................................................................................... 18 5.2 ROAD SAFETY ............................................................................................................................................... 20
CHAPTER 6. VARIATION AND CHANGES ........................................................................................................... 21
6.1 SUMMARY OF CHANGE ORDER .................................................................................................................. 21
CHAPTER 7. QUALITY CONTROL AND QUALITY ASSURANCE ....................................................................... 24
7.1 TESTS CONDUCTED ..................................................................................................................................... 24
CHAPTER 8. MOBILIZATION ................................................................................................................................. 26
8.1 CONSULTANT’S TEAM .................................................................................................................................. 26 8.2 CONTRACTOR’S PROPOSED TEAM ............................................................................................................ 26 8.3 STATUS OF PLANT AND EQUIPMENT OF CONTRACTOR ......................................................................... 27
CHAPTER 9. VISITS AND MEETINGS ................................................................................................................... 28
CHAPTER 10. IMPORTANT CORRESPONDENCES DURING THE MONTH ......................................................... 29
10.1 SUBMISSIONS AND APPROVALS ................................................................................................................. 29 10.2 CORRESPONDENCES ................................................................................................................................... 29
CHAPTER 11. WEATHER DURING THE MONTH ................................................................................................... 30
Monthly Progress Report June, 2018 Widening & Strengthening of Existing Carriage Way to 2 lane road for Bhadrak-Pirhat Road (0/000 Km. to 27/500 of SH-9 (Balance work)- Package OSRP-Bal-P02A)
ODISHA WORKS DEPARTMENT
Page 2 of 30
LIST OF FIGURES
Figure 1-1: Location Map ......................................................................................................................... 4
LIST OF APPENDIX
APPENDIX 1 – STRIP CHART OF HIGHWAYS
APPENDIX 2 – PROGRESS CHART OF STRUCTURES
APPENDIX 3 – IMPORTANT CORRESPONDENCES DURING THE MONTH
APPENDIX 4 – STATUS OF UTILITIES AND ENCUMBRANCES
CHAPTER 1. EXECUTIVE SUMMARY
Page 3 of 30
Chapter 1. Executive Summary
1.1 PROJECT BACKGROUND
The Odisha Works Department (OWD) has a medium to long-term comprehensive programme to
rehabilitate, upgrade and expand the road network throughout the state to improve accessibility, con-
nectivity and enhance the overall development. It is the pre-eminent state level road authority in Od-
isha which deals with issues relating to Feasibility Study and preparation of Detailed Project Report
including the Route Selection, even for relatively low volume roads.
The Government of Odisha has secured a loan from International Bank for Reconstruction and
Development (The World Bank) towards the cost of Widening and Strengthening of existing car-
riageway to 2-lane for Chandbali–Bhadrak–Anandpur Road Project (88 Km).
Chandbali – Bhadrak – Anandpur Road Project is part of 825 km of roads under Phase-I which is
a Section for promoting trade and regional integration between districts by improving transport com-
munication. The project road Chandbali – Bhadrak – Anandpur is a part of the Phase-I road devel-
opment, which was built several years ago with two lane configuration and currently serves moderate
level of traffic. The project involves widening of the existing road which has an average carriageway
width of 5.5 m to 6.8 m and 1.5m. Earthen shoulder on both sides, to a 7.0 m carriageway and
2.5m shoulders on both sides in flat and rolling sections. The expected outcome of the project in-
clude reduced transportation time of goods and better connectivity between districts along with im-
proved safety standards; reduced transit time for import and export goods via port.
1.2 THE PROJECT
The Bhadrak–Pirhat (SH-9) Section from Km. 0/000 to Km. 27/500 is a part of Chandbali–Bhadrak–
Anandpur Road Project (88 Km). The road section Bhadrak–Pirahat starts from Chainage 0/000 Km.
at Bhadrak and ends at Km. 27/500 at Pirahat, in this Bhadrak is district headquarter.
The total length of the project road is 27.500 Km. the road passes completely through plain terrain.
Major stretch of the road is located in the District of Bhadrak. This stretch passes through major hu-
man settlements as Bhadrak, Tihidi & Pirhat.
The location map of the project road is shown below in Figure 1-1;
Monthly Progress Report June, 2018 Widening & Strengthening of Existing Carriage Way to 2 lane road for Bhadrak-Pirhat Road (0/000 Km. to 27/500 of SH-9 (Balance work)- Package OSRP-Bal-P02A)
ODISHA WORKS DEPARTMENT
Page 4 of 30
Figure 1-1: Location Map
1.3 CONTRACT MANAGEMENT FRAME WORK
1.3.1 Employer
Mr. Om Prakash Patel, Chief Engineer, DPI & Roads, I/c World Bank Projects, Odisha
on behalf of Works Department, Government of Odisha.
1.3.2 Employer’ Representative
Executive Engineer (R&B) Division, Bhadrak
(On behalf of World Bank Projects, Works Department, Government of Odisha).
1.3.3 Engineer
Mr. R. Mathur, Resident Engineer
Lea Associates South Asia Pvt. Ltd.
B1/E-27, Mohan Co Operative Industrial Estate Mathura Road, New Delhi-110 044
Site Office-Kalyani Nagar, P.O.-Gelpur, District – Bhadrak, Odisha , Pin – 756781
Email: [email protected]
1.3.4 Contractor
M/s. FORTUNE GROUP,
India Office: Charampa, Bhadrak – 756101
Mob: 9937081755
Email: [email protected]
Site Office – At Camp at Ch.15+600 LHS (SH 09, P02A)
Email: [email protected]
Monthly Progress Report June, 2018 Widening & Strengthening of Existing Carriage Way to 2 lane road for Bhadrak-Pirhat Road (0/000 Km. to 27/500 of SH-9 (Balance work)- Package OSRP-Bal-P02A)
ODISHA WORKS DEPARTMENT
Page 5 of 30
1.4 PROJECT DETAILS
Package No.: OSRP-CW-ICB-P02A
Name of Work: Construction for Widening & Strengthening of Existing Car-riageway to 2-Lane Road from Bhadrak to Pirhat (Km.0/0 to Km.27/500 of SH-9) (Balance Works)
Contractor M/s. Fortune Group
Project Length: 27.500 Km.
Contract Value :- Rs. 79,32,67,447.00
Period of Construction :– 18 months
Date of Commencement of Work :– 16th November 2016
Scheduled Date of Completion :- 15th May 2018
Progress (Financial) Achieved till June’ 2018:- 74.50% (Excluding mobilization advance)
1.5 SALIENT FEATURES
1.5.1 Highways
Total Length of Project Corridor– 27.50 Km.
Type of Carriageway Flexible 12.760 Km., Rigid - 14.740 Km.
Roadway Width 12.00 -14.00 m.
Carriageway Width 7.00 to 10.50 m.
Bus Bays and Bus Shelter 23 No.s
Toll Plaza Deleted
Junctions 12 No.s
1.5.2 Structures
S. No. Structures Type No.s
A. New Construction
1 Box Type Minor Bridge 1
2 Box Culvert 7
3 Hume Pipe Culvert 2
4 Rehabilitation works 2
5 Utility 9
Total 21
B Balance works to be done
1 Box Type Minor Bridge 6
2 Box Culvert 21
3 Hume Pipe Culvert 22
4 Slab 1
Total 50
Grand Total 71
As per Contract total scope of utilities are 23 no.s.Out of this, 10 no.s cannot be
executed as road work completed in previous Contrac, 5 no.s cancelled for local
issues and 1 no. added additional. Utility = (23-10-5+1) = 9
Monthly Progress Report June, 2018 Widening & Strengthening of Existing Carriage Way to 2 lane road for Bhadrak-Pirhat Road (0/000 Km. to 27/500 of SH-9 (Balance work)- Package OSRP-Bal-P02A)
ODISHA WORKS DEPARTMENT
Page 6 of 30
1.5.3 Crust Details
Flexible Pavement GSB 200 mm.
WMM 250 mm
DBM 75 mm.
BC 40 mm.
Total Crust Thickness 1065 mm.
Rigid Pavement
GSB 150 mm.
DLC 150 mm.
CC Pavement 300 mm.
Total Crust Thickness 1100 mm.
1.6 MILESTONES
Section Name Period up to which these
sections are to be achieved.
Delay damages for not achieving these Section
Section – I (20 Km) 14 (Fourteen) Months from commencement of work.
Rs. 1,65,000/- per day of delay
Section – II (7.5 Km) 18 (Eighteen) Months from commencement of work.
Rs. 1,80,000/- per day of delay
Scheduled time of completion:- 18 (Eighteen) months from the date 16.11.2016.
CHAPTER 2. PHYSICAL PERFORMANCE AND PROGRAMME OF
WORK
Page 7 of 30
Chapter 2. Physical Performance and Programme of Work
The following statement shows the work executed till now in order to appreciate the physical progress of
the road work;
2.1 PROGRESS OF ROAD WORK
S. No.
Description of Item
Side Length in Km.
Length Completed
(Till previ-ous Con-
tract)
In present contract
Balance length to be Com-pleted
Complet-ed length
(Upto previous Month)
Com-pleted length (This
Month)
Total Com-pleted length
Net bal-ance (In present Con-tract)
1 Earthwork in
Embank-ment
LHS 27.500 14.675 12.825 12.820 0.000 12.820 0.005
RHS 27.500 15.045 12.455 12.290 0.110 12.400 0.055
2 Subgrade LHS 27.500 14.245 13.255 13.040 0.000 13.040 0.215
RHS 27.500 14.515 12.985 12.570 0.060 12.630 0.355
3 GSB LHS 27.500 14.245 13.255 13.010 0.000 13.010 0.245
RHS 27.500 13.915 13.585 13.150 0.150 13.300 0.285
4 WMM LHS 12.760 12.758 0.002 0.000 0.000 0.000 0.000
RHS 12.760 12.758 0.002 0.000 0.000 0.000 0.000
5 DBM LHS 12.760 12.758 0.002 0.000 0.000 0.000 0.007
RHS 12.760 12.758 0.002 0.000 0.000 0.000 0.007
6 BC LHS 12.760 12.753 0.007 0.000 0.000 0.000 0.007
RHS 12.760 12.753 0.007 0.000 0.000 0.000 0.007
7 DLC LHS 14.740 1.485 13.255 13.010 0.000 13.010 0.245
RHS 14.740 1.105 13.635 13.050 0.200 13.250 0.385
8 PQC LHS 14.740 1.425 13.315 12.940 0.055 12.995 0.320
RHS 14.740 0.940 13.800 13.090 0.186 13.276 0.524
2.2 PROGRESS OF CD WORKS AND STRUCTURE:-
Sl. No.
Structure Type
Total Nos. to
be Executed
Taken up to in
Previous Contract.
To be Taken Up
In New Contract
Completed & In Progress Balance Nos. to be
taken up
Remarks Side
No. Completed
No. In Progress
Total
1 Minor Bridge
07 06 01 LHS 01 0 01 0
RHS 01 0 01 0
2 Slab
Culvert 01 01 0
LHS 0 0 0 0
RHS 0 0 0 0
3 Box
Culvert 28 21 07
LHS 06 1 07 0
RHS 06 0 06 01
Monthly Progress Report June, 2018 Widening & Strengthening of Existing Carriage Way to 2 lane road for Bhadrak-Pirhat Road (0/000 Km. to 27/500 of SH-9 (Balance work)- Package OSRP-Bal-P02A)
ODISHA WORKS DEPARTMENT
Page 8 of 30
4 HP Culvert 24 22 02 LHS 02 0 02 0
RHS 02 0 02 0
5 Utility 09 0 09 LHS 03 05 08 01
RHS 03 05 08 01
6 Rehabilita-
tion & Widening
02 0 02 LHS 0 0 0 02
RHS 0 0 0 02
Total 71 50 21 LHS 12 06 18 03
RHS 12 05 17 04
2.3 PROGRESS IN QUANTITIES
BOQ Quantities:
S. No.
Description Unit
Total Quantity as
per BOQ (New Con-
tract)
Quantity Executed Balance Quantity
to be execut-ed as
per BOQ
Re-mark
Up to Pre-vious Month May'18
During the Month
June'18 Total
1
Earthwork in Embankment (Sand & Soil Filling)
Cum 120634 61084.94 228.00 61312.94 59321.06
2 Subgrade Cum 135390 122186.05 545.00 122731.00 12659.00
3 GSB Cum 36286 29774.26 142.35 29916.61 6369.39
4 WMM Cum 2711 0.00 0.00 0.00 2711
5 DLC Cum 24253 20042.81 130.50 20173.30 4079.70
6 PQC Cum 48505 40511.98 327.00 40838.97 7666.03
76% 75% 77% 79%
0%
82% 82%
13%
46%
0%20%40%60%80%
100%120%
PERCENTAGE OF WORK
BOQ ITEMS
BOQ Vs ACHIEVED - Financial Progress
BOQ /ESTIMATED EXECUTED
Monthly Progress Report June, 2018 Widening & Strengthening of Existing Carriage Way to 2 lane road for Bhadrak-Pirhat Road (0/000 Km. to 27/500 of SH-9 (Balance work)- Package OSRP-Bal-P02A)
ODISHA WORKS DEPARTMENT
Page 9 of 30
PIE CHART
Pie chart showing the weightage of major construction items is shown in BOQ.
Site Clearance, 0.10%
Earthwork, 15.41%GSB, 11.24%WMM, 0.84%
PMC, 0.32%
DLC, 10.23%
PQC, 41.17%Culverts, 3.02%
Bridges, 1.22% Road Safety & Amenities, 4.79%
Protective Work, 7.98%
Repair & Maintenance, 0.75%
EMM, 2.88%Dayworks (Labour,
Material & Equipment), 0.06%
Figure 2-1: Weightage of Major Construction Items
Monthly Progress Report June, 2018 Widening & Strengthening of Existing Carriage Way to 2 lane road for Bhadrak-Pirhat Road (0/000 Km. to 27/500 of SH-9 (Balance work)- Package OSRP-Bal-P02A)
ODISHA WORKS DEPARTMENT
Page 10 of 30
2.4 PROGRESS PHOTOGRAPHS
PQC is in progress at Ch. 11+320, RHS in progress at Ch. 12+490, RHS
PQC is in progress at Ch. 12+580, RHS Wall 1st lift Deshuttering is in progress at Ch.
0+003, LHS
Monthly Progress Report June, 2018 Widening & Strengthening of Existing Carriage Way to 2 lane road for Bhadrak-Pirhat Road (0/000 Km. to 27/500 of SH-9 (Balance work)- Package OSRP-Bal-P02A)
ODISHA WORKS DEPARTMENT
Page 11 of 30
2.5 ROUTINE MAINTENANCE
As per Contract, the Contractor is required to maintain the portion of the road which has been handed over to him. The maintenance work is being done by the Contractor.
2.6 PROGRAMME OF WORK
The Contractor has given next two month’s individual work programme from July’18 to August’18 for an
amount of Rs.2.17 Cr. & Rs. 2.23 Cr. respectively.
Planned V/s Achieved (June'18)
S. No.
Description Unit Planned for June'18 (B/S)
Achieved in June'18 (B/S)
Shortfall in June'18 (B/S) Remark
Road Work
1 C & G Hect. 0.03 0.00 0.03
2 Embankment Cum. 1236.50 228.00 1008.5
3 Subgrade Cum. 2015.00 545.00 1470.00
4 GSB Cum. 604.50 142.35 462.15
5 WMM Cum. 0.00 0.00 0.00
6 DBM Cum. 0.00 0.00 0.00
7 DLC Cum. 647.25 130.50 516.75
8 PQC Cum. 1365.00 327.00 1038.00
9 Saucer drain Lm 420.00 0.00 420.00
10 Stone pitching on
embankment Cum. 54.00 0.00 54.00
Structure Work
1 Box Culvert No.s 1.00 0.00 1.00 Work in progress.
2 Minor Bridge No.s - - -
3 HPC No.s - - -
4 Earth filling
quadrant por-tion
Cum 67.85 0.00 67.85
5 Back filling Cum 90.20 0.00 90.20
6 Filter media Cum 16.65 0.00 16.65
7 Filter media under stone
pitching
Cum 37.00 0.00 37.00
8 Wearing course
Sqm. 43.50 0.00 43.50
9 Painting of
Culvert No. 8.0 0.00 8.0
10 Stone Flooring Cum. 67.50 0.00 67.50
The plan for the month of June'18 was for Rs. 2.14 Cr. and the achieved progress (work done) is of Rs
0.37Cr. Thus shortfall in progress for the June'18’ is Rs 1.77 Cr.
Monthly Progress Report June, 2018 Widening & Strengthening of Existing Carriage Way to 2 lane road for Bhadrak-Pirhat Road (0/000 Km. to 27/500 of SH-9 (Balance work)- Package OSRP-Bal-P02A)
ODISHA WORKS DEPARTMENT
Page 12 of 30
S. No.
Planned Amount (June'18)
Achieved Amount (June'18)
Shortfall
1. 2.14 Cr.(as per work programme) 0.37 Cr. 1.77 Cr.
2.7 ‘TIME ELAPSED’ V/s ‘BALANCE TIME’
A chart showing the ‘Time Elapsed’ since the commencement date of the Project i.e. from 16th
Nov.’2016
to till June’18 and the ‘Balance Time’ from June’18 to till the completion by 15th May.’18 is given below
in Figure 2-2. Shows time has been fully elapsed. Contractor has applied for EOT, which is under re-
view/scrutiny of the Engineer.
Time Elapsed, 545 Days
(18 Months)
TimeRemaining,
0 Days(0.0 Months)
Figure 2-2: Time Elapsed Vs Time Remaining Total Duration of the Project (Construction Phase) - 545 Days (18 Months)
2.8 ‘WORK DONE’ V/s ‘BALANCE WORK’
A chart showing the ‘Work Done’ since the commencement date of the Project i.e. from 16th
Nov.’2016 to
till June’18 and the ‘Balance Work’ from June’18 to till the completion by 15th May.’18 is given below in
Figure 2-3.
Monthly Progress Report June, 2018 Widening & Strengthening of Existing Carriage Way to 2 lane road for Bhadrak-Pirhat Road (0/000 Km. to 27/500 of SH-9 (Balance work)- Package OSRP-Bal-P02A)
ODISHA WORKS DEPARTMENT
Page 13 of 30
74.50%
25.50%
)00.447,67,32,79Project Cost (Rs.
Total Work Done
Balance Work
Figure 2-3: Work Done Vs Balance Work Total Cost of the Project (Construction Phase) – Rs. 79,32,67,447
2.9 FORECAST FOR NEXT MONTH-
The work programme for the July’2018 has been given by the Contractor:
Forecast for June’2018;
Sl. No.
Description (Major Items)
Unit
Quantity remaining to be Executed by end
of June'18 as per BOQ
Quantity Planned to be Executed during
July’18
(As per Contractor’s Work Programme for
Balance work of SH09)
Approx. Cost of
Work plan (Rs. in Lakh)
Remarks
1 Earthwork in Embankment
Cum 59321.06
1140.00 6.76
2 Sub grade Cum 12659.00 2816.25 19.68
3 GSB Cum 6369.39 827.85 20.33
4 WMM Cum 2711.00 0.00 0.00
5 DLC Cum 4079.70 742.80 24.85
6 PQC Cum 7666.03 1312.73 88.39
7 Concrete (M-15) Cum 2950.10 0.00 0.00
8 Hume Pipe laying LM 944.50 0.00 0.00
9 Reinforcement MT 0.94 0.00 0.00
10 Concrete (M 20/25/30/35)
Cum 275.82 0.00 0.00
11 Saucer Drain LM 9330.00 530.00 15.71
Monthly Progress Report June, 2018 Widening & Strengthening of Existing Carriage Way to 2 lane road for Bhadrak-Pirhat Road (0/000 Km. to 27/500 of SH-9 (Balance work)- Package OSRP-Bal-P02A)
ODISHA WORKS DEPARTMENT
Page 14 of 30
12 Earth filling
quadrant portion Cum 3008.00 52.35 0.13
13 Back filling Cum 332.00 10.20 0.11
14 Filter media Cum 460.00 4.95 0.08
15 Stone pitching on
embankment Cum 1731.00 62.20 1.05
16 Filter media under
stone pitching Cum 1001.00 34.40 0.20
17 Rubble stone
flooring Cum 1531.00 65.70 2.78
18 Wearing Course Sqm 4673.00 29.00 0.16
19 Painting of culvert
No. No. 122.00 8.00 0.02
20 Miscellaneous - - - 36.75
Total (a) 217.00
Total Planning (a) for July’2018
(Highway & Structure) 217.00
2.10 STATUS OF EXTENSION OF TIME
The stipulated completion date of the project is 15.05.2018, and commencement date of the project is
16.11.2016 .The Project work could not be completed with the stipulated contract period and Contractor
has applied for the EOT for the completion of balance work. The EOT is under review of the Engineer.
CHAPTER 3. FINANCIAL PERFORMANCE
Page 15 of 30
Chapter 3. Financial Performance
Financial Progress achieved up to end of June’ 2018 is furnished below;
1. Contract Price – INR 79,32,67,447.00
2. Value of work done – INR 59,10,08,476.00
3. Mobilisation Advance – INR 3,96,63,372.00
4. Total (2+3) – INR 63,06,71,848.00
5. Percentage of Financial Progress – 74.50 % (Excluding mobilization advance & escalation)
3.1 MONTH WISE FINANCIAL PROGRESS
Month wise financial progress on work proper excluding escalation and advances is furnished in below;
Table 3-1: Month wise Financial Progress
S. No.
Month
During the month Cumulative
Cost of Work
Executed
% w.r.t. Contract
Price
Cumulative Cost
of Work
% w.r.t. Con-tract Price
1 31-Oct-16 - - - -
2 30-Nov-16 39,18,931.00 0.49 39,18,931.00 0.49
3 31-Dec-16 2,41,92,243.00 3.05 2,81,11,044.00 3.54
4 31-Jan-17 3,88,21,533.00 4.89 6,69,33,510.00 8.44
5 28-Feb-17 4,54,39,923.00 5.73 11,23,72,500.00 14.17
6 31-March-17 4,47,65,381.00 5.64 15,71,37,881.00 19.81
7 30-April-17 3,86,64,318.00 4.87 19,58,02,199.00 24.68
8 31-May-17 4,02,09,841.00 5.07 23,60,12,040.00 29.75
9 30-June-17 3,24,58,680.00 4.09 26,84,70,720.00 33.84
10 31-July-17 1,75,41,550.00 2.21 28,60,12,270.00 36.05
11 31-Aug-17 2,08,83,821.00 2.63 30,68,96,091.00 38.69
12 30-Sept-17 2,74,01,652.00 3.45 33,42,97,742.00 42.14
13 31-Oct-17 2,41,30,138.00 3.04 35,84,27,880.00 45.18
14 30-Nov-17 3,39,21,460.00 4.27 39,23,49,340.00 49.46
15 31-Dec-17 3,16,73,646.00 3.99 42,40,22,986.00 53.45
16 31-Jan-18 3,69,19,475.00 4.65 46,09,42,461.00 58.11
17 28-Feb-18 3,41,51,109.00 4.30 49,50,93,570.00 62.41
18 31-March-18 4,07,76,525.00 5.14 53,58,70,095.00 67.55
19 30-April-18 3,07,36,643.00 3.87 56,66,06,738.00 71.43
20 31-May-18 2,06,07,587.00 2.60 58,72,14,325.00 74.02
21 30-June-18 37,94,151.00 0.48 59,10,08,476.00 74.50
Monthly Progress Report June, 2018 Widening & Strengthening of Existing Carriage Way to 2 lane road for Bhadrak-Pirhat Road (0/000 Km. to 27/500 of SH-9 (Balance work)- Package OSRP-Bal-P02A)
ODISHA WORKS DEPARTMENT
Page 16 of 30
3.2 MOBILIZATION ADVANCE
Item Net Amount Paid
(Rs.)
Cumulative
Amount Paid
(Rs.)
Remarks
1st Mobilisation Advance 1,98,31,686.00 1,98,31,686.00
2nd
Mobilisation Advance 1,98,31,686.00 1,98,31,686.00
Total : 3,96,63,372.00
Amount of Advance recovered up to 30th Jun.’18 (in INR): 3,96,63,372.00
Balance amount to be recovered (in INR): Nil
3.3 STATEMENT OF IPC
S. No.
IPC No.
Month
Gross Amount of IPC (Rs. In millions)
Recov-eries
Net Amount
Paid
Cumulative of Net
Amount Paid
Cumulative Gross
Amount of IPC
Value of BOQ
Item
Value of Non BOQ Item
Escala-tion
Secured Advance
Mobiliza-tion
Advance
Gross Amount
1 01 Nov.’2016 3.92 3.92 0.69 3.23 3.23 3.92
2 02 Dec.’2016 24.19 24.19 4.50 19.69 22.92 28.11
3 03 Dec.’2016 19.83 19.83 0.39 19.44 42.36 47.94
4 04 Jan.’2017 38.82 38.82 8.05 30.77 73.12 86.76
5 05 Feb.’2017 45.44 45.44 8.50 36.94 110.06 132.20
6 06 Mar.’2017 44.76 1.43 46.19 8.65 37.54 147.61 178.39
7 07 April.’2017 38.66 3.92 42.58 8.05 34.53 182.13 220.97
8 08 May’2017 40.21 40.21 10.46 29.75 211.88 261.18
9 09 June’2017 32.46 32.46 8.50 23.96 235.85 293.64
10 10 July’2017 17.54 2.14 19.68 4.66 15.02 250.86 313.32
11 11 Aug.’2017 20.88 20.88 5.02 15.86 266.73 334.20
12 12 Sept.’2017 27.4 27.4 6.54 20.86 287.58 361.60
13 13 Oct.’2017 24.13 24.13 5.77 18.36 305.95 385.73
14 14 Nov.’2017 33.92 33.92 7.66 26.26 332.21 419.65
15 15 Nov.’2017 19.83 19.83 0.39 19.44 351.64 439.48
16 16 Dec.’2017 31.67 31.67 4.51 27.16 378.80 471.15
17 17 Jan.’2018 36.91 5.15 42.06 5.62 36.44 415.24 513.21
18 18 Feb.’2018 34.15 34.15 4.74 29.41 444.65 547.36
19 19 Mar.’2018 40.78 40.78 5.74 35.04 479.69 588.14
20 20 April.’2018 30.74 7.06 37.80 5.15 32.65 512.34 625.94
21 21 May.’2018 14.75 14.75 2.66 12.08 524.42 640.69
22 22 Jun.’2018 Bill not claimed by contractor for the month of June’2018
CHAPTER 4. STATUS OF RISK
Page 17 of 30
Chapter 4. Status of Risk
4.1 HANDING OVER OF SECTION
As stipulated in the Contract, Section-1 & 2 of the road (SH9) has been handed over to the Contractor
on 20.10.2016 & on 10.0.2017 respectively. The Contractor had to examine it and inform the Employ-
er the details of encumbrances at site if any within two weeks of the handing over.
Contractor has informed regarding the encumbrances, which after the scrutiny, Engineer has submit-
ted it to PMU.
4.2 STATUS OF UTILITY SHIFTING
Section Name
Encumbrances
(Within the Roadway)
Number Existing till last Month
Number
Removed During June’18
Balance
Remained for Removal
Section-I
Trees (upto 6m) 02 0 02
Trees (upto 6-7m) 0 0 0
Electric poles 0 0 0
R&R 01 0 01
Section-II
Trees (6m) 0 0 0
Trees (upto 6-7m) 2 0 2
Electric poles 13 0 13
R&R 01 0 01
Total
Trees (6m) 02 0 02
Trees (upto 6-7m) 2 0 2
Electric poles 13 0 13
R&R 02 0 02
Note:- *As instructed by PMU, Telephone poles can be removed by Contractor immediately dur-ing or before the execution of work. Therefore Telephone Poles no longer remains the en-cumbrances.
The status of utilities and encumbrances are appended as Appendix-4
4.3 ANY OTHER ISSUE;-
The ‘Contract Agreement was signed on 07th Oct.’2016 for the balance work of Bhadrak-
Pirhat section of SH9. The work programme was prepared and submitted by the Contrac-
tor for the month of Nov.’16 to August’18.
The work planned for June’18 was for Rs. 2.14Cr. While, the achieved work done is Rs. 0.37 Cr. (with a short fall is Rs. 1.77 Cr.). The Contractor could not achieve the planned progress as per work programme given in June’18 mainly due to rains, water logging of borrow areas of soil and moorum, shortage in procurement of materials due to inaccessi-bility of the approach roads to borrow areas, shortage of labour gangs etc. This has af-fected the construction of SG, GSB and DLC layers. The PQC work has also suffered dur-ing the month due to the unseasonal rains.
4.4 RISK INVOLVED
The progress has been slow during the month mainly due to the rains. This will further delay the completion of work.
CHAPTER 5. ENVIRONMENTAL MONITORING AND SAFETY
Page 18 of 30
Chapter 5. Environmental Monitoring and Safety
5.1 ENVIRONMENT MANAGEMENT PLAN
S. No.
Environmental
Issue/ Aspect Management Measures
1 Tree Cutting Tree cutting is being done by the forest department along with a
NGO.
2
Joint Field Verification The Contractor and Engineer has to carry out joint field verification to ascertain the possibility of saving Environment and Community re-sources and for finding any environment and safety issues during work;
The Joint Field Verification was done on 10.03.2016.
3 Location and Installation of Crushers, Hot Mix Plants and Batching Plants
The Contractor has submitted Consent to Operate (CTO) from OSPCB but not submitted yet the Consent to Establish (CTE) from OSPCB for Batching Plants 1 and 2 of SH-09 Camp.
4 Construction Camp(s) – Selection, Design and Lay-out
Contractor has submitted his proposed location plan of base camp at SH-09 and approval has been accorded as per the requirement of Environment Management Plan (EMP) by the Engineer.
5
Construction Vehicles, Equipment and Machinery
The Contractor shall maintain a record of Pollution under control (PUC) certificates for all vehicles at site office:-
PUC certificates of some of the construction vehicles, equipment and machineries have been submitted to Engineer.
6
Identification, Operation and Rehabilitation of Bor-row Areas
The Contractor had identified soil borrow area no.s 1 & 2 in village Kamaria at Ch. 20+800 (RHS) of SH-09 and submitted documents to Engineer for approval of Borrow Areas At present, the borrow areas are closed and rehabilitation works have also been done.
7 Identification, Operation and Rehabilitation of Stone Quarry
The Contractor has not obtained lease of stone quarry. Aggregate is being procured through private suppliers from stone quarries at Chandikhole.
8 Identification, and Opera-tion of Sand Quarry
The Contractor has not obtained lease of sand quarry. Sand is being procured from third party supplier.
9
Arrangement for Construc-tion Water
As per the Central Ground Water Authority (CGWA) guidelines, there are two categories of area. (i) Notified area and (ii) Non-notified area. For notified areas, permission/approval is required while for non-notified areas only NOC is required for abstraction of ground water more than 100 m
3/day. Now this location comes under non-notified
area. Therefore permission/approval for extraction may not be re-quired. Also as the extraction quantity is less than 100 m
3/day. There-
fore NOC is also not required as per previous notification. But as per new notification published by CGWA, NOC is required also as the extraction quantity is less than 100 m
3/day. The Contractor has yet to
obtained NOC.
10 Clearing and Grubbing Only ground cover necessary for works is being removed.
11
Stripping, Stacking and Preservation of Top Soil
Top soil had been stacked and preserved at construction and borrow area site during operation.
The exhausted borrow areas are closed, rehabilitation works have been done.
12 Labour Camp Management Contractor shall submit the location, lay-out, basic facilities of labour
camp:-
Contractor has hired the labour shelters/dwelling units outside the
Monthly Progress Report June, 2018 Widening & Strengthening of Existing Carriage Way to 2 lane road for Bhadrak-Pirhat Road (0/000 Km. to 27/500 of SH-9 (Balance work)- Package OSRP-Bal-P02A)
ODISHA WORKS DEPARTMENT
Page 19 of 30
S. No.
Environmental
Issue/ Aspect Management Measures
base camp at Ch. 15+800 (SH-09) for labourers with basic amenities
The potable water is being providing by Contractor in office, laborato-ry and camp area.
Provision of toilets/mobile toilets separate for women with sewage system and adequate water supply:-
Toilets have been constructed at base camp but not at site. These are being cleaned up regularly. Sewage system also being cleaned up.
13
Transportation of Construc-tion Materials and Haul Road Management
Vehicles shall be covered during transportation of materials and main-tained haul roads:-
Vehicles are not covered most of the times during transportation of construction materials. Though haul roads is being maintained during transportation at camp area of SH-09.
14
Worksite Safety Manage-ment
Work site proper safety management shall be arranged:-
Though safety arrangements have been done at site, it needs to be improved further.
Temporary diversion has to be arranged: - Diversion has been ar-ranged at site wherever it is required.
Traffic safety has to be arranged as per Traffic Management Plan:- The Contractor has arranged traffic safety as per submitted Traffic Management Plan.
Adequate PPEs to be provided to labourers and warning signage to be installed in high risk area:-
PPEs have been provided to labourers and implemented but its im-plementation needs to be improved, warning signages are inadequate in high risk area.
Precautions for electrical cables, wires and equipments:-
The Contractor has taken precautions for electrical cables, wires and equipment at base camp SH-09.
Readily available first aid kits:- The contractor has arranged first aid box at base camp’s office, laboratory and at store room of SH-09.
The Contractor shall take precautions to prevent danger due to mis-hap:- The Contractor has yet to be submitted the Construction Safety Plan for its implementation at site.
15
Accessibility The Contractor has to provide safe convenient passage for affected road side users:-
No obstruction reported from road side users.
16 Disruption to Other Users of Water
The Contractor shall not obstruct water bodies:-
No obstruction reported.
17 Labour Requirements Local labours shall be employed preferably:-
Local labourers are engaged for construction work.
18
Pollution Management Pollution management has to be done in conformance with EMP:-
Dust suppression measures needs to be applied during the construc-tion activities;
Water sprinkling is being done at site regularly two to three times in a day. No dust emission has been reported in this month during con-struction activities.
Pollution monitoring has yet to be scheduled half yearly by Contractor through a NABL accredited agency.
Waste will not be released into water bodies and drainage systems:-
No waste water is being discharged directly into the water bodies.
Dispose the fuel, lubricants and chemical wastes as per guidelines of
Monthly Progress Report June, 2018 Widening & Strengthening of Existing Carriage Way to 2 lane road for Bhadrak-Pirhat Road (0/000 Km. to 27/500 of SH-9 (Balance work)- Package OSRP-Bal-P02A)
ODISHA WORKS DEPARTMENT
Page 20 of 30
S. No.
Environmental
Issue/ Aspect Management Measures
SPCB/MoEF:-
Used and waste oil has to be disposed off through authorised recy-cler. The used and waste oil generates in very less quantity. Though the Contractor has identified the authorised recycler. The Contractor so far has stocked the waste oil at base camp at SH09.
Noise level shall be maintained of all construction vehicles, machiner-ies and equipment:-
The Contractor has maintained vehicles, machineries and equipments and obtained PUC certificates of some of the vehicles and machiner-ies.
19
Drainage and Flood Con-trol.
Pre monsoon activities have to be done:-
Contractor has cleaned up the channels wherever it is required before onset of monsoon.
20 Slope Protection and Con-trol of Soil Erosion
Slopes have to be protected with stone pitching and grass:-
Slope protection work has not started yet.
21
Waste Management
Contractor has yet to identify waste disposal sites:-
Separate garbage bins for garbage collection in camp area, office and laboratory have been provided.
Contractor has yet to identify site for bio-degradable waste disposal at SH-09 camp area.
For non-bio-degradable waste disposal, Contractor has identified the authorised recycler. The Contractor so far has stocked the waste oil at base camp at SH09.
22 Chance Found Archaeo-logical Property.
No archaeological property has been found at site.
23
Demobilisation and De-commissioning.
The Contractor shall clean up the area or temporary structures after completion of work as per the approved waste management plan:-
Demobilisation and Decommissioning has not started as project is in progress.
5.2 ROAD SAFETY
Though, barricading with bamboos and sand bags with reflective sticker and caution tape at site is
being done, but hard barricading and more sign boards are required in construction zones in con-
formance with codes & specifications.
Helmets, safety jackets, safety shoes, gumboot, nose mask and goggles etc. have been provided to
the workers but, these are required to be used regularly and adequately during construction activities.
CHAPTER 6. VARIATION AND CHANGES
Page 21 of 30
Chapter 6. Variation and Changes
6.1 SUMMARY OF CHANGE ORDER
The commencement date of the project is 16.11.2016. While, the following variation/change orders
have been initiated so far, details of these are being tabulated here as under;
Page 22 of 30
Summary of Change Request
Impact on Contract Cost (in Cr.)
Effect of this Change Cumulative Effect of Changes till
previous Request Cumulative Effect of Changes
after this Request
Approximate Cost
(Rs. in Cr.)
% of increase/ Decrease on
Contract Amount
Cost (Rs. in Cr.)
% of Increase/ De-crease on Contract
Amount
Cumulative Cost after
this Change
% of increase/ Decrease on
Contract Amount
(Change Request No. 01) Change in Span arrangement to size 2/33/0 of minor bridge at Ch. 1+759
-0.11 -0.14% 0.00 0.00% -0.11 -0.14%
(Change Request No. 02) New Item
(i) Maintenance of road with BUSG 0.30 0.38%
-0.11 -0.14% 0.32 0.40% (ii) Item 4.03, Close Graded Premix Mixed Seal Surfacing
0.13 0.16%
(Change Request No. 03) New Item Subgrade Construction (With Granite Stone Dust )
0.45 0.56% 0.32 0.40% 0.77 0.97%
(Change Request No. 04) New Item Subgrade Construction (With Granite Stone Dust )
0.38 0.48% 0.77 0.97% 1.15 1.44%
(Change Request No. 05)
Construction of 4-lane road from Ch. 0+000 to Ch. 0+620
1.31 1.65% -8.74 -11.02% -7.43 -9.37%
(Change Request No. 06)
Construction of 4-lane from SH-09 to Bhadrak town 390 m. and 878 m. towards NH-16
8.14 10.26% -7.43 -9.37% 0.71 0.89%
Monthly Progress Report June, 2018 Widening & Strengthening of Existing Carriage Way to 2 lane road for Bhadrak-Pirhat Road (0/000 Km. to 27/500 of SH-9 (Balance work)- Package OSRP-Bal-P02A)
ODISHA WORKS DEPARTMENT
Page 23 of 30
Summary of Variation Order
S. No. Item No. Description of Item Unit BOQ Qty. Variation Qty. Revise
BOQ Qty.
BOQ
Amount
Revise BOQ
Amount
Variation
Qty.
(%)
Variation
Amount
(%)
1
New Item No.1
Maintenance of road with BUSG
Sqm. Nil 11710.27 11710.27 Nil 30,39,989 100 0.38
4.03 Close graded pre-
mix mixed seal sur-facing
Sqm 12718.00 6386.61 19104.61 2154429.20 3236320.20 50.22 0.14
2
9.08(i) With new material
(Thickness 150mm.) Cum 2500 3696.78 6196.78 3811500.00 9447612.00 147.87 0.71
9.08(ii)
With salvaged mate-rial obtain from dis-mantling roadway and /or diversion
(Thickness 150mm.)
Cum 2500 325.21 2825.21 317625.00 358943.00 13.01 0.01
Cost of Change (Revised BOQ Amount – BOQ Amount) 97,99,307.00
Total % over Contract Amount for all proposals 1.24%
CHAPTER 7. QUALITY CONTROL AND QUALITY ASSURANCE
Page 24 of 30
Chapter 7. Quality Control and Quality Assurance
7.1 TESTS CONDUCTED
Following tests both at site and at Laboratory have been conducted during the month to ensure Quality
Control and Quality Assurance.
S. No.
Description of Tests Conducted
Number of Tests Conducted
No. of NCR Remedial measure adopted
A SOIL
1 MDD and OMC 01 Nil -
2 LL PI 01 Nil -
3 GSA 01 Nil -
4 FSI 01 09 -
5 CBR 00 Nil -
B FDD
1 Embankment control Tests
20 Nil -
2 Tests in Sub grade 40 Nil -
3 Tests in GSB 06 Nil -
4 Tests in DLC 06 Nil -
C AGGREGATE
C.A. (Gradation) 15 Nil -
F.A. (Gradation) 15 Nil -
AIV. 04 Nil -
FI 04 Nil -
D CEMENT
Fineness 01 Nil -
Normal consistency 01 Nil -
Initial & Final setting time
01 Nil -
Mortar Cube -
3 Days 01 Nil -
7 Days 01 Nil -
28 Days 01 Nil -
E CONCRETE CUBE TEST.
M40 (PQC)
7 Days 10 (Sets) Nil -
28 Days 28 (Sets) Nil -
M40 (RCC)
7 Days 0 (Sets) Nil
28 Days 0 (Sets) Nil
Monthly Progress Report June, 2018 Widening & Strengthening of Existing Carriage Way to 2 lane road for Bhadrak-Pirhat Road (0/000 Km. to 27/500 of SH-9 (Balance work)- Package OSRP-Bal-P02A)
ODISHA WORKS DEPARTMENT
Page 25 of 30
M35
7 Days 0 (Sets) Nil
28 Days 0 (Sets) Nil
M25
7 Days 03 (Sets) - -
28 Days 13 (Sets) - -
Beam (PQC)
7 Days 10 (Sets) Nil -
28 Days 28 (Sets) Nil -
M15
7 Days 0 (Sets) Nil -
28 Days 03 (Sets) Nil -
DLC
3 Days 05 (Sets) Nil -
7 Days 08 (Sets) Nil -
M20 (PCC)
7 Days 0 (Sets) Nil -
28 Days 06 (Sets) Nil -
CHAPTER 8. MOBILISATION
Page 26 of 30
Chapter 8. Mobilization
8.1 CONSULTANT’S TEAM
The staff mobilization is being done in consultation with Employer as per the project requirement con-
sidering the mobilization of the Contractor. The following table depicts the staff mobilization as on
date.
S. No.
Designation Name Joining Date
1. Resident Engineer Mr. Raju Mathur 01-Mar-15
2. Quantity Surveyor Mr. Brajesh Kumar 01-Mar-15
3. Highway Engineer Mr. K. Suresh 06-Mar-17
4. Bridge Engineer Mr. Satyaranjan Jati 06-April-15
5. Material Engineer Mr. K.K. Sengupta 15-June-16
6. Environment And Safety Expert - -
7. Asst. Quantity Surveyor Mr. Manas Kumar Pradhan 07-Nov-16
8. Asst. Highway Engineer-1 Mr. Suneel Kumar Dubey 01-Nov-16
9. Asst. Bridge Engineer Mr. Bappa Bose 16-Mar-15
10. Asst. Material-cum-Quality Engineer-2 Mr. Ajitesh Chandra Sinha 01-Mar-15
11. Asst. Surveyor-1 Mr. Ashwani Catter 01-Nov-16
12. Office Manager-cum-Accountant-1 Mr. Abhishek Ghosh 01-Mar-15
13. Computer Operator-cum-Office Assistant-1 Mr. Santosh Kumar 16-Mar-15
14. Office Attendant/Watchman Mr. Sanjeet Kumar Pani 16-Mar-15
8.2 CONTRACTOR’S PROPOSED TEAM
The Contractor has mobilized the following key personnels.
S. No. Designation Name
1 Project Manager Mr. P.R. Das
2 Highway Engineer Mr. M. Parida
3 Bridge Engineer Mr. Ranjan Kumar
4 Material Engineer Mr. S. Pattanayk
5 Quantity Surveyor Mr. Nrusingh Sethy
6 Equipment And Maintenance Engineer TBN
7 Environment And Safety Manager Mr. Ashish Kumar Samal
Monthly Progress Report June, 2018 Widening & Strengthening of Existing Carriage Way to 2 lane road for Bhadrak-Pirhat Road (0/000 Km. to 27/500 of SH-9 (Balance work)- Package OSRP-Bal-P02A)
ODISHA WORKS DEPARTMENT
Page 27 of 30
8.3 STATUS OF PLANT AND EQUIPMENT OF CONTRACTOR
S. No.
Description of Equipment/Plant
Min. No.s as per
Contract
No.s Mobilized Remarks
Own Hired
1 Motor Grader 1 1 - Mobilized at site on
18.11.2016
2 Hydraulic Excavator 2 2 -
3 Transit Mixer 8 5 -
4 Front end Loader 3 0 -
5 Dozer 1 0 -
6 Tipper 20 20
Availability of no.s of Tippers are vary-
ing day to day as per site require-
ment.
7 Soil compactor 1 1 -
8 JCB 3 2 -
9 Water tanker 5 4 -
10 Tractor - 1 -
11 Hydra Crane - - 0
12 Needle Vibrator - 2
13 Concrete Pump 1 - -
14 Slip from Paver(CP500) - - -
15 Mobile batching cum transit mixture
- - -
16 Tandem Roller - 0 -
Plants
17 Concrete Batch-mix Plant 1 2 -
One no. commis-sioning done on
dated 25.11.2016 & second on 24.02.2017
18 Cone Crushing Unit 1 1 -
Commissioning done in March’2017
at Chadaidhara near Chandikhole
The following survey equipment is available at site;
S. No. Name of the equipment Quantity (Nos.)
1 Total Station 1
2 Auto Level 4
CHAPTER 9. VISITS AND MEETINGS
Page 28 of 30
Chapter 9. Visits and Meetings
A progress review meeting was held on 14.06.2018 by Resident Engineer at CSC office with
the Managing Partner and Project Manager of Contractor.
A routine review meeting was held on 28.06.2018 by Resident Engineer at base Camp of the
project with the Managing Partner and Project Manager of Contractor.
On 30.06.2018 a review meeting was taken by the Hon’ble EIC-CUM-Secretary. CE (DPI &
Roads), SE (R&B) Works Department, EE (PMU), TL and Resident Engineer (CSC) & Contrac-
tor’s Managing Partner attended the meeting.
CHAPTER 10. IMPORTANT CORRESPONDENCE DURING THE
MONTH
Page 29 of 30
Chapter 10. Important Correspondences during the Month
10.1 SUBMISSIONS AND APPROVALS
Monthly Progress Report for May’2018 was submitted on 5th June’2018.
10.2 CORRESPONDENCES
03 numbers of letters were received from the Contractor during the month. Similarly 03
numbers of letters was received from PMU and 03 numbers have been replied to. Details
are appended as Appendix-3.
CHAPTER 11. WEATHER DURING THE MONTH
Page 30 of 30
Chapter 11. Weather during the Month
Following is the status of weather details recorded at laboratory during the month;
S. No.
Date Maximum
Temp °C
Minimum Temp °C
Maximum
Humidity
(%)
Minimum Humidity
(%)
Rain Fall (mm)
Remarks
1 01-Jun-18 37.3 29.5 90 55 25.20
2 02-Jun-18 36.2 29.8 82 58 0.00
3 03-Jun-18 37.0 30.6 84 63 0.00
4 04-Jun-18 38.8 32.1 82 50 0.00
5 05-Jun-18 36.1 31.6 86 61 5.00
6 06-Jun-18 36.5 30.6 89 62 45.50
7 07-Jun-18 37.4 31.2 87 61 0.00
8 08-Jun-18 38.6 29.2 90 58 72.20
9 09-Jun-18 33.1 29.5 92 78 8.40
10 10-Jun-18 35.8 30.3 93 70 5.20
11 11-Jun-18 35.9 30.8 88 66 0.00
12 12-Jun-18 31.5 28.7 97 77 26.00
13 13-Jun-18 31.4 28.2 97 74 0.00
14 14-Jun-18 33.4 28.9 93 71 0.00
15 15-Jun-18 38.5 29.7 92 56 0.00
16 16-Jun-18 39.9 30.3 90 47 0.00
17 17-Jun-18 40.5 33.2 67 42 0.00
18 18-Jun-18 41.1 33.2 63 41 0.00
19 19-Jun-18 41.2 33.8 74 42 0.00
20 20-Jun-18 41.3 33.3 76 43 15.40
21 21-Jun-18 38.1 29 88 60 115.80
22 22-Jun-18 35.8 30.7 90 67 0.00
23 23-Jun-18 35.1 29.4 89 70 0.00
24 24-Jun-18 32.5 29.2 97 82 0.00
25 25-Jun-18 30.8 27.2 99 86 95.00
26 26-Jun-18 30.1 27.1 99 89 15.80
27 27-Jun-18 30.4 27.5 99 92 18.60
28 28-Jun-18 32.6 28.8 95 81 15.30
29 29-Jun-18 33.9 28.4 93 71 19.80
30 30-Jun-18 36.4 29.8 90 66 0.00
APPENDIX
Appendix 1: Strip Chart of Highway
SAUCER DRAIN 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
SHOULDER
BC/PQC 1
DBM/DLC 1
WMM. 1 1 1 1 1
GSB
SUB.
EMB./EXC
0+
01
5
0+
10
0
0+
20
0
0+
30
0
0+
40
0
0+
50
0
0+
62
0
0+
70
0
0+
80
0
0+
90
0
1+
00
0
1+
01
5
1+
10
0
1+
20
0
1+
30
0
1+
40
0
1+
50
0
1+
60
0
1+
67
0
1+
75
5
1+
80
0
1+
84
0
2+
00
0
2+
10
0
2+
20
0
2+
30
0
2+
40
0
2+
50
0
2+
50
7
2+
60
0
2+
70
0
2+
80
0
2+
86
5
2+
90
0
3+
00
0
3+
10
0
3+
15
0
3+
25
0
3+
35
0
3+
50
0
3+
60
0
3+
70
0
3+
80
0
3+
90
0
4+
00
0
4+
10
0
4+
20
0
4+
30
0
4+
35
0
4+
40
0
4+
50
0
4+
60
0
4+
70
0
4+
80
0
4+
90
0
4+
94
0
5+
00
0
EMB./EXC 1
SUB. 1
GSB 1
WMM. 1 1 1 1 1
DBM/DLC 1
BC/PQC 1
SHOULDER
SAUCER DRAIN
SAUCER DRAIN
SHOULDER
BC/PQC
DBM/DLC
WMM.
GSB
SUB.
EMB./EXC
5+
00
0
5+
10
0
5+
20
0
5+
30
0
5+
40
0
5+
50
0
5+
60
0
5+
70
0
5+
80
0
5+
85
0
6+
00
0
6+
10
0
6+
10
0
6+
20
0
6+
30
0
6+
40
0
6+
45
3
6+
50
0
6+
60
0
6+
70
0
6+
80
0
6+
90
0
7+
01
0
7+
11
0
7+
21
0
7+
31
0
7+
41
0
7+
51
0
7+
61
0
7+
71
0
7+
81
0
7+
91
0
7+
95
3
8+
01
0
8+
11
0
8+
21
0
8+
30
0
8+
40
0
8+
50
0
8+
60
0
8+
70
0
8+
72
0
8+
80
0
8+
90
0
8+
94
5
9+
00
0
9+
02
7
9+
10
0
9+
16
5
9+
20
0
9+
25
5
9+
30
0
9+
40
0
9+
50
0
9+
56
7
9+
60
0
9+
70
0
9+
80
0
9+
85
0
9+
86
8
10
+0
00
EMB./EXC
SUB.
GSB
WMM.
DBM/DLC
BC/PQC
SHOULDER
SAUCER DRAIN
LEGENDS:
BO
X C
EL
L
BO
X T
YP
E B
RID
GE
BO
X T
YP
E B
RID
GE
HP
CU
LV
ER
T
3+
86
2
HP
CU
LV
ER
T
HP
CU
LV
ER
T
BO
X T
YP
E B
RID
GE
UPTO DBM UPTO DBM
SIN
GL
E R
OW
(1
.0 M
Dia
)
1X
3 M
UPTO BC UPTO WMM
3+
24
1
SL
AB
CU
LV
ER
T
BO
X T
YP
E B
RID
GE
TR
IPL
E R
OW
(1.0
M
Dia
)(1
.0 M
Dia
)
TR
IPL
E R
OW
(1.0
M
Dia
)(1
.0 M
Dia
)
Chainage
ICCHAPUR
BUILT UP
(FLEXIBLE)
RHS
SUB. Compltd
GSB compltd
RE
HA
BL
ITA
ION
TR
IPL
E R
OW
(1.0
M
Dia
)(1
.0 M
Dia
)
Chainage
HP
CU
LV
ER
T
RE
HA
BL
ITA
ION
DBM compltd PQC
BC compltd In Progress
LHS
BHADRAK PIRHAT
2X
8M
3X
8M
LAYER CHART (SH-09) (FROM KM. 0+000 TO KM. 10+000)
Village Name
Section
SALANDI BYPASS COLONY
BUILT UP (RIGID)
Section III Section II Section I(Handed Over)
Dated: 30.06.2018
UPTO DBM UPTO DBM UPTO WMM
1/2
3
3\3
3
3\3
3
Construction for Widening & Strengthening of Existing Carriageway to 2-Lane Road from bhadrak to Pirhat
(Km. 0/000 to Km. 27/500 of SH-09) (Balance Works) OSRP-CW-P02A
LHS
Major Junction CH-0+000 (Y-Type) Minor Junction CH-3+900 RHS (Y-Type)
Major Junction CH-6+500 LHS (Y-Type)
To be started
BO
X T
YP
E B
RID
GE
RE
HA
BL
ITA
ION
FIF
TE
EN
R(1
.0 M
Dia
)
1X
6 M
DO
UB
LE
RO
W(1
.0 M
RE
HA
BL
ITA
ION
3\3
3
In Progress
EMB./EXC compltd WMM.compltd DLC
To be started
Village Name
UPTO WMM
In Progress SAUCER DRAIN
UPTO WMM UPTO WMMUPTO DBM UPTO WMM
UPTO DBM UPTO WMM
UPTO WMM
RHS
Structure Shoulder
BARIK CHAKA
BUILT UP (FLEXIBLE)
Section Section I(Handed Over)
HP
CU
LV
ER
TS
ING
LE
RO
W (
1.0
M
Dia
)
HP
CU
LV
ER
T
BO
X C
EL
L
HP
CU
LV
ER
T
BO
X C
EL
L
1\2
3
UPTO DBM UPTO WMM
Compltd Compltd
Completed
BO
X C
EL
L
To be started
DOLOSAHI
BUILT UP (RIGID)
1\6
3
DO
UB
LE
RO
W(1
.0 M
Dia
) H
P C
UL
VE
RT
PIRHAT
SAUCER DRAIN
SHOULDER
BC/PQC 1/23 1 1
DBM/DLC
WMM. 1 1
GSB 1 1
SUB.
EMB./EXC
10
+0
00
10
+1
00
10
+2
27
10
+2
27
10
+3
00
10
+4
00
10
+5
00
10
+6
00
10
+7
00
10
+8
00
10
+9
10
11
+0
00
11
+1
00
11
+2
00
11
+3
00
11
+4
00
11
+5
00
11
+6
00
11
+7
00
11
+8
00
11
+9
00
12
+0
00
12
+1
00
12
+2
00
12
+3
00
12
+4
00
12
+5
00
12
+6
00
12
+7
00
12
+8
00
12
+8
96
12
+9
00
12
+9
30
13
+0
00
13
+1
00
13
+2
00
13
+3
00
13
+4
00
13
+5
00
13
+6
00
13
+7
00
13
+8
00
13
+9
00
14
+0
00
14
+0
50
14
+2
10
14
+3
00
14
+4
00
14
+4
50
14
+5
00
14
+6
00
14
+7
30
14
+7
84
14
+8
00
14
+8
40
15
+0
00
EMB./EXC 1
SUB. 1
GSB 1
WMM. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
DBM/DLC 1
BC/PQC 1 1
SHOULDER
SAUCER DRAIN
SAUCER DRAIN
SHOULDER
BC/PQC
DBM/DLC
WMM.
GSB
SUB.
EMB./EXC
15
+0
00
15
+0
80
15
+1
42
15
+1
90
15
+2
80
15
+3
52
15
+4
00
15
+4
88
15
+5
00
15
+6
00
15
+7
00
15
+7
00
15
+7
35
15
+8
00
15
+8
33
15
+9
00
16
+0
00
16
+0
50
16
+1
00
16
+3
00
16
+4
00
16
+5
00
16
+5
03
16
+6
00
16
+7
00
16
+7
15
16
+8
00
16
+9
00
16
+9
90
17
+0
60
17
+1
00
17
+2
00
17
+3
00
17
+4
00
17
+5
00
17
+6
00
17
+6
48
17
+7
00
17
+8
00
17
+9
00
17
+9
11
18
+0
00
18
+1
00
18
+1
77
18
+2
00
18
+3
00
18
+4
00
18
+5
00
18
+6
00
18
+6
09
18
+7
00
18
+8
00
18
+9
00
19
+0
00
19
+0
79
19
+2
00
19
+3
00
19
+3
50
19
+4
00
19
+5
00
19
+6
00
19
+7
00
19
+8
40
19
+8
70
19
+9
00
20
+0
00
EMB./EXC
SUB.
GSB
WMM. 1 1 1 1 1 1 1 1 1 1 1 2 1 1 1 1 1 1 1 1 1 1 2 1 1 1 1 1 1 1 1 1
DBM/DLC
BC/PQC 1
SHOULDER
SAUCER DRAIN
LEGENDS:
Construction for Widening & Strengthening of Existing Carriageway to 2-Lane Road from bhadrak to Pirhat
(Km. 0/000 to Km. 27/500 of SH-09) (Balance Works) OSRP-CW-P02A
BO
X C
EL
L
1\4
3
1\3
3
Minor Junction CH-12+235 LHS (T-Type)
TIHIDI
BUILT UP (RIGID)
Section III
FIV
E R
OW
(1.0
M
Dia
)
1\3
3
TE
N R
OW
(1.0
M
Dia
)
1\2
2
FIV
E R
OW
(1.0
M
Dia
)
Chainage
Chainage
BO
X C
EL
L
Section
RHS
Village Name
Structure Shoulder
BO
X C
EL
L
1\2
2B
OX
CE
LL
1\4
3
Dated: 30.06.2018
Minor Junction CH-17+658 RHS (T-Type)
FIV
E R
OW
(1.0
M
Dia
)
BO
X C
EL
L
Minor Junction CH-18+425
RHS (T-Type)
Minor Junction CH-19+376
RHS (T-Type)
SH-09 BASE CAMP (15+465 LHS)
UPTO WMM UPTO DBM UPTO WMM
BO
X C
EL
L
BO
X T
YP
E B
RID
GE
RHS
GSB compltd
1\2
2
1\2
3
1\2
2
1\2
2
SUB. Compltd
11
+1
10
1\4
3
11
+5
02
12
+3
65
FIV
E R
OW
(1.0
M
Dia
)H
P C
UL
VE
RT
Minor Junction CH-16+417 RHS (Y-Type)
1\2
3
SAUCER DRAIN
To be started
LHS
TE
N R
OW
(1.0
M
Dia
)
1\2
2
3\3
3
UPTO WMM
BHADRAK
1\2
2
UPTO DBM UPTO WMM
Village Name
UPTO WMM
LAYER CHART (SH-09) (FROM KM. 10+000 TO KM. 20+000)
Re-AlignmentDOLOSAH
I
BUILT UP
Section III Section I(Handed Over)
ALINAGAR & KUDANGO
NANDAP
UR
Section Section I(Handed Over) Section II(Handed Over)
13
+6
20
13
+1
05
BO
X C
EL
L
BO
X C
EL
L
BO
X C
EL
L
Section I(Handed Over)
CompltdIn Progress
UPTO WMM
UPTO WMM
UPTO DBM
UPTO DBM
BO
X C
EL
L
HP
CU
LV
ER
T
BO
X C
EL
L
BO
X C
EL
L
HP
CU
LV
ER
T
HP
CU
LV
ER
T
BO
X C
EL
L
BO
X C
EL
L
HP
CU
LV
ER
T
HP
CU
LV
ER
T
UPTO WMM
1\4
3
1\4
3
Section II(Handed Over)
BO
X C
EL
L
HP
CU
LV
ER
T
HP
CU
LV
ER
T
FIV
E R
OW
(1.0
M
FIV
E R
OW
(1.0
M
Dia
)
KOLHA
BUILT UP
(RIGID)
To be startedBC compltd In Progress To be started
LHS
Compltd
EMB./EXC compltd WMM.compltd DLC
BO
X C
EL
L
Structure
In ProgressCompleted
DBM compltd PQC
SAUCER DRAIN
SHOULDER
BC/PQC 1 1 1 1 1 1 1
DBM/DLC
WMM. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
GSB
SUB.
EMB./EXC
20+
000
20+
100
20+
127
20+
200
20+
300
20+
347
20+
400
20+
500
20+
600
20+
673
20+
700
20+
800
20+
900
21+
000
21+
057
21+
100
21+
200
21+
218
21+
300
21+
400
21+
490
21+
500
21+
600
21+
700
21+
800
21+
811
21+
900
22+
000
22+
100
22+
200
22+
300
22+
400
22+
500
22+
552
22+
600
22+
700
22+
800
22+
900
23+
000
23+
100
23+
200
23+
223
23+
300
23+
400
23+
500
23+
600
23+
700
23+
800
23+
900
24+
000
24+
080
24+
100
24+
200
24+
300
24+
450
24+
460
24+
500
24+
600
24+
700
24+
753
24+
800
24+
900
25+
000
EMB./EXC
SUB.
GSB
WMM. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
DBM/DLC
BC/PQC
SHOULDER
SAUCER DRAIN
SAUCER DRAIN
SHOULDER
BC/PQC
DBM/DLC
WMM. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
GSB
SUB.
EMB./EXC
25+
000
25+
100
25+
200
25+
231
25+
300
25+
400
25+
425
25+
500
25+
541
25+
600
25+
700
25+
800
25+
900
26+
000
26+
100
26+
200
26+
300
26+
400
26+
500
26+
550
26+
600
26+
700
26+
800
26+
900
27+
000
27+
100
27+
200
27+
300
27+
400
27+
500
EMB./EXC
SUB.
GSB
WMM. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
DBM/DLC
BC/PQC
SHOULDER
SAUCER DRAIN
LEGENDS:
To be started
Section II(Handed Over)
Minor Junction CH-24+600
(Cross-Type)
To be started
Minor Junction CH-23+252
LHS (T-Type)
1\2
2
Structure Shoulder
In Progress
DBM compltd PQC
SAUCER DRAIN
Compltd
Chainage
Minor Junction CH-21+420
LHS (T-Type)
RHS
MIN
OR
B
RID
GE
To be started
WMM.compltd DLC
BO
X C
EL
L
In Progress
SUB. Compltd In Progress
GSB compltd
EMB./EXC compltd
BC compltd
HP
CU
LV
ER
T
Minor Junction CH-21+990
RHS (T-Type)
Compltd
Village Name
PIRAHAT
BUILT UP (RIGID)
HP
CU
LV
ER
T
HP
CU
LV
ER
T
HP
CU
LV
ER
T
Dated: 30.06.2018 LAYER CHART (SH-09) (FROM KM. 20+000 TO KM. 27+500)
KAMERIA
BUILT UP (RIGID)
1\2
2
FIV
E R
OW
(1.0
M D
ia)
FIV
E R
OW
(1.0
M D
ia)
FIV
E R
OW
(1.0
M D
ia)
Section Section II(Handed Over)
1\2
2
1\2
2
HP
5 R
OW
1\4
3
BINDHA
BUILT UP (RIGID)
BO
X C
EL
L
BO
X C
EL
L
BO
X C
EL
L
BO
X C
EL
L
HP
CU
LV
ER
T
BO
X C
EL
L
FIV
E R
OW
(1.0
M D
ia)
FIV
E R
OW
(1.0
M D
ia)
TW
O R
OW
(1.0
M D
ia)
Completed
Construction for Widening & Strengthening of Existing Carriageway to 2-Lane Road from bhadrak to Pirhat
(Km. 0/000 to Km. 27/500 of SH-09) (Balance Works) OSRP-CW-P02A
TE
N R
OW
(1.0
M
Dia
)1.0
M D
ia)
PIRHAT
Village Name
Section
1\2
2
1\2
2
BHADRAK
Chainage
LHS
RHS
KOLHA
BUILT UP
(RIGID)
LHS
SHINDOLO
BO
X C
EL
L
3\3
3
HP
CU
LV
ER
T
Appendix 2: Progress Chart of Structures
Appendix-2
S.
No.
Type of
CulvertRoad Section Chainage
Actual
Locations
Span
ArrangementExcavation PCC
Raft/Foundation/
Pipe Laying
Head
walls/WallsSlab
Return wall/
Retaining wall
Railing/Crash
Barrier/Parapet
Floor Pitching/
Stone PitchingRemarks
1 BOX SH-09 MS-1 0+015 0+003 1/23/0 Completed Completed Completed Completed Completed Not Started Not Started Not Started LHS box portion completed.
2 MINOR SH-09 MS-1 1+015 1+015 3/33/0 Completed Not Started
3 MINOR SH-09 MS-1 1+755 1+755 3/33/0 Completed
4 PIPE SH-09 MS-1 2+507 2+507 1X1.0M NA NA NA Not Started
5 SLAB SH-09 MS-1 2+865 2+865 1X3M
6 MINOR SH-09 MS-1 3+241 3+241 2X8M Not Started
7 MINOR SH-09 MS-1 3+862 3+846 3X8M Not Started
8 PIPE SH-09 MS-1 4+350 4+350 3X1.0M NA NA NA Not Started
9 PIPE SH-09 MS-1 4+935 4+940 3X1.0M NA NA NA Not Started
10 REHAB SH-09 MS-1 6+096 6+100 0 Not Started Not Started Not Started Not Started
11 PIPE SH-09 MS-1 6+448 6+453 3X1.0M NA NA NA Not Started
12 PIPE SH-09 MS-1 7+001 7+010 2X1.0M NA NA NA Not Started
13 PIPE SH-09 MS-1 7+927 7+953 1X1.0M NA NA NA Not Started
14 PIPE SH-09 MS-1 8+710 8+720 15X1.0M NA NA NA Not Started
15 BOX SH-09 MS-1 8+939 8+945 1/64/0 Not Started
16 PIPE SH-09 MS-1 9+027 9+027 2X1.0M NA NA NA Not Started
17 MINOR SH-09 MS-1 9+159 9+165 3/33/0 Not Started
18 REHAB SH-09 MS-1 9+245 9+255 0
19 BOX SH-09 MS-1 9+602 9+567 1/23/0 Not Started
20 BOX SH-09 MS-1 9+902 9+868 1/63/0 Not Started
21 BOX SH-09 MS-1 10+260 10+227 1/22/0 Not Started
22 BOX SH-09 MS-1 12+365 12+370 1/22/0 Not Started
23 BOX SH-09 MS-1 12+896 12+896 1/22/0 Not Started
24 BOX SH-09 MS-1 13+132 13+105 1/23/0 Not Started
25 MINOR SH-09 MS-1 13+646 13+620 3/33/0 Not Started
26 PIPE SH-09 MS-1 14+455 14+450 10X1.0M NA NA NA Not Started
27 BOX SH-09 MS-1 14+791 14+784 1/22/0 Not Started
28 BOX SH-09 MS-1 15+125 15+142 1/43/0 Not Started
29 BOX SH-09 MS-1 15+360 15+352 1/22/0 Not Started
30 BOX SH-09 MS-1 15+425 15+488 1/43/0 Not Started
31 BOX SH-09 MS-1 15+714 15+700 1/43/0 Not Started
32 BOX SH-09 MS-1 15+750 15+735 1/43/0 Not Started
33 BOX SH-09 MS-1 15+850 15+833 1/43/0 Not Started
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Not Started
Completed
Completed
Completed
Not Started
Completed
Completed
Completed
Completed
Bhadrak- Pirhat Road Project (SH 09) (Package P02A)
Status of Work
Completed
Completed
Completed
Completed
Completed
Completed
Not Started
Completed
Appendix-2
S.
No.
Type of
CulvertRoad Section Chainage
Actual
Locations
Span
ArrangementExcavation PCC
Raft/Foundation/
Pipe Laying
Head
walls/WallsSlab
Return wall/
Retaining wall
Railing/Crash
Barrier/Parapet
Floor Pitching/
Stone PitchingRemarks
Status of Work
34 PIPE SH-09 MS-1 16+509 16+503 10X1.0M NA NA NA Not Started
35 PIPE SH-09 MS-1 16+733 16+715 5X1.0M NA NA NA Not Started
36 PIPE SH-10 MS-1 17+050 17+050 5X1.0M NA NA NA Not Started
37 BOX SH-09 MS-1 17+060 17+060 1/22/0 Not Started
38 BOX SH-09 MS-1 17+648 17+648 1/22/0 Not Started
39 PIPE SH-09 MS-1 17+911 17+911 3X1.0M Not Started
40 BOX SH-09 MS-2 11+142 11+110 1/23/0 Completed Completed Not Started
41 BOX SH-09 MS-2 11+535 11+502 1/22/0 Not Started
42 PIPE SH-09 MS-2 18+195 18+177 5X1.0M Not Started
43 PIPE SH-09 MS-2 18+625 18+609 5X1.0M Not Started
44 PIPE SH-09 MS-2 19+096 19+079 5X1.0M Not Started
45 BOX SH-09 MS-2 19+367 19+350 1/33/0 Not Started
46 BOX SH-09 MS-2 19+888 19+870 1/33/0 Not Started
47 BOX SH-09 MS-2 20+144 20+127 1/22/0 Not Started
48 PIPE SH-09 MS-2 20+365 20+347 5X1.0M Not Started
49 PIPE SH-09 MS-2 20+691 20+673 5X1.0M Not Started
50 PIPE SH-09 MS-2 21+074 21+057 5X1.0M Not Started
51 PIPE SH-09 MS-2 21+235 21+218 5X1.0M Not Started
52 PIPE SH-09 MS-2 21+490 21+410 2X1.0M NA NA NA Not Started
53 BOX SH-09 MS-2 21+829 21+811 1/22/0 Not Started
54 PIPE SH-09 MS-2 22+285 22+285 1X1.0M Not Started
55 PIPE SH-09 MS-2 22+570 22+552 5X1.0M NA NA NA Not Started
56 PIPE SH-09 MS-2 22+860 22+860 1X1.0M Not Started
57 BOX SH-09 MS-2 23+240 23+223 1/43/0 Not Started
58 PIPE SH-09 MS-2 23+600 23+600 1X1.0M
59 BOX SH-09 MS-2 24+096 24+080 1/22/0 Not Started
60 BOX SH-09 MS-2 24+478 24+460 1/22/0 Not Started
61 BOX SH-09 MS-2 24+770 24+753 1/22/0 Not Started
62 MINOR SH-09 MS-2 25+249 25+231 3/33/0 Not Started
63 PIPE SH-09 MS-2 25+541 25+541 10X1.0M NA NA NA
64 PIPE SH-09 MS-2 25+550 25+690 5X1.0M NA NA NA Not Started
65 BOX SH-09 MS-2 26+430 26+550 1/22/0 Not Started
Completed
Completed
Completed
NA
Do
Completed
Completed
NA
NA
NA
Do
Do
Completed
Do
Completed
Completed
Do
Do NA
NA
Completed
Completed
Completed
Do
Completed
Completed
Do
Completed
NA
NA
NA
Do
Completed
Completed
Completed
Completed
Completed
Completed
NACompleted
NA
Dismentalling completed
Appendix 3: Important Correspondences during the month
S.
NO.DATE LETTER REFFERENCE NO. SUBJECT FROM
1 23.06.2018 PMU-WB-56/2013 (Vol-III) 27166 Hindrances during construction of Bhadrak-Chandbali Road (SH-09-P02A) OWD
2 23.06.2018 PMU-WB-56/2013 (Vol-III) 27168Clearance of hindrances in PO2A (Bhadrak to Pirahat) and Duhuria to
Chandbali P04B (Chandbali portion ) under OSRP (WB)OWD
3 22.06.2018 PMU-WB-06/2017 -26993 Approval of Steel from M/S Rashmi Metalliks Ltd. OWD
APPENDIX-3
“Widening of Strengthening of Existing Carriage Way to 2 lane road from Bhadrak to Pirhat
(Km. 0/000 to Km. 27/500 of SH-09) (Balance Works) OSRP-CW-P02A
CORRESPONDENCE FOR THE MONTH OF JUNE, 2018
S.
NO.DATE LETTER REFFERENCE NO. SUBJECT TO
1 05.06.2018 LASA/RE-P02A/73466/2017/147Submission of Monthly Progress Report for the month of May'2018
(P02A)OWD
2 05.06.2018 LASA/RE-P02A/73466/2017/148Submission of Quarterly Progress Report for the period of April'2018
to June'2018 (P02A)OWD
3 22.06.2018 LASA/RE-P02A/73466/2017/152 Reg.- Deviation Statement for Completion of the Work (P02A) OWD
APPENDIX-3
“Widening of Strengthening of Existing Carriage Way to 2 lane road from Bhadrak to Pirhat
(Km. 0/000 to Km. 27/500 of SH-09) (Balance Works) OSRP-CW-P02A
CORRESPONDENCE FOR THE MONTH OF JUNE, 2018
Appendix 4: Status of Utilities and Encumbrances
1 00+000 01+000 Bhadrak by pass 2 12 1 1
2 01+000 02+000 Sarkarnagar
3 02+000 03+000 Haldidiha bypass
4 03+000 04+000 Haldidiha bypass
5 04+000 05+000
6 05+000 06+000
7 06+000 07+000 Ichhapur
8 07+000 08+000
9 08+000 09+000
10 09+000 10+000 Dolasahi 2 1
11 10+000 11+000 Alinagar
12 11+000 12+000 Alinagar
13 12+000 13+000 Alinagar 1
14 13+000 14+000
15 14+000 15+000
16 15+000 16+000
17 16+000 17+000
18 17+000 18+000 Tihidi
19 18+000 19+000 Tihidi
20 19+000 20+000
21 20+000 21+000 Kamaria
22 21+000 22+000 Kamaria
23 22+000 23+000
24 23+000 24+000 Sindol
25 24+000 25+000 Bindha
26 25+000 26+000 Bindha
27 26+000 27+500 Pirhat 1
4 13 3 1
SUMMARY OF ENCUMBRANCES - P02A as on 30.06.2018
Total =
Encumbrances (in number)
TreeS. No.
Chainage
Name of VillageFrom To EP R&R RWSS
Name of Work :- Bhadrak-Pirahat Road (Km. 0/000 to Km. 27/500 of SH-09, Balance works)
Package No.- OSRP-CW-ICB-P02A
Sound Unsound
1 0+120 RHS 8.40 Tree 350 √
2 0+152 RHS 8.40 Tree 430 √
3 9+823 RHS 4.31 Tree 100 √
4 9+827 RHS 5.18 Tree 100 √
4
Trees - P02A as on 30.06.2018
Total Nos.=
Condition
RemarksSpeciesGirth
(Cm)
Height
(m)
If marked
mention
Ýes'
If
unmarked
mention
No.
S.
No.Village Chainage Side
Offset
from C/L
(m)
Dolasahi
Salandi Bypass
Name of Work :- Bhadrak-Pirahat Road (Km. 0/0 to Km. 27/500 of SH-09, Balance works)
Package No.- OSRP-CW-ICB-P02A
S. No. Name of VillageChainage
(in Km)
Side
(LHS/RHS)
Offset from
PCL (m)
Electric Pole
(Active/Dead)
Description of
EncumbrancesRemarks
1 0+013 LHS 8.20 1 Electric Pole
2 0+050 LHS 8.25 1 Electric Pole
3 0+132 LHS 7.64 1 Electric Pole
4 0+154 LHS 8.40 1 Electric Pole
5 0+177 LHS 7.98 1 Electric Pole
6 0+206 LHS 8.40 1 Electric Pole
7 0+230 LHS 8.60 1 Electric Pole
8 0+254 LHS 8.60 1 Electric Pole
9 0+305 LHS 7.80 1 Electric Pole
10 0+360 LHS 8.40 1 Double Electric Pole
11 0+560 RHS 8.40 1 Electric Pole
12 0+620 RHS 7.30 1 Electric Pole
13 Pirhat 26+740 RHS 5.90 1Transformer with concrete
base
Total 13
Electric Poles - P02A as on 30.06.2018
Salandi Bypass
Name of Work :- Bhadrak-Pirahat Road (Km. 0/0 to Km. 27/500 of SH-09, Balance works)
Package No.- OSRP-CW-ICB-P02A
Required for Four laning
From To
1 0+130 0+148 RHS 9.30 to 8.00 1 Temporary Shops
2 9+810 9.9 RHS 4.30 1 Land Problem
3 12+410 12.44 LHS 0.00 to 6.50 1 Land Problem
Land owner
(Binod Barik, S/o- Prabir Barik,
Plot No-420, Mouza-
Haladharbinda, Khata No-79)
Total 3
R&R - P02A as on 30.06.2018
S.
No.Name of Village
Chainage Side
LHS/RHS
Offset from
PCL (m)
No. of
R&R
Description of
EncumbrancesRemarks
Salandi Bypass
Name of Work :- Bhadrak-Pirahat Road (Km. 0/0 to Km. 27/500 of SH-09, Balance works)
Package No.- OSRP-CW-ICB-P02A
From To
1 Salandi Bypass 0+020 0+035 RHS 5.00 1Underground water Supply
Pipe Line
Total 1
RWSS - P02A as on 30.06.2018
RemarksS.
No.
Name of
Village
ChainageSide
LHS/RHS
Offset from
PCL (m)
No. of
RWSS
Description of
Encumbrances
Bhadrak-Pirahat Road (Km. 0/0 to Km. 27/500 of SH-09, Balance works)
Package No.- OSRP-CW-ICB-P02AName of Work :-